Sanction Cost Weighted mode. Each block's category weight is auto-computed from its own sanction amount proportions. Two units with identical category counts may have different weight distributions.
PANSEMAL
10.00
๐Ÿฅ‡
Completed41 Started483 Rank#1
SENDHAWA
9.99
๐Ÿฅˆ
Completed50 Started1961 Rank#2
WARASEONI
9.99
๐Ÿฅ‰
Completed262 Started634 Rank#3
๐Ÿ“‹ Category Scorecard โ€” Block Level
313 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
# Block District Total ๐Ÿ“ˆ Trajectory
raw achievement %
Farm Pondโ–ถ Amrit Sarowarโ–ถ Dug Well Rechargeโ–ถ Irrigation infrastructureโ–ถ Water conservation & rechargeโ–ถ Watershed Related Worksโ–ถ Repair & Maintenance (Water Structures)โ–ถ Gap Filling in Plantationโ–ถ Work Not Permissible in VB-GRAM-Gโ–ถ
๐Ÿฅ‡ PANSEMAL โ†— BARWANI 10.00 A
25.0% 10.00
CategoryFarm Pond
Started / Completed / Phys150 / 20 / 130
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.2% 9.92
CategoryDug Well Recharge
Started / Completed / Phys184 / 6 / 175
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
โ€”
37.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys76 / 4 / 72
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys18 / 8 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.0% 10.00
CategoryGap Filling in Plantation
Started / Completed / Phys24 / 0 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.6% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys27 / 3 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
๐Ÿฅˆ SENDHAWA โ†— BARWANI 9.99 A
22.0% 9.98
CategoryFarm Pond
Started / Completed / Phys261 / 13 / 247
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
13.4% 9.99
CategoryDug Well Recharge
Started / Completed / Phys1,144 / 9 / 1,132
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate99.7%
Part A score (max 5.0)4.99 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.99 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys206 / 16 / 190
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.8% 10.00
CategoryGap Filling in Plantation
Started / Completed / Phys213 / 1 / 212
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.6% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys112 / 1 / 111
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
๐Ÿฅ‰ WARASEONI โ†— BALAGHAT 9.99 A
53.6% 10.00
CategoryFarm Pond
Started / Completed / Phys329 / 136 / 193
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys112 / 56 / 56
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys157 / 54 / 103
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 7.50
CategoryGap Filling in Plantation
Started / Completed / Phys2 / 0 / 1
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score7.50 / 10
2.0% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys11 / 3 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4 PATI โ†— BARWANI 9.99 A
11.7% 10.00
CategoryFarm Pond
Started / Completed / Phys208 / 4 / 204
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys700 / 19 / 681
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
34.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys111 / 9 / 102
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys50 / 2 / 48
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.4% 9.84
CategoryGap Filling in Plantation
Started / Completed / Phys61 / 0 / 59
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate96.7%
Part A score (max 5.0)4.84 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.84 / 10
17.8% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys68 / 0 / 68
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5 NEWALI โ†— BARWANI 9.98 A
21.4% 9.94
CategoryFarm Pond
Started / Completed / Phys82 / 8 / 73
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.8%
Part A score (max 5.0)4.94 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.94 / 10
โ€”
12.1% 9.98
CategoryDug Well Recharge
Started / Completed / Phys264 / 1 / 262
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
47.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys79 / 16 / 63
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 10.00
CategoryGap Filling in Plantation
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.8% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys19 / 0 / 19
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6 MANASA โ†— NEEMUCH 9.98 A
40.9% 10.00
CategoryFarm Pond
Started / Completed / Phys348 / 52 / 296
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.1% 9.95
CategoryDug Well Recharge
Started / Completed / Phys739 / 478 / 253
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.95 / 10
3.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 4 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys179 / 23 / 156
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.5% 10.00
CategoryGap Filling in Plantation
Started / Completed / Phys48 / 8 / 40
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.5% 9.87
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys39 / 5 / 33
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.87 / 10
7 JAWAD โ†— NEEMUCH 9.94 A
21.2% 9.97
CategoryFarm Pond
Started / Completed / Phys173 / 6 / 166
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.97 / 10
0.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys588 / 82 / 506
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 9.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 8
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)95.6%
Part B score (max 5.0)4.78 / 5.0
Final score9.00 / 10
29.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys90 / 1 / 89
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 2 / 19
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.3% 9.83
CategoryGap Filling in Plantation
Started / Completed / Phys59 / 12 / 45
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.83 / 10
19.6% 9.86
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys35 / 1 / 33
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.1%
Part A score (max 5.0)4.86 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.86 / 10
8 KATANGI โ†— BALAGHAT 9.93 A
54.4% 10.00
CategoryFarm Pond
Started / Completed / Phys377 / 116 / 261
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys140 / 47 / 93
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys146 / 36 / 110
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 6.11
CategoryGap Filling in Plantation
Started / Completed / Phys9 / 0 / 2
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score6.11 / 10
6.6% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys25 / 11 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9 BARWANI โ†— BARWANI 9.91 A
32.4% 9.93
CategoryFarm Pond
Started / Completed / Phys134 / 5 / 127
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.5%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
โ€”
11.7% 9.98
CategoryDug Well Recharge
Started / Completed / Phys241 / 21 / 219
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
10.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys23 / 2 / 21
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 3 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.9% 9.80
CategoryGap Filling in Plantation
Started / Completed / Phys50 / 3 / 45
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.80 / 10
5.2% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys15 / 0 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10 ZIRANYA โ†— KHARGONE 9.91 A
12.3% 10.00
CategoryFarm Pond
Started / Completed / Phys280 / 53 / 227
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.1% 9.91
CategoryDug Well Recharge
Started / Completed / Phys444 / 205 / 231
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.91 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
68.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys306 / 57 / 249
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 12 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.3% 7.73
CategoryGap Filling in Plantation
Started / Completed / Phys66 / 3 / 33
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score7.73 / 10
1.4% 9.29
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys21 / 6 / 12
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.29 / 10
11 LALBARRA โ†— BALAGHAT 9.87 A
56.7% 10.00
CategoryFarm Pond
Started / Completed / Phys472 / 376 / 96
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys172 / 149 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys176 / 47 / 129
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 10.00
CategoryGap Filling in Plantation
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 6.50
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys24 / 6 / 16
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score6.50 / 10
12 RAJPUR โ†— BARWANI 9.81 A
17.6% 10.00
CategoryFarm Pond
Started / Completed / Phys159 / 0 / 159
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys382 / 0 / 382
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys35 / 3 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys38 / 1 / 37
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.5% 9.41
CategoryGap Filling in Plantation
Started / Completed / Phys85 / 0 / 75
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.41 / 10
7.5% 9.89
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys46 / 0 / 45
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.89 / 10
13 THIKRI โ†— BARWANI 9.81 A
39.4% 10.00
CategoryFarm Pond
Started / Completed / Phys131 / 0 / 131
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys102 / 2 / 100
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys13 / 7 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 6 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.8% 9.39
CategoryGap Filling in Plantation
Started / Completed / Phys33 / 2 / 27
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate87.9%
Part A score (max 5.0)4.39 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.39 / 10
16.6% 9.80
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys25 / 1 / 23
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.80 / 10
14 KHANDWA โ†— KHANDWA 9.64 A
22.0% 8.43
CategoryFarm Pond
Started / Completed / Phys258 / 47 / 130
⚠ Works needing verification (Completed/Physically Completed)81 works (exp <30%)
Completion rate68.6%
Part A score (max 5.0)3.43 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.43 / 10
6.2% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.8% 9.82
CategoryDug Well Recharge
Started / Completed / Phys824 / 278 / 516
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.82 / 10
3.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys101 / 29 / 72
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys45 / 7 / 38
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryGap Filling in Plantation
Started / Completed / Phys11 / 0 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28.0% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys95 / 5 / 90
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15 KHALAWA โ†— KHANDWA 9.63 A
22.2% 8.65
CategoryFarm Pond
Started / Completed / Phys382 / 28 / 251
⚠ Works needing verification (Completed/Physically Completed)103 works (exp <30%)
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.65 / 10
4.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.4% 9.98
CategoryDug Well Recharge
Started / Completed / Phys1,097 / 50 / 1,043
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
1.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 3 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys195 / 30 / 165
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys44 / 8 / 36
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 5 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.3% 9.67
CategoryGap Filling in Plantation
Started / Completed / Phys15 / 2 / 12
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.67 / 10
14.6% 9.68
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys78 / 4 / 69
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.68 / 10
16 PANDHANA โ†— KHANDWA 9.62 A
37.3% 9.03
CategoryFarm Pond
Started / Completed / Phys377 / 178 / 126
⚠ Works needing verification (Completed/Physically Completed)73 works (exp <30%)
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.03 / 10
6.6% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.3% 9.99
CategoryDug Well Recharge
Started / Completed / Phys1,155 / 447 / 706
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate99.8%
Part A score (max 5.0)4.99 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.99 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys148 / 38 / 110
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys24 / 7 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 3 / 19
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryGap Filling in Plantation
Started / Completed / Phys13 / 5 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.4% 9.78
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys23 / 3 / 19
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate95.7%
Part A score (max 5.0)4.78 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.78 / 10
17 KASRAWAD โ†— KHARGONE 9.56 A
19.6% 10.00
CategoryFarm Pond
Started / Completed / Phys318 / 112 / 206
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.4% 9.98
CategoryDug Well Recharge
Started / Completed / Phys554 / 202 / 350
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
1.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
61.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys338 / 61 / 277
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 3.84
CategoryGap Filling in Plantation
Started / Completed / Phys26 / 1 / 15
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.10Cr / 0.01Cr
Expenditure rate (ongoing)15.2%
Part B score (max 5.0)0.76 / 5.0
Final score3.84 / 10
4.0% 5.24
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys31 / 4 / 22
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate83.9%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.20Cr / 0.04Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.04 / 5.0
Final score5.24 / 10
18 CHHAIGAON MAKHAN โ†— KHANDWA 9.44 A
38.4% 8.66
CategoryFarm Pond
Started / Completed / Phys320 / 129 / 105
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate73.1%
Part A score (max 5.0)3.66 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.66 / 10
4.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.6% 9.93
CategoryDug Well Recharge
Started / Completed / Phys838 / 722 / 105
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate98.7%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys83 / 35 / 48
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys18 / 8 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 8.57
CategoryGap Filling in Plantation
Started / Completed / Phys7 / 2 / 3
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.57 / 10
12.7% 9.91
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys58 / 13 / 44
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.91 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.91 / 10
19 PUNASA โ†— KHANDWA 9.33 A
40.8% 8.77
CategoryFarm Pond
Started / Completed / Phys338 / 47 / 208
⚠ Works needing verification (Completed/Physically Completed)83 works (exp <30%)
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.77 / 10
1.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.0% 9.90
CategoryDug Well Recharge
Started / Completed / Phys1,132 / 253 / 856
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.90 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys114 / 17 / 97
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys35 / 9 / 26
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 9.17
CategoryGap Filling in Plantation
Started / Completed / Phys6 / 0 / 5
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.17 / 10
12.0% 8.90
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys41 / 1 / 31
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.90 / 10
20 HARSUD โ†— KHANDWA 9.33 A
36.5% 8.32
CategoryFarm Pond
Started / Completed / Phys182 / 66 / 55
⚠ Works needing verification (Completed/Physically Completed)61 works (exp <30%)
Completion rate66.5%
Part A score (max 5.0)3.32 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.32 / 10
โ€”
21.7% 9.96
CategoryDug Well Recharge
Started / Completed / Phys756 / 297 / 453
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.96 / 10
1.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys48 / 22 / 26
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.0% 8.75
CategoryGap Filling in Plantation
Started / Completed / Phys12 / 4 / 5
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.75 / 10
8.4% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys17 / 3 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21 MAHIDPUR โ†— UJJAIN 9.33 A
26.1% 9.95
CategoryFarm Pond
Started / Completed / Phys92 / 44 / 47
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.95 / 10
13.5% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys912 / 182 / 730
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys37 / 24 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.2% 4.62
CategoryGap Filling in Plantation
Started / Completed / Phys22 / 6 / 13
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)6.1%
Part B score (max 5.0)0.30 / 5.0
Final score4.62 / 10
4.7% 4.23
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)9.6%
Part B score (max 5.0)0.48 / 5.0
Final score4.23 / 10
22 AMARPUR โ†— DINDORI 9.11 A
31.2% 9.92
CategoryFarm Pond
Started / Completed / Phys254 / 97 / 153
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
โ€”
2.5% 9.98
CategoryDug Well Recharge
Started / Completed / Phys200 / 29 / 170
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
27.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys60 / 6 / 54
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys31 / 27 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 9 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 4.89
CategoryGap Filling in Plantation
Started / Completed / Phys8 / 6 / 1
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)10.2%
Part B score (max 5.0)0.51 / 5.0
Final score4.89 / 10
18.4% 5.52
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys44 / 24 / 15
Completion rate88.6%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.15Cr / 0.03Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.09 / 5.0
Final score5.52 / 10
23 BALADI โ†— KHANDWA 9.09 A
46.3% 8.13
CategoryFarm Pond
Started / Completed / Phys96 / 36 / 24
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.13 / 10
4.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.5% 9.85
CategoryDug Well Recharge
Started / Completed / Phys334 / 133 / 191
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.85 / 10
โ€”
10.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys22 / 6 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.2% 10.00
CategoryGap Filling in Plantation
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.7% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24 TARANA โ†— UJJAIN 9.09 A
25.3% 10.00
CategoryFarm Pond
Started / Completed / Phys118 / 26 / 92
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.1% 9.98
CategoryDug Well Recharge
Started / Completed / Phys831 / 593 / 235
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
11.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys45 / 24 / 21
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys36 / 32 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.6% 4.64
CategoryGap Filling in Plantation
Started / Completed / Phys36 / 21 / 10
Completion rate86.1%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.15Cr / 0.01Cr
Expenditure rate (ongoing)6.7%
Part B score (max 5.0)0.34 / 5.0
Final score4.64 / 10
8.9% 4.35
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys20 / 0 / 16
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.01Cr
Expenditure rate (ongoing)7.1%
Part B score (max 5.0)0.35 / 5.0
Final score4.35 / 10
25 NEEMUCH โ†— NEEMUCH 9.00 A
27.0% 9.91
CategoryFarm Pond
Started / Completed / Phys162 / 18 / 141
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.1%
Part A score (max 5.0)4.91 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.91 / 10
3.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.9% 9.93
CategoryDug Well Recharge
Started / Completed / Phys588 / 240 / 340
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
1.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys49 / 3 / 46
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.6% 9.18
CategoryGap Filling in Plantation
Started / Completed / Phys67 / 11 / 45
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.18 / 10
17.7% 5.07
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys25 / 3 / 21
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.08Cr / 0.00Cr
Expenditure rate (ongoing)5.4%
Part B score (max 5.0)0.27 / 5.0
Final score5.07 / 10
26 BADNAGAR โ†— UJJAIN 8.72 A
51.5% 9.82
CategoryFarm Pond
Started / Completed / Phys165 / 26 / 133
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.82 / 10
9.0% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 11 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys19 / 6 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.2% 3.97
CategoryGap Filling in Plantation
Started / Completed / Phys27 / 0 / 21
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.15Cr / 0.00Cr
Expenditure rate (ongoing)1.6%
Part B score (max 5.0)0.08 / 5.0
Final score3.97 / 10
12.1% 3.26
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys14 / 3 / 6
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.21Cr / 0.00Cr
Expenditure rate (ongoing)0.9%
Part B score (max 5.0)0.04 / 5.0
Final score3.26 / 10
27 MEHANDWANI โ†— DINDORI 8.68 A
38.1% 10.00
CategoryFarm Pond
Started / Completed / Phys287 / 69 / 218
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.0% 9.92
CategoryDug Well Recharge
Started / Completed / Phys189 / 147 / 39
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
โ€”
14.7% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys89 / 6 / 81
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.29Cr / 0.28Cr
Expenditure rate (ongoing)96.2%
Part B score (max 5.0)4.81 / 5.0
Final score9.00 / 10
18.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys44 / 20 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 4.02
CategoryGap Filling in Plantation
Started / Completed / Phys13 / 0 / 4
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate30.8%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score4.02 / 10
23.5% 5.24
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys86 / 17 / 51
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate79.1%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.53Cr / 0.14Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.29 / 5.0
Final score5.24 / 10
28 SANCHI โ†— RAISEN 8.62 A
49.4% 9.92
CategoryFarm Pond
Started / Completed / Phys302 / 241 / 56
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
0.5% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys160 / 154 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
23.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys18 / 5 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.3% 0.77
CategoryGap Filling in Plantation
Started / Completed / Phys35 / 1 / 0
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate2.9%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked1.27Cr / 0.16Cr
Expenditure rate (ongoing)12.6%
Part B score (max 5.0)0.63 / 5.0
Final score0.77 / 10
8.8% 5.65
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys34 / 18 / 11
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.14Cr / 0.04Cr
Expenditure rate (ongoing)27.7%
Part B score (max 5.0)1.39 / 5.0
Final score5.65 / 10
29 MOHKHED โ†— CHHINDWARA 8.59 A
14.9% 8.87
CategoryFarm Pond
Started / Completed / Phys126 / 12 / 104
Completion rate92.1%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.17Cr / 0.15Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score8.87 / 10
โ€”
6.7% 9.96
CategoryDug Well Recharge
Started / Completed / Phys376 / 27 / 346
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.96 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
34.6% 8.69
CategoryWater conservation & recharge
Started / Completed / Phys60 / 12 / 40
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked2.66Cr / 2.32Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score8.69 / 10
18.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys43 / 23 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.0% 4.52
CategoryGap Filling in Plantation
Started / Completed / Phys39 / 5 / 19
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.30Cr / 0.09Cr
Expenditure rate (ongoing)28.8%
Part B score (max 5.0)1.44 / 5.0
Final score4.52 / 10
18.5% 7.25
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys47 / 10 / 30
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.21Cr / 0.13Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score7.25 / 10
30 KHACHAROD โ†— UJJAIN 8.57 A
26.6% 10.00
CategoryFarm Pond
Started / Completed / Phys101 / 55 / 46
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.2% 9.89
CategoryDug Well Recharge
Started / Completed / Phys510 / 427 / 72
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.89 / 10
โ€”
13.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys17 / 8 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.2% 4.38
CategoryGap Filling in Plantation
Started / Completed / Phys55 / 11 / 34
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.29 / 5.0
Final score4.38 / 10
13.3% 5.39
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys9 / 1 / 6
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.50 / 5.0
Final score5.39 / 10
31 BAMORI โ†— GUNA 8.54 A
21.6% 9.75
CategoryFarm Pond
Started / Completed / Phys80 / 76 / 0
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.75 / 10
โ€”
2.2% 9.92
CategoryDug Well Recharge
Started / Completed / Phys60 / 14 / 45
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
โ€”
31.1% 8.05
CategoryWater conservation & recharge
Started / Completed / Phys13 / 3 / 8
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.34Cr / 0.26Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score8.05 / 10
4.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.1% 2.51
CategoryGap Filling in Plantation
Started / Completed / Phys4 / 0 / 2
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.10Cr / 0.00Cr
Expenditure rate (ongoing)0.2%
Part B score (max 5.0)0.01 / 5.0
Final score2.51 / 10
4.8% 7.50
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys12 / 4 / 2
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score7.50 / 10
32 SAILANA โ†— RATLAM 8.47 A
16.6% 5.49
CategoryFarm Pond
Started / Completed / Phys180 / 101 / 71
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.71 / 5.0
Final score5.49 / 10
8.1% 4.38
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.35Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score4.38 / 10
5.7% 7.01
CategoryDug Well Recharge
Started / Completed / Phys332 / 67 / 260
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate98.5%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.09 / 5.0
Final score7.01 / 10
โ€”
42.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys73 / 29 / 44
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 7 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.0% 1.88
CategoryGap Filling in Plantation
Started / Completed / Phys20 / 4 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.04Cr
Expenditure rate (ongoing)17.5%
Part B score (max 5.0)0.88 / 5.0
Final score1.88 / 10
21.0% 10.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys89 / 45 / 44
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33 UJJAIN โ†— UJJAIN 8.45 A
25.3% 10.00
CategoryFarm Pond
Started / Completed / Phys76 / 6 / 70
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys244 / 47 / 197
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys43 / 8 / 35
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.9% 4.82
CategoryGap Filling in Plantation
Started / Completed / Phys15 / 3 / 10
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)9.8%
Part B score (max 5.0)0.49 / 5.0
Final score4.82 / 10
17.0% 3.60
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys14 / 3 / 7
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)0.5%
Part B score (max 5.0)0.03 / 5.0
Final score3.60 / 10
34 BALAGHAT โ†— BALAGHAT 8.42 A
53.0% 7.41
CategoryFarm Pond
Started / Completed / Phys296 / 191 / 99
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.37Cr / 0.18Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.51 / 5.0
Final score7.41 / 10
2.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 9.96
CategoryDug Well Recharge
Started / Completed / Phys134 / 71 / 62
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.3%
Part A score (max 5.0)4.96 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.96 / 10
โ€”
31.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys75 / 26 / 49
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 4.14
CategoryGap Filling in Plantation
Started / Completed / Phys8 / 0 / 5
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)20.3%
Part B score (max 5.0)1.02 / 5.0
Final score4.14 / 10
5.8% 7.28
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys46 / 26 / 13
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate84.8%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.47Cr / 0.29Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.04 / 5.0
Final score7.28 / 10
35 SAMNAPUR โ†— DINDORI 8.40 A
28.4% 9.80
CategoryFarm Pond
Started / Completed / Phys254 / 158 / 86
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate96.1%
Part A score (max 5.0)4.80 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.80 / 10
โ€”
2.8% 9.65
CategoryDug Well Recharge
Started / Completed / Phys186 / 119 / 54
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate93.0%
Part A score (max 5.0)4.65 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.65 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.1% 8.08
CategoryWater conservation & recharge
Started / Completed / Phys69 / 16 / 49
Completion rate94.2%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score8.08 / 10
18.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys28 / 10 / 18
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.6% 5.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 4
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.10Cr / 0.02Cr
Expenditure rate (ongoing)24.6%
Part B score (max 5.0)1.23 / 5.0
Final score5.67 / 10
3.4% 1.33
CategoryGap Filling in Plantation
Started / Completed / Phys27 / 1 / 3
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate14.8%
Part A score (max 5.0)0.74 / 5.0
Ongoing sanction / booked0.50Cr / 0.06Cr
Expenditure rate (ongoing)11.7%
Part B score (max 5.0)0.59 / 5.0
Final score1.33 / 10
5.3% 3.74
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys21 / 7 / 7
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.41 / 5.0
Final score3.74 / 10
36 KOTMA โ†— ANUPPUR 8.39 A
57.3% 9.93
CategoryFarm Pond
Started / Completed / Phys486 / 382 / 97
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
โ€”
0.8% 9.70
CategoryDug Well Recharge
Started / Completed / Phys50 / 2 / 45
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.70 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.1% 6.88
CategoryWater conservation & recharge
Started / Completed / Phys52 / 22 / 29
Completion rate98.1%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score6.88 / 10
0.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.0% 2.41
CategoryGap Filling in Plantation
Started / Completed / Phys77 / 4 / 1
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked1.67Cr / 0.69Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.41 / 10
8.1% 8.89
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys37 / 6 / 27
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate89.2%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)88.6%
Part B score (max 5.0)4.43 / 5.0
Final score8.89 / 10
37 GUNA โ†— GUNA 8.38 A
21.9% 6.59
CategoryFarm Pond
Started / Completed / Phys198 / 39 / 144
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate92.4%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.61Cr / 0.24Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.97 / 5.0
Final score6.59 / 10
โ€”
2.0% 9.85
CategoryDug Well Recharge
Started / Completed / Phys324 / 194 / 120
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate96.9%
Part A score (max 5.0)4.85 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.85 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.1% 8.98
CategoryWater conservation & recharge
Started / Completed / Phys187 / 42 / 139
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.91Cr / 0.75Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score8.98 / 10
1.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.0% 8.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 2 / 7
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score8.02 / 10
4.8% 4.42
CategoryGap Filling in Plantation
Started / Completed / Phys51 / 5 / 20
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate49.0%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked0.54Cr / 0.21Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score4.42 / 10
28.5% 9.43
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys131 / 18 / 98
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate88.5%
Part A score (max 5.0)4.43 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.43 / 10
38 GHATIYA โ†— UJJAIN 8.34 A
31.9% 9.85
CategoryFarm Pond
Started / Completed / Phys66 / 30 / 34
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.85 / 10
4.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.8% 9.90
CategoryDug Well Recharge
Started / Completed / Phys302 / 74 / 222
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.90 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys19 / 4 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.9% 4.79
CategoryGap Filling in Plantation
Started / Completed / Phys27 / 0 / 25
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)3.3%
Part B score (max 5.0)0.16 / 5.0
Final score4.79 / 10
18.4% 5.25
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys19 / 7 / 11
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)10.2%
Part B score (max 5.0)0.51 / 5.0
Final score5.25 / 10
39 CHAURAI โ†— CHHINDWARA 8.22 A
18.8% 7.94
CategoryFarm Pond
Started / Completed / Phys98 / 7 / 88
Completion rate96.9%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score7.94 / 10
2.4% 1.51
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)30.2%
Part B score (max 5.0)1.51 / 5.0
Final score1.51 / 10
6.9% 7.08
CategoryDug Well Recharge
Started / Completed / Phys460 / 115 / 336
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)43.5%
Part B score (max 5.0)2.17 / 5.0
Final score7.08 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.1% 8.86
CategoryWater conservation & recharge
Started / Completed / Phys49 / 16 / 31
Completion rate95.9%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.99Cr / 0.81Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.06 / 5.0
Final score8.86 / 10
14.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys37 / 15 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.1% 6.17
CategoryGap Filling in Plantation
Started / Completed / Phys19 / 1 / 16
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.9%
Part B score (max 5.0)1.69 / 5.0
Final score6.17 / 10
26.4% 8.05
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys74 / 10 / 57
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.52Cr / 0.37Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score8.05 / 10
40 SEGAON โ†— KHARGONE 8.19 A
17.3% 5.07
CategoryFarm Pond
Started / Completed / Phys114 / 0 / 111
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)4.0%
Part B score (max 5.0)0.20 / 5.0
Final score5.07 / 10
4.0% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.7% 9.83
CategoryDug Well Recharge
Started / Completed / Phys205 / 12 / 186
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.83 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys70 / 5 / 65
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys28 / 4 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.2% 1.73
CategoryGap Filling in Plantation
Started / Completed / Phys53 / 1 / 16
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate32.1%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked0.06Cr / 0.00Cr
Expenditure rate (ongoing)2.6%
Part B score (max 5.0)0.13 / 5.0
Final score1.73 / 10
9.8% 9.81
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys159 / 57 / 96
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.81 / 10
41 BHAGVANPURA โ†— KHARGONE 8.01 A
15.4% 5.52
CategoryFarm Pond
Started / Completed / Phys290 / 140 / 145
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)12.1%
Part B score (max 5.0)0.61 / 5.0
Final score5.52 / 10
2.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 9.76
CategoryDug Well Recharge
Started / Completed / Phys442 / 209 / 212
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.76 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
64.3% 8.89
CategoryWater conservation & recharge
Started / Completed / Phys215 / 59 / 150
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.72Cr / 0.58Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score8.89 / 10
3.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 2 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.1% 3.71
CategoryGap Filling in Plantation
Started / Completed / Phys59 / 2 / 31
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate55.9%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked0.20Cr / 0.04Cr
Expenditure rate (ongoing)18.3%
Part B score (max 5.0)0.92 / 5.0
Final score3.71 / 10
5.3% 5.20
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys113 / 4 / 85
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate78.8%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.23Cr / 0.06Cr
Expenditure rate (ongoing)25.2%
Part B score (max 5.0)1.26 / 5.0
Final score5.20 / 10
42 KHARGONE โ†— KHARGONE 7.98 B
24.2% 9.89
CategoryFarm Pond
Started / Completed / Phys90 / 25 / 63
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.89 / 10
6.5% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.9% 9.00
CategoryDug Well Recharge
Started / Completed / Phys239 / 18 / 220
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.22 / 5.0
Final score9.00 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys47 / 7 / 40
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
23.6% 2.47
CategoryGap Filling in Plantation
Started / Completed / Phys69 / 1 / 30
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate44.9%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked0.58Cr / 0.03Cr
Expenditure rate (ongoing)4.5%
Part B score (max 5.0)0.22 / 5.0
Final score2.47 / 10
2.9% 4.63
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys18 / 5 / 8
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)20.3%
Part B score (max 5.0)1.02 / 5.0
Final score4.63 / 10
43 DHIMERKHEDA โ†— KATNI 7.96 B
14.1% 4.69
CategoryFarm Pond
Started / Completed / Phys297 / 117 / 145
⚠ Works needing verification (Completed/Physically Completed)27 works (exp <30%)
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.12Cr / 0.01Cr
Expenditure rate (ongoing)5.6%
Part B score (max 5.0)0.28 / 5.0
Final score4.69 / 10
1.2% 7.08
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.19Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score7.08 / 10
0.7% 3.93
CategoryDug Well Recharge
Started / Completed / Phys95 / 37 / 27
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)11.2%
Part B score (max 5.0)0.56 / 5.0
Final score3.93 / 10
38.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys141 / 18 / 123
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.2% 8.09
CategoryWater conservation & recharge
Started / Completed / Phys42 / 10 / 29
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked1.52Cr / 1.05Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score8.09 / 10
19.8% 9.00
CategoryWatershed Related Works
Started / Completed / Phys70 / 23 / 46
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.90Cr / 0.84Cr
Expenditure rate (ongoing)93.9%
Part B score (max 5.0)4.70 / 5.0
Final score9.00 / 10
3.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 0.40
CategoryGap Filling in Plantation
Started / Completed / Phys14 / 1 / 0
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score0.40 / 10
9.3% 2.69
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys45 / 3 / 21
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.84Cr / 0.00Cr
Expenditure rate (ongoing)0.4%
Part B score (max 5.0)0.02 / 5.0
Final score2.69 / 10
44 GOTEGAON โ†— NARSINGHPUR 7.89 B
54.2% 9.98
CategoryFarm Pond
Started / Completed / Phys219 / 196 / 22
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
0.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys42 / 37 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys18 / 9 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.2% 2.30
CategoryGap Filling in Plantation
Started / Completed / Phys42 / 8 / 3
Completion rate26.2%
Part A score (max 5.0)1.31 / 5.0
Ongoing sanction / booked1.41Cr / 0.28Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score2.30 / 10
16.2% 4.73
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys54 / 14 / 21
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.96Cr / 0.29Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score4.73 / 10
45 BURHAR โ†— SHAHDOL 7.86 B
33.3% 5.26
CategoryFarm Pond
Started / Completed / Phys684 / 92 / 512
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate88.3%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked2.54Cr / 0.43Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score5.26 / 10
0.7% 2.36
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.24Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score2.36 / 10
0.6% 6.78
CategoryDug Well Recharge
Started / Completed / Phys177 / 22 / 149
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score6.78 / 10
4.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.5% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys343 / 31 / 303
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked1.29Cr / 1.18Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score9.00 / 10
25.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys185 / 11 / 174
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.3% 9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 7 / 7
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)91.8%
Part B score (max 5.0)4.59 / 5.0
Final score9.00 / 10
1.4% 4.96
CategoryGap Filling in Plantation
Started / Completed / Phys20 / 0 / 9
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate45.0%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score4.96 / 10
6.3% 7.84
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys129 / 7 / 107
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.82Cr / 0.56Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score7.84 / 10
46 AMARWARA โ†— CHHINDWARA 7.85 B
41.6% 7.52
CategoryFarm Pond
Started / Completed / Phys347 / 119 / 201
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate92.2%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.34Cr / 0.20Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score7.52 / 10
1.7% 1.37
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.11Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score1.37 / 10
4.3% 9.45
CategoryDug Well Recharge
Started / Completed / Phys382 / 159 / 181
⚠ Works needing verification (Completed/Physically Completed)42 works (exp <30%)
Completion rate89.0%
Part A score (max 5.0)4.45 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.45 / 10
โ€”
29.1% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys111 / 44 / 63
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.13Cr / 0.12Cr
Expenditure rate (ongoing)86.5%
Part B score (max 5.0)4.33 / 5.0
Final score9.00 / 10
4.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys16 / 8 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.7% 4.39
CategoryGap Filling in Plantation
Started / Completed / Phys11 / 1 / 6
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.10Cr / 0.02Cr
Expenditure rate (ongoing)24.1%
Part B score (max 5.0)1.21 / 5.0
Final score4.39 / 10
11.8% 6.60
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys76 / 8 / 58
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.26 / 5.0
Final score6.60 / 10
47 RAJGARH โ†— RAJGARH 7.76 B
16.9% 6.76
CategoryFarm Pond
Started / Completed / Phys454 / 313 / 119
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.26Cr / 0.10Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score6.76 / 10
1.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.5% 9.93
CategoryDug Well Recharge
Started / Completed / Phys568 / 460 / 100
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
61.5% 8.38
CategoryWater conservation & recharge
Started / Completed / Phys315 / 26 / 244
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked5.15Cr / 4.21Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score8.38 / 10
0.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.1% 9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 8 / 32
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)86.9%
Part B score (max 5.0)4.34 / 5.0
Final score9.00 / 10
0.1% 2.74
CategoryGap Filling in Plantation
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score2.74 / 10
11.6% 4.54
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys121 / 3 / 68
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate58.7%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked1.69Cr / 0.54Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.60 / 5.0
Final score4.54 / 10
48 ANUPPUR โ†— ANUPPUR 7.73 B
58.2% 9.00
CategoryFarm Pond
Started / Completed / Phys529 / 396 / 127
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)86.9%
Part B score (max 5.0)4.34 / 5.0
Final score9.00 / 10
โ€”
1.4% 9.33
CategoryDug Well Recharge
Started / Completed / Phys105 / 23 / 68
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.33 / 10
โ€”
17.7% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys78 / 34 / 43
Completion rate98.7%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)86.0%
Part B score (max 5.0)4.30 / 5.0
Final score9.00 / 10
โ€”
2.4% 9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.14Cr / 0.14Cr
Expenditure rate (ongoing)97.4%
Part B score (max 5.0)4.87 / 5.0
Final score9.00 / 10
10.7% 1.92
CategoryGap Filling in Plantation
Started / Completed / Phys95 / 2 / 14
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked1.17Cr / 0.25Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.07 / 5.0
Final score1.92 / 10
9.5% 3.63
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys63 / 5 / 37
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)5.8%
Part B score (max 5.0)0.29 / 5.0
Final score3.63 / 10
49 BAGH โ†— DHAR 7.67 B
5.8% 5.47
CategoryFarm Pond
Started / Completed / Phys243 / 11 / 144
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate63.8%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked1.27Cr / 0.58Cr
Expenditure rate (ongoing)45.6%
Part B score (max 5.0)2.28 / 5.0
Final score5.47 / 10
โ€”
1.4% 6.09
CategoryDug Well Recharge
Started / Completed / Phys365 / 14 / 232
⚠ Works needing verification (Completed/Physically Completed)24 works (exp <30%)
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score6.09 / 10
โ€”
85.2% 8.12
CategoryWater conservation & recharge
Started / Completed / Phys232 / 11 / 151
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked24.01Cr / 22.23Cr
Expenditure rate (ongoing)92.6%
Part B score (max 5.0)4.63 / 5.0
Final score8.12 / 10
2.1% 6.91
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 8
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score6.91 / 10
0.6% 6.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.50 / 5.0
Final score6.00 / 10
2.8% 2.47
CategoryGap Filling in Plantation
Started / Completed / Phys32 / 0 / 5
Completion rate15.6%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked1.59Cr / 0.54Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score2.47 / 10
2.1% 4.56
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys94 / 28 / 44
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked0.33Cr / 0.05Cr
Expenditure rate (ongoing)14.6%
Part B score (max 5.0)0.73 / 5.0
Final score4.56 / 10
50 TAMIA โ†— CHHINDWARA 7.65 B
22.3% 6.45
CategoryFarm Pond
Started / Completed / Phys269 / 117 / 109
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked1.81Cr / 0.81Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score6.45 / 10
3.9% 0.01
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.96Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score0.01 / 10
1.4% 9.98
CategoryDug Well Recharge
Started / Completed / Phys281 / 159 / 121
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
55.9% 8.43
CategoryWater conservation & recharge
Started / Completed / Phys305 / 88 / 186
Completion rate89.8%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked6.73Cr / 5.30Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score8.43 / 10
6.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys38 / 10 / 28
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 7.21
CategoryGap Filling in Plantation
Started / Completed / Phys15 / 2 / 8
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.56Cr / 0.44Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score7.21 / 10
6.2% 5.99
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys40 / 5 / 22
Completion rate67.5%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.71Cr / 0.37Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score5.99 / 10
51 DHANAURA โ†— SEONI 7.65 B
27.9% 5.06
CategoryFarm Pond
Started / Completed / Phys312 / 164 / 101
⚠ Works needing verification (Completed/Physically Completed)28 works (exp <30%)
Completion rate84.9%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.51Cr / 0.08Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.81 / 5.0
Final score5.06 / 10
1.5% 2.31
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.18Cr
Expenditure rate (ongoing)46.2%
Part B score (max 5.0)2.31 / 5.0
Final score2.31 / 10
1.7% 9.48
CategoryDug Well Recharge
Started / Completed / Phys200 / 93 / 86
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate89.5%
Part A score (max 5.0)4.48 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.48 / 10
โ€”
26.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys116 / 24 / 92
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys37 / 16 / 21
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 6.98
CategoryGap Filling in Plantation
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.36Cr / 0.20Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score6.98 / 10
19.9% 6.06
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys81 / 23 / 46
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.50Cr / 0.18Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.80 / 5.0
Final score6.06 / 10
52 ATHNER โ†— BETUL 7.57 B
11.5% 8.61
CategoryFarm Pond
Started / Completed / Phys167 / 19 / 138
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.15Cr / 0.12Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.91 / 5.0
Final score8.61 / 10
3.9% 2.81
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.54Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score2.81 / 10
3.7% 7.60
CategoryDug Well Recharge
Started / Completed / Phys355 / 51 / 296
Completion rate97.7%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score7.60 / 10
โ€”
67.8% 8.10
CategoryWater conservation & recharge
Started / Completed / Phys225 / 17 / 175
Completion rate85.3%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked2.80Cr / 2.15Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score8.10 / 10
3.9% 7.66
CategoryWatershed Related Works
Started / Completed / Phys15 / 7 / 7
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score7.66 / 10
0.9% 8.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 6 / 5
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score8.22 / 10
3.6% 2.36
CategoryGap Filling in Plantation
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.42Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score2.36 / 10
4.5% 5.10
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys27 / 8 / 13
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.11Cr / 0.03Cr
Expenditure rate (ongoing)24.1%
Part B score (max 5.0)1.21 / 5.0
Final score5.10 / 10
53 BAJNA โ†— RATLAM 7.47 B
12.9% 5.48
CategoryFarm Pond
Started / Completed / Phys274 / 128 / 139
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)12.1%
Part B score (max 5.0)0.60 / 5.0
Final score5.48 / 10
5.6% 6.25
CategoryAmrit Sarowar
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.11Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.25 / 5.0
Final score6.25 / 10
9.0% 5.29
CategoryDug Well Recharge
Started / Completed / Phys769 / 316 / 418
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)10.4%
Part B score (max 5.0)0.52 / 5.0
Final score5.29 / 10
โ€”
57.9% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys147 / 49 / 97
Completion rate99.3%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)87.3%
Part B score (max 5.0)4.36 / 5.0
Final score9.00 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 1.88
CategoryGap Filling in Plantation
Started / Completed / Phys9 / 1 / 2
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.12Cr / 0.01Cr
Expenditure rate (ongoing)4.2%
Part B score (max 5.0)0.21 / 5.0
Final score1.88 / 10
12.6% 4.72
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys39 / 6 / 26
Completion rate82.1%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.49Cr / 0.06Cr
Expenditure rate (ongoing)12.3%
Part B score (max 5.0)0.62 / 5.0
Final score4.72 / 10
54 BICHHUA โ†— CHHINDWARA 7.45 B
15.7% 8.08
CategoryFarm Pond
Started / Completed / Phys137 / 3 / 128
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score8.08 / 10
9.7% 3.03
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 0.95Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
4.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys294 / 9 / 285
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.3% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys41 / 2 / 38
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)87.6%
Part B score (max 5.0)4.38 / 5.0
Final score9.00 / 10
12.5% 8.56
CategoryWatershed Related Works
Started / Completed / Phys25 / 4 / 20
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score8.56 / 10
0.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.9% 2.55
CategoryGap Filling in Plantation
Started / Completed / Phys20 / 0 / 1
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked0.25Cr / 0.12Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.30 / 5.0
Final score2.55 / 10
17.7% 6.07
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys43 / 1 / 36
Completion rate86.0%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.38Cr / 0.13Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score6.07 / 10
55 CHANDERI โ†— ASHOK NAGAR 7.44 B
38.2% 5.00
CategoryFarm Pond
Started / Completed / Phys223 / 24 / 181
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate91.9%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.36Cr / 0.03Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score5.00 / 10
โ€”
1.5% 9.95
CategoryDug Well Recharge
Started / Completed / Phys100 / 51 / 48
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.95 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys151 / 13 / 138
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 3 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.0% 1.94
CategoryGap Filling in Plantation
Started / Completed / Phys38 / 2 / 10
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate31.6%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked0.18Cr / 0.01Cr
Expenditure rate (ongoing)7.3%
Part B score (max 5.0)0.36 / 5.0
Final score1.94 / 10
7.1% 4.37
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys109 / 15 / 79
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.20Cr / 0.00Cr
Expenditure rate (ongoing)1.2%
Part B score (max 5.0)0.06 / 5.0
Final score4.37 / 10
56 PARASWADA โ†— BALAGHAT 7.42 B
50.4% 6.22
CategoryFarm Pond
Started / Completed / Phys479 / 310 / 163
Completion rate98.7%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.08Cr / 0.02Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.29 / 5.0
Final score6.22 / 10
2.8% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 9.94
CategoryDug Well Recharge
Started / Completed / Phys166 / 132 / 32
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.8%
Part A score (max 5.0)4.94 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.94 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
36.5% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys208 / 47 / 159
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.28Cr / 0.26Cr
Expenditure rate (ongoing)93.6%
Part B score (max 5.0)4.68 / 5.0
Final score9.00 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 6.74
CategoryGap Filling in Plantation
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score6.74 / 10
5.7% 5.01
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys50 / 10 / 35
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)10.1%
Part B score (max 5.0)0.51 / 5.0
Final score5.01 / 10
57 BHIKANGAON โ†— KHARGONE 7.41 B
30.1% 5.95
CategoryFarm Pond
Started / Completed / Phys157 / 48 / 101
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate94.9%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.08Cr / 0.02Cr
Expenditure rate (ongoing)24.2%
Part B score (max 5.0)1.21 / 5.0
Final score5.95 / 10
5.8% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.5% 9.92
CategoryDug Well Recharge
Started / Completed / Phys412 / 134 / 271
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
โ€”
27.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys42 / 17 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
14.6% 4.00
CategoryGap Filling in Plantation
Started / Completed / Phys60 / 10 / 26
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.04Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score4.00 / 10
11.8% 5.84
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys91 / 16 / 55
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.26Cr / 0.10Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score5.84 / 10
58 KESLA โ†— NARMADAPURAM 7.39 B
19.3% 4.68
CategoryFarm Pond
Started / Completed / Phys85 / 3 / 64
Completion rate78.8%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.81Cr / 0.12Cr
Expenditure rate (ongoing)14.8%
Part B score (max 5.0)0.74 / 5.0
Final score4.68 / 10
5.6% 4.54
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.12Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.54 / 5.0
Final score4.54 / 10
2.1% 9.86
CategoryDug Well Recharge
Started / Completed / Phys141 / 19 / 118
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.86 / 10
โ€”
52.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys121 / 35 / 86
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.1% 2.40
CategoryGap Filling in Plantation
Started / Completed / Phys95 / 3 / 24
Completion rate28.4%
Part A score (max 5.0)1.42 / 5.0
Ongoing sanction / booked1.11Cr / 0.22Cr
Expenditure rate (ongoing)19.5%
Part B score (max 5.0)0.98 / 5.0
Final score2.40 / 10
9.5% 3.82
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys54 / 1 / 31
Completion rate59.3%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked0.61Cr / 0.10Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score3.82 / 10
59 TIRLA โ†— DHAR 7.38 B
14.1% 5.62
CategoryFarm Pond
Started / Completed / Phys292 / 44 / 183
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate77.7%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked1.86Cr / 0.64Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score5.62 / 10
โ€”
2.3% 4.68
CategoryDug Well Recharge
Started / Completed / Phys428 / 50 / 234
⚠ Works needing verification (Completed/Physically Completed)87 works (exp <30%)
Completion rate66.4%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked0.15Cr / 0.04Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.37 / 5.0
Final score4.68 / 10
โ€”
70.4% 8.14
CategoryWater conservation & recharge
Started / Completed / Phys355 / 14 / 279
Completion rate82.5%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked6.49Cr / 5.21Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.02 / 5.0
Final score8.14 / 10
5.7% 7.69
CategoryWatershed Related Works
Started / Completed / Phys67 / 0 / 56
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score7.69 / 10
1.0% 8.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score8.36 / 10
3.3% 2.55
CategoryGap Filling in Plantation
Started / Completed / Phys25 / 0 / 7
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked0.83Cr / 0.19Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.15 / 5.0
Final score2.55 / 10
3.3% 4.55
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys77 / 8 / 48
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.20Cr / 0.04Cr
Expenditure rate (ongoing)18.3%
Part B score (max 5.0)0.92 / 5.0
Final score4.55 / 10
60 KUKSHI โ†— DHAR 7.38 B
5.2% 4.09
CategoryFarm Pond
Started / Completed / Phys130 / 14 / 48
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate47.7%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked0.94Cr / 0.32Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score4.09 / 10
โ€”
1.3% 5.05
CategoryDug Well Recharge
Started / Completed / Phys184 / 71 / 51
⚠ Works needing verification (Completed/Physically Completed)27 works (exp <30%)
Completion rate66.3%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score5.05 / 10
0.2% 1.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
75.9% 8.30
CategoryWater conservation & recharge
Started / Completed / Phys260 / 22 / 203
Completion rate86.5%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked6.71Cr / 5.34Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score8.30 / 10
2.6% 7.29
CategoryWatershed Related Works
Started / Completed / Phys36 / 5 / 28
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.14Cr / 0.08Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score7.29 / 10
2.0% 9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 7
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)96.1%
Part B score (max 5.0)4.81 / 5.0
Final score9.00 / 10
8.1% 3.25
CategoryGap Filling in Plantation
Started / Completed / Phys50 / 0 / 15
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked1.91Cr / 0.67Cr
Expenditure rate (ongoing)34.9%
Part B score (max 5.0)1.75 / 5.0
Final score3.25 / 10
4.7% 3.43
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys39 / 1 / 24
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate64.1%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.22Cr / 0.01Cr
Expenditure rate (ongoing)4.5%
Part B score (max 5.0)0.23 / 5.0
Final score3.43 / 10
61 KIRNAPUR โ†— BALAGHAT 7.37 B
58.2% 6.11
CategoryFarm Pond
Started / Completed / Phys381 / 188 / 184
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.27Cr / 0.07Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.23 / 5.0
Final score6.11 / 10
3.6% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys151 / 73 / 78
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys114 / 34 / 80
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 3.57
CategoryGap Filling in Plantation
Started / Completed / Phys13 / 0 / 5
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score3.57 / 10
6.0% 5.56
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys59 / 16 / 33
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate83.1%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.14Cr / 0.04Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score5.56 / 10
62 DEORI โ†— SAGAR 7.35 B
38.8% 4.91
CategoryFarm Pond
Started / Completed / Phys322 / 76 / 176
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate78.3%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked1.53Cr / 0.31Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)1.00 / 5.0
Final score4.91 / 10
โ€”
5.9% 9.80
CategoryDug Well Recharge
Started / Completed / Phys422 / 176 / 229
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.80 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys181 / 98 / 83
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys15 / 9 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.2% 2.49
CategoryGap Filling in Plantation
Started / Completed / Phys22 / 0 / 7
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate31.8%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked0.13Cr / 0.02Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score2.49 / 10
11.6% 5.75
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys42 / 1 / 34
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.45Cr / 0.14Cr
Expenditure rate (ongoing)31.7%
Part B score (max 5.0)1.59 / 5.0
Final score5.75 / 10
63 KHIRKIYA โ†— HARDA 7.32 B
25.7% 5.52
CategoryFarm Pond
Started / Completed / Phys83 / 22 / 57
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.15Cr / 0.02Cr
Expenditure rate (ongoing)15.1%
Part B score (max 5.0)0.76 / 5.0
Final score5.52 / 10
โ€”
8.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys260 / 126 / 134
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 2 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys23 / 4 / 19
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.1% 7.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 11
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.64 / 10
7.5% 3.73
CategoryGap Filling in Plantation
Started / Completed / Phys10 / 0 / 7
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.10Cr / 0.00Cr
Expenditure rate (ongoing)4.6%
Part B score (max 5.0)0.23 / 5.0
Final score3.73 / 10
12.6% 3.85
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys14 / 1 / 8
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.48Cr / 0.06Cr
Expenditure rate (ongoing)12.6%
Part B score (max 5.0)0.63 / 5.0
Final score3.85 / 10
64 CHHAPARA โ†— SEONI 7.30 B
27.6% 5.30
CategoryFarm Pond
Started / Completed / Phys202 / 99 / 91
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate94.1%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.38Cr / 0.04Cr
Expenditure rate (ongoing)11.9%
Part B score (max 5.0)0.60 / 5.0
Final score5.30 / 10
โ€”
2.2% 4.80
CategoryDug Well Recharge
Started / Completed / Phys205 / 53 / 142
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score4.80 / 10
6.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys112 / 55 / 57
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys41 / 34 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.2% 3.10
CategoryGap Filling in Plantation
Started / Completed / Phys18 / 1 / 2
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.47Cr / 0.66Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.27 / 5.0
Final score3.10 / 10
12.8% 3.83
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys87 / 7 / 44
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked0.81Cr / 0.15Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score3.83 / 10
65 KHILCHIPUR โ†— RAJGARH 7.30 B
11.1% 5.21
CategoryFarm Pond
Started / Completed / Phys442 / 212 / 117
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked1.41Cr / 0.42Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.48 / 5.0
Final score5.21 / 10
โ€”
2.3% 7.63
CategoryDug Well Recharge
Started / Completed / Phys605 / 401 / 185
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate96.9%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score7.63 / 10
2.7% 6.38
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 0 / 17
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.81Cr / 0.59Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score6.38 / 10
62.0% 7.91
CategoryWater conservation & recharge
Started / Completed / Phys300 / 18 / 231
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked7.20Cr / 5.41Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score7.91 / 10
3.4% 8.04
CategoryWatershed Related Works
Started / Completed / Phys47 / 7 / 35
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.40Cr / 0.29Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score8.04 / 10
11.3% 7.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 1 / 60
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked2.59Cr / 2.21Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score7.69 / 10
1.5% 2.88
CategoryGap Filling in Plantation
Started / Completed / Phys66 / 0 / 15
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate22.7%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked0.82Cr / 0.29Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score2.88 / 10
5.6% 5.09
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys77 / 0 / 43
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked1.28Cr / 0.59Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.30 / 5.0
Final score5.09 / 10
66 RAGHOGARH โ†— GUNA 7.30 B
24.9% 4.97
CategoryFarm Pond
Started / Completed / Phys371 / 58 / 310
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.2%
Part B score (max 5.0)0.01 / 5.0
Final score4.97 / 10
โ€”
5.8% 9.84
CategoryDug Well Recharge
Started / Completed / Phys586 / 144 / 423
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.84 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
58.1% 8.05
CategoryWater conservation & recharge
Started / Completed / Phys301 / 42 / 257
Completion rate99.3%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score8.05 / 10
2.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 5 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.5% 4.47
CategoryGap Filling in Plantation
Started / Completed / Phys36 / 2 / 24
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.21Cr / 0.04Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score4.47 / 10
1.9% 9.85
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys33 / 5 / 27
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.85 / 10
67 KATTHIWADA โ†— ALIRAJPUR 7.30 B
18.3% 6.71
CategoryFarm Pond
Started / Completed / Phys188 / 28 / 145
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.67Cr / 0.28Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score6.71 / 10
2.7% 7.21
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.23Cr / 0.16Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score7.21 / 10
4.2% 6.95
CategoryDug Well Recharge
Started / Completed / Phys585 / 91 / 484
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)40.6%
Part B score (max 5.0)2.03 / 5.0
Final score6.95 / 10
โ€”
68.7% 7.62
CategoryWater conservation & recharge
Started / Completed / Phys180 / 12 / 111
Completion rate68.3%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked7.80Cr / 6.56Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.20 / 5.0
Final score7.62 / 10
1.7% 6.86
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 4
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score6.86 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 2.96
CategoryGap Filling in Plantation
Started / Completed / Phys30 / 7 / 4
Completion rate36.7%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked0.39Cr / 0.09Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.13 / 5.0
Final score2.96 / 10
2.4% 5.79
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys34 / 9 / 15
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.18Cr / 0.08Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.79 / 10
68 GOHPARU โ†— SHAHDOL 7.24 B
32.4% 4.80
CategoryFarm Pond
Started / Completed / Phys534 / 243 / 254
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate93.1%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.56Cr / 0.02Cr
Expenditure rate (ongoing)2.9%
Part B score (max 5.0)0.14 / 5.0
Final score4.80 / 10
1.1% 4.22
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.34Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.22 / 10
0.8% 5.11
CategoryDug Well Recharge
Started / Completed / Phys95 / 15 / 74
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)8.5%
Part B score (max 5.0)0.43 / 5.0
Final score5.11 / 10
10.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
42.7% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys202 / 21 / 178
Completion rate98.5%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.50Cr / 0.47Cr
Expenditure rate (ongoing)93.0%
Part B score (max 5.0)4.65 / 5.0
Final score9.00 / 10
3.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 2.74
CategoryGap Filling in Plantation
Started / Completed / Phys19 / 1 / 8
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate47.4%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)7.4%
Part B score (max 5.0)0.37 / 5.0
Final score2.74 / 10
8.0% 3.87
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys95 / 12 / 59
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate74.7%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked0.29Cr / 0.01Cr
Expenditure rate (ongoing)2.6%
Part B score (max 5.0)0.13 / 5.0
Final score3.87 / 10
69 MOHGAON โ†— MANDLA 7.19 B
30.2% 7.46
CategoryFarm Pond
Started / Completed / Phys148 / 118 / 26
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.16Cr / 0.08Cr
Expenditure rate (ongoing)51.9%
Part B score (max 5.0)2.60 / 5.0
Final score7.46 / 10
6.0% 1.84
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.15Cr / 0.42Cr
Expenditure rate (ongoing)36.9%
Part B score (max 5.0)1.84 / 5.0
Final score1.84 / 10
1.6% 7.35
CategoryDug Well Recharge
Started / Completed / Phys108 / 70 / 29
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score7.35 / 10
6.3% 5.27
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score5.27 / 10
36.0% 8.82
CategoryWater conservation & recharge
Started / Completed / Phys97 / 57 / 33
Completion rate92.8%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked1.60Cr / 1.34Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score8.82 / 10
2.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys16 / 8 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.2% 2.04
CategoryGap Filling in Plantation
Started / Completed / Phys66 / 4 / 5
Completion rate13.6%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked1.39Cr / 0.38Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score2.04 / 10
6.4% 7.88
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys64 / 28 / 30
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.35Cr / 0.24Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score7.88 / 10
70 MAJHOULI โ†— JABALPUR 7.16 B
11.7% 6.04
CategoryFarm Pond
Started / Completed / Phys96 / 41 / 46
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.31Cr / 0.10Cr
Expenditure rate (ongoing)30.3%
Part B score (max 5.0)1.51 / 5.0
Final score6.04 / 10
5.8% 5.02
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.87Cr / 0.66Cr
Expenditure rate (ongoing)75.4%
Part B score (max 5.0)3.77 / 5.0
Final score5.02 / 10
0.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.1% 8.30
CategoryWater conservation & recharge
Started / Completed / Phys32 / 12 / 19
Completion rate96.9%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score8.30 / 10
41.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys112 / 61 / 51
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.1% 1.65
CategoryGap Filling in Plantation
Started / Completed / Phys76 / 1 / 9
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate13.2%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked1.32Cr / 0.26Cr
Expenditure rate (ongoing)19.8%
Part B score (max 5.0)0.99 / 5.0
Final score1.65 / 10
21.1% 4.21
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys35 / 6 / 16
Completion rate62.9%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked2.13Cr / 0.45Cr
Expenditure rate (ongoing)21.4%
Part B score (max 5.0)1.07 / 5.0
Final score4.21 / 10
71 AJAIGARH โ†— PANNA 7.15 B
33.1% 6.18
CategoryFarm Pond
Started / Completed / Phys376 / 64 / 245
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate82.2%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked1.22Cr / 0.50Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score6.18 / 10
2.0% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.4% 7.07
CategoryDug Well Recharge
Started / Completed / Phys396 / 95 / 265
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score7.07 / 10
โ€”
33.5% 8.00
CategoryWater conservation & recharge
Started / Completed / Phys216 / 34 / 161
Completion rate90.3%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.67Cr / 0.47Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score8.00 / 10
3.0% 8.13
CategoryWatershed Related Works
Started / Completed / Phys13 / 2 / 8
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score8.13 / 10
4.4% 8.82
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 12
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score8.82 / 10
2.7% 1.43
CategoryGap Filling in Plantation
Started / Completed / Phys32 / 0 / 2
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked0.52Cr / 0.12Cr
Expenditure rate (ongoing)22.3%
Part B score (max 5.0)1.11 / 5.0
Final score1.43 / 10
17.0% 7.32
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys52 / 2 / 36
Completion rate73.1%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked1.56Cr / 1.15Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score7.32 / 10
72 MAHESHWAR โ†— KHARGONE 7.12 B
29.8% 4.99
CategoryFarm Pond
Started / Completed / Phys211 / 32 / 166
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.13Cr / 0.01Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.30 / 5.0
Final score4.99 / 10
6.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.0% 9.90
CategoryDug Well Recharge
Started / Completed / Phys568 / 59 / 498
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate98.1%
Part A score (max 5.0)4.90 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.90 / 10
โ€”
34.3% 8.33
CategoryWater conservation & recharge
Started / Completed / Phys111 / 13 / 97
Completion rate99.1%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.22Cr / 0.15Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score8.33 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.1% 3.87
CategoryGap Filling in Plantation
Started / Completed / Phys50 / 4 / 30
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate68.0%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)9.4%
Part B score (max 5.0)0.47 / 5.0
Final score3.87 / 10
7.0% 5.59
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys29 / 7 / 17
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.14Cr / 0.04Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score5.59 / 10
73 NIWAS โ†— MANDLA 7.10 B
25.9% 6.24
CategoryFarm Pond
Started / Completed / Phys144 / 74 / 67
Completion rate97.9%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)26.9%
Part B score (max 5.0)1.35 / 5.0
Final score6.24 / 10
โ€”
2.2% 5.01
CategoryDug Well Recharge
Started / Completed / Phys117 / 40 / 55
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate81.2%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score5.01 / 10
8.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.4% 8.08
CategoryWater conservation & recharge
Started / Completed / Phys61 / 2 / 48
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked1.05Cr / 0.84Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score8.08 / 10
0.9% 6.41
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score6.41 / 10
10.2% 6.61
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score6.61 / 10
2.5% 2.83
CategoryGap Filling in Plantation
Started / Completed / Phys18 / 3 / 0
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.29Cr / 0.12Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)2.00 / 5.0
Final score2.83 / 10
27.8% 7.02
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys197 / 60 / 127
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate94.9%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.28 / 5.0
Final score7.02 / 10
74 GHATIGAON โ†— GWALIOR 7.09 B
19.3% 4.87
CategoryFarm Pond
Started / Completed / Phys145 / 21 / 120
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score4.87 / 10
3.2% 5.76
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.77Cr / 0.63Cr
Expenditure rate (ongoing)81.9%
Part B score (max 5.0)4.09 / 5.0
Final score5.76 / 10
1.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys140 / 85 / 55
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 2 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys101 / 13 / 88
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys31 / 8 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 3 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.6% 2.59
CategoryGap Filling in Plantation
Started / Completed / Phys113 / 5 / 40
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked1.95Cr / 0.23Cr
Expenditure rate (ongoing)11.9%
Part B score (max 5.0)0.59 / 5.0
Final score2.59 / 10
17.0% 5.86
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys54 / 2 / 45
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.47Cr / 0.14Cr
Expenditure rate (ongoing)30.2%
Part B score (max 5.0)1.51 / 5.0
Final score5.86 / 10
75 GOGANWA โ†— KHARGONE 7.09 B
38.4% 4.89
CategoryFarm Pond
Started / Completed / Phys104 / 13 / 86
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score4.89 / 10
6.6% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.6% 5.04
CategoryDug Well Recharge
Started / Completed / Phys258 / 58 / 197
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.8%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)2.0%
Part B score (max 5.0)0.10 / 5.0
Final score5.04 / 10
โ€”
22.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys21 / 5 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.0% 7.73
CategoryGap Filling in Plantation
Started / Completed / Phys22 / 1 / 11
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score7.73 / 10
6.9% 9.62
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys26 / 4 / 20
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.62 / 10
76 DINDORI โ†— DINDORI 7.06 B
32.3% 6.34
CategoryFarm Pond
Started / Completed / Phys445 / 121 / 319
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.18Cr / 0.05Cr
Expenditure rate (ongoing)27.9%
Part B score (max 5.0)1.39 / 5.0
Final score6.34 / 10
โ€”
1.4% 9.87
CategoryDug Well Recharge
Started / Completed / Phys238 / 157 / 75
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate97.5%
Part A score (max 5.0)4.87 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.87 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.4% 6.76
CategoryWater conservation & recharge
Started / Completed / Phys116 / 22 / 93
Completion rate99.1%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.80 / 5.0
Final score6.76 / 10
19.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys92 / 33 / 59
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 8 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.5% 3.47
CategoryGap Filling in Plantation
Started / Completed / Phys30 / 5 / 5
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.84Cr / 0.30Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score3.47 / 10
14.3% 5.31
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys119 / 36 / 59
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked0.87Cr / 0.23Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score5.31 / 10
77 SHAHPURA โ†— DINDORI 7.02 B
20.8% 5.84
CategoryFarm Pond
Started / Completed / Phys405 / 203 / 179
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate94.3%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.17Cr / 0.04Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.12 / 5.0
Final score5.84 / 10
0.9% 0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
1.5% 9.10
CategoryDug Well Recharge
Started / Completed / Phys221 / 134 / 47
⚠ Works needing verification (Completed/Physically Completed)40 works (exp <30%)
Completion rate81.9%
Part A score (max 5.0)4.10 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.10 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.5% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys108 / 35 / 69
Completion rate96.3%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.73Cr / 0.67Cr
Expenditure rate (ongoing)91.7%
Part B score (max 5.0)4.59 / 5.0
Final score9.00 / 10
25.3% 8.02
CategoryWatershed Related Works
Started / Completed / Phys98 / 46 / 51
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score8.02 / 10
5.7% 5.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 7
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.31Cr / 1.06Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score5.71 / 10
0.8% 1.02
CategoryGap Filling in Plantation
Started / Completed / Phys16 / 0 / 2
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.20Cr / 0.02Cr
Expenditure rate (ongoing)8.0%
Part B score (max 5.0)0.40 / 5.0
Final score1.02 / 10
17.0% 4.54
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys130 / 21 / 59
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked1.70Cr / 0.50Cr
Expenditure rate (ongoing)29.3%
Part B score (max 5.0)1.46 / 5.0
Final score4.54 / 10
78 CHHINDWARA โ†— CHHINDWARA 6.98 C
12.0% 7.44
CategoryFarm Pond
Started / Completed / Phys93 / 39 / 50
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate95.7%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score7.44 / 10
4.7% 3.88
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.49Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score3.88 / 10
7.0% 9.00
CategoryDug Well Recharge
Started / Completed / Phys352 / 155 / 192
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)94.1%
Part B score (max 5.0)4.70 / 5.0
Final score9.00 / 10
5.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.9% 8.31
CategoryWater conservation & recharge
Started / Completed / Phys29 / 9 / 17
Completion rate89.7%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.43Cr / 0.33Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score8.31 / 10
11.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys21 / 7 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.9% 3.74
CategoryGap Filling in Plantation
Started / Completed / Phys31 / 9 / 9
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked0.14Cr / 0.02Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.83 / 5.0
Final score3.74 / 10
28.0% 4.39
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys45 / 5 / 32
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate82.2%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked0.78Cr / 0.04Cr
Expenditure rate (ongoing)5.6%
Part B score (max 5.0)0.28 / 5.0
Final score4.39 / 10
79 HARAI โ†— CHHINDWARA 6.97 C
34.9% 7.19
CategoryFarm Pond
Started / Completed / Phys396 / 161 / 153
Completion rate79.3%
Part A score (max 5.0)3.96 / 5.0
Ongoing sanction / booked1.71Cr / 1.10Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score7.19 / 10
โ€”
3.9% 9.00
CategoryDug Well Recharge
Started / Completed / Phys327 / 116 / 193
Completion rate94.5%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)87.3%
Part B score (max 5.0)4.36 / 5.0
Final score9.00 / 10
โ€”
32.8% 7.74
CategoryWater conservation & recharge
Started / Completed / Phys148 / 39 / 74
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked2.00Cr / 1.57Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score7.74 / 10
8.3% 8.01
CategoryWatershed Related Works
Started / Completed / Phys26 / 6 / 14
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.41Cr / 0.34Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score8.01 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.3% 2.54
CategoryGap Filling in Plantation
Started / Completed / Phys26 / 1 / 8
Completion rate34.6%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked1.13Cr / 0.18Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score2.54 / 10
9.4% 6.43
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys85 / 41 / 33
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.46Cr / 0.19Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score6.43 / 10
80 GHORA DONGRI โ†— BETUL 6.97 C
19.9% 5.47
CategoryFarm Pond
Started / Completed / Phys221 / 32 / 139
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked2.12Cr / 0.68Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score5.47 / 10
2.4% 4.19
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.95Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score4.19 / 10
2.6% 5.72
CategoryDug Well Recharge
Started / Completed / Phys458 / 166 / 287
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)15.4%
Part B score (max 5.0)0.77 / 5.0
Final score5.72 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
69.2% 7.75
CategoryWater conservation & recharge
Started / Completed / Phys348 / 5 / 291
Completion rate85.1%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked5.10Cr / 3.56Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score7.75 / 10
0.1% 5.14
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.64 / 5.0
Final score5.14 / 10
1.0% 7.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 11
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.70 / 5.0
Final score7.93 / 10
3.9% 3.83
CategoryGap Filling in Plantation
Started / Completed / Phys44 / 0 / 13
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked1.66Cr / 0.78Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score3.83 / 10
0.7% 3.04
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys29 / 1 / 5
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate20.7%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score3.04 / 10
81 ZIRAPUR โ†— RAJGARH 6.97 C
19.1% 6.04
CategoryFarm Pond
Started / Completed / Phys478 / 323 / 134
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.24Cr / 0.06Cr
Expenditure rate (ongoing)25.3%
Part B score (max 5.0)1.26 / 5.0
Final score6.04 / 10
โ€”
3.4% 9.93
CategoryDug Well Recharge
Started / Completed / Phys642 / 574 / 59
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
49.2% 7.78
CategoryWater conservation & recharge
Started / Completed / Phys218 / 41 / 174
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.67Cr / 0.38Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.84 / 5.0
Final score7.78 / 10
0.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 3 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.0% 3.43
CategoryGap Filling in Plantation
Started / Completed / Phys29 / 0 / 8
Completion rate27.6%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked0.71Cr / 0.29Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.05 / 5.0
Final score3.43 / 10
20.7% 4.94
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys154 / 0 / 96
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate62.3%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked2.77Cr / 1.01Cr
Expenditure rate (ongoing)36.4%
Part B score (max 5.0)1.82 / 5.0
Final score4.94 / 10
82 SEONDHA โ†— DATIA 6.96 C
31.8% 5.59
CategoryFarm Pond
Started / Completed / Phys253 / 230 / 16
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.72 / 5.0
Final score5.59 / 10
1.6% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys175 / 171 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys74 / 43 / 31
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 9 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.3% 4.36
CategoryGap Filling in Plantation
Started / Completed / Phys81 / 19 / 38
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.98Cr / 0.17Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.85 / 5.0
Final score4.36 / 10
23.9% 5.83
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys90 / 31 / 29
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked1.57Cr / 0.78Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.49 / 5.0
Final score5.83 / 10
83 BHAINSDEHI โ†— BETUL 6.95 C
11.7% 10.00
CategoryFarm Pond
Started / Completed / Phys164 / 3 / 161
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.6% 4.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.55Cr / 0.45Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score4.12 / 10
4.5% 5.02
CategoryDug Well Recharge
Started / Completed / Phys371 / 29 / 340
Completion rate99.5%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score5.02 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
63.0% 7.52
CategoryWater conservation & recharge
Started / Completed / Phys198 / 12 / 140
Completion rate76.8%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked3.30Cr / 2.43Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.68 / 5.0
Final score7.52 / 10
1.6% 6.75
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 6
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score6.75 / 10
3.3% 8.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 6 / 14
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score8.64 / 10
11.0% 2.11
CategoryGap Filling in Plantation
Started / Completed / Phys89 / 0 / 20
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate22.5%
Part A score (max 5.0)1.12 / 5.0
Ongoing sanction / booked1.24Cr / 0.24Cr
Expenditure rate (ongoing)19.7%
Part B score (max 5.0)0.98 / 5.0
Final score2.11 / 10
2.3% 3.75
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys21 / 6 / 9
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.07Cr / 0.00Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.18 / 5.0
Final score3.75 / 10
84 KAILARAS โ†— MORENA 6.94 C
4.0% 5.75
CategoryFarm Pond
Started / Completed / Phys456 / 338 / 78
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate91.2%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.89Cr / 0.21Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.18 / 5.0
Final score5.75 / 10
โ€”
0.1% 4.71
CategoryDug Well Recharge
Started / Completed / Phys115 / 88 / 7
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate82.6%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)11.6%
Part B score (max 5.0)0.58 / 5.0
Final score4.71 / 10
0.6% 8.20
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 0 / 11
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.20Cr / 0.16Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score8.20 / 10
26.6% 8.23
CategoryWater conservation & recharge
Started / Completed / Phys466 / 18 / 379
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked11.79Cr / 9.35Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score8.23 / 10
2.2% 8.98
CategoryWatershed Related Works
Started / Completed / Phys38 / 0 / 36
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.27Cr / 0.23Cr
Expenditure rate (ongoing)84.9%
Part B score (max 5.0)4.25 / 5.0
Final score8.98 / 10
0.7% 8.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 11
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score8.09 / 10
1.0% 1.80
CategoryGap Filling in Plantation
Started / Completed / Phys27 / 0 / 6
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.85Cr / 0.26Cr
Expenditure rate (ongoing)13.8%
Part B score (max 5.0)0.69 / 5.0
Final score1.80 / 10
64.8% 6.47
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys1,147 / 0 / 894
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate77.9%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked34.35Cr / 17.65Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score6.47 / 10
85 JOBAT โ†— ALIRAJPUR 6.92 C
10.0% 4.86
CategoryFarm Pond
Started / Completed / Phys141 / 0 / 118
Completion rate83.7%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)13.4%
Part B score (max 5.0)0.67 / 5.0
Final score4.86 / 10
2.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.2% 4.99
CategoryDug Well Recharge
Started / Completed / Phys442 / 2 / 424
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.17 / 5.0
Final score4.99 / 10
โ€”
64.0% 7.73
CategoryWater conservation & recharge
Started / Completed / Phys87 / 6 / 48
Completion rate62.1%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked8.34Cr / 7.71Cr
Expenditure rate (ongoing)92.5%
Part B score (max 5.0)4.63 / 5.0
Final score7.73 / 10
4.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 21
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 7.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score7.78 / 10
7.0% 1.12
CategoryGap Filling in Plantation
Started / Completed / Phys45 / 0 / 5
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked1.17Cr / 0.13Cr
Expenditure rate (ongoing)11.3%
Part B score (max 5.0)0.56 / 5.0
Final score1.12 / 10
4.9% 6.74
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys14 / 1 / 9
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.47Cr / 0.30Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.74 / 10
86 BATIYAGARH โ†— DAMOH 6.90 C
4.6% 5.64
CategoryFarm Pond
Started / Completed / Phys194 / 72 / 114
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate95.9%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.19Cr / 0.03Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score5.64 / 10
โ€”
0.9% 9.69
CategoryDug Well Recharge
Started / Completed / Phys327 / 195 / 112
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate93.9%
Part A score (max 5.0)4.69 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.69 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.3% 6.82
CategoryWater conservation & recharge
Started / Completed / Phys125 / 20 / 81
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked13.90Cr / 7.72Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.78 / 5.0
Final score6.82 / 10
1.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 6.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 9
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score6.70 / 10
2.6% 4.36
CategoryGap Filling in Plantation
Started / Completed / Phys136 / 9 / 56
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate47.8%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked1.19Cr / 0.47Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score4.36 / 10
62.6% 7.04
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys655 / 76 / 475
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate84.1%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked2.08Cr / 1.18Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score7.04 / 10
87 BIAORA โ†— RAJGARH 6.88 C
34.7% 6.19
CategoryFarm Pond
Started / Completed / Phys442 / 293 / 85
Completion rate85.5%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked1.45Cr / 0.56Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score6.19 / 10
1.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.3% 7.99
CategoryDug Well Recharge
Started / Completed / Phys610 / 474 / 107
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score7.99 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.6% 8.23
CategoryWater conservation & recharge
Started / Completed / Phys158 / 40 / 82
Completion rate77.2%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked2.57Cr / 2.24Cr
Expenditure rate (ongoing)87.4%
Part B score (max 5.0)4.37 / 5.0
Final score8.23 / 10
โ€”
14.4% 7.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 0 / 35
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked1.35Cr / 1.09Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score7.53 / 10
2.2% 1.21
CategoryGap Filling in Plantation
Started / Completed / Phys45 / 0 / 2
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate4.4%
Part A score (max 5.0)0.22 / 5.0
Ongoing sanction / booked0.60Cr / 0.12Cr
Expenditure rate (ongoing)19.7%
Part B score (max 5.0)0.99 / 5.0
Final score1.21 / 10
10.0% 4.18
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys75 / 1 / 28
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate38.7%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked2.35Cr / 1.06Cr
Expenditure rate (ongoing)44.9%
Part B score (max 5.0)2.25 / 5.0
Final score4.18 / 10
88 BAIHAR โ†— BALAGHAT 6.86 C
53.6% 5.39
CategoryFarm Pond
Started / Completed / Phys695 / 181 / 513
Completion rate99.9%
Part A score (max 5.0)4.99 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)8.0%
Part B score (max 5.0)0.40 / 5.0
Final score5.39 / 10
2.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 9.84
CategoryDug Well Recharge
Started / Completed / Phys127 / 72 / 51
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate96.9%
Part A score (max 5.0)4.84 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.84 / 10
โ€”
37.3% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys379 / 39 / 339
Completion rate99.7%
Part A score (max 5.0)4.99 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)98.0%
Part B score (max 5.0)4.90 / 5.0
Final score9.00 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 2.66
CategoryGap Filling in Plantation
Started / Completed / Phys13 / 4 / 2
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)7.1%
Part B score (max 5.0)0.36 / 5.0
Final score2.66 / 10
2.4% 3.68
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys51 / 5 / 31
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)3.0%
Part B score (max 5.0)0.15 / 5.0
Final score3.68 / 10
89 KHAIRLANJI โ†— BALAGHAT 6.85 C
57.2% 5.76
CategoryFarm Pond
Started / Completed / Phys438 / 216 / 217
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.10Cr / 0.02Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.81 / 5.0
Final score5.76 / 10
2.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 9.91
CategoryDug Well Recharge
Started / Completed / Phys111 / 35 / 74
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.91 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.2% 8.30
CategoryWater conservation & recharge
Started / Completed / Phys118 / 38 / 79
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score8.30 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.3% 9.00
CategoryGap Filling in Plantation
Started / Completed / Phys5 / 0 / 4
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.00 / 10
2.7% 4.75
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys16 / 3 / 12
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)1.2%
Part B score (max 5.0)0.06 / 5.0
Final score4.75 / 10
90 SEONI โ†— SEONI 6.85 C
14.0% 5.73
CategoryFarm Pond
Started / Completed / Phys111 / 54 / 51
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.10Cr / 0.02Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)1.00 / 5.0
Final score5.73 / 10
โ€”
5.0% 9.65
CategoryDug Well Recharge
Started / Completed / Phys434 / 119 / 285
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate93.1%
Part A score (max 5.0)4.65 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.65 / 10
2.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.2% 7.82
CategoryWater conservation & recharge
Started / Completed / Phys114 / 61 / 47
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.44Cr / 0.27Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score7.82 / 10
18.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys96 / 71 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 7.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 6 / 5
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score7.60 / 10
4.8% 1.57
CategoryGap Filling in Plantation
Started / Completed / Phys33 / 1 / 4
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate15.2%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked0.71Cr / 0.12Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score1.57 / 10
20.7% 3.42
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys92 / 17 / 32
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate53.3%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked2.16Cr / 0.33Cr
Expenditure rate (ongoing)15.1%
Part B score (max 5.0)0.75 / 5.0
Final score3.42 / 10
91 SAUSAR โ†— CHHINDWARA 6.85 C
32.1% 6.73
CategoryFarm Pond
Started / Completed / Phys185 / 39 / 101
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate75.7%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.68Cr / 0.40Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score6.73 / 10
4.1% 2.36
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.19Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score2.36 / 10
6.9% 7.49
CategoryDug Well Recharge
Started / Completed / Phys262 / 44 / 213
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.1%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.59 / 5.0
Final score7.49 / 10
โ€”
19.0% 8.73
CategoryWater conservation & recharge
Started / Completed / Phys52 / 2 / 44
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.43Cr / 0.37Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.30 / 5.0
Final score8.73 / 10
3.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.9% 6.22
CategoryGap Filling in Plantation
Started / Completed / Phys83 / 6 / 42
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.91Cr / 0.61Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score6.22 / 10
12.8% 5.39
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys45 / 8 / 23
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.31Cr / 0.12Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score5.39 / 10
92 BHABRA โ†— ALIRAJPUR 6.84 C
14.4% 6.31
CategoryFarm Pond
Started / Completed / Phys120 / 2 / 107
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.37Cr / 0.13Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.77 / 5.0
Final score6.31 / 10
2.0% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.5% 7.75
CategoryDug Well Recharge
Started / Completed / Phys414 / 2 / 401
Completion rate97.3%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.88 / 5.0
Final score7.75 / 10
โ€”
72.1% 7.22
CategoryWater conservation & recharge
Started / Completed / Phys90 / 4 / 54
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked8.86Cr / 7.08Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score7.22 / 10
1.4% 7.77
CategoryWatershed Related Works
Started / Completed / Phys9 / 1 / 5
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.11Cr / 0.10Cr
Expenditure rate (ongoing)88.8%
Part B score (max 5.0)4.44 / 5.0
Final score7.77 / 10
0.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.0% 0.94
CategoryGap Filling in Plantation
Started / Completed / Phys11 / 0 / 1
Completion rate9.1%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked1.17Cr / 0.11Cr
Expenditure rate (ongoing)9.6%
Part B score (max 5.0)0.48 / 5.0
Final score0.94 / 10
0.7% 3.97
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys7 / 0 / 5
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.10Cr / 0.01Cr
Expenditure rate (ongoing)8.0%
Part B score (max 5.0)0.40 / 5.0
Final score3.97 / 10
93 KARANJIYA โ†— DINDORI 6.83 C
36.5% 6.23
CategoryFarm Pond
Started / Completed / Phys338 / 168 / 166
Completion rate98.8%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.12Cr / 0.03Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score6.23 / 10
2.8% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 9.82
CategoryDug Well Recharge
Started / Completed / Phys168 / 29 / 133
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.82 / 10
2.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.2% 7.95
CategoryWater conservation & recharge
Started / Completed / Phys127 / 20 / 98
Completion rate92.9%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked1.29Cr / 0.86Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score7.95 / 10
1.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 3 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 2.65
CategoryGap Filling in Plantation
Started / Completed / Phys55 / 0 / 14
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate25.5%
Part A score (max 5.0)1.27 / 5.0
Ongoing sanction / booked0.79Cr / 0.22Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.38 / 5.0
Final score2.65 / 10
15.6% 4.81
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys147 / 3 / 110
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked1.05Cr / 0.20Cr
Expenditure rate (ongoing)19.2%
Part B score (max 5.0)0.96 / 5.0
Final score4.81 / 10
94 PETLAWAD โ†— JHABUA 6.82 C
10.1% 5.42
CategoryFarm Pond
Started / Completed / Phys272 / 80 / 88
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked1.79Cr / 0.83Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score5.42 / 10
1.3% 1.33
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.16Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.33 / 5.0
Final score1.33 / 10
4.6% 6.59
CategoryDug Well Recharge
Started / Completed / Phys832 / 385 / 375
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)40.5%
Part B score (max 5.0)2.03 / 5.0
Final score6.59 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
69.9% 7.58
CategoryWater conservation & recharge
Started / Completed / Phys372 / 40 / 221
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked11.11Cr / 9.05Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.07 / 5.0
Final score7.58 / 10
3.7% 5.86
CategoryWatershed Related Works
Started / Completed / Phys50 / 5 / 24
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked0.53Cr / 0.31Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score5.86 / 10
2.6% 7.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 14
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score7.29 / 10
4.0% 2.48
CategoryGap Filling in Plantation
Started / Completed / Phys65 / 4 / 6
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked1.51Cr / 0.52Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score2.48 / 10
3.7% 3.81
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys52 / 8 / 23
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked0.63Cr / 0.10Cr
Expenditure rate (ongoing)16.5%
Part B score (max 5.0)0.83 / 5.0
Final score3.81 / 10
95 BHANDER โ†— DATIA 6.81 C
21.9% 5.61
CategoryFarm Pond
Started / Completed / Phys163 / 87 / 69
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.13Cr / 0.02Cr
Expenditure rate (ongoing)16.5%
Part B score (max 5.0)0.82 / 5.0
Final score5.61 / 10
โ€”
1.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys110 / 87 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys123 / 25 / 98
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys19 / 3 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 3 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.2% 2.02
CategoryGap Filling in Plantation
Started / Completed / Phys85 / 1 / 23
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate28.2%
Part A score (max 5.0)1.41 / 5.0
Ongoing sanction / booked1.35Cr / 0.16Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score2.02 / 10
19.0% 3.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys30 / 4 / 7
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate36.7%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked2.80Cr / 0.65Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score3.00 / 10
96 SHAHPUR โ†— BETUL 6.81 C
9.6% 5.13
CategoryFarm Pond
Started / Completed / Phys120 / 0 / 93
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate77.5%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.53Cr / 0.13Cr
Expenditure rate (ongoing)25.1%
Part B score (max 5.0)1.26 / 5.0
Final score5.13 / 10
1.6% 2.11
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.17Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score2.11 / 10
3.7% 5.37
CategoryDug Well Recharge
Started / Completed / Phys355 / 33 / 313
Completion rate97.5%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)9.9%
Part B score (max 5.0)0.49 / 5.0
Final score5.37 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
68.1% 7.84
CategoryWater conservation & recharge
Started / Completed / Phys225 / 26 / 175
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked2.49Cr / 1.68Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score7.84 / 10
0.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.9% 7.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 3 / 28
Completion rate88.6%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.17Cr / 0.12Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score7.84 / 10
5.5% 2.09
CategoryGap Filling in Plantation
Started / Completed / Phys40 / 0 / 0
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.37Cr / 0.57Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score2.09 / 10
5.0% 2.08
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys25 / 3 / 7
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.00Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.08 / 5.0
Final score2.08 / 10
97 JAMAI โ†— CHHINDWARA 6.81 C
21.1% 7.76
CategoryFarm Pond
Started / Completed / Phys470 / 282 / 112
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked1.76Cr / 1.26Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score7.76 / 10
3.0% 1.90
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.58Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
2.4% 8.86
CategoryDug Well Recharge
Started / Completed / Phys463 / 221 / 230
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score8.86 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
54.2% 7.04
CategoryWater conservation & recharge
Started / Completed / Phys292 / 57 / 97
Completion rate52.7%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked17.28Cr / 15.21Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score7.04 / 10
4.2% 7.20
CategoryWatershed Related Works
Started / Completed / Phys25 / 7 / 8
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.67Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.20 / 5.0
Final score7.20 / 10
1.6% 7.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 2
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.48Cr / 0.44Cr
Expenditure rate (ongoing)92.7%
Part B score (max 5.0)4.63 / 5.0
Final score7.36 / 10
3.3% 2.36
CategoryGap Filling in Plantation
Started / Completed / Phys68 / 4 / 2
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate8.8%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked1.50Cr / 0.57Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score2.36 / 10
10.1% 5.72
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys59 / 4 / 21
Completion rate42.4%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked2.76Cr / 1.99Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.61 / 5.0
Final score5.72 / 10
98 BAHORIBAND โ†— KATNI 6.80 C
19.6% 5.91
CategoryFarm Pond
Started / Completed / Phys372 / 140 / 200
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.37Cr / 0.10Cr
Expenditure rate (ongoing)26.9%
Part B score (max 5.0)1.34 / 5.0
Final score5.91 / 10
โ€”
2.4% 4.50
CategoryDug Well Recharge
Started / Completed / Phys269 / 136 / 102
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.5%
Part B score (max 5.0)0.07 / 5.0
Final score4.50 / 10
3.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.8% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys52 / 11 / 40
Completion rate98.1%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)92.5%
Part B score (max 5.0)4.63 / 5.0
Final score9.00 / 10
14.5% 7.92
CategoryWatershed Related Works
Started / Completed / Phys73 / 11 / 57
Completion rate93.2%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.38Cr / 0.25Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score7.92 / 10
2.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.6% 1.70
CategoryGap Filling in Plantation
Started / Completed / Phys22 / 0 / 5
Completion rate22.7%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked0.66Cr / 0.07Cr
Expenditure rate (ongoing)11.2%
Part B score (max 5.0)0.56 / 5.0
Final score1.70 / 10
40.1% 6.36
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys139 / 19 / 92
Completion rate79.9%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.26Cr / 0.60Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score6.36 / 10
99 DATIA โ†— DATIA 6.79 C
19.6% 5.61
CategoryFarm Pond
Started / Completed / Phys295 / 106 / 160
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.58Cr / 0.13Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score5.61 / 10
โ€”
2.2% 9.98
CategoryDug Well Recharge
Started / Completed / Phys277 / 65 / 211
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
1.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 9 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
34.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys184 / 52 / 132
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys30 / 8 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 9 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.0% 1.91
CategoryGap Filling in Plantation
Started / Completed / Phys237 / 15 / 39
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate22.8%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked3.13Cr / 0.49Cr
Expenditure rate (ongoing)15.5%
Part B score (max 5.0)0.78 / 5.0
Final score1.91 / 10
21.0% 3.87
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys121 / 9 / 56
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate53.7%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked3.58Cr / 0.85Cr
Expenditure rate (ongoing)23.6%
Part B score (max 5.0)1.18 / 5.0
Final score3.87 / 10
100 BICHHIYA โ†— MANDLA 6.78 C
31.3% 6.40
CategoryFarm Pond
Started / Completed / Phys346 / 259 / 28
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked2.48Cr / 1.12Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score6.40 / 10
3.5% 4.39
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 1.40Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.39 / 5.0
Final score4.39 / 10
1.6% 5.51
CategoryDug Well Recharge
Started / Completed / Phys280 / 187 / 45
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate82.9%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.12Cr / 0.03Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.36 / 5.0
Final score5.51 / 10
9.4% 8.48
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 5 / 8
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked1.23Cr / 1.02Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score8.48 / 10
33.4% 7.89
CategoryWater conservation & recharge
Started / Completed / Phys269 / 159 / 67
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked3.09Cr / 2.28Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.69 / 5.0
Final score7.89 / 10
2.4% 6.77
CategoryWatershed Related Works
Started / Completed / Phys24 / 17 / 6
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score6.77 / 10
3.6% 6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 6 / 7
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)46.7%
Part B score (max 5.0)2.34 / 5.0
Final score6.16 / 10
2.9% 3.59
CategoryGap Filling in Plantation
Started / Completed / Phys32 / 1 / 11
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked1.20Cr / 0.41Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score3.59 / 10
11.7% 5.17
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys112 / 29 / 65
Completion rate83.9%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked2.43Cr / 0.47Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score5.17 / 10
101 POHRI โ†— SHIVPURI 6.77 C
12.6% 4.68
CategoryFarm Pond
Started / Completed / Phys269 / 168 / 51
Completion rate81.4%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked1.01Cr / 0.12Cr
Expenditure rate (ongoing)12.3%
Part B score (max 5.0)0.61 / 5.0
Final score4.68 / 10
0.6% 0.13
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.01Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
1.6% 4.57
CategoryDug Well Recharge
Started / Completed / Phys262 / 167 / 47
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate81.7%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)9.7%
Part B score (max 5.0)0.48 / 5.0
Final score4.57 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
51.8% 7.87
CategoryWater conservation & recharge
Started / Completed / Phys213 / 47 / 136
Completion rate85.9%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked6.25Cr / 4.47Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score7.87 / 10
6.2% 6.81
CategoryWatershed Related Works
Started / Completed / Phys25 / 7 / 16
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.26Cr / 0.11Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score6.81 / 10
4.7% 6.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 3 / 17
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.24Cr / 0.12Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score6.90 / 10
4.4% 2.72
CategoryGap Filling in Plantation
Started / Completed / Phys88 / 18 / 5
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate26.1%
Part A score (max 5.0)1.31 / 5.0
Ongoing sanction / booked1.47Cr / 0.42Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.41 / 5.0
Final score2.72 / 10
17.9% 6.37
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys165 / 6 / 106
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate67.9%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked3.88Cr / 2.31Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score6.37 / 10
102 GHUGHRI โ†— MANDLA 6.76 C
32.9% 6.69
CategoryFarm Pond
Started / Completed / Phys188 / 150 / 34
Completion rate97.9%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score6.69 / 10
3.5% 1.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.25Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score1.56 / 10
1.7% 5.16
CategoryDug Well Recharge
Started / Completed / Phys153 / 134 / 16
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)5.1%
Part B score (max 5.0)0.26 / 5.0
Final score5.16 / 10
9.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.0% 7.88
CategoryWater conservation & recharge
Started / Completed / Phys67 / 24 / 26
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked4.02Cr / 3.34Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score7.88 / 10
1.9% 7.41
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 8
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score7.41 / 10
0.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.9% 2.82
CategoryGap Filling in Plantation
Started / Completed / Phys28 / 2 / 2
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.55Cr / 0.65Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.11 / 5.0
Final score2.82 / 10
13.6% 5.58
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys117 / 45 / 65
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.17Cr / 0.03Cr
Expenditure rate (ongoing)17.6%
Part B score (max 5.0)0.88 / 5.0
Final score5.58 / 10
103 KESLI โ†— SAGAR 6.76 C
21.4% 4.73
CategoryFarm Pond
Started / Completed / Phys178 / 87 / 59
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.48Cr / 0.06Cr
Expenditure rate (ongoing)12.6%
Part B score (max 5.0)0.63 / 5.0
Final score4.73 / 10
โ€”
6.4% 4.11
CategoryDug Well Recharge
Started / Completed / Phys377 / 88 / 209
⚠ Works needing verification (Completed/Physically Completed)75 works (exp <30%)
Completion rate78.8%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)3.4%
Part B score (max 5.0)0.17 / 5.0
Final score4.11 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
36.9% 7.82
CategoryWater conservation & recharge
Started / Completed / Phys164 / 33 / 118
Completion rate92.1%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.36Cr / 0.23Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.21 / 5.0
Final score7.82 / 10
11.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys31 / 9 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 2.04
CategoryGap Filling in Plantation
Started / Completed / Phys36 / 3 / 2
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate13.9%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked0.54Cr / 0.15Cr
Expenditure rate (ongoing)26.9%
Part B score (max 5.0)1.34 / 5.0
Final score2.04 / 10
17.8% 6.62
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys56 / 15 / 26
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked0.67Cr / 0.39Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.96 / 5.0
Final score6.62 / 10
104 PARASIA โ†— CHHINDWARA 6.75 C
28.4% 7.30
CategoryFarm Pond
Started / Completed / Phys176 / 39 / 116
Completion rate88.1%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.62Cr / 0.36Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score7.30 / 10
โ€”
8.2% 6.52
CategoryDug Well Recharge
Started / Completed / Phys549 / 127 / 399
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.5%
Part B score (max 5.0)1.73 / 5.0
Final score6.52 / 10
1.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
34.9% 7.79
CategoryWater conservation & recharge
Started / Completed / Phys130 / 8 / 104
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked2.28Cr / 1.59Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.49 / 5.0
Final score7.79 / 10
6.6% 7.14
CategoryWatershed Related Works
Started / Completed / Phys26 / 6 / 15
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score7.14 / 10
2.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.1% 2.88
CategoryGap Filling in Plantation
Started / Completed / Phys40 / 5 / 8
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate32.5%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked0.38Cr / 0.09Cr
Expenditure rate (ongoing)25.1%
Part B score (max 5.0)1.25 / 5.0
Final score2.88 / 10
12.6% 3.02
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys54 / 5 / 9
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate25.9%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked1.47Cr / 0.51Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score3.02 / 10
105 BARGHAT โ†— SEONI 6.74 C
47.3% 5.72
CategoryFarm Pond
Started / Completed / Phys418 / 244 / 157
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate95.9%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.35Cr / 0.06Cr
Expenditure rate (ongoing)18.4%
Part B score (max 5.0)0.92 / 5.0
Final score5.72 / 10
โ€”
2.5% 9.45
CategoryDug Well Recharge
Started / Completed / Phys244 / 68 / 149
⚠ Works needing verification (Completed/Physically Completed)27 works (exp <30%)
Completion rate88.9%
Part A score (max 5.0)4.45 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.45 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28.5% 8.80
CategoryWater conservation & recharge
Started / Completed / Phys139 / 57 / 77
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.18Cr / 0.15Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score8.80 / 10
4.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys24 / 15 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 3 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 0.85
CategoryGap Filling in Plantation
Started / Completed / Phys28 / 1 / 1
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked0.38Cr / 0.04Cr
Expenditure rate (ongoing)9.8%
Part B score (max 5.0)0.49 / 5.0
Final score0.85 / 10
12.0% 4.44
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys53 / 11 / 36
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate88.7%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.15Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.44 / 10
106 SIRONJ โ†— VIDISHA 6.72 C
34.7% 6.71
CategoryFarm Pond
Started / Completed / Phys351 / 214 / 110
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.60Cr / 0.25Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score6.71 / 10
3.8% 3.55
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.84Cr / 0.60Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score3.55 / 10
2.8% 8.35
CategoryDug Well Recharge
Started / Completed / Phys235 / 102 / 118
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score8.35 / 10
โ€”
39.1% 8.24
CategoryWater conservation & recharge
Started / Completed / Phys214 / 85 / 111
Completion rate91.6%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.74Cr / 0.54Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score8.24 / 10
1.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys21 / 17 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.8% 1.78
CategoryGap Filling in Plantation
Started / Completed / Phys63 / 1 / 10
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate17.5%
Part A score (max 5.0)0.87 / 5.0
Ongoing sanction / booked1.96Cr / 0.36Cr
Expenditure rate (ongoing)18.1%
Part B score (max 5.0)0.91 / 5.0
Final score1.78 / 10
6.1% 5.51
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys58 / 8 / 35
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.30Cr / 0.11Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score5.51 / 10
107 BURHANPUR โ†— BURHANPUR 6.72 C
21.9% 7.03
CategoryFarm Pond
Started / Completed / Phys262 / 115 / 129
Completion rate93.1%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.33Cr / 0.16Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.38 / 5.0
Final score7.03 / 10
7.5% 6.71
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.39Cr / 0.23Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score6.71 / 10
5.8% 7.30
CategoryDug Well Recharge
Started / Completed / Phys446 / 221 / 214
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate97.5%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.43 / 5.0
Final score7.30 / 10
โ€”
45.8% 7.13
CategoryWater conservation & recharge
Started / Completed / Phys133 / 17 / 95
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.97Cr / 0.57Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.91 / 5.0
Final score7.13 / 10
3.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 2 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.1% 2.01
CategoryGap Filling in Plantation
Started / Completed / Phys22 / 0 / 5
Completion rate22.7%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked0.61Cr / 0.11Cr
Expenditure rate (ongoing)17.5%
Part B score (max 5.0)0.87 / 5.0
Final score2.01 / 10
8.8% 5.19
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys60 / 22 / 30
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.19Cr / 0.03Cr
Expenditure rate (ongoing)17.2%
Part B score (max 5.0)0.86 / 5.0
Final score5.19 / 10
108 BEOHARI โ†— SHAHDOL 6.70 C
40.9% 4.31
CategoryFarm Pond
Started / Completed / Phys263 / 108 / 102
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.06Cr / 0.07Cr
Expenditure rate (ongoing)6.3%
Part B score (max 5.0)0.31 / 5.0
Final score4.31 / 10
โ€”
1.4% 4.46
CategoryDug Well Recharge
Started / Completed / Phys85 / 14 / 60
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)2.1%
Part B score (max 5.0)0.10 / 5.0
Final score4.46 / 10
18.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys56 / 25 / 31
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 5 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 11 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.8% 1.04
CategoryGap Filling in Plantation
Started / Completed / Phys15 / 0 / 3
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score1.04 / 10
9.3% 3.09
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys85 / 6 / 44
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate58.8%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked0.49Cr / 0.01Cr
Expenditure rate (ongoing)3.0%
Part B score (max 5.0)0.15 / 5.0
Final score3.09 / 10
109 KUSMI โ†— SIDHI 6.70 C
27.5% 5.90
CategoryFarm Pond
Started / Completed / Phys352 / 246 / 93
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate96.3%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.26Cr / 0.06Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.08 / 5.0
Final score5.90 / 10
โ€”
0.8% 9.82
CategoryDug Well Recharge
Started / Completed / Phys85 / 58 / 24
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate96.5%
Part A score (max 5.0)4.82 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.82 / 10
5.9% 6.89
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 5 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.45Cr / 0.26Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score6.89 / 10
46.8% 7.56
CategoryWater conservation & recharge
Started / Completed / Phys186 / 109 / 74
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.52Cr / 0.28Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.64 / 5.0
Final score7.56 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.7% 7.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 12 / 5
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.44Cr / 0.31Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.50 / 5.0
Final score7.75 / 10
6.3% 3.85
CategoryGap Filling in Plantation
Started / Completed / Phys63 / 2 / 28
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked0.89Cr / 0.26Cr
Expenditure rate (ongoing)29.4%
Part B score (max 5.0)1.47 / 5.0
Final score3.85 / 10
8.0% 5.30
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys30 / 1 / 24
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.38Cr / 0.09Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.13 / 5.0
Final score5.30 / 10
110 PUSHPRAJGARH โ†— ANUPPUR 6.69 C
61.4% 6.33
CategoryFarm Pond
Started / Completed / Phys1,402 / 1,026 / 356
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.24Cr / 0.07Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.40 / 5.0
Final score6.33 / 10
โ€”
0.6% 9.60
CategoryDug Well Recharge
Started / Completed / Phys124 / 41 / 73
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate91.9%
Part A score (max 5.0)4.60 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.60 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.6% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys190 / 96 / 89
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked1.07Cr / 0.92Cr
Expenditure rate (ongoing)85.7%
Part B score (max 5.0)4.29 / 5.0
Final score9.00 / 10
2.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys18 / 6 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 9 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.7% 1.14
CategoryGap Filling in Plantation
Started / Completed / Phys115 / 0 / 2
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate1.7%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked2.12Cr / 0.45Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score1.14 / 10
12.0% 6.07
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys146 / 41 / 80
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate82.9%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked1.18Cr / 0.46Cr
Expenditure rate (ongoing)38.5%
Part B score (max 5.0)1.92 / 5.0
Final score6.07 / 10
111 BADA MALEHARA โ†— CHHATARPUR 6.69 C
38.2% 4.45
CategoryFarm Pond
Started / Completed / Phys262 / 178 / 46
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate85.5%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.52Cr / 0.02Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.18 / 5.0
Final score4.45 / 10
9.6% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.7% 4.89
CategoryDug Well Recharge
Started / Completed / Phys690 / 636 / 22
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)2.4%
Part B score (max 5.0)0.12 / 5.0
Final score4.89 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys145 / 62 / 83
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys29 / 17 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.1% 1.00
CategoryGap Filling in Plantation
Started / Completed / Phys22 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.13Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
10.5% 3.61
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys72 / 19 / 19
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked1.24Cr / 0.24Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score3.61 / 10
112 JABERA โ†— DAMOH 6.68 C
7.2% 5.80
CategoryFarm Pond
Started / Completed / Phys234 / 43 / 123
Completion rate70.9%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked1.46Cr / 0.66Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.26 / 5.0
Final score5.80 / 10
โ€”
1.2% 7.67
CategoryDug Well Recharge
Started / Completed / Phys350 / 121 / 183
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate86.9%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score7.67 / 10
โ€”
22.1% 6.88
CategoryWater conservation & recharge
Started / Completed / Phys151 / 16 / 96
Completion rate74.2%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked5.28Cr / 3.36Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score6.88 / 10
3.7% 7.07
CategoryWatershed Related Works
Started / Completed / Phys42 / 11 / 21
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.75Cr / 0.49Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score7.07 / 10
9.0% 8.21
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 4 / 58
Completion rate82.7%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked1.18Cr / 0.96Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score8.21 / 10
2.7% 1.73
CategoryGap Filling in Plantation
Started / Completed / Phys55 / 1 / 5
Completion rate10.9%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked1.64Cr / 0.39Cr
Expenditure rate (ongoing)23.6%
Part B score (max 5.0)1.18 / 5.0
Final score1.73 / 10
54.2% 6.66
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys446 / 5 / 316
Completion rate72.0%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked10.88Cr / 6.66Cr
Expenditure rate (ongoing)61.2%
Part B score (max 5.0)3.06 / 5.0
Final score6.66 / 10
113 LANJI โ†— BALAGHAT 6.67 C
51.5% 4.99
CategoryFarm Pond
Started / Completed / Phys315 / 146 / 168
Completion rate99.7%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score4.99 / 10
3.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys153 / 64 / 89
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
30.6% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys104 / 24 / 79
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)86.7%
Part B score (max 5.0)4.34 / 5.0
Final score9.00 / 10
2.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 6 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.9% 3.51
CategoryGap Filling in Plantation
Started / Completed / Phys18 / 1 / 5
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.65Cr / 0.24Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score3.51 / 10
2.4% 4.67
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys15 / 6 / 8
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score4.67 / 10
114 LAKHNADON โ†— SEONI 6.64 C
37.1% 5.35
CategoryFarm Pond
Started / Completed / Phys856 / 634 / 77
⚠ Works needing verification (Completed/Physically Completed)96 works (exp <30%)
Completion rate83.1%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.96Cr / 0.23Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.20 / 5.0
Final score5.35 / 10
โ€”
2.2% 5.82
CategoryDug Well Recharge
Started / Completed / Phys386 / 190 / 54
⚠ Works needing verification (Completed/Physically Completed)139 works (exp <30%)
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score5.82 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.8% 7.98
CategoryWater conservation & recharge
Started / Completed / Phys401 / 274 / 117
Completion rate97.5%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked1.68Cr / 1.04Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score7.98 / 10
3.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys34 / 17 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.3% 8.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys36 / 16 / 18
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score8.28 / 10
5.5% 4.96
CategoryGap Filling in Plantation
Started / Completed / Phys19 / 3 / 8
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.92Cr / 0.38Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score4.96 / 10
12.7% 6.03
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys318 / 103 / 116
⚠ Works needing verification (Completed/Physically Completed)69 works (exp <30%)
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked1.30Cr / 0.67Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score6.03 / 10
115 SONDWA โ†— ALIRAJPUR 6.62 C
5.9% 4.83
CategoryFarm Pond
Started / Completed / Phys195 / 7 / 138
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.88Cr / 0.20Cr
Expenditure rate (ongoing)22.2%
Part B score (max 5.0)1.11 / 5.0
Final score4.83 / 10
2.1% 7.40
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.40Cr / 0.29Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score7.40 / 10
3.2% 5.17
CategoryDug Well Recharge
Started / Completed / Phys771 / 34 / 633
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate86.5%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.20Cr / 0.03Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.85 / 5.0
Final score5.17 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
80.8% 6.97
CategoryWater conservation & recharge
Started / Completed / Phys275 / 20 / 124
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked28.91Cr / 25.15Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score6.97 / 10
0.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 7.21
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 10
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.53Cr / 0.40Cr
Expenditure rate (ongoing)75.4%
Part B score (max 5.0)3.77 / 5.0
Final score7.21 / 10
2.5% 1.20
CategoryGap Filling in Plantation
Started / Completed / Phys66 / 0 / 3
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked1.48Cr / 0.29Cr
Expenditure rate (ongoing)19.5%
Part B score (max 5.0)0.97 / 5.0
Final score1.20 / 10
2.0% 3.51
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys85 / 2 / 33
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate41.2%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked0.60Cr / 0.17Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score3.51 / 10
116 UDAIPURA โ†— RAISEN 6.62 C
64.3% 5.97
CategoryFarm Pond
Started / Completed / Phys267 / 13 / 241
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.47Cr / 0.11Cr
Expenditure rate (ongoing)24.3%
Part B score (max 5.0)1.21 / 5.0
Final score5.97 / 10
1.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.1% 9.97
CategoryDug Well Recharge
Started / Completed / Phys194 / 122 / 71
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.97 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.97 / 10
โ€”
16.1% 8.78
CategoryWater conservation & recharge
Started / Completed / Phys20 / 2 / 17
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.18Cr / 0.14Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score8.78 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.8% 3.33
CategoryGap Filling in Plantation
Started / Completed / Phys12 / 0 / 5
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.17Cr / 0.04Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score3.33 / 10
8.5% 5.20
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys45 / 6 / 37
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)8.4%
Part B score (max 5.0)0.42 / 5.0
Final score5.20 / 10
117 MUNGAOLI โ†— ASHOK NAGAR 6.62 C
37.5% 4.93
CategoryFarm Pond
Started / Completed / Phys410 / 24 / 322
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate84.4%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked2.24Cr / 0.32Cr
Expenditure rate (ongoing)14.1%
Part B score (max 5.0)0.71 / 5.0
Final score4.93 / 10
1.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 4.74
CategoryDug Well Recharge
Started / Completed / Phys145 / 36 / 98
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate92.4%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)2.4%
Part B score (max 5.0)0.12 / 5.0
Final score4.74 / 10
โ€”
47.4% 8.01
CategoryWater conservation & recharge
Started / Completed / Phys395 / 80 / 311
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score8.01 / 10
2.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 1.06
CategoryGap Filling in Plantation
Started / Completed / Phys42 / 0 / 4
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked0.96Cr / 0.11Cr
Expenditure rate (ongoing)11.7%
Part B score (max 5.0)0.59 / 5.0
Final score1.06 / 10
6.4% 6.10
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys278 / 64 / 191
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate91.7%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.62Cr / 0.19Cr
Expenditure rate (ongoing)30.2%
Part B score (max 5.0)1.51 / 5.0
Final score6.10 / 10
118 RAHATGARH โ†— SAGAR 6.61 C
14.4% 4.52
CategoryFarm Pond
Started / Completed / Phys236 / 179 / 18
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate83.5%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.44Cr / 0.03Cr
Expenditure rate (ongoing)6.9%
Part B score (max 5.0)0.35 / 5.0
Final score4.52 / 10
3.3% 4.16
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.74Cr
Expenditure rate (ongoing)83.2%
Part B score (max 5.0)4.16 / 5.0
Final score4.16 / 10
5.0% 9.48
CategoryDug Well Recharge
Started / Completed / Phys531 / 275 / 201
⚠ Works needing verification (Completed/Physically Completed)55 works (exp <30%)
Completion rate89.6%
Part A score (max 5.0)4.48 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.48 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.1% 7.70
CategoryWater conservation & recharge
Started / Completed / Phys117 / 69 / 34
Completion rate88.0%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.71Cr / 0.47Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score7.70 / 10
7.0% 6.89
CategoryWatershed Related Works
Started / Completed / Phys26 / 19 / 2
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score6.89 / 10
3.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.2% 2.41
CategoryGap Filling in Plantation
Started / Completed / Phys59 / 6 / 4
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate16.9%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked1.37Cr / 0.43Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score2.41 / 10
26.9% 6.75
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys56 / 10 / 26
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked2.18Cr / 1.54Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score6.75 / 10
119 DEWAS โ†— DEWAS 6.61 C
35.6% 6.49
CategoryFarm Pond
Started / Completed / Phys112 / 33 / 61
Completion rate83.9%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.52Cr / 0.24Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.30 / 5.0
Final score6.49 / 10
2.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.9% 7.51
CategoryDug Well Recharge
Started / Completed / Phys261 / 15 / 235
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score7.51 / 10
3.0% 7.82
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 3 / 6
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.32 / 5.0
Final score7.82 / 10
30.7% 7.37
CategoryWater conservation & recharge
Started / Completed / Phys104 / 13 / 80
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.33Cr / 0.19Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score7.37 / 10
6.3% 7.48
CategoryWatershed Related Works
Started / Completed / Phys22 / 3 / 17
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.48 / 10
3.0% 6.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score6.22 / 10
5.1% 1.85
CategoryGap Filling in Plantation
Started / Completed / Phys17 / 2 / 1
Completion rate17.6%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked0.39Cr / 0.08Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.96 / 5.0
Final score1.85 / 10
7.3% 4.44
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys19 / 0 / 11
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.28Cr / 0.09Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score4.44 / 10
120 CHITRANGI โ†— SINGRAULI 6.60 C
28.5% 5.65
CategoryFarm Pond
Started / Completed / Phys859 / 579 / 156
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked3.24Cr / 0.89Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score5.65 / 10
2.8% 5.86
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked1.34Cr / 0.96Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score5.86 / 10
1.1% 5.02
CategoryDug Well Recharge
Started / Completed / Phys390 / 190 / 144
⚠ Works needing verification (Completed/Physically Completed)43 works (exp <30%)
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)14.8%
Part B score (max 5.0)0.74 / 5.0
Final score5.02 / 10
โ€”
50.5% 7.54
CategoryWater conservation & recharge
Started / Completed / Phys563 / 83 / 415
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked5.57Cr / 3.47Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score7.54 / 10
3.4% 7.64
CategoryWatershed Related Works
Started / Completed / Phys73 / 20 / 42
Completion rate84.9%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.47Cr / 0.32Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.39 / 5.0
Final score7.64 / 10
2.4% 8.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 2 / 17
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.36Cr / 0.26Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score8.00 / 10
1.8% 2.17
CategoryGap Filling in Plantation
Started / Completed / Phys17 / 0 / 3
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate17.6%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked1.24Cr / 0.32Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score2.17 / 10
9.4% 4.95
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys152 / 31 / 74
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate69.1%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked1.77Cr / 0.53Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score4.95 / 10
121 MEGHNAGAR โ†— JHABUA 6.59 C
9.8% 6.19
CategoryFarm Pond
Started / Completed / Phys192 / 11 / 148
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.67Cr / 0.27Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score6.19 / 10
1.9% 4.01
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.48Cr / 0.23Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.35 / 5.0
Final score4.01 / 10
4.5% 5.77
CategoryDug Well Recharge
Started / Completed / Phys653 / 34 / 599
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate96.9%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)18.4%
Part B score (max 5.0)0.92 / 5.0
Final score5.77 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
70.7% 7.16
CategoryWater conservation & recharge
Started / Completed / Phys233 / 11 / 139
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked11.12Cr / 8.76Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score7.16 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 2.44
CategoryGap Filling in Plantation
Started / Completed / Phys33 / 3 / 7
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate30.3%
Part A score (max 5.0)1.52 / 5.0
Ongoing sanction / booked0.96Cr / 0.18Cr
Expenditure rate (ongoing)18.5%
Part B score (max 5.0)0.93 / 5.0
Final score2.44 / 10
8.5% 4.53
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys34 / 2 / 20
Completion rate64.7%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.81Cr / 0.21Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score4.53 / 10
122 KALAPIPAL โ†— SHAJAPUR 6.57 C
33.2% 5.99
CategoryFarm Pond
Started / Completed / Phys109 / 76 / 19
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.36Cr / 0.12Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.64 / 5.0
Final score5.99 / 10
2.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.2% 9.66
CategoryDug Well Recharge
Started / Completed / Phys383 / 212 / 145
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate93.2%
Part A score (max 5.0)4.66 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.66 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys40 / 25 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
14.8% 3.07
CategoryGap Filling in Plantation
Started / Completed / Phys60 / 9 / 16
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.50Cr / 0.10Cr
Expenditure rate (ongoing)19.7%
Part B score (max 5.0)0.99 / 5.0
Final score3.07 / 10
14.2% 2.76
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys17 / 2 / 4
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate35.3%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked0.30Cr / 0.06Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score2.76 / 10
123 ISAGARH โ†— ASHOK NAGAR 6.56 C
31.3% 4.73
CategoryFarm Pond
Started / Completed / Phys278 / 64 / 188
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.75Cr / 0.03Cr
Expenditure rate (ongoing)4.0%
Part B score (max 5.0)0.20 / 5.0
Final score4.73 / 10
3.1% 5.87
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.50Cr / 0.34Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score5.87 / 10
0.9% 4.25
CategoryDug Well Recharge
Started / Completed / Phys102 / 78 / 8
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate84.3%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.7%
Part B score (max 5.0)0.03 / 5.0
Final score4.25 / 10
โ€”
45.8% 8.71
CategoryWater conservation & recharge
Started / Completed / Phys205 / 83 / 120
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score8.71 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.2% 1.03
CategoryGap Filling in Plantation
Started / Completed / Phys96 / 1 / 6
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate7.3%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.22Cr / 0.16Cr
Expenditure rate (ongoing)13.3%
Part B score (max 5.0)0.66 / 5.0
Final score1.03 / 10
11.5% 5.18
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys204 / 67 / 108
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate85.8%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.78Cr / 0.14Cr
Expenditure rate (ongoing)17.8%
Part B score (max 5.0)0.89 / 5.0
Final score5.18 / 10
124 PATERA โ†— DAMOH 6.56 C
8.4% 6.57
CategoryFarm Pond
Started / Completed / Phys288 / 65 / 176
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate83.7%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked1.02Cr / 0.49Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.38 / 5.0
Final score6.57 / 10
โ€”
0.8% 7.23
CategoryDug Well Recharge
Started / Completed / Phys245 / 79 / 151
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate93.9%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score7.23 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.3% 7.63
CategoryWater conservation & recharge
Started / Completed / Phys214 / 14 / 157
Completion rate79.9%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked6.60Cr / 4.80Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score7.63 / 10
9.2% 7.34
CategoryWatershed Related Works
Started / Completed / Phys102 / 19 / 63
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked1.41Cr / 0.94Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score7.34 / 10
3.3% 7.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 4 / 27
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score7.59 / 10
1.7% 3.22
CategoryGap Filling in Plantation
Started / Completed / Phys69 / 2 / 26
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked0.79Cr / 0.19Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score3.22 / 10
49.8% 5.85
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys357 / 4 / 218
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked14.62Cr / 8.02Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.74 / 5.0
Final score5.85 / 10
125 BHIMPUR โ†— BETUL 6.54 C
18.9% 5.32
CategoryFarm Pond
Started / Completed / Phys195 / 3 / 105
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked3.02Cr / 1.54Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score5.32 / 10
2.7% 3.32
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.93Cr / 0.62Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.32 / 10
3.2% 8.77
CategoryDug Well Recharge
Started / Completed / Phys433 / 19 / 392
Completion rate94.9%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.02 / 5.0
Final score8.77 / 10
โ€”
61.8% 7.14
CategoryWater conservation & recharge
Started / Completed / Phys315 / 38 / 183
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked7.31Cr / 5.31Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.63 / 5.0
Final score7.14 / 10
1.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 6.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 2 / 15
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score6.88 / 10
4.7% 3.46
CategoryGap Filling in Plantation
Started / Completed / Phys12 / 0 / 4
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.33Cr / 0.48Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.80 / 5.0
Final score3.46 / 10
4.6% 5.33
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys83 / 9 / 58
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate80.7%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.35Cr / 0.09Cr
Expenditure rate (ongoing)26.0%
Part B score (max 5.0)1.30 / 5.0
Final score5.33 / 10
126 OBEDULLAHGANJ โ†— RAISEN 6.53 C
39.5% 5.50
CategoryFarm Pond
Started / Completed / Phys199 / 47 / 144
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.23Cr / 0.03Cr
Expenditure rate (ongoing)14.1%
Part B score (max 5.0)0.70 / 5.0
Final score5.50 / 10
1.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys146 / 74 / 72
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.4% 7.41
CategoryWater conservation & recharge
Started / Completed / Phys23 / 3 / 15
Completion rate78.3%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked1.26Cr / 0.88Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.41 / 10
13.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.0% 2.38
CategoryGap Filling in Plantation
Started / Completed / Phys25 / 0 / 7
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked0.92Cr / 0.18Cr
Expenditure rate (ongoing)19.5%
Part B score (max 5.0)0.98 / 5.0
Final score2.38 / 10
8.7% 5.19
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys34 / 10 / 17
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.25Cr / 0.06Cr
Expenditure rate (ongoing)24.3%
Part B score (max 5.0)1.22 / 5.0
Final score5.19 / 10
127 GAROTH โ†— MANDSAUR 6.51 C
8.8% 4.81
CategoryFarm Pond
Started / Completed / Phys261 / 20 / 126
Completion rate55.9%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked2.00Cr / 0.81Cr
Expenditure rate (ongoing)40.3%
Part B score (max 5.0)2.02 / 5.0
Final score4.81 / 10
2.7% 3.98
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.73Cr / 0.21Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score3.98 / 10
4.5% 7.24
CategoryDug Well Recharge
Started / Completed / Phys951 / 75 / 714
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.40Cr / 0.25Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score7.24 / 10
0.8% 6.30
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 3 / 6
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.20 / 5.0
Final score6.30 / 10
61.4% 7.44
CategoryWater conservation & recharge
Started / Completed / Phys372 / 15 / 280
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked4.75Cr / 3.30Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score7.44 / 10
1.4% 6.59
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 10
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.43 / 5.0
Final score6.59 / 10
2.6% 7.20
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 2 / 15
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score7.20 / 10
8.0% 2.95
CategoryGap Filling in Plantation
Started / Completed / Phys148 / 0 / 16
Completion rate10.8%
Part A score (max 5.0)0.54 / 5.0
Ongoing sanction / booked3.78Cr / 1.83Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score2.95 / 10
9.9% 5.32
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys85 / 1 / 51
Completion rate61.2%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked1.81Cr / 0.82Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.32 / 10
128 GAIRATGANJ โ†— RAISEN 6.51 C
49.5% 5.88
CategoryFarm Pond
Started / Completed / Phys345 / 265 / 73
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)19.5%
Part B score (max 5.0)0.98 / 5.0
Final score5.88 / 10
3.8% 4.30
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.15Cr / 0.03Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.96 / 5.0
Final score4.30 / 10
4.0% 9.98
CategoryDug Well Recharge
Started / Completed / Phys202 / 185 / 16
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.1% 8.05
CategoryWater conservation & recharge
Started / Completed / Phys86 / 38 / 43
Completion rate94.2%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.37Cr / 0.24Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.34 / 5.0
Final score8.05 / 10
โ€”
1.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.3% 2.18
CategoryGap Filling in Plantation
Started / Completed / Phys25 / 1 / 8
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked0.23Cr / 0.02Cr
Expenditure rate (ongoing)7.5%
Part B score (max 5.0)0.38 / 5.0
Final score2.18 / 10
5.3% 3.45
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys20 / 5 / 8
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)3.9%
Part B score (max 5.0)0.20 / 5.0
Final score3.45 / 10
129 SAGAR โ†— SAGAR 6.51 C
17.6% 5.07
CategoryFarm Pond
Started / Completed / Phys202 / 68 / 86
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.86Cr / 0.22Cr
Expenditure rate (ongoing)25.1%
Part B score (max 5.0)1.26 / 5.0
Final score5.07 / 10
โ€”
6.3% 6.93
CategoryDug Well Recharge
Started / Completed / Phys542 / 157 / 378
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.7%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score6.93 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
49.4% 7.82
CategoryWater conservation & recharge
Started / Completed / Phys234 / 75 / 131
Completion rate88.0%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked1.32Cr / 0.91Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.82 / 10
2.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.5% 7.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 6 / 11
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score7.06 / 10
7.7% 3.09
CategoryGap Filling in Plantation
Started / Completed / Phys72 / 2 / 1
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked1.64Cr / 0.95Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.88 / 5.0
Final score3.09 / 10
12.1% 4.33
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys44 / 3 / 23
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate59.1%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked1.20Cr / 0.33Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.37 / 5.0
Final score4.33 / 10
130 JATARA โ†— TIKAMGARH 6.51 C
8.1% 4.50
CategoryFarm Pond
Started / Completed / Phys252 / 22 / 109
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked1.67Cr / 0.63Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.90 / 5.0
Final score4.50 / 10
2.5% 2.81
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.63Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score2.81 / 10
3.7% 5.86
CategoryDug Well Recharge
Started / Completed / Phys633 / 42 / 509
⚠ Works needing verification (Completed/Physically Completed)38 works (exp <30%)
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.11Cr / 0.03Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.51 / 5.0
Final score5.86 / 10
โ€”
54.8% 7.67
CategoryWater conservation & recharge
Started / Completed / Phys342 / 23 / 207
Completion rate67.3%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked9.96Cr / 8.58Cr
Expenditure rate (ongoing)86.2%
Part B score (max 5.0)4.31 / 5.0
Final score7.67 / 10
2.3% 8.56
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 12
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.22Cr / 0.19Cr
Expenditure rate (ongoing)85.5%
Part B score (max 5.0)4.28 / 5.0
Final score8.56 / 10
11.7% 7.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys68 / 1 / 36
Completion rate54.4%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked2.80Cr / 2.41Cr
Expenditure rate (ongoing)85.8%
Part B score (max 5.0)4.29 / 5.0
Final score7.01 / 10
6.4% 2.42
CategoryGap Filling in Plantation
Started / Completed / Phys138 / 13 / 21
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate24.6%
Part A score (max 5.0)1.23 / 5.0
Ongoing sanction / booked2.19Cr / 0.52Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score2.42 / 10
10.7% 4.55
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys141 / 8 / 56
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate45.4%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked2.73Cr / 1.25Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score4.55 / 10
131 BINA โ†— SAGAR 6.50 C
31.5% 3.26
CategoryFarm Pond
Started / Completed / Phys124 / 21 / 37
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate46.8%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked0.89Cr / 0.16Cr
Expenditure rate (ongoing)18.4%
Part B score (max 5.0)0.92 / 5.0
Final score3.26 / 10
โ€”
8.5% 7.59
CategoryDug Well Recharge
Started / Completed / Phys417 / 196 / 20
⚠ Works needing verification (Completed/Physically Completed)201 works (exp <30%)
Completion rate51.8%
Part A score (max 5.0)2.59 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score7.59 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
42.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys39 / 7 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.0% 1.38
CategoryGap Filling in Plantation
Started / Completed / Phys40 / 0 / 3
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate7.5%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.38 / 10
8.8% 3.45
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys38 / 8 / 15
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate60.5%
Part A score (max 5.0)3.03 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)8.5%
Part B score (max 5.0)0.43 / 5.0
Final score3.45 / 10
132 UDAIGARH โ†— ALIRAJPUR 6.48 C
13.9% 5.87
CategoryFarm Pond
Started / Completed / Phys177 / 0 / 146
Completion rate82.5%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.49Cr / 0.17Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score5.87 / 10
3.3% 5.88
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.40Cr / 0.27Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score5.88 / 10
5.8% 7.46
CategoryDug Well Recharge
Started / Completed / Phys432 / 11 / 403
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score7.46 / 10
โ€”
62.8% 6.81
CategoryWater conservation & recharge
Started / Completed / Phys66 / 0 / 39
Completion rate59.1%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked8.71Cr / 6.72Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score6.81 / 10
4.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys22 / 2 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.0% 2.35
CategoryGap Filling in Plantation
Started / Completed / Phys59 / 0 / 9
Completion rate15.3%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked1.05Cr / 0.33Cr
Expenditure rate (ongoing)31.7%
Part B score (max 5.0)1.59 / 5.0
Final score2.35 / 10
3.9% 4.89
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys23 / 3 / 11
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate60.9%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked0.41Cr / 0.15Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score4.89 / 10
133 THANDLA โ†— JHABUA 6.47 C
12.1% 5.08
CategoryFarm Pond
Started / Completed / Phys243 / 27 / 145
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked1.25Cr / 0.39Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.55 / 5.0
Final score5.08 / 10
1.4% 2.91
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.29Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.91 / 5.0
Final score2.91 / 10
5.4% 5.69
CategoryDug Well Recharge
Started / Completed / Phys737 / 282 / 377
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.15Cr / 0.04Cr
Expenditure rate (ongoing)24.3%
Part B score (max 5.0)1.22 / 5.0
Final score5.69 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
70.0% 7.15
CategoryWater conservation & recharge
Started / Completed / Phys212 / 19 / 127
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked9.86Cr / 7.31Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score7.15 / 10
1.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.3% 1.81
CategoryGap Filling in Plantation
Started / Completed / Phys90 / 15 / 6
Completion rate23.3%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked1.49Cr / 0.19Cr
Expenditure rate (ongoing)12.9%
Part B score (max 5.0)0.65 / 5.0
Final score1.81 / 10
2.5% 2.96
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys18 / 1 / 6
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked0.37Cr / 0.07Cr
Expenditure rate (ongoing)20.4%
Part B score (max 5.0)1.02 / 5.0
Final score2.96 / 10
134 MAJHGAWAN โ†— SATNA 6.47 C
36.2% 5.59
CategoryFarm Pond
Started / Completed / Phys454 / 25 / 328
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked2.82Cr / 0.96Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.70 / 5.0
Final score5.59 / 10
4.3% 2.43
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.73Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.43 / 5.0
Final score2.43 / 10
1.4% 6.95
CategoryDug Well Recharge
Started / Completed / Phys199 / 38 / 142
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate90.5%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.42 / 5.0
Final score6.95 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
36.0% 8.88
CategoryWater conservation & recharge
Started / Completed / Phys181 / 37 / 126
Completion rate90.1%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked4.53Cr / 3.97Cr
Expenditure rate (ongoing)87.6%
Part B score (max 5.0)4.38 / 5.0
Final score8.88 / 10
4.8% 9.00
CategoryWatershed Related Works
Started / Completed / Phys39 / 8 / 29
Completion rate94.9%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.15Cr / 0.14Cr
Expenditure rate (ongoing)92.3%
Part B score (max 5.0)4.62 / 5.0
Final score9.00 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 3 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 2.26
CategoryGap Filling in Plantation
Started / Completed / Phys20 / 0 / 3
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked0.72Cr / 0.22Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.51 / 5.0
Final score2.26 / 10
11.2% 2.83
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys82 / 0 / 28
Completion rate34.1%
Part A score (max 5.0)1.71 / 5.0
Ongoing sanction / booked2.60Cr / 0.58Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.12 / 5.0
Final score2.83 / 10
135 ATER โ†— BHIND 6.45 C
8.9% 4.54
CategoryFarm Pond
Started / Completed / Phys160 / 78 / 29
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate66.9%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked0.97Cr / 0.23Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.20 / 5.0
Final score4.54 / 10
2.2% 0.18
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.02Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.18 / 5.0
Final score0.18 / 10
0.2% 5.35
CategoryDug Well Recharge
Started / Completed / Phys21 / 4 / 13
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)26.0%
Part B score (max 5.0)1.30 / 5.0
Final score5.35 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
51.6% 7.04
CategoryWater conservation & recharge
Started / Completed / Phys216 / 54 / 133
Completion rate86.6%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked1.83Cr / 0.99Cr
Expenditure rate (ongoing)54.3%
Part B score (max 5.0)2.71 / 5.0
Final score7.04 / 10
9.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys21 / 8 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.5% 8.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 4 / 17
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score8.27 / 10
0.7% 2.45
CategoryGap Filling in Plantation
Started / Completed / Phys9 / 0 / 1
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked0.17Cr / 0.06Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.90 / 5.0
Final score2.45 / 10
21.4% 4.58
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys68 / 3 / 39
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked1.79Cr / 0.53Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.50 / 5.0
Final score4.58 / 10
136 PAWAI โ†— PANNA 6.45 C
31.1% 5.97
CategoryFarm Pond
Started / Completed / Phys479 / 42 / 304
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked3.50Cr / 1.65Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score5.97 / 10
2.5% 6.27
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.64Cr / 0.55Cr
Expenditure rate (ongoing)85.4%
Part B score (max 5.0)4.27 / 5.0
Final score6.27 / 10
3.2% 5.89
CategoryDug Well Recharge
Started / Completed / Phys377 / 62 / 257
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.23Cr / 0.08Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score5.89 / 10
0.0% 2.17
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score2.17 / 10
28.2% 8.20
CategoryWater conservation & recharge
Started / Completed / Phys341 / 27 / 267
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked2.00Cr / 1.56Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score8.20 / 10
1.2% 6.46
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score6.46 / 10
8.8% 8.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys46 / 4 / 37
Completion rate89.1%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.40Cr / 0.33Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.05 / 5.0
Final score8.51 / 10
6.9% 4.54
CategoryGap Filling in Plantation
Started / Completed / Phys52 / 6 / 11
Completion rate32.7%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked2.77Cr / 1.60Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score4.54 / 10
18.0% 4.37
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys155 / 15 / 82
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate62.6%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.77Cr / 0.44Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.25 / 5.0
Final score4.37 / 10
137 MAWAI โ†— MANDLA 6.43 C
38.1% 5.79
CategoryFarm Pond
Started / Completed / Phys246 / 208 / 23
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.64Cr / 0.14Cr
Expenditure rate (ongoing)21.8%
Part B score (max 5.0)1.09 / 5.0
Final score5.79 / 10
4.3% 2.49
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.60Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score2.49 / 10
1.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys153 / 45 / 108
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
29.1% 8.14
CategoryWater conservation & recharge
Started / Completed / Phys149 / 83 / 52
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.67Cr / 0.48Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.61 / 5.0
Final score8.14 / 10
1.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.9% 8.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 4 / 13
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.22 / 5.0
Final score8.94 / 10
2.9% 1.77
CategoryGap Filling in Plantation
Started / Completed / Phys63 / 2 / 2
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate6.3%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked0.74Cr / 0.21Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.45 / 5.0
Final score1.77 / 10
17.0% 5.18
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys130 / 57 / 53
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked1.54Cr / 0.29Cr
Expenditure rate (ongoing)19.1%
Part B score (max 5.0)0.95 / 5.0
Final score5.18 / 10
138 DHARAMPURI โ†— DHAR 6.43 C
3.5% 6.01
CategoryFarm Pond
Started / Completed / Phys137 / 61 / 56
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score6.01 / 10
โ€”
3.7% 7.09
CategoryDug Well Recharge
Started / Completed / Phys378 / 158 / 192
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score7.09 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
47.2% 8.10
CategoryWater conservation & recharge
Started / Completed / Phys169 / 23 / 128
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked1.44Cr / 1.05Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score8.10 / 10
9.7% 6.59
CategoryWatershed Related Works
Started / Completed / Phys59 / 4 / 36
Completion rate67.8%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked0.51Cr / 0.33Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score6.59 / 10
3.8% 7.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 1 / 14
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.36Cr / 0.31Cr
Expenditure rate (ongoing)84.9%
Part B score (max 5.0)4.25 / 5.0
Final score7.37 / 10
19.7% 3.60
CategoryGap Filling in Plantation
Started / Completed / Phys109 / 0 / 43
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked2.81Cr / 0.91Cr
Expenditure rate (ongoing)32.5%
Part B score (max 5.0)1.62 / 5.0
Final score3.60 / 10
12.2% 3.97
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys166 / 30 / 92
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate73.5%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.34Cr / 0.02Cr
Expenditure rate (ongoing)6.0%
Part B score (max 5.0)0.30 / 5.0
Final score3.97 / 10
139 BUXWAHA โ†— CHHATARPUR 6.43 C
21.7% 4.87
CategoryFarm Pond
Started / Completed / Phys153 / 49 / 92
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate92.2%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.41Cr / 0.02Cr
Expenditure rate (ongoing)5.2%
Part B score (max 5.0)0.26 / 5.0
Final score4.87 / 10
2.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.0% 4.65
CategoryDug Well Recharge
Started / Completed / Phys356 / 195 / 132
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)1.1%
Part B score (max 5.0)0.05 / 5.0
Final score4.65 / 10
โ€”
22.3% 8.87
CategoryWater conservation & recharge
Started / Completed / Phys96 / 17 / 76
Completion rate96.9%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.44Cr / 0.35Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.02 / 5.0
Final score8.87 / 10
1.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.5% 3.59
CategoryGap Filling in Plantation
Started / Completed / Phys53 / 8 / 11
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate35.8%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked1.09Cr / 0.39Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score3.59 / 10
38.6% 5.95
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys85 / 2 / 68
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.85Cr / 0.31Cr
Expenditure rate (ongoing)36.6%
Part B score (max 5.0)1.83 / 5.0
Final score5.95 / 10
140 GOHAD โ†— BHIND 6.42 C
14.1% 4.25
CategoryFarm Pond
Started / Completed / Phys190 / 47 / 78
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate65.8%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked1.30Cr / 0.25Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.96 / 5.0
Final score4.25 / 10
0.8% 0.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
0.2% 5.08
CategoryDug Well Recharge
Started / Completed / Phys31 / 0 / 29
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score5.08 / 10
13.0% 7.86
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 4 / 46
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.31Cr / 0.20Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.23 / 5.0
Final score7.86 / 10
45.6% 8.60
CategoryWater conservation & recharge
Started / Completed / Phys152 / 12 / 133
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.82Cr / 0.63Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score8.60 / 10
5.2% 6.84
CategoryWatershed Related Works
Started / Completed / Phys19 / 7 / 11
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.12Cr / 0.05Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.10 / 5.0
Final score6.84 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.0% 0.98
CategoryGap Filling in Plantation
Started / Completed / Phys24 / 0 / 1
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked1.32Cr / 0.20Cr
Expenditure rate (ongoing)15.5%
Part B score (max 5.0)0.77 / 5.0
Final score0.98 / 10
16.1% 2.28
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys79 / 0 / 26
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate32.9%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked2.06Cr / 0.26Cr
Expenditure rate (ongoing)12.6%
Part B score (max 5.0)0.63 / 5.0
Final score2.28 / 10
141 MULTAI โ†— BETUL 6.41 C
37.1% 5.75
CategoryFarm Pond
Started / Completed / Phys153 / 9 / 115
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked1.12Cr / 0.38Cr
Expenditure rate (ongoing)33.9%
Part B score (max 5.0)1.69 / 5.0
Final score5.75 / 10
4.8% 3.15
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.47Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score3.15 / 10
7.7% 4.89
CategoryDug Well Recharge
Started / Completed / Phys461 / 203 / 241
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate96.3%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)1.5%
Part B score (max 5.0)0.07 / 5.0
Final score4.89 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.2% 7.93
CategoryWater conservation & recharge
Started / Completed / Phys142 / 38 / 95
Completion rate93.7%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.77Cr / 0.50Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score7.93 / 10
3.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys18 / 15 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 2.77
CategoryGap Filling in Plantation
Started / Completed / Phys25 / 0 / 5
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.07Cr
Expenditure rate (ongoing)35.5%
Part B score (max 5.0)1.77 / 5.0
Final score2.77 / 10
7.8% 4.32
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys53 / 6 / 33
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.27Cr / 0.04Cr
Expenditure rate (ongoing)12.9%
Part B score (max 5.0)0.65 / 5.0
Final score4.32 / 10
142 BHITARWAR โ†— GWALIOR 6.40 C
22.1% 6.34
CategoryFarm Pond
Started / Completed / Phys181 / 35 / 141
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.12Cr / 0.04Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score6.34 / 10
2.9% 4.28
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.49Cr / 0.25Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score4.28 / 10
2.7% 5.80
CategoryDug Well Recharge
Started / Completed / Phys244 / 58 / 176
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate95.9%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score5.80 / 10
6.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 3 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.4% 7.56
CategoryWater conservation & recharge
Started / Completed / Phys94 / 28 / 60
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score7.56 / 10
4.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 2 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 4 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.8% 3.69
CategoryGap Filling in Plantation
Started / Completed / Phys135 / 27 / 50
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked0.59Cr / 0.10Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score3.69 / 10
14.9% 5.05
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys104 / 29 / 48
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.19Cr / 0.05Cr
Expenditure rate (ongoing)27.1%
Part B score (max 5.0)1.35 / 5.0
Final score5.05 / 10
143 ASHOKNAGAR โ†— ASHOK NAGAR 6.39 C
49.2% 5.02
CategoryFarm Pond
Started / Completed / Phys671 / 292 / 346
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate95.1%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.76Cr / 0.04Cr
Expenditure rate (ongoing)5.3%
Part B score (max 5.0)0.26 / 5.0
Final score5.02 / 10
1.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys174 / 116 / 58
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28.1% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys187 / 66 / 120
Completion rate99.5%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.15Cr / 0.14Cr
Expenditure rate (ongoing)97.4%
Part B score (max 5.0)4.87 / 5.0
Final score9.00 / 10
2.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 5 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 1.23
CategoryGap Filling in Plantation
Started / Completed / Phys21 / 1 / 3
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate19.0%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked0.35Cr / 0.02Cr
Expenditure rate (ongoing)5.6%
Part B score (max 5.0)0.28 / 5.0
Final score1.23 / 10
14.1% 4.99
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys715 / 268 / 418
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate95.9%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.41Cr / 0.02Cr
Expenditure rate (ongoing)3.8%
Part B score (max 5.0)0.19 / 5.0
Final score4.99 / 10
144 KATNI โ†— KATNI 6.38 C
23.0% 4.68
CategoryFarm Pond
Started / Completed / Phys130 / 38 / 74
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.65Cr / 0.05Cr
Expenditure rate (ongoing)7.4%
Part B score (max 5.0)0.37 / 5.0
Final score4.68 / 10
3.5% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.2% 4.56
CategoryDug Well Recharge
Started / Completed / Phys152 / 26 / 92
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate77.6%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)13.6%
Part B score (max 5.0)0.68 / 5.0
Final score4.56 / 10
9.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 2 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.8% 9.85
CategoryWater conservation & recharge
Started / Completed / Phys34 / 7 / 26
Completion rate97.1%
Part A score (max 5.0)4.85 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.85 / 10
13.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys27 / 17 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 6 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.7% 1.89
CategoryGap Filling in Plantation
Started / Completed / Phys46 / 0 / 7
Completion rate15.2%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked1.87Cr / 0.42Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.13 / 5.0
Final score1.89 / 10
22.4% 4.12
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys67 / 19 / 24
Completion rate64.2%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked1.16Cr / 0.21Cr
Expenditure rate (ongoing)18.3%
Part B score (max 5.0)0.91 / 5.0
Final score4.12 / 10
145 MANDLA โ†— MANDLA 6.38 C
39.9% 6.38
CategoryFarm Pond
Started / Completed / Phys286 / 196 / 34
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked2.44Cr / 1.15Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score6.38 / 10
โ€”
1.8% 5.82
CategoryDug Well Recharge
Started / Completed / Phys220 / 85 / 95
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)34.5%
Part B score (max 5.0)1.72 / 5.0
Final score5.82 / 10
8.8% 7.29
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 1
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked1.14Cr / 0.67Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score7.29 / 10
17.4% 7.50
CategoryWater conservation & recharge
Started / Completed / Phys102 / 58 / 24
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked1.35Cr / 0.94Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score7.50 / 10
3.7% 8.32
CategoryWatershed Related Works
Started / Completed / Phys31 / 14 / 13
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.19Cr / 0.15Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.97 / 5.0
Final score8.32 / 10
1.3% 6.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 3 / 2
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.11 / 5.0
Final score6.68 / 10
6.9% 4.33
CategoryGap Filling in Plantation
Started / Completed / Phys56 / 18 / 7
Completion rate44.6%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked1.14Cr / 0.48Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score4.33 / 10
20.1% 5.39
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys156 / 56 / 49
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate67.3%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked3.50Cr / 1.42Cr
Expenditure rate (ongoing)40.6%
Part B score (max 5.0)2.03 / 5.0
Final score5.39 / 10
146 PANDHURNA โ†— CHHINDWARA 6.37 C
15.0% 5.31
CategoryFarm Pond
Started / Completed / Phys135 / 79 / 44
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.19Cr / 0.03Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score5.31 / 10
2.5% 2.58
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.20Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score2.58 / 10
5.9% 5.33
CategoryDug Well Recharge
Started / Completed / Phys362 / 35 / 305
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)12.7%
Part B score (max 5.0)0.64 / 5.0
Final score5.33 / 10
5.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.1% 8.35
CategoryWater conservation & recharge
Started / Completed / Phys25 / 9 / 11
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked1.02Cr / 0.89Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score8.35 / 10
23.2% 7.71
CategoryWatershed Related Works
Started / Completed / Phys48 / 14 / 27
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.51Cr / 0.35Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score7.71 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.9% 4.36
CategoryGap Filling in Plantation
Started / Completed / Phys106 / 5 / 34
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked1.57Cr / 0.79Cr
Expenditure rate (ongoing)50.4%
Part B score (max 5.0)2.52 / 5.0
Final score4.36 / 10
16.2% 4.76
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys32 / 6 / 17
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.58Cr / 0.14Cr
Expenditure rate (ongoing)23.4%
Part B score (max 5.0)1.17 / 5.0
Final score4.76 / 10
147 SUSNER โ†— AGAR-MALWA 6.37 C
17.2% 5.66
CategoryFarm Pond
Started / Completed / Phys205 / 70 / 88
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate77.1%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.69Cr / 0.25Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.80 / 5.0
Final score5.66 / 10
1.0% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.1% 5.81
CategoryDug Well Recharge
Started / Completed / Phys503 / 188 / 274
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate91.8%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score5.81 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
43.1% 7.01
CategoryWater conservation & recharge
Started / Completed / Phys146 / 50 / 77
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked1.89Cr / 1.01Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score7.01 / 10
0.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.4% 3.11
CategoryGap Filling in Plantation
Started / Completed / Phys136 / 11 / 40
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked1.79Cr / 0.44Cr
Expenditure rate (ongoing)24.7%
Part B score (max 5.0)1.23 / 5.0
Final score3.11 / 10
9.8% 9.00
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys20 / 2 / 17
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.14Cr / 0.14Cr
Expenditure rate (ongoing)98.0%
Part B score (max 5.0)4.90 / 5.0
Final score9.00 / 10
148 BIJEYPUR โ†— SHEOPUR 6.36 C
5.2% 5.26
CategoryFarm Pond
Started / Completed / Phys328 / 247 / 51
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate90.9%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.59Cr / 0.08Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.72 / 5.0
Final score5.26 / 10
1.8% 0.49
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.97Cr / 0.19Cr
Expenditure rate (ongoing)9.7%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
0.1% 9.87
CategoryDug Well Recharge
Started / Completed / Phys38 / 34 / 3
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.87 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
45.8% 8.01
CategoryWater conservation & recharge
Started / Completed / Phys398 / 23 / 324
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked7.33Cr / 5.35Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score8.01 / 10
5.2% 7.36
CategoryWatershed Related Works
Started / Completed / Phys48 / 3 / 36
Completion rate81.3%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked1.09Cr / 0.72Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score7.36 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 3.29
CategoryGap Filling in Plantation
Started / Completed / Phys46 / 1 / 4
Completion rate10.9%
Part A score (max 5.0)0.54 / 5.0
Ongoing sanction / booked3.51Cr / 1.93Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score3.29 / 10
36.5% 4.72
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys298 / 12 / 256
Completion rate89.9%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked3.50Cr / 0.16Cr
Expenditure rate (ongoing)4.5%
Part B score (max 5.0)0.22 / 5.0
Final score4.72 / 10
149 SHAHNAGAR โ†— PANNA 6.34 C
23.2% 5.46
CategoryFarm Pond
Started / Completed / Phys524 / 78 / 268
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate66.0%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked3.47Cr / 1.49Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score5.46 / 10
3.0% 1.67
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.36Cr / 0.46Cr
Expenditure rate (ongoing)33.5%
Part B score (max 5.0)1.67 / 5.0
Final score1.67 / 10
2.6% 5.24
CategoryDug Well Recharge
Started / Completed / Phys445 / 41 / 262
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate68.1%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.34Cr / 0.12Cr
Expenditure rate (ongoing)36.7%
Part B score (max 5.0)1.83 / 5.0
Final score5.24 / 10
0.2% 3.86
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.86 / 5.0
Final score3.86 / 10
29.4% 7.73
CategoryWater conservation & recharge
Started / Completed / Phys307 / 25 / 233
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked1.99Cr / 1.40Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score7.73 / 10
5.4% 7.79
CategoryWatershed Related Works
Started / Completed / Phys48 / 7 / 30
Completion rate77.1%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.37Cr / 0.29Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score7.79 / 10
12.3% 8.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 3 / 57
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.53Cr / 0.46Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score8.90 / 10
6.9% 2.22
CategoryGap Filling in Plantation
Started / Completed / Phys41 / 1 / 4
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked1.89Cr / 0.61Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score2.22 / 10
16.9% 5.54
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys108 / 2 / 69
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate65.7%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked2.16Cr / 0.98Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.26 / 5.0
Final score5.54 / 10
150 MALTHONE โ†— SAGAR 6.33 C
30.1% 4.55
CategoryFarm Pond
Started / Completed / Phys172 / 41 / 85
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate73.3%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked0.67Cr / 0.12Cr
Expenditure rate (ongoing)17.7%
Part B score (max 5.0)0.89 / 5.0
Final score4.55 / 10
โ€”
6.4% 4.37
CategoryDug Well Recharge
Started / Completed / Phys284 / 146 / 78
⚠ Works needing verification (Completed/Physically Completed)55 works (exp <30%)
Completion rate78.9%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)8.6%
Part B score (max 5.0)0.43 / 5.0
Final score4.37 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
38.5% 7.88
CategoryWater conservation & recharge
Started / Completed / Phys102 / 36 / 58
Completion rate92.2%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.38Cr / 0.25Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score7.88 / 10
1.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.7% 3.03
CategoryGap Filling in Plantation
Started / Completed / Phys21 / 3 / 9
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.17 / 5.0
Final score3.03 / 10
15.6% 7.07
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys105 / 31 / 57
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.52Cr / 0.30Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score7.07 / 10
151 SIHAWAL โ†— SIDHI 6.32 C
22.9% 5.10
CategoryFarm Pond
Started / Completed / Phys292 / 181 / 88
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate92.1%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.48Cr / 0.05Cr
Expenditure rate (ongoing)9.9%
Part B score (max 5.0)0.49 / 5.0
Final score5.10 / 10
โ€”
0.7% 4.18
CategoryDug Well Recharge
Started / Completed / Phys74 / 19 / 41
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate81.1%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score4.18 / 10
2.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 5 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
40.6% 8.30
CategoryWater conservation & recharge
Started / Completed / Phys188 / 46 / 137
Completion rate97.3%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked1.33Cr / 0.91Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score8.30 / 10
2.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys22 / 13 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.5% 7.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 9 / 15
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.53Cr / 0.30Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score7.40 / 10
7.1% 1.94
CategoryGap Filling in Plantation
Started / Completed / Phys77 / 2 / 13
Completion rate19.5%
Part A score (max 5.0)0.97 / 5.0
Ongoing sanction / booked1.06Cr / 0.20Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.97 / 5.0
Final score1.94 / 10
17.8% 3.90
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys119 / 9 / 70
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate66.4%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked1.31Cr / 0.15Cr
Expenditure rate (ongoing)11.7%
Part B score (max 5.0)0.58 / 5.0
Final score3.90 / 10
152 BANKHEDI โ†— NARMADAPURAM 6.32 C
23.7% 4.20
CategoryFarm Pond
Started / Completed / Phys80 / 29 / 27
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.20Cr / 0.03Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score4.20 / 10
โ€”
4.9% 9.26
CategoryDug Well Recharge
Started / Completed / Phys115 / 63 / 35
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.26 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
34.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys47 / 31 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 10 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 8 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.6% 0.93
CategoryGap Filling in Plantation
Started / Completed / Phys43 / 2 / 3
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate11.6%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked0.79Cr / 0.06Cr
Expenditure rate (ongoing)7.0%
Part B score (max 5.0)0.35 / 5.0
Final score0.93 / 10
12.7% 3.97
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys32 / 3 / 20
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.13Cr / 0.01Cr
Expenditure rate (ongoing)7.6%
Part B score (max 5.0)0.38 / 5.0
Final score3.97 / 10
153 SOHAGPUR โ†— SHAHDOL 6.31 C
31.5% 3.97
CategoryFarm Pond
Started / Completed / Phys346 / 104 / 150
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate73.4%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked1.78Cr / 0.11Cr
Expenditure rate (ongoing)6.0%
Part B score (max 5.0)0.30 / 5.0
Final score3.97 / 10
1.0% 3.27
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.16Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
0.9% 5.56
CategoryDug Well Recharge
Started / Completed / Phys90 / 18 / 56
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate82.2%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score5.56 / 10
1.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
38.4% 8.17
CategoryWater conservation & recharge
Started / Completed / Phys87 / 9 / 72
Completion rate93.1%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked2.99Cr / 2.11Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score8.17 / 10
0.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 4 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 2.69
CategoryGap Filling in Plantation
Started / Completed / Phys23 / 0 / 10
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate43.5%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked0.11Cr / 0.01Cr
Expenditure rate (ongoing)10.4%
Part B score (max 5.0)0.52 / 5.0
Final score2.69 / 10
17.8% 5.65
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys179 / 4 / 141
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.76Cr / 0.24Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score5.65 / 10
154 KHATEGAON โ†— DEWAS 6.31 C
39.7% 5.58
CategoryFarm Pond
Started / Completed / Phys187 / 7 / 134
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked2.02Cr / 0.73Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score5.58 / 10
โ€”
3.8% 6.84
CategoryDug Well Recharge
Started / Completed / Phys302 / 55 / 235
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)40.8%
Part B score (max 5.0)2.04 / 5.0
Final score6.84 / 10
2.6% 6.88
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 8
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score6.88 / 10
31.0% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys132 / 0 / 130
Completion rate98.5%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.18Cr / 0.17Cr
Expenditure rate (ongoing)91.2%
Part B score (max 5.0)4.56 / 5.0
Final score9.00 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.18 / 10
18.9% 3.49
CategoryGap Filling in Plantation
Started / Completed / Phys42 / 0 / 7
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked3.70Cr / 1.97Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score3.49 / 10
2.7% 3.51
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.00Cr
Expenditure rate (ongoing)3.6%
Part B score (max 5.0)0.18 / 5.0
Final score3.51 / 10
155 AMLA โ†— BETUL 6.31 C
24.6% 5.98
CategoryFarm Pond
Started / Completed / Phys215 / 15 / 149
Completion rate76.3%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked1.28Cr / 0.56Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.17 / 5.0
Final score5.98 / 10
โ€”
5.6% 7.87
CategoryDug Well Recharge
Started / Completed / Phys437 / 59 / 342
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate91.8%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score7.87 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
45.1% 7.06
CategoryWater conservation & recharge
Started / Completed / Phys128 / 8 / 75
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked2.60Cr / 1.99Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score7.06 / 10
6.3% 6.92
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 18
Completion rate90.5%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.13Cr / 0.06Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.39 / 5.0
Final score6.92 / 10
4.3% 7.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 2 / 12
Completion rate73.7%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.26Cr / 0.21Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score7.81 / 10
5.0% 1.84
CategoryGap Filling in Plantation
Started / Completed / Phys47 / 0 / 4
Completion rate8.5%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked0.93Cr / 0.26Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.42 / 5.0
Final score1.84 / 10
9.1% 3.83
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys54 / 3 / 29
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate59.3%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked0.77Cr / 0.13Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.86 / 5.0
Final score3.83 / 10
156 ALOT โ†— RATLAM 6.30 C
35.3% 5.40
CategoryFarm Pond
Started / Completed / Phys280 / 110 / 143
Completion rate90.4%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.57Cr / 0.10Cr
Expenditure rate (ongoing)17.7%
Part B score (max 5.0)0.89 / 5.0
Final score5.40 / 10
โ€”
18.0% 5.51
CategoryDug Well Recharge
Started / Completed / Phys1,050 / 364 / 617
⚠ Works needing verification (Completed/Physically Completed)61 works (exp <30%)
Completion rate93.4%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score5.51 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys104 / 70 / 34
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.7% 3.62
CategoryGap Filling in Plantation
Started / Completed / Phys118 / 24 / 33
Completion rate48.3%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked1.12Cr / 0.27Cr
Expenditure rate (ongoing)24.0%
Part B score (max 5.0)1.20 / 5.0
Final score3.62 / 10
5.0% 4.65
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys22 / 5 / 10
Completion rate68.2%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.18Cr / 0.04Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score4.65 / 10
157 KUNDAM โ†— JABALPUR 6.27 C
40.7% 5.36
CategoryFarm Pond
Started / Completed / Phys225 / 17 / 197
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.41Cr / 0.05Cr
Expenditure rate (ongoing)12.1%
Part B score (max 5.0)0.60 / 5.0
Final score5.36 / 10
6.5% 4.68
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.37Cr / 0.07Cr
Expenditure rate (ongoing)18.7%
Part B score (max 5.0)0.93 / 5.0
Final score4.68 / 10
3.3% 5.87
CategoryDug Well Recharge
Started / Completed / Phys262 / 103 / 158
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)17.7%
Part B score (max 5.0)0.88 / 5.0
Final score5.87 / 10
โ€”
19.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys95 / 39 / 56
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys42 / 26 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.6% 3.85
CategoryGap Filling in Plantation
Started / Completed / Phys78 / 19 / 23
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.28Cr / 0.06Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score3.85 / 10
13.6% 4.84
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys97 / 33 / 58
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.16Cr / 0.00Cr
Expenditure rate (ongoing)2.9%
Part B score (max 5.0)0.15 / 5.0
Final score4.84 / 10
158 JAISINGHNAGAR โ†— SHAHDOL 6.27 C
40.0% 4.57
CategoryFarm Pond
Started / Completed / Phys833 / 225 / 445
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked4.20Cr / 0.46Cr
Expenditure rate (ongoing)11.0%
Part B score (max 5.0)0.55 / 5.0
Final score4.57 / 10
1.9% 3.19
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.80Cr / 0.24Cr
Expenditure rate (ongoing)30.4%
Part B score (max 5.0)1.52 / 5.0
Final score3.19 / 10
0.6% 4.93
CategoryDug Well Recharge
Started / Completed / Phys133 / 55 / 75
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.7%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score4.93 / 10
5.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.9% 8.17
CategoryWater conservation & recharge
Started / Completed / Phys353 / 47 / 295
Completion rate96.9%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked1.22Cr / 0.81Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score8.17 / 10
1.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys15 / 5 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.6% 6.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 7 / 33
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.15Cr / 0.05Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score6.54 / 10
0.9% 3.35
CategoryGap Filling in Plantation
Started / Completed / Phys15 / 0 / 9
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.01Cr
Expenditure rate (ongoing)7.0%
Part B score (max 5.0)0.35 / 5.0
Final score3.35 / 10
8.8% 4.40
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys207 / 4 / 176
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.40 / 10
159 MANAWAR โ†— DHAR 6.26 C
14.1% 4.88
CategoryFarm Pond
Started / Completed / Phys234 / 35 / 145
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.61Cr / 0.13Cr
Expenditure rate (ongoing)20.8%
Part B score (max 5.0)1.04 / 5.0
Final score4.88 / 10
โ€”
4.1% 5.18
CategoryDug Well Recharge
Started / Completed / Phys386 / 124 / 206
⚠ Works needing verification (Completed/Physically Completed)27 works (exp <30%)
Completion rate85.5%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)18.0%
Part B score (max 5.0)0.90 / 5.0
Final score5.18 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
43.0% 8.13
CategoryWater conservation & recharge
Started / Completed / Phys128 / 40 / 58
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked5.84Cr / 5.03Cr
Expenditure rate (ongoing)86.0%
Part B score (max 5.0)4.30 / 5.0
Final score8.13 / 10
12.1% 7.18
CategoryWatershed Related Works
Started / Completed / Phys76 / 15 / 54
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.36Cr / 0.19Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score7.18 / 10
1.3% 5.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 9
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score5.88 / 10
13.4% 2.62
CategoryGap Filling in Plantation
Started / Completed / Phys62 / 1 / 5
Completion rate9.7%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked3.00Cr / 1.28Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score2.62 / 10
10.9% 4.24
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys146 / 48 / 68
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate79.5%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.64Cr / 0.03Cr
Expenditure rate (ongoing)5.4%
Part B score (max 5.0)0.27 / 5.0
Final score4.24 / 10
160 AGAR โ†— AGAR-MALWA 6.25 C
25.1% 3.74
CategoryFarm Pond
Started / Completed / Phys151 / 20 / 52
Completion rate47.7%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked2.07Cr / 0.56Cr
Expenditure rate (ongoing)27.1%
Part B score (max 5.0)1.35 / 5.0
Final score3.74 / 10
โ€”
9.4% 4.71
CategoryDug Well Recharge
Started / Completed / Phys500 / 89 / 287
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate75.2%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked0.30Cr / 0.06Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.95 / 5.0
Final score4.71 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
36.1% 7.95
CategoryWater conservation & recharge
Started / Completed / Phys72 / 19 / 44
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked1.26Cr / 0.90Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score7.95 / 10
6.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys25 / 17 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 5 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.8% 2.06
CategoryGap Filling in Plantation
Started / Completed / Phys25 / 3 / 3
Completion rate24.0%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked0.66Cr / 0.11Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.86 / 5.0
Final score2.06 / 10
4.4% 2.58
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys17 / 2 / 6
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked0.28Cr / 0.01Cr
Expenditure rate (ongoing)4.6%
Part B score (max 5.0)0.23 / 5.0
Final score2.58 / 10
161 RAJNAGAR โ†— CHHATARPUR 6.24 C
29.6% 4.48
CategoryFarm Pond
Started / Completed / Phys288 / 79 / 168
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate85.8%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked1.33Cr / 0.05Cr
Expenditure rate (ongoing)3.8%
Part B score (max 5.0)0.19 / 5.0
Final score4.48 / 10
1.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 4.63
CategoryDug Well Recharge
Started / Completed / Phys574 / 465 / 46
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate89.0%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.18 / 5.0
Final score4.63 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.0% 8.66
CategoryWater conservation & recharge
Started / Completed / Phys160 / 20 / 127
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked1.06Cr / 0.86Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score8.66 / 10
5.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys33 / 7 / 26
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 3.87
CategoryGap Filling in Plantation
Started / Completed / Phys20 / 2 / 6
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.11Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.87 / 5.0
Final score3.87 / 10
35.0% 5.26
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys171 / 2 / 136
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate80.7%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked1.00Cr / 0.25Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.23 / 5.0
Final score5.26 / 10
162 BHANPURA โ†— MANDSAUR 6.24 C
15.3% 5.44
CategoryFarm Pond
Started / Completed / Phys134 / 15 / 65
Completion rate59.7%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked1.08Cr / 0.53Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score5.44 / 10
โ€”
5.9% 4.86
CategoryDug Well Recharge
Started / Completed / Phys447 / 315 / 115
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)1.1%
Part B score (max 5.0)0.05 / 5.0
Final score4.86 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
43.8% 7.48
CategoryWater conservation & recharge
Started / Completed / Phys131 / 9 / 81
Completion rate68.7%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked2.64Cr / 2.13Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.04 / 5.0
Final score7.48 / 10
5.4% 7.42
CategoryWatershed Related Works
Started / Completed / Phys22 / 8 / 12
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score7.42 / 10
0.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.1% 3.74
CategoryGap Filling in Plantation
Started / Completed / Phys81 / 0 / 32
Completion rate39.5%
Part A score (max 5.0)1.98 / 5.0
Ongoing sanction / booked0.97Cr / 0.34Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.77 / 5.0
Final score3.74 / 10
20.7% 5.12
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys62 / 0 / 32
Completion rate51.6%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked1.88Cr / 0.95Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score5.12 / 10
163 JAORA โ†— RATLAM 6.23 C
44.2% 4.69
CategoryFarm Pond
Started / Completed / Phys146 / 31 / 98
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.17Cr / 0.01Cr
Expenditure rate (ongoing)5.5%
Part B score (max 5.0)0.27 / 5.0
Final score4.69 / 10
9.0% 7.69
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.44Cr
Expenditure rate (ongoing)93.8%
Part B score (max 5.0)4.69 / 5.0
Final score7.69 / 10
8.9% 4.89
CategoryDug Well Recharge
Started / Completed / Phys449 / 58 / 381
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.89 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
23.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys80 / 33 / 47
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.3% 3.24
CategoryGap Filling in Plantation
Started / Completed / Phys51 / 3 / 16
Completion rate37.3%
Part A score (max 5.0)1.86 / 5.0
Ongoing sanction / booked0.74Cr / 0.20Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.37 / 5.0
Final score3.24 / 10
4.2% 5.13
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys16 / 4 / 10
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score5.13 / 10
164 SILWANI โ†— RAISEN 6.23 C
61.1% 5.48
CategoryFarm Pond
Started / Completed / Phys430 / 193 / 226
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.12Cr / 0.01Cr
Expenditure rate (ongoing)12.1%
Part B score (max 5.0)0.60 / 5.0
Final score5.48 / 10
5.0% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.8% 9.98
CategoryDug Well Recharge
Started / Completed / Phys439 / 332 / 105
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
10.2% 6.81
CategoryWater conservation & recharge
Started / Completed / Phys32 / 13 / 17
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.15Cr / 0.06Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score6.81 / 10
โ€”
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 2.36
CategoryGap Filling in Plantation
Started / Completed / Phys11 / 0 / 1
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate9.1%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score2.36 / 10
8.2% 4.80
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys136 / 105 / 22
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate93.4%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.17Cr / 0.00Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score4.80 / 10
165 SAIKHEDA (GADARWARA) โ†— NARSINGHPUR 6.20 C
55.4% 5.62
CategoryFarm Pond
Started / Completed / Phys159 / 107 / 42
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.21Cr / 0.04Cr
Expenditure rate (ongoing)18.7%
Part B score (max 5.0)0.93 / 5.0
Final score5.62 / 10
โ€”
2.4% 4.34
CategoryDug Well Recharge
Started / Completed / Phys63 / 30 / 24
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.34 / 10
โ€”
14.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys21 / 12 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.9% 5.47
CategoryGap Filling in Plantation
Started / Completed / Phys46 / 17 / 25
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)18.0%
Part B score (max 5.0)0.90 / 5.0
Final score5.47 / 10
13.8% 4.99
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys19 / 9 / 8
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.18Cr / 0.02Cr
Expenditure rate (ongoing)10.4%
Part B score (max 5.0)0.52 / 5.0
Final score4.99 / 10
166 MAJHAULI โ†— SIDHI 6.20 C
36.0% 5.21
CategoryFarm Pond
Started / Completed / Phys340 / 267 / 55
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.33Cr / 0.03Cr
Expenditure rate (ongoing)9.5%
Part B score (max 5.0)0.47 / 5.0
Final score5.21 / 10
โ€”
1.0% 9.89
CategoryDug Well Recharge
Started / Completed / Phys95 / 75 / 18
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.9%
Part A score (max 5.0)4.89 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.89 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.7% 8.82
CategoryWater conservation & recharge
Started / Completed / Phys116 / 60 / 55
Completion rate99.1%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score8.82 / 10
5.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 4 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 6 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.5% 1.33
CategoryGap Filling in Plantation
Started / Completed / Phys128 / 2 / 17
⚠ Works needing verification (Completed/Physically Completed)45 works (exp <30%)
Completion rate14.8%
Part A score (max 5.0)0.74 / 5.0
Ongoing sanction / booked0.90Cr / 0.11Cr
Expenditure rate (ongoing)11.8%
Part B score (max 5.0)0.59 / 5.0
Final score1.33 / 10
15.4% 5.05
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys55 / 6 / 25
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked0.74Cr / 0.33Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score5.05 / 10
167 PRABHAT PATTAN โ†— BETUL 6.19 C
24.6% 5.54
CategoryFarm Pond
Started / Completed / Phys196 / 13 / 131
Completion rate73.5%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked1.49Cr / 0.56Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score5.54 / 10
1.4% 2.22
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.13Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score2.22 / 10
6.7% 4.92
CategoryDug Well Recharge
Started / Completed / Phys538 / 96 / 407
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.5%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.09Cr / 0.00Cr
Expenditure rate (ongoing)4.8%
Part B score (max 5.0)0.24 / 5.0
Final score4.92 / 10
โ€”
48.3% 7.35
CategoryWater conservation & recharge
Started / Completed / Phys144 / 16 / 106
Completion rate84.7%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked1.70Cr / 1.06Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score7.35 / 10
1.5% 8.05
CategoryWatershed Related Works
Started / Completed / Phys8 / 5 / 2
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score8.05 / 10
1.9% 6.61
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.04 / 5.0
Final score6.61 / 10
4.1% 2.66
CategoryGap Filling in Plantation
Started / Completed / Phys32 / 1 / 8
Completion rate28.1%
Part A score (max 5.0)1.41 / 5.0
Ongoing sanction / booked0.61Cr / 0.15Cr
Expenditure rate (ongoing)25.2%
Part B score (max 5.0)1.26 / 5.0
Final score2.66 / 10
11.5% 4.87
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys38 / 6 / 16
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.49Cr / 0.20Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.97 / 5.0
Final score4.87 / 10
168 BARWAH โ†— KHARGONE 6.18 C
22.8% 4.95
CategoryFarm Pond
Started / Completed / Phys200 / 80 / 108
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.08Cr / 0.00Cr
Expenditure rate (ongoing)5.1%
Part B score (max 5.0)0.25 / 5.0
Final score4.95 / 10
1.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.9% 9.95
CategoryDug Well Recharge
Started / Completed / Phys718 / 104 / 607
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.95 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.7% 7.18
CategoryWater conservation & recharge
Started / Completed / Phys150 / 58 / 86
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.20Cr / 0.10Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.38 / 5.0
Final score7.18 / 10
5.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys26 / 12 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.8% 3.96
CategoryGap Filling in Plantation
Started / Completed / Phys88 / 16 / 52
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.12Cr / 0.00Cr
Expenditure rate (ongoing)1.8%
Part B score (max 5.0)0.09 / 5.0
Final score3.96 / 10
15.3% 4.38
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys183 / 67 / 83
⚠ Works needing verification (Completed/Physically Completed)28 works (exp <30%)
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)5.6%
Part B score (max 5.0)0.28 / 5.0
Final score4.38 / 10
169 BERASIA โ†— BHOPAL 6.18 C
38.0% 5.12
CategoryFarm Pond
Started / Completed / Phys788 / 173 / 341
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked5.53Cr / 2.06Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.86 / 5.0
Final score5.12 / 10
2.7% 7.05
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.42Cr / 0.31Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score7.05 / 10
3.1% 6.08
CategoryDug Well Recharge
Started / Completed / Phys551 / 268 / 169
⚠ Works needing verification (Completed/Physically Completed)57 works (exp <30%)
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score6.08 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
38.0% 7.58
CategoryWater conservation & recharge
Started / Completed / Phys402 / 108 / 228
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked3.26Cr / 2.22Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score7.58 / 10
1.7% 7.39
CategoryWatershed Related Works
Started / Completed / Phys18 / 3 / 14
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score7.39 / 10
5.2% 8.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 5 / 16
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.45Cr / 0.35Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score8.47 / 10
1.7% 2.16
CategoryGap Filling in Plantation
Started / Completed / Phys33 / 0 / 7
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked0.58Cr / 0.13Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score2.16 / 10
9.4% 3.72
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys127 / 20 / 56
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked1.36Cr / 0.20Cr
Expenditure rate (ongoing)14.6%
Part B score (max 5.0)0.73 / 5.0
Final score3.72 / 10
170 UNCHAHARA โ†— SATNA 6.17 C
30.5% 3.76
CategoryFarm Pond
Started / Completed / Phys268 / 22 / 131
Completion rate57.1%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked2.56Cr / 0.47Cr
Expenditure rate (ongoing)18.2%
Part B score (max 5.0)0.91 / 5.0
Final score3.76 / 10
โ€”
1.7% 5.99
CategoryDug Well Recharge
Started / Completed / Phys114 / 7 / 97
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate91.2%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)28.5%
Part B score (max 5.0)1.42 / 5.0
Final score5.99 / 10
โ€”
23.6% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys91 / 3 / 81
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.88Cr / 0.79Cr
Expenditure rate (ongoing)89.1%
Part B score (max 5.0)4.45 / 5.0
Final score9.00 / 10
2.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 3 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.7% 9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 13
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.54Cr / 0.47Cr
Expenditure rate (ongoing)87.3%
Part B score (max 5.0)4.36 / 5.0
Final score9.00 / 10
7.1% 3.47
CategoryGap Filling in Plantation
Started / Completed / Phys15 / 0 / 3
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.98Cr / 0.48Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score3.47 / 10
16.0% 3.96
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys57 / 2 / 16
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate31.6%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked1.85Cr / 0.88Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score3.96 / 10
171 SEHORE โ†— SEHORE 6.17 C
48.7% 6.30
CategoryFarm Pond
Started / Completed / Phys340 / 30 / 258
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate84.7%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked1.42Cr / 0.59Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score6.30 / 10
โ€”
10.4% 6.96
CategoryDug Well Recharge
Started / Completed / Phys690 / 84 / 602
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score6.96 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.0% 8.40
CategoryWater conservation & recharge
Started / Completed / Phys121 / 12 / 108
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score8.40 / 10
1.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.2% 1.75
CategoryGap Filling in Plantation
Started / Completed / Phys50 / 1 / 4
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.65Cr / 0.41Cr
Expenditure rate (ongoing)25.0%
Part B score (max 5.0)1.25 / 5.0
Final score1.75 / 10
9.1% 3.35
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys66 / 7 / 21
Completion rate42.4%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked1.05Cr / 0.26Cr
Expenditure rate (ongoing)24.7%
Part B score (max 5.0)1.23 / 5.0
Final score3.35 / 10
172 NAINPUR โ†— MANDLA 6.16 C
45.2% 6.27
CategoryFarm Pond
Started / Completed / Phys329 / 238 / 40
Completion rate84.5%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked2.41Cr / 0.99Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.27 / 10
3.3% 0.75
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.17Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score0.75 / 10
2.5% 4.91
CategoryDug Well Recharge
Started / Completed / Phys337 / 92 / 199
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)11.8%
Part B score (max 5.0)0.59 / 5.0
Final score4.91 / 10
3.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.2% 8.02
CategoryWater conservation & recharge
Started / Completed / Phys74 / 45 / 14
Completion rate79.7%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked2.50Cr / 2.01Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score8.02 / 10
0.9% 6.56
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score6.56 / 10
1.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.0% 1.57
CategoryGap Filling in Plantation
Started / Completed / Phys38 / 1 / 1
Completion rate5.3%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked1.24Cr / 0.32Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.57 / 10
19.0% 4.99
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys139 / 22 / 61
Completion rate59.7%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked2.65Cr / 1.06Cr
Expenditure rate (ongoing)40.0%
Part B score (max 5.0)2.00 / 5.0
Final score4.99 / 10
173 NARAYANGANJ โ†— MANDLA 6.14 C
28.5% 6.39
CategoryFarm Pond
Started / Completed / Phys181 / 50 / 85
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked1.59Cr / 0.85Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score6.39 / 10
9.1% 1.34
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.99Cr / 0.53Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.34 / 5.0
Final score1.34 / 10
1.7% 7.21
CategoryDug Well Recharge
Started / Completed / Phys148 / 97 / 34
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate88.5%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score7.21 / 10
โ€”
23.4% 6.99
CategoryWater conservation & recharge
Started / Completed / Phys92 / 30 / 24
Completion rate58.7%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked2.83Cr / 2.30Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score6.99 / 10
15.0% 8.27
CategoryWatershed Related Works
Started / Completed / Phys72 / 55 / 10
Completion rate90.3%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score8.27 / 10
0.3% 6.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)81.9%
Part B score (max 5.0)4.10 / 5.0
Final score6.60 / 10
5.9% 2.32
CategoryGap Filling in Plantation
Started / Completed / Phys24 / 1 / 1
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked1.25Cr / 0.48Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.90 / 5.0
Final score2.32 / 10
16.0% 6.52
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys114 / 33 / 56
Completion rate78.1%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.83Cr / 0.43Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score6.52 / 10
174 BADARWAS โ†— SHIVPURI 6.13 C
33.0% 4.77
CategoryFarm Pond
Started / Completed / Phys237 / 91 / 96
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate78.9%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked1.81Cr / 0.30Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score4.77 / 10
โ€”
1.8% 4.72
CategoryDug Well Recharge
Started / Completed / Phys181 / 61 / 92
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate84.5%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)9.8%
Part B score (max 5.0)0.49 / 5.0
Final score4.72 / 10
0.7% 6.18
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.68 / 5.0
Final score6.18 / 10
37.2% 7.92
CategoryWater conservation & recharge
Started / Completed / Phys132 / 25 / 93
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked1.83Cr / 1.26Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.92 / 10
6.6% 7.23
CategoryWatershed Related Works
Started / Completed / Phys35 / 12 / 15
Completion rate77.1%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.35Cr / 0.24Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.23 / 10
4.7% 8.80
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 6 / 13
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.05 / 5.0
Final score8.80 / 10
5.8% 1.47
CategoryGap Filling in Plantation
Started / Completed / Phys111 / 2 / 8
Completion rate9.0%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked1.41Cr / 0.29Cr
Expenditure rate (ongoing)20.4%
Part B score (max 5.0)1.02 / 5.0
Final score1.47 / 10
10.2% 4.95
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys81 / 4 / 52
Completion rate69.1%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.91Cr / 0.27Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.50 / 5.0
Final score4.95 / 10
175 KAHNAPAS(GHANSAUR) โ†— SEONI 6.13 C
35.4% 4.58
CategoryFarm Pond
Started / Completed / Phys420 / 215 / 127
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate81.4%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.27Cr / 0.03Cr
Expenditure rate (ongoing)10.1%
Part B score (max 5.0)0.51 / 5.0
Final score4.58 / 10
โ€”
2.1% 8.44
CategoryDug Well Recharge
Started / Completed / Phys225 / 92 / 63
⚠ Works needing verification (Completed/Physically Completed)70 works (exp <30%)
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.44 / 10
โ€”
33.9% 8.32
CategoryWater conservation & recharge
Started / Completed / Phys185 / 82 / 101
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score8.32 / 10
1.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.5% 3.29
CategoryGap Filling in Plantation
Started / Completed / Phys29 / 2 / 6
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate27.6%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked0.51Cr / 0.20Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score3.29 / 10
18.7% 5.13
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys189 / 60 / 103
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.82 / 5.0
Final score5.13 / 10
176 SAWER โ†— INDORE 6.13 C
27.1% 8.55
CategoryFarm Pond
Started / Completed / Phys95 / 45 / 36
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.19Cr / 0.16Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score8.55 / 10
โ€”
1.2% 9.00
CategoryDug Well Recharge
Started / Completed / Phys177 / 172 / 1
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate97.7%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)91.7%
Part B score (max 5.0)4.58 / 5.0
Final score9.00 / 10
โ€”
14.4% 8.67
CategoryWater conservation & recharge
Started / Completed / Phys27 / 16 / 5
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.21Cr / 0.20Cr
Expenditure rate (ongoing)95.5%
Part B score (max 5.0)4.78 / 5.0
Final score8.67 / 10
2.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.5% 6.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.03 / 10
39.0% 3.62
CategoryGap Filling in Plantation
Started / Completed / Phys109 / 16 / 15
Completion rate28.4%
Part A score (max 5.0)1.42 / 5.0
Ongoing sanction / booked1.54Cr / 0.68Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score3.62 / 10
11.4% 4.64
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys19 / 2 / 14
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)8.7%
Part B score (max 5.0)0.43 / 5.0
Final score4.64 / 10
177 TONK KHURD โ†— DEWAS 6.12 C
32.5% 5.93
CategoryFarm Pond
Started / Completed / Phys85 / 19 / 54
Completion rate85.9%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.40Cr / 0.13Cr
Expenditure rate (ongoing)32.8%
Part B score (max 5.0)1.64 / 5.0
Final score5.93 / 10
โ€”
11.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys374 / 75 / 299
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.7% 7.51
CategoryWater conservation & recharge
Started / Completed / Phys77 / 6 / 62
Completion rate88.3%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.21Cr / 0.13Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score7.51 / 10
4.8% 5.39
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)36.4%
Part B score (max 5.0)1.82 / 5.0
Final score5.39 / 10
2.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.4% 0.97
CategoryGap Filling in Plantation
Started / Completed / Phys32 / 0 / 4
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.97Cr / 0.07Cr
Expenditure rate (ongoing)7.0%
Part B score (max 5.0)0.35 / 5.0
Final score0.97 / 10
9.0% 4.07
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys8 / 0 / 5
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.21Cr / 0.04Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score4.07 / 10
178 ARON โ†— GUNA 6.11 C
46.0% 5.15
CategoryFarm Pond
Started / Completed / Phys370 / 247 / 119
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.09Cr / 0.00Cr
Expenditure rate (ongoing)4.1%
Part B score (max 5.0)0.21 / 5.0
Final score5.15 / 10
โ€”
2.3% 9.98
CategoryDug Well Recharge
Started / Completed / Phys288 / 106 / 181
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.7%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
38.7% 7.06
CategoryWater conservation & recharge
Started / Completed / Phys155 / 39 / 115
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.15Cr / 0.06Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score7.06 / 10
2.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.2% 4.05
CategoryGap Filling in Plantation
Started / Completed / Phys48 / 1 / 14
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate31.3%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked0.38Cr / 0.19Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.49 / 5.0
Final score4.05 / 10
6.2% 4.64
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys133 / 22 / 99
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)1.9%
Part B score (max 5.0)0.09 / 5.0
Final score4.64 / 10
179 SATNA โ†— SATNA 6.10 C
28.5% 5.34
CategoryFarm Pond
Started / Completed / Phys189 / 75 / 73
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate78.3%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked0.44Cr / 0.12Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score5.34 / 10
5.3% 2.16
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
2.9% 5.98
CategoryDug Well Recharge
Started / Completed / Phys147 / 125 / 11
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)27.1%
Part B score (max 5.0)1.36 / 5.0
Final score5.98 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
39.2% 8.03
CategoryWater conservation & recharge
Started / Completed / Phys48 / 18 / 24
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked1.01Cr / 0.74Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score8.03 / 10
1.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.9% 7.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 4 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score7.00 / 10
4.2% 0.30
CategoryGap Filling in Plantation
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.02Cr
Expenditure rate (ongoing)6.1%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
10.3% 3.71
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys34 / 6 / 7
Completion rate38.2%
Part A score (max 5.0)1.91 / 5.0
Ongoing sanction / booked0.62Cr / 0.22Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.80 / 5.0
Final score3.71 / 10
180 CHAWARPATHA โ†— NARSINGHPUR 6.10 C
50.6% 5.71
CategoryFarm Pond
Started / Completed / Phys182 / 159 / 19
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.07Cr / 0.01Cr
Expenditure rate (ongoing)16.4%
Part B score (max 5.0)0.82 / 5.0
Final score5.71 / 10
โ€”
1.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys46 / 2 / 44
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys24 / 21 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.2% 5.46
CategoryGap Filling in Plantation
Started / Completed / Phys44 / 13 / 26
Completion rate88.6%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.11Cr / 0.02Cr
Expenditure rate (ongoing)20.5%
Part B score (max 5.0)1.03 / 5.0
Final score5.46 / 10
16.2% 4.69
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys28 / 11 / 14
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.23Cr / 0.01Cr
Expenditure rate (ongoing)4.5%
Part B score (max 5.0)0.23 / 5.0
Final score4.69 / 10
181 BADNAWAR โ†— DHAR 6.09 C
13.0% 5.75
CategoryFarm Pond
Started / Completed / Phys316 / 26 / 170
Completion rate62.0%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked3.56Cr / 1.88Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score5.75 / 10
0.5% 3.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score3.02 / 10
2.9% 7.55
CategoryDug Well Recharge
Started / Completed / Phys600 / 192 / 352
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate90.7%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score7.55 / 10
1.3% 7.33
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 5
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score7.33 / 10
32.6% 8.39
CategoryWater conservation & recharge
Started / Completed / Phys202 / 5 / 148
Completion rate75.7%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked7.10Cr / 6.54Cr
Expenditure rate (ongoing)92.0%
Part B score (max 5.0)4.60 / 5.0
Final score8.39 / 10
6.0% 7.29
CategoryWatershed Related Works
Started / Completed / Phys60 / 2 / 51
Completion rate88.3%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.40Cr / 0.23Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score7.29 / 10
0.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.2% 3.76
CategoryGap Filling in Plantation
Started / Completed / Phys213 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked7.55Cr / 5.68Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score3.76 / 10
29.3% 4.40
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys169 / 35 / 103
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate81.7%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked1.23Cr / 0.08Cr
Expenditure rate (ongoing)6.4%
Part B score (max 5.0)0.32 / 5.0
Final score4.40 / 10
182 MORAR โ†— GWALIOR 6.09 C
25.2% 6.12
CategoryFarm Pond
Started / Completed / Phys175 / 40 / 124
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score6.12 / 10
1.2% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 6.51
CategoryDug Well Recharge
Started / Completed / Phys215 / 36 / 170
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score6.51 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
29.0% 7.27
CategoryWater conservation & recharge
Started / Completed / Phys47 / 14 / 29
Completion rate91.5%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.96Cr / 0.52Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score7.27 / 10
3.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.0% 4.48
CategoryGap Filling in Plantation
Started / Completed / Phys36 / 4 / 23
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.16Cr / 0.02Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.73 / 5.0
Final score4.48 / 10
25.2% 4.19
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys85 / 11 / 54
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked1.23Cr / 0.09Cr
Expenditure rate (ongoing)7.3%
Part B score (max 5.0)0.37 / 5.0
Final score4.19 / 10
183 CHANCHODA โ†— GUNA 6.09 C
21.1% 5.23
CategoryFarm Pond
Started / Completed / Phys289 / 113 / 118
⚠ Works needing verification (Completed/Physically Completed)48 works (exp <30%)
Completion rate79.9%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.05Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score5.23 / 10
โ€”
7.7% 9.66
CategoryDug Well Recharge
Started / Completed / Phys894 / 501 / 333
⚠ Works needing verification (Completed/Physically Completed)60 works (exp <30%)
Completion rate93.3%
Part A score (max 5.0)4.66 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.66 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
38.0% 7.72
CategoryWater conservation & recharge
Started / Completed / Phys203 / 66 / 130
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.60Cr / 0.34Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.72 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.6% 6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 13 / 13
Completion rate96.3%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)30.7%
Part B score (max 5.0)1.53 / 5.0
Final score6.35 / 10
16.8% 3.79
CategoryGap Filling in Plantation
Started / Completed / Phys135 / 10 / 57
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate49.6%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked1.06Cr / 0.28Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score3.79 / 10
9.7% 2.21
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys100 / 11 / 30
⚠ Works needing verification (Completed/Physically Completed)53 works (exp <30%)
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked0.21Cr / 0.01Cr
Expenditure rate (ongoing)3.2%
Part B score (max 5.0)0.16 / 5.0
Final score2.21 / 10
184 SARANGPUR โ†— RAJGARH 6.09 C
36.9% 5.58
CategoryFarm Pond
Started / Completed / Phys179 / 135 / 22
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate87.7%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.37Cr / 0.09Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.19 / 5.0
Final score5.58 / 10
โ€”
11.2% 9.92
CategoryDug Well Recharge
Started / Completed / Phys612 / 501 / 101
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.1% 6.68
CategoryWater conservation & recharge
Started / Completed / Phys39 / 26 / 10
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.07 / 5.0
Final score6.68 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.9% 7.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 5 / 26
Completion rate96.9%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.78 / 5.0
Final score7.62 / 10
7.2% 1.01
CategoryGap Filling in Plantation
Started / Completed / Phys56 / 0 / 2
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate3.6%
Part A score (max 5.0)0.18 / 5.0
Ongoing sanction / booked0.75Cr / 0.12Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score1.01 / 10
9.8% 3.60
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys53 / 5 / 17
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate41.5%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.41Cr / 0.12Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.52 / 5.0
Final score3.60 / 10
185 GANDHWANI โ†— DHAR 6.09 C
4.8% 3.59
CategoryFarm Pond
Started / Completed / Phys237 / 10 / 51
Completion rate25.7%
Part A score (max 5.0)1.29 / 5.0
Ongoing sanction / booked1.58Cr / 0.73Cr
Expenditure rate (ongoing)46.0%
Part B score (max 5.0)2.30 / 5.0
Final score3.59 / 10
โ€”
2.1% 3.04
CategoryDug Well Recharge
Started / Completed / Phys400 / 47 / 39
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate21.5%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked0.79Cr / 0.31Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.96 / 5.0
Final score3.04 / 10
โ€”
65.2% 6.90
CategoryWater conservation & recharge
Started / Completed / Phys285 / 7 / 172
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked9.68Cr / 7.29Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score6.90 / 10
10.4% 6.07
CategoryWatershed Related Works
Started / Completed / Phys164 / 12 / 59
Completion rate43.3%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked2.76Cr / 2.15Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score6.07 / 10
3.2% 6.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 14
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.58Cr / 0.26Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score6.10 / 10
6.7% 2.73
CategoryGap Filling in Plantation
Started / Completed / Phys37 / 1 / 6
Completion rate18.9%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked2.32Cr / 0.83Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score2.73 / 10
7.6% 4.56
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys120 / 33 / 70
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate85.8%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.24Cr / 0.01Cr
Expenditure rate (ongoing)5.3%
Part B score (max 5.0)0.27 / 5.0
Final score4.56 / 10
186 NARSINGHGARH โ†— RAJGARH 6.09 C
33.9% 5.78
CategoryFarm Pond
Started / Completed / Phys255 / 171 / 52
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate87.5%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.65Cr / 0.18Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score5.78 / 10
โ€”
7.9% 4.97
CategoryDug Well Recharge
Started / Completed / Phys650 / 337 / 303
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate98.5%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.97 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28.8% 7.69
CategoryWater conservation & recharge
Started / Completed / Phys163 / 52 / 100
Completion rate93.3%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.69Cr / 0.42Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score7.69 / 10
0.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.5% 7.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys31 / 3 / 22
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.45Cr / 0.32Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score7.51 / 10
3.2% 1.70
CategoryGap Filling in Plantation
Started / Completed / Phys33 / 0 / 4
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate12.1%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked0.52Cr / 0.11Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.09 / 5.0
Final score1.70 / 10
13.0% 3.32
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys78 / 6 / 39
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked0.96Cr / 0.08Cr
Expenditure rate (ongoing)8.8%
Part B score (max 5.0)0.44 / 5.0
Final score3.32 / 10
187 NARWAR โ†— SHIVPURI 6.09 C
25.8% 4.87
CategoryFarm Pond
Started / Completed / Phys242 / 154 / 51
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate84.7%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.74Cr / 0.09Cr
Expenditure rate (ongoing)12.7%
Part B score (max 5.0)0.63 / 5.0
Final score4.87 / 10
โ€”
2.0% 3.86
CategoryDug Well Recharge
Started / Completed / Phys207 / 126 / 27
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.06Cr / 0.00Cr
Expenditure rate (ongoing)3.3%
Part B score (max 5.0)0.16 / 5.0
Final score3.86 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
39.0% 7.30
CategoryWater conservation & recharge
Started / Completed / Phys180 / 42 / 135
Completion rate98.3%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.38 / 5.0
Final score7.30 / 10
16.7% 8.41
CategoryWatershed Related Works
Started / Completed / Phys54 / 18 / 35
Completion rate98.1%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score8.41 / 10
0.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.4% 0.93
CategoryGap Filling in Plantation
Started / Completed / Phys147 / 0 / 5
Completion rate3.4%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked1.90Cr / 0.29Cr
Expenditure rate (ongoing)15.3%
Part B score (max 5.0)0.76 / 5.0
Final score0.93 / 10
8.1% 4.10
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys41 / 10 / 13
Completion rate56.1%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked0.82Cr / 0.21Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score4.10 / 10
188 KEOLARI โ†— SEONI 6.09 C
50.5% 4.66
CategoryFarm Pond
Started / Completed / Phys504 / 405 / 61
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.82Cr / 0.01Cr
Expenditure rate (ongoing)0.7%
Part B score (max 5.0)0.04 / 5.0
Final score4.66 / 10
โ€”
2.7% 9.59
CategoryDug Well Recharge
Started / Completed / Phys302 / 244 / 33
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate91.7%
Part A score (max 5.0)4.59 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.59 / 10
3.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 5 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.8% 9.84
CategoryWater conservation & recharge
Started / Completed / Phys62 / 22 / 38
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.84 / 10
6.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys31 / 13 / 18
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 4.27
CategoryGap Filling in Plantation
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.64Cr / 0.10Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score4.27 / 10
18.7% 4.75
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys87 / 10 / 72
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.32Cr / 0.00Cr
Expenditure rate (ongoing)0.7%
Part B score (max 5.0)0.03 / 5.0
Final score4.75 / 10
189 BEGUMGANJ โ†— RAISEN 6.08 C
47.7% 5.23
CategoryFarm Pond
Started / Completed / Phys424 / 140 / 269
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate96.5%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)8.2%
Part B score (max 5.0)0.41 / 5.0
Final score5.23 / 10
2.1% 7.50
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score7.50 / 10
4.1% 9.94
CategoryDug Well Recharge
Started / Completed / Phys335 / 199 / 132
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate98.8%
Part A score (max 5.0)4.94 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.94 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
36.2% 7.37
CategoryWater conservation & recharge
Started / Completed / Phys64 / 20 / 41
Completion rate95.3%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.30Cr / 0.16Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score7.37 / 10
0.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.8% 1.62
CategoryGap Filling in Plantation
Started / Completed / Phys18 / 2 / 1
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.83Cr / 0.13Cr
Expenditure rate (ongoing)15.8%
Part B score (max 5.0)0.79 / 5.0
Final score1.62 / 10
4.0% 4.03
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys20 / 4 / 12
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score4.03 / 10
190 SIDHI โ†— SIDHI 6.08 C
29.5% 5.25
CategoryFarm Pond
Started / Completed / Phys430 / 257 / 140
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.80Cr / 0.10Cr
Expenditure rate (ongoing)12.7%
Part B score (max 5.0)0.64 / 5.0
Final score5.25 / 10
โ€”
0.8% 5.29
CategoryDug Well Recharge
Started / Completed / Phys125 / 64 / 48
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate89.6%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score5.29 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.6% 8.54
CategoryWater conservation & recharge
Started / Completed / Phys279 / 85 / 193
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score8.54 / 10
6.9% 9.00
CategoryWatershed Related Works
Started / Completed / Phys57 / 29 / 27
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)97.9%
Part B score (max 5.0)4.89 / 5.0
Final score9.00 / 10
3.3% 9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 15 / 8
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.12Cr / 0.12Cr
Expenditure rate (ongoing)94.0%
Part B score (max 5.0)4.70 / 5.0
Final score9.00 / 10
15.2% 1.74
CategoryGap Filling in Plantation
Started / Completed / Phys112 / 1 / 22
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate20.5%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked3.96Cr / 0.57Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.72 / 5.0
Final score1.74 / 10
12.0% 4.50
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys101 / 5 / 64
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate68.3%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked1.12Cr / 0.24Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.09 / 5.0
Final score4.50 / 10
191 LAUNDI โ†— CHHATARPUR 6.07 C
37.9% 5.88
CategoryFarm Pond
Started / Completed / Phys185 / 87 / 77
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate88.6%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.58Cr / 0.17Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.45 / 5.0
Final score5.88 / 10
1.0% 4.18
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.15Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
6.2% 7.11
CategoryDug Well Recharge
Started / Completed / Phys453 / 248 / 185
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)46.7%
Part B score (max 5.0)2.33 / 5.0
Final score7.11 / 10
โ€”
26.7% 7.49
CategoryWater conservation & recharge
Started / Completed / Phys89 / 18 / 69
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score7.49 / 10
1.9% 7.14
CategoryWatershed Related Works
Started / Completed / Phys18 / 1 / 15
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.70 / 5.0
Final score7.14 / 10
4.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.7% 2.23
CategoryGap Filling in Plantation
Started / Completed / Phys31 / 1 / 5
Completion rate19.4%
Part A score (max 5.0)0.97 / 5.0
Ongoing sanction / booked0.43Cr / 0.11Cr
Expenditure rate (ongoing)25.2%
Part B score (max 5.0)1.26 / 5.0
Final score2.23 / 10
17.8% 3.71
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys67 / 3 / 32
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate52.2%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked1.20Cr / 0.26Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score3.71 / 10
192 RITHI โ†— KATNI 6.07 C
36.5% 5.18
CategoryFarm Pond
Started / Completed / Phys251 / 34 / 145
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate71.3%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked2.54Cr / 0.82Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.62 / 5.0
Final score5.18 / 10
0.8% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.6% 4.50
CategoryDug Well Recharge
Started / Completed / Phys259 / 127 / 60
⚠ Works needing verification (Completed/Physically Completed)71 works (exp <30%)
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)17.8%
Part B score (max 5.0)0.89 / 5.0
Final score4.50 / 10
5.4% 8.00
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 10 / 43
Completion rate98.1%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score8.00 / 10
20.6% 7.60
CategoryWater conservation & recharge
Started / Completed / Phys112 / 32 / 73
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.62Cr / 0.36Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score7.60 / 10
9.3% 7.61
CategoryWatershed Related Works
Started / Completed / Phys51 / 24 / 19
Completion rate84.3%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score7.61 / 10
5.7% 7.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 5 / 8
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score7.37 / 10
4.2% 0.95
CategoryGap Filling in Plantation
Started / Completed / Phys21 / 0 / 1
Completion rate4.8%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked0.92Cr / 0.13Cr
Expenditure rate (ongoing)14.2%
Part B score (max 5.0)0.71 / 5.0
Final score0.95 / 10
14.9% 5.48
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys43 / 6 / 30
Completion rate83.7%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.57Cr / 0.15Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score5.48 / 10
193 KHAKNAR โ†— BURHANPUR 6.07 C
37.1% 5.86
CategoryFarm Pond
Started / Completed / Phys411 / 124 / 248
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.96Cr / 0.25Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score5.86 / 10
2.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.6% 7.37
CategoryDug Well Recharge
Started / Completed / Phys736 / 247 / 447
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score7.37 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.1% 7.15
CategoryWater conservation & recharge
Started / Completed / Phys154 / 38 / 102
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.33Cr / 0.17Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score7.15 / 10
4.0% 7.16
CategoryWatershed Related Works
Started / Completed / Phys25 / 7 / 16
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.56 / 5.0
Final score7.16 / 10
1.1% 7.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 8
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score7.81 / 10
13.0% 3.09
CategoryGap Filling in Plantation
Started / Completed / Phys72 / 2 / 25
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked1.02Cr / 0.25Cr
Expenditure rate (ongoing)24.3%
Part B score (max 5.0)1.21 / 5.0
Final score3.09 / 10
9.2% 5.19
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys36 / 2 / 23
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked0.67Cr / 0.23Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score5.19 / 10
194 BETUL โ†— BETUL 6.07 C
22.5% 5.88
CategoryFarm Pond
Started / Completed / Phys145 / 0 / 127
Completion rate87.6%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.50 / 5.0
Final score5.88 / 10
4.9% 3.85
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.77Cr / 0.60Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
5.7% 4.95
CategoryDug Well Recharge
Started / Completed / Phys348 / 8 / 331
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)1.5%
Part B score (max 5.0)0.08 / 5.0
Final score4.95 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.5% 8.10
CategoryWater conservation & recharge
Started / Completed / Phys87 / 3 / 76
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.32Cr / 0.23Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score8.10 / 10
8.8% 9.00
CategoryWatershed Related Works
Started / Completed / Phys25 / 9 / 14
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.14Cr / 0.12Cr
Expenditure rate (ongoing)90.5%
Part B score (max 5.0)4.52 / 5.0
Final score9.00 / 10
6.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.1% 1.65
CategoryGap Filling in Plantation
Started / Completed / Phys95 / 0 / 5
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate5.3%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked2.05Cr / 0.57Cr
Expenditure rate (ongoing)27.7%
Part B score (max 5.0)1.38 / 5.0
Final score1.65 / 10
10.3% 3.93
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys104 / 9 / 55
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.53Cr / 0.09Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score3.93 / 10
195 REHLI โ†— SAGAR 6.06 C
22.2% 5.21
CategoryFarm Pond
Started / Completed / Phys278 / 105 / 132
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.58Cr / 0.11Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score5.21 / 10
โ€”
6.6% 4.42
CategoryDug Well Recharge
Started / Completed / Phys585 / 259 / 252
⚠ Works needing verification (Completed/Physically Completed)73 works (exp <30%)
Completion rate87.4%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.1%
Part B score (max 5.0)0.05 / 5.0
Final score4.42 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.5% 8.05
CategoryWater conservation & recharge
Started / Completed / Phys114 / 33 / 77
Completion rate96.5%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.34Cr / 0.22Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score8.05 / 10
3.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 5 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.0% 2.79
CategoryGap Filling in Plantation
Started / Completed / Phys26 / 4 / 5
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate34.6%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked0.36Cr / 0.08Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score2.79 / 10
34.7% 4.51
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys119 / 17 / 84
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate84.9%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.95Cr / 0.05Cr
Expenditure rate (ongoing)5.2%
Part B score (max 5.0)0.26 / 5.0
Final score4.51 / 10
196 DAHI โ†— DHAR 6.06 C
7.0% 4.86
CategoryFarm Pond
Started / Completed / Phys160 / 3 / 71
Completion rate46.3%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked1.23Cr / 0.63Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score4.86 / 10
โ€”
2.0% 3.82
CategoryDug Well Recharge
Started / Completed / Phys256 / 37 / 113
⚠ Works needing verification (Completed/Physically Completed)27 works (exp <30%)
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked0.20Cr / 0.04Cr
Expenditure rate (ongoing)17.8%
Part B score (max 5.0)0.89 / 5.0
Final score3.82 / 10
โ€”
64.2% 7.03
CategoryWater conservation & recharge
Started / Completed / Phys279 / 2 / 190
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked6.63Cr / 4.76Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score7.03 / 10
4.3% 6.86
CategoryWatershed Related Works
Started / Completed / Phys27 / 0 / 24
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.13Cr / 0.06Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score6.86 / 10
1.4% 8.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 16
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score8.23 / 10
6.3% 2.88
CategoryGap Filling in Plantation
Started / Completed / Phys48 / 0 / 7
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate14.6%
Part A score (max 5.0)0.73 / 5.0
Ongoing sanction / booked1.60Cr / 0.69Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.16 / 5.0
Final score2.88 / 10
14.8% 3.61
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys246 / 8 / 132
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate56.9%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked2.70Cr / 0.41Cr
Expenditure rate (ongoing)15.2%
Part B score (max 5.0)0.76 / 5.0
Final score3.61 / 10
197 HANUMANA โ†— REWA 6.04 C
30.7% 4.80
CategoryFarm Pond
Started / Completed / Phys288 / 140 / 61
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked2.65Cr / 0.69Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score4.80 / 10
0.6% 3.44
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.13Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score3.44 / 10
0.5% 5.21
CategoryDug Well Recharge
Started / Completed / Phys62 / 20 / 25
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate72.6%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score5.21 / 10
2.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.1% 7.71
CategoryWater conservation & recharge
Started / Completed / Phys139 / 87 / 40
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.47Cr / 0.29Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score7.71 / 10
9.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys16 / 8 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 21 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.2% 3.11
CategoryGap Filling in Plantation
Started / Completed / Phys29 / 2 / 11
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked0.56Cr / 0.10Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score3.11 / 10
19.9% 2.81
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys143 / 26 / 30
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked3.50Cr / 0.60Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score2.81 / 10
198 KHANIYADHANA โ†— SHIVPURI 6.03 C
26.5% 5.30
CategoryFarm Pond
Started / Completed / Phys321 / 134 / 136
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate84.1%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked1.23Cr / 0.27Cr
Expenditure rate (ongoing)21.8%
Part B score (max 5.0)1.09 / 5.0
Final score5.30 / 10
1.2% 0.40
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.03Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score0.40 / 10
2.4% 4.78
CategoryDug Well Recharge
Started / Completed / Phys335 / 145 / 91
⚠ Works needing verification (Completed/Physically Completed)74 works (exp <30%)
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)25.1%
Part B score (max 5.0)1.26 / 5.0
Final score4.78 / 10
3.0% 6.79
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 5 / 11
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score6.79 / 10
37.6% 7.93
CategoryWater conservation & recharge
Started / Completed / Phys163 / 46 / 89
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked5.10Cr / 3.87Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score7.93 / 10
3.1% 7.27
CategoryWatershed Related Works
Started / Completed / Phys21 / 9 / 9
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.22Cr / 0.13Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score7.27 / 10
1.8% 6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 4 / 5
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score6.16 / 10
7.7% 2.12
CategoryGap Filling in Plantation
Started / Completed / Phys140 / 2 / 19
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked2.25Cr / 0.62Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.37 / 5.0
Final score2.12 / 10
16.7% 4.93
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys163 / 1 / 103
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate63.8%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked2.08Cr / 0.73Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score4.93 / 10
199 KARKELI โ†— UMARIA 6.02 C
21.7% 5.48
CategoryFarm Pond
Started / Completed / Phys313 / 34 / 185
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked3.20Cr / 1.27Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score5.48 / 10
1.5% 6.28
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.38Cr / 0.28Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.28 / 10
2.3% 5.86
CategoryDug Well Recharge
Started / Completed / Phys441 / 84 / 283
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.17Cr / 0.06Cr
Expenditure rate (ongoing)34.0%
Part B score (max 5.0)1.70 / 5.0
Final score5.86 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
50.3% 7.00
CategoryWater conservation & recharge
Started / Completed / Phys267 / 21 / 191
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked5.46Cr / 3.31Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.03 / 5.0
Final score7.00 / 10
4.9% 7.69
CategoryWatershed Related Works
Started / Completed / Phys30 / 2 / 27
Completion rate96.7%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.86 / 5.0
Final score7.69 / 10
7.4% 6.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys58 / 5 / 31
Completion rate62.1%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked1.54Cr / 0.98Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.29 / 10
5.1% 1.11
CategoryGap Filling in Plantation
Started / Completed / Phys86 / 0 / 4
Completion rate4.7%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked2.36Cr / 0.41Cr
Expenditure rate (ongoing)17.5%
Part B score (max 5.0)0.87 / 5.0
Final score1.11 / 10
6.8% 2.64
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys200 / 23 / 22
Completion rate22.5%
Part A score (max 5.0)1.13 / 5.0
Ongoing sanction / booked2.88Cr / 0.87Cr
Expenditure rate (ongoing)30.3%
Part B score (max 5.0)1.52 / 5.0
Final score2.64 / 10
200 BAJAG โ†— DINDORI 6.02 C
34.9% 5.40
CategoryFarm Pond
Started / Completed / Phys261 / 45 / 213
Completion rate98.9%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)9.1%
Part B score (max 5.0)0.45 / 5.0
Final score5.40 / 10
โ€”
2.3% 9.61
CategoryDug Well Recharge
Started / Completed / Phys243 / 24 / 200
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate92.2%
Part A score (max 5.0)4.61 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.61 / 10
โ€”
24.5% 7.87
CategoryWater conservation & recharge
Started / Completed / Phys71 / 5 / 65
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.19Cr / 0.11Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.94 / 5.0
Final score7.87 / 10
7.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys17 / 1 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.0% 2.05
CategoryGap Filling in Plantation
Started / Completed / Phys35 / 1 / 9
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.12Cr / 0.14Cr
Expenditure rate (ongoing)12.5%
Part B score (max 5.0)0.62 / 5.0
Final score2.05 / 10
23.7% 3.87
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys102 / 13 / 57
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate68.6%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked1.24Cr / 0.11Cr
Expenditure rate (ongoing)8.8%
Part B score (max 5.0)0.44 / 5.0
Final score3.87 / 10
201 BIJADANDI โ†— MANDLA 6.02 C
28.0% 6.41
CategoryFarm Pond
Started / Completed / Phys150 / 133 / 9
Completion rate94.7%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.25Cr / 0.08Cr
Expenditure rate (ongoing)33.4%
Part B score (max 5.0)1.67 / 5.0
Final score6.41 / 10
14.8% 2.08
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.28Cr / 0.95Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
2.2% 4.73
CategoryDug Well Recharge
Started / Completed / Phys131 / 85 / 36
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate92.4%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)2.2%
Part B score (max 5.0)0.11 / 5.0
Final score4.73 / 10
โ€”
31.9% 8.21
CategoryWater conservation & recharge
Started / Completed / Phys60 / 35 / 18
Completion rate88.3%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked1.04Cr / 0.79Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score8.21 / 10
3.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys15 / 15 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.7% 2.07
CategoryGap Filling in Plantation
Started / Completed / Phys30 / 5 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.63Cr / 0.16Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score2.07 / 10
15.5% 5.14
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys116 / 68 / 24
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.38Cr / 0.09Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.18 / 5.0
Final score5.14 / 10
202 PIPLODA โ†— RATLAM 6.01 C
35.1% 4.74
CategoryFarm Pond
Started / Completed / Phys67 / 32 / 18
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.42Cr / 0.08Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score4.74 / 10
โ€”
11.9% 5.23
CategoryDug Well Recharge
Started / Completed / Phys188 / 44 / 129
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)12.6%
Part B score (max 5.0)0.63 / 5.0
Final score5.23 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys21 / 12 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
21.6% 4.65
CategoryGap Filling in Plantation
Started / Completed / Phys18 / 0 / 13
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.15Cr / 0.03Cr
Expenditure rate (ongoing)20.8%
Part B score (max 5.0)1.04 / 5.0
Final score4.65 / 10
9.8% 5.68
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.21Cr / 0.10Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score5.68 / 10
203 SONKATCH โ†— DEWAS 5.98 D
40.2% 5.77
CategoryFarm Pond
Started / Completed / Phys90 / 28 / 54
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.27Cr / 0.07Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score5.77 / 10
2.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.8% 6.89
CategoryDug Well Recharge
Started / Completed / Phys329 / 66 / 250
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.09 / 5.0
Final score6.89 / 10
โ€”
29.6% 7.05
CategoryWater conservation & recharge
Started / Completed / Phys69 / 8 / 56
Completion rate92.8%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score7.05 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.9% 1.43
CategoryGap Filling in Plantation
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.10Cr
Expenditure rate (ongoing)28.7%
Part B score (max 5.0)1.43 / 5.0
Final score1.43 / 10
12.4% 3.53
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys16 / 0 / 10
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.75Cr / 0.06Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.41 / 5.0
Final score3.53 / 10
204 PAHADGARH โ†— MORENA 5.97 D
6.6% 4.94
CategoryFarm Pond
Started / Completed / Phys490 / 370 / 87
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.3%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.99Cr / 0.06Cr
Expenditure rate (ongoing)5.6%
Part B score (max 5.0)0.28 / 5.0
Final score4.94 / 10
0.2% 1.78
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)35.6%
Part B score (max 5.0)1.78 / 5.0
Final score1.78 / 10
0.2% 4.68
CategoryDug Well Recharge
Started / Completed / Phys126 / 103 / 15
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.68 / 10
0.7% 5.29
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.85Cr / 0.68Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score5.29 / 10
48.7% 7.55
CategoryWater conservation & recharge
Started / Completed / Phys544 / 6 / 377
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked23.74Cr / 19.15Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.03 / 5.0
Final score7.55 / 10
6.4% 7.63
CategoryWatershed Related Works
Started / Completed / Phys74 / 2 / 51
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked2.85Cr / 2.31Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score7.63 / 10
1.3% 7.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 9
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.66Cr / 0.49Cr
Expenditure rate (ongoing)75.4%
Part B score (max 5.0)3.77 / 5.0
Final score7.10 / 10
1.1% 1.13
CategoryGap Filling in Plantation
Started / Completed / Phys18 / 0 / 2
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked1.61Cr / 0.19Cr
Expenditure rate (ongoing)11.6%
Part B score (max 5.0)0.58 / 5.0
Final score1.13 / 10
34.8% 3.81
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys401 / 0 / 50
Completion rate12.5%
Part A score (max 5.0)0.62 / 5.0
Ongoing sanction / booked50.06Cr / 31.86Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score3.81 / 10
205 DHAR โ†— DHAR 5.97 D
43.2% 5.26
CategoryFarm Pond
Started / Completed / Phys138 / 2 / 94
Completion rate69.6%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked1.37Cr / 0.49Cr
Expenditure rate (ongoing)35.6%
Part B score (max 5.0)1.78 / 5.0
Final score5.26 / 10
โ€”
0.5% 5.67
CategoryDug Well Recharge
Started / Completed / Phys18 / 1 / 15
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)24.6%
Part B score (max 5.0)1.23 / 5.0
Final score5.67 / 10
1.9% 5.81
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score5.81 / 10
17.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys43 / 12 / 31
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.6% 8.32
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 19
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score8.32 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.0% 3.05
CategoryGap Filling in Plantation
Started / Completed / Phys41 / 0 / 8
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate19.5%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked1.44Cr / 0.60Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score3.05 / 10
10.5% 5.33
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys170 / 80 / 74
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.39Cr / 0.06Cr
Expenditure rate (ongoing)16.1%
Part B score (max 5.0)0.80 / 5.0
Final score5.33 / 10
206 BANDA โ†— SAGAR 5.97 D
21.4% 5.11
CategoryFarm Pond
Started / Completed / Phys138 / 76 / 31
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate77.5%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.53Cr / 0.13Cr
Expenditure rate (ongoing)24.6%
Part B score (max 5.0)1.23 / 5.0
Final score5.11 / 10
โ€”
11.0% 5.17
CategoryDug Well Recharge
Started / Completed / Phys541 / 98 / 328
⚠ Works needing verification (Completed/Physically Completed)111 works (exp <30%)
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)24.6%
Part B score (max 5.0)1.23 / 5.0
Final score5.17 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.9% 8.33
CategoryWater conservation & recharge
Started / Completed / Phys66 / 18 / 47
Completion rate98.5%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score8.33 / 10
2.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 5 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.0% 2.84
CategoryGap Filling in Plantation
Started / Completed / Phys99 / 2 / 36
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate38.4%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked0.83Cr / 0.15Cr
Expenditure rate (ongoing)18.4%
Part B score (max 5.0)0.92 / 5.0
Final score2.84 / 10
23.9% 6.11
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys146 / 38 / 81
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked1.17Cr / 0.48Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score6.11 / 10
207 RAMPUR BAGHELAN โ†— SATNA 5.96 D
34.3% 4.80
CategoryFarm Pond
Started / Completed / Phys197 / 17 / 127
Completion rate73.1%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked1.19Cr / 0.27Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score4.80 / 10
5.8% 1.03
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.15Cr
Expenditure rate (ongoing)20.7%
Part B score (max 5.0)1.03 / 5.0
Final score1.03 / 10
2.4% 7.07
CategoryDug Well Recharge
Started / Completed / Phys124 / 24 / 95
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.28 / 5.0
Final score7.07 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28.7% 8.87
CategoryWater conservation & recharge
Started / Completed / Phys72 / 10 / 59
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.24Cr / 0.20Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score8.87 / 10
5.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys15 / 0 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.6% 8.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 4 / 11
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.59 / 5.0
Final score8.01 / 10
1.5% 1.48
CategoryGap Filling in Plantation
Started / Completed / Phys6 / 0 / 0
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.48 / 5.0
Final score1.48 / 10
15.9% 2.88
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys36 / 0 / 14
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked1.35Cr / 0.25Cr
Expenditure rate (ongoing)18.8%
Part B score (max 5.0)0.94 / 5.0
Final score2.88 / 10
208 RATLAM โ†— RATLAM 5.95 D
53.5% 5.28
CategoryFarm Pond
Started / Completed / Phys298 / 66 / 197
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate88.3%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.94Cr / 0.16Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.87 / 5.0
Final score5.28 / 10