๐Ÿ“ˆ On
โšก
Sanction Cost Weighted mode. Each district's category weight is auto-computed from its own sanction amount proportions. Two units with identical category counts may have different weight distributions.
KHANDWA
9.54
๐Ÿฅ‡
Completed3008 Started9481 Rank#1
NEEMUCH
9.30
๐Ÿฅˆ
Completed951 Started3283 Rank#2
BARWANI
9.00
๐Ÿฅ‰
Completed212 Started5663 Rank#3
๐Ÿ“‹ Category Scorecard โ€” District Level
52 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
# District Total ๐Ÿ“ˆ Trajectory
raw achievement %
Farm Pondโ–ถ Amrit Sarowarโ–ถ Dug Well Rechargeโ–ถ Irrigation infrastructureโ–ถ Water conservation & rechargeโ–ถ Watershed Related Worksโ–ถ Repair & Maintenance (Water Structures)โ–ถ Gap Filling in Plantationโ–ถ Work Not Permissible in VB-GRAM-Gโ–ถ PMKSY: Watershedโ–ถ JSJB 2.0โ–ถ
๐Ÿฅ‡ KHANDWA โ†— 9.54 A
30.0% 8.66
CategoryFarm Pond
Started / Completed / Phys1,953 / 531 / 899
⚠ Works needing verification (Completed/Physically Completed)523 works (exp <30%)
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.66 / 10
4.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys25 / 3 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.1% 9.93
CategoryDug Well Recharge
Started / Completed / Phys6,136 / 2,180 / 3,870
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
1.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 13 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys711 / 177 / 534
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys173 / 44 / 129
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 14 / 52
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.8% 9.46
CategoryGap Filling in Plantation
Started / Completed / Phys65 / 13 / 45
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate89.2%
Part A score (max 5.0)4.46 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.46 / 10
13.5% 9.75
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys319 / 33 / 270
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.75 / 10
0.4% 9.27
CategoryPMKSY: Watershed
PMKSY Works0 total  (84 done / -84 ongoing)
JGSA Target0.50 Cr
JGSA Valuation0.50 Cr
Expenditure0.37 Cr
% Valuation100.0%
Val Marks (20%)2.00
Exp Marks (20%)1.47
Claim Marks (25%)2.40
Bill Progress1.094
Bill Marks (25%)2.40
Geotag Marks (5%)0.500
Physical Marks (5%)0.50
Final score9.27 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works452,624
Target Works9,128
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
๐Ÿฅˆ NEEMUCH โ†— 9.30 A
28.4% 9.97
CategoryFarm Pond
Started / Completed / Phys683 / 76 / 603
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.97 / 10
3.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.6% 9.96
CategoryDug Well Recharge
Started / Completed / Phys1,915 / 800 / 1,099
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.96 / 10
2.2% 9.00
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 4 / 28
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)95.6%
Part B score (max 5.0)4.78 / 5.0
Final score9.00 / 10
23.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys318 / 27 / 291
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 3 / 34
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.6% 9.63
CategoryGap Filling in Plantation
Started / Completed / Phys174 / 31 / 130
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.63 / 10
11.4% 5.12
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys99 / 9 / 87
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.08Cr / 0.00Cr
Expenditure rate (ongoing)5.4%
Part B score (max 5.0)0.27 / 5.0
Final score5.12 / 10
10.1% 9.11
CategoryPMKSY: Watershed
PMKSY Works0 total  (20 done / -20 ongoing)
JGSA Target6.58 Cr
JGSA Valuation6.58 Cr
Expenditure3.97 Cr
% Valuation100.0%
Val Marks (20%)2.00
Exp Marks (20%)1.21
Claim Marks (25%)2.48
Bill Progress2.561
Bill Marks (25%)2.42
Geotag Marks (5%)0.500
Physical Marks (5%)0.50
Final score9.11 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works5,535
Target Works3,010
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
๐Ÿฅ‰ BARWANI โ†— 9.00 A
19.0% 9.98
CategoryFarm Pond
Started / Completed / Phys1,125 / 50 / 1,071
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
0.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.8% 9.99
CategoryDug Well Recharge
Started / Completed / Phys3,017 / 58 / 2,951
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate99.7%
Part A score (max 5.0)4.99 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.99 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 4 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys543 / 57 / 486
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys148 / 26 / 122
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 6 / 27
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.6% 6.19
CategoryGap Filling in Plantation
Started / Completed / Phys472 / 6 / 446
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score6.19 / 10
11.1% 6.63
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys313 / 5 / 304
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.7%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.11Cr / 0.04Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score6.63 / 10
6.1% 9.57
CategoryPMKSY: Watershed
PMKSY Works0 total  (85 done / -85 ongoing)
JGSA Target5.32 Cr
JGSA Valuation5.32 Cr
Expenditure4.75 Cr
% Valuation100.0%
Val Marks (20%)2.00
Exp Marks (20%)1.79
Claim Marks (25%)2.41
Bill Progress3.324
Bill Marks (25%)2.38
Geotag Marks (5%)0.500
Physical Marks (5%)0.50
Final score9.57 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works72,827
Target Works4,878
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
4 UJJAIN โ†— 8.56 A
28.9% 9.93
CategoryFarm Pond
Started / Completed / Phys618 / 187 / 422
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate98.5%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
9.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys17 / 0 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.8% 9.96
CategoryDug Well Recharge
Started / Completed / Phys2,815 / 1,334 / 1,461
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate99.3%
Part A score (max 5.0)4.96 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.96 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys180 / 74 / 106
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys57 / 47 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.6% 3.49
CategoryGap Filling in Plantation
Started / Completed / Phys226 / 38 / 85
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate54.4%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked2.32Cr / 0.35Cr
Expenditure rate (ongoing)15.3%
Part B score (max 5.0)0.76 / 5.0
Final score3.49 / 10
11.9% 3.90
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys90 / 14 / 49
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked1.34Cr / 0.11Cr
Expenditure rate (ongoing)7.9%
Part B score (max 5.0)0.40 / 5.0
Final score3.90 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works4,552
Target Works3,701
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
5 BALAGHAT โ†— 7.50 B
52.0% 6.39
CategoryFarm Pond
Started / Completed / Phys4,473 / 2,073 / 2,360
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate99.1%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked1.15Cr / 0.33Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score6.39 / 10
2.2% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys23 / 0 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 9.97
CategoryDug Well Recharge
Started / Completed / Phys1,391 / 716 / 666
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.97 / 10
0.3% 9.71
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 5 / 11
Completion rate94.1%
Part A score (max 5.0)4.71 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.71 / 10
31.8% 8.75
CategoryWater conservation & recharge
Started / Completed / Phys1,736 / 397 / 1,331
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.67Cr / 0.50Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score8.75 / 10
1.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys68 / 32 / 36
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 22 / 18
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 4.38
CategoryGap Filling in Plantation
Started / Completed / Phys79 / 7 / 32
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked0.91Cr / 0.35Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score4.38 / 10
3.7% 5.99
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys318 / 93 / 173
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked1.36Cr / 0.49Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.99 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works8,469
Target Works7,749
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
6 KHARGONE โ†— 7.44 B
18.4% 5.46
CategoryFarm Pond
Started / Completed / Phys1,778 / 503 / 1,213
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate96.5%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.76Cr / 0.10Cr
Expenditure rate (ongoing)12.8%
Part B score (max 5.0)0.64 / 5.0
Final score5.46 / 10
4.0% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys28 / 2 / 26
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.5% 5.99
CategoryDug Well Recharge
Started / Completed / Phys3,842 / 1,001 / 2,772
⚠ Works needing verification (Completed/Physically Completed)65 works (exp <30%)
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score5.99 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 8 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
47.0% 8.72
CategoryWater conservation & recharge
Started / Completed / Phys1,300 / 282 / 999
Completion rate98.5%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked2.67Cr / 2.03Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score8.72 / 10
2.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys78 / 21 / 57
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 23 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.4% 2.96
CategoryGap Filling in Plantation
Started / Completed / Phys556 / 39 / 241
⚠ Works needing verification (Completed/Physically Completed)139 works (exp <30%)
Completion rate50.4%
Part A score (max 5.0)2.52 / 5.0
Ongoing sanction / booked2.64Cr / 0.23Cr
Expenditure rate (ongoing)8.8%
Part B score (max 5.0)0.44 / 5.0
Final score2.96 / 10
6.2% 5.08
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys710 / 170 / 376
⚠ Works needing verification (Completed/Physically Completed)67 works (exp <30%)
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked2.33Cr / 0.58Cr
Expenditure rate (ongoing)24.7%
Part B score (max 5.0)1.24 / 5.0
Final score5.08 / 10
0.5% 8.87
CategoryPMKSY: Watershed
PMKSY Works0 total  (30 done / -30 ongoing)
JGSA Target0.83 Cr
JGSA Valuation0.83 Cr
Expenditure0.44 Cr
% Valuation100.0%
Val Marks (20%)2.00
Exp Marks (20%)1.06
Claim Marks (25%)2.41
Bill Progress1.259
Bill Marks (25%)2.41
Geotag Marks (5%)0.500
Physical Marks (5%)0.50
Final score8.87 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works10,382
Target Works7,086
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
7 GUNA โ†— 7.21 B
25.7% 6.27
CategoryFarm Pond
Started / Completed / Phys1,312 / 533 / 676
⚠ Works needing verification (Completed/Physically Completed)49 works (exp <30%)
Completion rate92.1%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked1.64Cr / 0.55Cr
Expenditure rate (ongoing)33.3%
Part B score (max 5.0)1.67 / 5.0
Final score6.27 / 10
โ€”
3.7% 9.79
CategoryDug Well Recharge
Started / Completed / Phys2,152 / 959 / 1,102
⚠ Works needing verification (Completed/Physically Completed)91 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.79 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.9% 7.95
CategoryWater conservation & recharge
Started / Completed / Phys859 / 192 / 642
Completion rate97.1%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked2.35Cr / 1.46Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score7.95 / 10
1.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys41 / 19 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 7.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys59 / 18 / 39
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.23Cr / 0.13Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score7.51 / 10
6.9% 3.82
CategoryGap Filling in Plantation
Started / Completed / Phys283 / 18 / 98
⚠ Works needing verification (Completed/Physically Completed)60 works (exp <30%)
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked4.23Cr / 1.50Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score3.82 / 10
11.8% 6.19
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys409 / 59 / 255
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate76.8%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.56Cr / 0.26Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.35 / 5.0
Final score6.19 / 10
3.3% 7.35
CategoryPMKSY: Watershed
PMKSY Works0 total  (52 done / -52 ongoing)
JGSA Target4.98 Cr
JGSA Valuation3.01 Cr
Expenditure1.11 Cr
% Valuation60.5%
Val Marks (20%)1.21
Exp Marks (20%)0.45
Claim Marks (25%)2.36
Bill Progress0.085
Bill Marks (25%)2.36
Geotag Marks (5%)0.490
Physical Marks (5%)0.48
Final score7.35 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works50,434
Target Works4,430
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
8 RAJGARH โ†— 7.20 B
19.2% 5.99
CategoryFarm Pond
Started / Completed / Phys2,250 / 1,447 / 525
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate87.6%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked4.46Cr / 1.43Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score5.99 / 10
0.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.7% 7.62
CategoryDug Well Recharge
Started / Completed / Phys3,687 / 2,747 / 854
⚠ Works needing verification (Completed/Physically Completed)63 works (exp <30%)
Completion rate97.7%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score7.62 / 10
1.1% 7.12
CategoryIrrigation infrastructure
Started / Completed / Phys49 / 5 / 29
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked0.87Cr / 0.63Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score7.12 / 10
46.7% 8.08
CategoryWater conservation & recharge
Started / Completed / Phys1,193 / 203 / 835
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked17.50Cr / 13.06Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score8.08 / 10
1.1% 8.00
CategoryWatershed Related Works
Started / Completed / Phys67 / 17 / 45
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.40Cr / 0.27Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score8.00 / 10
8.6% 7.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys269 / 20 / 197
Completion rate80.7%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked4.53Cr / 3.48Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score7.87 / 10
1.7% 2.08
CategoryGap Filling in Plantation
Started / Completed / Phys231 / 0 / 31
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate13.4%
Part A score (max 5.0)0.67 / 5.0
Ongoing sanction / booked3.43Cr / 0.97Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score2.08 / 10
10.8% 4.20
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys558 / 14 / 273
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked10.05Cr / 3.27Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score4.20 / 10
1.7% 7.09
CategoryPMKSY: Watershed
PMKSY Works0 total  (33 done / -33 ongoing)
JGSA Target4.36 Cr
JGSA Valuation2.92 Cr
Expenditure0.94 Cr
% Valuation67.1%
Val Marks (20%)1.34
Exp Marks (20%)0.43
Claim Marks (25%)2.42
Bill Progress1.075
Bill Marks (25%)2.22
Geotag Marks (5%)0.490
Physical Marks (5%)0.18
Final score7.09 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works200,491
Target Works7,518
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
9 SHAHDOL โ†— 7.10 B
33.6% 4.93
CategoryFarm Pond
Started / Completed / Phys2,681 / 772 / 1,358
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked13.45Cr / 2.58Cr
Expenditure rate (ongoing)19.2%
Part B score (max 5.0)0.96 / 5.0
Final score4.93 / 10
1.0% 2.56
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.94Cr / 0.72Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score2.56 / 10
0.7% 5.87
CategoryDug Well Recharge
Started / Completed / Phys588 / 124 / 400
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate89.1%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.12Cr / 0.04Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.42 / 5.0
Final score5.87 / 10
6.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 8 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.7% 8.46
CategoryWater conservation & recharge
Started / Completed / Phys1,041 / 133 / 853
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked9.03Cr / 6.72Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score8.46 / 10
9.8% 9.00
CategoryWatershed Related Works
Started / Completed / Phys229 / 23 / 203
Completion rate98.7%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.59Cr / 0.52Cr
Expenditure rate (ongoing)88.1%
Part B score (max 5.0)4.40 / 5.0
Final score9.00 / 10
3.1% 7.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys105 / 30 / 72
Completion rate97.1%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.39Cr / 0.21Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score7.52 / 10
1.4% 3.25
CategoryGap Filling in Plantation
Started / Completed / Phys93 / 1 / 38
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate41.9%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked0.82Cr / 0.19Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score3.25 / 10
8.5% 5.85
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys699 / 33 / 498
⚠ Works needing verification (Completed/Physically Completed)54 works (exp <30%)
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked3.57Cr / 1.47Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.05 / 5.0
Final score5.85 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works239,529
Target Works4,685
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
10 DATIA โ†— 6.98 C
22.1% 5.73
CategoryFarm Pond
Started / Completed / Phys711 / 422 / 242
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate93.4%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.91Cr / 0.19Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.06 / 5.0
Final score5.73 / 10
0.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.1% 9.99
CategoryDug Well Recharge
Started / Completed / Phys562 / 323 / 238
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.8%
Part A score (max 5.0)4.99 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.99 / 10
1.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys28 / 14 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
29.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys381 / 120 / 261
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys61 / 20 / 41
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 13 / 35
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.5% 2.35
CategoryGap Filling in Plantation
Started / Completed / Phys403 / 35 / 96
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate32.5%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked5.50Cr / 0.80Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.72 / 5.0
Final score2.35 / 10
20.2% 4.07
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys241 / 43 / 89
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked8.59Cr / 2.29Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.33 / 5.0
Final score4.07 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works2,966
Target Works1,792
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
11 ASHOK NAGAR โ†— 6.89 C
36.2% 5.26
CategoryFarm Pond
Started / Completed / Phys1,604 / 404 / 1,004
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate87.8%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked5.65Cr / 0.98Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.87 / 5.0
Final score5.26 / 10
1.6% 6.21
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.64Cr / 0.37Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score6.21 / 10
1.0% 5.22
CategoryDug Well Recharge
Started / Completed / Phys521 / 281 / 210
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate94.2%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)10.1%
Part B score (max 5.0)0.51 / 5.0
Final score5.22 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.1% 8.40
CategoryWater conservation & recharge
Started / Completed / Phys938 / 242 / 658
Completion rate95.9%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked1.98Cr / 1.42Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score8.40 / 10
2.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys39 / 15 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 5 / 27
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.8% 1.25
CategoryGap Filling in Plantation
Started / Completed / Phys197 / 4 / 16
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate10.2%
Part A score (max 5.0)0.51 / 5.0
Ongoing sanction / booked3.06Cr / 0.45Cr
Expenditure rate (ongoing)14.8%
Part B score (max 5.0)0.74 / 5.0
Final score1.25 / 10
9.2% 5.91
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys1,310 / 413 / 710
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked4.42Cr / 1.43Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score5.91 / 10
4.4% 7.64
CategoryPMKSY: Watershed
PMKSY Works0 total  (9 done / -9 ongoing)
JGSA Target5.91 Cr
JGSA Valuation4.55 Cr
Expenditure0.75 Cr
% Valuation77.0%
Val Marks (20%)1.54
Exp Marks (20%)0.26
Claim Marks (25%)2.45
Bill Progress0.853
Bill Marks (25%)2.44
Geotag Marks (5%)0.460
Physical Marks (5%)0.50
Final score7.64 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works16,106
Target Works3,146
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
12 CHHINDWARA โ†— 6.82 C
21.8% 7.02
CategoryFarm Pond
Started / Completed / Phys2,462 / 896 / 1,131
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate82.3%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked10.63Cr / 6.17Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.90 / 5.0
Final score7.02 / 10
2.7% 1.60
CategoryAmrit Sarowar
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked7.27Cr / 2.32Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.60 / 5.0
Final score1.60 / 10
3.9% 6.49
CategoryDug Well Recharge
Started / Completed / Phys4,162 / 1,163 / 2,784
⚠ Works needing verification (Completed/Physically Completed)63 works (exp <30%)
Completion rate94.8%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.39Cr / 0.14Cr
Expenditure rate (ongoing)35.0%
Part B score (max 5.0)1.75 / 5.0
Final score6.49 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys23 / 8 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.1% 7.87
CategoryWater conservation & recharge
Started / Completed / Phys1,242 / 286 / 653
Completion rate75.6%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked38.77Cr / 31.72Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score7.87 / 10
8.1% 8.02
CategoryWatershed Related Works
Started / Completed / Phys314 / 104 / 169
Completion rate86.9%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked2.81Cr / 2.07Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score8.02 / 10
1.8% 8.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys61 / 17 / 38
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.64Cr / 0.54Cr
Expenditure rate (ongoing)84.5%
Part B score (max 5.0)4.23 / 5.0
Final score8.74 / 10
5.4% 4.01
CategoryGap Filling in Plantation
Started / Completed / Phys480 / 39 / 134
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked8.55Cr / 3.77Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.20 / 5.0
Final score4.01 / 10
12.3% 5.23
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys636 / 99 / 275
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate58.8%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked14.10Cr / 6.46Cr
Expenditure rate (ongoing)45.8%
Part B score (max 5.0)2.29 / 5.0
Final score5.23 / 10
3.3% 6.23
CategoryPMKSY: Watershed
PMKSY Works0 total  (181 done / -181 ongoing)
JGSA Target9.01 Cr
JGSA Valuation2.18 Cr
Expenditure2.43 Cr
% Valuation24.2%
Val Marks (20%)0.48
Exp Marks (20%)0.54
Claim Marks (25%)2.36
Bill Progress1.750
Bill Marks (25%)2.06
Geotag Marks (5%)0.460
Physical Marks (5%)0.34
Final score6.23 / 10
5.0% 5.79
CategoryJSJB 2.0
Total Works4,798
Target Works8,284
Achievement %57.9%
Weightage5% of composite score
Final score5.79 / 10
13 ALIRAJPUR โ†— 6.70 C
11.7% 5.37
CategoryFarm Pond
Started / Completed / Phys1,007 / 38 / 716
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate74.9%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked6.78Cr / 2.21Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score5.37 / 10
2.2% 6.08
CategoryAmrit Sarowar
Started / Completed / Phys16 / 0 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked2.25Cr / 1.61Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score6.08 / 10
4.3% 6.47
CategoryDug Well Recharge
Started / Completed / Phys3,282 / 153 / 2,843
⚠ Works needing verification (Completed/Physically Completed)60 works (exp <30%)
Completion rate91.3%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.59Cr / 0.22Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.90 / 5.0
Final score6.47 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
65.7% 7.04
CategoryWater conservation & recharge
Started / Completed / Phys838 / 44 / 431
Completion rate56.7%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked70.85Cr / 59.64Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score7.04 / 10
1.6% 8.03
CategoryWatershed Related Works
Started / Completed / Phys74 / 6 / 61
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.25Cr / 0.18Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score8.03 / 10
1.0% 7.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 1 / 17
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.72Cr / 0.57Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score7.41 / 10
4.0% 1.81
CategoryGap Filling in Plantation
Started / Completed / Phys296 / 9 / 41
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate16.9%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked6.79Cr / 1.30Cr
Expenditure rate (ongoing)19.2%
Part B score (max 5.0)0.96 / 5.0
Final score1.81 / 10
2.7% 4.63
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys203 / 16 / 81
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate47.8%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked3.05Cr / 1.36Cr
Expenditure rate (ongoing)44.8%
Part B score (max 5.0)2.24 / 5.0
Final score4.63 / 10
1.8% 7.29
CategoryPMKSY: Watershed
PMKSY Works0 total  (0 done / 0 ongoing)
JGSA Target3.49 Cr
JGSA Valuation2.15 Cr
Expenditure1.86 Cr
% Valuation61.6%
Val Marks (20%)1.23
Exp Marks (20%)1.07
Claim Marks (25%)2.38
Bill Progress0.483
Bill Marks (25%)1.71
Geotag Marks (5%)0.490
Physical Marks (5%)0.41
Final score7.29 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works5,563
Target Works5,245
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
14 DHAR โ†— 6.70 C
9.9% 5.11
CategoryFarm Pond
Started / Completed / Phys2,877 / 500 / 1,306
⚠ Works needing verification (Completed/Physically Completed)81 works (exp <30%)
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked19.77Cr / 7.78Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.97 / 5.0
Final score5.11 / 10
0.0% 3.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score3.02 / 10
2.3% 5.33
CategoryDug Well Recharge
Started / Completed / Phys4,476 / 1,201 / 1,916
⚠ Works needing verification (Completed/Physically Completed)523 works (exp <30%)
Completion rate69.6%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked2.17Cr / 0.80Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score5.33 / 10
0.4% 5.84
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 3 / 11
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.85Cr / 0.50Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score5.84 / 10
54.7% 7.77
CategoryWater conservation & recharge
Started / Completed / Phys2,551 / 229 / 1,646
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked96.22Cr / 78.79Cr
Expenditure rate (ongoing)81.9%
Part B score (max 5.0)4.09 / 5.0
Final score7.77 / 10
5.8% 7.12
CategoryWatershed Related Works
Started / Completed / Phys664 / 64 / 420
Completion rate72.9%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked6.70Cr / 4.66Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score7.12 / 10
1.7% 7.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys147 / 8 / 105
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked2.46Cr / 1.71Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score7.31 / 10
8.8% 3.16
CategoryGap Filling in Plantation
Started / Completed / Phys885 / 9 / 142
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate17.1%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked34.46Cr / 15.88Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.30 / 5.0
Final score3.16 / 10
11.0% 4.16
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys2,157 / 419 / 984
⚠ Works needing verification (Completed/Physically Completed)312 works (exp <30%)
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked12.74Cr / 2.31Cr
Expenditure rate (ongoing)18.1%
Part B score (max 5.0)0.91 / 5.0
Final score4.16 / 10
0.4% 7.61
CategoryPMKSY: Watershed
PMKSY Works0 total  (5 done / -5 ongoing)
JGSA Target1.78 Cr
JGSA Valuation0.95 Cr
Expenditure1.11 Cr
% Valuation53.5%
Val Marks (20%)1.07
Exp Marks (20%)1.24
Claim Marks (25%)2.23
Bill Progress1.165
Bill Marks (25%)2.08
Geotag Marks (5%)0.500
Physical Marks (5%)0.48
Final score7.61 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works26,364
Target Works10,743
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
15 BETUL โ†— 6.69 C
18.4% 5.80
CategoryFarm Pond
Started / Completed / Phys1,713 / 94 / 1,171
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked13.68Cr / 5.78Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score5.80 / 10
2.8% 2.91
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.97Cr / 4.05Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score2.91 / 10
4.3% 6.68
CategoryDug Well Recharge
Started / Completed / Phys4,167 / 728 / 3,220
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.54Cr / 0.21Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.68 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
53.2% 7.41
CategoryWater conservation & recharge
Started / Completed / Phys1,915 / 178 / 1,324
Completion rate78.4%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked32.12Cr / 22.41Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.41 / 10
2.8% 7.76
CategoryWatershed Related Works
Started / Completed / Phys150 / 41 / 87
Completion rate85.3%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked1.05Cr / 0.74Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.50 / 5.0
Final score7.76 / 10
2.8% 7.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys169 / 23 / 112
Completion rate79.9%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.22Cr / 0.83Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.39 / 5.0
Final score7.39 / 10
5.4% 2.41
CategoryGap Filling in Plantation
Started / Completed / Phys444 / 1 / 59
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked11.60Cr / 4.02Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score2.41 / 10
5.3% 4.80
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys464 / 51 / 217
⚠ Works needing verification (Completed/Physically Completed)42 works (exp <30%)
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked5.31Cr / 2.03Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score4.80 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works32,227
Target Works8,146
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
16 MANDLA โ†— 6.68 C
31.3% 6.55
CategoryFarm Pond
Started / Completed / Phys2,018 / 1,425 / 343
Completion rate87.6%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked10.39Cr / 4.50Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.17 / 5.0
Final score6.55 / 10
4.0% 2.04
CategoryAmrit Sarowar
Started / Completed / Phys26 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.15Cr / 4.14Cr
Expenditure rate (ongoing)40.8%
Part B score (max 5.0)2.04 / 5.0
Final score2.04 / 10
1.7% 5.92
CategoryDug Well Recharge
Started / Completed / Phys1,647 / 835 / 612
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate87.9%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.37Cr / 0.11Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.52 / 5.0
Final score5.92 / 10
5.1% 7.60
CategoryIrrigation infrastructure
Started / Completed / Phys40 / 19 / 17
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked2.52Cr / 1.56Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score7.60 / 10
24.4% 7.88
CategoryWater conservation & recharge
Started / Completed / Phys971 / 489 / 305
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked18.69Cr / 14.19Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score7.88 / 10
3.1% 7.93
CategoryWatershed Related Works
Started / Completed / Phys192 / 123 / 51
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.82Cr / 0.56Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score7.93 / 10
2.2% 7.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 21 / 34
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.53Cr / 0.35Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score7.48 / 10
4.4% 2.62
CategoryGap Filling in Plantation
Started / Completed / Phys355 / 37 / 29
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate18.6%
Part A score (max 5.0)0.93 / 5.0
Ongoing sanction / booked9.42Cr / 3.19Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score2.62 / 10
14.4% 5.70
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys1,145 / 388 / 497
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked14.25Cr / 5.22Cr
Expenditure rate (ongoing)36.6%
Part B score (max 5.0)1.83 / 5.0
Final score5.70 / 10
4.6% 6.64
CategoryPMKSY: Watershed
PMKSY Works0 total  (98 done / -98 ongoing)
JGSA Target11.77 Cr
JGSA Valuation4.49 Cr
Expenditure1.63 Cr
% Valuation38.1%
Val Marks (20%)0.76
Exp Marks (20%)0.28
Claim Marks (25%)2.39
Bill Progress5.282
Bill Marks (25%)2.35
Geotag Marks (5%)0.470
Physical Marks (5%)0.40
Final score6.64 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works6,540
Target Works4,961
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
17 DINDORI โ†— 6.67 C
28.5% 5.76
CategoryFarm Pond
Started / Completed / Phys2,264 / 861 / 1,327
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked1.51Cr / 0.28Cr
Expenditure rate (ongoing)18.6%
Part B score (max 5.0)0.93 / 5.0
Final score5.76 / 10
0.5% 3.78
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score3.78 / 10
1.7% 4.76
CategoryDug Well Recharge
Started / Completed / Phys1,448 / 639 / 718
⚠ Works needing verification (Completed/Physically Completed)87 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)1.5%
Part B score (max 5.0)0.08 / 5.0
Final score4.76 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.3% 8.33
CategoryWater conservation & recharge
Started / Completed / Phys640 / 110 / 484
Completion rate92.8%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked6.81Cr / 5.03Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score8.33 / 10
13.7% 7.37
CategoryWatershed Related Works
Started / Completed / Phys324 / 140 / 182
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.40 / 5.0
Final score7.37 / 10
3.3% 7.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys85 / 24 / 45
Completion rate81.2%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked1.66Cr / 1.30Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score7.98 / 10
2.4% 2.23
CategoryGap Filling in Plantation
Started / Completed / Phys184 / 13 / 26
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked4.03Cr / 0.94Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score2.23 / 10
15.5% 4.81
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys656 / 121 / 323
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate67.7%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked8.29Cr / 2.37Cr
Expenditure rate (ongoing)28.5%
Part B score (max 5.0)1.43 / 5.0
Final score4.81 / 10
4.5% 6.04
CategoryPMKSY: Watershed
PMKSY Works0 total  (44 done / -44 ongoing)
JGSA Target10.28 Cr
JGSA Valuation2.74 Cr
Expenditure2.14 Cr
% Valuation26.6%
Val Marks (20%)0.53
Exp Marks (20%)0.42
Claim Marks (25%)2.27
Bill Progress0.157
Bill Marks (25%)2.23
Geotag Marks (5%)0.470
Physical Marks (5%)0.12
Final score6.04 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works827,675
Target Works4,791
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
18 RAISEN โ†— 6.64 C
50.2% 5.77
CategoryFarm Pond
Started / Completed / Phys2,287 / 1,051 / 1,168
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked1.19Cr / 0.22Cr
Expenditure rate (ongoing)18.4%
Part B score (max 5.0)0.92 / 5.0
Final score5.77 / 10
2.1% 6.30
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 8
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.32Cr / 0.17Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score6.30 / 10
4.7% 9.98
CategoryDug Well Recharge
Started / Completed / Phys1,659 / 1,122 / 529
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.8% 8.11
CategoryWater conservation & recharge
Started / Completed / Phys249 / 82 / 146
Completion rate91.6%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked2.97Cr / 2.09Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score8.11 / 10
1.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.0% 1.90
CategoryGap Filling in Plantation
Started / Completed / Phys130 / 4 / 23
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate20.8%
Part A score (max 5.0)1.04 / 5.0
Ongoing sanction / booked3.76Cr / 0.65Cr
Expenditure rate (ongoing)17.2%
Part B score (max 5.0)0.86 / 5.0
Final score1.90 / 10
6.5% 5.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys337 / 168 / 127
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.97Cr / 0.12Cr
Expenditure rate (ongoing)12.4%
Part B score (max 5.0)0.62 / 5.0
Final score5.00 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works40,226
Target Works4,238
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
19 RATLAM โ†— 6.57 C
28.4% 5.25
CategoryFarm Pond
Started / Completed / Phys1,271 / 468 / 638
⚠ Works needing verification (Completed/Physically Completed)28 works (exp <30%)
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked3.73Cr / 0.67Cr
Expenditure rate (ongoing)18.0%
Part B score (max 5.0)0.90 / 5.0
Final score5.25 / 10
3.5% 6.03
CategoryAmrit Sarowar
Started / Completed / Phys15 / 1 / 8
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.45Cr / 0.88Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.03 / 10
7.6% 5.53
CategoryDug Well Recharge
Started / Completed / Phys3,074 / 895 / 2,024
⚠ Works needing verification (Completed/Physically Completed)130 works (exp <30%)
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)15.7%
Part B score (max 5.0)0.78 / 5.0
Final score5.53 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.8% 7.99
CategoryWater conservation & recharge
Started / Completed / Phys527 / 228 / 293
Completion rate98.9%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.34Cr / 0.21Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score7.99 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 7 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 10 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.0% 3.57
CategoryGap Filling in Plantation
Started / Completed / Phys274 / 44 / 94
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate50.4%
Part A score (max 5.0)2.52 / 5.0
Ongoing sanction / booked2.93Cr / 0.62Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score3.57 / 10
8.8% 5.86
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys236 / 92 / 96
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate79.7%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked2.65Cr / 1.00Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score5.86 / 10
7.0% 7.12
CategoryPMKSY: Watershed
PMKSY Works0 total  (0 done / 0 ongoing)
JGSA Target7.33 Cr
JGSA Valuation2.95 Cr
Expenditure1.80 Cr
% Valuation40.3%
Val Marks (20%)0.81
Exp Marks (20%)0.49
Claim Marks (25%)2.44
Bill Progress1.860
Bill Marks (25%)2.44
Geotag Marks (5%)0.430
Physical Marks (5%)0.50
Final score7.12 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works6,353
Target Works4,925
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
20 KATNI โ†— 6.48 C
21.5% 5.31
CategoryFarm Pond
Started / Completed / Phys1,575 / 473 / 774
⚠ Works needing verification (Completed/Physically Completed)55 works (exp <30%)
Completion rate79.2%
Part A score (max 5.0)3.96 / 5.0
Ongoing sanction / booked6.79Cr / 1.83Cr
Expenditure rate (ongoing)27.0%
Part B score (max 5.0)1.35 / 5.0
Final score5.31 / 10
1.3% 5.28
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 3
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked1.42Cr / 1.07Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score5.28 / 10
2.5% 5.24
CategoryDug Well Recharge
Started / Completed / Phys1,470 / 559 / 609
⚠ Works needing verification (Completed/Physically Completed)227 works (exp <30%)
Completion rate79.5%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.19Cr / 0.05Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score5.24 / 10
11.2% 8.25
CategoryIrrigation infrastructure
Started / Completed / Phys240 / 41 / 197
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score8.25 / 10
12.3% 7.98
CategoryWater conservation & recharge
Started / Completed / Phys328 / 78 / 226
Completion rate92.7%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked2.99Cr / 2.00Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score7.98 / 10
13.4% 8.33
CategoryWatershed Related Works
Started / Completed / Phys302 / 123 / 157
Completion rate92.7%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked1.92Cr / 1.42Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score8.33 / 10
4.4% 7.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 15 / 50
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.78Cr / 0.43Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.77 / 5.0
Final score7.10 / 10
4.4% 1.59
CategoryGap Filling in Plantation
Started / Completed / Phys130 / 2 / 18
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked5.06Cr / 0.83Cr
Expenditure rate (ongoing)16.5%
Part B score (max 5.0)0.82 / 5.0
Final score1.59 / 10
19.9% 4.60
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys404 / 84 / 193
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate68.6%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked7.90Cr / 1.86Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score4.60 / 10
4.2% 7.90
CategoryPMKSY: Watershed
PMKSY Works0 total  (23 done / -23 ongoing)
JGSA Target6.30 Cr
JGSA Valuation4.22 Cr
Expenditure2.81 Cr
% Valuation67.0%
Val Marks (20%)1.34
Exp Marks (20%)0.89
Claim Marks (25%)2.36
Bill Progress6.979
Bill Marks (25%)2.35
Geotag Marks (5%)0.500
Physical Marks (5%)0.46
Final score7.90 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works14,324
Target Works4,000
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
21 JHABUA โ†— 6.44 C
12.2% 4.77
CategoryFarm Pond
Started / Completed / Phys1,233 / 138 / 571
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate57.5%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked12.73Cr / 4.83Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.90 / 5.0
Final score4.77 / 10
1.5% 2.96
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 2
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked2.78Cr / 1.25Cr
Expenditure rate (ongoing)44.9%
Part B score (max 5.0)2.24 / 5.0
Final score2.96 / 10
4.9% 6.43
CategoryDug Well Recharge
Started / Completed / Phys4,071 / 1,227 / 2,421
⚠ Works needing verification (Completed/Physically Completed)61 works (exp <30%)
Completion rate89.6%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.92Cr / 0.36Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.95 / 5.0
Final score6.43 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 5 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
64.2% 6.99
CategoryWater conservation & recharge
Started / Completed / Phys1,368 / 124 / 751
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked55.70Cr / 42.20Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score6.99 / 10
1.5% 6.58
CategoryWatershed Related Works
Started / Completed / Phys81 / 12 / 45
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.71Cr / 0.44Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score6.58 / 10
1.3% 7.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 9 / 36
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.32Cr / 0.20Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.66 / 10
4.4% 2.32
CategoryGap Filling in Plantation
Started / Completed / Phys382 / 29 / 47
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate19.9%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked7.51Cr / 1.98Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score2.32 / 10
3.7% 3.72
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys210 / 12 / 108
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked2.99Cr / 0.52Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.86 / 5.0
Final score3.72 / 10
1.2% 5.34
CategoryPMKSY: Watershed
PMKSY Works0 total  (0 done / 0 ongoing)
JGSA Target2.53 Cr
JGSA Valuation1.96 Cr
Expenditure0.43 Cr
% Valuation77.3%
Val Marks (20%)1.54
Exp Marks (20%)0.34
Claim Marks (25%)1.43
Bill Progress0.751
Bill Marks (25%)1.30
Geotag Marks (5%)0.490
Physical Marks (5%)0.23
Final score5.34 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works7,504
Target Works6,826
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
22 DAMOH โ†— 6.34 C
6.7% 5.63
CategoryFarm Pond
Started / Completed / Phys1,553 / 513 / 673
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked7.74Cr / 2.81Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score5.63 / 10
โ€”
1.2% 7.32
CategoryDug Well Recharge
Started / Completed / Phys2,220 / 960 / 1,060
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.37Cr / 0.20Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score7.32 / 10
0.3% 9.00
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 0 / 15
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.25Cr / 0.25Cr
Expenditure rate (ongoing)99.6%
Part B score (max 5.0)4.98 / 5.0
Final score9.00 / 10
22.6% 6.96
CategoryWater conservation & recharge
Started / Completed / Phys1,017 / 119 / 607
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked50.14Cr / 34.04Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.39 / 5.0
Final score6.96 / 10
4.1% 7.15
CategoryWatershed Related Works
Started / Completed / Phys294 / 59 / 164
Completion rate75.9%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked5.21Cr / 3.50Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.36 / 5.0
Final score7.15 / 10
3.8% 7.21
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys207 / 20 / 137
Completion rate75.8%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked4.43Cr / 3.03Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.21 / 10
3.4% 2.51
CategoryGap Filling in Plantation
Started / Completed / Phys739 / 21 / 166
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate25.3%
Part A score (max 5.0)1.27 / 5.0
Ongoing sanction / booked12.28Cr / 3.06Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.25 / 5.0
Final score2.51 / 10
51.2% 5.93
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys2,588 / 120 / 1,427
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked95.05Cr / 55.98Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score5.93 / 10
1.7% 5.11
CategoryPMKSY: Watershed
PMKSY Works0 total  (9 done / -9 ongoing)
JGSA Target8.25 Cr
JGSA Valuation0.71 Cr
Expenditure0.53 Cr
% Valuation8.6%
Val Marks (20%)0.17
Exp Marks (20%)0.13
Claim Marks (25%)2.41
Bill Progress1.258
Bill Marks (25%)1.62
Geotag Marks (5%)0.470
Physical Marks (5%)0.31
Final score5.11 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works8,065
Target Works5,323
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
23 SINGRAULI โ†— 6.33 C
26.7% 5.77
CategoryFarm Pond
Started / Completed / Phys1,815 / 1,225 / 322
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked6.12Cr / 1.85Cr
Expenditure rate (ongoing)30.2%
Part B score (max 5.0)1.51 / 5.0
Final score5.77 / 10
2.7% 5.21
CategoryAmrit Sarowar
Started / Completed / Phys20 / 0 / 8
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked2.60Cr / 1.67Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score5.21 / 10
1.7% 5.80
CategoryDug Well Recharge
Started / Completed / Phys1,095 / 546 / 452
⚠ Works needing verification (Completed/Physically Completed)76 works (exp <30%)
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.24 / 5.0
Final score5.80 / 10
0.0% 5.24
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
42.5% 6.98
CategoryWater conservation & recharge
Started / Completed / Phys916 / 174 / 564
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked13.66Cr / 8.08Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.96 / 5.0
Final score6.98 / 10
4.5% 7.18
CategoryWatershed Related Works
Started / Completed / Phys131 / 33 / 75
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked1.36Cr / 0.83Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.06 / 5.0
Final score7.18 / 10
2.8% 7.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys56 / 12 / 32
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked1.13Cr / 0.76Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score7.29 / 10
4.3% 1.94
CategoryGap Filling in Plantation
Started / Completed / Phys184 / 0 / 11
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate6.0%
Part A score (max 5.0)0.30 / 5.0
Ongoing sanction / booked6.19Cr / 2.03Cr
Expenditure rate (ongoing)32.9%
Part B score (max 5.0)1.64 / 5.0
Final score1.94 / 10
9.8% 4.77
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys447 / 64 / 229
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate65.5%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked4.44Cr / 1.32Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score4.77 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works5,657
Target Works4,105
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
24 PANNA โ†— 6.32 C
26.4% 5.54
CategoryFarm Pond
Started / Completed / Phys2,155 / 371 / 1,179
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate71.9%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked12.22Cr / 4.76Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.94 / 5.0
Final score5.54 / 10
2.0% 3.65
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 4
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked2.60Cr / 1.16Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.23 / 5.0
Final score3.65 / 10
2.9% 5.93
CategoryDug Well Recharge
Started / Completed / Phys1,820 / 381 / 1,062
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate79.3%
Part A score (max 5.0)3.96 / 5.0
Ongoing sanction / booked1.02Cr / 0.40Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.97 / 5.0
Final score5.93 / 10
0.2% 6.72
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 2 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score6.72 / 10
26.1% 7.67
CategoryWater conservation & recharge
Started / Completed / Phys1,178 / 121 / 873
Completion rate84.4%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked7.77Cr / 5.35Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score7.67 / 10
3.5% 7.90
CategoryWatershed Related Works
Started / Completed / Phys142 / 16 / 100
Completion rate81.7%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.97Cr / 0.74Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.81 / 5.0
Final score7.90 / 10
8.4% 8.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys182 / 16 / 145
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked1.77Cr / 1.43Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score8.46 / 10
6.1% 2.63
CategoryGap Filling in Plantation
Started / Completed / Phys285 / 15 / 26
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate14.4%
Part A score (max 5.0)0.72 / 5.0
Ongoing sanction / booked8.59Cr / 3.28Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score2.63 / 10
19.5% 5.07
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys588 / 49 / 269
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked14.38Cr / 6.80Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score5.07 / 10
โ€”
5.0% 9.29
CategoryJSJB 2.0
Total Works5,113
Target Works5,503
Achievement %92.9%
Weightage5% of composite score
Final score9.29 / 10
25 SHEOPUR โ†— 6.31 C
10.1% 4.80
CategoryFarm Pond
Started / Completed / Phys698 / 351 / 187
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate77.1%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked4.69Cr / 0.89Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score4.80 / 10
1.5% 0.50
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.93Cr / 0.29Cr
Expenditure rate (ongoing)10.0%
Part B score (max 5.0)0.50 / 5.0
Final score0.50 / 10
0.1% 4.22
CategoryDug Well Recharge
Started / Completed / Phys109 / 70 / 18
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate80.7%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.18 / 5.0
Final score4.22 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys22 / 6 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.4% 7.99
CategoryWater conservation & recharge
Started / Completed / Phys590 / 42 / 474
Completion rate87.5%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked9.70Cr / 7.03Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score7.99 / 10
3.6% 7.67
CategoryWatershed Related Works
Started / Completed / Phys71 / 14 / 48
Completion rate87.3%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked1.09Cr / 0.72Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score7.67 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 5 / 30
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.8% 2.29
CategoryGap Filling in Plantation
Started / Completed / Phys140 / 2 / 10
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate8.6%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked6.60Cr / 2.46Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score2.29 / 10
35.3% 4.68
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys618 / 46 / 476
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate84.5%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked7.07Cr / 0.65Cr
Expenditure rate (ongoing)9.2%
Part B score (max 5.0)0.46 / 5.0
Final score4.68 / 10
2.2% 7.38
CategoryPMKSY: Watershed
PMKSY Works0 total  (98 done / -98 ongoing)
JGSA Target4.32 Cr
JGSA Valuation2.34 Cr
Expenditure1.00 Cr
% Valuation54.1%
Val Marks (20%)1.08
Exp Marks (20%)0.46
Claim Marks (25%)2.44
Bill Progress2.161
Bill Marks (25%)2.43
Geotag Marks (5%)0.460
Physical Marks (5%)0.50
Final score7.38 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works1,589
Target Works1,542
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
26 GWALIOR โ†— 6.28 C
20.9% 5.82
CategoryFarm Pond
Started / Completed / Phys699 / 131 / 533
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.76Cr / 0.16Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.07 / 5.0
Final score5.82 / 10
2.8% 4.59
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 3
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked2.11Cr / 1.36Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score4.59 / 10
2.1% 6.10
CategoryDug Well Recharge
Started / Completed / Phys774 / 223 / 531
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.22 / 5.0
Final score6.10 / 10
3.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 6 / 26
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.9% 7.92
CategoryWater conservation & recharge
Started / Completed / Phys282 / 58 / 209
Completion rate94.7%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked1.48Cr / 0.94Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score7.92 / 10
3.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys61 / 16 / 45
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 6.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 12 / 16
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score6.36 / 10
12.5% 3.06
CategoryGap Filling in Plantation
Started / Completed / Phys333 / 39 / 125
⚠ Works needing verification (Completed/Physically Completed)56 works (exp <30%)
Completion rate49.2%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked3.20Cr / 0.38Cr
Expenditure rate (ongoing)11.9%
Part B score (max 5.0)0.59 / 5.0
Final score3.06 / 10
16.7% 4.74
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys291 / 44 / 162
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked4.35Cr / 1.04Cr
Expenditure rate (ongoing)24.0%
Part B score (max 5.0)1.20 / 5.0
Final score4.74 / 10
8.4% 6.19
CategoryPMKSY: Watershed
PMKSY Works0 total  (18 done / -18 ongoing)
JGSA Target8.02 Cr
JGSA Valuation2.00 Cr
Expenditure0.26 Cr
% Valuation24.9%
Val Marks (20%)0.50
Exp Marks (20%)0.07
Claim Marks (25%)2.33
Bill Progress0.084
Bill Marks (25%)2.33
Geotag Marks (5%)0.460
Physical Marks (5%)0.50
Final score6.19 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works2,626
Target Works1,891
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
27 ANUPPUR โ†— 6.26 C
56.2% 5.71
CategoryFarm Pond
Started / Completed / Phys3,391 / 2,353 / 788
⚠ Works needing verification (Completed/Physically Completed)174 works (exp <30%)
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked2.02Cr / 0.44Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score5.71 / 10
โ€”
0.7% 9.26
CategoryDug Well Recharge
Started / Completed / Phys452 / 91 / 294
⚠ Works needing verification (Completed/Physically Completed)67 works (exp <30%)
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.26 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.7% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys389 / 186 / 193
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked1.44Cr / 1.22Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score9.00 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys24 / 9 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys44 / 30 / 13
Completion rate97.7%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.14Cr / 0.14Cr
Expenditure rate (ongoing)97.4%
Part B score (max 5.0)4.87 / 5.0
Final score9.00 / 10
5.4% 2.05
CategoryGap Filling in Plantation
Started / Completed / Phys325 / 15 / 22
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate11.4%
Part A score (max 5.0)0.57 / 5.0
Ongoing sanction / booked6.25Cr / 1.85Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.48 / 5.0
Final score2.05 / 10
10.2% 5.44
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys333 / 70 / 164
⚠ Works needing verification (Completed/Physically Completed)40 works (exp <30%)
Completion rate70.3%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked5.81Cr / 2.24Cr
Expenditure rate (ongoing)38.5%
Part B score (max 5.0)1.92 / 5.0
Final score5.44 / 10
6.3% 5.63
CategoryPMKSY: Watershed
PMKSY Works0 total  (72 done / -72 ongoing)
JGSA Target9.68 Cr
JGSA Valuation4.51 Cr
Expenditure1.78 Cr
% Valuation46.6%
Val Marks (20%)0.93
Exp Marks (20%)0.37
Claim Marks (25%)2.12
Bill Progress2.062
Bill Marks (25%)1.38
Geotag Marks (5%)0.500
Physical Marks (5%)0.33
Final score5.63 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works6,508
Target Works4,304
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
28 HARDA โ†— 6.26 C
22.9% 5.28
CategoryFarm Pond
Started / Completed / Phys270 / 42 / 199
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.78Cr / 0.13Cr
Expenditure rate (ongoing)16.4%
Part B score (max 5.0)0.82 / 5.0
Final score5.28 / 10
โ€”
7.5% 9.95
CategoryDug Well Recharge
Started / Completed / Phys751 / 384 / 359
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.95 / 10
5.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 2 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys90 / 6 / 84
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.4% 7.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 10 / 26
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.86 / 10
21.5% 2.70
CategoryGap Filling in Plantation
Started / Completed / Phys85 / 0 / 37
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate43.5%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked2.95Cr / 0.31Cr
Expenditure rate (ongoing)10.5%
Part B score (max 5.0)0.53 / 5.0
Final score2.70 / 10
15.1% 3.66
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys76 / 1 / 43
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked1.63Cr / 0.25Cr
Expenditure rate (ongoing)15.2%
Part B score (max 5.0)0.76 / 5.0
Final score3.66 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works1,688
Target Works1,181
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
29 MORENA โ†— 6.24 C
6.2% 6.00
CategoryFarm Pond
Started / Completed / Phys2,037 / 1,238 / 353
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate78.1%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked14.27Cr / 5.98Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score6.00 / 10
0.2% 2.28
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.66Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score2.28 / 10
0.2% 4.73
CategoryDug Well Recharge
Started / Completed / Phys698 / 385 / 113
⚠ Works needing verification (Completed/Physically Completed)43 works (exp <30%)
Completion rate71.3%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.41Cr / 0.10Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score4.73 / 10
0.7% 6.58
CategoryIrrigation infrastructure
Started / Completed / Phys55 / 2 / 28
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked3.03Cr / 2.33Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score6.58 / 10
38.0% 7.04
CategoryWater conservation & recharge
Started / Completed / Phys2,431 / 53 / 1,495
Completion rate63.7%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked125.98Cr / 97.13Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score7.04 / 10
2.5% 7.25
CategoryWatershed Related Works
Started / Completed / Phys180 / 7 / 120
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked6.16Cr / 4.58Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score7.25 / 10
1.1% 7.05
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys72 / 1 / 47
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked3.20Cr / 2.38Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score7.05 / 10
1.0% 1.52
CategoryGap Filling in Plantation
Started / Completed / Phys170 / 0 / 11
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked7.63Cr / 1.82Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.19 / 5.0
Final score1.52 / 10
44.9% 5.23
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys2,974 / 3 / 1,398
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate47.1%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked210.92Cr / 121.06Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score5.23 / 10
0.3% 7.00
CategoryPMKSY: Watershed
PMKSY Works0 total  (6 done / -6 ongoing)
JGSA Target2.64 Cr
JGSA Valuation1.04 Cr
Expenditure0.49 Cr
% Valuation39.3%
Val Marks (20%)0.79
Exp Marks (20%)0.37
Claim Marks (25%)2.49
Bill Progress1.304
Bill Marks (25%)2.46
Geotag Marks (5%)0.480
Physical Marks (5%)0.42
Final score7.00 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works7,056
Target Works5,707
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
30 SEONI โ†— 6.19 C
34.2% 4.62
CategoryFarm Pond
Started / Completed / Phys3,240 / 1,850 / 823
⚠ Works needing verification (Completed/Physically Completed)200 works (exp <30%)
Completion rate82.5%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked9.47Cr / 0.93Cr
Expenditure rate (ongoing)9.8%
Part B score (max 5.0)0.49 / 5.0
Final score4.62 / 10
0.8% 1.48
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.91Cr / 0.57Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score1.48 / 10
2.3% 4.55
CategoryDug Well Recharge
Started / Completed / Phys2,248 / 882 / 1,014
⚠ Works needing verification (Completed/Physically Completed)326 works (exp <30%)
Completion rate84.3%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked0.07Cr / 0.00Cr
Expenditure rate (ongoing)6.7%
Part B score (max 5.0)0.33 / 5.0
Final score4.55 / 10
1.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 14 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.1% 8.16
CategoryWater conservation & recharge
Started / Completed / Phys1,281 / 596 / 644
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked4.37Cr / 2.91Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score8.16 / 10
7.1% 8.61
CategoryWatershed Related Works
Started / Completed / Phys318 / 177 / 139
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score8.61 / 10
2.9% 8.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys102 / 32 / 65
Completion rate95.1%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.35Cr / 0.24Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score8.18 / 10
4.1% 2.93
CategoryGap Filling in Plantation
Started / Completed / Phys164 / 9 / 32
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked6.46Cr / 2.16Cr
Expenditure rate (ongoing)33.5%
Part B score (max 5.0)1.68 / 5.0
Final score2.93 / 10
15.1% 4.46
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys1,024 / 226 / 413
⚠ Works needing verification (Completed/Physically Completed)93 works (exp <30%)
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked11.54Cr / 3.10Cr
Expenditure rate (ongoing)26.9%
Part B score (max 5.0)1.34 / 5.0
Final score4.46 / 10
โ€”
5.0% 9.98
CategoryJSJB 2.0
Total Works7,219
Target Works7,230
Achievement %99.8%
Weightage5% of composite score
Final score9.98 / 10
31 SHIVPURI โ†— 6.13 C
26.3% 4.58
CategoryFarm Pond
Started / Completed / Phys2,015 / 839 / 709
⚠ Works needing verification (Completed/Physically Completed)28 works (exp <30%)
Completion rate76.8%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked14.01Cr / 2.08Cr
Expenditure rate (ongoing)14.8%
Part B score (max 5.0)0.74 / 5.0
Final score4.58 / 10
0.6% 2.42
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 3
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked1.01Cr / 0.11Cr
Expenditure rate (ongoing)11.0%
Part B score (max 5.0)0.55 / 5.0
Final score2.42 / 10
2.1% 4.66
CategoryDug Well Recharge
Started / Completed / Phys1,936 / 900 / 624
⚠ Works needing verification (Completed/Physically Completed)189 works (exp <30%)
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.57Cr / 0.08Cr
Expenditure rate (ongoing)14.4%
Part B score (max 5.0)0.72 / 5.0
Final score4.66 / 10
0.8% 7.20
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 8 / 20
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score7.20 / 10
35.3% 7.90
CategoryWater conservation & recharge
Started / Completed / Phys1,104 / 237 / 745
Completion rate88.9%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked17.39Cr / 12.02Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.46 / 5.0
Final score7.90 / 10
6.4% 7.66
CategoryWatershed Related Works
Started / Completed / Phys200 / 63 / 117
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked1.63Cr / 1.03Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.66 / 10
2.3% 6.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys79 / 25 / 46
Completion rate89.9%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.66Cr / 0.32Cr
Expenditure rate (ongoing)47.8%
Part B score (max 5.0)2.39 / 5.0
Final score6.89 / 10
5.5% 1.79
CategoryGap Filling in Plantation
Started / Completed / Phys756 / 33 / 75
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked10.70Cr / 2.31Cr
Expenditure rate (ongoing)21.6%
Part B score (max 5.0)1.08 / 5.0
Final score1.79 / 10
14.5% 4.79
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys792 / 34 / 470
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked16.90Cr / 5.42Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.60 / 5.0
Final score4.79 / 10
1.3% 5.47
CategoryPMKSY: Watershed
PMKSY Works0 total  (182 done / -182 ongoing)
JGSA Target3.04 Cr
JGSA Valuation0.05 Cr
Expenditure0.38 Cr
% Valuation1.5%
Val Marks (20%)0.03
Exp Marks (20%)0.25
Claim Marks (25%)2.26
Bill Progress0.666
Bill Marks (25%)2.06
Geotag Marks (5%)0.450
Physical Marks (5%)0.41
Final score5.47 / 10
5.0% 9.26
CategoryJSJB 2.0
Total Works4,976
Target Works5,374
Achievement %92.6%
Weightage5% of composite score
Final score9.26 / 10
32 DEWAS โ†— 6.12 C
34.9% 5.29
CategoryFarm Pond
Started / Completed / Phys1,038 / 243 / 558
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate77.2%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked7.41Cr / 2.12Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score5.29 / 10
1.2% 7.01
CategoryAmrit Sarowar
Started / Completed / Phys7 / 1 / 4
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.42Cr / 0.29Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score7.01 / 10
7.8% 6.79
CategoryDug Well Recharge
Started / Completed / Phys3,193 / 1,407 / 1,683
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.17Cr / 0.07Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.95 / 5.0
Final score6.79 / 10
2.7% 7.32
CategoryIrrigation infrastructure
Started / Completed / Phys57 / 20 / 34
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score7.32 / 10
25.7% 7.95
CategoryWater conservation & recharge
Started / Completed / Phys621 / 102 / 480
Completion rate93.7%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked1.36Cr / 0.89Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score7.95 / 10
2.7% 7.46
CategoryWatershed Related Works
Started / Completed / Phys94 / 26 / 61
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score7.46 / 10
0.9% 6.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 4 / 10
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score6.36 / 10
11.6% 3.10
CategoryGap Filling in Plantation
Started / Completed / Phys176 / 2 / 39
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate23.3%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked10.22Cr / 3.95Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.93 / 5.0
Final score3.10 / 10
6.3% 3.43
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys100 / 5 / 51
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked2.05Cr / 0.26Cr
Expenditure rate (ongoing)12.6%
Part B score (max 5.0)0.63 / 5.0
Final score3.43 / 10
1.3% 6.76
CategoryPMKSY: Watershed
PMKSY Works0 total  (23 done / -23 ongoing)
JGSA Target1.42 Cr
JGSA Valuation0.64 Cr
Expenditure0.06 Cr
% Valuation45.1%
Val Marks (20%)0.90
Exp Marks (20%)0.08
Claim Marks (25%)2.42
Bill Progress0.752
Bill Marks (25%)2.38
Geotag Marks (5%)0.490
Physical Marks (5%)0.50
Final score6.76 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works11,370
Target Works5,027
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
33 BURHANPUR โ†— 6.11 C
28.8% 5.75
CategoryFarm Pond
Started / Completed / Phys697 / 239 / 357
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.5%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked2.17Cr / 0.64Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score5.75 / 10
4.7% 6.31
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.68Cr / 0.40Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.98 / 5.0
Final score6.31 / 10
6.8% 7.23
CategoryDug Well Recharge
Started / Completed / Phys1,185 / 468 / 637
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate93.2%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score7.23 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.1% 7.32
CategoryWater conservation & recharge
Started / Completed / Phys287 / 54 / 174
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked2.94Cr / 1.97Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score7.32 / 10
3.3% 7.28
CategoryWatershed Related Works
Started / Completed / Phys35 / 9 / 24
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.56 / 5.0
Final score7.28 / 10
1.0% 7.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 11
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score7.92 / 10
9.3% 2.57
CategoryGap Filling in Plantation
Started / Completed / Phys97 / 2 / 20
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate22.7%
Part A score (max 5.0)1.13 / 5.0
Ongoing sanction / booked2.45Cr / 0.71Cr
Expenditure rate (ongoing)28.8%
Part B score (max 5.0)1.44 / 5.0
Final score2.57 / 10
9.1% 4.58
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys108 / 24 / 50
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked1.24Cr / 0.29Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score4.58 / 10
โ€”
5.0% 6.83
CategoryJSJB 2.0
Total Works1,520
Target Works2,224
Achievement %68.3%
Weightage5% of composite score
Final score6.83 / 10
34 JABALPUR โ†— 6.08 C
22.8% 4.91
CategoryFarm Pond
Started / Completed / Phys777 / 246 / 390
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate81.9%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked4.38Cr / 0.72Cr
Expenditure rate (ongoing)16.4%
Part B score (max 5.0)0.82 / 5.0
Final score4.91 / 10
3.0% 5.54
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 5
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.61Cr / 0.98Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.04 / 5.0
Final score5.54 / 10
1.4% 5.20
CategoryDug Well Recharge
Started / Completed / Phys549 / 249 / 291
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)5.7%
Part B score (max 5.0)0.28 / 5.0
Final score5.20 / 10
0.1% 6.06
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 1
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.69 / 5.0
Final score6.06 / 10
19.2% 7.82
CategoryWater conservation & recharge
Started / Completed / Phys363 / 203 / 145
Completion rate95.9%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked1.63Cr / 0.99Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score7.82 / 10
10.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys185 / 110 / 75
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 34 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.8% 2.56
CategoryGap Filling in Plantation
Started / Completed / Phys342 / 49 / 46
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate27.8%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked6.00Cr / 1.40Cr
Expenditure rate (ongoing)23.4%
Part B score (max 5.0)1.17 / 5.0
Final score2.56 / 10
20.7% 4.02
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys413 / 113 / 142
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate61.7%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked9.10Cr / 1.70Cr
Expenditure rate (ongoing)18.7%
Part B score (max 5.0)0.94 / 5.0
Final score4.02 / 10
4.2% 7.75
CategoryPMKSY: Watershed
PMKSY Works0 total  (15 done / -15 ongoing)
JGSA Target4.23 Cr
JGSA Valuation2.46 Cr
Expenditure1.80 Cr
% Valuation58.0%
Val Marks (20%)1.16
Exp Marks (20%)0.85
Claim Marks (25%)2.46
Bill Progress2.902
Bill Marks (25%)2.41
Geotag Marks (5%)0.490
Physical Marks (5%)0.38
Final score7.75 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works67,088
Target Works1,943
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
35 SIDHI โ†— 6.04 C
26.3% 5.08
CategoryFarm Pond
Started / Completed / Phys1,678 / 1,044 / 426
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate87.6%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked4.41Cr / 0.62Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score5.08 / 10
โ€”
0.8% 4.74
CategoryDug Well Recharge
Started / Completed / Phys438 / 226 / 166
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)5.2%
Part B score (max 5.0)0.26 / 5.0
Final score4.74 / 10
2.1% 7.58
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 14 / 17
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.45Cr / 0.26Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score7.58 / 10
32.3% 8.37
CategoryWater conservation & recharge
Started / Completed / Phys892 / 353 / 521
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked2.75Cr / 1.91Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score8.37 / 10
3.5% 9.00
CategoryWatershed Related Works
Started / Completed / Phys98 / 49 / 48
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)97.9%
Part B score (max 5.0)4.89 / 5.0
Final score9.00 / 10
4.3% 7.95
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys106 / 52 / 47
Completion rate93.4%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked1.15Cr / 0.75Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score7.95 / 10
10.4% 1.78
CategoryGap Filling in Plantation
Started / Completed / Phys535 / 12 / 86
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate18.3%
Part A score (max 5.0)0.92 / 5.0
Ongoing sanction / booked9.45Cr / 1.64Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.87 / 5.0
Final score1.78 / 10
13.4% 4.08
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys403 / 29 / 205
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked7.41Cr / 1.74Cr
Expenditure rate (ongoing)23.4%
Part B score (max 5.0)1.17 / 5.0
Final score4.08 / 10
1.9% 7.12
CategoryPMKSY: Watershed
PMKSY Works0 total  (27 done / -27 ongoing)
JGSA Target2.89 Cr
JGSA Valuation1.52 Cr
Expenditure0.51 Cr
% Valuation52.6%
Val Marks (20%)1.05
Exp Marks (20%)0.36
Claim Marks (25%)2.40
Bill Progress1.298
Bill Marks (25%)2.39
Geotag Marks (5%)0.450
Physical Marks (5%)0.46
Final score7.12 / 10
5.0% 5.56
CategoryJSJB 2.0
Total Works1,811
Target Works3,256
Achievement %55.6%
Weightage5% of composite score
Final score5.56 / 10
36 AGAR-MALWA โ†— 5.99 D
19.1% 4.70
CategoryFarm Pond
Started / Completed / Phys679 / 118 / 250
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked7.25Cr / 2.89Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score4.70 / 10
1.0% 6.17
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.31Cr / 0.23Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score6.17 / 10
6.8% 5.73
CategoryDug Well Recharge
Started / Completed / Phys1,939 / 620 / 958
⚠ Works needing verification (Completed/Physically Completed)64 works (exp <30%)
Completion rate81.4%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.78Cr / 0.26Cr
Expenditure rate (ongoing)33.3%
Part B score (max 5.0)1.66 / 5.0
Final score5.73 / 10
0.5% 7.80
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 5
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.80 / 10
34.4% 7.44
CategoryWater conservation & recharge
Started / Completed / Phys454 / 88 / 268
Completion rate78.4%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked7.52Cr / 5.30Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score7.44 / 10
2.1% 7.44
CategoryWatershed Related Works
Started / Completed / Phys43 / 18 / 20
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score7.44 / 10
8.8% 7.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys170 / 13 / 128
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked1.13Cr / 0.83Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score7.83 / 10
10.9% 2.15
CategoryGap Filling in Plantation
Started / Completed / Phys280 / 17 / 49
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate23.6%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked6.12Cr / 1.19Cr
Expenditure rate (ongoing)19.5%
Part B score (max 5.0)0.97 / 5.0
Final score2.15 / 10
11.4% 4.30
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys134 / 12 / 62
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked4.28Cr / 1.32Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score4.30 / 10
โ€”
5.0% 9.60
CategoryJSJB 2.0
Total Works3,163
Target Works3,296
Achievement %96.0%
Weightage5% of composite score
Final score9.60 / 10
37 NARSINGHPUR โ†— 5.99 D
41.8% 6.04
CategoryFarm Pond
Started / Completed / Phys1,072 / 858 / 156
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked1.55Cr / 0.40Cr
Expenditure rate (ongoing)26.1%
Part B score (max 5.0)1.31 / 5.0
Final score6.04 / 10
0.4% 2.30
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.12Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.30 / 5.0
Final score2.30 / 10
1.0% 4.82
CategoryDug Well Recharge
Started / Completed / Phys290 / 132 / 140
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)2.7%
Part B score (max 5.0)0.13 / 5.0
Final score4.82 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.8% 8.03
CategoryWater conservation & recharge
Started / Completed / Phys145 / 92 / 43
Completion rate93.1%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked2.98Cr / 2.01Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score8.03 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 9 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 16 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.8% 3.48
CategoryGap Filling in Plantation
Started / Completed / Phys412 / 70 / 129
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate48.3%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked6.16Cr / 1.31Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score3.48 / 10
15.9% 4.41
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys248 / 69 / 107
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked4.69Cr / 0.81Cr
Expenditure rate (ongoing)17.2%
Part B score (max 5.0)0.86 / 5.0
Final score4.41 / 10
6.8% 8.17
CategoryPMKSY: Watershed
PMKSY Works0 total  (88 done / -88 ongoing)
JGSA Target4.79 Cr
JGSA Valuation3.64 Cr
Expenditure2.11 Cr
% Valuation75.9%
Val Marks (20%)1.52
Exp Marks (20%)0.88
Claim Marks (25%)2.47
Bill Progress3.505
Bill Marks (25%)2.47
Geotag Marks (5%)0.410
Physical Marks (5%)0.42
Final score8.17 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works70,462
Target Works1,552
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
38 CHHATARPUR โ†— 5.98 D
31.3% 4.69
CategoryFarm Pond
Started / Completed / Phys1,743 / 757 / 692
⚠ Works needing verification (Completed/Physically Completed)84 works (exp <30%)
Completion rate83.1%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked7.22Cr / 0.78Cr
Expenditure rate (ongoing)10.7%
Part B score (max 5.0)0.54 / 5.0
Final score4.69 / 10
2.7% 7.13
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 17
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked1.52Cr / 1.09Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score7.13 / 10
3.6% 4.86
CategoryDug Well Recharge
Started / Completed / Phys3,861 / 2,827 / 654
⚠ Works needing verification (Completed/Physically Completed)219 works (exp <30%)
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.29Cr / 0.02Cr
Expenditure rate (ongoing)7.0%
Part B score (max 5.0)0.35 / 5.0
Final score4.86 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 5 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.7% 8.45
CategoryWater conservation & recharge
Started / Completed / Phys937 / 248 / 651
Completion rate95.9%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked2.78Cr / 2.03Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score8.45 / 10
2.5% 8.00
CategoryWatershed Related Works
Started / Completed / Phys125 / 34 / 87
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score8.00 / 10
2.8% 8.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys80 / 7 / 71
Completion rate97.5%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score8.70 / 10
4.3% 2.87
CategoryGap Filling in Plantation
Started / Completed / Phys328 / 15 / 87
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate31.1%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked5.62Cr / 1.48Cr
Expenditure rate (ongoing)26.3%
Part B score (max 5.0)1.31 / 5.0
Final score2.87 / 10
24.6% 4.58
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys801 / 60 / 457
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate64.5%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked12.22Cr / 3.32Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score4.58 / 10
1.2% 7.30
CategoryPMKSY: Watershed
PMKSY Works0 total  (3 done / -3 ongoing)
JGSA Target2.41 Cr
JGSA Valuation2.24 Cr
Expenditure0.82 Cr
% Valuation92.9%
Val Marks (20%)1.86
Exp Marks (20%)0.68
Claim Marks (25%)2.01
Bill Progress1.363
Bill Marks (25%)1.90
Geotag Marks (5%)0.430
Physical Marks (5%)0.42
Final score7.30 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works11,769
Target Works6,817
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
39 SEHORE โ†— 5.95 D
38.9% 5.70
CategoryFarm Pond
Started / Completed / Phys1,183 / 155 / 733
⚠ Works needing verification (Completed/Physically Completed)50 works (exp <30%)
Completion rate75.1%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked8.21Cr / 3.20Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.95 / 5.0
Final score5.70 / 10
1.8% 2.05
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.43Cr / 0.59Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.05 / 5.0
Final score2.05 / 10
8.0% 7.17
CategoryDug Well Recharge
Started / Completed / Phys2,392 / 525 / 1,776
⚠ Works needing verification (Completed/Physically Completed)43 works (exp <30%)
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score7.17 / 10
1.4% 8.45
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 7 / 11
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.72 / 5.0
Final score8.45 / 10
18.0% 8.47
CategoryWater conservation & recharge
Started / Completed / Phys357 / 61 / 264
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked2.87Cr / 2.25Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score8.47 / 10
3.4% 8.07
CategoryWatershed Related Works
Started / Completed / Phys66 / 19 / 39
Completion rate87.9%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.32Cr / 0.24Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score8.07 / 10
2.4% 7.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys38 / 10 / 27
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score7.34 / 10
10.0% 1.72
CategoryGap Filling in Plantation
Started / Completed / Phys275 / 7 / 6
Completion rate4.7%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked7.53Cr / 2.24Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score1.72 / 10
10.2% 3.14
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys312 / 57 / 44
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate32.4%
Part A score (max 5.0)1.62 / 5.0
Ongoing sanction / booked6.01Cr / 1.83Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.52 / 5.0
Final score3.14 / 10
1.0% 7.35
CategoryPMKSY: Watershed
PMKSY Works0 total  (13 done / -13 ongoing)
JGSA Target0.79 Cr
JGSA Valuation0.64 Cr
Expenditure0.31 Cr
% Valuation81.3%
Val Marks (20%)1.63
Exp Marks (20%)0.80
Claim Marks (25%)2.07
Bill Progress0.622
Bill Marks (25%)2.07
Geotag Marks (5%)0.490
Physical Marks (5%)0.28
Final score7.35 / 10
5.0% 9.35
CategoryJSJB 2.0
Total Works3,800
Target Works4,064
Achievement %93.5%
Weightage5% of composite score
Final score9.35 / 10
40 SAGAR โ†— 5.88 D
22.6% 4.50
CategoryFarm Pond
Started / Completed / Phys2,156 / 892 / 699
⚠ Works needing verification (Completed/Physically Completed)120 works (exp <30%)
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked8.24Cr / 1.33Cr
Expenditure rate (ongoing)16.1%
Part B score (max 5.0)0.81 / 5.0
Final score4.50 / 10
0.5% 4.10
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.73Cr
Expenditure rate (ongoing)81.9%
Part B score (max 5.0)4.10 / 5.0
Final score4.10 / 10
6.3% 5.03
CategoryDug Well Recharge
Started / Completed / Phys4,628 / 1,864 / 1,904
⚠ Works needing verification (Completed/Physically Completed)835 works (exp <30%)
Completion rate81.4%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)19.1%
Part B score (max 5.0)0.96 / 5.0
Final score5.03 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys25 / 14 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28.9% 8.03
CategoryWater conservation & recharge
Started / Completed / Phys1,183 / 480 / 627
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked3.67Cr / 2.47Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.36 / 5.0
Final score8.03 / 10
3.8% 7.49
CategoryWatershed Related Works
Started / Completed / Phys120 / 61 / 54
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score7.49 / 10
2.8% 7.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 40 / 46
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score7.65 / 10
5.2% 2.76
CategoryGap Filling in Plantation
Started / Completed / Phys441 / 23 / 76
⚠ Works needing verification (Completed/Physically Completed)53 works (exp <30%)
Completion rate22.4%
Part A score (max 5.0)1.12 / 5.0
Ongoing sanction / booked5.81Cr / 1.90Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.63 / 5.0
Final score2.76 / 10
18.6% 5.79
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys902 / 225 / 440
⚠ Works needing verification (Completed/Physically Completed)56 works (exp <30%)
Completion rate73.7%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked10.08Cr / 4.24Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.10 / 5.0
Final score5.79 / 10
5.7% 5.72
CategoryPMKSY: Watershed
PMKSY Works0 total  (234 done / -234 ongoing)
JGSA Target10.28 Cr
JGSA Valuation3.82 Cr
Expenditure1.53 Cr
% Valuation37.2%
Val Marks (20%)0.74
Exp Marks (20%)0.30
Claim Marks (25%)2.23
Bill Progress3.761
Bill Marks (25%)1.66
Geotag Marks (5%)0.490
Physical Marks (5%)0.30
Final score5.72 / 10
5.0% 2.15
CategoryJSJB 2.0
Total Works1,763
Target Works8,210
Achievement %21.5%
Weightage5% of composite score
Final score2.15 / 10
41 NIWARI โ†— 5.84 D
12.3% 4.04
CategoryFarm Pond
Started / Completed / Phys491 / 132 / 123
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate51.9%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked3.17Cr / 0.91Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.44 / 5.0
Final score4.04 / 10
1.7% 4.18
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.26Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score4.18 / 10
3.9% 4.91
CategoryDug Well Recharge
Started / Completed / Phys964 / 231 / 435
⚠ Works needing verification (Completed/Physically Completed)94 works (exp <30%)
Completion rate69.1%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked0.53Cr / 0.15Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score4.91 / 10
โ€”
23.1% 8.05
CategoryWater conservation & recharge
Started / Completed / Phys235 / 62 / 142
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked2.52Cr / 1.87Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score8.05 / 10
9.9% 7.04
CategoryWatershed Related Works
Started / Completed / Phys111 / 20 / 59
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked1.87Cr / 1.30Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score7.04 / 10
13.5% 7.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys124 / 20 / 80
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked1.69Cr / 1.30Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score7.88 / 10
9.5% 2.54
CategoryGap Filling in Plantation
Started / Completed / Phys204 / 8 / 44
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate25.5%
Part A score (max 5.0)1.27 / 5.0
Ongoing sanction / booked4.02Cr / 1.02Cr
Expenditure rate (ongoing)25.3%
Part B score (max 5.0)1.26 / 5.0
Final score2.54 / 10
21.2% 3.42
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys352 / 11 / 135
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate41.5%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked7.98Cr / 2.15Cr
Expenditure rate (ongoing)27.0%
Part B score (max 5.0)1.35 / 5.0
Final score3.42 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works1,949
Target Works1,930
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
42 TIKAMGARH โ†— 5.81 D
10.3% 4.72
CategoryFarm Pond
Started / Completed / Phys852 / 78 / 406
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate56.8%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked5.67Cr / 2.14Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score4.72 / 10
2.2% 2.33
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.04Cr / 1.41Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score2.33 / 10
4.2% 6.19
CategoryDug Well Recharge
Started / Completed / Phys2,282 / 256 / 1,811
⚠ Works needing verification (Completed/Physically Completed)127 works (exp <30%)
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.23Cr / 0.08Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score6.19 / 10
0.1% 9.00
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 12 / 5
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)96.5%
Part B score (max 5.0)4.82 / 5.0
Final score9.00 / 10
35.5% 7.88
CategoryWater conservation & recharge
Started / Completed / Phys1,050 / 121 / 651
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked18.99Cr / 15.96Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score7.88 / 10
3.2% 8.54
CategoryWatershed Related Works
Started / Completed / Phys111 / 18 / 87
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.41Cr / 0.31Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score8.54 / 10
6.2% 7.07
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys128 / 6 / 68
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked4.30Cr / 3.60Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score7.07 / 10
14.2% 2.49
CategoryGap Filling in Plantation
Started / Completed / Phys863 / 48 / 213
⚠ Works needing verification (Completed/Physically Completed)108 works (exp <30%)
Completion rate30.2%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked12.03Cr / 2.35Cr
Expenditure rate (ongoing)19.6%
Part B score (max 5.0)0.98 / 5.0
Final score2.49 / 10
16.5% 4.30
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys590 / 25 / 293
⚠ Works needing verification (Completed/Physically Completed)45 works (exp <30%)
Completion rate53.9%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked10.68Cr / 3.44Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score4.30 / 10
2.7% 7.43
CategoryPMKSY: Watershed
PMKSY Works0 total  (3 done / -3 ongoing)
JGSA Target3.79 Cr
JGSA Valuation2.16 Cr
Expenditure1.20 Cr
% Valuation57.0%
Val Marks (20%)1.14
Exp Marks (20%)0.63
Claim Marks (25%)2.38
Bill Progress1.825
Bill Marks (25%)2.31
Geotag Marks (5%)0.500
Physical Marks (5%)0.47
Final score7.43 / 10
5.0% 4.78
CategoryJSJB 2.0
Total Works2,143
Target Works4,480
Achievement %47.8%
Weightage5% of composite score
Final score4.78 / 10
43 INDORE โ†— 5.80 D
31.4% 5.78
CategoryFarm Pond
Started / Completed / Phys540 / 180 / 223
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked3.50Cr / 1.43Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score5.78 / 10
2.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.8% 5.77
CategoryDug Well Recharge
Started / Completed / Phys814 / 494 / 204
⚠ Works needing verification (Completed/Physically Completed)103 works (exp <30%)
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score5.77 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.9% 8.42
CategoryWater conservation & recharge
Started / Completed / Phys130 / 66 / 51
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.46Cr / 0.36Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score8.42 / 10
5.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys50 / 20 / 30
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.8% 7.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 10 / 10
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score7.46 / 10
21.2% 3.34
CategoryGap Filling in Plantation
Started / Completed / Phys411 / 81 / 70
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate36.7%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked5.03Cr / 1.52Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.51 / 5.0
Final score3.34 / 10
14.7% 3.28
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys108 / 19 / 36
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate50.9%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked2.07Cr / 0.30Cr
Expenditure rate (ongoing)14.6%
Part B score (max 5.0)0.73 / 5.0
Final score3.28 / 10
3.1% 7.25
CategoryPMKSY: Watershed
PMKSY Works0 total  (2 done / -2 ongoing)
JGSA Target1.35 Cr
JGSA Valuation0.75 Cr
Expenditure0.49 Cr
% Valuation55.5%
Val Marks (20%)1.11
Exp Marks (20%)0.73
Claim Marks (25%)2.37
Bill Progress0.654
Bill Marks (25%)2.36
Geotag Marks (5%)0.390
Physical Marks (5%)0.30
Final score7.25 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works2,262
Target Works1,561
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
44 BHOPAL โ†— 5.80 D
35.5% 5.12
CategoryFarm Pond
Started / Completed / Phys945 / 257 / 376
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked6.33Cr / 2.24Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.77 / 5.0
Final score5.12 / 10
2.4% 5.27
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.82Cr / 0.51Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score5.27 / 10
3.1% 6.08
CategoryDug Well Recharge
Started / Completed / Phys678 / 329 / 219
⚠ Works needing verification (Completed/Physically Completed)60 works (exp <30%)
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.04 / 5.0
Final score6.08 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
34.0% 7.59
CategoryWater conservation & recharge
Started / Completed / Phys451 / 140 / 242
Completion rate84.7%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked3.41Cr / 2.29Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score7.59 / 10
2.6% 6.90
CategoryWatershed Related Works
Started / Completed / Phys35 / 11 / 20
Completion rate88.6%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.32Cr / 0.16Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score6.90 / 10
4.4% 8.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys25 / 5 / 17
Completion rate88.0%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.54Cr / 0.43Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.99 / 5.0
Final score8.39 / 10
2.3% 1.85
CategoryGap Filling in Plantation
Started / Completed / Phys53 / 0 / 7
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate13.2%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked1.10Cr / 0.26Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.19 / 5.0
Final score1.85 / 10
10.5% 3.46
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys144 / 18 / 60
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked3.03Cr / 0.46Cr
Expenditure rate (ongoing)15.1%
Part B score (max 5.0)0.76 / 5.0
Final score3.46 / 10
โ€”
5.0% 2.29
CategoryJSJB 2.0
Total Works495
Target Works2,157
Achievement %22.9%
Weightage5% of composite score
Final score2.29 / 10
45 VIDISHA โ†— 5.80 D
41.1% 5.54
CategoryFarm Pond
Started / Completed / Phys2,017 / 1,123 / 381
⚠ Works needing verification (Completed/Physically Completed)55 works (exp <30%)
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked12.53Cr / 4.55Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.82 / 5.0
Final score5.54 / 10
1.6% 3.72
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.80Cr / 1.16Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score3.72 / 10
3.5% 6.89
CategoryDug Well Recharge
Started / Completed / Phys1,725 / 520 / 972
⚠ Works needing verification (Completed/Physically Completed)160 works (exp <30%)
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score6.89 / 10
0.3% 8.35
CategoryIrrigation infrastructure
Started / Completed / Phys37 / 31 / 4
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score8.35 / 10
23.9% 7.51
CategoryWater conservation & recharge
Started / Completed / Phys848 / 403 / 339
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked4.17Cr / 2.61Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score7.51 / 10
0.7% 6.44
CategoryWatershed Related Works
Started / Completed / Phys38 / 27 / 10
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score6.44 / 10
1.1% 7.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 22 / 4
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score7.62 / 10
8.6% 1.56
CategoryGap Filling in Plantation
Started / Completed / Phys327 / 11 / 33
⚠ Works needing verification (Completed/Physically Completed)27 works (exp <30%)
Completion rate13.5%
Part A score (max 5.0)0.67 / 5.0
Ongoing sanction / booked8.97Cr / 1.59Cr
Expenditure rate (ongoing)17.7%
Part B score (max 5.0)0.89 / 5.0
Final score1.56 / 10
10.0% 3.29
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys523 / 99 / 166
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate50.7%
Part A score (max 5.0)2.53 / 5.0
Ongoing sanction / booked5.48Cr / 0.83Cr
Expenditure rate (ongoing)15.1%
Part B score (max 5.0)0.75 / 5.0
Final score3.29 / 10
4.1% 7.38
CategoryPMKSY: Watershed
PMKSY Works0 total  (4 done / -4 ongoing)
JGSA Target5.13 Cr
JGSA Valuation3.83 Cr
Expenditure0.93 Cr
% Valuation74.7%
Val Marks (20%)1.49
Exp Marks (20%)0.36
Claim Marks (25%)2.37
Bill Progress3.102
Bill Marks (25%)2.33
Geotag Marks (5%)0.480
Physical Marks (5%)0.34
Final score7.38 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works4,832
Target Works4,703
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
46 MANDSAUR โ†— 5.77 D
14.0% 3.85
CategoryFarm Pond
Started / Completed / Phys1,156 / 171 / 363
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked11.48Cr / 3.54Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score3.85 / 10
1.0% 3.98
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.73Cr / 0.21Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score3.98 / 10
7.2% 6.13
CategoryDug Well Recharge
Started / Completed / Phys4,172 / 1,080 / 2,268
⚠ Works needing verification (Completed/Physically Completed)168 works (exp <30%)
Completion rate80.2%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked1.69Cr / 0.72Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.12 / 5.0
Final score6.13 / 10
0.4% 6.70
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 10 / 8
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.20 / 5.0
Final score6.70 / 10
45.3% 7.21
CategoryWater conservation & recharge
Started / Completed / Phys1,158 / 255 / 607
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked16.10Cr / 11.24Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.21 / 10
1.7% 7.71
CategoryWatershed Related Works
Started / Completed / Phys53 / 17 / 26
Completion rate81.1%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.46Cr / 0.33Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score7.71 / 10
1.7% 7.80
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 9 / 22
Completion rate77.5%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.48Cr / 0.38Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score7.80 / 10
8.7% 3.02
CategoryGap Filling in Plantation
Started / Completed / Phys517 / 9 / 104
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate21.9%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked9.71Cr / 3.75Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score3.02 / 10
13.0% 4.28
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys355 / 38 / 122
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate45.1%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked10.03Cr / 4.07Cr
Expenditure rate (ongoing)40.6%
Part B score (max 5.0)2.03 / 5.0
Final score4.28 / 10
2.0% 6.95
CategoryPMKSY: Watershed
PMKSY Works0 total  (2 done / -2 ongoing)
JGSA Target2.95 Cr
JGSA Valuation2.07 Cr
Expenditure0.24 Cr
% Valuation70.1%
Val Marks (20%)1.40
Exp Marks (20%)0.16
Claim Marks (25%)2.43
Bill Progress2.122
Bill Marks (25%)2.41
Geotag Marks (5%)0.470
Physical Marks (5%)0.08
Final score6.95 / 10
5.0% 4.73
CategoryJSJB 2.0
Total Works3,125
Target Works6,605
Achievement %47.3%
Weightage5% of composite score
Final score4.73 / 10
47 SATNA โ†— 5.77 D
35.1% 4.78
CategoryFarm Pond
Started / Completed / Phys2,091 / 305 / 1,203
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked13.17Cr / 3.10Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.18 / 5.0
Final score4.78 / 10
2.7% 1.73
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.41Cr / 1.18Cr
Expenditure rate (ongoing)34.5%
Part B score (max 5.0)1.73 / 5.0
Final score1.73 / 10
2.0% 6.55
CategoryDug Well Recharge
Started / Completed / Phys1,133 / 309 / 743
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score6.55 / 10
0.4% 9.81
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 13 / 12
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.81 / 10
28.2% 8.69
CategoryWater conservation & recharge
Started / Completed / Phys660 / 126 / 478
Completion rate91.5%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked8.38Cr / 6.90Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score8.69 / 10
3.7% 7.84
CategoryWatershed Related Works
Started / Completed / Phys143 / 34 / 96
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.33Cr / 0.21Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score7.84 / 10
6.3% 7.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys121 / 33 / 77
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked1.00Cr / 0.59Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.96 / 5.0
Final score7.51 / 10
4.4% 2.17
CategoryGap Filling in Plantation
Started / Completed / Phys101 / 0 / 14
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate13.9%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked3.92Cr / 1.16Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score2.17 / 10
12.2% 2.82
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys413 / 15 / 109
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked11.24Cr / 2.96Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score2.82 / 10
โ€”
5.0% 4.26
CategoryJSJB 2.0
Total Works1,784
Target Works4,185
Achievement %42.6%
Weightage5% of composite score
Final score4.26 / 10
48 REWA โ†— 5.71 D
27.7% 5.41
CategoryFarm Pond
Started / Completed / Phys2,004 / 1,078 / 526
⚠ Works needing verification (Completed/Physically Completed)115 works (exp <30%)
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked7.89Cr / 2.22Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.40 / 5.0
Final score5.41 / 10
0.9% 0.82
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.36Cr / 0.22Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.82 / 5.0
Final score0.82 / 10
0.6% 5.85
CategoryDug Well Recharge
Started / Completed / Phys475 / 283 / 147
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score5.85 / 10
1.7% 7.96
CategoryIrrigation infrastructure
Started / Completed / Phys71 / 49 / 19
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score7.96 / 10
19.1% 7.93
CategoryWater conservation & recharge
Started / Completed / Phys625 / 368 / 224
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked2.27Cr / 1.45Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score7.93 / 10
4.8% 8.75
CategoryWatershed Related Works
Started / Completed / Phys118 / 65 / 50
Completion rate97.5%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.55Cr / 0.43Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score8.75 / 10
5.0% 7.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys110 / 64 / 38
Completion rate92.7%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.53 / 10
9.9% 2.49
CategoryGap Filling in Plantation
Started / Completed / Phys436 / 43 / 73
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate26.6%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked10.59Cr / 2.46Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score2.49 / 10
21.0% 3.33
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys970 / 165 / 241
⚠ Works needing verification (Completed/Physically Completed)37 works (exp <30%)
Completion rate41.9%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked18.92Cr / 4.70Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score3.33 / 10
4.1% 6.56
CategoryPMKSY: Watershed
PMKSY Works0 total  (29 done / -29 ongoing)
JGSA Target6.27 Cr
JGSA Valuation1.57 Cr
Expenditure1.66 Cr
% Valuation25.0%
Val Marks (20%)0.50
Exp Marks (20%)0.53
Claim Marks (25%)2.36
Bill Progress1.715
Bill Marks (25%)2.33
Geotag Marks (5%)0.440
Physical Marks (5%)0.40
Final score6.56 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works4,159
Target Works3,408
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
49 UMARIA โ†— 5.69 D
21.5% 4.58
CategoryFarm Pond
Started / Completed / Phys910 / 113 / 379
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked10.65Cr / 4.00Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score4.58 / 10
1.5% 4.47
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 2
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.35Cr / 0.91Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score4.47 / 10
2.5% 4.88
CategoryDug Well Recharge
Started / Completed / Phys1,111 / 120 / 570
⚠ Works needing verification (Completed/Physically Completed)60 works (exp <30%)
Completion rate62.1%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked0.95Cr / 0.34Cr
Expenditure rate (ongoing)35.5%
Part B score (max 5.0)1.78 / 5.0
Final score4.88 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
40.8% 6.61
CategoryWater conservation & recharge
Started / Completed / Phys708 / 106 / 366
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked15.73Cr / 10.32Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score6.61 / 10
5.5% 7.10
CategoryWatershed Related Works
Started / Completed / Phys60 / 4 / 44
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked1.64Cr / 1.01Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score7.10 / 10
5.4% 6.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys107 / 13 / 56
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked2.51Cr / 1.61Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.44 / 10
5.2% 1.92
CategoryGap Filling in Plantation
Started / Completed / Phys216 / 2 / 19
Completion rate9.7%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked5.00Cr / 1.43Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score1.92 / 10
11.1% 3.18
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys572 / 53 / 81
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate23.4%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked10.18Cr / 4.08Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.01 / 5.0
Final score3.18 / 10
1.6% 8.43
CategoryPMKSY: Watershed
PMKSY Works0 total  (2 done / -2 ongoing)
JGSA Target1.80 Cr
JGSA Valuation1.41 Cr
Expenditure0.83 Cr
% Valuation78.2%
Val Marks (20%)1.56
Exp Marks (20%)0.92
Claim Marks (25%)2.49
Bill Progress1.060
Bill Marks (25%)2.48
Geotag Marks (5%)0.500
Physical Marks (5%)0.48
Final score8.43 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works2,935
Target Works2,910
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
50 NARMADAPURAM โ†— 5.63 D
24.0% 4.14
CategoryFarm Pond
Started / Completed / Phys677 / 258 / 205
⚠ Works needing verification (Completed/Physically Completed)89 works (exp <30%)
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked3.58Cr / 0.52Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.73 / 5.0
Final score4.14 / 10
1.5% 4.41
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.11Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.41 / 5.0
Final score4.41 / 10
4.0% 9.63
CategoryDug Well Recharge
Started / Completed / Phys966 / 509 / 385
⚠ Works needing verification (Completed/Physically Completed)72 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.63 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys41 / 34 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.5% 7.47
CategoryWater conservation & recharge
Started / Completed / Phys343 / 180 / 162
Completion rate99.7%
Part A score (max 5.0)4.99 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score7.47 / 10
1.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys43 / 29 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 28 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.3% 2.13
CategoryGap Filling in Plantation
Started / Completed / Phys312 / 46 / 40
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate27.6%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked5.02Cr / 0.75Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score2.13 / 10
21.1% 4.48
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys702 / 359 / 130
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate69.7%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked2.84Cr / 0.56Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score4.48 / 10
2.1% 6.89
CategoryPMKSY: Watershed
PMKSY Works0 total  (7 done / -7 ongoing)
JGSA Target1.29 Cr
JGSA Valuation0.64 Cr
Expenditure0.33 Cr
% Valuation49.8%
Val Marks (20%)0.99
Exp Marks (20%)0.51
Claim Marks (25%)2.20
Bill Progress0.823
Bill Marks (25%)2.20
Geotag Marks (5%)0.490
Physical Marks (5%)0.50
Final score6.89 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works3,141
Target Works2,110
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
51 SHAJAPUR โ†— 5.38 D
27.9% 5.45
CategoryFarm Pond
Started / Completed / Phys538 / 296 / 130
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate79.2%
Part A score (max 5.0)3.96 / 5.0
Ongoing sanction / booked3.26Cr / 0.97Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.50 / 5.0
Final score5.45 / 10
2.4% 4.53
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 3
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.85Cr / 0.45Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score4.53 / 10
6.6% 4.89
CategoryDug Well Recharge
Started / Completed / Phys1,511 / 685 / 777
⚠ Works needing verification (Completed/Physically Completed)47 works (exp <30%)
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.1%
Part B score (max 5.0)0.05 / 5.0
Final score4.89 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
23.0% 7.35
CategoryWater conservation & recharge
Started / Completed / Phys289 / 130 / 150
Completion rate96.9%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.37Cr / 0.19Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.51 / 5.0
Final score7.35 / 10
2.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys40 / 18 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 5 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.8% 1.73
CategoryGap Filling in Plantation
Started / Completed / Phys310 / 24 / 40
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate20.6%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked5.24Cr / 0.73Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score1.73 / 10
11.4% 2.60
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys103 / 8 / 33
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked2.66Cr / 0.33Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score2.60 / 10
5.6% 8.11
CategoryPMKSY: Watershed
PMKSY Works0 total  (15 done / -15 ongoing)
JGSA Target3.16 Cr
JGSA Valuation2.37 Cr
Expenditure1.53 Cr
% Valuation75.0%
Val Marks (20%)1.50
Exp Marks (20%)0.97
Claim Marks (25%)2.33
Bill Progress1.016
Bill Marks (25%)2.33
Geotag Marks (5%)0.480
Physical Marks (5%)0.50
Final score8.11 / 10
5.0% 6.40
CategoryJSJB 2.0
Total Works1,537
Target Works2,401
Achievement %64.0%
Weightage5% of composite score
Final score6.40 / 10
52 BHIND โ†— 5.36 D
11.0% 3.16
CategoryFarm Pond
Started / Completed / Phys996 / 280 / 207
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate48.9%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked8.38Cr / 1.20Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.71 / 5.0
Final score3.16 / 10
2.1% 0.63
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.62Cr / 0.46Cr
Expenditure rate (ongoing)12.7%
Part B score (max 5.0)0.63 / 5.0
Final score0.63 / 10
0.2% 5.85
CategoryDug Well Recharge
Started / Completed / Phys116 / 7 / 87
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score5.85 / 10
5.5% 7.48
CategoryIrrigation infrastructure
Started / Completed / Phys143 / 10 / 116
Completion rate88.1%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked1.51Cr / 0.93Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score7.48 / 10
37.5% 7.38
CategoryWater conservation & recharge
Started / Completed / Phys722 / 121 / 511
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked7.33Cr / 4.40Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.38 / 10
5.6% 7.81
CategoryWatershed Related Works
Started / Completed / Phys75 / 17 / 52
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.90Cr / 0.57Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score7.81 / 10
2.7% 7.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys62 / 6 / 49
Completion rate88.7%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.42Cr / 0.25Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.37 / 10
3.6% 1.86
CategoryGap Filling in Plantation
Started / Completed / Phys153 / 0 / 28
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate18.3%
Part A score (max 5.0)0.92 / 5.0
Ongoing sanction / booked4.59Cr / 0.87Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score1.86 / 10
26.7% 3.03
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys577 / 9 / 160
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate29.3%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked27.00Cr / 8.45Cr
Expenditure rate (ongoing)31.3%
Part B score (max 5.0)1.56 / 5.0
Final score3.03 / 10
โ€”
5.0% 5.81
CategoryJSJB 2.0
Total Works1,236
Target Works2,126
Achievement %58.1%
Weightage5% of composite score
Final score5.81 / 10
Scheme: โ‚น Sanction Weighted Level: District Snapshot: 2026-06-29 Units shown: 52 โšก Weight % shown is each unit's own auto-computed weight โ€” not the global admin-set value.
102
Day of campaign
103
Total days
1
Days remaining
Flat
Grading scheme
Campaign: 2026-03-19 โ†’ 2026-06-30  ยท  Grades based on raw combined achievement % โ€” no benchmark division.
Grade thresholds (raw combined %):
A โ€” On Track โ‰ฅ 80% B โ€” Progressing โ‰ฅ 70% C โ€” Lagging โ‰ฅ 60% D โ€” Critical โ‰ฅ 0% N/A No target
Grade distribution โ€” 52 districts on this snapshot:
4
A โ€” On Track
5
B โ€” Progressing
26
C โ€” Lagging
17
D โ€” Critical
๐Ÿ’ก Flat scheme: Score % = (total score / 10) ร— 100. Grade assigned by comparing this % directly against fixed thresholds โ€” e.g., A+ โ‰ฅ 85%, A โ‰ฅ 80%.

โš–๏ธ Step 1 โ€” Category Weightage

Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.

Weightage = Sanctioned Cost of Category รท Total Sanctioned Cost (all categories) e.g. Farm Pond = โ‚น200 Cr out of โ‚น500 Cr total Weightage = 200 รท 500 = 0.40 (40%)

Computed independently per unit โ€” two districts with different sanction distributions will have different weightages for the same category.

๐Ÿ…ฐ Step 2a โ€” Part A Score (Completion)

Fixed 50% weight on completion of works.

Part A = (Completed + Phys) รท Started ร— 5

๐Ÿ…ฑ Step 2b โ€” Part B Score (Expenditure)

Fixed 50% weight on expenditure booking on ongoing works.

Part B = (Ongoing Booked รท Ongoing Sanction) ร— 5 If all done โ†’ full 5 marks automatically

๐Ÿ… Step 3 โ€” Ceiling & Model

Category Score = Part A + Part B

๐Ÿ“Š Step 4 โ€” Final Composite Score

Weighted sum of all category scores (weightages sum to 100%).

Final Score = ฮฃ (Weightage_i ร— Score_i)

Example: Farm Pond 40% ร— 7.2 + Dug Well 20% ร— 6.5 + Amrit Sarovar 40% ร— 8.1 โ†’ 7.42

๐Ÿ’ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.
Score Breakup
Sanction cost in โ‚น Crore  ยท  Marks on a scale of 0โ€“10
Sr. Category Sanction Cost
(โ‚น Crore)
Weightage
for Category
Marks Obtained (scale 0โ€“10) Marks as per
Weightage
For Completion
of Works
For Expenditure
Booking on
Running Works
Total