JGSA 2026 โ District-Level Category Scorecard
Snapshot: 2026-07-02 ยท Scheme: โน Sanction Weighted
BARWANI
9.94
๐ฅ
Completed212
Started5660
Rank#1
KHANDWA
9.54
๐ฅ
Completed3008
Started9481
Rank#2
NEEMUCH
9.30
๐ฅ
Completed951
Started3283
Rank#3
๐ Category Scorecard โ District Level
52 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
| # | District | Total |
๐ Trajectory raw achievement % |
Farm Pond | Amrit Sarowar | Dug Well Recharge | Irrigation infrastructure | Water conservation & recharge | Watershed Related Works | Repair & Maintenance (Water Structures) | Gap Filling in Plantation | Work Not Permissible in VB-GRAM-G | PMKSY: Watershed | JSJB 2.0 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ๐ฅ | BARWANI โ | 9.94 | A |
19.1%
9.98
CategoryFarm Pond
Started / Completed / Phys1,125 / 50 / 1,071
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
|
0.4%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.9%
9.99
CategoryDug Well Recharge
Started / Completed / Phys3,017 / 58 / 2,951
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate99.7%
Part A score (max 5.0)4.99 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.99 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 4 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys543 / 57 / 486
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
7.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys148 / 26 / 122
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 6 / 27
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.0%
9.81
CategoryGap Filling in Plantation
Started / Completed / Phys470 / 6 / 446
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.81 / 10
|
11.1%
9.97
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys312 / 5 / 305
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.97 / 10
|
6.1%
9.58
CategoryPMKSY: Watershed
PMKSY Works0 total (85 done / -85 ongoing)
JGSA Target5.32 Cr
JGSA Valuation5.32 Cr
Expenditure4.75 Cr
% Valuation100.0%
Val Marks (20%)2.00
Exp Marks (20%)1.79
Claim Marks (25%)2.40
Bill Progress3.347
Bill Marks (25%)2.40
Geotag Marks (5%)0.500
Physical Marks (5%)0.50
Final score9.58 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works72,827
Target Works4,878
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| ๐ฅ | KHANDWA โ | 9.54 | A |
30.0%
8.66
CategoryFarm Pond
Started / Completed / Phys1,953 / 531 / 899
⚠ Works needing verification (Completed/Physically Completed)523 works (exp <30%)
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score8.66 / 10
|
4.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys25 / 3 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
11.1%
9.93
CategoryDug Well Recharge
Started / Completed / Phys6,136 / 2,180 / 3,870
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 13 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys711 / 177 / 534
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
7.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys173 / 44 / 129
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 14 / 52
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.8%
9.46
CategoryGap Filling in Plantation
Started / Completed / Phys65 / 13 / 45
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate89.2%
Part A score (max 5.0)4.46 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.46 / 10
|
13.5%
9.75
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys319 / 33 / 270
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.75 / 10
|
0.4%
9.27
CategoryPMKSY: Watershed
PMKSY Works0 total (84 done / -84 ongoing)
JGSA Target0.50 Cr
JGSA Valuation0.50 Cr
Expenditure0.37 Cr
% Valuation100.0%
Val Marks (20%)2.00
Exp Marks (20%)1.47
Claim Marks (25%)2.40
Bill Progress1.094
Bill Marks (25%)2.40
Geotag Marks (5%)0.500
Physical Marks (5%)0.50
Final score9.27 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works452,624
Target Works9,128
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| ๐ฅ | NEEMUCH โ | 9.30 | A |
28.4%
9.97
CategoryFarm Pond
Started / Completed / Phys683 / 76 / 603
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.97 / 10
|
3.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
7.6%
9.96
CategoryDug Well Recharge
Started / Completed / Phys1,915 / 800 / 1,099
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.96 / 10
|
2.2%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 4 / 28
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)95.6%
Part B score (max 5.0)4.78 / 5.0
Final score9.00 / 10
|
23.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys318 / 27 / 291
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 3 / 34
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.6%
9.63
CategoryGap Filling in Plantation
Started / Completed / Phys174 / 31 / 130
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.63 / 10
|
11.4%
5.12
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys99 / 9 / 87
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.08Cr / 0.00Cr
Expenditure rate (ongoing)5.4%
Part B score (max 5.0)0.27 / 5.0
Final score5.12 / 10
|
10.1%
9.11
CategoryPMKSY: Watershed
PMKSY Works0 total (20 done / -20 ongoing)
JGSA Target6.58 Cr
JGSA Valuation6.58 Cr
Expenditure3.97 Cr
% Valuation100.0%
Val Marks (20%)2.00
Exp Marks (20%)1.21
Claim Marks (25%)2.48
Bill Progress2.564
Bill Marks (25%)2.42
Geotag Marks (5%)0.500
Physical Marks (5%)0.50
Final score9.11 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,535
Target Works3,010
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 4 | UJJAIN โ | 8.85 | A |
30.0%
9.93
CategoryFarm Pond
Started / Completed / Phys618 / 187 / 422
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate98.5%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
|
9.7%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys17 / 0 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
16.4%
9.96
CategoryDug Well Recharge
Started / Completed / Phys2,815 / 1,334 / 1,461
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate99.3%
Part A score (max 5.0)4.96 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.96 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys180 / 74 / 106
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys57 / 47 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.7%
4.47
CategoryGap Filling in Plantation
Started / Completed / Phys182 / 41 / 113
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.46Cr / 0.02Cr
Expenditure rate (ongoing)4.8%
Part B score (max 5.0)0.24 / 5.0
Final score4.47 / 10
|
10.9%
4.12
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys80 / 14 / 49
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate78.8%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.71Cr / 0.03Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.19 / 5.0
Final score4.12 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works4,552
Target Works3,701
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 5 | BALAGHAT โ | 7.63 | B |
52.0%
6.45
CategoryFarm Pond
Started / Completed / Phys4,468 / 2,073 / 2,362
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate99.3%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.97Cr / 0.29Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score6.45 / 10
|
2.2%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys23 / 0 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.4%
9.97
CategoryDug Well Recharge
Started / Completed / Phys1,391 / 716 / 666
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.97 / 10
|
0.3%
9.71
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 5 / 11
Completion rate94.1%
Part A score (max 5.0)4.71 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.71 / 10
|
31.8%
9.00
CategoryWater conservation & recharge
Started / Completed / Phys1,736 / 397 / 1,333
Completion rate99.7%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.59Cr / 0.48Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score9.00 / 10
|
1.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys68 / 32 / 36
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 22 / 18
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.4%
4.38
CategoryGap Filling in Plantation
Started / Completed / Phys79 / 7 / 32
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked0.91Cr / 0.35Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score4.38 / 10
|
3.6%
6.34
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys313 / 93 / 178
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate86.6%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked1.02Cr / 0.41Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score6.34 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works8,469
Target Works7,744
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 6 | KHARGONE โ | 7.50 | B |
18.5%
5.35
CategoryFarm Pond
Started / Completed / Phys1,764 / 503 / 1,213
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.42Cr / 0.04Cr
Expenditure rate (ongoing)9.6%
Part B score (max 5.0)0.48 / 5.0
Final score5.35 / 10
|
4.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys28 / 2 / 26
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.6%
6.99
CategoryDug Well Recharge
Started / Completed / Phys3,840 / 1,001 / 2,772
⚠ Works needing verification (Completed/Physically Completed)65 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.08 / 5.0
Final score6.99 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 8 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
47.7%
8.56
CategoryWater conservation & recharge
Started / Completed / Phys1,300 / 282 / 1,005
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked1.14Cr / 0.82Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score8.56 / 10
|
2.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys78 / 21 / 57
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 23 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
7.9%
3.36
CategoryGap Filling in Plantation
Started / Completed / Phys493 / 39 / 244
⚠ Works needing verification (Completed/Physically Completed)144 works (exp <30%)
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked1.31Cr / 0.13Cr
Expenditure rate (ongoing)9.7%
Part B score (max 5.0)0.49 / 5.0
Final score3.36 / 10
|
5.7%
5.55
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys671 / 170 / 398
⚠ Works needing verification (Completed/Physically Completed)70 works (exp <30%)
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.97Cr / 0.26Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score5.55 / 10
|
0.5%
8.87
CategoryPMKSY: Watershed
PMKSY Works0 total (30 done / -30 ongoing)
JGSA Target0.83 Cr
JGSA Valuation0.83 Cr
Expenditure0.44 Cr
% Valuation100.0%
Val Marks (20%)2.00
Exp Marks (20%)1.06
Claim Marks (25%)2.41
Bill Progress1.259
Bill Marks (25%)2.41
Geotag Marks (5%)0.500
Physical Marks (5%)0.50
Final score8.87 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works10,382
Target Works7,070
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 7 | RAJGARH โ | 7.35 | B |
19.2%
6.00
CategoryFarm Pond
Started / Completed / Phys2,250 / 1,447 / 529
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate87.8%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked4.38Cr / 1.41Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score6.00 / 10
|
0.4%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.7%
7.61
CategoryDug Well Recharge
Started / Completed / Phys3,687 / 2,747 / 855
⚠ Works needing verification (Completed/Physically Completed)63 works (exp <30%)
Completion rate97.7%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score7.61 / 10
|
1.1%
7.21
CategoryIrrigation infrastructure
Started / Completed / Phys49 / 5 / 30
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.81Cr / 0.59Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score7.21 / 10
|
46.7%
8.26
CategoryWater conservation & recharge
Started / Completed / Phys1,193 / 203 / 841
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked16.36Cr / 12.70Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score8.26 / 10
|
1.1%
8.20
CategoryWatershed Related Works
Started / Completed / Phys67 / 17 / 45
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.40Cr / 0.29Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score8.20 / 10
|
8.6%
8.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys269 / 20 / 198
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked4.47Cr / 3.65Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.09 / 5.0
Final score8.14 / 10
|
1.7%
2.06
CategoryGap Filling in Plantation
Started / Completed / Phys231 / 0 / 31
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate13.4%
Part A score (max 5.0)0.67 / 5.0
Ongoing sanction / booked3.43Cr / 0.95Cr
Expenditure rate (ongoing)27.7%
Part B score (max 5.0)1.39 / 5.0
Final score2.06 / 10
|
10.8%
4.54
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys558 / 15 / 291
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked9.45Cr / 3.40Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score4.54 / 10
|
1.7%
7.29
CategoryPMKSY: Watershed
PMKSY Works0 total (33 done / -33 ongoing)
JGSA Target4.36 Cr
JGSA Valuation2.92 Cr
Expenditure0.94 Cr
% Valuation67.1%
Val Marks (20%)1.34
Exp Marks (20%)0.43
Claim Marks (25%)2.42
Bill Progress1.169
Bill Marks (25%)2.42
Geotag Marks (5%)0.490
Physical Marks (5%)0.18
Final score7.29 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works200,491
Target Works7,518
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 8 | CHHINDWARA โ | 7.21 | B |
21.7%
7.29
CategoryFarm Pond
Started / Completed / Phys2,432 / 897 / 1,206
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked7.56Cr / 4.48Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score7.29 / 10
|
2.7%
1.82
CategoryAmrit Sarowar
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked7.27Cr / 2.64Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.82 / 5.0
Final score1.82 / 10
|
3.9%
7.41
CategoryDug Well Recharge
Started / Completed / Phys4,108 / 1,167 / 2,801
⚠ Works needing verification (Completed/Physically Completed)62 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.20Cr / 0.10Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.58 / 5.0
Final score7.41 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys23 / 8 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.3%
8.19
CategoryWater conservation & recharge
Started / Completed / Phys1,242 / 286 / 705
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked34.11Cr / 28.62Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score8.19 / 10
|
8.1%
8.42
CategoryWatershed Related Works
Started / Completed / Phys314 / 104 / 181
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked1.92Cr / 1.49Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.88 / 5.0
Final score8.42 / 10
|
1.8%
9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys61 / 17 / 39
Completion rate91.8%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.48Cr / 0.44Cr
Expenditure rate (ongoing)92.7%
Part B score (max 5.0)4.63 / 5.0
Final score9.00 / 10
|
5.3%
4.24
CategoryGap Filling in Plantation
Started / Completed / Phys458 / 39 / 153
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate41.9%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked6.88Cr / 2.95Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.15 / 5.0
Final score4.24 / 10
|
12.0%
6.11
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys600 / 103 / 338
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked8.34Cr / 4.06Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.43 / 5.0
Final score6.11 / 10
|
3.3%
6.48
CategoryPMKSY: Watershed
PMKSY Works0 total (181 done / -181 ongoing)
JGSA Target9.01 Cr
JGSA Valuation2.18 Cr
Expenditure2.43 Cr
% Valuation24.2%
Val Marks (20%)0.48
Exp Marks (20%)0.54
Claim Marks (25%)2.35
Bill Progress1.970
Bill Marks (25%)2.32
Geotag Marks (5%)0.460
Physical Marks (5%)0.34
Final score6.48 / 10
|
5.0%
5.85
CategoryJSJB 2.0
Total Works4,798
Target Works8,199
Achievement %58.5%
Weightage5% of composite score
Final score5.85 / 10
|
| 9 | SHAHDOL โ | 7.19 | B |
33.5%
4.73
CategoryFarm Pond
Started / Completed / Phys2,660 / 772 / 1,463
⚠ Works needing verification (Completed/Physically Completed)42 works (exp <30%)
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked10.14Cr / 1.08Cr
Expenditure rate (ongoing)10.6%
Part B score (max 5.0)0.53 / 5.0
Final score4.73 / 10
|
1.0%
3.23
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.94Cr / 0.98Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.52 / 5.0
Final score3.23 / 10
|
0.7%
5.73
CategoryDug Well Recharge
Started / Completed / Phys580 / 124 / 414
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate92.8%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)21.8%
Part B score (max 5.0)1.09 / 5.0
Final score5.73 / 10
|
6.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 8 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.7%
8.66
CategoryWater conservation & recharge
Started / Completed / Phys1,041 / 133 / 879
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked6.00Cr / 4.56Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score8.66 / 10
|
9.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys229 / 23 / 206
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.1%
7.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys105 / 30 / 73
Completion rate98.1%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.84 / 5.0
Final score7.75 / 10
|
1.4%
3.22
CategoryGap Filling in Plantation
Started / Completed / Phys92 / 1 / 39
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate43.5%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked0.71Cr / 0.15Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score3.22 / 10
|
8.5%
5.61
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys695 / 33 / 527
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked2.62Cr / 0.83Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score5.61 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works239,529
Target Works4,656
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 10 | GUNA โ | 7.09 | B |
25.6%
6.29
CategoryFarm Pond
Started / Completed / Phys1,308 / 533 / 691
⚠ Works needing verification (Completed/Physically Completed)56 works (exp <30%)
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.91Cr / 0.29Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score6.29 / 10
|
โ |
3.7%
9.79
CategoryDug Well Recharge
Started / Completed / Phys2,152 / 959 / 1,102
⚠ Works needing verification (Completed/Physically Completed)91 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.79 / 10
|
0.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.9%
8.42
CategoryWater conservation & recharge
Started / Completed / Phys859 / 192 / 649
Completion rate97.9%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked2.15Cr / 1.52Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score8.42 / 10
|
1.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys41 / 19 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.6%
7.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys59 / 18 / 39
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.23Cr / 0.13Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score7.51 / 10
|
6.8%
4.03
CategoryGap Filling in Plantation
Started / Completed / Phys274 / 18 / 117
⚠ Works needing verification (Completed/Physically Completed)65 works (exp <30%)
Completion rate49.3%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked2.29Cr / 0.72Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score4.03 / 10
|
11.9%
4.02
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys409 / 60 / 256
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.23Cr / 0.01Cr
Expenditure rate (ongoing)3.2%
Part B score (max 5.0)0.16 / 5.0
Final score4.02 / 10
|
3.3%
5.63
CategoryPMKSY: Watershed
PMKSY Works0 total (52 done / -52 ongoing)
JGSA Target4.98 Cr
JGSA Valuation3.01 Cr
Expenditure1.11 Cr
% Valuation60.5%
Val Marks (20%)1.21
Exp Marks (20%)0.45
Claim Marks (25%)1.50
Bill Progress0.054
Bill Marks (25%)1.50
Geotag Marks (5%)0.490
Physical Marks (5%)0.48
Final score5.63 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works50,434
Target Works4,426
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 11 | DATIA โ | 7.02 | B |
22.1%
5.70
CategoryFarm Pond
Started / Completed / Phys711 / 423 / 245
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.83Cr / 0.17Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score5.70 / 10
|
0.4%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.1%
9.99
CategoryDug Well Recharge
Started / Completed / Phys562 / 323 / 238
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.8%
Part A score (max 5.0)4.99 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.99 / 10
|
1.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys28 / 14 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
29.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys381 / 120 / 261
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys61 / 20 / 41
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 13 / 35
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
11.5%
2.42
CategoryGap Filling in Plantation
Started / Completed / Phys403 / 35 / 100
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate33.5%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked5.45Cr / 0.82Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score2.42 / 10
|
20.2%
4.26
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys241 / 44 / 92
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked7.95Cr / 2.28Cr
Expenditure rate (ongoing)28.7%
Part B score (max 5.0)1.44 / 5.0
Final score4.26 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works2,966
Target Works1,792
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 12 | ASHOK NAGAR โ | 7.01 | B |
36.1%
5.06
CategoryFarm Pond
Started / Completed / Phys1,582 / 404 / 1,037
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate91.1%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked4.11Cr / 0.42Cr
Expenditure rate (ongoing)10.1%
Part B score (max 5.0)0.51 / 5.0
Final score5.06 / 10
|
1.6%
7.26
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 7
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.50Cr / 0.34Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.26 / 10
|
1.0%
4.81
CategoryDug Well Recharge
Started / Completed / Phys521 / 281 / 212
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)1.5%
Part B score (max 5.0)0.08 / 5.0
Final score4.81 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.3%
9.00
CategoryWater conservation & recharge
Started / Completed / Phys938 / 242 / 689
Completion rate99.3%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.32Cr / 0.26Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score9.00 / 10
|
2.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys39 / 16 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 5 / 27
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.8%
1.25
CategoryGap Filling in Plantation
Started / Completed / Phys197 / 4 / 23
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate13.7%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked2.71Cr / 0.31Cr
Expenditure rate (ongoing)11.3%
Part B score (max 5.0)0.57 / 5.0
Final score1.25 / 10
|
9.1%
5.49
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys1,306 / 414 / 796
⚠ Works needing verification (Completed/Physically Completed)39 works (exp <30%)
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked2.02Cr / 0.35Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.86 / 5.0
Final score5.49 / 10
|
4.5%
7.73
CategoryPMKSY: Watershed
PMKSY Works0 total (9 done / -9 ongoing)
JGSA Target5.91 Cr
JGSA Valuation4.77 Cr
Expenditure0.75 Cr
% Valuation80.6%
Val Marks (20%)1.61
Exp Marks (20%)0.26
Claim Marks (25%)2.45
Bill Progress0.853
Bill Marks (25%)2.44
Geotag Marks (5%)0.470
Physical Marks (5%)0.50
Final score7.73 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works16,106
Target Works3,124
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 13 | DINDORI โ | 6.99 | C |
28.4%
6.03
CategoryFarm Pond
Started / Completed / Phys2,244 / 861 / 1,334
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.56Cr / 0.13Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.14 / 5.0
Final score6.03 / 10
|
0.5%
3.78
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score3.78 / 10
|
1.7%
9.70
CategoryDug Well Recharge
Started / Completed / Phys1,445 / 639 / 718
⚠ Works needing verification (Completed/Physically Completed)88 works (exp <30%)
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.70 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
24.4%
8.61
CategoryWater conservation & recharge
Started / Completed / Phys640 / 110 / 509
Completion rate96.7%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked2.74Cr / 2.07Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score8.61 / 10
|
13.8%
8.06
CategoryWatershed Related Works
Started / Completed / Phys324 / 140 / 183
Completion rate99.7%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score8.06 / 10
|
3.4%
7.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys85 / 24 / 46
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked1.41Cr / 1.09Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.84 / 5.0
Final score7.96 / 10
|
2.4%
2.48
CategoryGap Filling in Plantation
Started / Completed / Phys184 / 13 / 38
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate27.7%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked3.61Cr / 0.79Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.10 / 5.0
Final score2.48 / 10
|
15.4%
4.78
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys649 / 121 / 358
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked5.55Cr / 1.21Cr
Expenditure rate (ongoing)21.8%
Part B score (max 5.0)1.09 / 5.0
Final score4.78 / 10
|
4.5%
6.07
CategoryPMKSY: Watershed
PMKSY Works0 total (44 done / -44 ongoing)
JGSA Target10.28 Cr
JGSA Valuation2.92 Cr
Expenditure2.14 Cr
% Valuation28.4%
Val Marks (20%)0.57
Exp Marks (20%)0.42
Claim Marks (25%)2.27
Bill Progress0.157
Bill Marks (25%)2.23
Geotag Marks (5%)0.470
Physical Marks (5%)0.12
Final score6.07 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works827,675
Target Works4,768
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 14 | BETUL โ | 6.83 | C |
18.4%
5.83
CategoryFarm Pond
Started / Completed / Phys1,713 / 94 / 1,222
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate76.8%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked12.03Cr / 4.78Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.98 / 5.0
Final score5.83 / 10
|
2.8%
3.22
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.97Cr / 4.49Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score3.22 / 10
|
4.3%
6.37
CategoryDug Well Recharge
Started / Completed / Phys4,167 / 728 / 3,250
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate95.5%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.46Cr / 0.15Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.59 / 5.0
Final score6.37 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
53.2%
7.67
CategoryWater conservation & recharge
Started / Completed / Phys1,915 / 178 / 1,383
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked27.70Cr / 19.92Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.60 / 5.0
Final score7.67 / 10
|
2.8%
7.92
CategoryWatershed Related Works
Started / Completed / Phys150 / 41 / 93
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.77Cr / 0.53Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.46 / 5.0
Final score7.92 / 10
|
2.8%
7.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys169 / 23 / 118
Completion rate83.4%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.92Cr / 0.65Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score7.73 / 10
|
5.4%
2.42
CategoryGap Filling in Plantation
Started / Completed / Phys444 / 1 / 60
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate13.7%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked11.59Cr / 4.01Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score2.42 / 10
|
5.3%
4.66
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys464 / 51 / 238
⚠ Works needing verification (Completed/Physically Completed)45 works (exp <30%)
Completion rate62.3%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked3.65Cr / 1.13Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.55 / 5.0
Final score4.66 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works32,227
Target Works8,146
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 15 | ALIRAJPUR โ | 6.78 | C |
11.7%
5.44
CategoryFarm Pond
Started / Completed / Phys1,007 / 40 / 764
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked5.48Cr / 1.59Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score5.44 / 10
|
2.2%
6.85
CategoryAmrit Sarowar
Started / Completed / Phys16 / 0 / 11
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked1.52Cr / 1.04Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score6.85 / 10
|
4.3%
6.12
CategoryDug Well Recharge
Started / Completed / Phys3,282 / 167 / 2,895
⚠ Works needing verification (Completed/Physically Completed)63 works (exp <30%)
Completion rate93.3%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.41Cr / 0.12Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.46 / 5.0
Final score6.12 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
65.7%
7.13
CategoryWater conservation & recharge
Started / Completed / Phys838 / 45 / 439
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked70.57Cr / 59.82Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score7.13 / 10
|
1.6%
8.09
CategoryWatershed Related Works
Started / Completed / Phys74 / 6 / 61
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.25Cr / 0.18Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.57 / 5.0
Final score8.09 / 10
|
1.0%
7.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 1 / 19
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.53Cr / 0.40Cr
Expenditure rate (ongoing)75.4%
Part B score (max 5.0)3.77 / 5.0
Final score7.62 / 10
|
4.0%
1.80
CategoryGap Filling in Plantation
Started / Completed / Phys296 / 9 / 42
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked6.69Cr / 1.26Cr
Expenditure rate (ongoing)18.8%
Part B score (max 5.0)0.94 / 5.0
Final score1.80 / 10
|
2.7%
5.08
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys203 / 16 / 99
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate56.7%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked2.44Cr / 1.10Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score5.08 / 10
|
1.8%
7.29
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target3.49 Cr
JGSA Valuation2.15 Cr
Expenditure1.86 Cr
% Valuation61.6%
Val Marks (20%)1.23
Exp Marks (20%)1.07
Claim Marks (25%)2.38
Bill Progress0.483
Bill Marks (25%)1.71
Geotag Marks (5%)0.490
Physical Marks (5%)0.41
Final score7.29 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,563
Target Works5,245
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 16 | MANDLA โ | 6.77 | C |
31.3%
6.59
CategoryFarm Pond
Started / Completed / Phys2,018 / 1,426 / 346
Completion rate87.8%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked10.22Cr / 4.49Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score6.59 / 10
|
4.0%
2.13
CategoryAmrit Sarowar
Started / Completed / Phys26 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.15Cr / 4.32Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score2.13 / 10
|
1.7%
5.91
CategoryDug Well Recharge
Started / Completed / Phys1,647 / 835 / 617
⚠ Works needing verification (Completed/Physically Completed)59 works (exp <30%)
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.36Cr / 0.11Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score5.91 / 10
|
5.1%
8.01
CategoryIrrigation infrastructure
Started / Completed / Phys40 / 19 / 17
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked2.52Cr / 1.77Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score8.01 / 10
|
24.4%
8.06
CategoryWater conservation & recharge
Started / Completed / Phys971 / 493 / 306
Completion rate82.3%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked18.16Cr / 14.32Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score8.06 / 10
|
3.1%
7.96
CategoryWatershed Related Works
Started / Completed / Phys192 / 123 / 52
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.78Cr / 0.53Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score7.96 / 10
|
2.2%
7.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 21 / 34
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.53Cr / 0.35Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score7.48 / 10
|
4.4%
2.63
CategoryGap Filling in Plantation
Started / Completed / Phys355 / 37 / 29
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate18.6%
Part A score (max 5.0)0.93 / 5.0
Ongoing sanction / booked9.42Cr / 3.21Cr
Expenditure rate (ongoing)34.0%
Part B score (max 5.0)1.70 / 5.0
Final score2.63 / 10
|
14.4%
5.76
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys1,145 / 398 / 530
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked12.05Cr / 4.12Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.76 / 10
|
4.6%
6.61
CategoryPMKSY: Watershed
PMKSY Works0 total (98 done / -98 ongoing)
JGSA Target11.77 Cr
JGSA Valuation4.49 Cr
Expenditure1.63 Cr
% Valuation38.1%
Val Marks (20%)0.76
Exp Marks (20%)0.28
Claim Marks (25%)2.37
Bill Progress5.250
Bill Marks (25%)2.33
Geotag Marks (5%)0.470
Physical Marks (5%)0.40
Final score6.61 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,540
Target Works4,961
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 17 | DHAR โ | 6.73 | C |
9.9%
5.17
CategoryFarm Pond
Started / Completed / Phys2,877 / 500 / 1,322
⚠ Works needing verification (Completed/Physically Completed)81 works (exp <30%)
Completion rate63.3%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked19.46Cr / 7.80Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.01 / 5.0
Final score5.17 / 10
|
0.0%
3.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score3.02 / 10
|
2.3%
5.36
CategoryDug Well Recharge
Started / Completed / Phys4,476 / 1,201 / 1,938
⚠ Works needing verification (Completed/Physically Completed)527 works (exp <30%)
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked2.10Cr / 0.78Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score5.36 / 10
|
0.4%
5.84
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 3 / 11
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.85Cr / 0.50Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score5.84 / 10
|
54.7%
7.83
CategoryWater conservation & recharge
Started / Completed / Phys2,551 / 229 / 1,660
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked94.98Cr / 78.45Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score7.83 / 10
|
5.8%
7.16
CategoryWatershed Related Works
Started / Completed / Phys664 / 64 / 427
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked6.37Cr / 4.41Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score7.16 / 10
|
1.7%
7.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys147 / 8 / 106
Completion rate77.6%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked2.31Cr / 1.56Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score7.25 / 10
|
8.8%
3.15
CategoryGap Filling in Plantation
Started / Completed / Phys885 / 9 / 142
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate17.1%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked33.90Cr / 15.57Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.30 / 5.0
Final score3.15 / 10
|
11.0%
4.07
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys2,157 / 420 / 1,089
⚠ Works needing verification (Completed/Physically Completed)337 works (exp <30%)
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked10.44Cr / 1.18Cr
Expenditure rate (ongoing)11.3%
Part B score (max 5.0)0.57 / 5.0
Final score4.07 / 10
|
0.4%
7.76
CategoryPMKSY: Watershed
PMKSY Works0 total (5 done / -5 ongoing)
JGSA Target1.78 Cr
JGSA Valuation0.95 Cr
Expenditure1.11 Cr
% Valuation53.5%
Val Marks (20%)1.07
Exp Marks (20%)1.24
Claim Marks (25%)2.38
Bill Progress1.165
Bill Marks (25%)2.08
Geotag Marks (5%)0.500
Physical Marks (5%)0.48
Final score7.76 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works26,364
Target Works10,743
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 18 | ANUPPUR โ | 6.66 | C |
56.2%
6.38
CategoryFarm Pond
Started / Completed / Phys3,354 / 2,353 / 810
⚠ Works needing verification (Completed/Physically Completed)176 works (exp <30%)
Completion rate94.3%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.41Cr / 0.14Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score6.38 / 10
|
โ |
0.7%
9.26
CategoryDug Well Recharge
Started / Completed / Phys452 / 91 / 294
⚠ Works needing verification (Completed/Physically Completed)67 works (exp <30%)
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.26 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
12.8%
9.00
CategoryWater conservation & recharge
Started / Completed / Phys389 / 186 / 196
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked1.11Cr / 0.93Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.20 / 5.0
Final score9.00 / 10
|
1.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys24 / 9 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.3%
9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys44 / 30 / 13
Completion rate97.7%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.14Cr / 0.14Cr
Expenditure rate (ongoing)97.4%
Part B score (max 5.0)4.87 / 5.0
Final score9.00 / 10
|
5.4%
1.97
CategoryGap Filling in Plantation
Started / Completed / Phys324 / 15 / 24
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate12.0%
Part A score (max 5.0)0.60 / 5.0
Ongoing sanction / booked5.67Cr / 1.55Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score1.97 / 10
|
9.9%
5.59
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys312 / 70 / 181
⚠ Works needing verification (Completed/Physically Completed)40 works (exp <30%)
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked1.63Cr / 0.51Cr
Expenditure rate (ongoing)31.3%
Part B score (max 5.0)1.56 / 5.0
Final score5.59 / 10
|
6.3%
5.63
CategoryPMKSY: Watershed
PMKSY Works0 total (72 done / -72 ongoing)
JGSA Target9.68 Cr
JGSA Valuation4.51 Cr
Expenditure1.78 Cr
% Valuation46.6%
Val Marks (20%)0.93
Exp Marks (20%)0.37
Claim Marks (25%)2.12
Bill Progress2.062
Bill Marks (25%)1.38
Geotag Marks (5%)0.500
Physical Marks (5%)0.33
Final score5.63 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,508
Target Works4,267
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 19 | KATNI โ | 6.64 | C |
21.5%
5.30
CategoryFarm Pond
Started / Completed / Phys1,575 / 473 / 821
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate82.2%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked5.46Cr / 1.30Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score5.30 / 10
|
1.4%
7.70
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 7
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.60Cr / 0.50Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score7.70 / 10
|
2.5%
5.10
CategoryDug Well Recharge
Started / Completed / Phys1,470 / 559 / 629
⚠ Works needing verification (Completed/Physically Completed)227 works (exp <30%)
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score5.10 / 10
|
11.2%
8.07
CategoryIrrigation infrastructure
Started / Completed / Phys240 / 41 / 198
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score8.07 / 10
|
12.3%
8.28
CategoryWater conservation & recharge
Started / Completed / Phys328 / 78 / 233
Completion rate94.8%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked2.80Cr / 1.98Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score8.28 / 10
|
13.4%
8.60
CategoryWatershed Related Works
Started / Completed / Phys302 / 123 / 161
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked1.65Cr / 1.29Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score8.60 / 10
|
4.4%
7.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 15 / 53
Completion rate90.7%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.57Cr / 0.35Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score7.58 / 10
|
4.4%
1.69
CategoryGap Filling in Plantation
Started / Completed / Phys130 / 2 / 21
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate17.7%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked4.89Cr / 0.79Cr
Expenditure rate (ongoing)16.1%
Part B score (max 5.0)0.80 / 5.0
Final score1.69 / 10
|
19.7%
4.75
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys404 / 84 / 207
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate72.0%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked6.46Cr / 1.48Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score4.75 / 10
|
4.2%
8.27
CategoryPMKSY: Watershed
PMKSY Works0 total (23 done / -23 ongoing)
JGSA Target6.30 Cr
JGSA Valuation4.22 Cr
Expenditure3.81 Cr
% Valuation67.0%
Val Marks (20%)1.34
Exp Marks (20%)1.21
Claim Marks (25%)2.38
Bill Progress7.058
Bill Marks (25%)2.38
Geotag Marks (5%)0.500
Physical Marks (5%)0.46
Final score8.27 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works14,324
Target Works4,000
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 20 | RAISEN โ | 6.63 | C |
50.3%
5.74
CategoryFarm Pond
Started / Completed / Phys2,287 / 1,051 / 1,171
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked1.09Cr / 0.19Cr
Expenditure rate (ongoing)17.6%
Part B score (max 5.0)0.88 / 5.0
Final score5.74 / 10
|
2.1%
5.05
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 9
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.15Cr / 0.03Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.96 / 5.0
Final score5.05 / 10
|
4.7%
9.98
CategoryDug Well Recharge
Started / Completed / Phys1,659 / 1,122 / 529
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
22.8%
8.21
CategoryWater conservation & recharge
Started / Completed / Phys249 / 83 / 148
Completion rate92.8%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked2.81Cr / 2.01Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score8.21 / 10
|
1.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.0%
1.93
CategoryGap Filling in Plantation
Started / Completed / Phys130 / 4 / 24
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate21.5%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked3.73Cr / 0.64Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score1.93 / 10
|
6.4%
5.09
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys336 / 168 / 130
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate88.7%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.86Cr / 0.11Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score5.09 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works40,226
Target Works4,238
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 21 | RATLAM โ | 6.60 | C |
28.2%
5.39
CategoryFarm Pond
Started / Completed / Phys1,245 / 468 / 666
⚠ Works needing verification (Completed/Physically Completed)28 works (exp <30%)
Completion rate91.1%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked2.26Cr / 0.38Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score5.39 / 10
|
3.6%
6.11
CategoryAmrit Sarowar
Started / Completed / Phys15 / 1 / 8
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.45Cr / 0.90Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.11 / 10
|
7.7%
5.57
CategoryDug Well Recharge
Started / Completed / Phys3,071 / 895 / 2,031
⚠ Works needing verification (Completed/Physically Completed)130 works (exp <30%)
Completion rate95.3%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score5.57 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.3%
7.90
CategoryWater conservation & recharge
Started / Completed / Phys527 / 228 / 297
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score7.90 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 7 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 10 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
3.72
CategoryGap Filling in Plantation
Started / Completed / Phys269 / 44 / 95
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate51.7%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked2.76Cr / 0.63Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.13 / 5.0
Final score3.72 / 10
|
8.4%
5.72
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys213 / 92 / 103
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate91.5%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.92Cr / 0.21Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score5.72 / 10
|
7.1%
7.12
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target7.33 Cr
JGSA Valuation2.95 Cr
Expenditure1.80 Cr
% Valuation40.3%
Val Marks (20%)0.81
Exp Marks (20%)0.49
Claim Marks (25%)2.44
Bill Progress1.860
Bill Marks (25%)2.44
Geotag Marks (5%)0.430
Physical Marks (5%)0.50
Final score7.12 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,353
Target Works4,896
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 22 | JHABUA โ | 6.51 | C |
12.2%
4.79
CategoryFarm Pond
Started / Completed / Phys1,233 / 138 / 572
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate57.6%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked12.72Cr / 4.86Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score4.79 / 10
|
1.5%
2.99
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 2
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked2.78Cr / 1.27Cr
Expenditure rate (ongoing)45.6%
Part B score (max 5.0)2.28 / 5.0
Final score2.99 / 10
|
4.9%
6.40
CategoryDug Well Recharge
Started / Completed / Phys4,071 / 1,227 / 2,448
⚠ Works needing verification (Completed/Physically Completed)63 works (exp <30%)
Completion rate90.3%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.85Cr / 0.32Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score6.40 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 5 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
64.2%
7.08
CategoryWater conservation & recharge
Started / Completed / Phys1,368 / 124 / 753
Completion rate64.1%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked55.55Cr / 43.03Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.87 / 5.0
Final score7.08 / 10
|
1.5%
6.58
CategoryWatershed Related Works
Started / Completed / Phys81 / 12 / 45
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.71Cr / 0.44Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score6.58 / 10
|
1.3%
7.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 9 / 36
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.32Cr / 0.20Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.66 / 10
|
4.4%
2.32
CategoryGap Filling in Plantation
Started / Completed / Phys382 / 29 / 47
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate19.9%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked7.51Cr / 1.99Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.33 / 5.0
Final score2.32 / 10
|
3.7%
3.83
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys210 / 12 / 113
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate59.5%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked2.73Cr / 0.46Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score3.83 / 10
|
1.2%
6.43
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target2.53 Cr
JGSA Valuation1.96 Cr
Expenditure0.43 Cr
% Valuation77.3%
Val Marks (20%)1.54
Exp Marks (20%)0.34
Claim Marks (25%)2.30
Bill Progress0.880
Bill Marks (25%)1.53
Geotag Marks (5%)0.490
Physical Marks (5%)0.23
Final score6.43 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works7,504
Target Works6,826
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 23 | SEONI โ | 6.50 | C |
33.3%
5.03
CategoryFarm Pond
Started / Completed / Phys3,071 / 1,854 / 839
⚠ Works needing verification (Completed/Physically Completed)208 works (exp <30%)
Completion rate87.7%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked4.50Cr / 0.58Cr
Expenditure rate (ongoing)13.0%
Part B score (max 5.0)0.65 / 5.0
Final score5.03 / 10
|
0.7%
1.77
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 0.57Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score1.77 / 10
|
2.4%
4.99
CategoryDug Well Recharge
Started / Completed / Phys2,234 / 882 / 1,015
⚠ Works needing verification (Completed/Physically Completed)326 works (exp <30%)
Completion rate84.9%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)14.9%
Part B score (max 5.0)0.75 / 5.0
Final score4.99 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 14 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.8%
8.15
CategoryWater conservation & recharge
Started / Completed / Phys1,281 / 597 / 652
Completion rate97.5%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked2.99Cr / 1.95Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score8.15 / 10
|
7.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys318 / 177 / 141
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.0%
8.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys102 / 32 / 65
Completion rate95.1%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.35Cr / 0.23Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score8.06 / 10
|
4.2%
2.87
CategoryGap Filling in Plantation
Started / Completed / Phys161 / 9 / 34
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate26.7%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked5.75Cr / 1.76Cr
Expenditure rate (ongoing)30.7%
Part B score (max 5.0)1.53 / 5.0
Final score2.87 / 10
|
15.0%
4.63
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys998 / 231 / 467
⚠ Works needing verification (Completed/Physically Completed)107 works (exp <30%)
Completion rate69.9%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked7.70Cr / 1.74Cr
Expenditure rate (ongoing)22.6%
Part B score (max 5.0)1.13 / 5.0
Final score4.63 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works7,219
Target Works7,046
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 24 | SINGRAULI โ | 6.49 | C |
26.6%
5.89
CategoryFarm Pond
Started / Completed / Phys1,804 / 1,225 / 333
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked5.49Cr / 1.73Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.57 / 5.0
Final score5.89 / 10
|
2.7%
5.26
CategoryAmrit Sarowar
Started / Completed / Phys20 / 0 / 8
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked2.60Cr / 1.70Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score5.26 / 10
|
1.7%
5.71
CategoryDug Well Recharge
Started / Completed / Phys1,095 / 546 / 452
⚠ Works needing verification (Completed/Physically Completed)76 works (exp <30%)
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score5.71 / 10
|
0.0%
5.24
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
|
42.6%
7.19
CategoryWater conservation & recharge
Started / Completed / Phys916 / 176 / 570
Completion rate81.4%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked12.74Cr / 7.94Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score7.19 / 10
|
4.5%
7.17
CategoryWatershed Related Works
Started / Completed / Phys131 / 33 / 75
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked1.36Cr / 0.83Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score7.17 / 10
|
2.8%
7.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys56 / 12 / 32
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked1.13Cr / 0.80Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.46 / 10
|
4.3%
1.95
CategoryGap Filling in Plantation
Started / Completed / Phys184 / 0 / 12
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate6.5%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked6.05Cr / 1.97Cr
Expenditure rate (ongoing)32.5%
Part B score (max 5.0)1.62 / 5.0
Final score1.95 / 10
|
9.7%
5.15
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys444 / 66 / 243
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate69.6%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked3.99Cr / 1.33Cr
Expenditure rate (ongoing)33.4%
Part B score (max 5.0)1.67 / 5.0
Final score5.15 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works5,657
Target Works4,094
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 25 | DAMOH โ | 6.48 | C |
6.7%
5.65
CategoryFarm Pond
Started / Completed / Phys1,553 / 513 / 675
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked7.70Cr / 2.81Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.83 / 5.0
Final score5.65 / 10
|
โ |
1.2%
7.30
CategoryDug Well Recharge
Started / Completed / Phys2,220 / 962 / 1,064
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate91.3%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.35Cr / 0.19Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score7.30 / 10
|
0.3%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 0 / 15
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.25Cr / 0.25Cr
Expenditure rate (ongoing)99.6%
Part B score (max 5.0)4.98 / 5.0
Final score9.00 / 10
|
22.6%
7.02
CategoryWater conservation & recharge
Started / Completed / Phys1,017 / 119 / 612
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked49.97Cr / 34.28Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.02 / 10
|
4.1%
7.19
CategoryWatershed Related Works
Started / Completed / Phys294 / 59 / 167
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked5.06Cr / 3.38Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score7.19 / 10
|
3.8%
7.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys207 / 20 / 138
Completion rate76.3%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked4.28Cr / 3.02Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score7.34 / 10
|
3.4%
2.56
CategoryGap Filling in Plantation
Started / Completed / Phys739 / 21 / 176
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate26.7%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked12.09Cr / 2.97Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.23 / 5.0
Final score2.56 / 10
|
51.2%
6.18
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys2,588 / 121 / 1,513
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate63.1%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked84.55Cr / 51.12Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score6.18 / 10
|
1.7%
4.65
CategoryPMKSY: Watershed
PMKSY Works0 total (9 done / -9 ongoing)
JGSA Target8.25 Cr
JGSA Valuation1.02 Cr
Expenditure0.81 Cr
% Valuation12.3%
Val Marks (20%)0.25
Exp Marks (20%)0.20
Claim Marks (25%)2.17
Bill Progress0.976
Bill Marks (25%)1.26
Geotag Marks (5%)0.470
Physical Marks (5%)0.31
Final score4.65 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works8,065
Target Works5,323
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 26 | NARMADAPURAM โ | 6.41 | C |
23.6%
4.26
CategoryFarm Pond
Started / Completed / Phys668 / 258 / 213
⚠ Works needing verification (Completed/Physically Completed)89 works (exp <30%)
Completion rate70.5%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked3.01Cr / 0.44Cr
Expenditure rate (ongoing)14.8%
Part B score (max 5.0)0.74 / 5.0
Final score4.26 / 10
|
1.5%
4.54
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.12Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.54 / 5.0
Final score4.54 / 10
|
4.0%
9.63
CategoryDug Well Recharge
Started / Completed / Phys966 / 509 / 385
⚠ Works needing verification (Completed/Physically Completed)72 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.63 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys41 / 34 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
26.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys342 / 180 / 162
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys43 / 29 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 28 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
12.3%
2.13
CategoryGap Filling in Plantation
Started / Completed / Phys312 / 46 / 40
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate27.6%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked5.01Cr / 0.75Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score2.13 / 10
|
21.2%
4.79
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys702 / 368 / 210
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate82.3%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked2.39Cr / 0.32Cr
Expenditure rate (ongoing)13.5%
Part B score (max 5.0)0.68 / 5.0
Final score4.79 / 10
|
2.1%
7.15
CategoryPMKSY: Watershed
PMKSY Works0 total (7 done / -7 ongoing)
JGSA Target1.29 Cr
JGSA Valuation0.64 Cr
Expenditure0.33 Cr
% Valuation49.8%
Val Marks (20%)0.99
Exp Marks (20%)0.51
Claim Marks (25%)2.46
Bill Progress0.823
Bill Marks (25%)2.20
Geotag Marks (5%)0.490
Physical Marks (5%)0.50
Final score7.15 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works3,141
Target Works2,100
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 27 | PANNA โ | 6.41 | C |
26.4%
5.66
CategoryFarm Pond
Started / Completed / Phys2,155 / 371 / 1,192
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked11.95Cr / 4.86Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score5.66 / 10
|
2.0%
3.84
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 4
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked2.60Cr / 1.25Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score3.84 / 10
|
2.9%
5.97
CategoryDug Well Recharge
Started / Completed / Phys1,820 / 381 / 1,066
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked1.00Cr / 0.40Cr
Expenditure rate (ongoing)40.0%
Part B score (max 5.0)2.00 / 5.0
Final score5.97 / 10
|
0.2%
6.77
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 2 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score6.77 / 10
|
26.1%
7.80
CategoryWater conservation & recharge
Started / Completed / Phys1,178 / 121 / 879
Completion rate84.9%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked7.63Cr / 5.42Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score7.80 / 10
|
3.5%
7.92
CategoryWatershed Related Works
Started / Completed / Phys142 / 16 / 101
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.88Cr / 0.67Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score7.92 / 10
|
8.4%
8.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys182 / 16 / 146
Completion rate89.0%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked1.75Cr / 1.41Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score8.48 / 10
|
6.1%
2.65
CategoryGap Filling in Plantation
Started / Completed / Phys285 / 15 / 27
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate14.7%
Part A score (max 5.0)0.74 / 5.0
Ongoing sanction / booked8.57Cr / 3.27Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score2.65 / 10
|
19.5%
5.17
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys588 / 51 / 290
⚠ Works needing verification (Completed/Physically Completed)28 works (exp <30%)
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked12.18Cr / 5.53Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score5.17 / 10
|
โ |
5.0%
9.29
CategoryJSJB 2.0
Total Works5,113
Target Works5,503
Achievement %92.9%
Weightage5% of composite score
Final score9.29 / 10
|
| 28 | BURHANPUR โ | 6.38 | C |
28.4%
6.18
CategoryFarm Pond
Started / Completed / Phys673 / 239 / 377
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate91.5%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked1.29Cr / 0.41Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score6.18 / 10
|
4.8%
7.13
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.39Cr / 0.23Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score7.13 / 10
|
6.9%
7.40
CategoryDug Well Recharge
Started / Completed / Phys1,182 / 468 / 661
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate95.5%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score7.40 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.8%
7.23
CategoryWater conservation & recharge
Started / Completed / Phys287 / 55 / 197
Completion rate87.8%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked1.30Cr / 0.74Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score7.23 / 10
|
3.3%
7.28
CategoryWatershed Related Works
Started / Completed / Phys35 / 9 / 24
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.56 / 5.0
Final score7.28 / 10
|
1.0%
7.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 11
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score7.92 / 10
|
9.2%
2.79
CategoryGap Filling in Plantation
Started / Completed / Phys94 / 2 / 30
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate34.0%
Part A score (max 5.0)1.70 / 5.0
Ongoing sanction / booked1.63Cr / 0.35Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.09 / 5.0
Final score2.79 / 10
|
8.6%
5.54
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys96 / 24 / 53
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate80.2%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked0.86Cr / 0.26Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score5.54 / 10
|
โ |
5.0%
6.92
CategoryJSJB 2.0
Total Works1,520
Target Works2,197
Achievement %69.2%
Weightage5% of composite score
Final score6.92 / 10
|
| 29 | MORENA โ | 6.37 | C |
6.2%
6.01
CategoryFarm Pond
Started / Completed / Phys2,037 / 1,238 / 353
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate78.1%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked14.27Cr / 6.02Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score6.01 / 10
|
0.2%
2.28
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.66Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score2.28 / 10
|
0.2%
4.74
CategoryDug Well Recharge
Started / Completed / Phys698 / 385 / 113
⚠ Works needing verification (Completed/Physically Completed)43 works (exp <30%)
Completion rate71.3%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.41Cr / 0.10Cr
Expenditure rate (ongoing)23.4%
Part B score (max 5.0)1.17 / 5.0
Final score4.74 / 10
|
0.7%
6.58
CategoryIrrigation infrastructure
Started / Completed / Phys55 / 2 / 28
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked3.03Cr / 2.33Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score6.58 / 10
|
38.0%
7.12
CategoryWater conservation & recharge
Started / Completed / Phys2,431 / 53 / 1,511
Completion rate64.3%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked123.66Cr / 96.57Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.90 / 5.0
Final score7.12 / 10
|
2.5%
7.38
CategoryWatershed Related Works
Started / Completed / Phys180 / 7 / 121
Completion rate71.1%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked6.01Cr / 4.60Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score7.38 / 10
|
1.1%
7.07
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys72 / 1 / 47
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked3.20Cr / 2.39Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.74 / 5.0
Final score7.07 / 10
|
1.0%
1.50
CategoryGap Filling in Plantation
Started / Completed / Phys170 / 0 / 12
Completion rate7.1%
Part A score (max 5.0)0.35 / 5.0
Ongoing sanction / booked7.48Cr / 1.71Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score1.50 / 10
|
44.9%
5.43
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys2,972 / 3 / 1,508
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate50.8%
Part A score (max 5.0)2.54 / 5.0
Ongoing sanction / booked194.11Cr / 112.01Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score5.43 / 10
|
0.3%
7.00
CategoryPMKSY: Watershed
PMKSY Works0 total (6 done / -6 ongoing)
JGSA Target2.64 Cr
JGSA Valuation1.04 Cr
Expenditure0.49 Cr
% Valuation39.3%
Val Marks (20%)0.79
Exp Marks (20%)0.37
Claim Marks (25%)2.49
Bill Progress1.304
Bill Marks (25%)2.46
Geotag Marks (5%)0.480
Physical Marks (5%)0.42
Final score7.00 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works7,056
Target Works5,707
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 30 | DEWAS โ | 6.28 | C |
34.3%
5.66
CategoryFarm Pond
Started / Completed / Phys1,003 / 243 / 565
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked6.11Cr / 2.00Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.64 / 5.0
Final score5.66 / 10
|
1.2%
7.32
CategoryAmrit Sarowar
Started / Completed / Phys7 / 1 / 5
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.04 / 5.0
Final score7.32 / 10
|
7.9%
7.01
CategoryDug Well Recharge
Started / Completed / Phys3,184 / 1,407 / 1,686
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate97.1%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score7.01 / 10
|
2.7%
7.42
CategoryIrrigation infrastructure
Started / Completed / Phys57 / 20 / 34
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score7.42 / 10
|
26.0%
7.95
CategoryWater conservation & recharge
Started / Completed / Phys621 / 102 / 482
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked1.27Cr / 0.83Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score7.95 / 10
|
2.7%
6.95
CategoryWatershed Related Works
Started / Completed / Phys94 / 26 / 62
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.27 / 5.0
Final score6.95 / 10
|
0.9%
6.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 4 / 10
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score6.36 / 10
|
11.7%
3.12
CategoryGap Filling in Plantation
Started / Completed / Phys174 / 2 / 39
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate23.6%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked10.19Cr / 3.96Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score3.12 / 10
|
6.3%
3.57
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys98 / 5 / 53
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate59.2%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked1.96Cr / 0.24Cr
Expenditure rate (ongoing)12.3%
Part B score (max 5.0)0.61 / 5.0
Final score3.57 / 10
|
1.4%
7.12
CategoryPMKSY: Watershed
PMKSY Works0 total (23 done / -23 ongoing)
JGSA Target1.42 Cr
JGSA Valuation0.64 Cr
Expenditure0.31 Cr
% Valuation45.1%
Val Marks (20%)0.90
Exp Marks (20%)0.44
Claim Marks (25%)2.42
Bill Progress0.752
Bill Marks (25%)2.38
Geotag Marks (5%)0.490
Physical Marks (5%)0.50
Final score7.12 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works11,370
Target Works4,983
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 31 | SHEOPUR โ | 6.28 | C |
10.1%
4.80
CategoryFarm Pond
Started / Completed / Phys698 / 351 / 187
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate77.1%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked4.56Cr / 0.86Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score4.80 / 10
|
1.5%
0.50
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.93Cr / 0.29Cr
Expenditure rate (ongoing)10.0%
Part B score (max 5.0)0.50 / 5.0
Final score0.50 / 10
|
0.1%
4.22
CategoryDug Well Recharge
Started / Completed / Phys109 / 70 / 18
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate80.7%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.18 / 5.0
Final score4.22 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys22 / 6 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
8.07
CategoryWater conservation & recharge
Started / Completed / Phys590 / 42 / 481
Completion rate88.6%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked8.92Cr / 6.49Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score8.07 / 10
|
3.6%
7.67
CategoryWatershed Related Works
Started / Completed / Phys71 / 14 / 48
Completion rate87.3%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked1.09Cr / 0.72Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score7.67 / 10
|
1.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 5 / 30
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.8%
2.31
CategoryGap Filling in Plantation
Started / Completed / Phys140 / 2 / 10
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate8.6%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked6.60Cr / 2.48Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score2.31 / 10
|
35.3%
4.52
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys618 / 46 / 483
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked6.31Cr / 0.31Cr
Expenditure rate (ongoing)4.8%
Part B score (max 5.0)0.24 / 5.0
Final score4.52 / 10
|
2.2%
7.47
CategoryPMKSY: Watershed
PMKSY Works0 total (98 done / -98 ongoing)
JGSA Target4.32 Cr
JGSA Valuation2.51 Cr
Expenditure1.00 Cr
% Valuation58.1%
Val Marks (20%)1.16
Exp Marks (20%)0.46
Claim Marks (25%)2.44
Bill Progress2.171
Bill Marks (25%)2.44
Geotag Marks (5%)0.460
Physical Marks (5%)0.50
Final score7.47 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works1,589
Target Works1,542
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 32 | HARDA โ | 6.27 | C |
22.8%
5.35
CategoryFarm Pond
Started / Completed / Phys268 / 42 / 200
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate90.3%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.72Cr / 0.12Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.84 / 5.0
Final score5.35 / 10
|
โ |
7.5%
9.95
CategoryDug Well Recharge
Started / Completed / Phys751 / 384 / 359
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.95 / 10
|
5.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 2 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys90 / 6 / 84
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
6.4%
7.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 10 / 26
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.86 / 10
|
21.5%
2.75
CategoryGap Filling in Plantation
Started / Completed / Phys85 / 0 / 38
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate44.7%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked2.91Cr / 0.30Cr
Expenditure rate (ongoing)10.2%
Part B score (max 5.0)0.51 / 5.0
Final score2.75 / 10
|
15.1%
3.59
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys76 / 1 / 44
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate59.2%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked1.51Cr / 0.19Cr
Expenditure rate (ongoing)12.5%
Part B score (max 5.0)0.63 / 5.0
Final score3.59 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works1,688
Target Works1,179
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 33 | NARSINGHPUR โ | 6.22 | C |
42.1%
6.11
CategoryFarm Pond
Started / Completed / Phys1,069 / 859 / 166
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate95.9%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked1.14Cr / 0.30Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score6.11 / 10
|
0.4%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
4.82
CategoryDug Well Recharge
Started / Completed / Phys290 / 132 / 140
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)2.7%
Part B score (max 5.0)0.13 / 5.0
Final score4.82 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
11.9%
8.09
CategoryWater conservation & recharge
Started / Completed / Phys145 / 92 / 43
Completion rate93.1%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked2.98Cr / 2.05Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score8.09 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 9 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 16 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.2%
4.15
CategoryGap Filling in Plantation
Started / Completed / Phys380 / 71 / 158
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate60.3%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked4.76Cr / 1.08Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.13 / 5.0
Final score4.15 / 10
|
15.9%
4.66
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys244 / 70 / 112
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked4.37Cr / 0.81Cr
Expenditure rate (ongoing)18.6%
Part B score (max 5.0)0.93 / 5.0
Final score4.66 / 10
|
6.8%
8.17
CategoryPMKSY: Watershed
PMKSY Works0 total (88 done / -88 ongoing)
JGSA Target4.79 Cr
JGSA Valuation3.64 Cr
Expenditure2.11 Cr
% Valuation75.9%
Val Marks (20%)1.52
Exp Marks (20%)0.88
Claim Marks (25%)2.47
Bill Progress3.505
Bill Marks (25%)2.47
Geotag Marks (5%)0.410
Physical Marks (5%)0.42
Final score8.17 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works70,462
Target Works1,549
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 34 | SHIVPURI โ | 6.17 | C |
26.3%
4.57
CategoryFarm Pond
Started / Completed / Phys2,015 / 843 / 717
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked13.55Cr / 1.89Cr
Expenditure rate (ongoing)13.9%
Part B score (max 5.0)0.70 / 5.0
Final score4.57 / 10
|
0.6%
2.71
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 3
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked1.01Cr / 0.17Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score2.71 / 10
|
2.1%
4.70
CategoryDug Well Recharge
Started / Completed / Phys1,936 / 914 / 610
⚠ Works needing verification (Completed/Physically Completed)189 works (exp <30%)
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.57Cr / 0.09Cr
Expenditure rate (ongoing)15.3%
Part B score (max 5.0)0.76 / 5.0
Final score4.70 / 10
|
0.8%
7.20
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 8 / 20
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score7.20 / 10
|
35.3%
7.93
CategoryWater conservation & recharge
Started / Completed / Phys1,104 / 238 / 744
Completion rate88.9%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked17.39Cr / 12.12Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score7.93 / 10
|
6.4%
7.66
CategoryWatershed Related Works
Started / Completed / Phys200 / 63 / 117
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked1.63Cr / 1.03Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.66 / 10
|
2.3%
7.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys79 / 25 / 46
Completion rate89.9%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.66Cr / 0.37Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.78 / 5.0
Final score7.27 / 10
|
5.5%
1.82
CategoryGap Filling in Plantation
Started / Completed / Phys756 / 34 / 76
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate14.6%
Part A score (max 5.0)0.73 / 5.0
Ongoing sanction / booked10.67Cr / 2.33Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.09 / 5.0
Final score1.82 / 10
|
14.5%
4.90
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys792 / 36 / 485
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate65.8%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked15.62Cr / 5.04Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.61 / 5.0
Final score4.90 / 10
|
1.3%
5.47
CategoryPMKSY: Watershed
PMKSY Works0 total (182 done / -182 ongoing)
JGSA Target3.04 Cr
JGSA Valuation0.05 Cr
Expenditure0.38 Cr
% Valuation1.5%
Val Marks (20%)0.03
Exp Marks (20%)0.25
Claim Marks (25%)2.26
Bill Progress0.666
Bill Marks (25%)2.06
Geotag Marks (5%)0.450
Physical Marks (5%)0.41
Final score5.47 / 10
|
5.0%
9.26
CategoryJSJB 2.0
Total Works4,976
Target Works5,374
Achievement %92.6%
Weightage5% of composite score
Final score9.26 / 10
|
| 35 | AGAR-MALWA โ | 6.16 | C |
18.8%
4.99
CategoryFarm Pond
Started / Completed / Phys661 / 120 / 260
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate57.5%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked6.66Cr / 2.81Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.99 / 10
|
1.0%
6.89
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.31Cr / 0.28Cr
Expenditure rate (ongoing)87.7%
Part B score (max 5.0)4.39 / 5.0
Final score6.89 / 10
|
6.8%
5.92
CategoryDug Well Recharge
Started / Completed / Phys1,918 / 635 / 957
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.68Cr / 0.24Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score5.92 / 10
|
0.5%
7.80
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 5
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.80 / 10
|
34.6%
7.53
CategoryWater conservation & recharge
Started / Completed / Phys454 / 88 / 273
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked7.15Cr / 5.08Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score7.53 / 10
|
2.1%
7.44
CategoryWatershed Related Works
Started / Completed / Phys43 / 18 / 20
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score7.44 / 10
|
8.8%
8.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys170 / 13 / 128
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked1.13Cr / 0.88Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.88 / 5.0
Final score8.03 / 10
|
11.0%
2.19
CategoryGap Filling in Plantation
Started / Completed / Phys280 / 17 / 51
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate24.3%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked6.03Cr / 1.18Cr
Expenditure rate (ongoing)19.6%
Part B score (max 5.0)0.98 / 5.0
Final score2.19 / 10
|
11.5%
4.55
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys133 / 13 / 67
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked3.67Cr / 1.13Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score4.55 / 10
|
โ |
5.0%
9.71
CategoryJSJB 2.0
Total Works3,163
Target Works3,257
Achievement %97.1%
Weightage5% of composite score
Final score9.71 / 10
|
| 36 | GWALIOR โ | 6.12 | C |
20.9%
5.46
CategoryFarm Pond
Started / Completed / Phys699 / 131 / 538
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.54Cr / 0.07Cr
Expenditure rate (ongoing)13.6%
Part B score (max 5.0)0.68 / 5.0
Final score5.46 / 10
|
2.8%
5.78
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 6
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked1.45Cr / 0.89Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.06 / 5.0
Final score5.78 / 10
|
2.1%
6.10
CategoryDug Well Recharge
Started / Completed / Phys774 / 223 / 531
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.22 / 5.0
Final score6.10 / 10
|
3.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 6 / 26
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
22.9%
7.49
CategoryWater conservation & recharge
Started / Completed / Phys282 / 58 / 212
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.97Cr / 0.52Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score7.49 / 10
|
3.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys61 / 16 / 45
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 12 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
12.5%
3.17
CategoryGap Filling in Plantation
Started / Completed / Phys333 / 39 / 131
⚠ Works needing verification (Completed/Physically Completed)57 works (exp <30%)
Completion rate51.1%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked2.99Cr / 0.37Cr
Expenditure rate (ongoing)12.4%
Part B score (max 5.0)0.62 / 5.0
Final score3.17 / 10
|
16.7%
4.49
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys291 / 44 / 181
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate77.3%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked2.63Cr / 0.33Cr
Expenditure rate (ongoing)12.5%
Part B score (max 5.0)0.63 / 5.0
Final score4.49 / 10
|
8.4%
5.47
CategoryPMKSY: Watershed
PMKSY Works0 total (18 done / -18 ongoing)
JGSA Target8.02 Cr
JGSA Valuation2.00 Cr
Expenditure0.26 Cr
% Valuation24.9%
Val Marks (20%)0.50
Exp Marks (20%)0.07
Claim Marks (25%)1.97
Bill Progress0.071
Bill Marks (25%)1.97
Geotag Marks (5%)0.460
Physical Marks (5%)0.50
Final score5.47 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,626
Target Works1,891
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 37 | JABALPUR โ | 6.09 | C |
22.7%
4.95
CategoryFarm Pond
Started / Completed / Phys777 / 247 / 406
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked3.88Cr / 0.58Cr
Expenditure rate (ongoing)14.9%
Part B score (max 5.0)0.75 / 5.0
Final score4.95 / 10
|
3.0%
5.64
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 5
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.61Cr / 1.01Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score5.64 / 10
|
1.4%
5.20
CategoryDug Well Recharge
Started / Completed / Phys549 / 249 / 291
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)5.7%
Part B score (max 5.0)0.28 / 5.0
Final score5.20 / 10
|
0.1%
6.06
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 1
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.69 / 5.0
Final score6.06 / 10
|
19.2%
7.57
CategoryWater conservation & recharge
Started / Completed / Phys363 / 203 / 146
Completion rate96.1%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked1.41Cr / 0.78Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score7.57 / 10
|
10.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys185 / 110 / 75
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 34 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
10.8%
2.96
CategoryGap Filling in Plantation
Started / Completed / Phys342 / 49 / 80
⚠ Works needing verification (Completed/Physically Completed)27 works (exp <30%)
Completion rate37.7%
Part A score (max 5.0)1.89 / 5.0
Ongoing sanction / booked5.05Cr / 1.09Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.07 / 5.0
Final score2.96 / 10
|
20.8%
4.06
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys413 / 113 / 153
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked8.56Cr / 1.44Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.84 / 5.0
Final score4.06 / 10
|
4.2%
7.75
CategoryPMKSY: Watershed
PMKSY Works0 total (15 done / -15 ongoing)
JGSA Target4.23 Cr
JGSA Valuation2.46 Cr
Expenditure1.80 Cr
% Valuation58.0%
Val Marks (20%)1.16
Exp Marks (20%)0.85
Claim Marks (25%)2.46
Bill Progress2.902
Bill Marks (25%)2.41
Geotag Marks (5%)0.490
Physical Marks (5%)0.38
Final score7.75 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works67,088
Target Works1,943
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 38 | SIDHI โ | 6.06 | C |
26.0%
5.16
CategoryFarm Pond
Started / Completed / Phys1,647 / 1,044 / 455
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked3.01Cr / 0.37Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score5.16 / 10
|
โ |
0.8%
4.91
CategoryDug Well Recharge
Started / Completed / Phys435 / 226 / 167
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate90.3%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)7.9%
Part B score (max 5.0)0.40 / 5.0
Final score4.91 / 10
|
2.1%
7.58
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 14 / 17
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.45Cr / 0.26Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score7.58 / 10
|
32.6%
8.17
CategoryWater conservation & recharge
Started / Completed / Phys892 / 353 / 528
Completion rate98.8%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked1.98Cr / 1.28Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score8.17 / 10
|
3.5%
9.00
CategoryWatershed Related Works
Started / Completed / Phys98 / 49 / 48
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)97.9%
Part B score (max 5.0)4.89 / 5.0
Final score9.00 / 10
|
4.3%
8.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys106 / 52 / 48
Completion rate94.3%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked1.10Cr / 0.72Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score8.00 / 10
|
10.4%
1.84
CategoryGap Filling in Plantation
Started / Completed / Phys530 / 12 / 91
⚠ Works needing verification (Completed/Physically Completed)59 works (exp <30%)
Completion rate19.4%
Part A score (max 5.0)0.97 / 5.0
Ongoing sanction / booked9.17Cr / 1.60Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score1.84 / 10
|
13.3%
4.31
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys395 / 31 / 224
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked5.00Cr / 1.09Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.09 / 5.0
Final score4.31 / 10
|
1.9%
7.16
CategoryPMKSY: Watershed
PMKSY Works0 total (27 done / -27 ongoing)
JGSA Target2.89 Cr
JGSA Valuation1.58 Cr
Expenditure0.51 Cr
% Valuation54.7%
Val Marks (20%)1.09
Exp Marks (20%)0.36
Claim Marks (25%)2.40
Bill Progress1.298
Bill Marks (25%)2.39
Geotag Marks (5%)0.450
Physical Marks (5%)0.46
Final score7.16 / 10
|
5.0%
5.62
CategoryJSJB 2.0
Total Works1,811
Target Works3,222
Achievement %56.2%
Weightage5% of composite score
Final score5.62 / 10
|
| 39 | SEHORE โ | 6.02 | C |
38.9%
5.70
CategoryFarm Pond
Started / Completed / Phys1,183 / 155 / 758
⚠ Works needing verification (Completed/Physically Completed)50 works (exp <30%)
Completion rate77.2%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked7.42Cr / 2.73Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score5.70 / 10
|
1.8%
2.05
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.43Cr / 0.59Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.05 / 5.0
Final score2.05 / 10
|
8.0%
7.05
CategoryDug Well Recharge
Started / Completed / Phys2,392 / 525 / 1,784
⚠ Works needing verification (Completed/Physically Completed)43 works (exp <30%)
Completion rate96.5%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score7.05 / 10
|
1.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 7 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
18.0%
8.44
CategoryWater conservation & recharge
Started / Completed / Phys357 / 61 / 266
Completion rate91.6%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked2.61Cr / 2.01Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score8.44 / 10
|
3.4%
8.13
CategoryWatershed Related Works
Started / Completed / Phys66 / 19 / 40
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.27Cr / 0.20Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.66 / 5.0
Final score8.13 / 10
|
2.4%
8.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys38 / 10 / 27
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.28 / 5.0
Final score8.14 / 10
|
10.0%
1.80
CategoryGap Filling in Plantation
Started / Completed / Phys275 / 7 / 9
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate5.8%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked7.43Cr / 2.24Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.51 / 5.0
Final score1.80 / 10
|
10.2%
3.52
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys312 / 57 / 81
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate44.2%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked4.89Cr / 1.28Cr
Expenditure rate (ongoing)26.1%
Part B score (max 5.0)1.31 / 5.0
Final score3.52 / 10
|
1.0%
7.35
CategoryPMKSY: Watershed
PMKSY Works0 total (13 done / -13 ongoing)
JGSA Target0.79 Cr
JGSA Valuation0.64 Cr
Expenditure0.31 Cr
% Valuation81.3%
Val Marks (20%)1.63
Exp Marks (20%)0.80
Claim Marks (25%)2.07
Bill Progress0.622
Bill Marks (25%)2.07
Geotag Marks (5%)0.490
Physical Marks (5%)0.28
Final score7.35 / 10
|
5.0%
9.35
CategoryJSJB 2.0
Total Works3,800
Target Works4,064
Achievement %93.5%
Weightage5% of composite score
Final score9.35 / 10
|
| 40 | NIWARI โ | 6.01 | C |
12.3%
4.08
CategoryFarm Pond
Started / Completed / Phys491 / 132 / 130
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.02Cr / 0.85Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score4.08 / 10
|
1.7%
4.54
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.30Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score4.54 / 10
|
3.9%
4.92
CategoryDug Well Recharge
Started / Completed / Phys964 / 231 / 441
⚠ Works needing verification (Completed/Physically Completed)94 works (exp <30%)
Completion rate69.7%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked0.51Cr / 0.15Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score4.92 / 10
|
โ |
23.1%
8.16
CategoryWater conservation & recharge
Started / Completed / Phys235 / 62 / 143
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked2.32Cr / 1.76Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score8.16 / 10
|
9.9%
7.27
CategoryWatershed Related Works
Started / Completed / Phys111 / 20 / 66
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked1.51Cr / 1.03Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score7.27 / 10
|
13.5%
8.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys124 / 20 / 86
Completion rate85.5%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked1.24Cr / 0.94Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score8.08 / 10
|
9.5%
2.57
CategoryGap Filling in Plantation
Started / Completed / Phys204 / 8 / 48
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate27.5%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked3.95Cr / 0.94Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.19 / 5.0
Final score2.57 / 10
|
21.2%
3.76
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys352 / 11 / 152
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate46.3%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked7.49Cr / 2.17Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score3.76 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works1,949
Target Works1,930
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 41 | MANDSAUR โ | 5.96 | D |
13.5%
4.15
CategoryFarm Pond
Started / Completed / Phys1,095 / 171 / 394
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate51.6%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked9.79Cr / 3.07Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score4.15 / 10
|
1.0%
3.98
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.73Cr / 0.21Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score3.98 / 10
|
7.2%
6.25
CategoryDug Well Recharge
Started / Completed / Phys4,140 / 1,080 / 2,344
⚠ Works needing verification (Completed/Physically Completed)171 works (exp <30%)
Completion rate82.7%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked1.41Cr / 0.60Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.12 / 5.0
Final score6.25 / 10
|
0.4%
6.70
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 10 / 8
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.20 / 5.0
Final score6.70 / 10
|
45.6%
7.42
CategoryWater conservation & recharge
Started / Completed / Phys1,158 / 255 / 643
Completion rate77.5%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked14.50Cr / 10.27Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score7.42 / 10
|
1.8%
7.59
CategoryWatershed Related Works
Started / Completed / Phys53 / 17 / 28
Completion rate84.9%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.34Cr / 0.23Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score7.59 / 10
|
1.8%
8.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 9 / 25
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.35Cr / 0.28Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score8.25 / 10
|
8.8%
3.12
CategoryGap Filling in Plantation
Started / Completed / Phys515 / 9 / 119
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate24.9%
Part A score (max 5.0)1.24 / 5.0
Ongoing sanction / booked9.15Cr / 3.44Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score3.12 / 10
|
13.0%
4.39
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys353 / 38 / 139
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate50.1%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked8.11Cr / 3.06Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score4.39 / 10
|
2.0%
6.99
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target2.95 Cr
JGSA Valuation2.07 Cr
Expenditure0.24 Cr
% Valuation70.1%
Val Marks (20%)1.40
Exp Marks (20%)0.16
Claim Marks (25%)2.43
Bill Progress2.138
Bill Marks (25%)2.43
Geotag Marks (5%)0.490
Physical Marks (5%)0.08
Final score6.99 / 10
|
5.0%
4.80
CategoryJSJB 2.0
Total Works3,125
Target Works6,512
Achievement %48.0%
Weightage5% of composite score
Final score4.80 / 10
|
| 42 | CHHATARPUR โ | 5.94 | D |
31.3%
4.68
CategoryFarm Pond
Started / Completed / Phys1,743 / 757 / 700
⚠ Works needing verification (Completed/Physically Completed)84 works (exp <30%)
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked6.91Cr / 0.70Cr
Expenditure rate (ongoing)10.1%
Part B score (max 5.0)0.50 / 5.0
Final score4.68 / 10
|
2.7%
7.44
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 18
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked1.29Cr / 0.95Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score7.44 / 10
|
3.6%
4.86
CategoryDug Well Recharge
Started / Completed / Phys3,861 / 2,827 / 654
⚠ Works needing verification (Completed/Physically Completed)219 works (exp <30%)
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.29Cr / 0.02Cr
Expenditure rate (ongoing)7.0%
Part B score (max 5.0)0.35 / 5.0
Final score4.86 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 5 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.7%
8.55
CategoryWater conservation & recharge
Started / Completed / Phys937 / 248 / 655
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked2.46Cr / 1.84Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score8.55 / 10
|
2.5%
8.00
CategoryWatershed Related Works
Started / Completed / Phys125 / 34 / 87
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score8.00 / 10
|
2.8%
8.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys80 / 7 / 71
Completion rate97.5%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score8.70 / 10
|
4.3%
2.87
CategoryGap Filling in Plantation
Started / Completed / Phys328 / 15 / 87
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate31.1%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked5.62Cr / 1.48Cr
Expenditure rate (ongoing)26.3%
Part B score (max 5.0)1.31 / 5.0
Final score2.87 / 10
|
24.6%
4.31
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys801 / 61 / 481
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate67.7%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked9.34Cr / 1.72Cr
Expenditure rate (ongoing)18.5%
Part B score (max 5.0)0.92 / 5.0
Final score4.31 / 10
|
1.2%
7.40
CategoryPMKSY: Watershed
PMKSY Works0 total (3 done / -3 ongoing)
JGSA Target2.41 Cr
JGSA Valuation2.24 Cr
Expenditure0.82 Cr
% Valuation92.9%
Val Marks (20%)1.86
Exp Marks (20%)0.68
Claim Marks (25%)2.10
Bill Progress1.367
Bill Marks (25%)1.91
Geotag Marks (5%)0.430
Physical Marks (5%)0.42
Final score7.40 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works11,769
Target Works6,817
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 43 | SAGAR โ | 5.92 | D |
22.6%
4.51
CategoryFarm Pond
Started / Completed / Phys2,156 / 892 / 706
⚠ Works needing verification (Completed/Physically Completed)122 works (exp <30%)
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked8.04Cr / 1.29Cr
Expenditure rate (ongoing)16.1%
Part B score (max 5.0)0.80 / 5.0
Final score4.51 / 10
|
0.5%
4.16
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.74Cr
Expenditure rate (ongoing)83.2%
Part B score (max 5.0)4.16 / 5.0
Final score4.16 / 10
|
6.3%
4.90
CategoryDug Well Recharge
Started / Completed / Phys4,628 / 1,864 / 1,907
⚠ Works needing verification (Completed/Physically Completed)835 works (exp <30%)
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score4.90 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys25 / 14 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
28.9%
8.01
CategoryWater conservation & recharge
Started / Completed / Phys1,183 / 480 / 630
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked3.28Cr / 2.18Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.32 / 5.0
Final score8.01 / 10
|
3.9%
7.65
CategoryWatershed Related Works
Started / Completed / Phys120 / 61 / 54
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score7.65 / 10
|
2.9%
7.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 40 / 46
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score7.65 / 10
|
5.2%
2.79
CategoryGap Filling in Plantation
Started / Completed / Phys441 / 23 / 77
⚠ Works needing verification (Completed/Physically Completed)70 works (exp <30%)
Completion rate22.7%
Part A score (max 5.0)1.13 / 5.0
Ongoing sanction / booked5.62Cr / 1.87Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score2.79 / 10
|
18.6%
5.89
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys902 / 227 / 475
⚠ Works needing verification (Completed/Physically Completed)57 works (exp <30%)
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked8.68Cr / 3.47Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)2.00 / 5.0
Final score5.89 / 10
|
5.7%
5.97
CategoryPMKSY: Watershed
PMKSY Works0 total (234 done / -234 ongoing)
JGSA Target10.28 Cr
JGSA Valuation3.86 Cr
Expenditure2.09 Cr
% Valuation37.5%
Val Marks (20%)0.75
Exp Marks (20%)0.41
Claim Marks (25%)2.22
Bill Progress4.052
Bill Marks (25%)1.79
Geotag Marks (5%)0.490
Physical Marks (5%)0.30
Final score5.97 / 10
|
5.0%
2.15
CategoryJSJB 2.0
Total Works1,763
Target Works8,210
Achievement %21.5%
Weightage5% of composite score
Final score2.15 / 10
|
| 44 | TIKAMGARH โ | 5.89 | D |
10.3%
4.81
CategoryFarm Pond
Started / Completed / Phys852 / 78 / 417
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked5.43Cr / 2.07Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score4.81 / 10
|
2.2%
2.43
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.04Cr / 1.48Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.43 / 5.0
Final score2.43 / 10
|
4.2%
6.20
CategoryDug Well Recharge
Started / Completed / Phys2,282 / 256 / 1,816
⚠ Works needing verification (Completed/Physically Completed)127 works (exp <30%)
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.21Cr / 0.07Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score6.20 / 10
|
0.1%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 12 / 5
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)96.5%
Part B score (max 5.0)4.82 / 5.0
Final score9.00 / 10
|
35.5%
8.04
CategoryWater conservation & recharge
Started / Completed / Phys1,050 / 121 / 667
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked18.16Cr / 15.59Cr
Expenditure rate (ongoing)85.8%
Part B score (max 5.0)4.29 / 5.0
Final score8.04 / 10
|
3.2%
8.65
CategoryWatershed Related Works
Started / Completed / Phys111 / 18 / 87
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.41Cr / 0.32Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score8.65 / 10
|
6.2%
7.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys128 / 6 / 69
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked4.27Cr / 3.61Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score7.16 / 10
|
14.2%
2.51
CategoryGap Filling in Plantation
Started / Completed / Phys863 / 48 / 217
⚠ Works needing verification (Completed/Physically Completed)111 works (exp <30%)
Completion rate30.7%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked11.90Cr / 2.32Cr
Expenditure rate (ongoing)19.5%
Part B score (max 5.0)0.97 / 5.0
Final score2.51 / 10
|
16.5%
4.34
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys590 / 25 / 304
⚠ Works needing verification (Completed/Physically Completed)46 works (exp <30%)
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked10.00Cr / 3.11Cr
Expenditure rate (ongoing)31.1%
Part B score (max 5.0)1.55 / 5.0
Final score4.34 / 10
|
2.7%
7.08
CategoryPMKSY: Watershed
PMKSY Works0 total (3 done / -3 ongoing)
JGSA Target3.79 Cr
JGSA Valuation2.16 Cr
Expenditure1.20 Cr
% Valuation57.0%
Val Marks (20%)1.14
Exp Marks (20%)0.63
Claim Marks (25%)2.20
Bill Progress1.687
Bill Marks (25%)2.14
Geotag Marks (5%)0.500
Physical Marks (5%)0.47
Final score7.08 / 10
|
5.0%
4.78
CategoryJSJB 2.0
Total Works2,143
Target Works4,480
Achievement %47.8%
Weightage5% of composite score
Final score4.78 / 10
|
| 45 | BHOPAL โ | 5.87 | D |
35.5%
5.15
CategoryFarm Pond
Started / Completed / Phys945 / 257 / 383
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate67.7%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked6.12Cr / 2.16Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.77 / 5.0
Final score5.15 / 10
|
2.4%
6.12
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.59Cr / 0.39Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score6.12 / 10
|
3.1%
6.16
CategoryDug Well Recharge
Started / Completed / Phys678 / 329 / 223
⚠ Works needing verification (Completed/Physically Completed)60 works (exp <30%)
Completion rate81.4%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.17Cr / 0.07Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score6.16 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
34.0%
7.64
CategoryWater conservation & recharge
Started / Completed / Phys451 / 140 / 244
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked3.30Cr / 2.23Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score7.64 / 10
|
2.6%
7.07
CategoryWatershed Related Works
Started / Completed / Phys35 / 11 / 21
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.22Cr / 0.11Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.49 / 5.0
Final score7.07 / 10
|
4.4%
8.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys25 / 5 / 18
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.45Cr / 0.35Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score8.51 / 10
|
2.3%
1.86
CategoryGap Filling in Plantation
Started / Completed / Phys53 / 0 / 7
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate13.2%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked1.08Cr / 0.26Cr
Expenditure rate (ongoing)24.1%
Part B score (max 5.0)1.20 / 5.0
Final score1.86 / 10
|
10.5%
3.49
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys144 / 20 / 60
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked2.94Cr / 0.42Cr
Expenditure rate (ongoing)14.2%
Part B score (max 5.0)0.71 / 5.0
Final score3.49 / 10
|
โ |
5.0%
2.29
CategoryJSJB 2.0
Total Works495
Target Works2,157
Achievement %22.9%
Weightage5% of composite score
Final score2.29 / 10
|
| 46 | SATNA โ | 5.86 | D |
35.1%
4.79
CategoryFarm Pond
Started / Completed / Phys2,091 / 305 / 1,218
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate72.8%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked12.78Cr / 2.94Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score4.79 / 10
|
2.7%
1.73
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.41Cr / 1.18Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score1.73 / 10
|
2.0%
6.46
CategoryDug Well Recharge
Started / Completed / Phys1,133 / 309 / 747
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate93.2%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score6.46 / 10
|
0.4%
9.81
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 13 / 12
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.81 / 10
|
28.2%
8.70
CategoryWater conservation & recharge
Started / Completed / Phys660 / 126 / 480
Completion rate91.8%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked7.67Cr / 6.30Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.11 / 5.0
Final score8.70 / 10
|
3.7%
8.34
CategoryWatershed Related Works
Started / Completed / Phys143 / 35 / 98
Completion rate93.0%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.28Cr / 0.21Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score8.34 / 10
|
6.3%
8.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys121 / 33 / 77
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked1.00Cr / 0.78Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score8.46 / 10
|
4.4%
2.18
CategoryGap Filling in Plantation
Started / Completed / Phys101 / 0 / 14
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate13.9%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked3.92Cr / 1.17Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score2.18 / 10
|
12.2%
2.92
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys413 / 15 / 115
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate31.5%
Part A score (max 5.0)1.57 / 5.0
Ongoing sanction / booked11.00Cr / 2.96Cr
Expenditure rate (ongoing)26.9%
Part B score (max 5.0)1.35 / 5.0
Final score2.92 / 10
|
โ |
5.0%
4.26
CategoryJSJB 2.0
Total Works1,784
Target Works4,185
Achievement %42.6%
Weightage5% of composite score
Final score4.26 / 10
|
| 47 | INDORE โ | 5.85 | D |
31.5%
5.86
CategoryFarm Pond
Started / Completed / Phys540 / 180 / 232
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate76.3%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked3.20Cr / 1.31Cr
Expenditure rate (ongoing)40.8%
Part B score (max 5.0)2.04 / 5.0
Final score5.86 / 10
|
2.3%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.8%
5.74
CategoryDug Well Recharge
Started / Completed / Phys814 / 494 / 199
⚠ Works needing verification (Completed/Physically Completed)108 works (exp <30%)
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score5.74 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.9%
8.44
CategoryWater conservation & recharge
Started / Completed / Phys130 / 66 / 51
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.46Cr / 0.36Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score8.44 / 10
|
5.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys50 / 20 / 30
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.8%
7.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 10 / 10
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score7.46 / 10
|
21.2%
3.31
CategoryGap Filling in Plantation
Started / Completed / Phys410 / 81 / 73
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate37.6%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked4.98Cr / 1.43Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score3.31 / 10
|
14.6%
3.46
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys106 / 20 / 37
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked1.98Cr / 0.31Cr
Expenditure rate (ongoing)15.4%
Part B score (max 5.0)0.77 / 5.0
Final score3.46 / 10
|
3.1%
7.25
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target1.35 Cr
JGSA Valuation0.75 Cr
Expenditure0.49 Cr
% Valuation55.5%
Val Marks (20%)1.11
Exp Marks (20%)0.73
Claim Marks (25%)2.37
Bill Progress0.654
Bill Marks (25%)2.36
Geotag Marks (5%)0.390
Physical Marks (5%)0.30
Final score7.25 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,262
Target Works1,561
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 48 | VIDISHA โ | 5.75 | D |
41.1%
5.48
CategoryFarm Pond
Started / Completed / Phys2,017 / 1,124 / 443
⚠ Works needing verification (Completed/Physically Completed)64 works (exp <30%)
Completion rate77.7%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked10.62Cr / 3.39Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.59 / 5.0
Final score5.48 / 10
|
1.6%
3.60
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.80Cr / 1.12Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score3.60 / 10
|
3.5%
6.77
CategoryDug Well Recharge
Started / Completed / Phys1,725 / 520 / 989
⚠ Works needing verification (Completed/Physically Completed)162 works (exp <30%)
Completion rate87.5%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score6.77 / 10
|
0.3%
8.35
CategoryIrrigation infrastructure
Started / Completed / Phys37 / 31 / 4
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score8.35 / 10
|
23.9%
7.43
CategoryWater conservation & recharge
Started / Completed / Phys848 / 403 / 350
Completion rate88.8%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked3.68Cr / 2.20Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score7.43 / 10
|
0.7%
6.44
CategoryWatershed Related Works
Started / Completed / Phys38 / 27 / 10
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score6.44 / 10
|
1.1%
7.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 22 / 5
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.52 / 5.0
Final score7.35 / 10
|
8.6%
1.66
CategoryGap Filling in Plantation
Started / Completed / Phys327 / 11 / 42
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked8.53Cr / 1.45Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score1.66 / 10
|
10.0%
3.28
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys522 / 107 / 193
⚠ Works needing verification (Completed/Physically Completed)81 works (exp <30%)
Completion rate57.5%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked4.15Cr / 0.34Cr
Expenditure rate (ongoing)8.2%
Part B score (max 5.0)0.41 / 5.0
Final score3.28 / 10
|
4.1%
7.43
CategoryPMKSY: Watershed
PMKSY Works0 total (4 done / -4 ongoing)
JGSA Target5.13 Cr
JGSA Valuation3.85 Cr
Expenditure0.93 Cr
% Valuation75.0%
Val Marks (20%)1.50
Exp Marks (20%)0.36
Claim Marks (25%)2.42
Bill Progress3.102
Bill Marks (25%)2.33
Geotag Marks (5%)0.480
Physical Marks (5%)0.34
Final score7.43 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,832
Target Works4,703
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 49 | UMARIA โ | 5.74 | D |
21.5%
4.61
CategoryFarm Pond
Started / Completed / Phys910 / 113 / 379
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked10.65Cr / 4.05Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score4.61 / 10
|
1.5%
4.48
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 2
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.35Cr / 0.91Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score4.48 / 10
|
2.5%
4.96
CategoryDug Well Recharge
Started / Completed / Phys1,111 / 120 / 570
⚠ Works needing verification (Completed/Physically Completed)60 works (exp <30%)
Completion rate62.1%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked0.95Cr / 0.35Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.85 / 5.0
Final score4.96 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
40.8%
6.65
CategoryWater conservation & recharge
Started / Completed / Phys708 / 106 / 366
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked15.73Cr / 10.43Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score6.65 / 10
|
5.5%
7.10
CategoryWatershed Related Works
Started / Completed / Phys60 / 4 / 44
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked1.64Cr / 1.01Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score7.10 / 10
|
5.4%
6.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys107 / 13 / 56
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked2.51Cr / 1.66Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score6.53 / 10
|
5.2%
1.90
CategoryGap Filling in Plantation
Started / Completed / Phys216 / 2 / 19
Completion rate9.7%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked5.00Cr / 1.41Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score1.90 / 10
|
11.1%
3.37
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys572 / 53 / 81
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate23.4%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked10.18Cr / 4.47Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score3.37 / 10
|
1.6%
8.53
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target1.80 Cr
JGSA Valuation1.49 Cr
Expenditure0.83 Cr
% Valuation83.0%
Val Marks (20%)1.66
Exp Marks (20%)0.92
Claim Marks (25%)2.49
Bill Progress1.060
Bill Marks (25%)2.48
Geotag Marks (5%)0.500
Physical Marks (5%)0.48
Final score8.53 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,935
Target Works2,910
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 50 | REWA โ | 5.73 | D |
27.7%
5.32
CategoryFarm Pond
Started / Completed / Phys2,004 / 1,078 / 557
⚠ Works needing verification (Completed/Physically Completed)118 works (exp <30%)
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked6.87Cr / 1.70Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score5.32 / 10
|
0.9%
0.82
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.36Cr / 0.22Cr
Expenditure rate (ongoing)16.4%
Part B score (max 5.0)0.82 / 5.0
Final score0.82 / 10
|
0.6%
5.78
CategoryDug Well Recharge
Started / Completed / Phys475 / 283 / 148
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate90.7%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score5.78 / 10
|
1.7%
7.96
CategoryIrrigation infrastructure
Started / Completed / Phys71 / 49 / 19
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score7.96 / 10
|
19.1%
8.15
CategoryWater conservation & recharge
Started / Completed / Phys625 / 368 / 229
Completion rate95.5%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked1.51Cr / 1.02Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score8.15 / 10
|
4.8%
8.32
CategoryWatershed Related Works
Started / Completed / Phys118 / 65 / 52
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score8.32 / 10
|
5.0%
6.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys110 / 64 / 42
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score6.84 / 10
|
9.9%
2.62
CategoryGap Filling in Plantation
Started / Completed / Phys436 / 43 / 78
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate27.8%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked10.07Cr / 2.48Cr
Expenditure rate (ongoing)24.6%
Part B score (max 5.0)1.23 / 5.0
Final score2.62 / 10
|
21.0%
3.51
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys970 / 166 / 280
⚠ Works needing verification (Completed/Physically Completed)42 works (exp <30%)
Completion rate46.0%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked17.80Cr / 4.33Cr
Expenditure rate (ongoing)24.3%
Part B score (max 5.0)1.22 / 5.0
Final score3.51 / 10
|
4.1%
6.56
CategoryPMKSY: Watershed
PMKSY Works0 total (29 done / -29 ongoing)
JGSA Target6.27 Cr
JGSA Valuation1.57 Cr
Expenditure1.66 Cr
% Valuation25.0%
Val Marks (20%)0.50
Exp Marks (20%)0.53
Claim Marks (25%)2.36
Bill Progress1.715
Bill Marks (25%)2.33
Geotag Marks (5%)0.440
Physical Marks (5%)0.40
Final score6.56 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,159
Target Works3,408
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 51 | BHIND โ | 5.55 | D |
9.9%
3.88
CategoryFarm Pond
Started / Completed / Phys843 / 280 / 207
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked6.00Cr / 1.19Cr
Expenditure rate (ongoing)19.8%
Part B score (max 5.0)0.99 / 5.0
Final score3.88 / 10
|
2.2%
0.63
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.62Cr / 0.46Cr
Expenditure rate (ongoing)12.7%
Part B score (max 5.0)0.63 / 5.0
Final score0.63 / 10
|
0.2%
6.26
CategoryDug Well Recharge
Started / Completed / Phys113 / 7 / 87
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.11 / 5.0
Final score6.26 / 10
|
5.7%
7.48
CategoryIrrigation infrastructure
Started / Completed / Phys143 / 10 / 116
Completion rate88.1%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked1.51Cr / 0.93Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score7.48 / 10
|
38.4%
7.38
CategoryWater conservation & recharge
Started / Completed / Phys722 / 121 / 511
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked7.33Cr / 4.40Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.38 / 10
|
5.8%
7.81
CategoryWatershed Related Works
Started / Completed / Phys75 / 17 / 52
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.90Cr / 0.57Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score7.81 / 10
|
2.7%
7.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys62 / 6 / 49
Completion rate88.7%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.42Cr / 0.25Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.37 / 10
|
3.7%
1.86
CategoryGap Filling in Plantation
Started / Completed / Phys153 / 0 / 28
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate18.3%
Part A score (max 5.0)0.92 / 5.0
Ongoing sanction / booked4.59Cr / 0.87Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score1.86 / 10
|
26.4%
3.19
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys552 / 9 / 160
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate30.6%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked25.22Cr / 8.36Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score3.19 / 10
|
โ |
5.0%
6.27
CategoryJSJB 2.0
Total Works1,236
Target Works1,970
Achievement %62.7%
Weightage5% of composite score
Final score6.27 / 10
|
| 52 | SHAJAPUR โ | 5.41 | D |
27.9%
5.49
CategoryFarm Pond
Started / Completed / Phys535 / 299 / 135
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate81.1%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked2.94Cr / 0.84Cr
Expenditure rate (ongoing)28.7%
Part B score (max 5.0)1.43 / 5.0
Final score5.49 / 10
|
2.4%
5.30
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.67Cr / 0.37Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score5.30 / 10
|
6.6%
4.89
CategoryDug Well Recharge
Started / Completed / Phys1,511 / 685 / 777
⚠ Works needing verification (Completed/Physically Completed)47 works (exp <30%)
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.1%
Part B score (max 5.0)0.05 / 5.0
Final score4.89 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
23.0%
7.26
CategoryWater conservation & recharge
Started / Completed / Phys289 / 130 / 152
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.30Cr / 0.14Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.39 / 5.0
Final score7.26 / 10
|
2.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys40 / 18 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 5 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.7%
1.79
CategoryGap Filling in Plantation
Started / Completed / Phys305 / 24 / 43
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked5.06Cr / 0.70Cr
Expenditure rate (ongoing)13.9%
Part B score (max 5.0)0.69 / 5.0
Final score1.79 / 10
|
11.4%
2.66
CategoryWork Not Permissible in VB-GRAM-G
Started / Completed / Phys102 / 8 / 34
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate41.2%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked2.62Cr / 0.32Cr
Expenditure rate (ongoing)12.1%
Part B score (max 5.0)0.60 / 5.0
Final score2.66 / 10
|
5.7%
8.11
CategoryPMKSY: Watershed
PMKSY Works0 total (15 done / -15 ongoing)
JGSA Target3.16 Cr
JGSA Valuation2.37 Cr
Expenditure1.53 Cr
% Valuation75.0%
Val Marks (20%)1.50
Exp Marks (20%)0.97
Claim Marks (25%)2.33
Bill Progress1.016
Bill Marks (25%)2.33
Geotag Marks (5%)0.480
Physical Marks (5%)0.50
Final score8.11 / 10
|
5.0%
6.41
CategoryJSJB 2.0
Total Works1,537
Target Works2,398
Achievement %64.1%
Weightage5% of composite score
Final score6.41 / 10
|
Scheme: โน Sanction Weighted
Level: District
Snapshot: 2026-07-02
Units shown: 52
โก Weight % shown is each unit's own auto-computed weight โ not the global admin-set value.
105
Day of campaign
103
Total days
0
Days remaining
Flat
Grading scheme
Campaign: 2026-03-19 โ 2026-06-30 ยท Grades based on raw combined achievement % โ no benchmark division.
Grade thresholds (raw combined %):
A โ On Track โฅ 80%
B โ Progressing โฅ 70%
C โ Lagging โฅ 60%
D โ Critical โฅ 0%
N/A No target
Grade distribution โ 52 districts on this snapshot:
4
A โ On Track
8
B โ Progressing
28
C โ Lagging
12
D โ Critical
๐ก Flat scheme: Score % = (total score / 10) ร 100. Grade assigned by comparing this % directly against fixed thresholds โ e.g., A+ โฅ 85%, A โฅ 80%.
โ๏ธ Step 1 โ Category Weightage
Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.
Weightage = Sanctioned Cost of Category
รท Total Sanctioned Cost (all categories)
e.g. Farm Pond = โน200 Cr out of โน500 Cr total
Weightage = 200 รท 500 = 0.40 (40%)
Computed independently per unit โ two districts with different sanction distributions will have different weightages for the same category.
๐ ฐ Step 2a โ Part A Score (Completion)
Fixed 50% weight on completion of works.
Part A = (Completed + Phys) รท Started ร 5
๐ ฑ Step 2b โ Part B Score (Expenditure)
Fixed 50% weight on expenditure booking on ongoing works.
Part B = (Ongoing Booked รท Ongoing Sanction) ร 5
If all done โ full 5 marks automatically
๐ Step 3 โ Ceiling & Model
Category Score = Part A + Part B
๐ Step 4 โ Final Composite Score
Weighted sum of all category scores (weightages sum to 100%).
Final Score = ฮฃ (Weightage_i ร Score_i)
Example: Farm Pond 40% ร 7.2 + Dug Well 20% ร 6.5 + Amrit Sarovar 40% ร 8.1 โ 7.42
๐ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.