JGSA 2026 โ Block-Level Category Scorecard
Snapshot: 2026-04-12 ยท Scheme: โน Sanction Weighted
KASRAWAD
7.31
๐ฅ
Completed353
Started1230
Rank#1
BALADI
7.26
๐ฅ
Completed208
Started455
Rank#2
HARSUD
7.18
๐ฅ
Completed436
Started1000
Rank#3
๐ Category Scorecard โ Block Level
313 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
| # | Block | District | Total |
๐ Trajectory raw achievement % |
Farm Pond | Amrit Sarowar | Dug Well Recharge | Irrigation infrastructure | Water conservation & recharge | Watershed Related Works | Repair & Maintenance (Water Structures) |
|---|---|---|---|---|---|---|---|---|---|---|---|
| ๐ฅ | KASRAWAD โ | KHARGONE | 7.31 | B |
21.5%
8.28
CategoryFarm Pond
Started / Completed / Phys322 / 112 / 167
Completion rate86.6%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.73Cr / 0.58Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score8.28 / 10
|
3.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
8.27
CategoryDug Well Recharge
Started / Completed / Phys559 / 194 / 295
Completion rate87.5%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.18Cr / 0.14Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score8.27 / 10
|
1.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
66.3%
6.65
CategoryWater conservation & recharge
Started / Completed / Phys338 / 43 / 126
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked9.09Cr / 7.54Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score6.65 / 10
|
0.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| ๐ฅ | BALADI โ | KHANDWA | 7.26 | B |
52.5%
7.83
CategoryFarm Pond
Started / Completed / Phys96 / 69 / 20
Completion rate92.7%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score7.83 / 10
|
5.0%
2.80
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score2.80 / 10
|
28.9%
7.18
CategoryDug Well Recharge
Started / Completed / Phys334 / 133 / 166
Completion rate89.5%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score7.18 / 10
|
โ |
11.7%
6.38
CategoryWater conservation & recharge
Started / Completed / Phys22 / 5 / 8
Completion rate59.1%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked0.16Cr / 0.11Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score6.38 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| ๐ฅ | HARSUD โ | KHANDWA | 7.18 | B |
42.2%
6.39
CategoryFarm Pond
Started / Completed / Phys185 / 118 / 52
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.29Cr / 0.10Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score6.39 / 10
|
โ |
24.6%
8.36
CategoryDug Well Recharge
Started / Completed / Phys756 / 291 / 442
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score8.36 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.2%
6.84
CategoryWater conservation & recharge
Started / Completed / Phys48 / 22 / 20
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.29Cr / 0.15Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.47 / 5.0
Final score6.84 / 10
|
2.9%
8.75
CategoryWatershed Related Works
Started / Completed / Phys6 / 4 / 1
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score8.75 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 4 | MEHANDWANI โ | DINDORI | 7.17 | B |
50.6%
6.83
CategoryFarm Pond
Started / Completed / Phys290 / 63 / 202
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.78Cr / 0.35Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score6.83 / 10
|
โ |
2.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys189 / 148 / 41
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.4%
8.61
CategoryWater conservation & recharge
Started / Completed / Phys89 / 4 / 71
Completion rate84.3%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked1.75Cr / 1.54Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score8.61 / 10
|
24.5%
6.51
CategoryWatershed Related Works
Started / Completed / Phys44 / 6 / 22
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked2.11Cr / 1.40Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.51 / 10
|
2.9%
6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score6.40 / 10
|
| 5 | PUNASA โ | KHANDWA | 7.13 | B |
47.3%
7.10
CategoryFarm Pond
Started / Completed / Phys342 / 83 / 230
Completion rate91.5%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.63Cr / 0.32Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.52 / 5.0
Final score7.10 / 10
|
2.5%
1.44
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.14Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.44 / 5.0
Final score1.44 / 10
|
14.9%
8.72
CategoryDug Well Recharge
Started / Completed / Phys1,132 / 246 / 847
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.89 / 5.0
Final score8.72 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
20.4%
6.86
CategoryWater conservation & recharge
Started / Completed / Phys114 / 10 / 76
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked1.02Cr / 0.63Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.09 / 5.0
Final score6.86 / 10
|
9.9%
7.08
CategoryWatershed Related Works
Started / Completed / Phys35 / 7 / 18
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.52Cr / 0.36Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.08 / 10
|
4.4%
6.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 8
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.33 / 10
|
| 6 | MAHIDPUR โ | UJJAIN | 7.12 | B |
29.6%
8.45
CategoryFarm Pond
Started / Completed / Phys92 / 35 / 46
Completion rate88.0%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.22Cr / 0.17Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score8.45 / 10
|
15.3%
2.90
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.00Cr / 0.58Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.90 / 5.0
Final score2.90 / 10
|
36.4%
7.99
CategoryDug Well Recharge
Started / Completed / Phys915 / 151 / 708
Completion rate93.9%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score7.99 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.4%
6.68
CategoryWater conservation & recharge
Started / Completed / Phys37 / 18 / 6
Completion rate64.9%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.43Cr / 0.30Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score6.68 / 10
|
2.3%
5.89
CategoryWatershed Related Works
Started / Completed / Phys6 / 4 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.55 / 5.0
Final score5.89 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 7 | CHHAIGAON MAKHAN โ | KHANDWA | 6.88 | C |
45.2%
7.09
CategoryFarm Pond
Started / Completed / Phys322 / 195 / 72
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked1.13Cr / 0.67Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score7.09 / 10
|
5.7%
5.01
CategoryAmrit Sarowar
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.62Cr / 0.46Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score5.01 / 10
|
15.8%
7.48
CategoryDug Well Recharge
Started / Completed / Phys838 / 712 / 86
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)54.3%
Part B score (max 5.0)2.72 / 5.0
Final score7.48 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.4%
7.09
CategoryWater conservation & recharge
Started / Completed / Phys83 / 30 / 25
Completion rate66.3%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked1.48Cr / 1.12Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score7.09 / 10
|
7.2%
5.23
CategoryWatershed Related Works
Started / Completed / Phys18 / 2 / 5
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked0.66Cr / 0.43Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score5.23 / 10
|
3.9%
5.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 4
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.22Cr / 0.14Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score5.91 / 10
|
| 8 | KHANDWA โ | KHANDWA | 6.87 | C |
34.6%
6.49
CategoryFarm Pond
Started / Completed / Phys286 / 113 / 136
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.76Cr / 0.32Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score6.49 / 10
|
8.4%
6.12
CategoryAmrit Sarowar
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.74Cr / 0.54Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score6.12 / 10
|
12.0%
8.39
CategoryDug Well Recharge
Started / Completed / Phys824 / 292 / 512
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score8.39 / 10
|
5.1%
7.35
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 5 / 6
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score7.35 / 10
|
20.7%
7.50
CategoryWater conservation & recharge
Started / Completed / Phys101 / 20 / 54
Completion rate73.3%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked1.59Cr / 1.22Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score7.50 / 10
|
18.7%
6.14
CategoryWatershed Related Works
Started / Completed / Phys45 / 5 / 22
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.33Cr / 0.84Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.14 / 10
|
0.6%
6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score6.16 / 10
|
| 9 | UJJAIN โ | UJJAIN | 6.83 | C |
36.0%
6.06
CategoryFarm Pond
Started / Completed / Phys84 / 6 / 61
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked0.28Cr / 0.11Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score6.06 / 10
|
5.4%
2.71
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score2.71 / 10
|
17.8%
8.54
CategoryDug Well Recharge
Started / Completed / Phys245 / 47 / 186
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score8.54 / 10
|
โ |
36.6%
7.17
CategoryWater conservation & recharge
Started / Completed / Phys43 / 7 / 25
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.57Cr / 0.39Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.17 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.1%
8.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)88.6%
Part B score (max 5.0)4.43 / 5.0
Final score8.18 / 10
|
| 10 | AMARPUR โ | DINDORI | 6.75 | C |
38.8%
6.95
CategoryFarm Pond
Started / Completed / Phys257 / 97 / 145
Completion rate94.2%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.45Cr / 0.20Cr
Expenditure rate (ongoing)44.8%
Part B score (max 5.0)2.24 / 5.0
Final score6.95 / 10
|
โ |
3.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys200 / 30 / 170
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.3%
5.74
CategoryWater conservation & recharge
Started / Completed / Phys60 / 3 / 16
Completion rate31.7%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked5.14Cr / 4.28Cr
Expenditure rate (ongoing)83.2%
Part B score (max 5.0)4.16 / 5.0
Final score5.74 / 10
|
15.3%
7.85
CategoryWatershed Related Works
Started / Completed / Phys31 / 23 / 4
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score7.85 / 10
|
9.6%
6.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 9 / 2
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.69Cr / 0.49Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score6.62 / 10
|
| 11 | PANDHANA โ | KHANDWA | 6.74 | C |
40.9%
7.30
CategoryFarm Pond
Started / Completed / Phys381 / 228 / 120
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.63Cr / 0.34Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score7.30 / 10
|
7.2%
2.36
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.75Cr / 0.83Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score2.36 / 10
|
12.3%
8.34
CategoryDug Well Recharge
Started / Completed / Phys1,155 / 442 / 638
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.19Cr / 0.14Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score8.34 / 10
|
0.9%
5.16
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score5.16 / 10
|
27.6%
6.67
CategoryWater conservation & recharge
Started / Completed / Phys148 / 25 / 72
Completion rate65.5%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked4.47Cr / 3.04Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score6.67 / 10
|
5.0%
5.77
CategoryWatershed Related Works
Started / Completed / Phys24 / 4 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.62Cr / 0.41Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score5.77 / 10
|
6.0%
6.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 1 / 9
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.83Cr / 0.66Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score6.25 / 10
|
| 12 | KHALAWA โ | KHANDWA | 6.67 | C |
27.9%
8.01
CategoryFarm Pond
Started / Completed / Phys384 / 116 / 254
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.37Cr / 0.24Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score8.01 / 10
|
5.1%
6.10
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.65Cr / 0.47Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score6.10 / 10
|
10.4%
8.69
CategoryDug Well Recharge
Started / Completed / Phys1,097 / 54 / 1,010
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score8.69 / 10
|
2.3%
4.02
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.53Cr / 0.30Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score4.02 / 10
|
39.7%
5.96
CategoryWater conservation & recharge
Started / Completed / Phys195 / 10 / 106
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked6.40Cr / 3.82Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.98 / 5.0
Final score5.96 / 10
|
10.5%
5.01
CategoryWatershed Related Works
Started / Completed / Phys44 / 2 / 17
Completion rate43.2%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked1.68Cr / 0.96Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score5.01 / 10
|
3.9%
5.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 4 / 6
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.46Cr / 0.24Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score5.79 / 10
|
| 13 | DINDORI โ | DINDORI | 6.66 | C |
39.9%
6.15
CategoryFarm Pond
Started / Completed / Phys455 / 115 / 250
Completion rate80.2%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked3.29Cr / 1.40Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.14 / 5.0
Final score6.15 / 10
|
โ |
1.7%
5.49
CategoryDug Well Recharge
Started / Completed / Phys239 / 162 / 74
Completion rate98.7%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)11.1%
Part B score (max 5.0)0.56 / 5.0
Final score5.49 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
31.8%
6.77
CategoryWater conservation & recharge
Started / Completed / Phys116 / 15 / 47
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked7.36Cr / 6.04Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score6.77 / 10
|
23.8%
7.34
CategoryWatershed Related Works
Started / Completed / Phys92 / 28 / 40
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked2.70Cr / 1.97Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score7.34 / 10
|
2.7%
7.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 7 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.33Cr / 0.24Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.63 / 5.0
Final score7.38 / 10
|
| 14 | ARON โ | GUNA | 6.46 | C |
51.2%
6.99
CategoryFarm Pond
Started / Completed / Phys379 / 231 / 67
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked2.86Cr / 1.75Cr
Expenditure rate (ongoing)61.2%
Part B score (max 5.0)3.06 / 5.0
Final score6.99 / 10
|
โ |
2.5%
9.00
CategoryDug Well Recharge
Started / Completed / Phys288 / 107 / 169
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)93.2%
Part B score (max 5.0)4.66 / 5.0
Final score9.00 / 10
|
โ |
42.3%
5.62
CategoryWater conservation & recharge
Started / Completed / Phys155 / 9 / 33
Completion rate27.1%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked9.74Cr / 8.30Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score5.62 / 10
|
3.1%
7.42
CategoryWatershed Related Works
Started / Completed / Phys11 / 3 / 3
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.49Cr / 0.46Cr
Expenditure rate (ongoing)93.9%
Part B score (max 5.0)4.69 / 5.0
Final score7.42 / 10
|
0.8%
5.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score5.51 / 10
|
| 15 | SOHAGPUR โ | NARMADAPURAM | 6.45 | C |
59.9%
4.76
CategoryFarm Pond
Started / Completed / Phys120 / 38 / 52
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.46Cr / 0.09Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score4.76 / 10
|
โ |
10.8%
6.16
CategoryDug Well Recharge
Started / Completed / Phys134 / 47 / 63
Completion rate82.1%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.06 / 5.0
Final score6.16 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
26.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys13 / 4 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 16 | BAJAG โ | DINDORI | 6.40 | C |
50.7%
5.99
CategoryFarm Pond
Started / Completed / Phys278 / 41 / 168
Completion rate75.2%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked2.77Cr / 1.23Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score5.99 / 10
|
โ |
3.2%
5.00
CategoryDug Well Recharge
Started / Completed / Phys245 / 41 / 202
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score5.00 / 10
|
โ |
33.0%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys71 / 1 / 37
Completion rate53.5%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked4.30Cr / 2.92Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score6.07 / 10
|
9.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys17 / 1 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.3%
6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.26Cr / 0.18Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.45 / 5.0
Final score6.79 / 10
|
| 17 | BHAGVANPURA โ | KHARGONE | 6.25 | C |
17.2%
6.84
CategoryFarm Pond
Started / Completed / Phys292 / 119 / 72
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked1.73Cr / 1.24Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score6.84 / 10
|
2.6%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.8%
7.22
CategoryDug Well Recharge
Started / Completed / Phys443 / 202 / 151
Completion rate79.7%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.23Cr / 0.15Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.23 / 5.0
Final score7.22 / 10
|
0.2%
4.02
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.52 / 5.0
Final score4.02 / 10
|
71.7%
5.84
CategoryWater conservation & recharge
Started / Completed / Phys215 / 31 / 57
Completion rate40.9%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked12.18Cr / 9.24Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score5.84 / 10
|
3.5%
7.65
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 7
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.27Cr / 0.23Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score7.65 / 10
|
1.0%
7.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.21Cr
Expenditure rate (ongoing)91.5%
Part B score (max 5.0)4.57 / 5.0
Final score7.57 / 10
|
| 18 | BHAINSDEHI โ | BETUL | 6.11 | C |
13.4%
8.45
CategoryFarm Pond
Started / Completed / Phys164 / 3 / 129
Completion rate80.5%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.50Cr / 0.44Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score8.45 / 10
|
3.0%
2.69
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.55Cr / 0.30Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.69 / 5.0
Final score2.69 / 10
|
5.2%
7.92
CategoryDug Well Recharge
Started / Completed / Phys371 / 28 / 298
Completion rate87.9%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score7.92 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
72.8%
5.71
CategoryWater conservation & recharge
Started / Completed / Phys201 / 7 / 80
Completion rate43.3%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked7.79Cr / 5.52Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score5.71 / 10
|
1.8%
4.35
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score4.35 / 10
|
3.8%
6.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 4 / 10
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score6.48 / 10
|
| 19 | BANKHEDI โ | NARMADAPURAM | 6.10 | C |
39.1%
3.32
CategoryFarm Pond
Started / Completed / Phys101 / 30 / 23
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.02Cr / 0.14Cr
Expenditure rate (ongoing)13.8%
Part B score (max 5.0)0.69 / 5.0
Final score3.32 / 10
|
โ |
6.5%
5.56
CategoryDug Well Recharge
Started / Completed / Phys119 / 66 / 31
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score5.56 / 10
|
0.8%
8.03
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 3 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score8.03 / 10
|
44.1%
7.78
CategoryWater conservation & recharge
Started / Completed / Phys47 / 30 / 8
Completion rate80.9%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.58Cr / 0.43Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.74 / 5.0
Final score7.78 / 10
|
4.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 10 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 8 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 20 | WARASEONI โ | BALAGHAT | 6.09 | C |
57.3%
5.68
CategoryFarm Pond
Started / Completed / Phys390 / 125 / 113
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked3.51Cr / 1.84Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score5.68 / 10
|
2.6%
3.44
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.34Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score3.44 / 10
|
1.5%
7.19
CategoryDug Well Recharge
Started / Completed / Phys114 / 55 / 42
Completion rate85.1%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.19 / 10
|
0.2%
5.60
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score5.60 / 10
|
34.3%
6.96
CategoryWater conservation & recharge
Started / Completed / Phys157 / 40 / 58
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked2.90Cr / 2.23Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score6.96 / 10
|
2.3%
5.18
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.38Cr / 0.30Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score5.18 / 10
|
1.8%
6.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 1
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.13Cr / 0.11Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score6.88 / 10
|
| 21 | PANAGAR โ | JABALPUR | 6.02 | C |
6.8%
0.84
CategoryFarm Pond
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.12Cr / 0.00Cr
Expenditure rate (ongoing)4.2%
Part B score (max 5.0)0.21 / 5.0
Final score0.84 / 10
|
โ |
0.6%
1.10
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
|
โ |
74.5%
6.97
CategoryWater conservation & recharge
Started / Completed / Phys12 / 9 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.93Cr / 0.60Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.22 / 5.0
Final score6.97 / 10
|
2.3%
6.72
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score6.72 / 10
|
15.8%
3.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score3.89 / 10
|
| 22 | LANJI โ | BALAGHAT | 6.01 | C |
57.6%
6.17
CategoryFarm Pond
Started / Completed / Phys369 / 124 / 96
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked3.44Cr / 2.20Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.17 / 10
|
4.1%
1.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.13Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
|
2.4%
8.15
CategoryDug Well Recharge
Started / Completed / Phys154 / 63 / 51
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)89.1%
Part B score (max 5.0)4.45 / 5.0
Final score8.15 / 10
|
โ |
31.5%
6.24
CategoryWater conservation & recharge
Started / Completed / Phys104 / 17 / 27
Completion rate42.3%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked3.24Cr / 2.67Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score6.24 / 10
|
2.7%
6.47
CategoryWatershed Related Works
Started / Completed / Phys14 / 3 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.20Cr / 0.16Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score6.47 / 10
|
1.7%
4.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score4.28 / 10
|
| 23 | SHAHPURA โ | DINDORI | 5.98 | D |
25.9%
5.65
CategoryFarm Pond
Started / Completed / Phys418 / 182 / 113
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked2.63Cr / 1.12Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score5.65 / 10
|
1.1%
0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
|
1.8%
5.00
CategoryDug Well Recharge
Started / Completed / Phys221 / 168 / 52
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.4%
Part B score (max 5.0)0.02 / 5.0
Final score5.00 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.2%
6.43
CategoryWater conservation & recharge
Started / Completed / Phys108 / 26 / 26
Completion rate48.1%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked7.09Cr / 5.71Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score6.43 / 10
|
30.5%
6.19
CategoryWatershed Related Works
Started / Completed / Phys98 / 26 / 25
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked4.65Cr / 3.34Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.19 / 10
|
6.9%
4.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 3
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.98Cr / 1.64Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score4.86 / 10
|
| 24 | ZIRANYA โ | KHARGONE | 5.97 | D |
13.5%
5.52
CategoryFarm Pond
Started / Completed / Phys299 / 49 / 106
Completion rate51.8%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked2.38Cr / 1.39Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score5.52 / 10
|
6.9%
6.97
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 7
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked1.00Cr / 0.76Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.97 / 10
|
3.2%
6.95
CategoryDug Well Recharge
Started / Completed / Phys451 / 196 / 136
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.31Cr / 0.20Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.95 / 10
|
0.3%
6.20
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score6.20 / 10
|
71.4%
5.87
CategoryWater conservation & recharge
Started / Completed / Phys313 / 13 / 107
Completion rate38.3%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked14.85Cr / 11.74Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score5.87 / 10
|
0.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.6%
6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 7 / 3
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked1.04Cr / 0.88Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score6.52 / 10
|
| 25 | SANCHI โ | RAISEN | 5.92 | D |
61.4%
6.65
CategoryFarm Pond
Started / Completed / Phys306 / 228 / 49
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.61Cr / 0.26Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score6.65 / 10
|
0.6%
1.31
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
|
3.9%
8.52
CategoryDug Well Recharge
Started / Completed / Phys160 / 151 / 6
Completion rate98.1%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score8.52 / 10
|
4.2%
4.08
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.36Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score4.08 / 10
|
28.4%
4.49
CategoryWater conservation & recharge
Started / Completed / Phys18 / 2 / 0
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked3.00Cr / 2.36Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score4.49 / 10
|
0.4%
1.90
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
|
1.2%
3.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score3.60 / 10
|
| 26 | KHARGONE โ | KHARGONE | 5.91 | D |
36.0%
4.89
CategoryFarm Pond
Started / Completed / Phys106 / 24 / 44
Completion rate64.2%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.89Cr / 0.30Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.89 / 10
|
8.5%
4.72
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.39Cr / 0.24Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score4.72 / 10
|
7.9%
7.15
CategoryDug Well Recharge
Started / Completed / Phys245 / 18 / 204
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score7.15 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
43.8%
6.57
CategoryWater conservation & recharge
Started / Completed / Phys47 / 6 / 29
Completion rate74.5%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.57 / 10
|
1.8%
5.56
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score5.56 / 10
|
1.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 27 | BARWAH โ | KHARGONE | 5.89 | D |
35.9%
4.37
CategoryFarm Pond
Started / Completed / Phys216 / 56 / 49
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked2.33Cr / 0.91Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.94 / 5.0
Final score4.37 / 10
|
1.8%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.5%
7.20
CategoryDug Well Recharge
Started / Completed / Phys720 / 99 / 494
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.31Cr / 0.19Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score7.20 / 10
|
1.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.4%
6.24
CategoryWater conservation & recharge
Started / Completed / Phys150 / 43 / 60
Completion rate68.7%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked1.57Cr / 0.88Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score6.24 / 10
|
7.9%
7.00
CategoryWatershed Related Works
Started / Completed / Phys26 / 8 / 12
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.31Cr / 0.19Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.00 / 10
|
1.5%
7.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score7.13 / 10
|
| 28 | BAMORI โ | GUNA | 5.83 | D |
25.9%
6.14
CategoryFarm Pond
Started / Completed / Phys84 / 74 / 0
Completion rate88.1%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.21Cr / 0.07Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score6.14 / 10
|
โ |
2.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys60 / 15 / 45
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
35.7%
5.19
CategoryWater conservation & recharge
Started / Completed / Phys13 / 3 / 3
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked1.20Cr / 0.69Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score5.19 / 10
|
5.2%
6.34
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score6.34 / 10
|
30.6%
5.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 3
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.93Cr / 0.68Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.89 / 10
|
| 29 | GHATIYA โ | UJJAIN | 5.76 | D |
41.2%
6.48
CategoryFarm Pond
Started / Completed / Phys68 / 28 / 29
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.24Cr / 0.11Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score6.48 / 10
|
18.7%
1.02
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.14Cr
Expenditure rate (ongoing)20.3%
Part B score (max 5.0)1.02 / 5.0
Final score1.02 / 10
|
21.6%
6.58
CategoryDug Well Recharge
Started / Completed / Phys306 / 74 / 215
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score6.58 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.4%
8.15
CategoryWater conservation & recharge
Started / Completed / Phys19 / 4 / 9
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.17Cr / 0.16Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.73 / 5.0
Final score8.15 / 10
|
1.5%
1.69
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score1.69 / 10
|
3.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 30 | TARANA โ | UJJAIN | 5.74 | D |
29.4%
6.95
CategoryFarm Pond
Started / Completed / Phys118 / 19 / 47
Completion rate55.9%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked1.00Cr / 0.83Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score6.95 / 10
|
20.5%
3.20
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.72Cr / 1.10Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.20 / 5.0
Final score3.20 / 10
|
24.6%
7.67
CategoryDug Well Recharge
Started / Completed / Phys834 / 559 / 151
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.31Cr / 0.21Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.42 / 5.0
Final score7.67 / 10
|
โ |
13.5%
4.77
CategoryWater conservation & recharge
Started / Completed / Phys45 / 12 / 1
Completion rate28.9%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked0.74Cr / 0.49Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score4.77 / 10
|
12.0%
4.24
CategoryWatershed Related Works
Started / Completed / Phys36 / 9 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.77Cr / 0.46Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score4.24 / 10
|
โ |
| 31 | MAHESHWAR โ | KHARGONE | 5.73 | D |
35.5%
5.05
CategoryFarm Pond
Started / Completed / Phys216 / 28 / 77
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked2.17Cr / 1.14Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score5.05 / 10
|
7.1%
3.73
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.81Cr / 0.60Cr
Expenditure rate (ongoing)74.5%
Part B score (max 5.0)3.73 / 5.0
Final score3.73 / 10
|
13.0%
6.19
CategoryDug Well Recharge
Started / Completed / Phys572 / 53 / 255
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.68Cr / 0.48Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score6.19 / 10
|
โ |
40.0%
6.50
CategoryWater conservation & recharge
Started / Completed / Phys111 / 10 / 54
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked2.28Cr / 1.65Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score6.50 / 10
|
1.2%
5.38
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.04 / 5.0
Final score5.38 / 10
|
3.1%
6.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score6.49 / 10
|
| 32 | BADI โ | RAISEN | 5.72 | D |
79.1%
5.84
CategoryFarm Pond
Started / Completed / Phys329 / 114 / 17
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked3.42Cr / 2.63Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.85 / 5.0
Final score5.84 / 10
|
โ |
7.3%
8.15
CategoryDug Well Recharge
Started / Completed / Phys183 / 52 / 78
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)91.9%
Part B score (max 5.0)4.60 / 5.0
Final score8.15 / 10
|
โ |
12.1%
3.65
CategoryWater conservation & recharge
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.79Cr / 0.57Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.65 / 10
|
0.4%
4.92
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)98.4%
Part B score (max 5.0)4.92 / 5.0
Final score4.92 / 10
|
1.1%
4.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)86.8%
Part B score (max 5.0)4.34 / 5.0
Final score4.34 / 10
|
| 33 | ZIRAPUR โ | RAJGARH | 5.72 | D |
24.8%
6.43
CategoryFarm Pond
Started / Completed / Phys479 / 311 / 117
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked1.09Cr / 0.43Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.96 / 5.0
Final score6.43 / 10
|
โ |
4.4%
5.77
CategoryDug Well Recharge
Started / Completed / Phys642 / 575 / 61
Completion rate99.1%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)16.4%
Part B score (max 5.0)0.82 / 5.0
Final score5.77 / 10
|
0.6%
5.19
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.19 / 10
|
63.6%
5.50
CategoryWater conservation & recharge
Started / Completed / Phys218 / 33 / 22
Completion rate25.2%
Part A score (max 5.0)1.26 / 5.0
Ongoing sanction / booked18.16Cr / 15.37Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score5.50 / 10
|
0.2%
3.59
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score3.59 / 10
|
6.4%
5.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 3 / 1
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked2.01Cr / 1.77Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score5.19 / 10
|
| 34 | GHUGHRI โ | MANDLA | 5.69 | D |
41.4%
7.17
CategoryFarm Pond
Started / Completed / Phys188 / 130 / 11
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked2.16Cr / 1.48Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.17 / 10
|
4.4%
1.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.24Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score1.49 / 10
|
2.2%
6.93
CategoryDug Well Recharge
Started / Completed / Phys154 / 112 / 3
Completion rate74.7%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.93 / 10
|
11.7%
2.58
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.14Cr / 1.10Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score2.58 / 10
|
37.7%
5.52
CategoryWater conservation & recharge
Started / Completed / Phys67 / 15 / 11
Completion rate38.8%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked5.23Cr / 3.75Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score5.52 / 10
|
2.3%
4.30
CategoryWatershed Related Works
Started / Completed / Phys15 / 1 / 2
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.23Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score4.30 / 10
|
0.4%
5.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score5.88 / 10
|
| 35 | ASHOKNAGAR โ | ASHOK NAGAR | 5.66 | D |
59.0%
5.57
CategoryFarm Pond
Started / Completed / Phys688 / 220 / 211
Completion rate62.6%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked7.03Cr / 3.43Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score5.57 / 10
|
1.5%
3.37
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.33Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
|
1.4%
7.10
CategoryDug Well Recharge
Started / Completed / Phys174 / 88 / 55
Completion rate82.2%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score7.10 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.1%
5.93
CategoryWater conservation & recharge
Started / Completed / Phys187 / 33 / 32
Completion rate34.8%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked7.00Cr / 5.87Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score5.93 / 10
|
2.7%
5.51
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.40Cr / 0.24Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score5.51 / 10
|
2.1%
4.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.52Cr / 0.40Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score4.43 / 10
|
| 36 | GAIRATGANJ โ | RAISEN | 5.64 | D |
54.3%
6.62
CategoryFarm Pond
Started / Completed / Phys350 / 182 / 14
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked3.36Cr / 2.57Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score6.62 / 10
|
4.1%
3.25
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score3.25 / 10
|
4.4%
8.53
CategoryDug Well Recharge
Started / Completed / Phys202 / 165 / 2
Completion rate82.7%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.40 / 5.0
Final score8.53 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
34.9%
4.05
CategoryWater conservation & recharge
Started / Completed / Phys86 / 6 / 0
Completion rate7.0%
Part A score (max 5.0)0.35 / 5.0
Ongoing sanction / booked3.93Cr / 2.91Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.70 / 5.0
Final score4.05 / 10
|
โ |
1.5%
2.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score2.56 / 10
|
| 37 | GOHPARU โ | SHAHDOL | 5.60 | D |
38.3%
4.44
CategoryFarm Pond
Started / Completed / Phys603 / 229 / 131
Completion rate59.7%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked5.78Cr / 1.68Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.46 / 5.0
Final score4.44 / 10
|
1.1%
2.16
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
|
0.8%
5.89
CategoryDug Well Recharge
Started / Completed / Phys98 / 15 / 54
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.37 / 5.0
Final score5.89 / 10
|
11.1%
7.10
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked2.71Cr / 2.69Cr
Expenditure rate (ongoing)99.1%
Part B score (max 5.0)4.96 / 5.0
Final score7.10 / 10
|
44.7%
6.40
CategoryWater conservation & recharge
Started / Completed / Phys202 / 5 / 84
Completion rate44.1%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked11.22Cr / 9.42Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score6.40 / 10
|
3.3%
4.17
CategoryWatershed Related Works
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.16Cr / 0.97Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score4.17 / 10
|
0.5%
6.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.13Cr / 0.12Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score6.18 / 10
|
| 38 | PUSHPRAJGARH โ | ANUPPUR | 5.60 | D |
74.2%
5.60
CategoryFarm Pond
Started / Completed / Phys1,443 / 948 / 175
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked8.91Cr / 3.05Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.60 / 10
|
โ |
0.6%
5.21
CategoryDug Well Recharge
Started / Completed / Phys124 / 48 / 6
Completion rate43.5%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.21 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.4%
5.87
CategoryWater conservation & recharge
Started / Completed / Phys190 / 47 / 28
Completion rate39.5%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked7.26Cr / 5.66Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score5.87 / 10
|
2.6%
5.30
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 4
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.19Cr / 1.00Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.30 / 10
|
2.7%
3.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.35Cr / 0.94Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score3.50 / 10
|
| 39 | SARANGPUR โ | RAJGARH | 5.58 | D |
44.7%
4.81
CategoryFarm Pond
Started / Completed / Phys181 / 115 / 3
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked1.86Cr / 0.58Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score4.81 / 10
|
โ |
13.6%
7.54
CategoryDug Well Recharge
Started / Completed / Phys615 / 475 / 62
Completion rate87.3%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.54 / 10
|
0.6%
5.19
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score5.19 / 10
|
22.9%
6.62
CategoryWater conservation & recharge
Started / Completed / Phys39 / 15 / 7
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked1.97Cr / 1.50Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score6.62 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.9%
4.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 3 / 2
Completion rate15.6%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked1.83Cr / 1.42Cr
Expenditure rate (ongoing)77.4%
Part B score (max 5.0)3.87 / 5.0
Final score4.65 / 10
|
| 40 | PATI โ | BARWANI | 5.54 | D |
16.1%
5.92
CategoryFarm Pond
Started / Completed / Phys216 / 4 / 108
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked1.16Cr / 0.77Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score5.92 / 10
|
โ |
13.6%
7.23
CategoryDug Well Recharge
Started / Completed / Phys711 / 18 / 511
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.47Cr / 0.33Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score7.23 / 10
|
โ |
46.2%
5.05
CategoryWater conservation & recharge
Started / Completed / Phys111 / 9 / 24
Completion rate29.7%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked4.03Cr / 2.87Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score5.05 / 10
|
20.8%
5.57
CategoryWatershed Related Works
Started / Completed / Phys50 / 2 / 21
Completion rate46.0%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked1.56Cr / 1.02Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score5.57 / 10
|
3.3%
3.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.31Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
|
| 41 | SAMNAPUR โ | DINDORI | 5.50 | D |
26.3%
5.36
CategoryFarm Pond
Started / Completed / Phys277 / 160 / 82
Completion rate87.4%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.66Cr / 0.13Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score5.36 / 10
|
โ |
2.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys187 / 128 / 59
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.2%
3.41
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score3.41 / 10
|
32.3%
7.00
CategoryWater conservation & recharge
Started / Completed / Phys69 / 13 / 26
Completion rate56.5%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked3.79Cr / 3.17Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score7.00 / 10
|
15.9%
6.20
CategoryWatershed Related Works
Started / Completed / Phys28 / 8 / 9
Completion rate60.7%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked1.56Cr / 0.99Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.17 / 5.0
Final score6.20 / 10
|
23.0%
2.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 2 / 2
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked4.28Cr / 0.35Cr
Expenditure rate (ongoing)8.2%
Part B score (max 5.0)0.41 / 5.0
Final score2.63 / 10
|
| 42 | KHAIRLANJI โ | BALAGHAT | 5.49 | D |
61.0%
5.44
CategoryFarm Pond
Started / Completed / Phys474 / 138 / 92
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked6.46Cr / 3.90Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score5.44 / 10
|
2.4%
1.16
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.11Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.16 / 5.0
Final score1.16 / 10
|
1.4%
7.09
CategoryDug Well Recharge
Started / Completed / Phys113 / 33 / 33
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.12Cr / 0.10Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score7.09 / 10
|
0.4%
4.18
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
|
33.4%
5.81
CategoryWater conservation & recharge
Started / Completed / Phys118 / 11 / 36
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked4.81Cr / 3.68Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score5.81 / 10
|
1.0%
5.52
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score5.52 / 10
|
0.4%
6.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)84.9%
Part B score (max 5.0)4.24 / 5.0
Final score6.74 / 10
|
| 43 | BETUL โ | BETUL | 5.46 | D |
29.8%
5.29
CategoryFarm Pond
Started / Completed / Phys145 / 0 / 76
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.86Cr / 1.00Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score5.29 / 10
|
6.5%
3.34
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.77Cr / 0.52Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
|
7.6%
7.57
CategoryDug Well Recharge
Started / Completed / Phys348 / 5 / 296
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score7.57 / 10
|
0.2%
4.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score4.22 / 10
|
36.3%
5.54
CategoryWater conservation & recharge
Started / Completed / Phys87 / 1 / 38
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked2.47Cr / 1.63Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score5.54 / 10
|
11.7%
4.74
CategoryWatershed Related Works
Started / Completed / Phys25 / 2 / 6
Completion rate32.0%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked1.04Cr / 0.65Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.14 / 5.0
Final score4.74 / 10
|
7.9%
6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.56 / 10
|
| 44 | NARSINGHGARH โ | RAJGARH | 5.46 | D |
41.3%
4.35
CategoryFarm Pond
Started / Completed / Phys263 / 130 / 22
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked3.19Cr / 0.93Cr
Expenditure rate (ongoing)29.2%
Part B score (max 5.0)1.46 / 5.0
Final score4.35 / 10
|
โ |
9.3%
7.54
CategoryDug Well Recharge
Started / Completed / Phys656 / 319 / 299
Completion rate94.2%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score7.54 / 10
|
1.2%
4.40
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score4.40 / 10
|
33.8%
6.33
CategoryWater conservation & recharge
Started / Completed / Phys163 / 34 / 55
Completion rate54.6%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked3.84Cr / 2.76Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.60 / 5.0
Final score6.33 / 10
|
0.9%
4.11
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 1
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score4.11 / 10
|
13.4%
5.42
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys31 / 3 / 8
Completion rate35.5%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked1.58Cr / 1.16Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score5.42 / 10
|
| 45 | BADNAGAR โ | UJJAIN | 5.46 | D |
59.9%
5.88
CategoryFarm Pond
Started / Completed / Phys180 / 27 / 115
Completion rate78.9%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.83Cr / 0.32Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score5.88 / 10
|
16.6%
1.93
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.24Cr / 0.48Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.93 / 5.0
Final score1.93 / 10
|
0.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 11 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.2%
6.88
CategoryWater conservation & recharge
Started / Completed / Phys19 / 4 / 9
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.51Cr / 0.35Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score6.88 / 10
|
1.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.6%
4.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.06Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score4.60 / 10
|
| 46 | BIAORA โ | RAJGARH | 5.44 | D |
40.5%
5.02
CategoryFarm Pond
Started / Completed / Phys460 / 269 / 33
Completion rate65.7%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked3.64Cr / 1.27Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score5.02 / 10
|
1.5%
4.99
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.40Cr
Expenditure rate (ongoing)99.7%
Part B score (max 5.0)4.99 / 5.0
Final score4.99 / 10
|
5.9%
7.64
CategoryDug Well Recharge
Started / Completed / Phys613 / 494 / 99
Completion rate96.7%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score7.64 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
5.29
CategoryWater conservation & recharge
Started / Completed / Phys158 / 22 / 31
Completion rate33.5%
Part A score (max 5.0)1.68 / 5.0
Ongoing sanction / booked5.20Cr / 3.76Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score5.29 / 10
|
โ |
16.1%
5.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 0 / 28
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked1.94Cr / 1.21Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score5.93 / 10
|
| 47 | NAINPUR โ | MANDLA | 5.42 | D |
59.1%
5.53
CategoryFarm Pond
Started / Completed / Phys337 / 208 / 11
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked5.53Cr / 2.53Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score5.53 / 10
|
4.3%
0.09
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.02Cr
Expenditure rate (ongoing)1.8%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
|
3.5%
5.25
CategoryDug Well Recharge
Started / Completed / Phys365 / 85 / 154
Completion rate65.5%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked0.32Cr / 0.13Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score5.25 / 10
|
3.9%
6.23
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.89Cr / 0.82Cr
Expenditure rate (ongoing)91.2%
Part B score (max 5.0)4.56 / 5.0
Final score6.23 / 10
|
25.8%
6.01
CategoryWater conservation & recharge
Started / Completed / Phys74 / 24 / 4
Completion rate37.8%
Part A score (max 5.0)1.89 / 5.0
Ongoing sanction / booked5.36Cr / 4.42Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score6.01 / 10
|
1.2%
3.14
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.20Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
|
2.2%
5.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 1
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score5.96 / 10
|
| 48 | PANSEMAL โ | BARWANI | 5.42 | D |
32.5%
5.65
CategoryFarm Pond
Started / Completed / Phys165 / 19 / 88
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.97Cr / 0.47Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score5.65 / 10
|
7.8%
2.41
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.55Cr / 0.13Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score2.41 / 10
|
6.2%
5.06
CategoryDug Well Recharge
Started / Completed / Phys227 / 7 / 149
Completion rate68.7%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.18Cr / 0.06Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score5.06 / 10
|
โ |
45.1%
5.73
CategoryWater conservation & recharge
Started / Completed / Phys76 / 2 / 25
Completion rate35.5%
Part A score (max 5.0)1.78 / 5.0
Ongoing sanction / booked3.02Cr / 2.39Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.96 / 5.0
Final score5.73 / 10
|
7.6%
5.83
CategoryWatershed Related Works
Started / Completed / Phys18 / 6 / 4
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.35Cr / 0.21Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score5.83 / 10
|
0.8%
6.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.07 / 5.0
Final score6.57 / 10
|
| 49 | ATHNER โ | BETUL | 5.42 | D |
12.6%
7.31
CategoryFarm Pond
Started / Completed / Phys167 / 15 / 86
Completion rate60.5%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.05Cr / 0.90Cr
Expenditure rate (ongoing)85.7%
Part B score (max 5.0)4.28 / 5.0
Final score7.31 / 10
|
4.3%
0.41
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.08Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score0.41 / 10
|
4.1%
8.14
CategoryDug Well Recharge
Started / Completed / Phys355 / 45 / 260
Completion rate85.9%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.85 / 5.0
Final score8.14 / 10
|
โ |
73.8%
5.24
CategoryWater conservation & recharge
Started / Completed / Phys225 / 6 / 65
Completion rate31.6%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked11.99Cr / 8.79Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score5.24 / 10
|
4.3%
5.62
CategoryWatershed Related Works
Started / Completed / Phys15 / 2 / 6
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.95 / 5.0
Final score5.62 / 10
|
1.0%
4.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 1 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score4.13 / 10
|
| 50 | REHLI โ | SAGAR | 5.39 | D |
35.8%
4.89
CategoryFarm Pond
Started / Completed / Phys280 / 82 / 56
Completion rate49.3%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked2.56Cr / 1.24Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score4.89 / 10
|
โ |
10.6%
5.87
CategoryDug Well Recharge
Started / Completed / Phys586 / 254 / 132
Completion rate65.9%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked0.48Cr / 0.25Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score5.87 / 10
|
1.6%
4.57
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.57 / 5.0
Final score4.57 / 10
|
31.3%
5.42
CategoryWater conservation & recharge
Started / Completed / Phys114 / 10 / 32
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked2.46Cr / 1.76Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score5.42 / 10
|
6.3%
6.79
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 9
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.30Cr / 0.22Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score6.79 / 10
|
14.4%
5.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 8
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.68Cr / 0.42Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score5.70 / 10
|
| 51 | MOHGAON โ | MANDLA | 5.37 | D |
35.7%
6.53
CategoryFarm Pond
Started / Completed / Phys151 / 103 / 0
Completion rate68.2%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked1.88Cr / 1.17Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score6.53 / 10
|
7.0%
0.52
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.15Cr / 0.12Cr
Expenditure rate (ongoing)10.4%
Part B score (max 5.0)0.52 / 5.0
Final score0.52 / 10
|
2.0%
6.06
CategoryDug Well Recharge
Started / Completed / Phys117 / 67 / 8
Completion rate64.1%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score6.06 / 10
|
7.3%
3.30
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.80Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score3.30 / 10
|
41.8%
5.63
CategoryWater conservation & recharge
Started / Completed / Phys97 / 26 / 2
Completion rate28.9%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked5.87Cr / 4.91Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.63 / 10
|
3.3%
4.29
CategoryWatershed Related Works
Started / Completed / Phys16 / 2 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.47Cr / 0.35Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score4.29 / 10
|
2.9%
5.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.27Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.09 / 5.0
Final score5.09 / 10
|
| 52 | KATNI โ | KATNI | 5.36 | D |
37.5%
3.65
CategoryFarm Pond
Started / Completed / Phys145 / 35 / 21
Completion rate38.6%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked3.20Cr / 1.10Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score3.65 / 10
|
5.0%
1.89
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.64Cr / 0.24Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score1.89 / 10
|
3.6%
4.32
CategoryDug Well Recharge
Started / Completed / Phys174 / 26 / 75
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked0.19Cr / 0.05Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score4.32 / 10
|
13.8%
7.34
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 0 / 14
Completion rate73.7%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.40Cr / 0.29Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.66 / 5.0
Final score7.34 / 10
|
11.3%
5.63
CategoryWater conservation & recharge
Started / Completed / Phys34 / 4 / 13
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.58Cr / 0.36Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score5.63 / 10
|
20.1%
7.55
CategoryWatershed Related Works
Started / Completed / Phys27 / 13 / 9
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score7.55 / 10
|
8.7%
6.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 3 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.34Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score6.65 / 10
|
| 53 | MANASA โ | NEEMUCH | 5.33 | D |
50.1%
4.22
CategoryFarm Pond
Started / Completed / Phys401 / 47 / 133
Completion rate44.9%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked8.47Cr / 3.34Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.97 / 5.0
Final score4.22 / 10
|
5.2%
6.03
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.66Cr / 0.42Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.03 / 10
|
6.8%
6.60
CategoryDug Well Recharge
Started / Completed / Phys763 / 454 / 185
Completion rate83.7%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score6.60 / 10
|
4.0%
5.87
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 2 / 9
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.34Cr / 0.19Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score5.87 / 10
|
32.4%
6.46
CategoryWater conservation & recharge
Started / Completed / Phys179 / 10 / 106
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked4.04Cr / 2.60Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score6.46 / 10
|
0.4%
2.55
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score2.55 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 54 | AMLA โ | BETUL | 5.32 | D |
28.6%
4.99
CategoryFarm Pond
Started / Completed / Phys215 / 13 / 71
Completion rate39.1%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked3.11Cr / 1.89Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.04 / 5.0
Final score4.99 / 10
|
โ |
6.5%
7.28
CategoryDug Well Recharge
Started / Completed / Phys437 / 48 / 247
Completion rate67.5%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.36Cr / 0.28Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score7.28 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
52.5%
5.14
CategoryWater conservation & recharge
Started / Completed / Phys128 / 2 / 27
Completion rate22.7%
Part A score (max 5.0)1.13 / 5.0
Ongoing sanction / booked7.02Cr / 5.63Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score5.14 / 10
|
7.3%
5.92
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 7
Completion rate38.1%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked0.79Cr / 0.64Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score5.92 / 10
|
5.0%
5.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 1 / 4
Completion rate26.3%
Part A score (max 5.0)1.32 / 5.0
Ongoing sanction / booked0.61Cr / 0.50Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.13 / 5.0
Final score5.44 / 10
|
| 55 | RAJPUR โ | BARWANI | 5.31 | D |
29.1%
4.75
CategoryFarm Pond
Started / Completed / Phys176 / 0 / 67
Completion rate38.1%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked1.01Cr / 0.58Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score4.75 / 10
|
4.0%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
16.8%
6.79
CategoryDug Well Recharge
Started / Completed / Phys398 / 0 / 280
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.31Cr / 0.20Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.79 / 10
|
1.4%
5.49
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 4 / 3
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.60 / 5.0
Final score5.49 / 10
|
20.3%
5.59
CategoryWater conservation & recharge
Started / Completed / Phys35 / 2 / 12
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.38Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.59 / 5.0
Final score5.59 / 10
|
26.0%
5.69
CategoryWatershed Related Works
Started / Completed / Phys38 / 1 / 22
Completion rate60.5%
Part A score (max 5.0)3.03 / 5.0
Ongoing sanction / booked0.72Cr / 0.38Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score5.69 / 10
|
2.4%
3.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 1
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score3.90 / 10
|
| 56 | KARANJIYA โ | DINDORI | 5.29 | D |
45.7%
5.91
CategoryFarm Pond
Started / Completed / Phys342 / 159 / 76
Completion rate68.7%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked3.85Cr / 1.91Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score5.91 / 10
|
3.5%
5.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.40Cr / 0.15Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
|
1.7%
7.92
CategoryDug Well Recharge
Started / Completed / Phys168 / 29 / 134
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score7.92 / 10
|
3.4%
3.99
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.70Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score3.99 / 10
|
41.1%
4.64
CategoryWater conservation & recharge
Started / Completed / Phys127 / 7 / 21
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked9.51Cr / 6.72Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score4.64 / 10
|
1.5%
6.13
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 6
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.25Cr / 0.16Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score6.13 / 10
|
3.1%
4.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.70Cr / 0.56Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score4.51 / 10
|
| 57 | BIRSA โ | BALAGHAT | 5.29 | D |
59.1%
5.66
CategoryFarm Pond
Started / Completed / Phys704 / 177 / 50
Completion rate32.2%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked14.07Cr / 11.40Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score5.66 / 10
|
1.4%
0.46
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.05Cr
Expenditure rate (ongoing)9.3%
Part B score (max 5.0)0.46 / 5.0
Final score0.46 / 10
|
0.9%
6.25
CategoryDug Well Recharge
Started / Completed / Phys125 / 12 / 34
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked0.21Cr / 0.18Cr
Expenditure rate (ongoing)88.3%
Part B score (max 5.0)4.41 / 5.0
Final score6.25 / 10
|
0.0%
5.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score5.00 / 10
|
36.4%
4.91
CategoryWater conservation & recharge
Started / Completed / Phys259 / 13 / 23
Completion rate13.9%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked11.94Cr / 10.05Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score4.91 / 10
|
1.5%
4.23
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 2
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.41Cr / 0.28Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score4.23 / 10
|
0.7%
4.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score4.73 / 10
|
| 58 | LALBARRA โ | BALAGHAT | 5.29 | D |
61.3%
5.61
CategoryFarm Pond
Started / Completed / Phys526 / 310 / 0
Completion rate58.9%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked5.60Cr / 2.98Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score5.61 / 10
|
1.9%
3.51
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
|
1.8%
7.44
CategoryDug Well Recharge
Started / Completed / Phys173 / 138 / 3
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score7.44 / 10
|
1.6%
5.93
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.35Cr / 0.33Cr
Expenditure rate (ongoing)93.7%
Part B score (max 5.0)4.68 / 5.0
Final score5.93 / 10
|
30.3%
4.59
CategoryWater conservation & recharge
Started / Completed / Phys176 / 22 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked6.35Cr / 5.04Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score4.59 / 10
|
1.6%
3.82
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.30Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score3.82 / 10
|
1.5%
6.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.16Cr / 0.14Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score6.90 / 10
|
| 59 | DHIMERKHEDA โ | KATNI | 5.25 | D |
19.0%
3.17
CategoryFarm Pond
Started / Completed / Phys317 / 67 / 47
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked3.51Cr / 0.97Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.37 / 5.0
Final score3.17 / 10
|
1.3%
4.14
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.33Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.14 / 10
|
0.8%
4.21
CategoryDug Well Recharge
Started / Completed / Phys96 / 38 / 21
Completion rate61.5%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked0.09Cr / 0.02Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score4.21 / 10
|
40.2%
5.84
CategoryIrrigation infrastructure
Started / Completed / Phys141 / 10 / 49
Completion rate41.8%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked7.15Cr / 5.36Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score5.84 / 10
|
13.3%
6.02
CategoryWater conservation & recharge
Started / Completed / Phys42 / 6 / 17
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked3.06Cr / 2.01Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score6.02 / 10
|
21.6%
5.68
CategoryWatershed Related Works
Started / Completed / Phys70 / 11 / 20
Completion rate44.3%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked4.33Cr / 3.00Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score5.68 / 10
|
3.8%
4.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 3
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.90Cr / 0.65Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score4.93 / 10
|
| 60 | MAJHGAWAN โ | SATNA | 5.25 | D |
42.8%
4.98
CategoryFarm Pond
Started / Completed / Phys456 / 12 / 150
Completion rate35.5%
Part A score (max 5.0)1.78 / 5.0
Ongoing sanction / booked8.35Cr / 5.35Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.20 / 5.0
Final score4.98 / 10
|
5.0%
1.66
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.50Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score1.66 / 10
|
1.6%
5.98
CategoryDug Well Recharge
Started / Completed / Phys200 / 27 / 58
Completion rate42.5%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked0.27Cr / 0.21Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score5.98 / 10
|
0.3%
4.48
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score4.48 / 10
|
42.5%
5.94
CategoryWater conservation & recharge
Started / Completed / Phys181 / 5 / 58
Completion rate34.8%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked9.94Cr / 8.34Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score5.94 / 10
|
5.7%
5.67
CategoryWatershed Related Works
Started / Completed / Phys39 / 0 / 15
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked1.17Cr / 0.88Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score5.67 / 10
|
2.1%
3.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 1
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked0.59Cr / 0.36Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score3.84 / 10
|
| 61 | MAWAI โ | MANDLA | 5.22 | D |
47.7%
6.32
CategoryFarm Pond
Started / Completed / Phys247 / 190 / 16
Completion rate83.4%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked1.79Cr / 0.77Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score6.32 / 10
|
5.4%
0.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.06Cr
Expenditure rate (ongoing)4.9%
Part B score (max 5.0)0.24 / 5.0
Final score0.24 / 10
|
1.8%
5.26
CategoryDug Well Recharge
Started / Completed / Phys153 / 41 / 10
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.26 / 10
|
2.3%
5.50
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.31Cr / 0.16Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.50 / 5.0
Final score5.50 / 10
|
36.3%
4.60
CategoryWater conservation & recharge
Started / Completed / Phys149 / 22 / 3
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked7.07Cr / 5.31Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score4.60 / 10
|
1.8%
5.62
CategoryWatershed Related Works
Started / Completed / Phys7 / 3 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score5.62 / 10
|
4.9%
4.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 1
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked1.08Cr / 0.86Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score4.28 / 10
|
| 62 | SILWANI โ | RAISEN | 5.21 | D |
69.3%
5.38
CategoryFarm Pond
Started / Completed / Phys442 / 138 / 1
Completion rate31.4%
Part A score (max 5.0)1.57 / 5.0
Ongoing sanction / booked5.16Cr / 3.92Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score5.38 / 10
|
5.6%
3.42
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.39Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
|
11.0%
7.39
CategoryDug Well Recharge
Started / Completed / Phys439 / 292 / 2
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked0.38Cr / 0.30Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.04 / 5.0
Final score7.39 / 10
|
โ |
11.4%
3.40
CategoryWater conservation & recharge
Started / Completed / Phys32 / 2 / 0
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked1.11Cr / 0.69Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score3.40 / 10
|
โ |
2.7%
3.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.28Cr / 0.18Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score3.29 / 10
|
| 63 | KEOLARI โ | SEONI | 5.20 | D |
64.1%
5.70
CategoryFarm Pond
Started / Completed / Phys505 / 328 / 0
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked5.17Cr / 2.54Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score5.70 / 10
|
1.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
3.4%
7.12
CategoryDug Well Recharge
Started / Completed / Phys302 / 237 / 0
Completion rate78.5%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score7.12 / 10
|
4.2%
3.92
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.99Cr / 0.77Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score3.92 / 10
|
16.2%
4.29
CategoryWater conservation & recharge
Started / Completed / Phys62 / 5 / 0
Completion rate8.1%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked3.66Cr / 2.84Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score4.29 / 10
|
7.7%
4.11
CategoryWatershed Related Works
Started / Completed / Phys31 / 2 / 0
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked1.71Cr / 1.30Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score4.11 / 10
|
3.0%
4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.59Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.22 / 5.0
Final score4.22 / 10
|
| 64 | BAIHAR โ | BALAGHAT | 5.18 | D |
57.1%
5.09
CategoryFarm Pond
Started / Completed / Phys731 / 97 / 108
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked14.39Cr / 10.62Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score5.09 / 10
|
2.1%
1.45
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.22Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.45 / 5.0
Final score1.45 / 10
|
1.1%
5.88
CategoryDug Well Recharge
Started / Completed / Phys131 / 63 / 7
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score5.88 / 10
|
โ |
38.0%
5.58
CategoryWater conservation & recharge
Started / Completed / Phys379 / 8 / 101
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked9.45Cr / 7.84Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score5.58 / 10
|
0.4%
3.48
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
|
1.2%
3.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.30Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
|
| 65 | KHACHAROD โ | UJJAIN | 5.17 | D |
35.9%
5.37
CategoryFarm Pond
Started / Completed / Phys105 / 54 / 45
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.15Cr / 0.02Cr
Expenditure rate (ongoing)13.1%
Part B score (max 5.0)0.65 / 5.0
Final score5.37 / 10
|
16.4%
1.46
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.26Cr
Expenditure rate (ongoing)29.2%
Part B score (max 5.0)1.46 / 5.0
Final score1.46 / 10
|
25.3%
5.43
CategoryDug Well Recharge
Started / Completed / Phys522 / 434 / 72
Completion rate96.9%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)11.7%
Part B score (max 5.0)0.59 / 5.0
Final score5.43 / 10
|
โ |
17.7%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys17 / 8 / 8
Completion rate94.1%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.12Cr / 0.04Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.80 / 5.0
Final score6.51 / 10
|
4.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 66 | JAMAI โ | CHHINDWARA | 5.16 | D |
24.4%
6.59
CategoryFarm Pond
Started / Completed / Phys472 / 236 / 51
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked4.22Cr / 2.99Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.55 / 5.0
Final score6.59 / 10
|
3.5%
0.94
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.29Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score0.94 / 10
|
2.8%
8.43
CategoryDug Well Recharge
Started / Completed / Phys466 / 197 / 176
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.21Cr
Expenditure rate (ongoing)88.5%
Part B score (max 5.0)4.42 / 5.0
Final score8.43 / 10
|
0.1%
3.90
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
|
62.5%
4.76
CategoryWater conservation & recharge
Started / Completed / Phys292 / 19 / 16
Completion rate12.0%
Part A score (max 5.0)0.60 / 5.0
Ongoing sanction / booked25.68Cr / 21.36Cr
Expenditure rate (ongoing)83.2%
Part B score (max 5.0)4.16 / 5.0
Final score4.76 / 10
|
4.9%
4.69
CategoryWatershed Related Works
Started / Completed / Phys25 / 3 / 1
Completion rate16.0%
Part A score (max 5.0)0.80 / 5.0
Ongoing sanction / booked1.77Cr / 1.38Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score4.69 / 10
|
1.9%
4.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 1 / 0
Completion rate9.1%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked0.76Cr / 0.60Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score4.40 / 10
|
| 67 | MAJHAULI โ | SIDHI | 5.15 | D |
50.5%
5.41
CategoryFarm Pond
Started / Completed / Phys356 / 220 / 0
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked3.46Cr / 1.61Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score5.41 / 10
|
โ |
1.4%
6.87
CategoryDug Well Recharge
Started / Completed / Phys96 / 69 / 0
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score6.87 / 10
|
1.5%
5.92
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.26Cr / 0.22Cr
Expenditure rate (ongoing)85.1%
Part B score (max 5.0)4.26 / 5.0
Final score5.92 / 10
|
35.6%
4.88
CategoryWater conservation & recharge
Started / Completed / Phys116 / 25 / 0
Completion rate21.6%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked5.50Cr / 4.18Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score4.88 / 10
|
7.7%
4.41
CategoryWatershed Related Works
Started / Completed / Phys13 / 1 / 0
Completion rate7.7%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked1.32Cr / 1.06Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score4.41 / 10
|
3.3%
4.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 0
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.48Cr / 0.24Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.49 / 5.0
Final score4.71 / 10
|
| 68 | NIWAS โ | MANDLA | 5.14 | D |
37.6%
6.17
CategoryFarm Pond
Started / Completed / Phys146 / 71 / 4
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked1.93Cr / 1.39Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score6.17 / 10
|
โ |
3.2%
5.26
CategoryDug Well Recharge
Started / Completed / Phys118 / 41 / 11
Completion rate44.1%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.17Cr / 0.10Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.06 / 5.0
Final score5.26 / 10
|
11.5%
3.79
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.11Cr / 0.84Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
|
31.9%
4.24
CategoryWater conservation & recharge
Started / Completed / Phys61 / 2 / 1
Completion rate4.9%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked2.87Cr / 2.29Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score4.24 / 10
|
1.3%
4.29
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score4.29 / 10
|
14.5%
5.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.25Cr / 1.22Cr
Expenditure rate (ongoing)97.8%
Part B score (max 5.0)4.89 / 5.0
Final score5.60 / 10
|
| 69 | PARASWADA โ | BALAGHAT | 5.14 | D |
55.0%
5.60
CategoryFarm Pond
Started / Completed / Phys510 / 226 / 4
Completion rate45.1%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked7.62Cr / 5.10Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score5.60 / 10
|
2.9%
2.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.33Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score2.20 / 10
|
1.6%
6.68
CategoryDug Well Recharge
Started / Completed / Phys167 / 108 / 1
Completion rate65.3%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score6.68 / 10
|
0.7%
4.52
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.17Cr
Expenditure rate (ongoing)90.4%
Part B score (max 5.0)4.52 / 5.0
Final score4.52 / 10
|
38.1%
4.65
CategoryWater conservation & recharge
Started / Completed / Phys208 / 18 / 0
Completion rate8.7%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked9.22Cr / 7.77Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score4.65 / 10
|
1.2%
5.98
CategoryWatershed Related Works
Started / Completed / Phys7 / 4 / 0
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.12 / 5.0
Final score5.98 / 10
|
0.6%
3.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)74.5%
Part B score (max 5.0)3.73 / 5.0
Final score3.73 / 10
|
| 70 | BIJADANDI โ | MANDLA | 5.14 | D |
35.1%
6.83
CategoryFarm Pond
Started / Completed / Phys151 / 100 / 17
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked1.00Cr / 0.59Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.96 / 5.0
Final score6.83 / 10
|
18.5%
1.47
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.28Cr / 0.67Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.47 / 5.0
Final score1.47 / 10
|
2.7%
6.78
CategoryDug Well Recharge
Started / Completed / Phys131 / 40 / 55
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score6.78 / 10
|
โ |
39.9%
5.20
CategoryWater conservation & recharge
Started / Completed / Phys60 / 10 / 5
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked4.24Cr / 3.36Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score5.20 / 10
|
3.7%
5.53
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score5.53 / 10
|
0.1%
4.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)81.2%
Part B score (max 5.0)4.06 / 5.0
Final score4.06 / 10
|
| 71 | MULTAI โ | BETUL | 5.11 | D |
41.0%
4.48
CategoryFarm Pond
Started / Completed / Phys153 / 4 / 51
Completion rate35.9%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked3.64Cr / 1.95Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score4.48 / 10
|
5.3%
1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.16Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
|
8.5%
6.77
CategoryDug Well Recharge
Started / Completed / Phys461 / 151 / 282
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.08 / 5.0
Final score6.77 / 10
|
0.0%
4.52
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)90.4%
Part B score (max 5.0)4.52 / 5.0
Final score4.52 / 10
|
38.9%
5.60
CategoryWater conservation & recharge
Started / Completed / Phys142 / 7 / 57
Completion rate45.1%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked3.27Cr / 2.18Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score5.60 / 10
|
3.4%
7.22
CategoryWatershed Related Works
Started / Completed / Phys18 / 1 / 13
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score7.22 / 10
|
2.9%
7.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 7
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.22Cr / 0.19Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score7.53 / 10
|
| 72 | CHAURAI โ | CHHINDWARA | 5.11 | D |
27.6%
5.40
CategoryFarm Pond
Started / Completed / Phys99 / 1 / 22
Completion rate23.2%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked2.37Cr / 2.01Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score5.40 / 10
|
3.5%
0.66
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
|
10.3%
6.98
CategoryDug Well Recharge
Started / Completed / Phys475 / 101 / 137
Completion rate50.1%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked0.58Cr / 0.52Cr
Expenditure rate (ongoing)89.4%
Part B score (max 5.0)4.47 / 5.0
Final score6.98 / 10
|
0.7%
5.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score5.22 / 10
|
35.0%
5.05
CategoryWater conservation & recharge
Started / Completed / Phys49 / 3 / 9
Completion rate24.5%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked3.08Cr / 2.36Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score5.05 / 10
|
20.8%
4.54
CategoryWatershed Related Works
Started / Completed / Phys37 / 6 / 2
Completion rate21.6%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked1.83Cr / 1.27Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score4.54 / 10
|
2.2%
5.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score5.99 / 10
|
| 73 | MUNGAOLI โ | ASHOK NAGAR | 5.10 | D |
41.4%
4.56
CategoryFarm Pond
Started / Completed / Phys413 / 24 / 118
Completion rate34.4%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked9.76Cr / 5.54Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score4.56 / 10
|
2.1%
3.28
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.49Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score3.28 / 10
|
1.1%
5.01
CategoryDug Well Recharge
Started / Completed / Phys147 / 39 / 21
Completion rate40.8%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked0.23Cr / 0.13Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score5.01 / 10
|
โ |
51.9%
5.63
CategoryWater conservation & recharge
Started / Completed / Phys395 / 42 / 75
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked14.15Cr / 11.74Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score5.63 / 10
|
2.5%
5.11
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.76Cr / 0.67Cr
Expenditure rate (ongoing)87.8%
Part B score (max 5.0)4.39 / 5.0
Final score5.11 / 10
|
1.0%
4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.30Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score4.26 / 10
|
| 74 | KUSMI โ | SIDHI | 5.09 | D |
33.5%
5.01
CategoryFarm Pond
Started / Completed / Phys375 / 195 / 0
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked4.07Cr / 1.96Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score5.01 / 10
|
โ |
0.9%
5.39
CategoryDug Well Recharge
Started / Completed / Phys88 / 55 / 0
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.39 / 10
|
6.7%
3.36
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.73Cr / 1.16Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
|
53.5%
5.32
CategoryWater conservation & recharge
Started / Completed / Phys186 / 56 / 0
Completion rate30.1%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked10.92Cr / 8.33Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.81 / 5.0
Final score5.32 / 10
|
1.1%
4.11
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.24Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score4.11 / 10
|
4.2%
5.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 8 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.67Cr
Expenditure rate (ongoing)77.4%
Part B score (max 5.0)3.87 / 5.0
Final score5.87 / 10
|
| 75 | GANGEV โ | REWA | 5.08 | D |
58.2%
4.34
CategoryFarm Pond
Started / Completed / Phys231 / 122 / 17
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked1.29Cr / 0.34Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score4.34 / 10
|
4.8%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.6%
4.83
CategoryDug Well Recharge
Started / Completed / Phys60 / 57 / 1
Completion rate96.7%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.83 / 10
|
โ |
25.7%
5.65
CategoryWater conservation & recharge
Started / Completed / Phys36 / 13 / 10
Completion rate63.9%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked0.45Cr / 0.22Cr
Expenditure rate (ongoing)49.2%
Part B score (max 5.0)2.46 / 5.0
Final score5.65 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 76 | GOGANWA โ | KHARGONE | 5.08 | D |
47.9%
3.99
CategoryFarm Pond
Started / Completed / Phys110 / 13 / 25
Completion rate34.5%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked1.29Cr / 0.58Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score3.99 / 10
|
7.8%
3.84
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.25Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
|
16.3%
7.23
CategoryDug Well Recharge
Started / Completed / Phys260 / 58 / 160
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score7.23 / 10
|
โ |
26.2%
5.86
CategoryWater conservation & recharge
Started / Completed / Phys21 / 4 / 5
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.65Cr / 0.48Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score5.86 / 10
|
0.3%
2.69
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score2.69 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 77 | SEGAON โ | KHARGONE | 5.07 | D |
22.2%
5.02
CategoryFarm Pond
Started / Completed / Phys116 / 0 / 41
Completion rate35.3%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked1.32Cr / 0.86Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score5.02 / 10
|
5.1%
4.63
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.42Cr
Expenditure rate (ongoing)92.6%
Part B score (max 5.0)4.63 / 5.0
Final score4.63 / 10
|
5.9%
7.27
CategoryDug Well Recharge
Started / Completed / Phys206 / 17 / 138
Completion rate75.2%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.27 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.8%
4.77
CategoryWater conservation & recharge
Started / Completed / Phys70 / 4 / 16
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked2.46Cr / 1.64Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.34 / 5.0
Final score4.77 / 10
|
26.4%
4.88
CategoryWatershed Related Works
Started / Completed / Phys28 / 3 / 7
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked1.44Cr / 0.89Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score4.88 / 10
|
2.1%
7.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.14Cr
Expenditure rate (ongoing)95.7%
Part B score (max 5.0)4.78 / 5.0
Final score7.28 / 10
|
| 78 | NEEMUCH โ | NEEMUCH | 5.06 | D |
41.7%
3.53
CategoryFarm Pond
Started / Completed / Phys202 / 17 / 66
Completion rate41.1%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.99Cr / 0.59Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.47 / 5.0
Final score3.53 / 10
|
4.9%
2.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.19Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score2.56 / 10
|
20.5%
5.91
CategoryDug Well Recharge
Started / Completed / Phys619 / 245 / 154
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.57Cr / 0.31Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score5.91 / 10
|
2.2%
8.65
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)89.7%
Part B score (max 5.0)4.49 / 5.0
Final score8.65 / 10
|
24.0%
7.00
CategoryWater conservation & recharge
Started / Completed / Phys49 / 3 / 38
Completion rate83.7%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.41Cr / 0.23Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.82 / 5.0
Final score7.00 / 10
|
2.4%
6.32
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.98 / 5.0
Final score6.32 / 10
|
4.3%
5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 5
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.25 / 5.0
Final score5.38 / 10
|
| 79 | TIMARNI โ | HARDA | 5.06 | D |
42.6%
3.41
CategoryFarm Pond
Started / Completed / Phys142 / 7 / 42
Completion rate34.5%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked1.73Cr / 0.58Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.68 / 5.0
Final score3.41 / 10
|
1.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
13.7%
6.64
CategoryDug Well Recharge
Started / Completed / Phys289 / 82 / 154
Completion rate81.7%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.55 / 5.0
Final score6.64 / 10
|
1.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
26.0%
6.58
CategoryWater conservation & recharge
Started / Completed / Phys56 / 0 / 37
Completion rate66.1%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked0.80Cr / 0.52Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.28 / 5.0
Final score6.58 / 10
|
4.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
10.2%
4.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 8
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.12Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.19 / 5.0
Final score4.19 / 10
|
| 80 | KESLA โ | NARMADAPURAM | 5.04 | D |
28.4%
2.17
CategoryFarm Pond
Started / Completed / Phys109 / 3 / 18
Completion rate19.3%
Part A score (max 5.0)0.96 / 5.0
Ongoing sanction / booked3.50Cr / 0.85Cr
Expenditure rate (ongoing)24.2%
Part B score (max 5.0)1.21 / 5.0
Final score2.17 / 10
|
7.8%
1.29
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.31Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score1.29 / 10
|
2.5%
6.38
CategoryDug Well Recharge
Started / Completed / Phys146 / 19 / 82
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score6.38 / 10
|
โ |
59.7%
6.82
CategoryWater conservation & recharge
Started / Completed / Phys121 / 32 / 50
Completion rate67.8%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked3.17Cr / 2.17Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score6.82 / 10
|
0.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.6%
5.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 1
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score5.39 / 10
|
| 81 | BHIKANGAON โ | KHARGONE | 5.03 | D |
44.1%
3.75
CategoryFarm Pond
Started / Completed / Phys181 / 31 / 27
Completion rate32.0%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked2.37Cr / 1.02Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score3.75 / 10
|
7.5%
2.99
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.35Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score2.99 / 10
|
13.6%
6.91
CategoryDug Well Recharge
Started / Completed / Phys415 / 135 / 184
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score6.91 / 10
|
โ |
34.8%
6.37
CategoryWater conservation & recharge
Started / Completed / Phys42 / 9 / 16
Completion rate59.5%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked1.15Cr / 0.78Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score6.37 / 10
|
โ | โ |
| 82 | RAGHOGARH โ | GUNA | 5.03 | D |
29.8%
4.06
CategoryFarm Pond
Started / Completed / Phys429 / 47 / 102
Completion rate34.7%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked5.06Cr / 2.35Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score4.06 / 10
|
โ |
6.2%
6.19
CategoryDug Well Recharge
Started / Completed / Phys598 / 139 / 388
Completion rate88.1%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.19 / 10
|
0.2%
4.27
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)85.5%
Part B score (max 5.0)4.27 / 5.0
Final score4.27 / 10
|
60.1%
5.40
CategoryWater conservation & recharge
Started / Completed / Phys301 / 29 / 60
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked10.24Cr / 8.04Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score5.40 / 10
|
2.1%
4.92
CategoryWatershed Related Works
Started / Completed / Phys10 / 3 / 1
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.18Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.92 / 5.0
Final score4.92 / 10
|
1.7%
5.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score5.11 / 10
|
| 83 | BARWANI โ | BARWANI | 5.03 | D |
49.6%
5.05
CategoryFarm Pond
Started / Completed / Phys152 / 7 / 79
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.87Cr / 0.39Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score5.05 / 10
|
5.1%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
17.2%
6.32
CategoryDug Well Recharge
Started / Completed / Phys263 / 23 / 192
Completion rate81.7%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score6.32 / 10
|
โ |
14.4%
5.38
CategoryWater conservation & recharge
Started / Completed / Phys23 / 2 / 8
Completion rate43.5%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked0.30Cr / 0.19Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.20 / 5.0
Final score5.38 / 10
|
13.7%
4.82
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 4
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.31Cr / 0.16Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score4.82 / 10
|
โ |
| 84 | RAJGARH โ | RAJGARH | 5.02 | D |
19.2%
5.93
CategoryFarm Pond
Started / Completed / Phys457 / 299 / 101
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked1.17Cr / 0.36Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score5.93 / 10
|
1.5%
2.60
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.39Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score2.60 / 10
|
2.8%
7.52
CategoryDug Well Recharge
Started / Completed / Phys569 / 462 / 65
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.52 / 10
|
0.5%
3.67
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score3.67 / 10
|
69.5%
4.75
CategoryWater conservation & recharge
Started / Completed / Phys315 / 16 / 15
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked33.49Cr / 28.55Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score4.75 / 10
|
0.6%
4.62
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 0
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked0.29Cr / 0.20Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score4.62 / 10
|
5.8%
4.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 2 / 2
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked2.62Cr / 2.20Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.20 / 5.0
Final score4.69 / 10
|
| 85 | NEWALI โ | BARWANI | 5.00 | D |
25.9%
4.39
CategoryFarm Pond
Started / Completed / Phys90 / 9 / 20
Completion rate32.2%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked0.88Cr / 0.49Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score4.39 / 10
|
โ |
13.4%
7.36
CategoryDug Well Recharge
Started / Completed / Phys265 / 1 / 202
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked0.16Cr / 0.11Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.36 / 10
|
โ |
52.5%
4.73
CategoryWater conservation & recharge
Started / Completed / Phys79 / 16 / 10
Completion rate32.9%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked1.72Cr / 1.06Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.09 / 5.0
Final score4.73 / 10
|
7.8%
4.91
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 2
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.26Cr / 0.14Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score4.91 / 10
|
0.4%
2.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score2.60 / 10
|
| 86 | HARAI โ | CHHINDWARA | 5.00 | D |
43.4%
5.83
CategoryFarm Pond
Started / Completed / Phys396 / 140 / 43
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked4.34Cr / 3.05Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score5.83 / 10
|
โ |
4.9%
7.13
CategoryDug Well Recharge
Started / Completed / Phys327 / 105 / 79
Completion rate56.3%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked0.37Cr / 0.32Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.32 / 5.0
Final score7.13 / 10
|
โ |
40.8%
4.11
CategoryWater conservation & recharge
Started / Completed / Phys148 / 7 / 6
Completion rate8.8%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked6.54Cr / 4.81Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.11 / 10
|
10.3%
4.11
CategoryWatershed Related Works
Started / Completed / Phys26 / 3 / 0
Completion rate11.5%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked1.59Cr / 1.13Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score4.11 / 10
|
0.5%
2.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score2.92 / 10
|
| 87 | PATERA โ | DAMOH | 4.99 | D |
17.5%
4.96
CategoryFarm Pond
Started / Completed / Phys291 / 57 / 23
Completion rate27.5%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked4.74Cr / 3.40Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score4.96 / 10
|
โ |
1.7%
6.33
CategoryDug Well Recharge
Started / Completed / Phys247 / 77 / 66
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.27Cr / 0.19Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score6.33 / 10
|
0.6%
4.59
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.21Cr
Expenditure rate (ongoing)91.8%
Part B score (max 5.0)4.59 / 5.0
Final score4.59 / 10
|
54.3%
4.69
CategoryWater conservation & recharge
Started / Completed / Phys214 / 7 / 23
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked19.03Cr / 15.20Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score4.69 / 10
|
19.0%
5.72
CategoryWatershed Related Works
Started / Completed / Phys102 / 15 / 20
Completion rate34.3%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked4.85Cr / 3.88Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score5.72 / 10
|
6.9%
5.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 4 / 2
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked2.11Cr / 1.77Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.10 / 10
|
| 88 | SIRONJ โ | VIDISHA | 4.97 | D |
41.7%
5.50
CategoryFarm Pond
Started / Completed / Phys351 / 164 / 36
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked3.23Cr / 1.71Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score5.50 / 10
|
4.6%
2.10
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.84Cr / 0.35Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.10 / 5.0
Final score2.10 / 10
|
3.4%
6.54
CategoryDug Well Recharge
Started / Completed / Phys235 / 94 / 75
Completion rate71.9%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.17Cr / 0.10Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score6.54 / 10
|
โ |
47.0%
4.61
CategoryWater conservation & recharge
Started / Completed / Phys214 / 45 / 15
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked6.45Cr / 4.14Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score4.61 / 10
|
1.8%
6.58
CategoryWatershed Related Works
Started / Completed / Phys21 / 11 / 0
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked0.20Cr / 0.16Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score6.58 / 10
|
1.5%
4.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.14Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score4.66 / 10
|
| 89 | MOHKHED โ | CHHINDWARA | 4.96 | D |
20.0%
6.76
CategoryFarm Pond
Started / Completed / Phys131 / 7 / 84
Completion rate69.5%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked0.68Cr / 0.45Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score6.76 / 10
|
โ |
8.8%
7.51
CategoryDug Well Recharge
Started / Completed / Phys383 / 29 / 331
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score7.51 / 10
|
0.4%
2.91
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.91 / 5.0
Final score2.91 / 10
|
44.9%
4.07
CategoryWater conservation & recharge
Started / Completed / Phys60 / 1 / 4
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked4.89Cr / 3.57Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score4.07 / 10
|
23.3%
4.53
CategoryWatershed Related Works
Started / Completed / Phys43 / 7 / 1
Completion rate18.6%
Part A score (max 5.0)0.93 / 5.0
Ongoing sanction / booked2.07Cr / 1.49Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score4.53 / 10
|
2.5%
2.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.28Cr / 0.11Cr
Expenditure rate (ongoing)40.6%
Part B score (max 5.0)2.03 / 5.0
Final score2.03 / 10
|
| 90 | BINA โ | SAGAR | 4.96 | D |
37.1%
2.43
CategoryFarm Pond
Started / Completed / Phys124 / 19 / 11
Completion rate24.2%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked1.45Cr / 0.35Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score2.43 / 10
|
โ |
10.0%
5.18
CategoryDug Well Recharge
Started / Completed / Phys417 / 346 / 33
Completion rate90.9%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)12.6%
Part B score (max 5.0)0.63 / 5.0
Final score5.18 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
50.0%
6.76
CategoryWater conservation & recharge
Started / Completed / Phys39 / 3 / 23
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.65Cr / 0.44Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score6.76 / 10
|
โ |
2.8%
5.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score5.51 / 10
|
| 91 | THIKRI โ | BARWANI | 4.96 | D |
71.1%
4.64
CategoryFarm Pond
Started / Completed / Phys147 / 0 / 71
Completion rate48.3%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked1.55Cr / 0.69Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score4.64 / 10
|
โ |
7.0%
4.88
CategoryDug Well Recharge
Started / Completed / Phys106 / 2 / 100
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)1.4%
Part B score (max 5.0)0.07 / 5.0
Final score4.88 / 10
|
โ |
9.7%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys14 / 7 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.94 / 5.0
Final score6.51 / 10
|
12.2%
5.62
CategoryWatershed Related Works
Started / Completed / Phys11 / 6 / 3
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score5.62 / 10
|
โ |
| 92 | BEGUMGANJ โ | RAISEN | 4.93 | D |
52.8%
5.16
CategoryFarm Pond
Started / Completed / Phys432 / 101 / 47
Completion rate34.3%
Part A score (max 5.0)1.71 / 5.0
Ongoing sanction / booked7.48Cr / 5.15Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score5.16 / 10
|
2.2%
3.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.26Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score3.00 / 10
|
4.5%
7.16
CategoryDug Well Recharge
Started / Completed / Phys336 / 172 / 46
Completion rate64.9%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.30Cr / 0.24Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score7.16 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.3%
4.40
CategoryWater conservation & recharge
Started / Completed / Phys64 / 6 / 1
Completion rate10.9%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked6.93Cr / 5.33Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score4.40 / 10
|
0.2%
1.97
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.97 / 5.0
Final score1.97 / 10
|
0.2%
4.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score4.27 / 10
|
| 93 | VIDISHA โ | VIDISHA | 4.88 | D |
58.4%
4.08
CategoryFarm Pond
Started / Completed / Phys271 / 165 / 11
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked2.31Cr / 0.39Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.83 / 5.0
Final score4.08 / 10
|
3.7%
0.24
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.02Cr
Expenditure rate (ongoing)4.7%
Part B score (max 5.0)0.24 / 5.0
Final score0.24 / 10
|
4.0%
6.49
CategoryDug Well Recharge
Started / Completed / Phys164 / 105 / 52
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)34.0%
Part B score (max 5.0)1.70 / 5.0
Final score6.49 / 10
|
โ |
29.9%
6.79
CategoryWater conservation & recharge
Started / Completed / Phys76 / 41 / 10
Completion rate67.1%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked2.21Cr / 1.52Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score6.79 / 10
|
1.0%
5.48
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score5.48 / 10
|
3.0%
4.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.22Cr / 0.16Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score4.92 / 10
|
| 94 | BURHANPUR โ | BURHANPUR | 4.86 | D |
26.2%
5.99
CategoryFarm Pond
Started / Completed / Phys268 / 101 / 51
Completion rate56.7%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked2.07Cr / 1.31Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score5.99 / 10
|
8.7%
3.35
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.48Cr / 0.99Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score3.35 / 10
|
6.8%
8.03
CategoryDug Well Recharge
Started / Completed / Phys447 / 219 / 160
Completion rate84.8%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score8.03 / 10
|
โ |
53.5%
4.16
CategoryWater conservation & recharge
Started / Completed / Phys133 / 2 / 12
Completion rate10.5%
Part A score (max 5.0)0.53 / 5.0
Ongoing sanction / booked7.67Cr / 5.58Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.63 / 5.0
Final score4.16 / 10
|
3.5%
5.23
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 2
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.46Cr / 0.34Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score5.23 / 10
|
1.2%
3.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.15Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
|
| 95 | NATERAN โ | VIDISHA | 4.85 | D |
54.3%
4.40
CategoryFarm Pond
Started / Completed / Phys320 / 129 / 64
Completion rate60.3%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked3.79Cr / 1.05Cr
Expenditure rate (ongoing)27.7%
Part B score (max 5.0)1.39 / 5.0
Final score4.40 / 10
|
2.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
7.1%
6.76
CategoryDug Well Recharge
Started / Completed / Phys484 / 80 / 293
Completion rate77.1%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.90 / 5.0
Final score6.76 / 10
|
0.4%
5.80
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 3 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score5.80 / 10
|
35.3%
5.47
CategoryWater conservation & recharge
Started / Completed / Phys144 / 41 / 25
Completion rate45.8%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked3.32Cr / 2.11Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score5.47 / 10
|
0.4%
4.77
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)95.4%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
|
0.3%
1.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score1.71 / 10
|
| 96 | MANDLA โ | MANDLA | 4.82 | D |
54.8%
5.15
CategoryFarm Pond
Started / Completed / Phys288 / 112 / 5
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked7.54Cr / 4.71Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score5.15 / 10
|
โ |
2.6%
4.15
CategoryDug Well Recharge
Started / Completed / Phys235 / 57 / 32
Completion rate37.9%
Part A score (max 5.0)1.89 / 5.0
Ongoing sanction / booked0.38Cr / 0.17Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.26 / 5.0
Final score4.15 / 10
|
11.9%
3.49
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked2.76Cr / 1.58Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score3.49 / 10
|
23.8%
4.83
CategoryWater conservation & recharge
Started / Completed / Phys102 / 15 / 5
Completion rate19.6%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked4.81Cr / 3.71Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score4.83 / 10
|
5.0%
5.30
CategoryWatershed Related Works
Started / Completed / Phys31 / 4 / 4
Completion rate25.8%
Part A score (max 5.0)1.29 / 5.0
Ongoing sanction / booked0.93Cr / 0.75Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.01 / 5.0
Final score5.30 / 10
|
1.8%
2.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.25Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score2.98 / 10
|
| 97 | PIPARIYA โ | NARMADAPURAM | 4.82 | D |
54.4%
2.94
CategoryFarm Pond
Started / Completed / Phys98 / 39 / 0
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked1.08Cr / 0.20Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.95 / 5.0
Final score2.94 / 10
|
โ |
9.2%
5.59
CategoryDug Well Recharge
Started / Completed / Phys122 / 79 / 0
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score5.59 / 10
|
โ |
34.0%
7.42
CategoryWater conservation & recharge
Started / Completed / Phys34 / 24 / 1
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.78Cr / 0.58Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.74 / 5.0
Final score7.42 / 10
|
1.1%
4.75
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score4.75 / 10
|
1.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 98 | ANUPPUR โ | ANUPPUR | 4.81 | D |
75.2%
4.56
CategoryFarm Pond
Started / Completed / Phys596 / 345 / 41
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked4.56Cr / 1.21Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.33 / 5.0
Final score4.56 / 10
|
โ |
1.6%
4.09
CategoryDug Well Recharge
Started / Completed / Phys108 / 20 / 8
Completion rate25.9%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score4.09 / 10
|
โ |
20.3%
5.53
CategoryWater conservation & recharge
Started / Completed / Phys78 / 17 / 19
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked1.80Cr / 1.16Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score5.53 / 10
|
โ |
2.8%
6.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.27Cr / 0.22Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score6.57 / 10
|
| 99 | BICHHIYA โ | MANDLA | 4.80 | D |
36.7%
5.43
CategoryFarm Pond
Started / Completed / Phys346 / 172 / 0
Completion rate49.7%
Part A score (max 5.0)2.49 / 5.0
Ongoing sanction / booked7.28Cr / 4.29Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score5.43 / 10
|
4.1%
3.03
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 0.97Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
|
2.0%
5.05
CategoryDug Well Recharge
Started / Completed / Phys292 / 76 / 79
Completion rate53.1%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.35Cr / 0.17Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.39 / 5.0
Final score5.05 / 10
|
11.0%
3.73
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 0
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked4.27Cr / 2.90Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score3.73 / 10
|
39.1%
4.77
CategoryWater conservation & recharge
Started / Completed / Phys269 / 42 / 6
Completion rate17.8%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked13.66Cr / 10.59Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score4.77 / 10
|
2.9%
4.75
CategoryWatershed Related Works
Started / Completed / Phys24 / 4 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.01Cr / 0.79Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score4.75 / 10
|
4.3%
4.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 2 / 0
Completion rate11.8%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked1.50Cr / 1.05Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score4.10 / 10
|
| 100 | BALAGHAT โ | BALAGHAT | 4.80 | D |
58.9%
4.95
CategoryFarm Pond
Started / Completed / Phys357 / 139 / 19
Completion rate44.3%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked5.15Cr / 2.82Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score4.95 / 10
|
3.0%
0.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.03Cr
Expenditure rate (ongoing)6.0%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
|
2.0%
6.59
CategoryDug Well Recharge
Started / Completed / Phys137 / 66 / 15
Completion rate59.1%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)72.6%
Part B score (max 5.0)3.63 / 5.0
Final score6.59 / 10
|
โ |
32.5%
4.90
CategoryWater conservation & recharge
Started / Completed / Phys75 / 10 / 7
Completion rate22.7%
Part A score (max 5.0)1.13 / 5.0
Ongoing sanction / booked4.75Cr / 3.58Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score4.90 / 10
|
2.2%
4.43
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.20Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.43 / 5.0
Final score4.43 / 10
|
1.4%
3.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score3.59 / 10
|
| 101 | PRABHAT PATTAN โ | BETUL | 4.79 | D |
29.2%
4.19
CategoryFarm Pond
Started / Completed / Phys196 / 8 / 52
Completion rate30.6%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked3.61Cr / 1.92Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score4.19 / 10
|
1.6%
0.16
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.01Cr
Expenditure rate (ongoing)3.2%
Part B score (max 5.0)0.16 / 5.0
Final score0.16 / 10
|
7.9%
6.73
CategoryDug Well Recharge
Started / Completed / Phys538 / 89 / 347
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.26Cr / 0.14Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.73 / 10
|
โ |
57.2%
5.00
CategoryWater conservation & recharge
Started / Completed / Phys144 / 5 / 34
Completion rate27.1%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked7.68Cr / 5.61Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score5.00 / 10
|
1.8%
4.51
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 2
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score4.51 / 10
|
2.2%
3.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 2
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.26Cr / 0.13Cr
Expenditure rate (ongoing)50.0%
Part B score (max 5.0)2.50 / 5.0
Final score3.93 / 10
|
| 102 | KIRNAPUR โ | BALAGHAT | 4.77 | D |
65.7%
4.53
CategoryFarm Pond
Started / Completed / Phys457 / 99 / 86
Completion rate40.5%
Part A score (max 5.0)2.02 / 5.0
Ongoing sanction / booked6.71Cr / 3.36Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score4.53 / 10
|
3.6%
0.55
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.08Cr
Expenditure rate (ongoing)11.1%
Part B score (max 5.0)0.55 / 5.0
Final score0.55 / 10
|
2.0%
6.54
CategoryDug Well Recharge
Started / Completed / Phys155 / 44 / 34
Completion rate50.3%
Part A score (max 5.0)2.52 / 5.0
Ongoing sanction / booked0.20Cr / 0.16Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score6.54 / 10
|
โ |
26.2%
5.59
CategoryWater conservation & recharge
Started / Completed / Phys114 / 11 / 31
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked3.45Cr / 2.59Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.74 / 5.0
Final score5.59 / 10
|
1.4%
6.62
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.13Cr / 0.11Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score6.62 / 10
|
1.1%
7.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score7.78 / 10
|
| 103 | SIDHI โ | SIDHI | 4.75 | D |
43.2%
4.69
CategoryFarm Pond
Started / Completed / Phys485 / 217 / 0
Completion rate44.7%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked6.98Cr / 3.42Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score4.69 / 10
|
โ |
1.1%
5.01
CategoryDug Well Recharge
Started / Completed / Phys130 / 64 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.17Cr / 0.08Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.51 / 5.0
Final score5.01 / 10
|
0.8%
4.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.21Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.22 / 10
|
41.5%
4.98
CategoryWater conservation & recharge
Started / Completed / Phys279 / 48 / 0
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked10.99Cr / 9.06Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score4.98 / 10
|
9.1%
4.18
CategoryWatershed Related Works
Started / Completed / Phys57 / 10 / 0
Completion rate17.5%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked2.26Cr / 1.49Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score4.18 / 10
|
4.3%
4.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 4 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.12Cr / 0.78Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score4.33 / 10
|
| 104 | SEONI โ | SEONI | 4.73 | D |
19.7%
4.95
CategoryFarm Pond
Started / Completed / Phys121 / 44 / 0
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked2.09Cr / 1.31Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.14 / 5.0
Final score4.95 / 10
|
โ |
6.6%
5.60
CategoryDug Well Recharge
Started / Completed / Phys434 / 127 / 13
Completion rate32.3%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked0.75Cr / 0.60Cr
Expenditure rate (ongoing)79.6%
Part B score (max 5.0)3.98 / 5.0
Final score5.60 / 10
|
3.0%
5.68
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 3 / 0
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.31Cr / 0.23Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score5.68 / 10
|
41.4%
4.47
CategoryWater conservation & recharge
Started / Completed / Phys114 / 20 / 0
Completion rate17.5%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked6.26Cr / 4.49Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score4.47 / 10
|
24.5%
4.74
CategoryWatershed Related Works
Started / Completed / Phys96 / 25 / 0
Completion rate26.0%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked3.11Cr / 2.14Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score4.74 / 10
|
4.8%
4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 3 / 0
Completion rate23.1%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked0.67Cr / 0.42Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.11 / 5.0
Final score4.26 / 10
|
| 105 | GHATIGAON โ | GWALIOR | 4.72 | D |
31.9%
3.48
CategoryFarm Pond
Started / Completed / Phys176 / 16 / 27
Completion rate24.4%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked5.29Cr / 2.39Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score3.48 / 10
|
5.3%
1.47
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.17Cr / 0.34Cr
Expenditure rate (ongoing)29.4%
Part B score (max 5.0)1.47 / 5.0
Final score1.47 / 10
|
1.8%
6.32
CategoryDug Well Recharge
Started / Completed / Phys149 / 81 / 28
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score6.32 / 10
|
6.1%
6.51
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 2 / 3
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.87Cr / 0.74Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score6.51 / 10
|
44.7%
5.70
CategoryWater conservation & recharge
Started / Completed / Phys101 / 7 / 28
Completion rate34.7%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked7.58Cr / 6.01Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.97 / 5.0
Final score5.70 / 10
|
8.3%
4.85
CategoryWatershed Related Works
Started / Completed / Phys31 / 4 / 6
Completion rate32.3%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked1.24Cr / 0.81Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score4.85 / 10
|
1.9%
3.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.18Cr / 0.08Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.21 / 5.0
Final score3.87 / 10
|
| 106 | KATANGI โ | BALAGHAT | 4.71 | D |
62.4%
4.45
CategoryFarm Pond
Started / Completed / Phys462 / 74 / 70
Completion rate31.2%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked8.33Cr / 4.82Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score4.45 / 10
|
2.3%
1.86
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.17Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
|
1.9%
6.58
CategoryDug Well Recharge
Started / Completed / Phys148 / 41 / 51
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.58 / 10
|
0.5%
6.90
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score6.90 / 10
|
32.3%
5.28
CategoryWater conservation & recharge
Started / Completed / Phys146 / 5 / 36
Completion rate28.1%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked5.06Cr / 3.92Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score5.28 / 10
|
0.1%
3.49
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
|
0.5%
4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
|
| 107 | JAISINAGAR โ | SAGAR | 4.69 | D |
55.7%
3.61
CategoryFarm Pond
Started / Completed / Phys93 / 44 / 0
Completion rate47.3%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked1.63Cr / 0.41Cr
Expenditure rate (ongoing)25.0%
Part B score (max 5.0)1.25 / 5.0
Final score3.61 / 10
|
โ |
18.6%
6.74
CategoryDug Well Recharge
Started / Completed / Phys383 / 319 / 0
Completion rate83.3%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score6.74 / 10
|
โ |
22.9%
5.56
CategoryWater conservation & recharge
Started / Completed / Phys19 / 8 / 0
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.54Cr / 0.37Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.45 / 5.0
Final score5.56 / 10
|
2.8%
5.30
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score5.30 / 10
|
โ |
| 108 | OBEDULLAHGANJ โ | RAISEN | 4.67 | D |
49.1%
5.02
CategoryFarm Pond
Started / Completed / Phys208 / 38 / 29
Completion rate32.2%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked3.23Cr / 2.21Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score5.02 / 10
|
1.6%
2.87
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score2.87 / 10
|
4.1%
7.74
CategoryDug Well Recharge
Started / Completed / Phys149 / 73 / 29
Completion rate68.5%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.12Cr / 0.11Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score7.74 / 10
|
1.0%
1.71
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score1.71 / 10
|
26.6%
3.83
CategoryWater conservation & recharge
Started / Completed / Phys23 / 1 / 0
Completion rate4.3%
Part A score (max 5.0)0.22 / 5.0
Ongoing sanction / booked2.48Cr / 1.79Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score3.83 / 10
|
16.6%
4.54
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.55Cr / 1.41Cr
Expenditure rate (ongoing)90.8%
Part B score (max 5.0)4.54 / 5.0
Final score4.54 / 10
|
1.0%
5.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.25 / 10
|
| 109 | BAHORIBAND โ | KATNI | 4.66 | D |
36.8%
4.43
CategoryFarm Pond
Started / Completed / Phys392 / 98 / 78
Completion rate44.9%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked3.34Cr / 1.46Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score4.43 / 10
|
โ |
4.4%
5.21
CategoryDug Well Recharge
Started / Completed / Phys284 / 104 / 57
Completion rate56.7%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)47.4%
Part B score (max 5.0)2.37 / 5.0
Final score5.21 / 10
|
6.0%
4.36
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.01Cr / 0.88Cr
Expenditure rate (ongoing)87.3%
Part B score (max 5.0)4.36 / 5.0
Final score4.36 / 10
|
22.5%
5.28
CategoryWater conservation & recharge
Started / Completed / Phys52 / 6 / 9
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked3.18Cr / 2.44Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score5.28 / 10
|
25.5%
4.56
CategoryWatershed Related Works
Started / Completed / Phys73 / 7 / 5
Completion rate16.4%
Part A score (max 5.0)0.82 / 5.0
Ongoing sanction / booked3.45Cr / 2.57Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.74 / 5.0
Final score4.56 / 10
|
4.7%
4.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.79Cr / 0.64Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score4.01 / 10
|
| 110 | KHAKNAR โ | BURHANPUR | 4.66 | D |
48.9%
4.57
CategoryFarm Pond
Started / Completed / Phys429 / 76 / 79
Completion rate36.1%
Part A score (max 5.0)1.81 / 5.0
Ongoing sanction / booked5.60Cr / 3.09Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score4.57 / 10
|
3.6%
3.91
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.48Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score3.91 / 10
|
10.9%
6.61
CategoryDug Well Recharge
Started / Completed / Phys739 / 187 / 303
Completion rate66.3%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked0.63Cr / 0.42Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score6.61 / 10
|
0.0%
4.90
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)98.1%
Part B score (max 5.0)4.90 / 5.0
Final score4.90 / 10
|
30.3%
4.33
CategoryWater conservation & recharge
Started / Completed / Phys154 / 9 / 26
Completion rate22.7%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked3.95Cr / 2.53Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score4.33 / 10
|
5.0%
3.99
CategoryWatershed Related Works
Started / Completed / Phys25 / 1 / 1
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked0.80Cr / 0.57Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score3.99 / 10
|
1.4%
4.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.15Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score4.01 / 10
|
| 111 | GHORA DONGRI โ | BETUL | 4.61 | D |
20.9%
4.84
CategoryFarm Pond
Started / Completed / Phys222 / 28 / 77
Completion rate47.3%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked4.95Cr / 2.45Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score4.84 / 10
|
2.6%
3.56
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.81Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score3.56 / 10
|
2.7%
7.90
CategoryDug Well Recharge
Started / Completed / Phys458 / 165 / 206
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score7.90 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
72.5%
4.45
CategoryWater conservation & recharge
Started / Completed / Phys348 / 5 / 40
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked29.36Cr / 22.36Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.81 / 5.0
Final score4.45 / 10
|
0.1%
4.10
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.10 / 10
|
1.1%
4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.40Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.22 / 10
|
| 112 | PETLAWAD โ | JHABUA | 4.60 | D |
10.9%
3.16
CategoryFarm Pond
Started / Completed / Phys272 / 20 / 1
Completion rate7.7%
Part A score (max 5.0)0.39 / 5.0
Ongoing sanction / booked4.33Cr / 2.40Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.78 / 5.0
Final score3.16 / 10
|
1.4%
0.66
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.08Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
|
5.0%
4.92
CategoryDug Well Recharge
Started / Completed / Phys832 / 243 / 15
Completion rate31.0%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked1.48Cr / 1.00Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score4.92 / 10
|
0.1%
4.20
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score4.20 / 10
|
75.7%
4.87
CategoryWater conservation & recharge
Started / Completed / Phys372 / 11 / 36
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked28.42Cr / 24.11Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score4.87 / 10
|
4.1%
4.04
CategoryWatershed Related Works
Started / Completed / Phys50 / 0 / 9
Completion rate18.0%
Part A score (max 5.0)0.90 / 5.0
Ongoing sanction / booked1.34Cr / 0.84Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score4.04 / 10
|
2.8%
5.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 0 / 3
Completion rate17.6%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked1.03Cr / 0.87Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score5.12 / 10
|
| 113 | KESLI โ | SAGAR | 4.60 | D |
27.6%
4.44
CategoryFarm Pond
Started / Completed / Phys180 / 74 / 0
Completion rate41.1%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked1.93Cr / 0.92Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score4.44 / 10
|
โ |
8.4%
5.07
CategoryDug Well Recharge
Started / Completed / Phys386 / 108 / 32
Completion rate36.3%
Part A score (max 5.0)1.81 / 5.0
Ongoing sanction / booked0.64Cr / 0.42Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.07 / 10
|
0.2%
8.26
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)98.6%
Part B score (max 5.0)4.93 / 5.0
Final score8.26 / 10
|
47.0%
4.53
CategoryWater conservation & recharge
Started / Completed / Phys164 / 12 / 5
Completion rate10.4%
Part A score (max 5.0)0.52 / 5.0
Ongoing sanction / booked4.89Cr / 3.93Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score4.53 / 10
|
14.1%
4.79
CategoryWatershed Related Works
Started / Completed / Phys31 / 2 / 0
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked1.54Cr / 1.37Cr
Expenditure rate (ongoing)89.4%
Part B score (max 5.0)4.47 / 5.0
Final score4.79 / 10
|
2.7%
4.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.31Cr / 0.25Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score4.64 / 10
|
| 114 | BHITARWAR โ | GWALIOR | 4.59 | D |
41.4%
2.95
CategoryFarm Pond
Started / Completed / Phys264 / 23 / 48
Completion rate26.9%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked5.45Cr / 1.75Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score2.95 / 10
|
3.8%
0.57
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.08Cr
Expenditure rate (ongoing)11.3%
Part B score (max 5.0)0.57 / 5.0
Final score0.57 / 10
|
3.9%
5.82
CategoryDug Well Recharge
Started / Completed / Phys270 / 60 / 113
Completion rate64.1%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score5.82 / 10
|
7.9%
7.24
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 1 / 9
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.67Cr / 0.55Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.11 / 5.0
Final score7.24 / 10
|
32.2%
5.90
CategoryWater conservation & recharge
Started / Completed / Phys94 / 14 / 31
Completion rate47.9%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked2.69Cr / 1.89Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score5.90 / 10
|
5.5%
5.18
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 5
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked0.62Cr / 0.41Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.18 / 10
|
5.3%
6.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 1 / 7
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.26Cr / 0.18Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score6.85 / 10
|
| 115 | TONK KHURD โ | DEWAS | 4.59 | D |
41.9%
3.81
CategoryFarm Pond
Started / Completed / Phys95 / 15 / 9
Completion rate25.3%
Part A score (max 5.0)1.26 / 5.0
Ongoing sanction / booked2.37Cr / 1.21Cr
Expenditure rate (ongoing)50.9%
Part B score (max 5.0)2.55 / 5.0
Final score3.81 / 10
|
3.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
13.7%
6.07
CategoryDug Well Recharge
Started / Completed / Phys396 / 73 / 144
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.46Cr / 0.31Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.07 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.4%
5.43
CategoryWater conservation & recharge
Started / Completed / Phys77 / 2 / 22
Completion rate31.2%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked2.34Cr / 1.82Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score5.43 / 10
|
5.6%
4.36
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.39Cr / 0.23Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score4.36 / 10
|
2.4%
3.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.13Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score3.53 / 10
|
| 116 | DEORI โ | SAGAR | 4.58 | D |
45.2%
3.26
CategoryFarm Pond
Started / Completed / Phys325 / 48 / 31
Completion rate24.3%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked5.51Cr / 2.25Cr
Expenditure rate (ongoing)40.8%
Part B score (max 5.0)2.04 / 5.0
Final score3.26 / 10
|
โ |
6.9%
5.32
CategoryDug Well Recharge
Started / Completed / Phys425 / 142 / 79
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.52Cr / 0.29Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score5.32 / 10
|
1.3%
5.51
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 1 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score5.51 / 10
|
39.0%
5.60
CategoryWater conservation & recharge
Started / Completed / Phys181 / 46 / 47
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked2.45Cr / 1.48Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score5.60 / 10
|
6.5%
6.11
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.27Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.11 / 10
|
1.1%
8.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)87.4%
Part B score (max 5.0)4.37 / 5.0
Final score8.12 / 10
|
| 117 | CHANDERI โ | ASHOK NAGAR | 4.57 | D |
44.2%
4.20
CategoryFarm Pond
Started / Completed / Phys243 / 20 / 44
Completion rate26.3%
Part A score (max 5.0)1.32 / 5.0
Ongoing sanction / booked4.60Cr / 2.65Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score4.20 / 10
|
โ |
1.6%
6.31
CategoryDug Well Recharge
Started / Completed / Phys100 / 41 / 14
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score6.31 / 10
|
0.5%
4.41
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score4.41 / 10
|
35.1%
4.72
CategoryWater conservation & recharge
Started / Completed / Phys151 / 9 / 18
Completion rate17.9%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked4.32Cr / 3.30Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score4.72 / 10
|
12.2%
5.43
CategoryWatershed Related Works
Started / Completed / Phys13 / 1 / 1
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked1.47Cr / 1.37Cr
Expenditure rate (ongoing)93.1%
Part B score (max 5.0)4.66 / 5.0
Final score5.43 / 10
|
6.4%
4.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 0
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked0.88Cr / 0.70Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score4.29 / 10
|
| 118 | JAWAD โ | NEEMUCH | 4.57 | D |
32.9%
2.72
CategoryFarm Pond
Started / Completed / Phys198 / 3 / 28
Completion rate15.7%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked2.88Cr / 1.12Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score2.72 / 10
|
1.0%
1.58
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
|
16.0%
5.41
CategoryDug Well Recharge
Started / Completed / Phys613 / 82 / 245
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.74Cr / 0.40Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score5.41 / 10
|
1.1%
6.10
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.10 / 10
|
39.8%
5.66
CategoryWater conservation & recharge
Started / Completed / Phys90 / 0 / 49
Completion rate54.4%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked1.65Cr / 0.97Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.94 / 5.0
Final score5.66 / 10
|
2.0%
4.71
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score4.71 / 10
|
7.3%
5.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 2 / 7
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.34Cr / 0.21Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score5.26 / 10
|
| 119 | SAWER โ | INDORE | 4.56 | D |
55.8%
4.49
CategoryFarm Pond
Started / Completed / Phys112 / 42 / 18
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked0.86Cr / 0.31Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score4.49 / 10
|
4.4%
0.01
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score0.01 / 10
|
2.3%
6.99
CategoryDug Well Recharge
Started / Completed / Phys188 / 155 / 1
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score6.99 / 10
|
โ |
25.3%
5.57
CategoryWater conservation & recharge
Started / Completed / Phys27 / 13 / 3
Completion rate59.3%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked0.24Cr / 0.13Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score5.57 / 10
|
4.2%
5.47
CategoryWatershed Related Works
Started / Completed / Phys5 / 2 / 1
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score5.47 / 10
|
7.9%
3.20
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.19Cr / 0.06Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score3.20 / 10
|
| 120 | KAILARAS โ | MORENA | 4.56 | D |
12.1%
5.79
CategoryFarm Pond
Started / Completed / Phys469 / 321 / 5
Completion rate69.5%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked3.05Cr / 1.41Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score5.79 / 10
|
โ |
0.3%
5.24
CategoryDug Well Recharge
Started / Completed / Phys117 / 89 / 0
Completion rate76.1%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)28.8%
Part B score (max 5.0)1.44 / 5.0
Final score5.24 / 10
|
1.7%
4.58
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.53Cr / 1.40Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score4.58 / 10
|
77.3%
4.38
CategoryWater conservation & recharge
Started / Completed / Phys469 / 5 / 0
Completion rate1.1%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked68.21Cr / 59.03Cr
Expenditure rate (ongoing)86.5%
Part B score (max 5.0)4.33 / 5.0
Final score4.38 / 10
|
6.4%
4.51
CategoryWatershed Related Works
Started / Completed / Phys38 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.70Cr / 5.14Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score4.51 / 10
|
2.1%
4.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.89Cr / 1.61Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score4.25 / 10
|
| 121 | SHAHPUR โ | BETUL | 4.56 | D |
10.8%
5.24
CategoryFarm Pond
Started / Completed / Phys120 / 1 / 66
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked1.21Cr / 0.59Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score5.24 / 10
|
1.7%
2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.17Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
|
4.1%
7.44
CategoryDug Well Recharge
Started / Completed / Phys355 / 21 / 265
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.42 / 5.0
Final score7.44 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
76.1%
4.41
CategoryWater conservation & recharge
Started / Completed / Phys225 / 3 / 31
Completion rate15.1%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked15.29Cr / 11.19Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.66 / 5.0
Final score4.41 / 10
|
0.7%
5.06
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score5.06 / 10
|
6.6%
3.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 2
Completion rate5.7%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked1.43Cr / 1.05Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score3.96 / 10
|
| 122 | GYARASPUR โ | VIDISHA | 4.55 | D |
72.3%
4.05
CategoryFarm Pond
Started / Completed / Phys271 / 133 / 16
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked3.60Cr / 0.93Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.30 / 5.0
Final score4.05 / 10
|
โ |
8.4%
6.25
CategoryDug Well Recharge
Started / Completed / Phys346 / 87 / 179
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.21Cr / 0.10Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score6.25 / 10
|
0.0%
2.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score2.84 / 10
|
17.2%
5.85
CategoryWater conservation & recharge
Started / Completed / Phys75 / 21 / 22
Completion rate57.3%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked0.96Cr / 0.57Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.98 / 5.0
Final score5.85 / 10
|
โ |
2.1%
4.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score4.56 / 10
|
| 123 | MAJHOULI โ | JABALPUR | 4.55 | D |
19.2%
2.86
CategoryFarm Pond
Started / Completed / Phys112 / 13 / 15
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked2.41Cr / 0.78Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score2.86 / 10
|
7.9%
2.57
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.58Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score2.57 / 10
|
0.2%
4.55
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.55 / 10
|
โ |
15.2%
5.40
CategoryWater conservation & recharge
Started / Completed / Phys32 / 7 / 5
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked1.64Cr / 1.16Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score5.40 / 10
|
57.2%
5.17
CategoryWatershed Related Works
Started / Completed / Phys112 / 33 / 10
Completion rate38.4%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked5.01Cr / 3.25Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score5.17 / 10
|
0.3%
3.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
|
| 124 | KURWAI โ | VIDISHA | 4.55 | D |
66.1%
3.92
CategoryFarm Pond
Started / Completed / Phys300 / 160 / 11
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked2.82Cr / 0.60Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.07 / 5.0
Final score3.92 / 10
|
1.9%
1.55
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.06Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score1.55 / 10
|
2.8%
5.14
CategoryDug Well Recharge
Started / Completed / Phys109 / 28 / 47
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)33.9%
Part B score (max 5.0)1.70 / 5.0
Final score5.14 / 10
|
1.1%
6.86
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 17 / 0
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.86 / 10
|
24.5%
5.86
CategoryWater conservation & recharge
Started / Completed / Phys76 / 37 / 3
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked0.99Cr / 0.64Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score5.86 / 10
|
2.0%
5.57
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score5.57 / 10
|
1.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 125 | DAMOH โ | DAMOH | 4.54 | D |
17.3%
5.39
CategoryFarm Pond
Started / Completed / Phys230 / 99 / 4
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked2.90Cr / 1.82Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score5.39 / 10
|
1.1%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
3.5%
6.10
CategoryDug Well Recharge
Started / Completed / Phys433 / 144 / 36
Completion rate41.6%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.65Cr / 0.52Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score6.10 / 10
|
0.1%
4.86
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)97.3%
Part B score (max 5.0)4.86 / 5.0
Final score4.86 / 10
|
56.9%
4.49
CategoryWater conservation & recharge
Started / Completed / Phys201 / 9 / 8
Completion rate8.5%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked17.88Cr / 14.55Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score4.49 / 10
|
11.2%
4.44
CategoryWatershed Related Works
Started / Completed / Phys70 / 4 / 2
Completion rate8.6%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked3.12Cr / 2.51Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.02 / 5.0
Final score4.44 / 10
|
9.9%
3.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.20Cr / 2.21Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.45 / 10
|
| 126 | BARGHAT โ | SEONI | 4.53 | D |
56.3%
4.77
CategoryFarm Pond
Started / Completed / Phys441 / 134 / 0
Completion rate30.4%
Part A score (max 5.0)1.52 / 5.0
Ongoing sanction / booked8.88Cr / 5.77Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.77 / 10
|
โ |
3.0%
3.89
CategoryDug Well Recharge
Started / Completed / Phys260 / 37 / 0
Completion rate14.2%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.57Cr / 0.36Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score3.89 / 10
|
0.6%
3.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.09Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score3.75 / 10
|
32.4%
4.30
CategoryWater conservation & recharge
Started / Completed / Phys139 / 12 / 0
Completion rate8.6%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked6.58Cr / 5.09Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.86 / 5.0
Final score4.30 / 10
|
5.6%
4.31
CategoryWatershed Related Works
Started / Completed / Phys24 / 3 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked1.04Cr / 0.76Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score4.31 / 10
|
2.2%
3.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.35Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score3.65 / 10
|
| 127 | KHILCHIPUR โ | RAJGARH | 4.53 | D |
12.1%
4.49
CategoryFarm Pond
Started / Completed / Phys450 / 204 / 51
Completion rate56.7%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked3.38Cr / 1.12Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score4.49 / 10
|
โ |
2.5%
7.43
CategoryDug Well Recharge
Started / Completed / Phys609 / 391 / 104
Completion rate81.3%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.30Cr / 0.20Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.43 / 10
|
2.9%
3.47
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.89Cr / 1.32Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
|
66.6%
4.51
CategoryWater conservation & recharge
Started / Completed / Phys300 / 14 / 7
Completion rate7.0%
Part A score (max 5.0)0.35 / 5.0
Ongoing sanction / booked41.73Cr / 34.74Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score4.51 / 10
|
3.7%
5.27
CategoryWatershed Related Works
Started / Completed / Phys47 / 6 / 6
Completion rate25.5%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked1.80Cr / 1.44Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)4.00 / 5.0
Final score5.27 / 10
|
12.2%
4.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 1 / 0
Completion rate1.1%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked7.73Cr / 6.28Cr
Expenditure rate (ongoing)81.2%
Part B score (max 5.0)4.06 / 5.0
Final score4.12 / 10
|
| 128 | BHIMPUR โ | BETUL | 4.53 | D |
20.9%
3.72
CategoryFarm Pond
Started / Completed / Phys196 / 3 / 24
Completion rate13.8%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked5.67Cr / 3.44Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score3.72 / 10
|
2.9%
1.19
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.93Cr / 0.22Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score1.19 / 10
|
3.6%
7.61
CategoryDug Well Recharge
Started / Completed / Phys433 / 19 / 297
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked0.30Cr / 0.24Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score7.61 / 10
|
โ |
68.1%
4.80
CategoryWater conservation & recharge
Started / Completed / Phys315 / 25 / 48
Completion rate23.2%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked16.59Cr / 12.08Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score4.80 / 10
|
2.0%
3.92
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.48Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score3.92 / 10
|
2.6%
4.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 2
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.76Cr / 0.53Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score4.02 / 10
|
| 129 | MORAR โ | GWALIOR | 4.52 | D |
44.6%
3.44
CategoryFarm Pond
Started / Completed / Phys237 / 19 / 50
Completion rate29.1%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked3.81Cr / 1.51Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score3.44 / 10
|
1.7%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.6%
5.54
CategoryDug Well Recharge
Started / Completed / Phys242 / 36 / 101
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.27Cr / 0.15Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score5.54 / 10
|
1.3%
4.81
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.31 / 5.0
Final score4.81 / 10
|
40.1%
5.09
CategoryWater conservation & recharge
Started / Completed / Phys47 / 10 / 12
Completion rate46.8%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked2.87Cr / 1.58Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score5.09 / 10
|
5.0%
6.40
CategoryWatershed Related Works
Started / Completed / Phys13 / 2 / 8
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score6.40 / 10
|
1.8%
4.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 1
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score4.74 / 10
|
| 130 | RAJNAGAR โ | CHHATARPUR | 4.50 | D |
47.2%
4.11
CategoryFarm Pond
Started / Completed / Phys296 / 65 / 65
Completion rate43.9%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked6.80Cr / 2.61Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score4.11 / 10
|
2.7%
2.09
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.29Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score2.09 / 10
|
2.9%
6.00
CategoryDug Well Recharge
Started / Completed / Phys584 / 480 / 24
Completion rate86.3%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.68 / 5.0
Final score6.00 / 10
|
0.7%
4.20
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.14Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score4.20 / 10
|
32.7%
4.90
CategoryWater conservation & recharge
Started / Completed / Phys160 / 5 / 34
Completion rate24.4%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked6.08Cr / 4.48Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.68 / 5.0
Final score4.90 / 10
|
7.8%
5.05
CategoryWatershed Related Works
Started / Completed / Phys33 / 2 / 4
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked1.65Cr / 1.37Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score5.05 / 10
|
6.0%
5.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 5
Completion rate23.8%
Part A score (max 5.0)1.19 / 5.0
Ongoing sanction / booked1.17Cr / 0.90Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score5.03 / 10
|
| 131 | PAHADGARH โ | MORENA | 4.49 | D |
10.4%
5.87
CategoryFarm Pond
Started / Completed / Phys499 / 402 / 36
Completion rate87.8%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked1.77Cr / 0.52Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score5.87 / 10
|
0.2%
0.29
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.01Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.29 / 5.0
Final score0.29 / 10
|
0.3%
7.09
CategoryDug Well Recharge
Started / Completed / Phys126 / 106 / 4
Completion rate87.3%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score7.09 / 10
|
1.1%
4.17
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.95Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.17 / 5.0
Final score4.17 / 10
|
75.9%
4.33
CategoryWater conservation & recharge
Started / Completed / Phys541 / 5 / 0
Completion rate0.9%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked78.85Cr / 67.48Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score4.33 / 10
|
10.1%
4.42
CategoryWatershed Related Works
Started / Completed / Phys74 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked10.48Cr / 9.12Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.35 / 5.0
Final score4.42 / 10
|
2.0%
4.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 0
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked1.94Cr / 1.51Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score4.23 / 10
|
| 132 | MAKHAN NAGAR โ | NARMADAPURAM | 4.48 | D |
49.0%
2.92
CategoryFarm Pond
Started / Completed / Phys123 / 35 / 15
Completion rate40.7%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked1.68Cr / 0.30Cr
Expenditure rate (ongoing)17.8%
Part B score (max 5.0)0.89 / 5.0
Final score2.92 / 10
|
โ |
11.6%
4.46
CategoryDug Well Recharge
Started / Completed / Phys183 / 78 / 38
Completion rate63.4%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked0.24Cr / 0.06Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score4.46 / 10
|
1.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
24.9%
6.25
CategoryWater conservation & recharge
Started / Completed / Phys44 / 19 / 14
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.28Cr / 0.14Cr
Expenditure rate (ongoing)50.0%
Part B score (max 5.0)2.50 / 5.0
Final score6.25 / 10
|
6.1%
9.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 6
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.85 / 5.0
Final score9.00 / 10
|
6.9%
3.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)46.2%
Part B score (max 5.0)2.31 / 5.0
Final score3.98 / 10
|
| 133 | LATERI โ | VIDISHA | 4.48 | D |
47.8%
3.77
CategoryFarm Pond
Started / Completed / Phys216 / 82 / 12
Completion rate43.5%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked3.66Cr / 1.17Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.60 / 5.0
Final score3.77 / 10
|
1.4%
3.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score3.02 / 10
|
5.3%
5.36
CategoryDug Well Recharge
Started / Completed / Phys301 / 117 / 81
Completion rate65.8%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score5.36 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.0%
5.11
CategoryWater conservation & recharge
Started / Completed / Phys168 / 55 / 11
Completion rate39.3%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked3.63Cr / 2.29Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score5.11 / 10
|
1.1%
3.93
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.68 / 5.0
Final score3.93 / 10
|
1.9%
5.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 6 / 0
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.50 / 5.0
Final score5.79 / 10
|
| 134 | SIHAWAL โ | SIDHI | 4.47 | D |
34.1%
4.28
CategoryFarm Pond
Started / Completed / Phys352 / 135 / 0
Completion rate38.4%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked4.79Cr / 2.27Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score4.28 / 10
|
โ |
1.1%
2.45
CategoryDug Well Recharge
Started / Completed / Phys95 / 12 / 0
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.22Cr / 0.08Cr
Expenditure rate (ongoing)36.4%
Part B score (max 5.0)1.82 / 5.0
Final score2.45 / 10
|
2.5%
3.91
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 2 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.55Cr / 0.34Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score3.91 / 10
|
51.1%
4.58
CategoryWater conservation & recharge
Started / Completed / Phys188 / 25 / 0
Completion rate13.3%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked10.68Cr / 8.36Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score4.58 / 10
|
3.0%
4.85
CategoryWatershed Related Works
Started / Completed / Phys22 / 8 / 0
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.39Cr / 0.23Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score4.85 / 10
|
8.2%
4.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 7 / 0
Completion rate26.9%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked1.71Cr / 1.22Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score4.91 / 10
|
| 135 | AJAIGARH โ | PANNA | 4.47 | D |
41.2%
4.19
CategoryFarm Pond
Started / Completed / Phys376 / 59 / 0
Completion rate15.7%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked6.41Cr / 4.37Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score4.19 / 10
|
2.5%
3.96
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.37Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score3.96 / 10
|
5.4%
5.03
CategoryDug Well Recharge
Started / Completed / Phys396 / 88 / 0
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked0.79Cr / 0.62Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score5.03 / 10
|
โ |
41.7%
4.67
CategoryWater conservation & recharge
Started / Completed / Phys216 / 20 / 0
Completion rate9.3%
Part A score (max 5.0)0.46 / 5.0
Ongoing sanction / booked7.31Cr / 6.15Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.21 / 5.0
Final score4.67 / 10
|
3.7%
4.28
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.59Cr
Expenditure rate (ongoing)85.7%
Part B score (max 5.0)4.28 / 5.0
Final score4.28 / 10
|
5.5%
4.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.93Cr / 0.79Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score4.88 / 10
|
| 136 | ICHHAWAR โ | SEHORE | 4.47 | D |
47.8%
3.73
CategoryFarm Pond
Started / Completed / Phys272 / 4 / 102
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked4.47Cr / 1.59Cr
Expenditure rate (ongoing)35.6%
Part B score (max 5.0)1.78 / 5.0
Final score3.73 / 10
|
1.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
7.2%
6.73
CategoryDug Well Recharge
Started / Completed / Phys420 / 71 / 251
Completion rate76.7%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score6.73 / 10
|
0.5%
3.69
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score3.69 / 10
|
34.2%
5.02
CategoryWater conservation & recharge
Started / Completed / Phys83 / 4 / 20
Completion rate28.9%
Part A score (max 5.0)1.45 / 5.0
Ongoing sanction / booked3.70Cr / 2.65Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score5.02 / 10
|
5.9%
5.09
CategoryWatershed Related Works
Started / Completed / Phys18 / 1 / 4
Completion rate27.8%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked0.65Cr / 0.48Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score5.09 / 10
|
3.0%
5.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.26Cr / 0.21Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score5.37 / 10
|
| 137 | GOTEGAON โ | NARSINGHPUR | 4.46 | D |
83.0%
4.37
CategoryFarm Pond
Started / Completed / Phys272 / 165 / 13
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked2.65Cr / 0.58Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.10 / 5.0
Final score4.37 / 10
|
โ |
1.4%
4.15
CategoryDug Well Recharge
Started / Completed / Phys50 / 37 / 0
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)8.9%
Part B score (max 5.0)0.45 / 5.0
Final score4.15 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.8%
5.21
CategoryWater conservation & recharge
Started / Completed / Phys18 / 2 / 7
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.45Cr / 0.25Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score5.21 / 10
|
0.3%
3.69
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.69 / 5.0
Final score3.69 / 10
|
1.3%
2.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score2.43 / 10
|
| 138 | UMARBAN โ | DHAR | 4.46 | D |
10.7%
4.26
CategoryFarm Pond
Started / Completed / Phys395 / 106 / 0
Completion rate26.8%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked1.72Cr / 1.00Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.92 / 5.0
Final score4.26 / 10
|
โ |
5.6%
3.82
CategoryDug Well Recharge
Started / Completed / Phys474 / 157 / 0
Completion rate33.1%
Part A score (max 5.0)1.66 / 5.0
Ongoing sanction / booked0.82Cr / 0.35Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score3.82 / 10
|
0.5%
2.48
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score2.48 / 10
|
53.8%
4.79
CategoryWater conservation & recharge
Started / Completed / Phys124 / 4 / 12
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked9.90Cr / 8.20Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.79 / 10
|
24.6%
3.93
CategoryWatershed Related Works
Started / Completed / Phys80 / 3 / 2
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked4.93Cr / 3.57Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.93 / 10
|
4.8%
4.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 3
Completion rate21.4%
Part A score (max 5.0)1.07 / 5.0
Ongoing sanction / booked0.89Cr / 0.67Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score4.83 / 10
|
| 139 | ISAGARH โ | ASHOK NAGAR | 4.45 | D |
37.8%
4.14
CategoryFarm Pond
Started / Completed / Phys282 / 21 / 48
Completion rate24.5%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked6.58Cr / 3.84Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.91 / 5.0
Final score4.14 / 10
|
3.7%
1.05
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.18Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score1.05 / 10
|
1.1%
4.32
CategoryDug Well Recharge
Started / Completed / Phys102 / 38 / 2
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked0.16Cr / 0.08Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score4.32 / 10
|
โ |
54.7%
4.91
CategoryWater conservation & recharge
Started / Completed / Phys205 / 25 / 7
Completion rate15.6%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked10.30Cr / 8.51Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score4.91 / 10
|
1.3%
4.07
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score4.07 / 10
|
1.3%
4.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score4.15 / 10
|
| 140 | JABERA โ | DAMOH | 4.44 | D |
16.6%
4.35
CategoryFarm Pond
Started / Completed / Phys234 / 34 / 3
Completion rate15.8%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked4.58Cr / 3.26Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score4.35 / 10
|
โ |
2.8%
5.64
CategoryDug Well Recharge
Started / Completed / Phys351 / 101 / 0
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked0.64Cr / 0.54Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score5.64 / 10
|
โ |
51.2%
4.27
CategoryWater conservation & recharge
Started / Completed / Phys151 / 5 / 1
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked15.67Cr / 12.76Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score4.27 / 10
|
8.5%
5.12
CategoryWatershed Related Works
Started / Completed / Phys42 / 9 / 1
Completion rate23.8%
Part A score (max 5.0)1.19 / 5.0
Ongoing sanction / booked2.17Cr / 1.70Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score5.12 / 10
|
20.9%
4.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.78Cr / 6.11Cr
Expenditure rate (ongoing)90.1%
Part B score (max 5.0)4.50 / 5.0
Final score4.50 / 10
|
| 141 | DEWAS โ | DEWAS | 4.43 | D |
43.0%
4.04
CategoryFarm Pond
Started / Completed / Phys125 / 29 / 8
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.48Cr / 1.27Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score4.04 / 10
|
2.3%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.1%
5.41
CategoryDug Well Recharge
Started / Completed / Phys280 / 6 / 130
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.34Cr / 0.20Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score5.41 / 10
|
3.3%
4.80
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 3 / 0
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score4.80 / 10
|
33.3%
4.43
CategoryWater conservation & recharge
Started / Completed / Phys104 / 5 / 11
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked2.47Cr / 1.81Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score4.43 / 10
|
6.8%
4.24
CategoryWatershed Related Works
Started / Completed / Phys22 / 2 / 1
Completion rate13.6%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked0.48Cr / 0.34Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score4.24 / 10
|
3.3%
3.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score3.25 / 10
|
| 142 | SHEOPUR โ | SHEOPUR | 4.42 | D |
38.5%
4.26
CategoryFarm Pond
Started / Completed / Phys143 / 56 / 0
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked3.45Cr / 1.59Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.30 / 5.0
Final score4.26 / 10
|
โ |
0.8%
7.10
CategoryDug Well Recharge
Started / Completed / Phys43 / 31 / 0
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.10 / 10
|
6.4%
4.36
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.92Cr / 0.80Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.36 / 5.0
Final score4.36 / 10
|
41.4%
4.52
CategoryWater conservation & recharge
Started / Completed / Phys81 / 3 / 0
Completion rate3.7%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked5.68Cr / 4.92Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score4.52 / 10
|
5.9%
4.53
CategoryWatershed Related Works
Started / Completed / Phys13 / 1 / 0
Completion rate7.7%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked0.76Cr / 0.63Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score4.53 / 10
|
7.1%
4.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.90Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score4.36 / 10
|
| 143 | JOURA โ | MORENA | 4.41 | D |
16.3%
5.59
CategoryFarm Pond
Started / Completed / Phys230 / 143 / 0
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked3.42Cr / 1.70Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.48 / 5.0
Final score5.59 / 10
|
0.5%
0.01
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score0.01 / 10
|
0.4%
4.91
CategoryDug Well Recharge
Started / Completed / Phys77 / 43 / 0
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score4.91 / 10
|
1.1%
4.80
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.50Cr
Expenditure rate (ongoing)96.0%
Part B score (max 5.0)4.80 / 5.0
Final score4.80 / 10
|
76.6%
4.21
CategoryWater conservation & recharge
Started / Completed / Phys261 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked36.65Cr / 30.86Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
|
1.3%
4.29
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.53Cr
Expenditure rate (ongoing)85.8%
Part B score (max 5.0)4.29 / 5.0
Final score4.29 / 10
|
3.8%
3.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.83Cr / 1.46Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score3.98 / 10
|
| 144 | DABRA โ | GWALIOR | 4.40 | D |
64.1%
4.17
CategoryFarm Pond
Started / Completed / Phys248 / 30 / 109
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked3.02Cr / 0.82Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.36 / 5.0
Final score4.17 / 10
|
8.7%
1.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.85Cr / 0.17Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
|
5.1%
5.64
CategoryDug Well Recharge
Started / Completed / Phys192 / 40 / 113
Completion rate79.7%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score5.64 / 10
|
0.7%
3.86
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score3.86 / 10
|
18.0%
6.65
CategoryWater conservation & recharge
Started / Completed / Phys40 / 1 / 28
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.24Cr / 0.15Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.65 / 10
|
1.8%
3.71
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score3.71 / 10
|
1.6%
4.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.54 / 5.0
Final score4.04 / 10
|
| 145 | JAWA โ | REWA | 4.40 | D |
42.4%
3.55
CategoryFarm Pond
Started / Completed / Phys229 / 64 / 26
Completion rate39.3%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked3.68Cr / 1.16Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score3.55 / 10
|
โ |
0.7%
6.82
CategoryDug Well Recharge
Started / Completed / Phys35 / 20 / 8
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score6.82 / 10
|
0.3%
3.71
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score3.71 / 10
|
41.4%
5.37
CategoryWater conservation & recharge
Started / Completed / Phys84 / 20 / 11
Completion rate36.9%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked3.86Cr / 2.72Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score5.37 / 10
|
6.2%
4.47
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 4
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.62Cr / 0.35Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score4.47 / 10
|
9.0%
3.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 3
Completion rate23.5%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked0.77Cr / 0.39Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score3.71 / 10
|
| 146 | RAHATGARH โ | SAGAR | 4.37 | D |
22.0%
3.55
CategoryFarm Pond
Started / Completed / Phys237 / 93 / 0
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked2.36Cr / 0.75Cr
Expenditure rate (ongoing)31.8%
Part B score (max 5.0)1.59 / 5.0
Final score3.55 / 10
|
5.0%
2.02
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.36Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score2.02 / 10
|
7.6%
5.76
CategoryDug Well Recharge
Started / Completed / Phys531 / 208 / 78
Completion rate53.9%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.63Cr / 0.39Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score5.76 / 10
|
1.4%
8.16
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.10Cr / 0.10Cr
Expenditure rate (ongoing)96.6%
Part B score (max 5.0)4.83 / 5.0
Final score8.16 / 10
|
48.6%
4.49
CategoryWater conservation & recharge
Started / Completed / Phys117 / 19 / 0
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked8.25Cr / 6.06Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.49 / 10
|
10.6%
4.22
CategoryWatershed Related Works
Started / Completed / Phys26 / 3 / 1
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked1.70Cr / 1.17Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score4.22 / 10
|
4.8%
6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 6 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.27Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score6.35 / 10
|
| 147 | BHANPURA โ | MANDSAUR | 4.37 | D |
23.2%
3.28
CategoryFarm Pond
Started / Completed / Phys156 / 10 / 0
Completion rate6.4%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked2.92Cr / 1.73Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score3.28 / 10
|
โ |
8.3%
6.34
CategoryDug Well Recharge
Started / Completed / Phys463 / 264 / 20
Completion rate61.3%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked0.43Cr / 0.28Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score6.34 / 10
|
0.2%
4.73
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)94.7%
Part B score (max 5.0)4.73 / 5.0
Final score4.73 / 10
|
60.0%
4.48
CategoryWater conservation & recharge
Started / Completed / Phys131 / 3 / 1
Completion rate3.1%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked7.78Cr / 6.74Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score4.48 / 10
|
7.4%
4.68
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 0
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked0.94Cr / 0.84Cr
Expenditure rate (ongoing)89.0%
Part B score (max 5.0)4.45 / 5.0
Final score4.68 / 10
|
0.9%
3.95
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.10Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score3.95 / 10
|
| 148 | BANDA โ | SAGAR | 4.36 | D |
36.6%
3.57
CategoryFarm Pond
Started / Completed / Phys145 / 59 / 7
Completion rate45.5%
Part A score (max 5.0)2.28 / 5.0
Ongoing sanction / booked1.46Cr / 0.38Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score3.57 / 10
|
โ |
18.1%
6.25
CategoryDug Well Recharge
Started / Completed / Phys545 / 173 / 138
Completion rate57.1%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked0.60Cr / 0.41Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score6.25 / 10
|
1.0%
4.63
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)92.6%
Part B score (max 5.0)4.63 / 5.0
Final score4.63 / 10
|
37.4%
4.05
CategoryWater conservation & recharge
Started / Completed / Phys66 / 5 / 9
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked2.40Cr / 1.44Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score4.05 / 10
|
4.0%
5.06
CategoryWatershed Related Works
Started / Completed / Phys8 / 3 / 0
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.28Cr / 0.18Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score5.06 / 10
|
2.9%
5.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 3
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score5.48 / 10
|
| 149 | BASODA โ | VIDISHA | 4.35 | D |
75.8%
3.83
CategoryFarm Pond
Started / Completed / Phys303 / 161 / 19
Completion rate59.4%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked3.20Cr / 0.55Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.86 / 5.0
Final score3.83 / 10
|
โ |
2.3%
6.51
CategoryDug Well Recharge
Started / Completed / Phys90 / 47 / 18
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score6.51 / 10
|
0.7%
4.52
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)40.3%
Part B score (max 5.0)2.02 / 5.0
Final score4.52 / 10
|
19.4%
6.28
CategoryWater conservation & recharge
Started / Completed / Phys95 / 47 / 21
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.75Cr / 0.40Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.70 / 5.0
Final score6.28 / 10
|
0.3%
3.58
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score3.58 / 10
|
1.6%
2.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.71 / 5.0
Final score2.96 / 10
|
| 150 | CHITRANGI โ | SINGRAULI | 4.35 | D |
33.3%
4.70
CategoryFarm Pond
Started / Completed / Phys914 / 481 / 21
Completion rate54.9%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked12.39Cr / 4.85Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score4.70 / 10
|
3.2%
2.55
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.60Cr / 1.32Cr
Expenditure rate (ongoing)50.9%
Part B score (max 5.0)2.55 / 5.0
Final score2.55 / 10
|
1.4%
4.83
CategoryDug Well Recharge
Started / Completed / Phys438 / 192 / 37
Completion rate52.3%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked0.54Cr / 0.24Cr
Expenditure rate (ongoing)44.3%
Part B score (max 5.0)2.22 / 5.0
Final score4.83 / 10
|
โ |
55.7%
4.24
CategoryWater conservation & recharge
Started / Completed / Phys563 / 35 / 15
Completion rate8.9%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked41.73Cr / 31.64Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score4.24 / 10
|
3.7%
4.50
CategoryWatershed Related Works
Started / Completed / Phys73 / 12 / 1
Completion rate17.8%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked2.38Cr / 1.72Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.61 / 5.0
Final score4.50 / 10
|
2.7%
4.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 1 / 0
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked2.14Cr / 1.65Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score4.08 / 10
|
| 151 | BAGH โ | DHAR | 4.34 | D |
6.1%
3.00
CategoryFarm Pond
Started / Completed / Phys243 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.86Cr / 2.32Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score3.00 / 10
|
โ |
1.5%
2.73
CategoryDug Well Recharge
Started / Completed / Phys365 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.94Cr / 0.51Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score2.73 / 10
|
โ |
89.5%
4.46
CategoryWater conservation & recharge
Started / Completed / Phys232 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked56.31Cr / 50.20Cr
Expenditure rate (ongoing)89.1%
Part B score (max 5.0)4.46 / 5.0
Final score4.46 / 10
|
2.2%
4.50
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.38Cr / 1.24Cr
Expenditure rate (ongoing)90.0%
Part B score (max 5.0)4.50 / 5.0
Final score4.50 / 10
|
0.6%
4.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.35Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score4.44 / 10
|
| 152 | PANDHURNA โ | CHHINDWARA | 4.34 | D |
21.8%
5.76
CategoryFarm Pond
Started / Completed / Phys136 / 61 / 31
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.75Cr / 0.36Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score5.76 / 10
|
3.6%
0.29
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.02Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.29 / 5.0
Final score0.29 / 10
|
8.6%
6.35
CategoryDug Well Recharge
Started / Completed / Phys366 / 34 / 185
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked0.38Cr / 0.26Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.36 / 5.0
Final score6.35 / 10
|
7.7%
3.37
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.85Cr / 0.57Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
|
21.9%
3.91
CategoryWater conservation & recharge
Started / Completed / Phys25 / 0 / 1
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked2.25Cr / 1.67Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score3.91 / 10
|
33.6%
3.71
CategoryWatershed Related Works
Started / Completed / Phys48 / 1 / 1
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked3.52Cr / 2.46Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score3.71 / 10
|
2.7%
5.97
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.20Cr / 0.17Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.30 / 5.0
Final score5.97 / 10
|
| 153 | CHICHOLI โ | BETUL | 4.34 | D |
27.6%
3.20
CategoryFarm Pond
Started / Completed / Phys137 / 0 / 18
Completion rate13.1%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked3.12Cr / 1.59Cr
Expenditure rate (ongoing)50.9%
Part B score (max 5.0)2.55 / 5.0
Final score3.20 / 10
|
9.3%
2.27
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.55Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score2.27 / 10
|
8.2%
6.16
CategoryDug Well Recharge
Started / Completed / Phys411 / 42 / 215
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.40Cr / 0.24Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.03 / 5.0
Final score6.16 / 10
|
โ |
37.5%
5.11
CategoryWater conservation & recharge
Started / Completed / Phys103 / 6 / 19
Completion rate24.3%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked3.94Cr / 3.07Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score5.11 / 10
|
12.5%
4.86
CategoryWatershed Related Works
Started / Completed / Phys37 / 1 / 6
Completion rate18.9%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked1.29Cr / 1.01Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score4.86 / 10
|
4.8%
4.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 2
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked0.58Cr / 0.45Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score4.39 / 10
|
| 154 | BHANDER โ | DATIA | 4.33 | D |
36.8%
3.09
CategoryFarm Pond
Started / Completed / Phys212 / 49 / 12
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked3.17Cr / 1.04Cr
Expenditure rate (ongoing)32.9%
Part B score (max 5.0)1.65 / 5.0
Final score3.09 / 10
|
โ |
2.4%
6.25
CategoryDug Well Recharge
Started / Completed / Phys118 / 58 / 13
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.25 / 10
|
3.0%
5.58
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score5.58 / 10
|
42.6%
4.66
CategoryWater conservation & recharge
Started / Completed / Phys123 / 2 / 47
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked3.07Cr / 1.64Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score4.66 / 10
|
5.5%
6.22
CategoryWatershed Related Works
Started / Completed / Phys19 / 2 / 11
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score6.22 / 10
|
9.7%
5.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 8
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.30Cr / 0.19Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score5.72 / 10
|
| 155 | DHARAMPURI โ | DHAR | 4.33 | D |
5.2%
4.52
CategoryFarm Pond
Started / Completed / Phys137 / 29 / 0
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked0.75Cr / 0.52Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score4.52 / 10
|
โ |
5.5%
4.53
CategoryDug Well Recharge
Started / Completed / Phys378 / 36 / 0
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked0.89Cr / 0.72Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.05 / 5.0
Final score4.53 / 10
|
0.3%
3.01
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score3.01 / 10
|
69.3%
4.41
CategoryWater conservation & recharge
Started / Completed / Phys169 / 3 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked12.31Cr / 10.63Cr
Expenditure rate (ongoing)86.4%
Part B score (max 5.0)4.32 / 5.0
Final score4.41 / 10
|
14.3%
4.00
CategoryWatershed Related Works
Started / Completed / Phys59 / 1 / 0
Completion rate1.7%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked2.56Cr / 2.00Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.91 / 5.0
Final score4.00 / 10
|
5.5%
3.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.99Cr / 0.77Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score3.92 / 10
|
| 156 | CHHAPARA โ | SEONI | 4.33 | D |
35.4%
4.24
CategoryFarm Pond
Started / Completed / Phys210 / 62 / 0
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked4.92Cr / 2.73Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score4.24 / 10
|
โ |
2.8%
4.28
CategoryDug Well Recharge
Started / Completed / Phys209 / 38 / 0
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked0.44Cr / 0.30Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score4.28 / 10
|
7.5%
2.64
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.47Cr / 0.77Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score2.64 / 10
|
41.4%
4.62
CategoryWater conservation & recharge
Started / Completed / Phys112 / 19 / 0
Completion rate17.0%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked7.22Cr / 5.44Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score4.62 / 10
|
11.3%
4.83
CategoryWatershed Related Works
Started / Completed / Phys41 / 9 / 0
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked1.80Cr / 1.34Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score4.83 / 10
|
1.8%
3.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.24Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score3.41 / 10
|
| 157 | GAROTH โ | MANDSAUR | 4.32 | D |
11.1%
3.33
CategoryFarm Pond
Started / Completed / Phys281 / 19 / 1
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked4.37Cr / 2.60Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score3.33 / 10
|
3.2%
3.07
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.46Cr / 0.89Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score3.07 / 10
|
5.6%
4.68
CategoryDug Well Recharge
Started / Completed / Phys964 / 69 / 42
Completion rate11.5%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked2.21Cr / 1.81Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.68 / 10
|
0.9%
3.39
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.41Cr / 0.28Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score3.39 / 10
|
74.4%
4.51
CategoryWater conservation & recharge
Started / Completed / Phys372 / 3 / 0
Completion rate0.8%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked33.10Cr / 29.61Cr
Expenditure rate (ongoing)89.5%
Part B score (max 5.0)4.47 / 5.0
Final score4.51 / 10
|
1.7%
4.31
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.75Cr / 0.64Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.31 / 5.0
Final score4.31 / 10
|
3.1%
4.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.41Cr / 1.22Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score4.33 / 10
|
| 158 | DEOSAR โ | SINGRAULI | 4.32 | D |
40.2%
4.79
CategoryFarm Pond
Started / Completed / Phys704 / 388 / 2
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked5.61Cr / 2.27Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score4.79 / 10
|
3.4%
2.96
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.07Cr / 0.64Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.96 / 5.0
Final score2.96 / 10
|
3.3%
5.04
CategoryDug Well Recharge
Started / Completed / Phys397 / 255 / 4
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.36Cr / 0.13Cr
Expenditure rate (ongoing)35.5%
Part B score (max 5.0)1.77 / 5.0
Final score5.04 / 10
|
0.2%
3.39
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.39 / 5.0
Final score3.39 / 10
|
43.9%
4.04
CategoryWater conservation & recharge
Started / Completed / Phys224 / 23 / 3
Completion rate11.6%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked12.40Cr / 8.58Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score4.04 / 10
|
5.4%
3.87
CategoryWatershed Related Works
Started / Completed / Phys25 / 1 / 0
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked1.65Cr / 1.21Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score3.87 / 10
|
3.6%
3.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 0
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.11Cr / 0.77Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score3.83 / 10
|
| 159 | PORSA โ | MORENA | 4.32 | D |
15.6%
4.83
CategoryFarm Pond
Started / Completed / Phys171 / 67 / 9
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked3.44Cr / 1.79Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.61 / 5.0
Final score4.83 / 10
|
โ |
0.4%
2.96
CategoryDug Well Recharge
Started / Completed / Phys64 / 11 / 0
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)42.0%
Part B score (max 5.0)2.10 / 5.0
Final score2.96 / 10
|
2.3%
3.35
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.02Cr / 0.68Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score3.35 / 10
|
79.2%
4.27
CategoryWater conservation & recharge
Started / Completed / Phys267 / 1 / 0
Completion rate0.4%
Part A score (max 5.0)0.02 / 5.0
Ongoing sanction / booked34.47Cr / 29.30Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score4.27 / 10
|
2.1%
3.57
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.64Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score3.57 / 10
|
0.5%
4.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.19Cr
Expenditure rate (ongoing)95.8%
Part B score (max 5.0)4.79 / 5.0
Final score4.79 / 10
|
| 160 | PATAN โ | JABALPUR | 4.31 | D |
53.8%
2.37
CategoryFarm Pond
Started / Completed / Phys47 / 17 / 1
Completion rate38.3%
Part A score (max 5.0)1.91 / 5.0
Ongoing sanction / booked0.52Cr / 0.05Cr
Expenditure rate (ongoing)9.2%
Part B score (max 5.0)0.46 / 5.0
Final score2.37 / 10
|
โ |
0.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.4%
6.23
CategoryWater conservation & recharge
Started / Completed / Phys16 / 12 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.24Cr / 0.12Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score6.23 / 10
|
3.5%
5.04
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.04 / 10
|
4.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 161 | BIJEYPUR โ | SHEOPUR | 4.30 | D |
8.9%
6.10
CategoryFarm Pond
Started / Completed / Phys333 / 233 / 0
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked2.04Cr / 1.06Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score6.10 / 10
|
3.0%
0.49
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.97Cr / 0.19Cr
Expenditure rate (ongoing)9.7%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
|
0.2%
5.89
CategoryDug Well Recharge
Started / Completed / Phys39 / 35 / 0
Completion rate89.7%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score5.89 / 10
|
0.5%
4.62
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.32Cr
Expenditure rate (ongoing)92.4%
Part B score (max 5.0)4.62 / 5.0
Final score4.62 / 10
|
76.3%
4.27
CategoryWater conservation & recharge
Started / Completed / Phys398 / 4 / 0
Completion rate1.0%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked48.87Cr / 41.26Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.27 / 10
|
8.7%
4.04
CategoryWatershed Related Works
Started / Completed / Phys48 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.65Cr / 4.57Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
|
2.3%
4.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 1.24Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.08 / 5.0
Final score4.08 / 10
|
| 162 | SEHORE โ | SEHORE | 4.30 | D |
66.5%
3.10
CategoryFarm Pond
Started / Completed / Phys451 / 27 / 147
Completion rate38.6%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked7.38Cr / 1.72Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score3.10 / 10
|
โ |
11.3%
6.10
CategoryDug Well Recharge
Started / Completed / Phys732 / 65 / 450
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.57Cr / 0.30Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score6.10 / 10
|
1.0%
5.71
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 1
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.71 / 10
|
17.4%
6.76
CategoryWater conservation & recharge
Started / Completed / Phys121 / 5 / 79
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked1.11Cr / 0.73Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score6.76 / 10
|
1.6%
6.07
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 8
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.07 / 5.0
Final score6.07 / 10
|
2.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 163 | BURHAR โ | SHAHDOL | 4.30 | D |
38.6%
3.53
CategoryFarm Pond
Started / Completed / Phys768 / 86 / 18
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked23.07Cr / 13.19Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score3.53 / 10
|
0.7%
0.76
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.08Cr
Expenditure rate (ongoing)15.2%
Part B score (max 5.0)0.76 / 5.0
Final score0.76 / 10
|
0.7%
4.42
CategoryDug Well Recharge
Started / Completed / Phys182 / 23 / 0
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.42Cr / 0.31Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score4.42 / 10
|
5.0%
5.52
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 0
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked3.44Cr / 3.31Cr
Expenditure rate (ongoing)96.0%
Part B score (max 5.0)4.80 / 5.0
Final score5.52 / 10
|
27.5%
4.48
CategoryWater conservation & recharge
Started / Completed / Phys343 / 18 / 1
Completion rate5.5%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked18.21Cr / 15.30Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score4.48 / 10
|
26.0%
5.04
CategoryWatershed Related Works
Started / Completed / Phys185 / 4 / 0
Completion rate2.2%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked17.71Cr / 17.45Cr
Expenditure rate (ongoing)98.6%
Part B score (max 5.0)4.93 / 5.0
Final score5.04 / 10
|
1.4%
5.30
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 3 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.76Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.30 / 5.0
Final score5.30 / 10
|
| 164 | AMARWARA โ | CHHINDWARA | 4.29 | D |
50.1%
4.33
CategoryFarm Pond
Started / Completed / Phys353 / 116 / 0
Completion rate32.9%
Part A score (max 5.0)1.64 / 5.0
Ongoing sanction / booked6.98Cr / 3.76Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score4.33 / 10
|
2.0%
0.10
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.01Cr
Expenditure rate (ongoing)2.0%
Part B score (max 5.0)0.10 / 5.0
Final score0.10 / 10
|
5.1%
6.34
CategoryDug Well Recharge
Started / Completed / Phys382 / 176 / 0
Completion rate46.1%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked0.55Cr / 0.44Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score6.34 / 10
|
โ |
34.6%
4.38
CategoryWater conservation & recharge
Started / Completed / Phys111 / 14 / 0
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked6.12Cr / 4.59Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score4.38 / 10
|
5.4%
3.34
CategoryWatershed Related Works
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.08Cr / 0.72Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
|
2.9%
3.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.58Cr / 0.40Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score3.44 / 10
|
| 165 | SHAHPURA โ | JABALPUR | 4.28 | D |
42.0%
2.61
CategoryFarm Pond
Started / Completed / Phys181 / 52 / 4
Completion rate30.9%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked4.32Cr / 0.92Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.06 / 5.0
Final score2.61 / 10
|
3.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.0%
3.99
CategoryDug Well Recharge
Started / Completed / Phys52 / 28 / 2
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.10 / 5.0
Final score3.99 / 10
|
0.7%
5.02
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.69 / 5.0
Final score5.02 / 10
|
45.7%
5.92
CategoryWater conservation & recharge
Started / Completed / Phys122 / 61 / 16
Completion rate63.1%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked2.21Cr / 1.22Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.77 / 5.0
Final score5.92 / 10
|
2.3%
5.70
CategoryWatershed Related Works
Started / Completed / Phys9 / 7 / 0
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.70 / 10
|
4.8%
5.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 7 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.17Cr / 0.06Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score5.48 / 10
|
| 166 | HOSHANGABAD โ | NARMADAPURAM | 4.27 | D |
36.5%
2.73
CategoryFarm Pond
Started / Completed / Phys49 / 12 / 1
Completion rate26.5%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked0.43Cr / 0.12Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score2.73 / 10
|
โ |
12.7%
5.24
CategoryDug Well Recharge
Started / Completed / Phys119 / 57 / 1
Completion rate48.7%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score5.24 / 10
|
8.9%
6.14
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 12 / 0
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score6.14 / 10
|
28.8%
4.76
CategoryWater conservation & recharge
Started / Completed / Phys29 / 13 / 0
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)50.4%
Part B score (max 5.0)2.52 / 5.0
Final score4.76 / 10
|
1.4%
3.06
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score3.06 / 10
|
11.7%
5.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score5.56 / 10
|
| 167 | SABALGARH โ | MORENA | 4.26 | D |
28.6%
4.51
CategoryFarm Pond
Started / Completed / Phys545 / 179 / 0
Completion rate32.8%
Part A score (max 5.0)1.64 / 5.0
Ongoing sanction / booked16.02Cr / 9.20Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score4.51 / 10
|
0.3%
1.86
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
|
0.3%
4.18
CategoryDug Well Recharge
Started / Completed / Phys108 / 59 / 0
Completion rate54.6%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.13Cr / 0.04Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.45 / 5.0
Final score4.18 / 10
|
1.1%
4.42
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.87Cr / 0.77Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
|
65.2%
4.14
CategoryWater conservation & recharge
Started / Completed / Phys380 / 3 / 0
Completion rate0.8%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked53.79Cr / 44.11Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.14 / 10
|
1.1%
5.81
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.89Cr / 0.73Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.14 / 5.0
Final score5.81 / 10
|
3.5%
4.24
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.86Cr / 2.43Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score4.24 / 10
|
| 168 | KATTHIWADA โ | ALIRAJPUR | 4.25 | D |
19.1%
3.99
CategoryFarm Pond
Started / Completed / Phys188 / 23 / 0
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked5.76Cr / 3.89Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score3.99 / 10
|
2.9%
2.53
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.98Cr / 0.50Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.53 / 5.0
Final score2.53 / 10
|
4.4%
4.12
CategoryDug Well Recharge
Started / Completed / Phys585 / 88 / 0
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked1.29Cr / 0.87Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score4.12 / 10
|
โ |
71.4%
4.40
CategoryWater conservation & recharge
Started / Completed / Phys180 / 10 / 0
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked23.49Cr / 19.34Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score4.40 / 10
|
1.8%
4.42
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.55Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
|
0.4%
4.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)90.8%
Part B score (max 5.0)4.54 / 5.0
Final score4.54 / 10
|
| 169 | NARWAR โ | SHIVPURI | 4.25 | D |
30.7%
4.73
CategoryFarm Pond
Started / Completed / Phys246 / 120 / 0
Completion rate48.8%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked3.73Cr / 1.71Cr
Expenditure rate (ongoing)45.8%
Part B score (max 5.0)2.29 / 5.0
Final score4.73 / 10
|
โ |
2.4%
4.30
CategoryDug Well Recharge
Started / Completed / Phys211 / 109 / 4
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked0.25Cr / 0.08Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score4.30 / 10
|
0.4%
3.49
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
|
46.0%
4.01
CategoryWater conservation & recharge
Started / Completed / Phys180 / 9 / 0
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked9.36Cr / 7.04Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score4.01 / 10
|
19.7%
4.05
CategoryWatershed Related Works
Started / Completed / Phys54 / 4 / 0
Completion rate7.4%
Part A score (max 5.0)0.37 / 5.0
Ongoing sanction / booked4.10Cr / 3.02Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score4.05 / 10
|
0.9%
4.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.17Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score4.17 / 10
|
| 170 | MALTHONE โ | SAGAR | 4.24 | D |
39.2%
2.83
CategoryFarm Pond
Started / Completed / Phys179 / 26 / 23
Completion rate27.4%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked2.55Cr / 0.75Cr
Expenditure rate (ongoing)29.3%
Part B score (max 5.0)1.47 / 5.0
Final score2.83 / 10
|
โ |
8.2%
5.02
CategoryDug Well Recharge
Started / Completed / Phys288 / 133 / 48
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked0.27Cr / 0.10Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score5.02 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
48.1%
5.10
CategoryWater conservation & recharge
Started / Completed / Phys102 / 11 / 26
Completion rate36.3%
Part A score (max 5.0)1.81 / 5.0
Ongoing sanction / booked2.60Cr / 1.71Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score5.10 / 10
|
1.5%
4.67
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score4.67 / 10
|
2.5%
5.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 2
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.92 / 5.0
Final score5.77 / 10
|
| 171 | SONDWA โ | ALIRAJPUR | 4.24 | D |
6.1%
2.84
CategoryFarm Pond
Started / Completed / Phys197 / 3 / 0
Completion rate1.5%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked3.68Cr / 2.03Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.77 / 5.0
Final score2.84 / 10
|
2.1%
4.25
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.29Cr / 1.10Cr
Expenditure rate (ongoing)84.9%
Part B score (max 5.0)4.24 / 5.0
Final score4.25 / 10
|
3.3%
3.07
CategoryDug Well Recharge
Started / Completed / Phys776 / 18 / 0
Completion rate2.3%
Part A score (max 5.0)0.12 / 5.0
Ongoing sanction / booked1.96Cr / 1.16Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score3.07 / 10
|
0.2%
4.16
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score4.16 / 10
|
84.5%
4.38
CategoryWater conservation & recharge
Started / Completed / Phys275 / 8 / 0
Completion rate2.9%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked49.88Cr / 42.21Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score4.38 / 10
|
0.9%
4.82
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.43Cr / 0.36Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score4.82 / 10
|
2.8%
4.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 0
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked1.62Cr / 1.36Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score4.51 / 10
|
| 172 | THANDLA โ | JHABUA | 4.22 | D |
13.2%
2.85
CategoryFarm Pond
Started / Completed / Phys243 / 5 / 0
Completion rate2.1%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked4.21Cr / 2.31Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score2.85 / 10
|
1.5%
1.90
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.19Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
|
5.9%
4.13
CategoryDug Well Recharge
Started / Completed / Phys737 / 190 / 14
Completion rate27.7%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked1.38Cr / 0.76Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score4.13 / 10
|
0.1%
4.98
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)99.6%
Part B score (max 5.0)4.98 / 5.0
Final score4.98 / 10
|
75.9%
4.51
CategoryWater conservation & recharge
Started / Completed / Phys212 / 3 / 16
Completion rate9.0%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked22.28Cr / 18.11Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.06 / 5.0
Final score4.51 / 10
|
1.9%
4.34
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 3
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.47Cr / 0.27Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.84 / 5.0
Final score4.34 / 10
|
1.5%
4.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 1
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.49Cr / 0.36Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score4.29 / 10
|
| 173 | MORENA โ | MORENA | 4.22 | D |
5.3%
4.82
CategoryFarm Pond
Started / Completed / Phys199 / 85 / 0
Completion rate42.7%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked2.02Cr / 1.08Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score4.82 / 10
|
1.1%
2.53
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.35Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score2.53 / 10
|
0.6%
2.99
CategoryDug Well Recharge
Started / Completed / Phys152 / 47 / 0
Completion rate30.9%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked0.27Cr / 0.08Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.44 / 5.0
Final score2.99 / 10
|
1.3%
4.15
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.73Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score4.15 / 10
|
87.4%
4.21
CategoryWater conservation & recharge
Started / Completed / Phys405 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked57.40Cr / 48.37Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
|
4.2%
4.22
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 0
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked2.74Cr / 2.19Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)4.00 / 5.0
Final score4.22 / 10
|
0.2%
3.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
|
| 174 | TAMIA โ | CHHINDWARA | 4.22 | D |
24.1%
4.42
CategoryFarm Pond
Started / Completed / Phys269 / 63 / 0
Completion rate23.4%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked8.76Cr / 5.70Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.42 / 10
|
4.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.96Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.5%
6.03
CategoryDug Well Recharge
Started / Completed / Phys281 / 115 / 0
Completion rate40.9%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked0.42Cr / 0.33Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.99 / 5.0
Final score6.03 / 10
|
โ |
60.5%
4.38
CategoryWater conservation & recharge
Started / Completed / Phys305 / 14 / 0
Completion rate4.6%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked27.18Cr / 22.59Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.15 / 5.0
Final score4.38 / 10
|
7.4%
4.31
CategoryWatershed Related Works
Started / Completed / Phys38 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.40Cr / 2.93Cr
Expenditure rate (ongoing)86.2%
Part B score (max 5.0)4.31 / 5.0
Final score4.31 / 10
|
2.3%
4.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.04Cr / 0.83Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.00 / 5.0
Final score4.00 / 10
|
| 175 | BADNAWAR โ | DHAR | 4.21 | D |
22.9%
3.40
CategoryFarm Pond
Started / Completed / Phys316 / 3 / 0
Completion rate0.9%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked6.84Cr / 4.58Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score3.40 / 10
|
0.8%
2.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
|
5.2%
4.06
CategoryDug Well Recharge
Started / Completed / Phys602 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.56Cr / 1.27Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.06 / 5.0
Final score4.06 / 10
|
2.3%
4.13
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.57Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score4.13 / 10
|
57.8%
4.56
CategoryWater conservation & recharge
Started / Completed / Phys202 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked17.33Cr / 15.80Cr
Expenditure rate (ongoing)91.2%
Part B score (max 5.0)4.56 / 5.0
Final score4.56 / 10
|
10.6%
4.28
CategoryWatershed Related Works
Started / Completed / Phys60 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.19Cr / 2.73Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score4.28 / 10
|
0.3%
4.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)97.9%
Part B score (max 5.0)4.89 / 5.0
Final score4.89 / 10
|
| 176 | BUXWAHA โ | CHHATARPUR | 4.20 | D |
40.2%
4.36
CategoryFarm Pond
Started / Completed / Phys153 / 45 / 0
Completion rate29.4%
Part A score (max 5.0)1.47 / 5.0
Ongoing sanction / booked4.40Cr / 2.54Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score4.36 / 10
|
4.5%
4.11
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.57Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.11 / 5.0
Final score4.11 / 10
|
5.6%
5.85
CategoryDug Well Recharge
Started / Completed / Phys360 / 198 / 0
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.39Cr / 0.24Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score5.85 / 10
|
โ |
41.3%
3.95
CategoryWater conservation & recharge
Started / Completed / Phys96 / 8 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked6.14Cr / 4.34Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score3.95 / 10
|
2.6%
5.01
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.35Cr / 0.29Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score5.01 / 10
|
5.8%
2.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.54Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score2.99 / 10
|
| 177 | SATNA โ | SATNA | 4.20 | D |
33.3%
4.00
CategoryFarm Pond
Started / Completed / Phys189 / 33 / 44
Completion rate40.7%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked1.20Cr / 0.47Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score4.00 / 10
|
6.2%
1.48
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score1.48 / 10
|
3.4%
6.12
CategoryDug Well Recharge
Started / Completed / Phys147 / 76 / 4
Completion rate54.4%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score6.12 / 10
|
1.1%
3.27
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
|
45.8%
4.60
CategoryWater conservation & recharge
Started / Completed / Phys48 / 6 / 5
Completion rate22.9%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked2.62Cr / 1.81Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.46 / 5.0
Final score4.60 / 10
|
2.0%
7.35
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.07Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score7.35 / 10
|
8.1%
3.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 0
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.47Cr / 0.27Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score3.39 / 10
|
| 178 | SAGAR โ | SAGAR | 4.18 | D |
22.3%
3.46
CategoryFarm Pond
Started / Completed / Phys205 / 35 / 1
Completion rate17.6%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked3.27Cr / 1.69Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score3.46 / 10
|
โ |
7.8%
6.75
CategoryDug Well Recharge
Started / Completed / Phys542 / 155 / 195
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked0.49Cr / 0.35Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score6.75 / 10
|
0.4%
5.59
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score5.59 / 10
|
61.3%
4.10
CategoryWater conservation & recharge
Started / Completed / Phys234 / 16 / 4
Completion rate8.5%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked10.09Cr / 7.41Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.10 / 10
|
2.6%
3.80
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.45Cr / 0.29Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score3.80 / 10
|
5.6%
4.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 2 / 1
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked0.91Cr / 0.66Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score4.35 / 10
|
| 179 | GUNA โ | GUNA | 4.17 | D |
37.4%
3.16
CategoryFarm Pond
Started / Completed / Phys243 / 27 / 2
Completion rate11.9%
Part A score (max 5.0)0.60 / 5.0
Ongoing sanction / booked10.10Cr / 5.18Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.57 / 5.0
Final score3.16 / 10
|
โ |
2.8%
6.49
CategoryDug Well Recharge
Started / Completed / Phys329 / 176 / 118
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score6.49 / 10
|
1.6%
4.82
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.46Cr
Expenditure rate (ongoing)96.3%
Part B score (max 5.0)4.82 / 5.0
Final score4.82 / 10
|
51.8%
4.81
CategoryWater conservation & recharge
Started / Completed / Phys187 / 19 / 18
Completion rate19.8%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked14.23Cr / 10.87Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score4.81 / 10
|
2.2%
3.17
CategoryWatershed Related Works
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.43Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score3.17 / 10
|
4.2%
3.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.13Cr / 0.79Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score3.99 / 10
|
| 180 | PRITHVIPUR โ | NIWARI | 4.16 | D |
18.9%
3.62
CategoryFarm Pond
Started / Completed / Phys288 / 63 / 6
Completion rate24.0%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked3.76Cr / 1.82Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score3.62 / 10
|
3.5%
3.07
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.92Cr / 0.57Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score3.07 / 10
|
4.6%
4.56
CategoryDug Well Recharge
Started / Completed / Phys467 / 176 / 32
Completion rate44.5%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked0.67Cr / 0.31Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score4.56 / 10
|
โ |
30.9%
4.33
CategoryWater conservation & recharge
Started / Completed / Phys111 / 3 / 0
Completion rate2.7%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked8.12Cr / 6.82Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score4.33 / 10
|
22.0%
4.07
CategoryWatershed Related Works
Started / Completed / Phys104 / 3 / 0
Completion rate2.9%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked5.71Cr / 4.49Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score4.07 / 10
|
20.1%
4.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys76 / 2 / 2
Completion rate5.3%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked5.00Cr / 4.36Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score4.62 / 10
|
| 181 | KOTMA โ | ANUPPUR | 4.14 | D |
75.6%
3.85
CategoryFarm Pond
Started / Completed / Phys593 / 333 / 0
Completion rate56.2%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked5.08Cr / 1.06Cr
Expenditure rate (ongoing)20.8%
Part B score (max 5.0)1.04 / 5.0
Final score3.85 / 10
|
โ |
0.8%
3.96
CategoryDug Well Recharge
Started / Completed / Phys50 / 4 / 0
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score3.96 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.6%
4.96
CategoryWater conservation & recharge
Started / Completed / Phys52 / 12 / 0
Completion rate23.1%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked2.73Cr / 2.08Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score4.96 / 10
|
0.9%
3.52
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
|
2.1%
4.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score4.75 / 10
|
| 182 | TIRLA โ | DHAR | 4.13 | D |
15.3%
3.59
CategoryFarm Pond
Started / Completed / Phys295 / 42 / 0
Completion rate14.2%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked6.15Cr / 3.54Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.87 / 5.0
Final score3.59 / 10
|
โ |
2.4%
2.86
CategoryDug Well Recharge
Started / Completed / Phys428 / 47 / 0
Completion rate11.0%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked0.98Cr / 0.45Cr
Expenditure rate (ongoing)46.3%
Part B score (max 5.0)2.32 / 5.0
Final score2.86 / 10
|
โ |
75.2%
4.30
CategoryWater conservation & recharge
Started / Completed / Phys355 / 7 / 0
Completion rate2.0%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked33.55Cr / 28.17Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score4.30 / 10
|
6.0%
4.06
CategoryWatershed Related Works
Started / Completed / Phys67 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.73Cr / 2.22Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.06 / 5.0
Final score4.06 / 10
|
1.1%
3.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.36Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score3.75 / 10
|
| 183 | JAISINGHNAGAR โ | SHAHDOL | 4.13 | D |
46.3%
3.43
CategoryFarm Pond
Started / Completed / Phys932 / 206 / 152
Completion rate38.4%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked14.83Cr / 4.46Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.50 / 5.0
Final score3.43 / 10
|
2.7%
1.01
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.29Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score1.01 / 10
|
0.7%
5.57
CategoryDug Well Recharge
Started / Completed / Phys134 / 56 / 10
Completion rate49.3%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.11 / 5.0
Final score5.57 / 10
|
5.3%
4.85
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.79Cr / 2.70Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score4.85 / 10
|
37.7%
4.89
CategoryWater conservation & recharge
Started / Completed / Phys354 / 22 / 50
Completion rate20.3%
Part A score (max 5.0)1.02 / 5.0
Ongoing sanction / booked16.25Cr / 12.60Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score4.89 / 10
|
1.4%
4.61
CategoryWatershed Related Works
Started / Completed / Phys15 / 3 / 2
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.53Cr / 0.31Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score4.61 / 10
|
5.8%
5.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 4 / 8
Completion rate29.3%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked2.15Cr / 1.65Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score5.29 / 10
|
| 184 | CHHINDWARA โ | CHHINDWARA | 4.13 | D |
19.3%
4.73
CategoryFarm Pond
Started / Completed / Phys97 / 25 / 10
Completion rate36.1%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked1.16Cr / 0.68Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score4.73 / 10
|
7.3%
2.72
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.34Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score2.72 / 10
|
11.0%
6.99
CategoryDug Well Recharge
Started / Completed / Phys361 / 156 / 143
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.99 / 10
|
8.7%
4.67
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.66Cr / 0.53Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score4.67 / 10
|
26.1%
3.45
CategoryWater conservation & recharge
Started / Completed / Phys29 / 3 / 1
Completion rate13.8%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked2.19Cr / 1.21Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score3.45 / 10
|
17.0%
4.19
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 1
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked1.33Cr / 0.99Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.72 / 5.0
Final score4.19 / 10
|
10.7%
2.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.93Cr / 0.40Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.15 / 5.0
Final score2.15 / 10
|
| 185 | KHANIYADHANA โ | SHIVPURI | 4.13 | D |
35.0%
4.65
CategoryFarm Pond
Started / Completed / Phys321 / 89 / 60
Completion rate46.4%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked4.88Cr / 2.28Cr
Expenditure rate (ongoing)46.7%
Part B score (max 5.0)2.33 / 5.0
Final score4.65 / 10
|
1.6%
0.03
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
|
3.2%
5.70
CategoryDug Well Recharge
Started / Completed / Phys335 / 184 / 53
Completion rate70.7%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.25Cr / 0.11Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score5.70 / 10
|
4.0%
3.68
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.07Cr / 0.79Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.68 / 5.0
Final score3.68 / 10
|
49.7%
3.79
CategoryWater conservation & recharge
Started / Completed / Phys163 / 5 / 1
Completion rate3.7%
Part A score (max 5.0)0.18 / 5.0
Ongoing sanction / booked13.14Cr / 9.48Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score3.79 / 10
|
4.2%
4.29
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 0
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.97Cr / 0.69Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score4.29 / 10
|
2.3%
4.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 0
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.53Cr / 0.41Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score4.39 / 10
|
| 186 | ALOT โ | RATLAM | 4.12 | D |
46.6%
3.46
CategoryFarm Pond
Started / Completed / Phys311 / 80 / 2
Completion rate26.4%
Part A score (max 5.0)1.32 / 5.0
Ongoing sanction / booked4.59Cr / 1.96Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.14 / 5.0
Final score3.46 / 10
|
โ |
22.0%
4.86
CategoryDug Well Recharge
Started / Completed / Phys1,068 / 356 / 1
Completion rate33.4%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.84Cr / 1.17Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.19 / 5.0
Final score4.86 / 10
|
0.2%
4.06
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.06 / 5.0
Final score4.06 / 10
|
30.3%
4.56
CategoryWater conservation & recharge
Started / Completed / Phys105 / 24 / 0
Completion rate22.9%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked3.21Cr / 2.19Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score4.56 / 10
|
0.6%
6.08
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score6.08 / 10
|
0.4%
4.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)93.6%
Part B score (max 5.0)4.68 / 5.0
Final score4.68 / 10
|
| 187 | VIJAYRAGHAVGADH โ | KATNI | 4.11 | D |
44.3%
3.34
CategoryFarm Pond
Started / Completed / Phys243 / 39 / 29
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked3.51Cr / 1.36Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.95 / 5.0
Final score3.34 / 10
|
โ |
9.3%
4.35
CategoryDug Well Recharge
Started / Completed / Phys386 / 103 / 70
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked0.56Cr / 0.23Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score4.35 / 10
|
5.1%
4.71
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 3 / 0
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.39Cr / 0.26Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score4.71 / 10
|
15.5%
5.34
CategoryWater conservation & recharge
Started / Completed / Phys36 / 7 / 10
Completion rate47.2%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked0.90Cr / 0.54Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.98 / 5.0
Final score5.34 / 10
|
15.1%
3.39
CategoryWatershed Related Works
Started / Completed / Phys40 / 2 / 2
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.44Cr / 0.83Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score3.39 / 10
|
10.8%
5.95
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 6
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.67Cr / 0.49Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.64 / 5.0
Final score5.95 / 10
|
| 188 | BICHHUA โ | CHHINDWARA | 4.10 | D |
20.8%
5.63
CategoryFarm Pond
Started / Completed / Phys144 / 2 / 56
Completion rate40.3%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked1.59Cr / 1.15Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score5.63 / 10
|
12.4%
1.05
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 0.33Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score1.05 / 10
|
6.4%
7.11
CategoryDug Well Recharge
Started / Completed / Phys310 / 8 / 260
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.79 / 5.0
Final score7.11 / 10
|
1.3%
3.66
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.12Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score3.66 / 10
|
42.5%
4.05
CategoryWater conservation & recharge
Started / Completed / Phys41 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.35Cr / 4.34Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score4.05 / 10
|
16.0%
3.48
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.01Cr / 1.40Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
|
0.7%
2.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score2.81 / 10
|
| 189 | PALERA โ | TIKAMGARH | 4.09 | D |
16.5%
3.00
CategoryFarm Pond
Started / Completed / Phys236 / 8 / 5
Completion rate5.5%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked3.32Cr / 1.81Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score3.00 / 10
|
2.1%
0.85
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.45Cr / 0.08Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.85 / 5.0
Final score0.85 / 10
|
7.1%
5.20
CategoryDug Well Recharge
Started / Completed / Phys592 / 110 / 20
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked1.19Cr / 0.97Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score5.20 / 10
|
0.2%
3.91
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score3.91 / 10
|
60.8%
4.36
CategoryWater conservation & recharge
Started / Completed / Phys279 / 12 / 2
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked12.61Cr / 10.37Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.11 / 5.0
Final score4.36 / 10
|
3.7%
4.18
CategoryWatershed Related Works
Started / Completed / Phys21 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.79Cr / 0.66Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
|
9.6%
4.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.05Cr / 1.70Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.14 / 10
|
| 190 | BIJAWAR โ | CHHATARPUR | 4.09 | D |
41.2%
3.74
CategoryFarm Pond
Started / Completed / Phys216 / 58 / 28
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked3.60Cr / 1.26Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score3.74 / 10
|
3.4%
3.29
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.30Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score3.29 / 10
|
4.5%
4.94
CategoryDug Well Recharge
Started / Completed / Phys431 / 325 / 33
Completion rate83.1%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.10Cr / 0.02Cr
Expenditure rate (ongoing)15.7%
Part B score (max 5.0)0.79 / 5.0
Final score4.94 / 10
|
โ |
47.9%
4.39
CategoryWater conservation & recharge
Started / Completed / Phys147 / 11 / 12
Completion rate15.6%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked5.94Cr / 4.28Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score4.39 / 10
|
1.9%
3.43
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.17Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score3.43 / 10
|
1.1%
4.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.12Cr
Expenditure rate (ongoing)85.8%
Part B score (max 5.0)4.29 / 5.0
Final score4.29 / 10
|
| 191 | ASHTA โ | SEHORE | 4.08 | D |
57.2%
3.26
CategoryFarm Pond
Started / Completed / Phys509 / 67 / 131
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked9.39Cr / 2.46Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score3.26 / 10
|
5.5%
0.81
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.20Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score0.81 / 10
|
8.3%
5.76
CategoryDug Well Recharge
Started / Completed / Phys727 / 246 / 281
Completion rate72.5%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.52Cr / 0.22Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score5.76 / 10
|
1.5%
5.10
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 1 / 2
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score5.10 / 10
|
19.4%
6.24
CategoryWater conservation & recharge
Started / Completed / Phys101 / 15 / 32
Completion rate46.5%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked3.06Cr / 2.40Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score6.24 / 10
|
5.6%
4.92
CategoryWatershed Related Works
Started / Completed / Phys32 / 7 / 6
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked0.73Cr / 0.42Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score4.92 / 10
|
2.6%
5.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 5
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.33Cr / 0.23Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score5.31 / 10
|
| 192 | AMBAH โ | MORENA | 4.08 | D |
12.4%
3.60
CategoryFarm Pond
Started / Completed / Phys158 / 38 / 0
Completion rate24.1%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked1.77Cr / 0.85Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score3.60 / 10
|
โ |
0.9%
3.64
CategoryDug Well Recharge
Started / Completed / Phys64 / 2 / 0
Completion rate3.1%
Part A score (max 5.0)0.16 / 5.0
Ongoing sanction / booked0.17Cr / 0.12Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score3.64 / 10
|
1.7%
4.53
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.29Cr
Expenditure rate (ongoing)90.6%
Part B score (max 5.0)4.53 / 5.0
Final score4.53 / 10
|
73.5%
4.07
CategoryWater conservation & recharge
Started / Completed / Phys110 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked14.19Cr / 11.56Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.07 / 5.0
Final score4.07 / 10
|
7.7%
4.77
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked1.45Cr / 1.27Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.35 / 5.0
Final score4.77 / 10
|
3.8%
4.21
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.62Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
|
| 193 | SUSNER โ | AGAR-MALWA | 4.07 | D |
23.9%
4.27
CategoryFarm Pond
Started / Completed / Phys208 / 52 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked2.30Cr / 1.39Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score4.27 / 10
|
1.3%
3.42
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
|
9.9%
5.41
CategoryDug Well Recharge
Started / Completed / Phys508 / 161 / 0
Completion rate31.7%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked0.90Cr / 0.69Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score5.41 / 10
|
0.6%
2.16
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
|
59.0%
3.81
CategoryWater conservation & recharge
Started / Completed / Phys146 / 8 / 0
Completion rate5.5%
Part A score (max 5.0)0.27 / 5.0
Ongoing sanction / booked7.64Cr / 5.40Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score3.81 / 10
|
0.2%
3.78
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score3.78 / 10
|
5.0%
3.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.54Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score3.99 / 10
|
| 194 | KOLARAS โ | SHIVPURI | 4.07 | D |
44.2%
4.28
CategoryFarm Pond
Started / Completed / Phys238 / 76 / 12
Completion rate37.0%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked6.12Cr / 2.97Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score4.28 / 10
|
1.8%
2.29
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.18Cr
Expenditure rate (ongoing)45.8%
Part B score (max 5.0)2.29 / 5.0
Final score2.29 / 10
|
2.9%
4.64
CategoryDug Well Recharge
Started / Completed / Phys253 / 107 / 8
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.36Cr / 0.17Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.37 / 5.0
Final score4.64 / 10
|
0.7%
3.34
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.11Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
|
49.6%
3.91
CategoryWater conservation & recharge
Started / Completed / Phys110 / 2 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked10.72Cr / 8.18Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score3.91 / 10
|
0.6%
3.13
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
|
0.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 195 | PARASIA โ | CHHINDWARA | 4.06 | D |
35.1%
4.29
CategoryFarm Pond
Started / Completed / Phys182 / 27 / 4
Completion rate17.0%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked4.37Cr / 3.01Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score4.29 / 10
|
โ |
10.1%
5.30
CategoryDug Well Recharge
Started / Completed / Phys563 / 85 / 71
Completion rate27.7%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked1.07Cr / 0.84Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score5.30 / 10
|
1.6%
3.91
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.19Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score3.91 / 10
|
41.9%
3.67
CategoryWater conservation & recharge
Started / Completed / Phys130 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.15Cr / 4.51Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score3.67 / 10
|
7.9%
3.69
CategoryWatershed Related Works
Started / Completed / Phys26 / 1 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked1.11Cr / 0.78Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score3.69 / 10
|
3.4%
3.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.39Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score3.88 / 10
|
| 196 | SENDHAWA โ | BARWANI | 4.06 | D |
33.2%
3.17
CategoryFarm Pond
Started / Completed / Phys297 / 13 / 48
Completion rate20.5%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked4.37Cr / 1.87Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score3.17 / 10
|
4.5%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.75Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
18.4%
6.21
CategoryDug Well Recharge
Started / Completed / Phys1,190 / 8 / 698
Completion rate59.3%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked1.24Cr / 0.81Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.24 / 5.0
Final score6.21 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
40.9%
4.23
CategoryWater conservation & recharge
Started / Completed / Phys207 / 5 / 48
Completion rate25.6%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked4.73Cr / 2.79Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score4.23 / 10
|
1.9%
3.85
CategoryWatershed Related Works
Started / Completed / Phys11 / 2 / 1
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.22Cr / 0.11Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score3.85 / 10
|
0.9%
3.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 2
Completion rate30.8%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score3.99 / 10
|
| 197 | PATHARIYA โ | DAMOH | 4.05 | D |
24.0%
3.35
CategoryFarm Pond
Started / Completed / Phys235 / 64 / 4
Completion rate28.9%
Part A score (max 5.0)1.45 / 5.0
Ongoing sanction / booked3.52Cr / 1.34Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score3.35 / 10
|
โ |
5.0%
5.35
CategoryDug Well Recharge
Started / Completed / Phys385 / 170 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.54Cr / 0.33Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score5.35 / 10
|
4.6%
4.72
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.85Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.72 / 5.0
Final score4.72 / 10
|
54.7%
4.12
CategoryWater conservation & recharge
Started / Completed / Phys142 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.82Cr / 8.91Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score4.12 / 10
|
8.3%
4.66
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.64Cr / 1.53Cr
Expenditure rate (ongoing)93.1%
Part B score (max 5.0)4.66 / 5.0
Final score4.66 / 10
|
3.4%
3.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.48Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
|
| 198 | KHURAI โ | SAGAR | 4.05 | D |
43.5%
2.70
CategoryFarm Pond
Started / Completed / Phys253 / 77 / 5
Completion rate32.4%
Part A score (max 5.0)1.62 / 5.0
Ongoing sanction / booked3.03Cr / 0.65Cr
Expenditure rate (ongoing)21.6%
Part B score (max 5.0)1.08 / 5.0
Final score2.70 / 10
|
2.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
8.7%
5.90
CategoryDug Well Recharge
Started / Completed / Phys339 / 182 / 74
Completion rate75.5%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.22Cr / 0.09Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score5.90 / 10
|
โ |
43.4%
5.19
CategoryWater conservation & recharge
Started / Completed / Phys115 / 36 / 11
Completion rate40.9%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked2.51Cr / 1.58Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score5.19 / 10
|
0.0%
8.33
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score8.33 / 10
|
2.0%
5.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
|
| 199 | BADWARA โ | KATNI | 4.05 | D |
33.7%
3.70
CategoryFarm Pond
Started / Completed / Phys297 / 62 / 43
Completion rate35.4%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked2.83Cr / 1.09Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score3.70 / 10
|
7.5%
1.63
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.98Cr / 0.32Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score1.63 / 10
|
6.2%
4.44
CategoryDug Well Recharge
Started / Completed / Phys310 / 76 / 77
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked0.41Cr / 0.16Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score4.44 / 10
|
โ |
20.4%
5.09
CategoryWater conservation & recharge
Started / Completed / Phys52 / 1 / 10
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked2.19Cr / 1.77Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score5.09 / 10
|
24.4%
4.65
CategoryWatershed Related Works
Started / Completed / Phys41 / 4 / 5
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked2.52Cr / 1.79Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score4.65 / 10
|
8.0%
2.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.04Cr / 0.62Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score2.98 / 10
|
| 200 | MAIHAR โ | SATNA | 4.04 | D |
48.1%
3.88
CategoryFarm Pond
Started / Completed / Phys328 / 13 / 103
Completion rate35.4%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked5.70Cr / 2.41Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.12 / 5.0
Final score3.88 / 10
|
3.7%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.5%
5.98
CategoryDug Well Recharge
Started / Completed / Phys155 / 48 / 25
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score5.98 / 10
|
0.1%
4.98
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)99.6%
Part B score (max 5.0)4.98 / 5.0
Final score4.98 / 10
|
30.6%
4.64
CategoryWater conservation & recharge
Started / Completed / Phys87 / 0 / 11
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked4.74Cr / 3.80Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score4.64 / 10
|
6.6%
4.23
CategoryWatershed Related Works
Started / Completed / Phys56 / 4 / 2
Completion rate10.7%
Part A score (max 5.0)0.54 / 5.0
Ongoing sanction / booked0.99Cr / 0.74Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score4.23 / 10
|
9.4%
4.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 0 / 7
Completion rate17.5%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked1.38Cr / 0.87Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score4.02 / 10
|
| 201 | NISARPUR โ | DHAR | 4.04 | D |
25.2%
2.42
CategoryFarm Pond
Started / Completed / Phys78 / 1 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked1.19Cr / 0.56Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score2.42 / 10
|
โ |
8.1%
2.90
CategoryDug Well Recharge
Started / Completed / Phys150 / 2 / 0
Completion rate1.3%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked0.38Cr / 0.22Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score2.90 / 10
|
โ |
63.3%
4.81
CategoryWater conservation & recharge
Started / Completed / Phys39 / 2 / 0
Completion rate5.1%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked2.97Cr / 2.70Cr
Expenditure rate (ongoing)91.0%
Part B score (max 5.0)4.55 / 5.0
Final score4.81 / 10
|
3.2%
4.71
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score4.71 / 10
|
0.2%
2.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score2.11 / 10
|
| 202 | SHAJAPUR โ | SHAJAPUR | 4.03 | D |
45.0%
2.74
CategoryFarm Pond
Started / Completed / Phys233 / 35 / 18
Completion rate22.7%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked6.14Cr / 1.97Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score2.74 / 10
|
3.9%
1.88
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.26Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score1.88 / 10
|
5.9%
5.96
CategoryDug Well Recharge
Started / Completed / Phys433 / 256 / 51
Completion rate70.9%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.30Cr / 0.15Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score5.96 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
4.90
CategoryWater conservation & recharge
Started / Completed / Phys132 / 12 / 33
Completion rate34.1%
Part A score (max 5.0)1.70 / 5.0
Ongoing sanction / booked4.00Cr / 2.56Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.20 / 5.0
Final score4.90 / 10
|
8.0%
6.45
CategoryWatershed Related Works
Started / Completed / Phys33 / 3 / 18
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.52Cr / 0.34Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score6.45 / 10
|
1.2%
4.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score4.73 / 10
|
| 203 | SONKATCH โ | DEWAS | 4.02 | D |
50.3%
3.29
CategoryFarm Pond
Started / Completed / Phys103 / 22 / 5
Completion rate26.2%
Part A score (max 5.0)1.31 / 5.0
Ongoing sanction / booked2.91Cr / 1.15Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score3.29 / 10
|
2.5%
3.49
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
|
12.5%
5.12
CategoryDug Well Recharge
Started / Completed / Phys377 / 66 / 134
Completion rate53.1%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.46Cr / 0.23Cr
Expenditure rate (ongoing)49.4%
Part B score (max 5.0)2.47 / 5.0
Final score5.12 / 10
|
โ |
32.7%
4.82
CategoryWater conservation & recharge
Started / Completed / Phys69 / 4 / 19
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.74Cr / 1.10Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score4.82 / 10
|
1.1%
2.72
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score2.72 / 10
|
0.8%
4.42
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.06Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
|
| 204 | NALKHEDA โ | AGAR-MALWA | 4.02 | D |
29.1%
3.25
CategoryFarm Pond
Started / Completed / Phys125 / 2 / 0
Completion rate1.6%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked3.18Cr / 2.01Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score3.25 / 10
|
โ |
10.9%
4.85
CategoryDug Well Recharge
Started / Completed / Phys464 / 64 / 0
Completion rate13.8%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked1.03Cr / 0.86Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score4.85 / 10
|
โ |
52.3%
4.28
CategoryWater conservation & recharge
Started / Completed / Phys80 / 1 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked5.71Cr / 4.81Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score4.28 / 10
|
0.9%
3.51
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
|
6.8%
4.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.75Cr / 0.60Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score4.03 / 10
|
| 205 | SIHORA โ | JABALPUR | 4.01 | D |
54.9%
1.64
CategoryFarm Pond
Started / Completed / Phys161 / 9 / 10
Completion rate11.8%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked4.02Cr / 0.84Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.04 / 5.0
Final score1.64 / 10
|
2.9%
3.93
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.18Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
|
0.5%
2.30
CategoryDug Well Recharge
Started / Completed / Phys16 / 2 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score2.30 / 10
|
โ |
35.7%
6.92
CategoryWater conservation & recharge
Started / Completed / Phys39 / 12 / 3
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked1.54Cr / 1.83Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score6.92 / 10
|
1.4%
4.53
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.87 / 5.0
Final score4.53 / 10
|
4.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 206 | BADOD โ | AGAR-MALWA | 4.01 | D |
26.6%
2.88
CategoryFarm Pond
Started / Completed / Phys208 / 18 / 0
Completion rate8.7%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked4.24Cr / 2.08Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score2.88 / 10
|
3.1%
3.45
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.36Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.45 / 10
|
7.0%
6.03
CategoryDug Well Recharge
Started / Completed / Phys463 / 269 / 0
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked0.50Cr / 0.31Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score6.03 / 10
|
1.1%
3.54
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score3.54 / 10
|
38.3%
4.26
CategoryWater conservation & recharge
Started / Completed / Phys156 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.60Cr / 5.62Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score4.26 / 10
|
3.0%
4.15
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.43Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score4.15 / 10
|
20.9%
4.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.60Cr / 3.17Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.39 / 5.0
Final score4.39 / 10
|
| 207 | UDAIPURA โ | RAISEN | 4.00 | D |
73.7%
3.78
CategoryFarm Pond
Started / Completed / Phys292 / 12 / 15
Completion rate9.2%
Part A score (max 5.0)0.46 / 5.0
Ongoing sanction / booked6.08Cr / 4.04Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.78 / 10
|
1.8%
3.27
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
|
5.4%
8.43
CategoryDug Well Recharge
Started / Completed / Phys194 / 123 / 23
Completion rate75.3%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked0.12Cr / 0.12Cr
Expenditure rate (ongoing)93.3%
Part B score (max 5.0)4.66 / 5.0
Final score8.43 / 10
|
โ |
17.3%
3.66
CategoryWater conservation & recharge
Started / Completed / Phys20 / 0 / 1
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked1.40Cr / 0.95Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score3.66 / 10
|
0.4%
2.54
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score2.54 / 10
|
1.2%
4.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.10Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score4.15 / 10
|
| 208 | JATARA โ | TIKAMGARH | 4.00 | D |
10.1%
2.95
CategoryFarm Pond
Started / Completed / Phys262 / 12 / 7
Completion rate7.3%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked3.59Cr / 1.85Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score2.95 / 10
|
2.9%
0.92
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.21Cr
Expenditure rate (ongoing)18.3%
Part B score (max 5.0)0.92 / 5.0
Final score0.92 / 10
|
4.6%
4.71
CategoryDug Well Recharge
Started / Completed / Phys661 / 28 / 108
Completion rate20.6%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked1.39Cr / 1.02Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score4.71 / 10
|
โ |
65.6%
4.22
CategoryWater conservation & recharge
Started / Completed / Phys342 / 6 / 1
Completion rate2.0%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked24.56Cr / 20.23Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score4.22 / 10
|
2.8%
4.56
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 1
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.06Cr / 0.89Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.21 / 5.0
Final score4.56 / 10
|
14.0%
4.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys68 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.38Cr / 4.35Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
|
| 209 | BADARWAS โ | SHIVPURI | 4.00 | D |
39.3%
4.06
CategoryFarm Pond
Started / Completed / Phys237 / 63 / 12
Completion rate31.6%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked5.83Cr / 2.89Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score4.06 / 10
|
โ |
2.1%
4.41
CategoryDug Well Recharge
Started / Completed / Phys181 / 39 / 0
Completion rate21.5%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked0.36Cr / 0.24Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score4.41 / 10
|
0.8%
3.36
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.12Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
|
44.3%
3.88
CategoryWater conservation & recharge
Started / Completed / Phys132 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked9.76Cr / 7.57Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score3.88 / 10
|
7.9%
4.47
CategoryWatershed Related Works
Started / Completed / Phys35 / 5 / 0
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.52Cr / 1.14Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score4.47 / 10
|
5.6%
3.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 3 / 0
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked1.16Cr / 0.72Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score3.85 / 10
|
| 210 | SAUSAR โ | CHHINDWARA | 4.00 | D |
48.3%
4.25
CategoryFarm Pond
Started / Completed / Phys185 / 25 / 0
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked2.79Cr / 1.99Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score4.25 / 10
|
6.1%
0.10
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.01Cr
Expenditure rate (ongoing)2.1%
Part B score (max 5.0)0.10 / 5.0
Final score0.10 / 10
|
10.4%
5.41
CategoryDug Well Recharge
Started / Completed / Phys262 / 37 / 8
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked0.56Cr / 0.51Cr
Expenditure rate (ongoing)91.0%
Part B score (max 5.0)4.55 / 5.0
Final score5.41 / 10
|
โ |
28.7%
3.98
CategoryWater conservation & recharge
Started / Completed / Phys52 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.86Cr / 1.49Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score3.98 / 10
|
5.1%
3.80
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
|
1.3%
3.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
|
| 211 | WAIDHAN โ | SINGRAULI | 3.99 | D |
30.2%
4.24
CategoryFarm Pond
Started / Completed / Phys342 / 143 / 1
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked3.77Cr / 1.60Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score4.24 / 10
|
3.3%
3.14
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.43Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
|
4.4%
5.06
CategoryDug Well Recharge
Started / Completed / Phys388 / 51 / 113
Completion rate42.3%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.53Cr / 0.31Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score5.06 / 10
|
โ |
44.5%
3.86
CategoryWater conservation & recharge
Started / Completed / Phys129 / 6 / 8
Completion rate10.9%
Part A score (max 5.0)0.54 / 5.0
Ongoing sanction / booked8.16Cr / 5.41Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.86 / 10
|
12.2%
4.01
CategoryWatershed Related Works
Started / Completed / Phys33 / 4 / 0
Completion rate12.1%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked2.34Cr / 1.59Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score4.01 / 10
|
5.3%
3.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.08Cr / 0.71Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score3.28 / 10
|
| 212 | JOBAT โ | ALIRAJPUR | 3.99 | D |
11.3%
2.18
CategoryFarm Pond
Started / Completed / Phys141 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.84Cr / 0.80Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score2.18 / 10
|
3.0%
4.64
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.46Cr
Expenditure rate (ongoing)92.8%
Part B score (max 5.0)4.64 / 5.0
Final score4.64 / 10
|
7.0%
2.86
CategoryDug Well Recharge
Started / Completed / Phys442 / 2 / 0
Completion rate0.5%
Part A score (max 5.0)0.02 / 5.0
Ongoing sanction / booked1.13Cr / 0.64Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score2.86 / 10
|
โ |
72.6%
4.33
CategoryWater conservation & recharge
Started / Completed / Phys87 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked11.80Cr / 10.21Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score4.33 / 10
|
5.0%
4.24
CategoryWatershed Related Works
Started / Completed / Phys22 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.68Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score4.24 / 10
|
1.1%
4.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.15Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score4.31 / 10
|
| 213 | BUDNI โ | SEHORE | 3.99 | D |
60.4%
3.62
CategoryFarm Pond
Started / Completed / Phys81 / 1 / 23
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked1.04Cr / 0.44Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score3.62 / 10
|
โ |
16.2%
5.76
CategoryDug Well Recharge
Started / Completed / Phys151 / 32 / 69
Completion rate66.9%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked0.13Cr / 0.06Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score5.76 / 10
|
15.6%
3.80
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.29Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
|
3.2%
4.03
CategoryWater conservation & recharge
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.78 / 5.0
Final score4.03 / 10
|
2.7%
2.37
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)47.4%
Part B score (max 5.0)2.37 / 5.0
Final score2.37 / 10
|
1.9%
4.20
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score4.20 / 10
|
| 214 | CHHATARPUR โ | CHHATARPUR | 3.98 | D |
52.0%
3.24
CategoryFarm Pond
Started / Completed / Phys242 / 86 / 1
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked5.00Cr / 1.44Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.45 / 5.0
Final score3.24 / 10
|
3.9%
0.99
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.12Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score0.99 / 10
|
7.8%
5.79
CategoryDug Well Recharge
Started / Completed / Phys518 / 258 / 0
Completion rate49.8%
Part A score (max 5.0)2.49 / 5.0
Ongoing sanction / booked0.62Cr / 0.41Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score5.79 / 10
|
0.5%
5.73
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)89.6%
Part B score (max 5.0)4.48 / 5.0
Final score5.73 / 10
|
27.5%
5.18
CategoryWater conservation & recharge
Started / Completed / Phys115 / 31 / 8
Completion rate33.9%
Part A score (max 5.0)1.70 / 5.0
Ongoing sanction / booked3.18Cr / 2.22Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score5.18 / 10
|
4.2%
3.80
CategoryWatershed Related Works
Started / Completed / Phys21 / 2 / 0
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked0.54Cr / 0.36Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.80 / 10
|
4.0%
4.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 0
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.55Cr / 0.45Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.64 / 10
|
| 215 | POHRI โ | SHIVPURI | 3.97 | D |
16.2%
4.30
CategoryFarm Pond
Started / Completed / Phys269 / 103 / 0
Completion rate38.3%
Part A score (max 5.0)1.91 / 5.0
Ongoing sanction / booked3.24Cr / 1.55Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.38 / 5.0
Final score4.30 / 10
|
0.7%
0.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)1.9%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
|
2.0%
4.46
CategoryDug Well Recharge
Started / Completed / Phys262 / 108 / 0
Completion rate41.2%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked0.39Cr / 0.19Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.40 / 5.0
Final score4.46 / 10
|
0.2%
4.93
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.08Cr
Expenditure rate (ongoing)98.7%
Part B score (max 5.0)4.93 / 5.0
Final score4.93 / 10
|
66.7%
3.88
CategoryWater conservation & recharge
Started / Completed / Phys213 / 3 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked22.17Cr / 16.88Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.81 / 5.0
Final score3.88 / 10
|
8.0%
4.05
CategoryWatershed Related Works
Started / Completed / Phys25 / 1 / 0
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked2.61Cr / 2.01Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score4.05 / 10
|
6.1%
4.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.03Cr / 1.73Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score4.27 / 10
|
| 216 | BERASIA โ | BHOPAL | 3.97 | D |
42.7%
3.32
CategoryFarm Pond
Started / Completed / Phys788 / 105 / 19
Completion rate15.7%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked14.00Cr / 7.09Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.53 / 5.0
Final score3.32 / 10
|
3.0%
3.10
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.16Cr / 0.72Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score3.10 / 10
|
3.6%
5.20
CategoryDug Well Recharge
Started / Completed / Phys564 / 228 / 55
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked0.70Cr / 0.38Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score5.20 / 10
|
0.2%
2.45
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)48.9%
Part B score (max 5.0)2.45 / 5.0
Final score2.45 / 10
|
42.7%
4.41
CategoryWater conservation & recharge
Started / Completed / Phys402 / 20 / 29
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked15.45Cr / 11.74Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score4.41 / 10
|
1.9%
4.33
CategoryWatershed Related Works
Started / Completed / Phys18 / 1 / 3
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked0.67Cr / 0.43Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.21 / 5.0
Final score4.33 / 10
|
5.9%
5.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 1 / 5
Completion rate26.1%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked2.00Cr / 1.53Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score5.13 / 10
|
| 217 | HARDA โ | HARDA | 3.97 | D |
54.1%
2.29
CategoryFarm Pond
Started / Completed / Phys98 / 5 / 16
Completion rate21.4%
Part A score (max 5.0)1.07 / 5.0
Ongoing sanction / booked2.35Cr / 0.57Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score2.29 / 10
|
4.6%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
11.6%
5.47
CategoryDug Well Recharge
Started / Completed / Phys233 / 147 / 22
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score5.47 / 10
|
โ |
20.2%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys11 / 1 / 5
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.32Cr / 0.21Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score6.07 / 10
|
6.1%
8.69
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 6
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)88.1%
Part B score (max 5.0)4.40 / 5.0
Final score8.69 / 10
|
3.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 218 | SIRMOUR โ | REWA | 3.95 | D |
57.6%
3.47
CategoryFarm Pond
Started / Completed / Phys287 / 135 / 0
Completion rate47.0%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked2.31Cr / 0.52Cr
Expenditure rate (ongoing)22.3%
Part B score (max 5.0)1.11 / 5.0
Final score3.47 / 10
|
3.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.4%
8.96
CategoryDug Well Recharge
Started / Completed / Phys73 / 69 / 0
Completion rate94.5%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score8.96 / 10
|
1.8%
4.77
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 4 / 0
Completion rate23.5%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score4.77 / 10
|
30.7%
5.04
CategoryWater conservation & recharge
Started / Completed / Phys60 / 20 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.89Cr / 1.27Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score5.04 / 10
|
5.7%
4.78
CategoryWatershed Related Works
Started / Completed / Phys12 / 5 / 0
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.34Cr / 0.18Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.70 / 5.0
Final score4.78 / 10
|
0.6%
1.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
|
| 219 | RAMA โ | JHABUA | 3.94 | D |
9.4%
1.82
CategoryFarm Pond
Started / Completed / Phys169 / 0 / 2
Completion rate1.2%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked2.34Cr / 0.82Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score1.82 / 10
|
3.0%
2.43
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.36Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score2.43 / 10
|
5.9%
4.07
CategoryDug Well Recharge
Started / Completed / Phys594 / 125 / 35
Completion rate26.9%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked1.08Cr / 0.59Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score4.07 / 10
|
โ |
78.3%
4.27
CategoryWater conservation & recharge
Started / Completed / Phys98 / 0 / 1
Completion rate1.0%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked19.49Cr / 16.45Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.27 / 10
|
0.6%
2.05
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score2.05 / 10
|
2.8%
3.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.49Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
|
| 220 | BAGLI โ | DEWAS | 3.93 | D |
44.1%
3.09
CategoryFarm Pond
Started / Completed / Phys420 / 71 / 43
Completion rate27.1%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked9.50Cr / 3.30Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.74 / 5.0
Final score3.09 / 10
|
4.1%
1.14
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.27Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score1.14 / 10
|
12.0%
6.76
CategoryDug Well Recharge
Started / Completed / Phys1,317 / 818 / 211
Completion rate78.1%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.77Cr / 0.44Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score6.76 / 10
|
0.5%
2.95
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score2.95 / 10
|
33.9%
4.21
CategoryWater conservation & recharge
Started / Completed / Phys171 / 8 / 16
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked8.45Cr / 5.93Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score4.21 / 10
|
4.3%
4.80
CategoryWatershed Related Works
Started / Completed / Phys35 / 4 / 3
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.87Cr / 0.66Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score4.80 / 10
|
1.1%
5.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.23Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score5.35 / 10
|
| 221 | SHAHNAGAR โ | PANNA | 3.93 | D |
30.5%
3.62
CategoryFarm Pond
Started / Completed / Phys524 / 64 / 0
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked9.12Cr / 5.50Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score3.62 / 10
|
4.0%
0.71
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.36Cr / 0.19Cr
Expenditure rate (ongoing)14.2%
Part B score (max 5.0)0.71 / 5.0
Final score0.71 / 10
|
3.4%
3.60
CategoryDug Well Recharge
Started / Completed / Phys445 / 45 / 0
Completion rate10.1%
Part A score (max 5.0)0.51 / 5.0
Ongoing sanction / booked1.04Cr / 0.64Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score3.60 / 10
|
0.3%
3.80
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
|
38.6%
4.21
CategoryWater conservation & recharge
Started / Completed / Phys307 / 7 / 0
Completion rate2.3%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked12.70Cr / 10.41Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.21 / 10
|
7.1%
4.28
CategoryWatershed Related Works
Started / Completed / Phys48 / 5 / 0
Completion rate10.4%
Part A score (max 5.0)0.52 / 5.0
Ongoing sanction / booked2.07Cr / 1.56Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score4.28 / 10
|
16.2%
4.55
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 2 / 0
Completion rate3.0%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked5.36Cr / 4.71Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.40 / 5.0
Final score4.55 / 10
|
| 222 | MEGHNAGAR โ | JHABUA | 3.92 | D |
11.1%
3.07
CategoryFarm Pond
Started / Completed / Phys192 / 4 / 0
Completion rate2.1%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked3.59Cr / 2.13Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.97 / 5.0
Final score3.07 / 10
|
2.2%
3.05
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.45Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score3.05 / 10
|
5.1%
2.98
CategoryDug Well Recharge
Started / Completed / Phys653 / 31 / 0
Completion rate4.7%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked1.61Cr / 0.88Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score2.98 / 10
|
0.2%
3.93
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
|
80.3%
4.11
CategoryWater conservation & recharge
Started / Completed / Phys233 / 3 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked26.21Cr / 21.22Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score4.11 / 10
|
0.5%
4.47
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.14Cr
Expenditure rate (ongoing)89.5%
Part B score (max 5.0)4.47 / 5.0
Final score4.47 / 10
|
0.7%
4.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.24Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.84 / 5.0
Final score4.84 / 10
|
| 223 | GANDHWANI โ | DHAR | 3.92 | D |
5.6%
2.65
CategoryFarm Pond
Started / Completed / Phys237 / 3 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked2.28Cr / 1.18Cr
Expenditure rate (ongoing)51.8%
Part B score (max 5.0)2.59 / 5.0
Final score2.65 / 10
|
โ |
2.5%
2.27
CategoryDug Well Recharge
Started / Completed / Phys400 / 26 / 0
Completion rate6.5%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked0.97Cr / 0.38Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score2.27 / 10
|
โ |
76.0%
4.08
CategoryWater conservation & recharge
Started / Completed / Phys285 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked31.49Cr / 25.72Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.08 / 5.0
Final score4.08 / 10
|
12.1%
3.94
CategoryWatershed Related Works
Started / Completed / Phys164 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.03Cr / 3.97Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score3.94 / 10
|
3.8%
3.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 1.11Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score3.53 / 10
|
| 224 | SEONDHA โ | DATIA | 3.91 | D |
52.7%
3.77
CategoryFarm Pond
Started / Completed / Phys296 / 101 / 0
Completion rate34.1%
Part A score (max 5.0)1.71 / 5.0
Ongoing sanction / booked3.96Cr / 1.63Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score3.77 / 10
|
2.2%
1.63
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.08Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score1.63 / 10
|
4.2%
7.24
CategoryDug Well Recharge
Started / Completed / Phys181 / 123 / 1
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.15Cr / 0.11Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score7.24 / 10
|
2.9%
3.79
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.24Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
|
29.9%
4.03
CategoryWater conservation & recharge
Started / Completed / Phys74 / 7 / 0
Completion rate9.5%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked3.06Cr / 2.17Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score4.03 / 10
|
4.4%
3.20
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.20 / 5.0
Final score3.20 / 10
|
3.8%
3.55
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.31Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score3.55 / 10
|
| 225 | BAJNA โ | RATLAM | 3.91 | D |
15.7%
3.60
CategoryFarm Pond
Started / Completed / Phys298 / 74 / 2
Completion rate25.5%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked2.32Cr / 1.08Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score3.60 / 10
|
7.6%
2.80
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.49Cr / 0.83Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score2.80 / 10
|
10.4%
4.48
CategoryDug Well Recharge
Started / Completed / Phys796 / 190 / 6
Completion rate24.6%
Part A score (max 5.0)1.23 / 5.0
Ongoing sanction / booked1.54Cr / 1.00Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.48 / 10
|
โ |
65.0%
4.04
CategoryWater conservation & recharge
Started / Completed / Phys147 / 6 / 0
Completion rate4.1%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked12.60Cr / 9.68Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score4.04 / 10
|
1.1%
2.91
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score2.91 / 10
|
0.2%
1.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)34.9%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
|
| 226 | BATIYAGARH โ | DAMOH | 3.91 | D |
14.3%
5.63
CategoryFarm Pond
Started / Completed / Phys208 / 60 / 40
Completion rate48.1%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked2.64Cr / 1.71Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score5.63 / 10
|
โ |
2.5%
5.52
CategoryDug Well Recharge
Started / Completed / Phys336 / 135 / 0
Completion rate40.2%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked0.51Cr / 0.36Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score5.52 / 10
|
0.3%
4.12
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score4.12 / 10
|
77.4%
3.55
CategoryWater conservation & recharge
Started / Completed / Phys125 / 1 / 0
Completion rate0.8%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked26.58Cr / 18.65Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score3.55 / 10
|
3.3%
3.58
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.12Cr / 0.80Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.58 / 5.0
Final score3.58 / 10
|
2.3%
3.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.61Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
|
| 227 | KARELI โ | NARSINGHPUR | 3.90 | D |
81.6%
3.47
CategoryFarm Pond
Started / Completed / Phys211 / 90 / 11
Completion rate47.9%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked2.86Cr / 0.62Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score3.47 / 10
|
โ |
1.3%
5.20
CategoryDug Well Recharge
Started / Completed / Phys37 / 16 / 7
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score5.20 / 10
|
0.5%
3.02
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score3.02 / 10
|
13.8%
5.96
CategoryWater conservation & recharge
Started / Completed / Phys34 / 13 / 5
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.46Cr / 0.31Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score5.96 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.4%
5.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 3 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score5.15 / 10
|
| 228 | RAMPUR BAGHELAN โ | SATNA | 3.89 | D |
41.7%
3.61
CategoryFarm Pond
Started / Completed / Phys201 / 12 / 37
Completion rate24.4%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked3.37Cr / 1.61Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.39 / 5.0
Final score3.61 / 10
|
7.0%
0.47
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.07Cr
Expenditure rate (ongoing)9.3%
Part B score (max 5.0)0.47 / 5.0
Final score0.47 / 10
|
2.9%
5.10
CategoryDug Well Recharge
Started / Completed / Phys126 / 10 / 15
Completion rate19.8%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked0.25Cr / 0.20Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.11 / 5.0
Final score5.10 / 10
|
1.3%
4.76
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.11Cr / 0.09Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score4.76 / 10
|
34.6%
4.66
CategoryWater conservation & recharge
Started / Completed / Phys72 / 3 / 5
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked3.44Cr / 2.82Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.66 / 10
|
7.0%
3.64
CategoryWatershed Related Works
Started / Completed / Phys15 / 0 / 1
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked0.69Cr / 0.46Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score3.64 / 10
|
5.5%
4.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 2 / 2
Completion rate23.5%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked0.51Cr / 0.39Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score4.94 / 10
|
| 229 | KHIRKIYA โ | HARDA | 3.88 | D |
35.1%
3.13
CategoryFarm Pond
Started / Completed / Phys99 / 16 / 0
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked2.01Cr / 0.93Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score3.13 / 10
|
2.7%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
10.2%
6.66
CategoryDug Well Recharge
Started / Completed / Phys263 / 116 / 55
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score6.66 / 10
|
20.8%
4.30
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 1 / 1
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked1.27Cr / 0.93Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score4.30 / 10
|
14.3%
3.29
CategoryWater conservation & recharge
Started / Completed / Phys23 / 1 / 0
Completion rate4.3%
Part A score (max 5.0)0.22 / 5.0
Ongoing sanction / booked0.90Cr / 0.56Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score3.29 / 10
|
3.0%
3.76
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.20Cr / 0.11Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score3.76 / 10
|
13.9%
4.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 0
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked0.90Cr / 0.75Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.50 / 10
|
| 230 | BHABRA โ | ALIRAJPUR | 3.88 | D |
15.2%
3.24
CategoryFarm Pond
Started / Completed / Phys120 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.41Cr / 2.21Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
|
2.2%
3.03
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.29Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
|
4.8%
3.78
CategoryDug Well Recharge
Started / Completed / Phys414 / 2 / 0
Completion rate0.5%
Part A score (max 5.0)0.02 / 5.0
Ongoing sanction / booked1.07Cr / 0.80Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score3.78 / 10
|
โ |
76.4%
4.04
CategoryWater conservation & recharge
Started / Completed / Phys90 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked17.12Cr / 13.85Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
|
1.4%
3.64
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.23Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score3.64 / 10
|
0.0%
4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)85.1%
Part B score (max 5.0)4.26 / 5.0
Final score4.26 / 10
|
| 231 | NARAYANGANJ โ | MANDLA | 3.88 | D |
36.2%
4.38
CategoryFarm Pond
Started / Completed / Phys187 / 25 / 25
Completion rate26.7%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked4.71Cr / 2.86Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score4.38 / 10
|
13.5%
0.36
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.39Cr / 0.17Cr
Expenditure rate (ongoing)7.1%
Part B score (max 5.0)0.36 / 5.0
Final score0.36 / 10
|
2.3%
6.01
CategoryDug Well Recharge
Started / Completed / Phys155 / 69 / 21
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked0.17Cr / 0.10Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.01 / 10
|
โ |
29.0%
4.35
CategoryWater conservation & recharge
Started / Completed / Phys92 / 9 / 0
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked4.78Cr / 3.69Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.86 / 5.0
Final score4.35 / 10
|
18.6%
4.46
CategoryWatershed Related Works
Started / Completed / Phys72 / 8 / 0
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked2.96Cr / 2.31Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score4.46 / 10
|
0.4%
3.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
|
| 232 | PAWAI โ | PANNA | 3.87 | D |
41.5%
3.37
CategoryFarm Pond
Started / Completed / Phys479 / 31 / 0
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked12.93Cr / 7.89Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score3.37 / 10
|
3.3%
3.61
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.10Cr / 0.79Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
|
4.3%
3.91
CategoryDug Well Recharge
Started / Completed / Phys377 / 51 / 0
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked1.23Cr / 0.80Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.23 / 5.0
Final score3.91 / 10
|
0.1%
2.17
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score2.17 / 10
|
37.6%
4.29
CategoryWater conservation & recharge
Started / Completed / Phys341 / 8 / 0
Completion rate2.3%
Part A score (max 5.0)0.12 / 5.0
Ongoing sanction / booked12.20Cr / 10.18Cr
Expenditure rate (ongoing)83.5%
Part B score (max 5.0)4.17 / 5.0
Final score4.29 / 10
|
1.6%
4.04
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.54Cr / 0.43Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
|
11.7%
4.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys46 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.85Cr / 3.30Cr
Expenditure rate (ongoing)85.7%
Part B score (max 5.0)4.28 / 5.0
Final score4.28 / 10
|
| 233 | RITHI โ | KATNI | 3.86 | D |
47.1%
2.52
CategoryFarm Pond
Started / Completed / Phys286 / 15 / 29
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked8.85Cr / 3.09Cr
Expenditure rate (ongoing)34.9%
Part B score (max 5.0)1.75 / 5.0
Final score2.52 / 10
|
2.0%
1.96
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.16Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score1.96 / 10
|
3.0%
5.18
CategoryDug Well Recharge
Started / Completed / Phys260 / 164 / 50
Completion rate82.3%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.11Cr / 0.02Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.06 / 5.0
Final score5.18 / 10
|
6.4%
5.89
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 7 / 24
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked0.80Cr / 0.49Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score5.89 / 10
|
24.1%
4.86
CategoryWater conservation & recharge
Started / Completed / Phys112 / 19 / 21
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked3.34Cr / 2.05Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score4.86 / 10
|
10.9%
5.61
CategoryWatershed Related Works
Started / Completed / Phys51 / 18 / 10
Completion rate54.9%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked1.14Cr / 0.65Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.87 / 5.0
Final score5.61 / 10
|
6.7%
4.97
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 4 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.06Cr / 0.70Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score4.97 / 10
|
| 234 | SAIKHEDA (GADARWARA) โ | NARSINGHPUR | 3.85 | D |
79.1%
3.47
CategoryFarm Pond
Started / Completed / Phys207 / 76 / 17
Completion rate44.9%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked2.66Cr / 0.65Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score3.47 / 10
|
โ |
2.7%
3.52
CategoryDug Well Recharge
Started / Completed / Phys64 / 26 / 1
Completion rate42.2%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score3.52 / 10
|
โ |
16.0%
5.74
CategoryWater conservation & recharge
Started / Completed / Phys21 / 7 / 6
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.39Cr / 0.20Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.64 / 5.0
Final score5.74 / 10
|
0.5%
4.18
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)83.7%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
|
1.8%
4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.72 / 5.0
Final score4.22 / 10
|
| 235 | TENDUKHEDA โ | DAMOH | 3.83 | D |
16.5%
4.54
CategoryFarm Pond
Started / Completed / Phys211 / 90 / 0
Completion rate42.7%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked1.72Cr / 0.83Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score4.54 / 10
|
โ |
5.2%
5.65
CategoryDug Well Recharge
Started / Completed / Phys354 / 97 / 0
Completion rate27.4%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked0.67Cr / 0.58Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score5.65 / 10
|
โ |
51.8%
3.59
CategoryWater conservation & recharge
Started / Completed / Phys88 / 1 / 0
Completion rate1.1%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked9.14Cr / 6.45Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score3.59 / 10
|
6.8%
3.18
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.77Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score3.18 / 10
|
19.6%
3.61
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.48Cr / 2.51Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
|
| 236 | PANNA โ | PANNA | 3.81 | D |
42.9%
3.83
CategoryFarm Pond
Started / Completed / Phys327 / 49 / 0
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked5.68Cr / 3.50Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score3.83 / 10
|
3.7%
1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.13Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
|
5.4%
3.62
CategoryDug Well Recharge
Started / Completed / Phys328 / 70 / 0
Completion rate21.3%
Part A score (max 5.0)1.07 / 5.0
Ongoing sanction / booked0.68Cr / 0.35Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score3.62 / 10
|
0.4%
3.40
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score3.40 / 10
|
26.6%
3.76
CategoryWater conservation & recharge
Started / Completed / Phys114 / 1 / 0
Completion rate0.9%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked4.18Cr / 3.11Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score3.76 / 10
|
9.2%
4.70
CategoryWatershed Related Works
Started / Completed / Phys47 / 3 / 0
Completion rate6.4%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked1.40Cr / 1.23Cr
Expenditure rate (ongoing)87.5%
Part B score (max 5.0)4.38 / 5.0
Final score4.70 / 10
|
11.7%
4.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.86Cr / 1.52Cr
Expenditure rate (ongoing)81.9%
Part B score (max 5.0)4.09 / 5.0
Final score4.09 / 10
|
| 237 | KHATEGAON โ | DEWAS | 3.81 | D |
59.4%
2.39
CategoryFarm Pond
Started / Completed / Phys291 / 6 / 49
Completion rate18.9%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked9.82Cr / 2.84Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score2.39 / 10
|
โ |
5.4%
3.36
CategoryDug Well Recharge
Started / Completed / Phys428 / 55 / 73
Completion rate29.9%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.78Cr / 0.29Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score3.36 / 10
|
2.6%
4.79
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.28Cr / 0.18Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score4.79 / 10
|
31.3%
6.41
CategoryWater conservation & recharge
Started / Completed / Phys132 / 0 / 65
Completion rate49.2%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked3.25Cr / 2.56Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.95 / 5.0
Final score6.41 / 10
|
1.0%
6.06
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score6.06 / 10
|
0.3%
4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.18 / 10
|
| 238 | KALAPIPAL โ | SHAJAPUR | 3.80 | D |
52.6%
2.99
CategoryFarm Pond
Started / Completed / Phys150 / 46 / 4
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked2.09Cr / 0.55Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score2.99 / 10
|
5.5%
0.99
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.07Cr
Expenditure rate (ongoing)19.8%
Part B score (max 5.0)0.99 / 5.0
Final score0.99 / 10
|
16.1%
5.68
CategoryDug Well Recharge
Started / Completed / Phys400 / 198 / 102
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.93 / 5.0
Final score5.68 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.1%
4.72
CategoryWater conservation & recharge
Started / Completed / Phys40 / 12 / 5
Completion rate42.5%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked1.08Cr / 0.56Cr
Expenditure rate (ongoing)51.8%
Part B score (max 5.0)2.59 / 5.0
Final score4.72 / 10
|
โ | โ |
| 239 | NIWARI โ | NIWARI | 3.80 | D |
19.7%
2.19
CategoryFarm Pond
Started / Completed / Phys208 / 8 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked2.84Cr / 1.13Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)1.99 / 5.0
Final score2.19 / 10
|
1.1%
0.15
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.00Cr
Expenditure rate (ongoing)3.0%
Part B score (max 5.0)0.15 / 5.0
Final score0.15 / 10
|
8.8%
3.33
CategoryDug Well Recharge
Started / Completed / Phys508 / 70 / 0
Completion rate13.8%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked1.13Cr / 0.60Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score3.33 / 10
|
โ |
44.7%
4.31
CategoryWater conservation & recharge
Started / Completed / Phys124 / 5 / 0
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked6.44Cr / 5.29Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.11 / 5.0
Final score4.31 / 10
|
3.4%
4.12
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.51Cr / 0.42Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score4.12 / 10
|
22.3%
4.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.32Cr / 3.01Cr
Expenditure rate (ongoing)90.5%
Part B score (max 5.0)4.53 / 5.0
Final score4.53 / 10
|
| 240 | RANAPUR โ | JHABUA | 3.80 | D |
24.9%
1.97
CategoryFarm Pond
Started / Completed / Phys146 / 5 / 1
Completion rate4.1%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked5.13Cr / 1.81Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score1.97 / 10
|
2.1%
2.01
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.18Cr
Expenditure rate (ongoing)40.3%
Part B score (max 5.0)2.01 / 5.0
Final score2.01 / 10
|
6.1%
3.78
CategoryDug Well Recharge
Started / Completed / Phys524 / 17 / 79
Completion rate18.3%
Part A score (max 5.0)0.92 / 5.0
Ongoing sanction / booked1.09Cr / 0.62Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.86 / 5.0
Final score3.78 / 10
|
โ |
64.1%
4.56
CategoryWater conservation & recharge
Started / Completed / Phys145 / 2 / 15
Completion rate11.7%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked11.91Cr / 9.47Cr
Expenditure rate (ongoing)79.6%
Part B score (max 5.0)3.98 / 5.0
Final score4.56 / 10
|
2.4%
3.93
CategoryWatershed Related Works
Started / Completed / Phys16 / 0 / 1
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked0.50Cr / 0.36Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.93 / 10
|
0.2%
3.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 2
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score3.59 / 10
|
| 241 | TEONTHAR โ | REWA | 3.78 | D |
44.0%
3.99
CategoryFarm Pond
Started / Completed / Phys284 / 88 / 23
Completion rate39.1%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked3.55Cr / 1.45Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score3.99 / 10
|
4.5%
0.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.03Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
|
1.2%
5.04
CategoryDug Well Recharge
Started / Completed / Phys59 / 19 / 6
Completion rate42.4%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score5.04 / 10
|
6.8%
5.37
CategoryIrrigation infrastructure
Started / Completed / Phys21 / 2 / 4
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.55Cr / 0.44Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.37 / 10
|
23.0%
3.91
CategoryWater conservation & recharge
Started / Completed / Phys80 / 7 / 2
Completion rate11.3%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked2.61Cr / 1.75Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score3.91 / 10
|
11.1%
3.87
CategoryWatershed Related Works
Started / Completed / Phys29 / 0 / 6
Completion rate20.7%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked1.35Cr / 0.76Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score3.87 / 10
|
9.4%
2.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.19Cr / 0.66Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score2.76 / 10
|
| 242 | UDAIGARH โ | ALIRAJPUR | 3.77 | D |
15.5%
2.88
CategoryFarm Pond
Started / Completed / Phys177 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.69Cr / 1.55Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score2.88 / 10
|
3.6%
3.22
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.41Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score3.22 / 10
|
6.4%
3.32
CategoryDug Well Recharge
Started / Completed / Phys432 / 11 / 4
Completion rate3.5%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked1.08Cr / 0.68Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.32 / 10
|
โ |
69.7%
4.04
CategoryWater conservation & recharge
Started / Completed / Phys66 / 0 / 3
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked11.99Cr / 9.14Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score4.04 / 10
|
4.8%
3.78
CategoryWatershed Related Works
Started / Completed / Phys22 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.83Cr / 0.63Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score3.78 / 10
|
โ |
| 243 | KARKELI โ | UMARIA | 3.77 | D |
24.6%
3.52
CategoryFarm Pond
Started / Completed / Phys313 / 27 / 0
Completion rate8.6%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked9.73Cr / 6.02Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score3.52 / 10
|
1.7%
3.19
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.47Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score3.19 / 10
|
2.6%
4.08
CategoryDug Well Recharge
Started / Completed / Phys441 / 67 / 0
Completion rate15.2%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked0.97Cr / 0.64Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.32 / 5.0
Final score4.08 / 10
|
0.1%
3.40
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score3.40 / 10
|
57.1%
3.87
CategoryWater conservation & recharge
Started / Completed / Phys267 / 5 / 1
Completion rate2.2%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked24.22Cr / 18.19Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score3.87 / 10
|
5.6%
4.03
CategoryWatershed Related Works
Started / Completed / Phys30 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.42Cr / 1.95Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.03 / 5.0
Final score4.03 / 10
|
8.3%
3.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys58 / 1 / 0
Completion rate1.7%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked3.54Cr / 2.53Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score3.66 / 10
|
| 244 | LAUNDI โ | CHHATARPUR | 3.76 | D |
52.6%
3.26
CategoryFarm Pond
Started / Completed / Phys221 / 68 / 5
Completion rate33.0%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked5.73Cr / 1.84Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score3.26 / 10
|
1.1%
2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
|
7.5%
5.46
CategoryDug Well Recharge
Started / Completed / Phys476 / 187 / 24
Completion rate44.3%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.69Cr / 0.45Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score5.46 / 10
|
โ |
30.9%
4.28
CategoryWater conservation & recharge
Started / Completed / Phys89 / 4 / 1
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked4.85Cr / 3.88Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score4.28 / 10
|
2.2%
3.40
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.25Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score3.40 / 10
|
5.7%
3.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.94Cr / 0.70Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score3.75 / 10
|
| 245 | KUKSHI โ | DHAR | 3.74 | D |
6.0%
2.35
CategoryFarm Pond
Started / Completed / Phys130 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.92Cr / 0.90Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.35 / 5.0
Final score2.35 / 10
|
โ |
1.5%
2.16
CategoryDug Well Recharge
Started / Completed / Phys184 / 0 / 7
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked0.46Cr / 0.18Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.97 / 5.0
Final score2.16 / 10
|
0.2%
1.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
|
87.1%
3.87
CategoryWater conservation & recharge
Started / Completed / Phys260 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked27.90Cr / 21.62Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.87 / 5.0
Final score3.87 / 10
|
3.0%
3.47
CategoryWatershed Related Works
Started / Completed / Phys36 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.97Cr / 0.67Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
|
2.2%
3.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.56Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.86 / 5.0
Final score3.86 / 10
|
| 246 | HANUMANA โ | REWA | 3.74 | D |
42.8%
2.52
CategoryFarm Pond
Started / Completed / Phys317 / 46 / 0
Completion rate14.5%
Part A score (max 5.0)0.73 / 5.0
Ongoing sanction / booked8.93Cr / 3.21Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score2.52 / 10
|
0.8%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.7%
3.54
CategoryDug Well Recharge
Started / Completed / Phys62 / 11 / 0
Completion rate17.7%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score3.54 / 10
|
3.8%
5.50
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 5 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.44Cr / 0.27Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score5.50 / 10
|
28.6%
4.75
CategoryWater conservation & recharge
Started / Completed / Phys139 / 38 / 2
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked4.92Cr / 3.26Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score4.75 / 10
|
11.9%
5.04
CategoryWatershed Related Works
Started / Completed / Phys16 / 5 / 0
Completion rate31.3%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked2.11Cr / 1.47Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score5.04 / 10
|
11.5%
4.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 6 / 1
Completion rate24.1%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked1.93Cr / 1.11Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score4.09 / 10
|
| 247 | MANAWAR โ | DHAR | 3.72 | D |
18.6%
3.04
CategoryFarm Pond
Started / Completed / Phys234 / 9 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked3.25Cr / 1.85Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.85 / 5.0
Final score3.04 / 10
|
โ |
5.4%
3.49
CategoryDug Well Recharge
Started / Completed / Phys386 / 29 / 0
Completion rate7.5%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked0.92Cr / 0.57Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score3.49 / 10
|
1.4%
4.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.24Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.84 / 5.0
Final score4.84 / 10
|
56.9%
4.00
CategoryWater conservation & recharge
Started / Completed / Phys128 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.41Cr / 8.34Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.00 / 5.0
Final score4.00 / 10
|
16.0%
3.52
CategoryWatershed Related Works
Started / Completed / Phys76 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.92Cr / 2.05Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
|
1.7%
3.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.21Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score3.29 / 10
|
| 248 | PHANDA โ | BHOPAL | 3.71 | D |
45.5%
3.13
CategoryFarm Pond
Started / Completed / Phys157 / 20 / 0
Completion rate12.7%
Part A score (max 5.0)0.64 / 5.0
Ongoing sanction / booked2.57Cr / 1.28Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score3.13 / 10
|
2.9%
2.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score2.09 / 10
|
5.4%
4.17
CategoryDug Well Recharge
Started / Completed / Phys127 / 22 / 0
Completion rate17.3%
Part A score (max 5.0)0.87 / 5.0
Ongoing sanction / booked0.27Cr / 0.18Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score4.17 / 10
|
โ |
32.7%
4.47
CategoryWater conservation & recharge
Started / Completed / Phys49 / 10 / 0
Completion rate20.4%
Part A score (max 5.0)1.02 / 5.0
Ongoing sanction / booked1.59Cr / 1.09Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score4.47 / 10
|
11.2%
4.34
CategoryWatershed Related Works
Started / Completed / Phys17 / 2 / 0
Completion rate11.8%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked0.67Cr / 0.51Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score4.34 / 10
|
2.4%
2.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score2.10 / 10
|
| 249 | SARDARPUR โ | DHAR | 3.69 | D |
16.7%
2.41
CategoryFarm Pond
Started / Completed / Phys353 / 18 / 0
Completion rate5.1%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked8.41Cr / 3.63Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score2.41 / 10
|
โ |
2.4%
2.55
CategoryDug Well Recharge
Started / Completed / Phys489 / 54 / 0
Completion rate11.0%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked1.13Cr / 0.45Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)2.00 / 5.0
Final score2.55 / 10
|
0.6%
2.62
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.17Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score2.62 / 10
|
74.0%
4.00
CategoryWater conservation & recharge
Started / Completed / Phys335 / 3 / 0
Completion rate0.9%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked39.41Cr / 31.15Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score4.00 / 10
|
2.8%
3.62
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.48Cr / 1.07Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
|
3.5%
4.42
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 0
Completion rate4.8%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked1.76Cr / 1.48Cr
Expenditure rate (ongoing)83.7%
Part B score (max 5.0)4.18 / 5.0
Final score4.42 / 10
|
| 250 | GUNOR โ | PANNA | 3.69 | D |
38.0%
3.22
CategoryFarm Pond
Started / Completed / Phys449 / 63 / 0
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked6.83Cr / 3.44Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.52 / 5.0
Final score3.22 / 10
|
โ |
3.4%
3.63
CategoryDug Well Recharge
Started / Completed / Phys274 / 88 / 0
Completion rate32.1%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked0.48Cr / 0.20Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score3.63 / 10
|
0.5%
3.32
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.32 / 10
|
40.9%
3.94
CategoryWater conservation & recharge
Started / Completed / Phys200 / 5 / 0
Completion rate2.5%
Part A score (max 5.0)0.13 / 5.0
Ongoing sanction / booked8.41Cr / 6.41Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score3.94 / 10
|
5.0%
3.77
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 0
Completion rate4.8%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked1.01Cr / 0.71Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score3.77 / 10
|
12.2%
4.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys34 / 3 / 0
Completion rate8.8%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked2.31Cr / 1.80Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score4.33 / 10
|
| 251 | BADA MALEHARA โ | CHHATARPUR | 3.68 | D |
46.6%
3.42
CategoryFarm Pond
Started / Completed / Phys290 / 106 / 0
Completion rate36.6%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked6.13Cr / 1.95Cr
Expenditure rate (ongoing)31.8%
Part B score (max 5.0)1.59 / 5.0
Final score3.42 / 10
|
10.7%
2.50
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.11Cr / 1.06Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score2.50 / 10
|
5.3%
6.17
CategoryDug Well Recharge
Started / Completed / Phys703 / 615 / 0
Completion rate87.5%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score6.17 / 10
|
1.1%
2.34
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.10Cr
Expenditure rate (ongoing)46.8%
Part B score (max 5.0)2.34 / 5.0
Final score2.34 / 10
|
27.2%
4.21
CategoryWater conservation & recharge
Started / Completed / Phys145 / 19 / 0
Completion rate13.1%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked4.72Cr / 3.36Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score4.21 / 10
|
4.6%
3.29
CategoryWatershed Related Works
Started / Completed / Phys29 / 1 / 0
Completion rate3.4%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked0.83Cr / 0.52Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score3.29 / 10
|
4.4%
3.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.87Cr / 0.67Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
|
| 252 | MOMAN BADODIYA โ | SHAJAPUR | 3.68 | D |
51.2%
2.68
CategoryFarm Pond
Started / Completed / Phys192 / 41 / 5
Completion rate24.0%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked3.67Cr / 1.09Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score2.68 / 10
|
3.9%
2.80
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.20Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score2.80 / 10
|
12.0%
5.86
CategoryDug Well Recharge
Started / Completed / Phys444 / 39 / 273
Completion rate70.3%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score5.86 / 10
|
1.0%
5.47
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score5.47 / 10
|
28.4%
4.16
CategoryWater conservation & recharge
Started / Completed / Phys68 / 3 / 11
Completion rate20.6%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked1.96Cr / 1.22Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score4.16 / 10
|
1.7%
4.38
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score4.38 / 10
|
1.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 253 | DAHI โ | DHAR | 3.67 | D |
8.8%
3.20
CategoryFarm Pond
Started / Completed / Phys160 / 1 / 0
Completion rate0.6%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked2.30Cr / 1.46Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score3.20 / 10
|
โ |
2.5%
1.94
CategoryDug Well Recharge
Started / Completed / Phys256 / 6 / 0
Completion rate2.3%
Part A score (max 5.0)0.12 / 5.0
Ongoing sanction / booked0.65Cr / 0.24Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.83 / 5.0
Final score1.94 / 10
|
โ |
81.3%
3.79
CategoryWater conservation & recharge
Started / Completed / Phys279 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked21.25Cr / 16.11Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
|
5.5%
3.46
CategoryWatershed Related Works
Started / Completed / Phys27 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.43Cr / 0.99Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score3.46 / 10
|
1.8%
3.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.37Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
|
| 254 | HATTA โ | DAMOH | 3.66 | D |
20.8%
2.37
CategoryFarm Pond
Started / Completed / Phys175 / 6 / 0
Completion rate3.4%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked3.44Cr / 1.51Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score2.37 / 10
|
โ |
2.1%
3.69
CategoryDug Well Recharge
Started / Completed / Phys141 / 7 / 0
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked0.35Cr / 0.24Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score3.69 / 10
|
โ |
53.5%
4.10
CategoryWater conservation & recharge
Started / Completed / Phys96 / 4 / 0
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked9.05Cr / 7.04Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score4.10 / 10
|
17.2%
3.91
CategoryWatershed Related Works
Started / Completed / Phys43 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.95Cr / 2.31Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score3.91 / 10
|
6.3%
3.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.08Cr / 0.77Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score3.56 / 10
|
| 255 | PALI โ | UMARIA | 3.66 | D |
37.9%
3.50
CategoryFarm Pond
Started / Completed / Phys164 / 3 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked6.34Cr / 4.32Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score3.50 / 10
|
1.1%
3.24
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
|
3.4%
3.14
CategoryDug Well Recharge
Started / Completed / Phys224 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.36Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
|
โ |
45.0%
3.86
CategoryWater conservation & recharge
Started / Completed / Phys86 / 1 / 0
Completion rate1.2%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked7.52Cr / 5.72Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score3.86 / 10
|
8.9%
3.30
CategoryWatershed Related Works
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.52Cr / 1.00Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score3.30 / 10
|
3.7%
4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.53Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score4.26 / 10
|
| 256 | DHANAURA โ | SEONI | 3.63 | D |
40.1%
3.30
CategoryFarm Pond
Started / Completed / Phys374 / 93 / 1
Completion rate25.1%
Part A score (max 5.0)1.26 / 5.0
Ongoing sanction / booked6.84Cr / 2.80Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score3.30 / 10
|
1.8%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
2.1%
6.52
CategoryDug Well Recharge
Started / Completed / Phys201 / 105 / 0
Completion rate52.2%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked0.24Cr / 0.19Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score6.52 / 10
|
โ |
31.6%
3.80
CategoryWater conservation & recharge
Started / Completed / Phys116 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked7.17Cr / 5.44Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
|
16.3%
4.02
CategoryWatershed Related Works
Started / Completed / Phys37 / 2 / 0
Completion rate5.4%
Part A score (max 5.0)0.27 / 5.0
Ongoing sanction / booked3.46Cr / 2.60Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score4.02 / 10
|
8.1%
3.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.85Cr / 1.43Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score3.88 / 10
|
| 257 | JABALPUR โ | JABALPUR | 3.63 | D |
45.5%
2.19
CategoryFarm Pond
Started / Completed / Phys177 / 29 / 12
Completion rate23.2%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked3.32Cr / 0.69Cr
Expenditure rate (ongoing)20.7%
Part B score (max 5.0)1.04 / 5.0
Final score2.19 / 10
|
11.1%
1.27
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.26Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score1.27 / 10
|
6.4%
6.29
CategoryDug Well Recharge
Started / Completed / Phys230 / 108 / 40
Completion rate64.3%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.21Cr / 0.13Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score6.29 / 10
|
0.2%
2.26
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score2.26 / 10
|
22.3%
5.13
CategoryWater conservation & recharge
Started / Completed / Phys47 / 8 / 15
Completion rate48.9%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked0.77Cr / 0.41Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score5.13 / 10
|
7.3%
6.61
CategoryWatershed Related Works
Started / Completed / Phys13 / 8 / 2
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score6.61 / 10
|
7.1%
6.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 11 / 3
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.28Cr / 0.12Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score6.45 / 10
|
| 258 | KUNDAM โ | JABALPUR | 3.62 | D |
56.5%
2.24
CategoryFarm Pond
Started / Completed / Phys268 / 14 / 24
Completion rate14.2%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked8.43Cr / 2.58Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score2.24 / 10
|
9.3%
1.37
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 0.44Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.37 / 5.0
Final score1.37 / 10
|
4.0%
6.61
CategoryDug Well Recharge
Started / Completed / Phys266 / 103 / 134
Completion rate89.1%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score6.61 / 10
|
โ |
22.7%
6.70
CategoryWater conservation & recharge
Started / Completed / Phys95 / 32 / 36
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked1.26Cr / 0.78Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score6.70 / 10
|
7.5%
5.84
CategoryWatershed Related Works
Started / Completed / Phys42 / 19 / 7
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.50Cr / 0.28Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score5.84 / 10
|
โ |
| 259 | JAITHARI โ | ANUPPUR | 3.60 | D |
85.9%
3.32
CategoryFarm Pond
Started / Completed / Phys1,067 / 465 / 58
Completion rate49.0%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked17.08Cr / 2.97Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score3.32 / 10
|
โ |
1.1%
4.22
CategoryDug Well Recharge
Started / Completed / Phys173 / 37 / 36
Completion rate42.2%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.24Cr / 0.10Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.22 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.0%
6.03
CategoryWater conservation & recharge
Started / Completed / Phys69 / 20 / 24
Completion rate63.8%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked1.42Cr / 0.81Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.85 / 5.0
Final score6.03 / 10
|
0.3%
6.20
CategoryWatershed Related Works
Started / Completed / Phys5 / 2 / 1
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score6.20 / 10
|
3.6%
3.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 3 / 1
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.10Cr / 0.56Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.55 / 5.0
Final score3.67 / 10
|
| 260 | SHUJALPUR โ | SHAJAPUR | 3.60 | D |
47.7%
2.80
CategoryFarm Pond
Started / Completed / Phys107 / 24 / 0
Completion rate22.4%
Part A score (max 5.0)1.12 / 5.0
Ongoing sanction / booked2.69Cr / 0.90Cr
Expenditure rate (ongoing)33.5%
Part B score (max 5.0)1.68 / 5.0
Final score2.80 / 10
|
2.1%
2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
|
12.6%
5.04
CategoryDug Well Recharge
Started / Completed / Phys371 / 99 / 132
Completion rate62.3%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked0.33Cr / 0.13Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score5.04 / 10
|
1.3%
2.28
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score2.28 / 10
|
35.3%
4.30
CategoryWater conservation & recharge
Started / Completed / Phys50 / 4 / 7
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked2.32Cr / 1.48Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.20 / 5.0
Final score4.30 / 10
|
0.4%
4.28
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score4.28 / 10
|
0.6%
2.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score2.35 / 10
|
| 261 | MANDSAUR โ | MANDSAUR | 3.60 | D |
26.6%
1.32
CategoryFarm Pond
Started / Completed / Phys230 / 7 / 1
Completion rate3.5%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked2.75Cr / 0.63Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score1.32 / 10
|
โ |
24.0%
4.41
CategoryDug Well Recharge
Started / Completed / Phys991 / 199 / 289
Completion rate49.2%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked1.30Cr / 0.51Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.94 / 5.0
Final score4.41 / 10
|
โ |
47.8%
4.39
CategoryWater conservation & recharge
Started / Completed / Phys150 / 21 / 25
Completion rate30.7%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked4.14Cr / 2.37Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score4.39 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.3%
4.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score4.65 / 10
|
| 262 | SITAMAU โ | MANDSAUR | 3.60 | D |
23.0%
2.40
CategoryFarm Pond
Started / Completed / Phys333 / 14 / 1
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked5.79Cr / 2.52Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score2.40 / 10
|
โ |
10.6%
4.09
CategoryDug Well Recharge
Started / Completed / Phys1,066 / 75 / 31
Completion rate9.9%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked2.49Cr / 1.78Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score4.09 / 10
|
0.5%
3.85
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
|
60.2%
3.92
CategoryWater conservation & recharge
Started / Completed / Phys360 / 10 / 0
Completion rate2.8%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked15.63Cr / 11.81Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score3.92 / 10
|
2.5%
4.09
CategoryWatershed Related Works
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.54Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.09 / 5.0
Final score4.09 / 10
|
3.1%
4.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.82Cr / 0.67Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score4.09 / 10
|
| 263 | MAUGANJ โ | REWA | 3.59 | D |
48.7%
3.17
CategoryFarm Pond
Started / Completed / Phys255 / 66 / 0
Completion rate25.9%
Part A score (max 5.0)1.29 / 5.0
Ongoing sanction / booked3.65Cr / 1.37Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score3.17 / 10
|
โ |
1.6%
2.94
CategoryDug Well Recharge
Started / Completed / Phys61 / 7 / 0
Completion rate11.5%
Part A score (max 5.0)0.57 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score2.94 / 10
|
4.4%
2.98
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.26Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score2.98 / 10
|
35.4%
4.13
CategoryWater conservation & recharge
Started / Completed / Phys70 / 11 / 0
Completion rate15.7%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked2.74Cr / 1.83Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score4.13 / 10
|
4.5%
3.26
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.45Cr / 0.29Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score3.26 / 10
|
5.5%
4.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 5 / 0
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked0.27Cr / 0.15Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score4.81 / 10
|
| 264 | GOHAD โ | BHIND | 3.59 | D |
19.5%
2.75
CategoryFarm Pond
Started / Completed / Phys224 / 30 / 0
Completion rate13.4%
Part A score (max 5.0)0.67 / 5.0
Ongoing sanction / booked5.18Cr / 2.16Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.08 / 5.0
Final score2.75 / 10
|
1.0%
0.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
|
0.3%
3.70
CategoryDug Well Recharge
Started / Completed / Phys31 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.70 / 5.0
Final score3.70 / 10
|
15.9%
3.94
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.81Cr / 3.78Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score3.94 / 10
|
55.8%
3.85
CategoryWater conservation & recharge
Started / Completed / Phys152 / 1 / 0
Completion rate0.7%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked16.77Cr / 12.79Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.81 / 5.0
Final score3.85 / 10
|
6.3%
3.60
CategoryWatershed Related Works
Started / Completed / Phys19 / 1 / 0
Completion rate5.3%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked1.84Cr / 1.23Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.60 / 10
|
1.2%
3.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.23Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score3.26 / 10
|
| 265 | JAORA โ | RATLAM | 3.58 | D |
52.2%
2.78
CategoryFarm Pond
Started / Completed / Phys160 / 26 / 0
Completion rate16.3%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked5.33Cr / 2.10Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score2.78 / 10
|
9.8%
3.85
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.91Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
|
10.2%
4.41
CategoryDug Well Recharge
Started / Completed / Phys470 / 61 / 20
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked1.01Cr / 0.72Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score4.41 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.2%
4.23
CategoryWater conservation & recharge
Started / Completed / Phys80 / 8 / 12
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked2.20Cr / 1.31Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score4.23 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.4%
8.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)92.5%
Part B score (max 5.0)4.62 / 5.0
Final score8.37 / 10
|
| 266 | SHIVPURI โ | SHIVPURI | 3.57 | D |
50.1%
3.12
CategoryFarm Pond
Started / Completed / Phys254 / 46 / 4
Completion rate19.7%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked8.97Cr / 3.83Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score3.12 / 10
|
1.3%
2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
|
3.1%
5.05
CategoryDug Well Recharge
Started / Completed / Phys269 / 118 / 5
Completion rate45.7%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked0.38Cr / 0.21Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score5.05 / 10
|
โ |
41.2%
3.96
CategoryWater conservation & recharge
Started / Completed / Phys123 / 2 / 0
Completion rate1.6%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked9.12Cr / 7.08Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score3.96 / 10
|
2.1%
4.46
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.41Cr
Expenditure rate (ongoing)89.2%
Part B score (max 5.0)4.46 / 5.0
Final score4.46 / 10
|
2.2%
4.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.45Cr
Expenditure rate (ongoing)92.5%
Part B score (max 5.0)4.63 / 5.0
Final score4.63 / 10
|
| 267 | ALIRAJPUR โ | ALIRAJPUR | 3.57 | D |
23.6%
1.98
CategoryFarm Pond
Started / Completed / Phys186 / 1 / 0
Completion rate0.5%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked4.87Cr / 1.91Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score1.98 / 10
|
2.4%
3.21
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score3.21 / 10
|
7.9%
3.45
CategoryDug Well Recharge
Started / Completed / Phys638 / 31 / 0
Completion rate4.9%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked1.57Cr / 1.01Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score3.45 / 10
|
โ |
65.3%
4.17
CategoryWater conservation & recharge
Started / Completed / Phys140 / 1 / 0
Completion rate0.7%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked13.58Cr / 11.24Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.17 / 10
|
0.7%
3.38
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score3.38 / 10
|
0.1%
4.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score4.23 / 10
|
| 268 | PICHHORE โ | SHIVPURI | 3.57 | D |
40.1%
3.48
CategoryFarm Pond
Started / Completed / Phys230 / 59 / 0
Completion rate25.7%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked3.50Cr / 1.54Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score3.48 / 10
|
1.7%
2.32
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.09Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.32 / 5.0
Final score2.32 / 10
|
4.8%
3.93
CategoryDug Well Recharge
Started / Completed / Phys219 / 69 / 0
Completion rate31.5%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked0.38Cr / 0.18Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score3.93 / 10
|
2.2%
4.77
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.24Cr
Expenditure rate (ongoing)95.3%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
|
37.3%
3.56
CategoryWater conservation & recharge
Started / Completed / Phys85 / 5 / 0
Completion rate5.9%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked4.10Cr / 2.67Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score3.56 / 10
|
8.7%
3.99
CategoryWatershed Related Works
Started / Completed / Phys17 / 2 / 0
Completion rate11.8%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked0.91Cr / 0.62Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score3.99 / 10
|
5.2%
3.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.39Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score3.22 / 10
|
| 269 | SEONI MALWA โ | NARMADAPURAM | 3.56 | D |
66.4%
2.38
CategoryFarm Pond
Started / Completed / Phys194 / 51 / 2
Completion rate27.3%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked3.77Cr / 0.76Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score2.38 / 10
|
โ |
6.8%
5.38
CategoryDug Well Recharge
Started / Completed / Phys205 / 54 / 74
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.38 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
23.1%
5.73
CategoryWater conservation & recharge
Started / Completed / Phys58 / 25 / 7
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked0.94Cr / 0.56Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score5.73 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 6 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.7%
5.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.78 / 5.0
Final score5.54 / 10
|
| 270 | DATIA โ | DATIA | 3.56 | D |
36.1%
2.65
CategoryFarm Pond
Started / Completed / Phys412 / 57 / 25
Completion rate19.9%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked6.77Cr / 2.24Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score2.65 / 10
|
โ |
3.3%
4.38
CategoryDug Well Recharge
Started / Completed / Phys301 / 29 / 67
Completion rate31.9%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked0.53Cr / 0.30Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score4.38 / 10
|
1.9%
5.80
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 6 / 2
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.24Cr / 0.17Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score5.80 / 10
|
47.4%
4.03
CategoryWater conservation & recharge
Started / Completed / Phys184 / 13 / 29
Completion rate22.8%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked8.44Cr / 4.88Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score4.03 / 10
|
5.7%
3.29
CategoryWatershed Related Works
Started / Completed / Phys30 / 0 / 2
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked1.24Cr / 0.73Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score3.29 / 10
|
5.6%
4.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 2 / 4
Completion rate23.1%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked1.02Cr / 0.67Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score4.43 / 10
|
| 271 | AMARPATAN โ | SATNA | 3.55 | D |
48.1%
1.75
CategoryFarm Pond
Started / Completed / Phys74 / 0 / 7
Completion rate9.5%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked1.68Cr / 0.43Cr
Expenditure rate (ongoing)25.6%
Part B score (max 5.0)1.28 / 5.0
Final score1.75 / 10
|
โ |
5.9%
5.00
CategoryDug Well Recharge
Started / Completed / Phys99 / 11 / 56
Completion rate67.7%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score5.00 / 10
|
โ |
41.0%
5.44
CategoryWater conservation & recharge
Started / Completed / Phys31 / 1 / 14
Completion rate48.4%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked0.71Cr / 0.43Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score5.44 / 10
|
โ |
4.9%
3.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.83 / 5.0
Final score3.66 / 10
|
| 272 | NAGOD โ | SATNA | 3.54 | D |
43.1%
2.97
CategoryFarm Pond
Started / Completed / Phys363 / 46 / 0
Completion rate12.7%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked6.06Cr / 2.83Cr
Expenditure rate (ongoing)46.7%
Part B score (max 5.0)2.33 / 5.0
Final score2.97 / 10
|
2.5%
0.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.04Cr
Expenditure rate (ongoing)9.8%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
|
3.0%
4.16
CategoryDug Well Recharge
Started / Completed / Phys190 / 7 / 2
Completion rate4.7%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked0.46Cr / 0.36Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score4.16 / 10
|
1.5%
2.95
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.14Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score2.95 / 10
|
37.5%
3.95
CategoryWater conservation & recharge
Started / Completed / Phys136 / 8 / 0
Completion rate5.9%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked5.76Cr / 4.21Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score3.95 / 10
|
3.8%
4.20
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 0
Completion rate4.8%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked0.58Cr / 0.46Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score4.20 / 10
|
8.5%
5.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 4
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.11Cr / 0.90Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score5.18 / 10
|
| 273 | PIPLODA โ | RATLAM | 3.54 | D |
60.9%
2.71
CategoryFarm Pond
Started / Completed / Phys97 / 29 / 0
Completion rate29.9%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked1.71Cr / 0.42Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score2.71 / 10
|
โ |
14.3%
5.07
CategoryDug Well Recharge
Started / Completed / Phys197 / 54 / 0
Completion rate27.4%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked0.37Cr / 0.27Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score5.07 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
22.8%
4.22
CategoryWater conservation & recharge
Started / Completed / Phys21 / 4 / 1
Completion rate23.8%
Part A score (max 5.0)1.19 / 5.0
Ongoing sanction / booked0.65Cr / 0.39Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score4.22 / 10
|
1.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 274 | KURAI โ | SEONI | 3.53 | D |
41.7%
3.31
CategoryFarm Pond
Started / Completed / Phys260 / 15 / 0
Completion rate5.8%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked9.75Cr / 5.89Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score3.31 / 10
|
4.8%
0.83
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.20Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score0.83 / 10
|
2.5%
3.94
CategoryDug Well Recharge
Started / Completed / Phys240 / 11 / 0
Completion rate4.6%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked0.59Cr / 0.44Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.72 / 5.0
Final score3.94 / 10
|
โ |
38.3%
4.06
CategoryWater conservation & recharge
Started / Completed / Phys153 / 7 / 0
Completion rate4.6%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked9.08Cr / 6.97Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score4.06 / 10
|
9.7%
3.64
CategoryWatershed Related Works
Started / Completed / Phys47 / 1 / 0
Completion rate2.1%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked2.36Cr / 1.67Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score3.64 / 10
|
2.8%
3.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.49Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
|
| 275 | RAIPUR KARCHULIYAN โ | REWA | 3.52 | D |
52.2%
2.80
CategoryFarm Pond
Started / Completed / Phys314 / 81 / 34
Completion rate36.6%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked2.40Cr / 0.46Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.97 / 5.0
Final score2.80 / 10
|
9.4%
0.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.03Cr
Expenditure rate (ongoing)4.0%
Part B score (max 5.0)0.20 / 5.0
Final score0.20 / 10
|
3.1%
4.69
CategoryDug Well Recharge
Started / Completed / Phys87 / 52 / 9
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score4.69 / 10
|
2.5%
5.71
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 4 / 3
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score5.71 / 10
|
25.6%
5.61
CategoryWater conservation & recharge
Started / Completed / Phys50 / 17 / 9
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.83Cr / 0.50Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score5.61 / 10
|
4.5%
4.93
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.60 / 5.0
Final score4.93 / 10
|
2.8%
3.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.8%
Part B score (max 5.0)2.24 / 5.0
Final score3.49 / 10
|
| 276 | CHANCHODA โ | GUNA | 3.51 | D |
35.0%
1.97
CategoryFarm Pond
Started / Completed / Phys412 / 55 / 8
Completion rate15.3%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked7.20Cr / 1.74Cr
Expenditure rate (ongoing)24.2%
Part B score (max 5.0)1.21 / 5.0
Final score1.97 / 10
|
โ |
9.8%
6.11
CategoryDug Well Recharge
Started / Completed / Phys931 / 523 / 295
Completion rate87.9%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.29Cr / 0.10Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score6.11 / 10
|
0.6%
4.47
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score4.47 / 10
|
47.2%
4.10
CategoryWater conservation & recharge
Started / Completed / Phys204 / 21 / 12
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked10.08Cr / 6.63Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score4.10 / 10
|
0.6%
2.73
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score2.73 / 10
|
6.9%
3.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 0 / 1
Completion rate3.7%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked1.54Cr / 1.03Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score3.53 / 10
|
| 277 | KARERA โ | SHIVPURI | 3.51 | D |
43.5%
2.91
CategoryFarm Pond
Started / Completed / Phys224 / 27 / 2
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked6.12Cr / 2.77Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score2.91 / 10
|
โ |
3.3%
3.94
CategoryDug Well Recharge
Started / Completed / Phys210 / 41 / 0
Completion rate19.5%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked0.43Cr / 0.26Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score3.94 / 10
|
1.3%
3.65
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.15Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.65 / 10
|
27.4%
3.86
CategoryWater conservation & recharge
Started / Completed / Phys98 / 5 / 0
Completion rate5.1%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked4.24Cr / 3.06Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score3.86 / 10
|
23.3%
4.17
CategoryWatershed Related Works
Started / Completed / Phys37 / 4 / 0
Completion rate10.8%
Part A score (max 5.0)0.54 / 5.0
Ongoing sanction / booked3.21Cr / 2.33Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score4.17 / 10
|
1.2%
2.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.11Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score2.84 / 10
|
| 278 | SAILANA โ | RATLAM | 3.50 | D |
24.0%
3.12
CategoryFarm Pond
Started / Completed / Phys210 / 44 / 0
Completion rate21.0%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked2.47Cr / 1.03Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score3.12 / 10
|
10.1%
1.73
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.43Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score1.73 / 10
|
7.4%
4.67
CategoryDug Well Recharge
Started / Completed / Phys345 / 55 / 0
Completion rate15.9%
Part A score (max 5.0)0.80 / 5.0
Ongoing sanction / booked0.75Cr / 0.58Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score4.67 / 10
|
โ |
53.4%
3.85
CategoryWater conservation & recharge
Started / Completed / Phys73 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked6.45Cr / 4.88Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score3.85 / 10
|
0.2%
2.24
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score2.24 / 10
|
4.9%
3.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.41Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
|
| 279 | SHAHGARH โ | SAGAR | 3.49 | D |
53.6%
2.18
CategoryFarm Pond
Started / Completed / Phys163 / 29 / 0
Completion rate17.8%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked2.01Cr / 0.52Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score2.18 / 10
|
โ |
12.3%
4.39
CategoryDug Well Recharge
Started / Completed / Phys221 / 90 / 46
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.22Cr / 0.06Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score4.39 / 10
|
1.1%
4.42
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
|
21.6%
5.43
CategoryWater conservation & recharge
Started / Completed / Phys32 / 12 / 0
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.82Cr / 0.58Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score5.43 / 10
|
9.1%
5.44
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score5.44 / 10
|
2.3%
2.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score2.57 / 10
|
| 280 | MANPUR โ | UMARIA | 3.44 | D |
26.7%
2.73
CategoryFarm Pond
Started / Completed / Phys435 / 35 / 0
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked7.31Cr / 3.40Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score2.73 / 10
|
2.7%
2.33
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.36Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score2.33 / 10
|
4.1%
2.40
CategoryDug Well Recharge
Started / Completed / Phys446 / 30 / 0
Completion rate6.7%
Part A score (max 5.0)0.34 / 5.0
Ongoing sanction / booked1.10Cr / 0.46Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.06 / 5.0
Final score2.40 / 10
|
0.0%
4.67
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)93.5%
Part B score (max 5.0)4.67 / 5.0
Final score4.67 / 10
|
51.3%
3.86
CategoryWater conservation & recharge
Started / Completed / Phys355 / 4 / 0
Completion rate1.1%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked14.93Cr / 11.35Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.86 / 10
|
8.4%
3.93
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.46Cr / 1.93Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
|
6.9%
3.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.01Cr / 1.43Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score3.57 / 10
|
| 281 | KARAHAL โ | SHEOPUR | 3.43 | D |
33.7%
3.06
CategoryFarm Pond
Started / Completed / Phys229 / 47 / 0
Completion rate20.5%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked6.84Cr / 2.78Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score3.06 / 10
|
3.9%
0.54
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.10Cr
Expenditure rate (ongoing)10.7%
Part B score (max 5.0)0.54 / 5.0
Final score0.54 / 10
|
0.3%
3.63
CategoryDug Well Recharge
Started / Completed / Phys28 / 12 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score3.63 / 10
|
3.6%
4.47
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.80Cr
Expenditure rate (ongoing)89.4%
Part B score (max 5.0)4.47 / 5.0
Final score4.47 / 10
|
52.5%
3.75
CategoryWater conservation & recharge
Started / Completed / Phys111 / 2 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked12.75Cr / 9.33Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score3.75 / 10
|
1.8%
3.67
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.32Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score3.67 / 10
|
4.2%
4.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.83Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
|
| 282 | DEPALPUR โ | INDORE | 3.41 | D |
53.1%
2.11
CategoryFarm Pond
Started / Completed / Phys194 / 2 / 11
Completion rate6.7%
Part A score (max 5.0)0.34 / 5.0
Ongoing sanction / booked5.32Cr / 1.88Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score2.11 / 10
|
1.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
7.1%
3.33
CategoryDug Well Recharge
Started / Completed / Phys292 / 33 / 56
Completion rate30.5%
Part A score (max 5.0)1.52 / 5.0
Ongoing sanction / booked0.52Cr / 0.19Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.80 / 5.0
Final score3.33 / 10
|
โ |
13.8%
4.86
CategoryWater conservation & recharge
Started / Completed / Phys43 / 7 / 9
Completion rate37.2%
Part A score (max 5.0)1.86 / 5.0
Ongoing sanction / booked0.84Cr / 0.50Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score4.86 / 10
|
18.4%
5.46
CategoryWatershed Related Works
Started / Completed / Phys41 / 8 / 10
Completion rate43.9%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked1.09Cr / 0.71Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score5.46 / 10
|
6.4%
5.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 2 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.17Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.43 / 5.0
Final score5.93 / 10
|
| 283 | JHABUA โ | JHABUA | 3.38 | D |
20.2%
2.65
CategoryFarm Pond
Started / Completed / Phys211 / 2 / 0
Completion rate0.9%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked5.58Cr / 2.90Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score2.65 / 10
|
0.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
6.7%
4.34
CategoryDug Well Recharge
Started / Completed / Phys731 / 162 / 0
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.48Cr / 0.95Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score4.34 / 10
|
โ |
71.9%
3.53
CategoryWater conservation & recharge
Started / Completed / Phys308 / 4 / 1
Completion rate1.6%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked19.04Cr / 13.15Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.45 / 5.0
Final score3.53 / 10
|
โ |
0.4%
3.61
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
|
| 284 | BEOHARI โ | SHAHDOL | 3.37 | D |
53.1%
2.16
CategoryFarm Pond
Started / Completed / Phys351 / 69 / 0
Completion rate19.7%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked6.78Cr / 1.60Cr
Expenditure rate (ongoing)23.6%
Part B score (max 5.0)1.18 / 5.0
Final score2.16 / 10
|
โ |
1.8%
2.16
CategoryDug Well Recharge
Started / Completed / Phys114 / 12 / 0
Completion rate10.5%
Part A score (max 5.0)0.53 / 5.0
Ongoing sanction / booked0.26Cr / 0.09Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.64 / 5.0
Final score2.16 / 10
|
18.5%
5.59
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked2.26Cr / 2.15Cr
Expenditure rate (ongoing)95.1%
Part B score (max 5.0)4.75 / 5.0
Final score5.59 / 10
|
12.8%
4.41
CategoryWater conservation & recharge
Started / Completed / Phys56 / 11 / 0
Completion rate19.6%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked1.83Cr / 1.25Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score4.41 / 10
|
7.3%
4.50
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.67Cr / 0.44Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.50 / 10
|
6.6%
3.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 1 / 0
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked0.94Cr / 0.70Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score3.99 / 10
|
| 285 | GAURIHAR โ | CHHATARPUR | 3.36 | D |
51.8%
3.15
CategoryFarm Pond
Started / Completed / Phys201 / 63 / 4
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked5.10Cr / 1.52Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score3.15 / 10
|
3.4%
0.75
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.08Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score0.75 / 10
|
5.6%
4.73
CategoryDug Well Recharge
Started / Completed / Phys439 / 270 / 4
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked0.33Cr / 0.11Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.61 / 5.0
Final score4.73 / 10
|
0.5%
3.90
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
|
35.4%
3.60
CategoryWater conservation & recharge
Started / Completed / Phys130 / 6 / 9
Completion rate11.5%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked4.39Cr / 2.65Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score3.60 / 10
|
0.5%
1.61
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score1.61 / 10
|
2.8%
4.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score4.76 / 10
|
| 286 | MHOW โ | INDORE | 3.35 | D |
61.0%
2.73
CategoryFarm Pond
Started / Completed / Phys272 / 74 / 8
Completion rate30.1%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked5.16Cr / 1.26Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.23 / 5.0
Final score2.73 / 10
|
12.6%
2.27
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.53Cr / 0.70Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score2.27 / 10
|
7.2%
4.58
CategoryDug Well Recharge
Started / Completed / Phys323 / 225 / 3
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.27Cr / 0.06Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.05 / 5.0
Final score4.58 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.2%
5.89
CategoryWater conservation & recharge
Started / Completed / Phys40 / 10 / 8
Completion rate45.0%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked1.11Cr / 0.80Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score5.89 / 10
|
3.2%
3.24
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.25Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
|
1.6%
6.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 1
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.59 / 10
|
| 287 | AGAR โ | AGAR-MALWA | 3.34 | D |
31.1%
1.94
CategoryFarm Pond
Started / Completed / Phys177 / 2 / 0
Completion rate1.1%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked3.94Cr / 1.49Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.89 / 5.0
Final score1.94 / 10
|
โ |
11.0%
3.58
CategoryDug Well Recharge
Started / Completed / Phys535 / 50 / 0
Completion rate9.3%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked1.27Cr / 0.79Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score3.58 / 10
|
0.6%
1.82
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)36.4%
Part B score (max 5.0)1.82 / 5.0
Final score1.82 / 10
|
39.2%
4.02
CategoryWater conservation & recharge
Started / Completed / Phys72 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked4.85Cr / 3.83Cr
Expenditure rate (ongoing)79.0%
Part B score (max 5.0)3.95 / 5.0
Final score4.02 / 10
|
6.8%
3.76
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.65Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score3.76 / 10
|
11.4%
4.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 1 / 0
Completion rate2.7%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked1.42Cr / 1.21Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score4.40 / 10
|
| 288 | LAKHNADON โ | SEONI | 3.30 | D |
48.8%
2.85
CategoryFarm Pond
Started / Completed / Phys982 / 159 / 0
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked16.29Cr / 6.65Cr
Expenditure rate (ongoing)40.8%
Part B score (max 5.0)2.04 / 5.0
Final score2.85 / 10
|
โ |
2.5%
3.21
CategoryDug Well Recharge
Started / Completed / Phys391 / 106 / 0
Completion rate27.1%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.73Cr / 0.27Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score3.21 / 10
|
1.1%
4.68
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.25Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.68 / 10
|
38.7%
3.72
CategoryWater conservation & recharge
Started / Completed / Phys401 / 26 / 0
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked14.62Cr / 9.92Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.39 / 5.0
Final score3.72 / 10
|
4.0%
3.85
CategoryWatershed Related Works
Started / Completed / Phys34 / 1 / 0
Completion rate2.9%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked1.51Cr / 1.12Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.71 / 5.0
Final score3.85 / 10
|
4.9%
3.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys36 / 2 / 0
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked1.82Cr / 1.31Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score3.88 / 10
|
| 289 | NAIGARHI โ | REWA | 3.30 | D |
53.0%
2.43
CategoryFarm Pond
Started / Completed / Phys201 / 19 / 5
Completion rate11.9%
Part A score (max 5.0)0.60 / 5.0
Ongoing sanction / booked6.71Cr / 2.45Cr
Expenditure rate (ongoing)36.6%
Part B score (max 5.0)1.83 / 5.0
Final score2.43 / 10
|
โ |
0.6%
3.69
CategoryDug Well Recharge
Started / Completed / Phys44 / 5 / 14
Completion rate43.2%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.53 / 5.0
Final score3.69 / 10
|
0.5%
3.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
|
30.8%
4.43
CategoryWater conservation & recharge
Started / Completed / Phys91 / 15 / 3
Completion rate19.8%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked3.68Cr / 2.53Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score4.43 / 10
|
7.1%
3.61
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.02Cr / 0.73Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
|
7.9%
4.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 4 / 0
Completion rate19.0%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked0.90Cr / 0.63Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score4.45 / 10
|
| 290 | KANNOD โ | DEWAS | 3.30 | D |
55.1%
2.08
CategoryFarm Pond
Started / Completed / Phys233 / 31 / 6
Completion rate15.9%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked7.90Cr / 2.03Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.29 / 5.0
Final score2.08 / 10
|
2.3%
2.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.18Cr
Expenditure rate (ongoing)46.0%
Part B score (max 5.0)2.30 / 5.0
Final score2.30 / 10
|
10.3%
4.75
CategoryDug Well Recharge
Started / Completed / Phys676 / 228 / 129
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked0.83Cr / 0.35Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.75 / 10
|
10.9%
4.77
CategoryIrrigation infrastructure
Started / Completed / Phys34 / 6 / 6
Completion rate35.3%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked1.14Cr / 0.68Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score4.77 / 10
|
19.1%
5.23
CategoryWater conservation & recharge
Started / Completed / Phys68 / 14 / 17
Completion rate45.6%
Part A score (max 5.0)2.28 / 5.0
Ongoing sanction / booked2.07Cr / 1.22Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score5.23 / 10
|
1.9%
3.86
CategoryWatershed Related Works
Started / Completed / Phys16 / 1 / 0
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked0.22Cr / 0.15Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score3.86 / 10
|
0.3%
4.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.16 / 5.0
Final score4.16 / 10
|
| 291 | MEHGAON โ | BHIND | 3.30 | D |
13.9%
1.74
CategoryFarm Pond
Started / Completed / Phys298 / 19 / 0
Completion rate6.4%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked3.87Cr / 1.10Cr
Expenditure rate (ongoing)28.5%
Part B score (max 5.0)1.43 / 5.0
Final score1.74 / 10
|
3.2%
1.08
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.21Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.08 / 5.0
Final score1.08 / 10
|
0.3%
3.13
CategoryDug Well Recharge
Started / Completed / Phys28 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
|
12.2%
3.47
CategoryIrrigation infrastructure
Started / Completed / Phys78 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.63Cr / 2.53Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
|
56.9%
3.65
CategoryWater conservation & recharge
Started / Completed / Phys183 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked16.92Cr / 12.34Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.65 / 10
|
9.7%
3.90
CategoryWatershed Related Works
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.88Cr / 2.25Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
|
3.8%
3.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.79Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
|
| 292 | DHAR โ | DHAR | 3.29 | D |
60.3%
3.18
CategoryFarm Pond
Started / Completed / Phys138 / 1 / 0
Completion rate0.7%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked4.09Cr / 2.57Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.18 / 10
|
โ |
0.7%
3.10
CategoryDug Well Recharge
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score3.10 / 10
|
2.6%
2.68
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score2.68 / 10
|
23.8%
3.59
CategoryWater conservation & recharge
Started / Completed / Phys43 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.63Cr / 1.17Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score3.59 / 10
|
12.0%
3.38
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.82Cr / 0.56Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score3.38 / 10
|
0.6%
4.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score4.11 / 10
|
| 293 | ATER โ | BHIND | 3.27 | D |
14.5%
2.64
CategoryFarm Pond
Started / Completed / Phys228 / 45 / 0
Completion rate19.7%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked3.04Cr / 1.01Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score2.64 / 10
|
2.6%
0.18
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.02Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.18 / 5.0
Final score0.18 / 10
|
0.3%
3.02
CategoryDug Well Recharge
Started / Completed / Phys25 / 2 / 0
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)52.5%
Part B score (max 5.0)2.62 / 5.0
Final score3.02 / 10
|
0.4%
3.82
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score3.82 / 10
|
62.7%
3.57
CategoryWater conservation & recharge
Started / Completed / Phys226 / 5 / 0
Completion rate2.2%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked15.95Cr / 11.05Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score3.57 / 10
|
12.6%
3.00
CategoryWatershed Related Works
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.22Cr / 1.93Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score3.00 / 10
|
7.0%
3.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 1 / 0
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked1.69Cr / 1.12Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score3.52 / 10
|
| 294 | RAMNAGAR โ | SATNA | 3.27 | D |
85.1%
2.69
CategoryFarm Pond
Started / Completed / Phys220 / 15 / 0
Completion rate6.8%
Part A score (max 5.0)0.34 / 5.0
Ongoing sanction / booked3.66Cr / 1.72Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.35 / 5.0
Final score2.69 / 10
|
โ |
6.3%
8.16
CategoryDug Well Recharge
Started / Completed / Phys110 / 0 / 84
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)86.9%
Part B score (max 5.0)4.34 / 5.0
Final score8.16 / 10
|
0.3%
5.85
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score5.85 / 10
|
5.9%
4.94
CategoryWater conservation & recharge
Started / Completed / Phys14 / 0 / 2
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.26Cr / 0.22Cr
Expenditure rate (ongoing)84.5%
Part B score (max 5.0)4.23 / 5.0
Final score4.94 / 10
|
1.5%
4.31
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.31 / 5.0
Final score4.31 / 10
|
1.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 295 | BABAI CHICHLI โ | NARSINGHPUR | 3.26 | D |
86.7%
2.99
CategoryFarm Pond
Started / Completed / Phys210 / 83 / 0
Completion rate39.5%
Part A score (max 5.0)1.98 / 5.0
Ongoing sanction / booked3.74Cr / 0.76Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score2.99 / 10
|
โ |
2.0%
4.40
CategoryDug Well Recharge
Started / Completed / Phys53 / 24 / 5
Completion rate54.7%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score4.40 / 10
|
โ |
8.9%
5.28
CategoryWater conservation & recharge
Started / Completed / Phys16 / 7 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.31Cr / 0.17Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score5.28 / 10
|
โ |
2.4%
4.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.58 / 5.0
Final score4.91 / 10
|
| 296 | UNCHAHARA โ | SATNA | 3.16 | D |
39.9%
1.95
CategoryFarm Pond
Started / Completed / Phys269 / 8 / 19
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked4.88Cr / 1.42Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score1.95 / 10
|
โ |
2.2%
4.43
CategoryDug Well Recharge
Started / Completed / Phys114 / 6 / 8
Completion rate12.3%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked0.26Cr / 0.20Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score4.43 / 10
|
โ |
30.7%
3.94
CategoryWater conservation & recharge
Started / Completed / Phys91 / 0 / 9
Completion rate9.9%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked3.78Cr / 2.61Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.94 / 10
|
3.0%
3.56
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.28Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score3.56 / 10
|
24.2%
4.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.20Cr / 2.57Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score4.01 / 10
|
| 297 | RAMPUR NAIKIN โ | SIDHI | 3.15 | D |
42.7%
1.98
CategoryFarm Pond
Started / Completed / Phys306 / 48 / 4
Completion rate17.0%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked4.82Cr / 1.09Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.13 / 5.0
Final score1.98 / 10
|
โ |
1.4%
2.07
CategoryDug Well Recharge
Started / Completed / Phys73 / 8 / 0
Completion rate11.0%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked0.17Cr / 0.05Cr
Expenditure rate (ongoing)30.4%
Part B score (max 5.0)1.52 / 5.0
Final score2.07 / 10
|
3.0%
3.96
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.39Cr / 0.25Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.96 / 10
|
38.2%
3.92
CategoryWater conservation & recharge
Started / Completed / Phys123 / 23 / 1
Completion rate19.5%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked4.33Cr / 2.55Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score3.92 / 10
|
1.9%
5.65
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.16Cr / 0.14Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.40 / 5.0
Final score5.65 / 10
|
12.7%
4.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 4 / 0
Completion rate14.8%
Part A score (max 5.0)0.74 / 5.0
Ongoing sanction / booked1.42Cr / 1.02Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.60 / 5.0
Final score4.34 / 10
|
| 298 | RON โ | BHIND | 3.13 | D |
14.0%
1.69
CategoryFarm Pond
Started / Completed / Phys88 / 7 / 0
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked1.22Cr / 0.32Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.30 / 5.0
Final score1.69 / 10
|
5.6%
1.95
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.21Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score1.95 / 10
|
0.2%
2.94
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score2.94 / 10
|
4.8%
3.45
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score3.45 / 10
|
60.3%
3.40
CategoryWater conservation & recharge
Started / Completed / Phys59 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.71Cr / 3.88Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score3.40 / 10
|
7.7%
3.83
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.56Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score3.83 / 10
|
7.5%
3.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.71Cr / 0.50Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score3.53 / 10
|
| 299 | SOHAGPUR โ | SHAHDOL | 3.12 | D |
48.6%
2.16
CategoryFarm Pond
Started / Completed / Phys508 / 95 / 5
Completion rate19.7%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked9.46Cr / 2.22Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score2.16 / 10
|
1.1%
2.78
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score2.78 / 10
|
1.1%
4.91
CategoryDug Well Recharge
Started / Completed / Phys98 / 20 / 30
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score4.91 / 10
|
1.3%
3.41
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.20Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score3.41 / 10
|
41.2%
4.13
CategoryWater conservation & recharge
Started / Completed / Phys87 / 3 / 5
Completion rate9.2%
Part A score (max 5.0)0.46 / 5.0
Ongoing sanction / booked8.84Cr / 6.50Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.13 / 10
|
0.9%
3.37
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
|
5.9%
3.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 0 / 2
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.29Cr / 0.82Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score3.54 / 10
|
| 300 | CHAWARPATHA โ | NARSINGHPUR | 3.10 | D |
78.7%
3.22
CategoryFarm Pond
Started / Completed / Phys245 / 93 / 0
Completion rate38.0%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked3.50Cr / 0.92Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score3.22 / 10
|
4.8%
0.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.4%
Part B score (max 5.0)0.02 / 5.0
Final score0.02 / 10
|
1.8%
4.67
CategoryDug Well Recharge
Started / Completed / Phys53 / 2 / 27
Completion rate54.7%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score4.67 / 10
|
0.4%
2.51
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score2.51 / 10
|
10.8%
3.36
CategoryWater conservation & recharge
Started / Completed / Phys24 / 2 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked0.76Cr / 0.45Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score3.36 / 10
|
1.5%
3.50
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.50 / 5.0
Final score3.50 / 10
|
1.9%
2.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.51 / 5.0
Final score2.51 / 10
|
| 301 | KAHNAPAS(GHANSAUR) โ | SEONI | 3.08 | D |
52.0%
2.72
CategoryFarm Pond
Started / Completed / Phys499 / 87 / 0
Completion rate17.4%
Part A score (max 5.0)0.87 / 5.0
Ongoing sanction / booked9.70Cr / 3.59Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score2.72 / 10
|
โ |
2.6%
2.59
CategoryDug Well Recharge
Started / Completed / Phys226 / 56 / 0
Completion rate24.8%
Part A score (max 5.0)1.24 / 5.0
Ongoing sanction / booked0.44Cr / 0.12Cr
Expenditure rate (ongoing)27.0%
Part B score (max 5.0)1.35 / 5.0
Final score2.59 / 10
|
โ |
41.4%
3.51
CategoryWater conservation & recharge
Started / Completed / Phys185 / 5 / 0
Completion rate2.7%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked9.04Cr / 6.10Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score3.51 / 10
|
2.2%
3.76
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.37Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score3.76 / 10
|
1.8%
3.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.41Cr / 0.29Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score3.58 / 10
|
| 302 | NASRULLAGANJ โ | SEHORE | 3.08 | D |
58.0%
1.50
CategoryFarm Pond
Started / Completed / Phys178 / 1 / 15
Completion rate9.0%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked4.33Cr / 0.91Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.05 / 5.0
Final score1.50 / 10
|
โ |
15.5%
5.16
CategoryDug Well Recharge
Started / Completed / Phys489 / 41 / 246
Completion rate58.7%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked0.52Cr / 0.23Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score5.16 / 10
|
1.1%
3.54
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.87 / 5.0
Final score3.54 / 10
|
18.2%
5.17
CategoryWater conservation & recharge
Started / Completed / Phys45 / 6 / 12
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.82Cr / 0.52Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.17 / 5.0
Final score5.17 / 10
|
1.5%
5.69
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score5.69 / 10
|
5.6%
6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.08Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.82 / 5.0
Final score6.16 / 10
|
| 303 | REWA โ | REWA | 3.05 | D |
79.5%
2.88
CategoryFarm Pond
Started / Completed / Phys233 / 69 / 0
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.47Cr / 0.69Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score2.88 / 10
|
8.7%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 14 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.3%
1.99
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score1.99 / 10
|
9.3%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys21 / 16 / 0
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.12Cr / 0.05Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score6.07 / 10
|
0.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
7.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)91.2%
Part B score (max 5.0)4.56 / 5.0
Final score7.89 / 10
|
| 304 | LAHAR โ | BHIND | 3.05 | D |
24.6%
1.70
CategoryFarm Pond
Started / Completed / Phys146 / 9 / 0
Completion rate6.2%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked2.19Cr / 0.61Cr
Expenditure rate (ongoing)27.8%
Part B score (max 5.0)1.39 / 5.0
Final score1.70 / 10
|
2.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.5%
3.42
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
|
4.6%
2.53
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.22Cr
Expenditure rate (ongoing)50.6%
Part B score (max 5.0)2.53 / 5.0
Final score2.53 / 10
|
58.2%
3.73
CategoryWater conservation & recharge
Started / Completed / Phys58 / 1 / 0
Completion rate1.7%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked5.46Cr / 3.98Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.64 / 5.0
Final score3.73 / 10
|
4.1%
3.14
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.24Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
|
5.2%
3.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.38Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score3.94 / 10
|
| 305 | NOWGOAN โ | CHHATARPUR | 3.05 | D |
79.6%
2.61
CategoryFarm Pond
Started / Completed / Phys267 / 97 / 0
Completion rate36.3%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked5.61Cr / 0.89Cr
Expenditure rate (ongoing)15.8%
Part B score (max 5.0)0.79 / 5.0
Final score2.61 / 10
|
โ |
6.3%
4.69
CategoryDug Well Recharge
Started / Completed / Phys466 / 358 / 0
Completion rate76.8%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.16Cr / 0.03Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score4.69 / 10
|
โ |
11.5%
4.75
CategoryWater conservation & recharge
Started / Completed / Phys55 / 9 / 0
Completion rate16.4%
Part A score (max 5.0)0.82 / 5.0
Ongoing sanction / booked1.01Cr / 0.80Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score4.75 / 10
|
1.8%
5.04
CategoryWatershed Related Works
Started / Completed / Phys9 / 1 / 0
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked0.16Cr / 0.14Cr
Expenditure rate (ongoing)89.7%
Part B score (max 5.0)4.49 / 5.0
Final score5.04 / 10
|
0.8%
4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.09Cr
Expenditure rate (ongoing)99.2%
Part B score (max 5.0)4.96 / 5.0
Final score4.96 / 10
|
| 306 | NALCHHA โ | DHAR | 3.01 | D |
36.9%
2.41
CategoryFarm Pond
Started / Completed / Phys165 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.38Cr / 2.11Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score2.41 / 10
|
โ |
7.8%
2.67
CategoryDug Well Recharge
Started / Completed / Phys351 / 3 / 0
Completion rate0.9%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked0.92Cr / 0.48Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score2.67 / 10
|
1.0%
3.50
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score3.50 / 10
|
45.0%
3.52
CategoryWater conservation & recharge
Started / Completed / Phys100 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.34Cr / 3.76Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
|
5.6%
3.34
CategoryWatershed Related Works
Started / Completed / Phys26 / 1 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked0.66Cr / 0.42Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.34 / 10
|
3.7%
2.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.25Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score2.88 / 10
|
| 307 | NARSIMHAPUR โ | NARSINGHPUR | 3.01 | D |
59.9%
3.01
CategoryFarm Pond
Started / Completed / Phys253 / 80 / 1
Completion rate32.0%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked5.17Cr / 1.45Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score3.01 / 10
|
9.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.22Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.3%
3.12
CategoryDug Well Recharge
Started / Completed / Phys65 / 5 / 0
Completion rate7.7%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score3.12 / 10
|
โ |
28.4%
4.01
CategoryWater conservation & recharge
Started / Completed / Phys32 / 4 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked3.58Cr / 2.42Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score4.01 / 10
|
0.8%
2.55
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.55 / 5.0
Final score2.55 / 10
|
0.3%
3.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
|
| 308 | BALDEOGARH โ | TIKAMGARH | 2.95 | D |
29.6%
2.11
CategoryFarm Pond
Started / Completed / Phys242 / 5 / 0
Completion rate2.1%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked4.45Cr / 1.78Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score2.11 / 10
|
8.4%
0.13
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.28Cr / 0.03Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
|
10.2%
3.41
CategoryDug Well Recharge
Started / Completed / Phys612 / 10 / 11
Completion rate3.4%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked1.51Cr / 0.98Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score3.41 / 10
|
0.6%
4.67
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)93.5%
Part B score (max 5.0)4.67 / 5.0
Final score4.67 / 10
|
40.5%
3.77
CategoryWater conservation & recharge
Started / Completed / Phys262 / 10 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked6.00Cr / 4.29Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score3.77 / 10
|
5.6%
3.81
CategoryWatershed Related Works
Started / Completed / Phys31 / 1 / 0
Completion rate3.2%
Part A score (max 5.0)0.16 / 5.0
Ongoing sanction / booked0.85Cr / 0.62Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.81 / 10
|
5.1%
4.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.62Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score4.02 / 10
|
| 309 | TIKAMGARH โ | TIKAMGARH | 2.72 | D |
30.2%
1.47
CategoryFarm Pond
Started / Completed / Phys200 / 1 / 0
Completion rate0.5%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked4.09Cr / 1.18Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score1.47 / 10
|
1.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
10.8%
2.85
CategoryDug Well Recharge
Started / Completed / Phys567 / 10 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked1.45Cr / 0.80Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score2.85 / 10
|
0.1%
3.37
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
|
41.2%
3.48
CategoryWater conservation & recharge
Started / Completed / Phys167 / 1 / 0
Completion rate0.6%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked5.55Cr / 3.83Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.48 / 10
|
12.9%
3.31
CategoryWatershed Related Works
Started / Completed / Phys45 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.75Cr / 1.16Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score3.31 / 10
|
3.5%
3.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.30Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
|
| 310 | MALHARGARH โ | MANDSAUR | 2.51 | D |
38.4%
1.49
CategoryFarm Pond
Started / Completed / Phys238 / 3 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked4.90Cr / 1.40Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score1.49 / 10
|
โ |
16.4%
3.32
CategoryDug Well Recharge
Started / Completed / Phys811 / 35 / 24
Completion rate7.3%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.95Cr / 1.15Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.95 / 5.0
Final score3.32 / 10
|
โ |
42.8%
3.06
CategoryWater conservation & recharge
Started / Completed / Phys145 / 0 / 2
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked5.47Cr / 3.27Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score3.06 / 10
|
1.4%
3.03
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
|
0.9%
4.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.11Cr
Expenditure rate (ongoing)94.7%
Part B score (max 5.0)4.73 / 5.0
Final score4.73 / 10
|
| 311 | RATLAM โ | RATLAM | 2.44 | D |
64.9%
1.67
CategoryFarm Pond
Started / Completed / Phys376 / 9 / 0
Completion rate2.4%
Part A score (max 5.0)0.12 / 5.0
Ongoing sanction / booked13.60Cr / 4.21Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score1.67 / 10
|
โ |
3.8%
3.90
CategoryDug Well Recharge
Started / Completed / Phys310 / 19 / 0
Completion rate6.1%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked0.75Cr / 0.54Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score3.90 / 10
|
0.2%
1.93
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score1.93 / 10
|
29.5%
3.89
CategoryWater conservation & recharge
Started / Completed / Phys102 / 5 / 0
Completion rate4.9%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked6.06Cr / 4.42Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.89 / 10
|
โ |
1.6%
3.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score3.78 / 10
|
| 312 | BHIND โ | BHIND | 2.42 | D |
36.2%
2.14
CategoryFarm Pond
Started / Completed / Phys133 / 17 / 0
Completion rate12.8%
Part A score (max 5.0)0.64 / 5.0
Ongoing sanction / booked3.04Cr / 0.91Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.50 / 5.0
Final score2.14 / 10
|
9.1%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.4%
4.21
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
|
0.6%
2.53
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score2.53 / 10
|
40.2%
2.99
CategoryWater conservation & recharge
Started / Completed / Phys58 / 3 / 0
Completion rate5.2%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked3.79Cr / 2.07Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score2.99 / 10
|
10.2%
2.84
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.00Cr / 0.57Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score2.84 / 10
|
3.4%
3.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
|
| 313 | INDORE โ | INDORE | 2.11 | D |
42.1%
2.31
CategoryFarm Pond
Started / Completed / Phys64 / 6 / 0
Completion rate9.4%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked0.58Cr / 0.21Cr
Expenditure rate (ongoing)36.9%
Part B score (max 5.0)1.84 / 5.0
Final score2.31 / 10
|
25.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
13.5%
2.81
CategoryDug Well Recharge
Started / Completed / Phys133 / 43 / 0
Completion rate32.3%
Part A score (max 5.0)1.62 / 5.0
Ongoing sanction / booked0.18Cr / 0.04Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score2.81 / 10
|
0.6%
4.30
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)86.0%
Part B score (max 5.0)4.30 / 5.0
Final score4.30 / 10
|
13.9%
4.30
CategoryWater conservation & recharge
Started / Completed / Phys20 / 4 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score4.30 / 10
|
1.2%
5.56
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)61.2%
Part B score (max 5.0)3.06 / 5.0
Final score5.56 / 10
|
3.4%
1.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
|
Scheme: โน Sanction Weighted
Level: Block
Snapshot: 2026-04-12
Units shown: 313
โก Weight % shown is each unit's own auto-computed weight โ not the global admin-set value.
24
Day of campaign
103
Total days
79
Days remaining
Flat
Grading scheme
Campaign: 2026-03-19 โ 2026-06-30 ยท Grades based on raw combined achievement % โ no benchmark division.
Grade thresholds (raw combined %):
A โ On Track โฅ 80%
B โ Progressing โฅ 70%
C โ Lagging โฅ 60%
D โ Critical โฅ 0%
N/A No target
Grade distribution โ 313 blocks on this snapshot:
0
A โ On Track
6
B โ Progressing
16
C โ Lagging
291
D โ Critical
๐ก Flat scheme: Score % = (total score / 10) ร 100. Grade assigned by comparing this % directly against fixed thresholds โ e.g., A+ โฅ 85%, A โฅ 80%.
โ๏ธ Step 1 โ Category Weightage
Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.
Weightage = Sanctioned Cost of Category
รท Total Sanctioned Cost (all categories)
e.g. Farm Pond = โน200 Cr out of โน500 Cr total
Weightage = 200 รท 500 = 0.40 (40%)
Computed independently per unit โ two districts with different sanction distributions will have different weightages for the same category.
๐ ฐ Step 2a โ Part A Score (Completion)
Fixed 50% weight on completion of works.
Part A = (Completed + Phys) รท Started ร 5
๐ ฑ Step 2b โ Part B Score (Expenditure)
Fixed 50% weight on expenditure booking on ongoing works.
Part B = (Ongoing Booked รท Ongoing Sanction) ร 5
If all done โ full 5 marks automatically
๐ Step 3 โ Ceiling & Model
Category Score = Part A + Part B
๐ Step 4 โ Final Composite Score
Weighted sum of all category scores (weightages sum to 100%).
Final Score = ฮฃ (Weightage_i ร Score_i)
Example: Farm Pond 40% ร 7.2 + Dug Well 20% ร 6.5 + Amrit Sarovar 40% ร 8.1 โ 7.42