KASRAWAD
7.31
๐Ÿฅ‡
Completed353 Started1230 Rank#1
BALADI
7.26
๐Ÿฅˆ
Completed208 Started455 Rank#2
HARSUD
7.18
๐Ÿฅ‰
Completed436 Started1000 Rank#3
๐Ÿ“‹ Category Scorecard โ€” Block Level
313 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
# Block District Total Farm Pondโ–ถ Amrit Sarowarโ–ถ Dug Well Rechargeโ–ถ Irrigation infrastructureโ–ถ Water conservation & rechargeโ–ถ Watershed Related Worksโ–ถ Repair & Maintenance (Water Structures)โ–ถ
๐Ÿฅ‡ KASRAWAD โ†— KHARGONE 7.31
21.5% 8.28
CategoryFarm Pond
Started / Completed / Phys322 / 112 / 167
Completion rate86.6%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.73Cr / 0.58Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score8.28 / 10
3.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.9% 8.27
CategoryDug Well Recharge
Started / Completed / Phys559 / 194 / 295
Completion rate87.5%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.18Cr / 0.14Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score8.27 / 10
1.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
66.3% 6.65
CategoryWater conservation & recharge
Started / Completed / Phys338 / 43 / 126
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked9.09Cr / 7.54Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score6.65 / 10
0.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
๐Ÿฅˆ BALADI โ†— KHANDWA 7.26
52.5% 7.83
CategoryFarm Pond
Started / Completed / Phys96 / 69 / 20
Completion rate92.7%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score7.83 / 10
5.0% 2.80
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score2.80 / 10
28.9% 7.18
CategoryDug Well Recharge
Started / Completed / Phys334 / 133 / 166
Completion rate89.5%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score7.18 / 10
โ€”
11.7% 6.38
CategoryWater conservation & recharge
Started / Completed / Phys22 / 5 / 8
Completion rate59.1%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked0.16Cr / 0.11Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score6.38 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
๐Ÿฅ‰ HARSUD โ†— KHANDWA 7.18
42.2% 6.39
CategoryFarm Pond
Started / Completed / Phys185 / 118 / 52
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.29Cr / 0.10Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score6.39 / 10
โ€”
24.6% 8.36
CategoryDug Well Recharge
Started / Completed / Phys756 / 291 / 442
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score8.36 / 10
1.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.2% 6.84
CategoryWater conservation & recharge
Started / Completed / Phys48 / 22 / 20
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.29Cr / 0.15Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.47 / 5.0
Final score6.84 / 10
2.9% 8.75
CategoryWatershed Related Works
Started / Completed / Phys6 / 4 / 1
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score8.75 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4 MEHANDWANI โ†— DINDORI 7.17
50.6% 6.83
CategoryFarm Pond
Started / Completed / Phys290 / 63 / 202
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.78Cr / 0.35Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score6.83 / 10
โ€”
2.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys189 / 148 / 41
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.4% 8.61
CategoryWater conservation & recharge
Started / Completed / Phys89 / 4 / 71
Completion rate84.3%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked1.75Cr / 1.54Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score8.61 / 10
24.5% 6.51
CategoryWatershed Related Works
Started / Completed / Phys44 / 6 / 22
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked2.11Cr / 1.40Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.51 / 10
2.9% 6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score6.40 / 10
5 PUNASA โ†— KHANDWA 7.13
47.3% 7.10
CategoryFarm Pond
Started / Completed / Phys342 / 83 / 230
Completion rate91.5%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.63Cr / 0.32Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.52 / 5.0
Final score7.10 / 10
2.5% 1.44
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.14Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.44 / 5.0
Final score1.44 / 10
14.9% 8.72
CategoryDug Well Recharge
Started / Completed / Phys1,132 / 246 / 847
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.89 / 5.0
Final score8.72 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.4% 6.86
CategoryWater conservation & recharge
Started / Completed / Phys114 / 10 / 76
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked1.02Cr / 0.63Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.09 / 5.0
Final score6.86 / 10
9.9% 7.08
CategoryWatershed Related Works
Started / Completed / Phys35 / 7 / 18
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.52Cr / 0.36Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.08 / 10
4.4% 6.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 8
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.33 / 10
6 MAHIDPUR โ†— UJJAIN 7.12
29.6% 8.45
CategoryFarm Pond
Started / Completed / Phys92 / 35 / 46
Completion rate88.0%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.22Cr / 0.17Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score8.45 / 10
15.3% 2.90
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.00Cr / 0.58Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.90 / 5.0
Final score2.90 / 10
36.4% 7.99
CategoryDug Well Recharge
Started / Completed / Phys915 / 151 / 708
Completion rate93.9%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score7.99 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.4% 6.68
CategoryWater conservation & recharge
Started / Completed / Phys37 / 18 / 6
Completion rate64.9%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.43Cr / 0.30Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score6.68 / 10
2.3% 5.89
CategoryWatershed Related Works
Started / Completed / Phys6 / 4 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.55 / 5.0
Final score5.89 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7 CHHAIGAON MAKHAN โ†— KHANDWA 6.88
45.2% 7.09
CategoryFarm Pond
Started / Completed / Phys322 / 195 / 72
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked1.13Cr / 0.67Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score7.09 / 10
5.7% 5.01
CategoryAmrit Sarowar
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.62Cr / 0.46Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score5.01 / 10
15.8% 7.48
CategoryDug Well Recharge
Started / Completed / Phys838 / 712 / 86
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)54.3%
Part B score (max 5.0)2.72 / 5.0
Final score7.48 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.4% 7.09
CategoryWater conservation & recharge
Started / Completed / Phys83 / 30 / 25
Completion rate66.3%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked1.48Cr / 1.12Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score7.09 / 10
7.2% 5.23
CategoryWatershed Related Works
Started / Completed / Phys18 / 2 / 5
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked0.66Cr / 0.43Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score5.23 / 10
3.9% 5.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 4
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.22Cr / 0.14Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score5.91 / 10
8 KHANDWA โ†— KHANDWA 6.87
34.6% 6.49
CategoryFarm Pond
Started / Completed / Phys286 / 113 / 136
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.76Cr / 0.32Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score6.49 / 10
8.4% 6.12
CategoryAmrit Sarowar
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.74Cr / 0.54Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score6.12 / 10
12.0% 8.39
CategoryDug Well Recharge
Started / Completed / Phys824 / 292 / 512
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score8.39 / 10
5.1% 7.35
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 5 / 6
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score7.35 / 10
20.7% 7.50
CategoryWater conservation & recharge
Started / Completed / Phys101 / 20 / 54
Completion rate73.3%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked1.59Cr / 1.22Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score7.50 / 10
18.7% 6.14
CategoryWatershed Related Works
Started / Completed / Phys45 / 5 / 22
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.33Cr / 0.84Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.14 / 10
0.6% 6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score6.16 / 10
9 UJJAIN โ†— UJJAIN 6.83
36.0% 6.06
CategoryFarm Pond
Started / Completed / Phys84 / 6 / 61
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked0.28Cr / 0.11Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score6.06 / 10
5.4% 2.71
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score2.71 / 10
17.8% 8.54
CategoryDug Well Recharge
Started / Completed / Phys245 / 47 / 186
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score8.54 / 10
โ€”
36.6% 7.17
CategoryWater conservation & recharge
Started / Completed / Phys43 / 7 / 25
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.57Cr / 0.39Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.17 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.1% 8.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)88.6%
Part B score (max 5.0)4.43 / 5.0
Final score8.18 / 10
10 AMARPUR โ†— DINDORI 6.75
38.8% 6.95
CategoryFarm Pond
Started / Completed / Phys257 / 97 / 145
Completion rate94.2%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.45Cr / 0.20Cr
Expenditure rate (ongoing)44.8%
Part B score (max 5.0)2.24 / 5.0
Final score6.95 / 10
โ€”
3.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys200 / 30 / 170
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
33.3% 5.74
CategoryWater conservation & recharge
Started / Completed / Phys60 / 3 / 16
Completion rate31.7%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked5.14Cr / 4.28Cr
Expenditure rate (ongoing)83.2%
Part B score (max 5.0)4.16 / 5.0
Final score5.74 / 10
15.3% 7.85
CategoryWatershed Related Works
Started / Completed / Phys31 / 23 / 4
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score7.85 / 10
9.6% 6.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 9 / 2
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.69Cr / 0.49Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score6.62 / 10
11 PANDHANA โ†— KHANDWA 6.74
40.9% 7.30
CategoryFarm Pond
Started / Completed / Phys381 / 228 / 120
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.63Cr / 0.34Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score7.30 / 10
7.2% 2.36
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.75Cr / 0.83Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score2.36 / 10
12.3% 8.34
CategoryDug Well Recharge
Started / Completed / Phys1,155 / 442 / 638
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.19Cr / 0.14Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score8.34 / 10
0.9% 5.16
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score5.16 / 10
27.6% 6.67
CategoryWater conservation & recharge
Started / Completed / Phys148 / 25 / 72
Completion rate65.5%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked4.47Cr / 3.04Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score6.67 / 10
5.0% 5.77
CategoryWatershed Related Works
Started / Completed / Phys24 / 4 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.62Cr / 0.41Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score5.77 / 10
6.0% 6.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 1 / 9
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.83Cr / 0.66Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score6.25 / 10
12 KHALAWA โ†— KHANDWA 6.67
27.9% 8.01
CategoryFarm Pond
Started / Completed / Phys384 / 116 / 254
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.37Cr / 0.24Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score8.01 / 10
5.1% 6.10
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.65Cr / 0.47Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score6.10 / 10
10.4% 8.69
CategoryDug Well Recharge
Started / Completed / Phys1,097 / 54 / 1,010
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score8.69 / 10
2.3% 4.02
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.53Cr / 0.30Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score4.02 / 10
39.7% 5.96
CategoryWater conservation & recharge
Started / Completed / Phys195 / 10 / 106
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked6.40Cr / 3.82Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.98 / 5.0
Final score5.96 / 10
10.5% 5.01
CategoryWatershed Related Works
Started / Completed / Phys44 / 2 / 17
Completion rate43.2%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked1.68Cr / 0.96Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score5.01 / 10
3.9% 5.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 4 / 6
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.46Cr / 0.24Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score5.79 / 10
13 DINDORI โ†— DINDORI 6.66
39.9% 6.15
CategoryFarm Pond
Started / Completed / Phys455 / 115 / 250
Completion rate80.2%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked3.29Cr / 1.40Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.14 / 5.0
Final score6.15 / 10
โ€”
1.7% 5.49
CategoryDug Well Recharge
Started / Completed / Phys239 / 162 / 74
Completion rate98.7%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)11.1%
Part B score (max 5.0)0.56 / 5.0
Final score5.49 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.8% 6.77
CategoryWater conservation & recharge
Started / Completed / Phys116 / 15 / 47
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked7.36Cr / 6.04Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score6.77 / 10
23.8% 7.34
CategoryWatershed Related Works
Started / Completed / Phys92 / 28 / 40
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked2.70Cr / 1.97Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score7.34 / 10
2.7% 7.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 7 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.33Cr / 0.24Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.63 / 5.0
Final score7.38 / 10
14 ARON โ†— GUNA 6.46
51.2% 6.99
CategoryFarm Pond
Started / Completed / Phys379 / 231 / 67
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked2.86Cr / 1.75Cr
Expenditure rate (ongoing)61.2%
Part B score (max 5.0)3.06 / 5.0
Final score6.99 / 10
โ€”
2.5% 9.00
CategoryDug Well Recharge
Started / Completed / Phys288 / 107 / 169
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)93.2%
Part B score (max 5.0)4.66 / 5.0
Final score9.00 / 10
โ€”
42.3% 5.62
CategoryWater conservation & recharge
Started / Completed / Phys155 / 9 / 33
Completion rate27.1%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked9.74Cr / 8.30Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score5.62 / 10
3.1% 7.42
CategoryWatershed Related Works
Started / Completed / Phys11 / 3 / 3
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.49Cr / 0.46Cr
Expenditure rate (ongoing)93.9%
Part B score (max 5.0)4.69 / 5.0
Final score7.42 / 10
0.8% 5.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score5.51 / 10
15 SOHAGPUR โ†— NARMADAPURAM 6.45
59.9% 4.76
CategoryFarm Pond
Started / Completed / Phys120 / 38 / 52
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.46Cr / 0.09Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score4.76 / 10
โ€”
10.8% 6.16
CategoryDug Well Recharge
Started / Completed / Phys134 / 47 / 63
Completion rate82.1%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.06 / 5.0
Final score6.16 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys13 / 4 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16 BAJAG โ†— DINDORI 6.40
50.7% 5.99
CategoryFarm Pond
Started / Completed / Phys278 / 41 / 168
Completion rate75.2%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked2.77Cr / 1.23Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score5.99 / 10
โ€”
3.2% 5.00
CategoryDug Well Recharge
Started / Completed / Phys245 / 41 / 202
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score5.00 / 10
โ€”
33.0% 6.07
CategoryWater conservation & recharge
Started / Completed / Phys71 / 1 / 37
Completion rate53.5%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked4.30Cr / 2.92Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score6.07 / 10
9.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys17 / 1 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.3% 6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.26Cr / 0.18Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.45 / 5.0
Final score6.79 / 10
17 BHAGVANPURA โ†— KHARGONE 6.25
17.2% 6.84
CategoryFarm Pond
Started / Completed / Phys292 / 119 / 72
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked1.73Cr / 1.24Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score6.84 / 10
2.6% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.8% 7.22
CategoryDug Well Recharge
Started / Completed / Phys443 / 202 / 151
Completion rate79.7%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.23Cr / 0.15Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.23 / 5.0
Final score7.22 / 10
0.2% 4.02
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.52 / 5.0
Final score4.02 / 10
71.7% 5.84
CategoryWater conservation & recharge
Started / Completed / Phys215 / 31 / 57
Completion rate40.9%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked12.18Cr / 9.24Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score5.84 / 10
3.5% 7.65
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 7
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.27Cr / 0.23Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score7.65 / 10
1.0% 7.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.21Cr
Expenditure rate (ongoing)91.5%
Part B score (max 5.0)4.57 / 5.0
Final score7.57 / 10
18 BHAINSDEHI โ†— BETUL 6.11
13.4% 8.45
CategoryFarm Pond
Started / Completed / Phys164 / 3 / 129
Completion rate80.5%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.50Cr / 0.44Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score8.45 / 10
3.0% 2.69
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.55Cr / 0.30Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.69 / 5.0
Final score2.69 / 10
5.2% 7.92
CategoryDug Well Recharge
Started / Completed / Phys371 / 28 / 298
Completion rate87.9%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score7.92 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
72.8% 5.71
CategoryWater conservation & recharge
Started / Completed / Phys201 / 7 / 80
Completion rate43.3%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked7.79Cr / 5.52Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score5.71 / 10
1.8% 4.35
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score4.35 / 10
3.8% 6.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 4 / 10
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score6.48 / 10
19 BANKHEDI โ†— NARMADAPURAM 6.10
39.1% 3.32
CategoryFarm Pond
Started / Completed / Phys101 / 30 / 23
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.02Cr / 0.14Cr
Expenditure rate (ongoing)13.8%
Part B score (max 5.0)0.69 / 5.0
Final score3.32 / 10
โ€”
6.5% 5.56
CategoryDug Well Recharge
Started / Completed / Phys119 / 66 / 31
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score5.56 / 10
0.8% 8.03
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 3 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score8.03 / 10
44.1% 7.78
CategoryWater conservation & recharge
Started / Completed / Phys47 / 30 / 8
Completion rate80.9%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.58Cr / 0.43Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.74 / 5.0
Final score7.78 / 10
4.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 10 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 8 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20 WARASEONI โ†— BALAGHAT 6.09
57.3% 5.68
CategoryFarm Pond
Started / Completed / Phys390 / 125 / 113
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked3.51Cr / 1.84Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score5.68 / 10
2.6% 3.44
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.34Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score3.44 / 10
1.5% 7.19
CategoryDug Well Recharge
Started / Completed / Phys114 / 55 / 42
Completion rate85.1%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.19 / 10
0.2% 5.60
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score5.60 / 10
34.3% 6.96
CategoryWater conservation & recharge
Started / Completed / Phys157 / 40 / 58
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked2.90Cr / 2.23Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score6.96 / 10
2.3% 5.18
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.38Cr / 0.30Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score5.18 / 10
1.8% 6.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 1
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.13Cr / 0.11Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score6.88 / 10
21 PANAGAR โ†— JABALPUR 6.02
6.8% 0.84
CategoryFarm Pond
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.12Cr / 0.00Cr
Expenditure rate (ongoing)4.2%
Part B score (max 5.0)0.21 / 5.0
Final score0.84 / 10
โ€”
0.6% 1.10
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
โ€”
74.5% 6.97
CategoryWater conservation & recharge
Started / Completed / Phys12 / 9 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.93Cr / 0.60Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.22 / 5.0
Final score6.97 / 10
2.3% 6.72
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score6.72 / 10
15.8% 3.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score3.89 / 10
22 LANJI โ†— BALAGHAT 6.01
57.6% 6.17
CategoryFarm Pond
Started / Completed / Phys369 / 124 / 96
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked3.44Cr / 2.20Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.17 / 10
4.1% 1.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.13Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
2.4% 8.15
CategoryDug Well Recharge
Started / Completed / Phys154 / 63 / 51
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)89.1%
Part B score (max 5.0)4.45 / 5.0
Final score8.15 / 10
โ€”
31.5% 6.24
CategoryWater conservation & recharge
Started / Completed / Phys104 / 17 / 27
Completion rate42.3%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked3.24Cr / 2.67Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score6.24 / 10
2.7% 6.47
CategoryWatershed Related Works
Started / Completed / Phys14 / 3 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.20Cr / 0.16Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score6.47 / 10
1.7% 4.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score4.28 / 10
23 SHAHPURA โ†— DINDORI 5.98
25.9% 5.65
CategoryFarm Pond
Started / Completed / Phys418 / 182 / 113
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked2.63Cr / 1.12Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score5.65 / 10
1.1% 0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
1.8% 5.00
CategoryDug Well Recharge
Started / Completed / Phys221 / 168 / 52
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.4%
Part B score (max 5.0)0.02 / 5.0
Final score5.00 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.2% 6.43
CategoryWater conservation & recharge
Started / Completed / Phys108 / 26 / 26
Completion rate48.1%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked7.09Cr / 5.71Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score6.43 / 10
30.5% 6.19
CategoryWatershed Related Works
Started / Completed / Phys98 / 26 / 25
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked4.65Cr / 3.34Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.19 / 10
6.9% 4.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 3
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.98Cr / 1.64Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score4.86 / 10
24 ZIRANYA โ†— KHARGONE 5.97
13.5% 5.52
CategoryFarm Pond
Started / Completed / Phys299 / 49 / 106
Completion rate51.8%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked2.38Cr / 1.39Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score5.52 / 10
6.9% 6.97
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 7
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked1.00Cr / 0.76Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.97 / 10
3.2% 6.95
CategoryDug Well Recharge
Started / Completed / Phys451 / 196 / 136
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.31Cr / 0.20Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.95 / 10
0.3% 6.20
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score6.20 / 10
71.4% 5.87
CategoryWater conservation & recharge
Started / Completed / Phys313 / 13 / 107
Completion rate38.3%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked14.85Cr / 11.74Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score5.87 / 10
0.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.6% 6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 7 / 3
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked1.04Cr / 0.88Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score6.52 / 10
25 SANCHI โ†— RAISEN 5.92
61.4% 6.65
CategoryFarm Pond
Started / Completed / Phys306 / 228 / 49
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.61Cr / 0.26Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score6.65 / 10
0.6% 1.31
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
3.9% 8.52
CategoryDug Well Recharge
Started / Completed / Phys160 / 151 / 6
Completion rate98.1%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score8.52 / 10
4.2% 4.08
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.36Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score4.08 / 10
28.4% 4.49
CategoryWater conservation & recharge
Started / Completed / Phys18 / 2 / 0
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked3.00Cr / 2.36Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score4.49 / 10
0.4% 1.90
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
1.2% 3.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score3.60 / 10
26 KHARGONE โ†— KHARGONE 5.91
36.0% 4.89
CategoryFarm Pond
Started / Completed / Phys106 / 24 / 44
Completion rate64.2%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.89Cr / 0.30Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.89 / 10
8.5% 4.72
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.39Cr / 0.24Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score4.72 / 10
7.9% 7.15
CategoryDug Well Recharge
Started / Completed / Phys245 / 18 / 204
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score7.15 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
43.8% 6.57
CategoryWater conservation & recharge
Started / Completed / Phys47 / 6 / 29
Completion rate74.5%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.57 / 10
1.8% 5.56
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score5.56 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27 BARWAH โ†— KHARGONE 5.89
35.9% 4.37
CategoryFarm Pond
Started / Completed / Phys216 / 56 / 49
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked2.33Cr / 0.91Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.94 / 5.0
Final score4.37 / 10
1.8% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.5% 7.20
CategoryDug Well Recharge
Started / Completed / Phys720 / 99 / 494
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.31Cr / 0.19Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score7.20 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.4% 6.24
CategoryWater conservation & recharge
Started / Completed / Phys150 / 43 / 60
Completion rate68.7%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked1.57Cr / 0.88Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score6.24 / 10
7.9% 7.00
CategoryWatershed Related Works
Started / Completed / Phys26 / 8 / 12
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.31Cr / 0.19Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.00 / 10
1.5% 7.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score7.13 / 10
28 BAMORI โ†— GUNA 5.83
25.9% 6.14
CategoryFarm Pond
Started / Completed / Phys84 / 74 / 0
Completion rate88.1%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.21Cr / 0.07Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score6.14 / 10
โ€”
2.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys60 / 15 / 45
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
35.7% 5.19
CategoryWater conservation & recharge
Started / Completed / Phys13 / 3 / 3
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked1.20Cr / 0.69Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score5.19 / 10
5.2% 6.34
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score6.34 / 10
30.6% 5.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 3
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.93Cr / 0.68Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.89 / 10
29 GHATIYA โ†— UJJAIN 5.76
41.2% 6.48
CategoryFarm Pond
Started / Completed / Phys68 / 28 / 29
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.24Cr / 0.11Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score6.48 / 10
18.7% 1.02
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.14Cr
Expenditure rate (ongoing)20.3%
Part B score (max 5.0)1.02 / 5.0
Final score1.02 / 10
21.6% 6.58
CategoryDug Well Recharge
Started / Completed / Phys306 / 74 / 215
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score6.58 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.4% 8.15
CategoryWater conservation & recharge
Started / Completed / Phys19 / 4 / 9
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.17Cr / 0.16Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.73 / 5.0
Final score8.15 / 10
1.5% 1.69
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score1.69 / 10
3.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30 TARANA โ†— UJJAIN 5.74
29.4% 6.95
CategoryFarm Pond
Started / Completed / Phys118 / 19 / 47
Completion rate55.9%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked1.00Cr / 0.83Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score6.95 / 10
20.5% 3.20
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.72Cr / 1.10Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.20 / 5.0
Final score3.20 / 10
24.6% 7.67
CategoryDug Well Recharge
Started / Completed / Phys834 / 559 / 151
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.31Cr / 0.21Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.42 / 5.0
Final score7.67 / 10
โ€”
13.5% 4.77
CategoryWater conservation & recharge
Started / Completed / Phys45 / 12 / 1
Completion rate28.9%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked0.74Cr / 0.49Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score4.77 / 10
12.0% 4.24
CategoryWatershed Related Works
Started / Completed / Phys36 / 9 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.77Cr / 0.46Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score4.24 / 10
โ€”
31 MAHESHWAR โ†— KHARGONE 5.73
35.5% 5.05
CategoryFarm Pond
Started / Completed / Phys216 / 28 / 77
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked2.17Cr / 1.14Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score5.05 / 10
7.1% 3.73
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.81Cr / 0.60Cr
Expenditure rate (ongoing)74.5%
Part B score (max 5.0)3.73 / 5.0
Final score3.73 / 10
13.0% 6.19
CategoryDug Well Recharge
Started / Completed / Phys572 / 53 / 255
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.68Cr / 0.48Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score6.19 / 10
โ€”
40.0% 6.50
CategoryWater conservation & recharge
Started / Completed / Phys111 / 10 / 54
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked2.28Cr / 1.65Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score6.50 / 10
1.2% 5.38
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.04 / 5.0
Final score5.38 / 10
3.1% 6.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score6.49 / 10
32 BADI โ†— RAISEN 5.72
79.1% 5.84
CategoryFarm Pond
Started / Completed / Phys329 / 114 / 17
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked3.42Cr / 2.63Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.85 / 5.0
Final score5.84 / 10
โ€”
7.3% 8.15
CategoryDug Well Recharge
Started / Completed / Phys183 / 52 / 78
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)91.9%
Part B score (max 5.0)4.60 / 5.0
Final score8.15 / 10
โ€”
12.1% 3.65
CategoryWater conservation & recharge
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.79Cr / 0.57Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.65 / 10
0.4% 4.92
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)98.4%
Part B score (max 5.0)4.92 / 5.0
Final score4.92 / 10
1.1% 4.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)86.8%
Part B score (max 5.0)4.34 / 5.0
Final score4.34 / 10
33 ZIRAPUR โ†— RAJGARH 5.72
24.8% 6.43
CategoryFarm Pond
Started / Completed / Phys479 / 311 / 117
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked1.09Cr / 0.43Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.96 / 5.0
Final score6.43 / 10
โ€”
4.4% 5.77
CategoryDug Well Recharge
Started / Completed / Phys642 / 575 / 61
Completion rate99.1%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)16.4%
Part B score (max 5.0)0.82 / 5.0
Final score5.77 / 10
0.6% 5.19
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.19 / 10
63.6% 5.50
CategoryWater conservation & recharge
Started / Completed / Phys218 / 33 / 22
Completion rate25.2%
Part A score (max 5.0)1.26 / 5.0
Ongoing sanction / booked18.16Cr / 15.37Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score5.50 / 10
0.2% 3.59
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score3.59 / 10
6.4% 5.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 3 / 1
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked2.01Cr / 1.77Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score5.19 / 10
34 GHUGHRI โ†— MANDLA 5.69
41.4% 7.17
CategoryFarm Pond
Started / Completed / Phys188 / 130 / 11
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked2.16Cr / 1.48Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.17 / 10
4.4% 1.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.24Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score1.49 / 10
2.2% 6.93
CategoryDug Well Recharge
Started / Completed / Phys154 / 112 / 3
Completion rate74.7%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.93 / 10
11.7% 2.58
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.14Cr / 1.10Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score2.58 / 10
37.7% 5.52
CategoryWater conservation & recharge
Started / Completed / Phys67 / 15 / 11
Completion rate38.8%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked5.23Cr / 3.75Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score5.52 / 10
2.3% 4.30
CategoryWatershed Related Works
Started / Completed / Phys15 / 1 / 2
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.23Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score4.30 / 10
0.4% 5.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score5.88 / 10
35 ASHOKNAGAR โ†— ASHOK NAGAR 5.66
59.0% 5.57
CategoryFarm Pond
Started / Completed / Phys688 / 220 / 211
Completion rate62.6%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked7.03Cr / 3.43Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score5.57 / 10
1.5% 3.37
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.33Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
1.4% 7.10
CategoryDug Well Recharge
Started / Completed / Phys174 / 88 / 55
Completion rate82.2%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score7.10 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.1% 5.93
CategoryWater conservation & recharge
Started / Completed / Phys187 / 33 / 32
Completion rate34.8%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked7.00Cr / 5.87Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score5.93 / 10
2.7% 5.51
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.40Cr / 0.24Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score5.51 / 10
2.1% 4.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.52Cr / 0.40Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score4.43 / 10
36 GAIRATGANJ โ†— RAISEN 5.64
54.3% 6.62
CategoryFarm Pond
Started / Completed / Phys350 / 182 / 14
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked3.36Cr / 2.57Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score6.62 / 10
4.1% 3.25
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score3.25 / 10
4.4% 8.53
CategoryDug Well Recharge
Started / Completed / Phys202 / 165 / 2
Completion rate82.7%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.40 / 5.0
Final score8.53 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
34.9% 4.05
CategoryWater conservation & recharge
Started / Completed / Phys86 / 6 / 0
Completion rate7.0%
Part A score (max 5.0)0.35 / 5.0
Ongoing sanction / booked3.93Cr / 2.91Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.70 / 5.0
Final score4.05 / 10
โ€”
1.5% 2.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score2.56 / 10
37 GOHPARU โ†— SHAHDOL 5.60
38.3% 4.44
CategoryFarm Pond
Started / Completed / Phys603 / 229 / 131
Completion rate59.7%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked5.78Cr / 1.68Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.46 / 5.0
Final score4.44 / 10
1.1% 2.16
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
0.8% 5.89
CategoryDug Well Recharge
Started / Completed / Phys98 / 15 / 54
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.37 / 5.0
Final score5.89 / 10
11.1% 7.10
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked2.71Cr / 2.69Cr
Expenditure rate (ongoing)99.1%
Part B score (max 5.0)4.96 / 5.0
Final score7.10 / 10
44.7% 6.40
CategoryWater conservation & recharge
Started / Completed / Phys202 / 5 / 84
Completion rate44.1%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked11.22Cr / 9.42Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score6.40 / 10
3.3% 4.17
CategoryWatershed Related Works
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.16Cr / 0.97Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score4.17 / 10
0.5% 6.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.13Cr / 0.12Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score6.18 / 10
38 PUSHPRAJGARH โ†— ANUPPUR 5.60
74.2% 5.60
CategoryFarm Pond
Started / Completed / Phys1,443 / 948 / 175
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked8.91Cr / 3.05Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.60 / 10
โ€”
0.6% 5.21
CategoryDug Well Recharge
Started / Completed / Phys124 / 48 / 6
Completion rate43.5%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.21 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.4% 5.87
CategoryWater conservation & recharge
Started / Completed / Phys190 / 47 / 28
Completion rate39.5%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked7.26Cr / 5.66Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score5.87 / 10
2.6% 5.30
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 4
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.19Cr / 1.00Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.30 / 10
2.7% 3.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.35Cr / 0.94Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score3.50 / 10
39 SARANGPUR โ†— RAJGARH 5.58
44.7% 4.81
CategoryFarm Pond
Started / Completed / Phys181 / 115 / 3
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked1.86Cr / 0.58Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score4.81 / 10
โ€”
13.6% 7.54
CategoryDug Well Recharge
Started / Completed / Phys615 / 475 / 62
Completion rate87.3%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.54 / 10
0.6% 5.19
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score5.19 / 10
22.9% 6.62
CategoryWater conservation & recharge
Started / Completed / Phys39 / 15 / 7
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked1.97Cr / 1.50Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score6.62 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.9% 4.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 3 / 2
Completion rate15.6%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked1.83Cr / 1.42Cr
Expenditure rate (ongoing)77.4%
Part B score (max 5.0)3.87 / 5.0
Final score4.65 / 10
40 PATI โ†— BARWANI 5.54
16.1% 5.92
CategoryFarm Pond
Started / Completed / Phys216 / 4 / 108
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked1.16Cr / 0.77Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score5.92 / 10
โ€”
13.6% 7.23
CategoryDug Well Recharge
Started / Completed / Phys711 / 18 / 511
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.47Cr / 0.33Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score7.23 / 10
โ€”
46.2% 5.05
CategoryWater conservation & recharge
Started / Completed / Phys111 / 9 / 24
Completion rate29.7%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked4.03Cr / 2.87Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score5.05 / 10
20.8% 5.57
CategoryWatershed Related Works
Started / Completed / Phys50 / 2 / 21
Completion rate46.0%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked1.56Cr / 1.02Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score5.57 / 10
3.3% 3.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.31Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
41 SAMNAPUR โ†— DINDORI 5.50
26.3% 5.36
CategoryFarm Pond
Started / Completed / Phys277 / 160 / 82
Completion rate87.4%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.66Cr / 0.13Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score5.36 / 10
โ€”
2.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys187 / 128 / 59
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 3.41
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score3.41 / 10
32.3% 7.00
CategoryWater conservation & recharge
Started / Completed / Phys69 / 13 / 26
Completion rate56.5%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked3.79Cr / 3.17Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score7.00 / 10
15.9% 6.20
CategoryWatershed Related Works
Started / Completed / Phys28 / 8 / 9
Completion rate60.7%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked1.56Cr / 0.99Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.17 / 5.0
Final score6.20 / 10
23.0% 2.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 2 / 2
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked4.28Cr / 0.35Cr
Expenditure rate (ongoing)8.2%
Part B score (max 5.0)0.41 / 5.0
Final score2.63 / 10
42 KHAIRLANJI โ†— BALAGHAT 5.49
61.0% 5.44
CategoryFarm Pond
Started / Completed / Phys474 / 138 / 92
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked6.46Cr / 3.90Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score5.44 / 10
2.4% 1.16
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.11Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.16 / 5.0
Final score1.16 / 10
1.4% 7.09
CategoryDug Well Recharge
Started / Completed / Phys113 / 33 / 33
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.12Cr / 0.10Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score7.09 / 10
0.4% 4.18
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
33.4% 5.81
CategoryWater conservation & recharge
Started / Completed / Phys118 / 11 / 36
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked4.81Cr / 3.68Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score5.81 / 10
1.0% 5.52
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score5.52 / 10
0.4% 6.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)84.9%
Part B score (max 5.0)4.24 / 5.0
Final score6.74 / 10
43 BETUL โ†— BETUL 5.46
29.8% 5.29
CategoryFarm Pond
Started / Completed / Phys145 / 0 / 76
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.86Cr / 1.00Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score5.29 / 10
6.5% 3.34
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.77Cr / 0.52Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
7.6% 7.57
CategoryDug Well Recharge
Started / Completed / Phys348 / 5 / 296
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score7.57 / 10
0.2% 4.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score4.22 / 10
36.3% 5.54
CategoryWater conservation & recharge
Started / Completed / Phys87 / 1 / 38
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked2.47Cr / 1.63Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score5.54 / 10
11.7% 4.74
CategoryWatershed Related Works
Started / Completed / Phys25 / 2 / 6
Completion rate32.0%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked1.04Cr / 0.65Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.14 / 5.0
Final score4.74 / 10
7.9% 6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.56 / 10
44 NARSINGHGARH โ†— RAJGARH 5.46
41.3% 4.35
CategoryFarm Pond
Started / Completed / Phys263 / 130 / 22
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked3.19Cr / 0.93Cr
Expenditure rate (ongoing)29.2%
Part B score (max 5.0)1.46 / 5.0
Final score4.35 / 10
โ€”
9.3% 7.54
CategoryDug Well Recharge
Started / Completed / Phys656 / 319 / 299
Completion rate94.2%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score7.54 / 10
1.2% 4.40
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score4.40 / 10
33.8% 6.33
CategoryWater conservation & recharge
Started / Completed / Phys163 / 34 / 55
Completion rate54.6%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked3.84Cr / 2.76Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.60 / 5.0
Final score6.33 / 10
0.9% 4.11
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 1
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score4.11 / 10
13.4% 5.42
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys31 / 3 / 8
Completion rate35.5%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked1.58Cr / 1.16Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score5.42 / 10
45 BADNAGAR โ†— UJJAIN 5.46
59.9% 5.88
CategoryFarm Pond
Started / Completed / Phys180 / 27 / 115
Completion rate78.9%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.83Cr / 0.32Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score5.88 / 10
16.6% 1.93
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.24Cr / 0.48Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.93 / 5.0
Final score1.93 / 10
0.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 11 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.2% 6.88
CategoryWater conservation & recharge
Started / Completed / Phys19 / 4 / 9
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.51Cr / 0.35Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score6.88 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.6% 4.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.06Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score4.60 / 10
46 BIAORA โ†— RAJGARH 5.44
40.5% 5.02
CategoryFarm Pond
Started / Completed / Phys460 / 269 / 33
Completion rate65.7%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked3.64Cr / 1.27Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score5.02 / 10
1.5% 4.99
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.40Cr
Expenditure rate (ongoing)99.7%
Part B score (max 5.0)4.99 / 5.0
Final score4.99 / 10
5.9% 7.64
CategoryDug Well Recharge
Started / Completed / Phys613 / 494 / 99
Completion rate96.7%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score7.64 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.4% 5.29
CategoryWater conservation & recharge
Started / Completed / Phys158 / 22 / 31
Completion rate33.5%
Part A score (max 5.0)1.68 / 5.0
Ongoing sanction / booked5.20Cr / 3.76Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score5.29 / 10
โ€”
16.1% 5.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 0 / 28
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked1.94Cr / 1.21Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score5.93 / 10
47 NAINPUR โ†— MANDLA 5.42
59.1% 5.53
CategoryFarm Pond
Started / Completed / Phys337 / 208 / 11
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked5.53Cr / 2.53Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score5.53 / 10
4.3% 0.09
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.02Cr
Expenditure rate (ongoing)1.8%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
3.5% 5.25
CategoryDug Well Recharge
Started / Completed / Phys365 / 85 / 154
Completion rate65.5%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked0.32Cr / 0.13Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score5.25 / 10
3.9% 6.23
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.89Cr / 0.82Cr
Expenditure rate (ongoing)91.2%
Part B score (max 5.0)4.56 / 5.0
Final score6.23 / 10
25.8% 6.01
CategoryWater conservation & recharge
Started / Completed / Phys74 / 24 / 4
Completion rate37.8%
Part A score (max 5.0)1.89 / 5.0
Ongoing sanction / booked5.36Cr / 4.42Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score6.01 / 10
1.2% 3.14
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.20Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
2.2% 5.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 1
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score5.96 / 10
48 PANSEMAL โ†— BARWANI 5.42
32.5% 5.65
CategoryFarm Pond
Started / Completed / Phys165 / 19 / 88
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.97Cr / 0.47Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score5.65 / 10
7.8% 2.41
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.55Cr / 0.13Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score2.41 / 10
6.2% 5.06
CategoryDug Well Recharge
Started / Completed / Phys227 / 7 / 149
Completion rate68.7%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.18Cr / 0.06Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score5.06 / 10
โ€”
45.1% 5.73
CategoryWater conservation & recharge
Started / Completed / Phys76 / 2 / 25
Completion rate35.5%
Part A score (max 5.0)1.78 / 5.0
Ongoing sanction / booked3.02Cr / 2.39Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.96 / 5.0
Final score5.73 / 10
7.6% 5.83
CategoryWatershed Related Works
Started / Completed / Phys18 / 6 / 4
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.35Cr / 0.21Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score5.83 / 10
0.8% 6.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.07 / 5.0
Final score6.57 / 10
49 ATHNER โ†— BETUL 5.42
12.6% 7.31
CategoryFarm Pond
Started / Completed / Phys167 / 15 / 86
Completion rate60.5%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.05Cr / 0.90Cr
Expenditure rate (ongoing)85.7%
Part B score (max 5.0)4.28 / 5.0
Final score7.31 / 10
4.3% 0.41
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.08Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score0.41 / 10
4.1% 8.14
CategoryDug Well Recharge
Started / Completed / Phys355 / 45 / 260
Completion rate85.9%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.85 / 5.0
Final score8.14 / 10
โ€”
73.8% 5.24
CategoryWater conservation & recharge
Started / Completed / Phys225 / 6 / 65
Completion rate31.6%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked11.99Cr / 8.79Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score5.24 / 10
4.3% 5.62
CategoryWatershed Related Works
Started / Completed / Phys15 / 2 / 6
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.95 / 5.0
Final score5.62 / 10
1.0% 4.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 1 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score4.13 / 10
50 REHLI โ†— SAGAR 5.39
35.8% 4.89
CategoryFarm Pond
Started / Completed / Phys280 / 82 / 56
Completion rate49.3%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked2.56Cr / 1.24Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score4.89 / 10
โ€”
10.6% 5.87
CategoryDug Well Recharge
Started / Completed / Phys586 / 254 / 132
Completion rate65.9%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked0.48Cr / 0.25Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score5.87 / 10
1.6% 4.57
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.57 / 5.0
Final score4.57 / 10
31.3% 5.42
CategoryWater conservation & recharge
Started / Completed / Phys114 / 10 / 32
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked2.46Cr / 1.76Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score5.42 / 10
6.3% 6.79
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 9
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.30Cr / 0.22Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score6.79 / 10
14.4% 5.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 8
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.68Cr / 0.42Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score5.70 / 10
51 MOHGAON โ†— MANDLA 5.37
35.7% 6.53
CategoryFarm Pond
Started / Completed / Phys151 / 103 / 0
Completion rate68.2%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked1.88Cr / 1.17Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score6.53 / 10
7.0% 0.52
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.15Cr / 0.12Cr
Expenditure rate (ongoing)10.4%
Part B score (max 5.0)0.52 / 5.0
Final score0.52 / 10
2.0% 6.06
CategoryDug Well Recharge
Started / Completed / Phys117 / 67 / 8
Completion rate64.1%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score6.06 / 10
7.3% 3.30
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.80Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score3.30 / 10
41.8% 5.63
CategoryWater conservation & recharge
Started / Completed / Phys97 / 26 / 2
Completion rate28.9%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked5.87Cr / 4.91Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.63 / 10
3.3% 4.29
CategoryWatershed Related Works
Started / Completed / Phys16 / 2 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.47Cr / 0.35Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score4.29 / 10
2.9% 5.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.27Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.09 / 5.0
Final score5.09 / 10
52 KATNI โ†— KATNI 5.36
37.5% 3.65
CategoryFarm Pond
Started / Completed / Phys145 / 35 / 21
Completion rate38.6%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked3.20Cr / 1.10Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score3.65 / 10
5.0% 1.89
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.64Cr / 0.24Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score1.89 / 10
3.6% 4.32
CategoryDug Well Recharge
Started / Completed / Phys174 / 26 / 75
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked0.19Cr / 0.05Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score4.32 / 10
13.8% 7.34
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 0 / 14
Completion rate73.7%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.40Cr / 0.29Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.66 / 5.0
Final score7.34 / 10
11.3% 5.63
CategoryWater conservation & recharge
Started / Completed / Phys34 / 4 / 13
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.58Cr / 0.36Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score5.63 / 10
20.1% 7.55
CategoryWatershed Related Works
Started / Completed / Phys27 / 13 / 9
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score7.55 / 10
8.7% 6.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 3 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.34Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score6.65 / 10
53 MANASA โ†— NEEMUCH 5.33
50.1% 4.22
CategoryFarm Pond
Started / Completed / Phys401 / 47 / 133
Completion rate44.9%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked8.47Cr / 3.34Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.97 / 5.0
Final score4.22 / 10
5.2% 6.03
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.66Cr / 0.42Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.03 / 10
6.8% 6.60
CategoryDug Well Recharge
Started / Completed / Phys763 / 454 / 185
Completion rate83.7%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score6.60 / 10
4.0% 5.87
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 2 / 9
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.34Cr / 0.19Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score5.87 / 10
32.4% 6.46
CategoryWater conservation & recharge
Started / Completed / Phys179 / 10 / 106
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked4.04Cr / 2.60Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score6.46 / 10
0.4% 2.55
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score2.55 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
54 AMLA โ†— BETUL 5.32
28.6% 4.99
CategoryFarm Pond
Started / Completed / Phys215 / 13 / 71
Completion rate39.1%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked3.11Cr / 1.89Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.04 / 5.0
Final score4.99 / 10
โ€”
6.5% 7.28
CategoryDug Well Recharge
Started / Completed / Phys437 / 48 / 247
Completion rate67.5%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.36Cr / 0.28Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score7.28 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
52.5% 5.14
CategoryWater conservation & recharge
Started / Completed / Phys128 / 2 / 27
Completion rate22.7%
Part A score (max 5.0)1.13 / 5.0
Ongoing sanction / booked7.02Cr / 5.63Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score5.14 / 10
7.3% 5.92
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 7
Completion rate38.1%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked0.79Cr / 0.64Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score5.92 / 10
5.0% 5.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 1 / 4
Completion rate26.3%
Part A score (max 5.0)1.32 / 5.0
Ongoing sanction / booked0.61Cr / 0.50Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.13 / 5.0
Final score5.44 / 10
55 RAJPUR โ†— BARWANI 5.31
29.1% 4.75
CategoryFarm Pond
Started / Completed / Phys176 / 0 / 67
Completion rate38.1%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked1.01Cr / 0.58Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score4.75 / 10
4.0% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
16.8% 6.79
CategoryDug Well Recharge
Started / Completed / Phys398 / 0 / 280
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.31Cr / 0.20Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.79 / 10
1.4% 5.49
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 4 / 3
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.60 / 5.0
Final score5.49 / 10
20.3% 5.59
CategoryWater conservation & recharge
Started / Completed / Phys35 / 2 / 12
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.38Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.59 / 5.0
Final score5.59 / 10
26.0% 5.69
CategoryWatershed Related Works
Started / Completed / Phys38 / 1 / 22
Completion rate60.5%
Part A score (max 5.0)3.03 / 5.0
Ongoing sanction / booked0.72Cr / 0.38Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score5.69 / 10
2.4% 3.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 1
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score3.90 / 10
56 KARANJIYA โ†— DINDORI 5.29
45.7% 5.91
CategoryFarm Pond
Started / Completed / Phys342 / 159 / 76
Completion rate68.7%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked3.85Cr / 1.91Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score5.91 / 10
3.5% 5.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.40Cr / 0.15Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
1.7% 7.92
CategoryDug Well Recharge
Started / Completed / Phys168 / 29 / 134
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score7.92 / 10
3.4% 3.99
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.70Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score3.99 / 10
41.1% 4.64
CategoryWater conservation & recharge
Started / Completed / Phys127 / 7 / 21
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked9.51Cr / 6.72Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score4.64 / 10
1.5% 6.13
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 6
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.25Cr / 0.16Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score6.13 / 10
3.1% 4.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.70Cr / 0.56Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score4.51 / 10
57 BIRSA โ†— BALAGHAT 5.29
59.1% 5.66
CategoryFarm Pond
Started / Completed / Phys704 / 177 / 50
Completion rate32.2%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked14.07Cr / 11.40Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score5.66 / 10
1.4% 0.46
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.05Cr
Expenditure rate (ongoing)9.3%
Part B score (max 5.0)0.46 / 5.0
Final score0.46 / 10
0.9% 6.25
CategoryDug Well Recharge
Started / Completed / Phys125 / 12 / 34
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked0.21Cr / 0.18Cr
Expenditure rate (ongoing)88.3%
Part B score (max 5.0)4.41 / 5.0
Final score6.25 / 10
0.0% 5.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score5.00 / 10
36.4% 4.91
CategoryWater conservation & recharge
Started / Completed / Phys259 / 13 / 23
Completion rate13.9%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked11.94Cr / 10.05Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score4.91 / 10
1.5% 4.23
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 2
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.41Cr / 0.28Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score4.23 / 10
0.7% 4.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score4.73 / 10
58 LALBARRA โ†— BALAGHAT 5.29
61.3% 5.61
CategoryFarm Pond
Started / Completed / Phys526 / 310 / 0
Completion rate58.9%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked5.60Cr / 2.98Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score5.61 / 10
1.9% 3.51
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
1.8% 7.44
CategoryDug Well Recharge
Started / Completed / Phys173 / 138 / 3
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score7.44 / 10
1.6% 5.93
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.35Cr / 0.33Cr
Expenditure rate (ongoing)93.7%
Part B score (max 5.0)4.68 / 5.0
Final score5.93 / 10
30.3% 4.59
CategoryWater conservation & recharge
Started / Completed / Phys176 / 22 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked6.35Cr / 5.04Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score4.59 / 10
1.6% 3.82
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.30Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score3.82 / 10
1.5% 6.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.16Cr / 0.14Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score6.90 / 10
59 DHIMERKHEDA โ†— KATNI 5.25
19.0% 3.17
CategoryFarm Pond
Started / Completed / Phys317 / 67 / 47
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked3.51Cr / 0.97Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.37 / 5.0
Final score3.17 / 10
1.3% 4.14
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.33Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.14 / 10
0.8% 4.21
CategoryDug Well Recharge
Started / Completed / Phys96 / 38 / 21
Completion rate61.5%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked0.09Cr / 0.02Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score4.21 / 10
40.2% 5.84
CategoryIrrigation infrastructure
Started / Completed / Phys141 / 10 / 49
Completion rate41.8%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked7.15Cr / 5.36Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score5.84 / 10
13.3% 6.02
CategoryWater conservation & recharge
Started / Completed / Phys42 / 6 / 17
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked3.06Cr / 2.01Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score6.02 / 10
21.6% 5.68
CategoryWatershed Related Works
Started / Completed / Phys70 / 11 / 20
Completion rate44.3%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked4.33Cr / 3.00Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score5.68 / 10
3.8% 4.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 3
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.90Cr / 0.65Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score4.93 / 10
60 MAJHGAWAN โ†— SATNA 5.25
42.8% 4.98
CategoryFarm Pond
Started / Completed / Phys456 / 12 / 150
Completion rate35.5%
Part A score (max 5.0)1.78 / 5.0
Ongoing sanction / booked8.35Cr / 5.35Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.20 / 5.0
Final score4.98 / 10
5.0% 1.66
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.50Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score1.66 / 10
1.6% 5.98
CategoryDug Well Recharge
Started / Completed / Phys200 / 27 / 58
Completion rate42.5%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked0.27Cr / 0.21Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score5.98 / 10
0.3% 4.48
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score4.48 / 10
42.5% 5.94
CategoryWater conservation & recharge
Started / Completed / Phys181 / 5 / 58
Completion rate34.8%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked9.94Cr / 8.34Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score5.94 / 10
5.7% 5.67
CategoryWatershed Related Works
Started / Completed / Phys39 / 0 / 15
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked1.17Cr / 0.88Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score5.67 / 10
2.1% 3.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 1
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked0.59Cr / 0.36Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score3.84 / 10
61 MAWAI โ†— MANDLA 5.22
47.7% 6.32
CategoryFarm Pond
Started / Completed / Phys247 / 190 / 16
Completion rate83.4%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked1.79Cr / 0.77Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score6.32 / 10
5.4% 0.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.06Cr
Expenditure rate (ongoing)4.9%
Part B score (max 5.0)0.24 / 5.0
Final score0.24 / 10
1.8% 5.26
CategoryDug Well Recharge
Started / Completed / Phys153 / 41 / 10
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.26 / 10
2.3% 5.50
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.31Cr / 0.16Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.50 / 5.0
Final score5.50 / 10
36.3% 4.60
CategoryWater conservation & recharge
Started / Completed / Phys149 / 22 / 3
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked7.07Cr / 5.31Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score4.60 / 10
1.8% 5.62
CategoryWatershed Related Works
Started / Completed / Phys7 / 3 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score5.62 / 10
4.9% 4.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 1
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked1.08Cr / 0.86Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score4.28 / 10
62 SILWANI โ†— RAISEN 5.21
69.3% 5.38
CategoryFarm Pond
Started / Completed / Phys442 / 138 / 1
Completion rate31.4%
Part A score (max 5.0)1.57 / 5.0
Ongoing sanction / booked5.16Cr / 3.92Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score5.38 / 10
5.6% 3.42
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.39Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
11.0% 7.39
CategoryDug Well Recharge
Started / Completed / Phys439 / 292 / 2
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked0.38Cr / 0.30Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.04 / 5.0
Final score7.39 / 10
โ€”
11.4% 3.40
CategoryWater conservation & recharge
Started / Completed / Phys32 / 2 / 0
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked1.11Cr / 0.69Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score3.40 / 10
โ€”
2.7% 3.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.28Cr / 0.18Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score3.29 / 10
63 KEOLARI โ†— SEONI 5.20
64.1% 5.70
CategoryFarm Pond
Started / Completed / Phys505 / 328 / 0
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked5.17Cr / 2.54Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score5.70 / 10
1.4% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
3.4% 7.12
CategoryDug Well Recharge
Started / Completed / Phys302 / 237 / 0
Completion rate78.5%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score7.12 / 10
4.2% 3.92
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.99Cr / 0.77Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score3.92 / 10
16.2% 4.29
CategoryWater conservation & recharge
Started / Completed / Phys62 / 5 / 0
Completion rate8.1%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked3.66Cr / 2.84Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score4.29 / 10
7.7% 4.11
CategoryWatershed Related Works
Started / Completed / Phys31 / 2 / 0
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked1.71Cr / 1.30Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score4.11 / 10
3.0% 4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.59Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.22 / 5.0
Final score4.22 / 10
64 BAIHAR โ†— BALAGHAT 5.18
57.1% 5.09
CategoryFarm Pond
Started / Completed / Phys731 / 97 / 108
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked14.39Cr / 10.62Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score5.09 / 10
2.1% 1.45
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.22Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.45 / 5.0
Final score1.45 / 10
1.1% 5.88
CategoryDug Well Recharge
Started / Completed / Phys131 / 63 / 7
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score5.88 / 10
โ€”
38.0% 5.58
CategoryWater conservation & recharge
Started / Completed / Phys379 / 8 / 101
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked9.45Cr / 7.84Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score5.58 / 10
0.4% 3.48
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
1.2% 3.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.30Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
65 KHACHAROD โ†— UJJAIN 5.17
35.9% 5.37
CategoryFarm Pond
Started / Completed / Phys105 / 54 / 45
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.15Cr / 0.02Cr
Expenditure rate (ongoing)13.1%
Part B score (max 5.0)0.65 / 5.0
Final score5.37 / 10
16.4% 1.46
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.26Cr
Expenditure rate (ongoing)29.2%
Part B score (max 5.0)1.46 / 5.0
Final score1.46 / 10
25.3% 5.43
CategoryDug Well Recharge
Started / Completed / Phys522 / 434 / 72
Completion rate96.9%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)11.7%
Part B score (max 5.0)0.59 / 5.0
Final score5.43 / 10
โ€”
17.7% 6.51
CategoryWater conservation & recharge
Started / Completed / Phys17 / 8 / 8
Completion rate94.1%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.12Cr / 0.04Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.80 / 5.0
Final score6.51 / 10
4.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
66 JAMAI โ†— CHHINDWARA 5.16
24.4% 6.59
CategoryFarm Pond
Started / Completed / Phys472 / 236 / 51
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked4.22Cr / 2.99Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.55 / 5.0
Final score6.59 / 10
3.5% 0.94
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.29Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score0.94 / 10
2.8% 8.43
CategoryDug Well Recharge
Started / Completed / Phys466 / 197 / 176
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.21Cr
Expenditure rate (ongoing)88.5%
Part B score (max 5.0)4.42 / 5.0
Final score8.43 / 10
0.1% 3.90
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
62.5% 4.76
CategoryWater conservation & recharge
Started / Completed / Phys292 / 19 / 16
Completion rate12.0%
Part A score (max 5.0)0.60 / 5.0
Ongoing sanction / booked25.68Cr / 21.36Cr
Expenditure rate (ongoing)83.2%
Part B score (max 5.0)4.16 / 5.0
Final score4.76 / 10
4.9% 4.69
CategoryWatershed Related Works
Started / Completed / Phys25 / 3 / 1
Completion rate16.0%
Part A score (max 5.0)0.80 / 5.0
Ongoing sanction / booked1.77Cr / 1.38Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score4.69 / 10
1.9% 4.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 1 / 0
Completion rate9.1%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked0.76Cr / 0.60Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score4.40 / 10
67 MAJHAULI โ†— SIDHI 5.15
50.5% 5.41
CategoryFarm Pond
Started / Completed / Phys356 / 220 / 0
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked3.46Cr / 1.61Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score5.41 / 10
โ€”
1.4% 6.87
CategoryDug Well Recharge
Started / Completed / Phys96 / 69 / 0
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score6.87 / 10
1.5% 5.92
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.26Cr / 0.22Cr
Expenditure rate (ongoing)85.1%
Part B score (max 5.0)4.26 / 5.0
Final score5.92 / 10
35.6% 4.88
CategoryWater conservation & recharge
Started / Completed / Phys116 / 25 / 0
Completion rate21.6%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked5.50Cr / 4.18Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score4.88 / 10
7.7% 4.41
CategoryWatershed Related Works
Started / Completed / Phys13 / 1 / 0
Completion rate7.7%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked1.32Cr / 1.06Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score4.41 / 10
3.3% 4.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 0
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.48Cr / 0.24Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.49 / 5.0
Final score4.71 / 10
68 NIWAS โ†— MANDLA 5.14
37.6% 6.17
CategoryFarm Pond
Started / Completed / Phys146 / 71 / 4
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked1.93Cr / 1.39Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score6.17 / 10
โ€”
3.2% 5.26
CategoryDug Well Recharge
Started / Completed / Phys118 / 41 / 11
Completion rate44.1%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.17Cr / 0.10Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.06 / 5.0
Final score5.26 / 10
11.5% 3.79
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.11Cr / 0.84Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
31.9% 4.24
CategoryWater conservation & recharge
Started / Completed / Phys61 / 2 / 1
Completion rate4.9%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked2.87Cr / 2.29Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score4.24 / 10
1.3% 4.29
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score4.29 / 10
14.5% 5.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.25Cr / 1.22Cr
Expenditure rate (ongoing)97.8%
Part B score (max 5.0)4.89 / 5.0
Final score5.60 / 10
69 PARASWADA โ†— BALAGHAT 5.14
55.0% 5.60
CategoryFarm Pond
Started / Completed / Phys510 / 226 / 4
Completion rate45.1%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked7.62Cr / 5.10Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score5.60 / 10
2.9% 2.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.33Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score2.20 / 10
1.6% 6.68
CategoryDug Well Recharge
Started / Completed / Phys167 / 108 / 1
Completion rate65.3%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score6.68 / 10
0.7% 4.52
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.17Cr
Expenditure rate (ongoing)90.4%
Part B score (max 5.0)4.52 / 5.0
Final score4.52 / 10
38.1% 4.65
CategoryWater conservation & recharge
Started / Completed / Phys208 / 18 / 0
Completion rate8.7%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked9.22Cr / 7.77Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score4.65 / 10
1.2% 5.98
CategoryWatershed Related Works
Started / Completed / Phys7 / 4 / 0
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.12 / 5.0
Final score5.98 / 10
0.6% 3.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)74.5%
Part B score (max 5.0)3.73 / 5.0
Final score3.73 / 10
70 BIJADANDI โ†— MANDLA 5.14
35.1% 6.83
CategoryFarm Pond
Started / Completed / Phys151 / 100 / 17
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked1.00Cr / 0.59Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.96 / 5.0
Final score6.83 / 10
18.5% 1.47
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.28Cr / 0.67Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.47 / 5.0
Final score1.47 / 10
2.7% 6.78
CategoryDug Well Recharge
Started / Completed / Phys131 / 40 / 55
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score6.78 / 10
โ€”
39.9% 5.20
CategoryWater conservation & recharge
Started / Completed / Phys60 / 10 / 5
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked4.24Cr / 3.36Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score5.20 / 10
3.7% 5.53
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score5.53 / 10
0.1% 4.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)81.2%
Part B score (max 5.0)4.06 / 5.0
Final score4.06 / 10
71 MULTAI โ†— BETUL 5.11
41.0% 4.48
CategoryFarm Pond
Started / Completed / Phys153 / 4 / 51
Completion rate35.9%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked3.64Cr / 1.95Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score4.48 / 10
5.3% 1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.16Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
8.5% 6.77
CategoryDug Well Recharge
Started / Completed / Phys461 / 151 / 282
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.08 / 5.0
Final score6.77 / 10
0.0% 4.52
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)90.4%
Part B score (max 5.0)4.52 / 5.0
Final score4.52 / 10
38.9% 5.60
CategoryWater conservation & recharge
Started / Completed / Phys142 / 7 / 57
Completion rate45.1%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked3.27Cr / 2.18Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score5.60 / 10
3.4% 7.22
CategoryWatershed Related Works
Started / Completed / Phys18 / 1 / 13
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score7.22 / 10
2.9% 7.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 7
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.22Cr / 0.19Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score7.53 / 10
72 CHAURAI โ†— CHHINDWARA 5.11
27.6% 5.40
CategoryFarm Pond
Started / Completed / Phys99 / 1 / 22
Completion rate23.2%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked2.37Cr / 2.01Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score5.40 / 10
3.5% 0.66
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
10.3% 6.98
CategoryDug Well Recharge
Started / Completed / Phys475 / 101 / 137
Completion rate50.1%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked0.58Cr / 0.52Cr
Expenditure rate (ongoing)89.4%
Part B score (max 5.0)4.47 / 5.0
Final score6.98 / 10
0.7% 5.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score5.22 / 10
35.0% 5.05
CategoryWater conservation & recharge
Started / Completed / Phys49 / 3 / 9
Completion rate24.5%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked3.08Cr / 2.36Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score5.05 / 10
20.8% 4.54
CategoryWatershed Related Works
Started / Completed / Phys37 / 6 / 2
Completion rate21.6%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked1.83Cr / 1.27Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score4.54 / 10
2.2% 5.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score5.99 / 10
73 MUNGAOLI โ†— ASHOK NAGAR 5.10
41.4% 4.56
CategoryFarm Pond
Started / Completed / Phys413 / 24 / 118
Completion rate34.4%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked9.76Cr / 5.54Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score4.56 / 10
2.1% 3.28
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.49Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score3.28 / 10
1.1% 5.01
CategoryDug Well Recharge
Started / Completed / Phys147 / 39 / 21
Completion rate40.8%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked0.23Cr / 0.13Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score5.01 / 10
โ€”
51.9% 5.63
CategoryWater conservation & recharge
Started / Completed / Phys395 / 42 / 75
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked14.15Cr / 11.74Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score5.63 / 10
2.5% 5.11
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.76Cr / 0.67Cr
Expenditure rate (ongoing)87.8%
Part B score (max 5.0)4.39 / 5.0
Final score5.11 / 10
1.0% 4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.30Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score4.26 / 10
74 KUSMI โ†— SIDHI 5.09
33.5% 5.01
CategoryFarm Pond
Started / Completed / Phys375 / 195 / 0
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked4.07Cr / 1.96Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score5.01 / 10
โ€”
0.9% 5.39
CategoryDug Well Recharge
Started / Completed / Phys88 / 55 / 0
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.39 / 10
6.7% 3.36
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.73Cr / 1.16Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
53.5% 5.32
CategoryWater conservation & recharge
Started / Completed / Phys186 / 56 / 0
Completion rate30.1%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked10.92Cr / 8.33Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.81 / 5.0
Final score5.32 / 10
1.1% 4.11
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.24Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score4.11 / 10
4.2% 5.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 8 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.67Cr
Expenditure rate (ongoing)77.4%
Part B score (max 5.0)3.87 / 5.0
Final score5.87 / 10
75 GANGEV โ†— REWA 5.08
58.2% 4.34
CategoryFarm Pond
Started / Completed / Phys231 / 122 / 17
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked1.29Cr / 0.34Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score4.34 / 10
4.8% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.6% 4.83
CategoryDug Well Recharge
Started / Completed / Phys60 / 57 / 1
Completion rate96.7%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.83 / 10
โ€”
25.7% 5.65
CategoryWater conservation & recharge
Started / Completed / Phys36 / 13 / 10
Completion rate63.9%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked0.45Cr / 0.22Cr
Expenditure rate (ongoing)49.2%
Part B score (max 5.0)2.46 / 5.0
Final score5.65 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
76 GOGANWA โ†— KHARGONE 5.08
47.9% 3.99
CategoryFarm Pond
Started / Completed / Phys110 / 13 / 25
Completion rate34.5%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked1.29Cr / 0.58Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score3.99 / 10
7.8% 3.84
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.25Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
16.3% 7.23
CategoryDug Well Recharge
Started / Completed / Phys260 / 58 / 160
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score7.23 / 10
โ€”
26.2% 5.86
CategoryWater conservation & recharge
Started / Completed / Phys21 / 4 / 5
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.65Cr / 0.48Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score5.86 / 10
0.3% 2.69
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score2.69 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
77 SEGAON โ†— KHARGONE 5.07
22.2% 5.02
CategoryFarm Pond
Started / Completed / Phys116 / 0 / 41
Completion rate35.3%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked1.32Cr / 0.86Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score5.02 / 10
5.1% 4.63
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.42Cr
Expenditure rate (ongoing)92.6%
Part B score (max 5.0)4.63 / 5.0
Final score4.63 / 10
5.9% 7.27
CategoryDug Well Recharge
Started / Completed / Phys206 / 17 / 138
Completion rate75.2%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.27 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.8% 4.77
CategoryWater conservation & recharge
Started / Completed / Phys70 / 4 / 16
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked2.46Cr / 1.64Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.34 / 5.0
Final score4.77 / 10
26.4% 4.88
CategoryWatershed Related Works
Started / Completed / Phys28 / 3 / 7
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked1.44Cr / 0.89Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score4.88 / 10
2.1% 7.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.14Cr
Expenditure rate (ongoing)95.7%
Part B score (max 5.0)4.78 / 5.0
Final score7.28 / 10
78 NEEMUCH โ†— NEEMUCH 5.06
41.7% 3.53
CategoryFarm Pond
Started / Completed / Phys202 / 17 / 66
Completion rate41.1%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.99Cr / 0.59Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.47 / 5.0
Final score3.53 / 10
4.9% 2.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.19Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score2.56 / 10
20.5% 5.91
CategoryDug Well Recharge
Started / Completed / Phys619 / 245 / 154
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.57Cr / 0.31Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score5.91 / 10
2.2% 8.65
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)89.7%
Part B score (max 5.0)4.49 / 5.0
Final score8.65 / 10
24.0% 7.00
CategoryWater conservation & recharge
Started / Completed / Phys49 / 3 / 38
Completion rate83.7%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.41Cr / 0.23Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.82 / 5.0
Final score7.00 / 10
2.4% 6.32
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.98 / 5.0
Final score6.32 / 10
4.3% 5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 5
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.25 / 5.0
Final score5.38 / 10
79 TIMARNI โ†— HARDA 5.06
42.6% 3.41
CategoryFarm Pond
Started / Completed / Phys142 / 7 / 42
Completion rate34.5%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked1.73Cr / 0.58Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.68 / 5.0
Final score3.41 / 10
1.9% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
13.7% 6.64
CategoryDug Well Recharge
Started / Completed / Phys289 / 82 / 154
Completion rate81.7%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.55 / 5.0
Final score6.64 / 10
1.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.0% 6.58
CategoryWater conservation & recharge
Started / Completed / Phys56 / 0 / 37
Completion rate66.1%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked0.80Cr / 0.52Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.28 / 5.0
Final score6.58 / 10
4.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.2% 4.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 8
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.12Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.19 / 5.0
Final score4.19 / 10
80 KESLA โ†— NARMADAPURAM 5.04
28.4% 2.17
CategoryFarm Pond
Started / Completed / Phys109 / 3 / 18
Completion rate19.3%
Part A score (max 5.0)0.96 / 5.0
Ongoing sanction / booked3.50Cr / 0.85Cr
Expenditure rate (ongoing)24.2%
Part B score (max 5.0)1.21 / 5.0
Final score2.17 / 10
7.8% 1.29
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.31Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score1.29 / 10
2.5% 6.38
CategoryDug Well Recharge
Started / Completed / Phys146 / 19 / 82
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score6.38 / 10
โ€”
59.7% 6.82
CategoryWater conservation & recharge
Started / Completed / Phys121 / 32 / 50
Completion rate67.8%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked3.17Cr / 2.17Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score6.82 / 10
0.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 5.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 1
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score5.39 / 10
81 BHIKANGAON โ†— KHARGONE 5.03
44.1% 3.75
CategoryFarm Pond
Started / Completed / Phys181 / 31 / 27
Completion rate32.0%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked2.37Cr / 1.02Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score3.75 / 10
7.5% 2.99
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.35Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score2.99 / 10
13.6% 6.91
CategoryDug Well Recharge
Started / Completed / Phys415 / 135 / 184
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score6.91 / 10
โ€”
34.8% 6.37
CategoryWater conservation & recharge
Started / Completed / Phys42 / 9 / 16
Completion rate59.5%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked1.15Cr / 0.78Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score6.37 / 10
โ€” โ€”
82 RAGHOGARH โ†— GUNA 5.03
29.8% 4.06
CategoryFarm Pond
Started / Completed / Phys429 / 47 / 102
Completion rate34.7%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked5.06Cr / 2.35Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score4.06 / 10
โ€”
6.2% 6.19
CategoryDug Well Recharge
Started / Completed / Phys598 / 139 / 388
Completion rate88.1%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.19 / 10
0.2% 4.27
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)85.5%
Part B score (max 5.0)4.27 / 5.0
Final score4.27 / 10
60.1% 5.40
CategoryWater conservation & recharge
Started / Completed / Phys301 / 29 / 60
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked10.24Cr / 8.04Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score5.40 / 10
2.1% 4.92
CategoryWatershed Related Works
Started / Completed / Phys10 / 3 / 1
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.18Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.92 / 5.0
Final score4.92 / 10
1.7% 5.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score5.11 / 10
83 BARWANI โ†— BARWANI 5.03
49.6% 5.05
CategoryFarm Pond
Started / Completed / Phys152 / 7 / 79
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.87Cr / 0.39Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score5.05 / 10
5.1% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
17.2% 6.32
CategoryDug Well Recharge
Started / Completed / Phys263 / 23 / 192
Completion rate81.7%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score6.32 / 10
โ€”
14.4% 5.38
CategoryWater conservation & recharge
Started / Completed / Phys23 / 2 / 8
Completion rate43.5%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked0.30Cr / 0.19Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.20 / 5.0
Final score5.38 / 10
13.7% 4.82
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 4
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.31Cr / 0.16Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score4.82 / 10
โ€”
84 RAJGARH โ†— RAJGARH 5.02
19.2% 5.93
CategoryFarm Pond
Started / Completed / Phys457 / 299 / 101
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked1.17Cr / 0.36Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score5.93 / 10
1.5% 2.60
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.39Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score2.60 / 10
2.8% 7.52
CategoryDug Well Recharge
Started / Completed / Phys569 / 462 / 65
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.52 / 10
0.5% 3.67
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score3.67 / 10
69.5% 4.75
CategoryWater conservation & recharge
Started / Completed / Phys315 / 16 / 15
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked33.49Cr / 28.55Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score4.75 / 10
0.6% 4.62
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 0
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked0.29Cr / 0.20Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score4.62 / 10
5.8% 4.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 2 / 2
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked2.62Cr / 2.20Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.20 / 5.0
Final score4.69 / 10
85 NEWALI โ†— BARWANI 5.00
25.9% 4.39
CategoryFarm Pond
Started / Completed / Phys90 / 9 / 20
Completion rate32.2%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked0.88Cr / 0.49Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score4.39 / 10
โ€”
13.4% 7.36
CategoryDug Well Recharge
Started / Completed / Phys265 / 1 / 202
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked0.16Cr / 0.11Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.36 / 10
โ€”
52.5% 4.73
CategoryWater conservation & recharge
Started / Completed / Phys79 / 16 / 10
Completion rate32.9%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked1.72Cr / 1.06Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.09 / 5.0
Final score4.73 / 10
7.8% 4.91
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 2
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.26Cr / 0.14Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score4.91 / 10
0.4% 2.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score2.60 / 10
86 HARAI โ†— CHHINDWARA 5.00
43.4% 5.83
CategoryFarm Pond
Started / Completed / Phys396 / 140 / 43
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked4.34Cr / 3.05Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score5.83 / 10
โ€”
4.9% 7.13
CategoryDug Well Recharge
Started / Completed / Phys327 / 105 / 79
Completion rate56.3%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked0.37Cr / 0.32Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.32 / 5.0
Final score7.13 / 10
โ€”
40.8% 4.11
CategoryWater conservation & recharge
Started / Completed / Phys148 / 7 / 6
Completion rate8.8%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked6.54Cr / 4.81Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.11 / 10
10.3% 4.11
CategoryWatershed Related Works
Started / Completed / Phys26 / 3 / 0
Completion rate11.5%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked1.59Cr / 1.13Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score4.11 / 10
0.5% 2.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score2.92 / 10
87 PATERA โ†— DAMOH 4.99
17.5% 4.96
CategoryFarm Pond
Started / Completed / Phys291 / 57 / 23
Completion rate27.5%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked4.74Cr / 3.40Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score4.96 / 10
โ€”
1.7% 6.33
CategoryDug Well Recharge
Started / Completed / Phys247 / 77 / 66
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.27Cr / 0.19Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score6.33 / 10
0.6% 4.59
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.21Cr
Expenditure rate (ongoing)91.8%
Part B score (max 5.0)4.59 / 5.0
Final score4.59 / 10
54.3% 4.69
CategoryWater conservation & recharge
Started / Completed / Phys214 / 7 / 23
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked19.03Cr / 15.20Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score4.69 / 10
19.0% 5.72
CategoryWatershed Related Works
Started / Completed / Phys102 / 15 / 20
Completion rate34.3%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked4.85Cr / 3.88Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score5.72 / 10
6.9% 5.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 4 / 2
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked2.11Cr / 1.77Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.10 / 10
88 SIRONJ โ†— VIDISHA 4.97
41.7% 5.50
CategoryFarm Pond
Started / Completed / Phys351 / 164 / 36
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked3.23Cr / 1.71Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score5.50 / 10
4.6% 2.10
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.84Cr / 0.35Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.10 / 5.0
Final score2.10 / 10
3.4% 6.54
CategoryDug Well Recharge
Started / Completed / Phys235 / 94 / 75
Completion rate71.9%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.17Cr / 0.10Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score6.54 / 10
โ€”
47.0% 4.61
CategoryWater conservation & recharge
Started / Completed / Phys214 / 45 / 15
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked6.45Cr / 4.14Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score4.61 / 10
1.8% 6.58
CategoryWatershed Related Works
Started / Completed / Phys21 / 11 / 0
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked0.20Cr / 0.16Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score6.58 / 10
1.5% 4.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.14Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score4.66 / 10
89 MOHKHED โ†— CHHINDWARA 4.96
20.0% 6.76
CategoryFarm Pond
Started / Completed / Phys131 / 7 / 84
Completion rate69.5%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked0.68Cr / 0.45Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score6.76 / 10
โ€”
8.8% 7.51
CategoryDug Well Recharge
Started / Completed / Phys383 / 29 / 331
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score7.51 / 10
0.4% 2.91
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.91 / 5.0
Final score2.91 / 10
44.9% 4.07
CategoryWater conservation & recharge
Started / Completed / Phys60 / 1 / 4
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked4.89Cr / 3.57Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score4.07 / 10
23.3% 4.53
CategoryWatershed Related Works
Started / Completed / Phys43 / 7 / 1
Completion rate18.6%
Part A score (max 5.0)0.93 / 5.0
Ongoing sanction / booked2.07Cr / 1.49Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score4.53 / 10
2.5% 2.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.28Cr / 0.11Cr
Expenditure rate (ongoing)40.6%
Part B score (max 5.0)2.03 / 5.0
Final score2.03 / 10
90 BINA โ†— SAGAR 4.96
37.1% 2.43
CategoryFarm Pond
Started / Completed / Phys124 / 19 / 11
Completion rate24.2%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked1.45Cr / 0.35Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score2.43 / 10
โ€”
10.0% 5.18
CategoryDug Well Recharge
Started / Completed / Phys417 / 346 / 33
Completion rate90.9%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)12.6%
Part B score (max 5.0)0.63 / 5.0
Final score5.18 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
50.0% 6.76
CategoryWater conservation & recharge
Started / Completed / Phys39 / 3 / 23
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.65Cr / 0.44Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score6.76 / 10
โ€”
2.8% 5.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score5.51 / 10
91 THIKRI โ†— BARWANI 4.96
71.1% 4.64
CategoryFarm Pond
Started / Completed / Phys147 / 0 / 71
Completion rate48.3%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked1.55Cr / 0.69Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score4.64 / 10
โ€”
7.0% 4.88
CategoryDug Well Recharge
Started / Completed / Phys106 / 2 / 100
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)1.4%
Part B score (max 5.0)0.07 / 5.0
Final score4.88 / 10
โ€”
9.7% 6.51
CategoryWater conservation & recharge
Started / Completed / Phys14 / 7 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.94 / 5.0
Final score6.51 / 10
12.2% 5.62
CategoryWatershed Related Works
Started / Completed / Phys11 / 6 / 3
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score5.62 / 10
โ€”
92 BEGUMGANJ โ†— RAISEN 4.93
52.8% 5.16
CategoryFarm Pond
Started / Completed / Phys432 / 101 / 47
Completion rate34.3%
Part A score (max 5.0)1.71 / 5.0
Ongoing sanction / booked7.48Cr / 5.15Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score5.16 / 10
2.2% 3.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.26Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score3.00 / 10
4.5% 7.16
CategoryDug Well Recharge
Started / Completed / Phys336 / 172 / 46
Completion rate64.9%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.30Cr / 0.24Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score7.16 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
39.3% 4.40
CategoryWater conservation & recharge
Started / Completed / Phys64 / 6 / 1
Completion rate10.9%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked6.93Cr / 5.33Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score4.40 / 10
0.2% 1.97
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.97 / 5.0
Final score1.97 / 10
0.2% 4.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score4.27 / 10
93 VIDISHA โ†— VIDISHA 4.88
58.4% 4.08
CategoryFarm Pond
Started / Completed / Phys271 / 165 / 11
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked2.31Cr / 0.39Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.83 / 5.0
Final score4.08 / 10
3.7% 0.24
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.02Cr
Expenditure rate (ongoing)4.7%
Part B score (max 5.0)0.24 / 5.0
Final score0.24 / 10
4.0% 6.49
CategoryDug Well Recharge
Started / Completed / Phys164 / 105 / 52
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)34.0%
Part B score (max 5.0)1.70 / 5.0
Final score6.49 / 10
โ€”
29.9% 6.79
CategoryWater conservation & recharge
Started / Completed / Phys76 / 41 / 10
Completion rate67.1%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked2.21Cr / 1.52Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score6.79 / 10
1.0% 5.48
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score5.48 / 10
3.0% 4.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.22Cr / 0.16Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score4.92 / 10
94 BURHANPUR โ†— BURHANPUR 4.86
26.2% 5.99
CategoryFarm Pond
Started / Completed / Phys268 / 101 / 51
Completion rate56.7%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked2.07Cr / 1.31Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score5.99 / 10
8.7% 3.35
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.48Cr / 0.99Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score3.35 / 10
6.8% 8.03
CategoryDug Well Recharge
Started / Completed / Phys447 / 219 / 160
Completion rate84.8%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score8.03 / 10
โ€”
53.5% 4.16
CategoryWater conservation & recharge
Started / Completed / Phys133 / 2 / 12
Completion rate10.5%
Part A score (max 5.0)0.53 / 5.0
Ongoing sanction / booked7.67Cr / 5.58Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.63 / 5.0
Final score4.16 / 10
3.5% 5.23
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 2
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.46Cr / 0.34Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score5.23 / 10
1.2% 3.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.15Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
95 NATERAN โ†— VIDISHA 4.85
54.3% 4.40
CategoryFarm Pond
Started / Completed / Phys320 / 129 / 64
Completion rate60.3%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked3.79Cr / 1.05Cr
Expenditure rate (ongoing)27.7%
Part B score (max 5.0)1.39 / 5.0
Final score4.40 / 10
2.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
7.1% 6.76
CategoryDug Well Recharge
Started / Completed / Phys484 / 80 / 293
Completion rate77.1%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.90 / 5.0
Final score6.76 / 10
0.4% 5.80
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 3 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score5.80 / 10
35.3% 5.47
CategoryWater conservation & recharge
Started / Completed / Phys144 / 41 / 25
Completion rate45.8%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked3.32Cr / 2.11Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score5.47 / 10
0.4% 4.77
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)95.4%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
0.3% 1.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score1.71 / 10
96 MANDLA โ†— MANDLA 4.82
54.8% 5.15
CategoryFarm Pond
Started / Completed / Phys288 / 112 / 5
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked7.54Cr / 4.71Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score5.15 / 10
โ€”
2.6% 4.15
CategoryDug Well Recharge
Started / Completed / Phys235 / 57 / 32
Completion rate37.9%
Part A score (max 5.0)1.89 / 5.0
Ongoing sanction / booked0.38Cr / 0.17Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.26 / 5.0
Final score4.15 / 10
11.9% 3.49
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked2.76Cr / 1.58Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score3.49 / 10
23.8% 4.83
CategoryWater conservation & recharge
Started / Completed / Phys102 / 15 / 5
Completion rate19.6%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked4.81Cr / 3.71Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score4.83 / 10
5.0% 5.30
CategoryWatershed Related Works
Started / Completed / Phys31 / 4 / 4
Completion rate25.8%
Part A score (max 5.0)1.29 / 5.0
Ongoing sanction / booked0.93Cr / 0.75Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.01 / 5.0
Final score5.30 / 10
1.8% 2.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.25Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score2.98 / 10
97 PIPARIYA โ†— NARMADAPURAM 4.82
54.4% 2.94
CategoryFarm Pond
Started / Completed / Phys98 / 39 / 0
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked1.08Cr / 0.20Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.95 / 5.0
Final score2.94 / 10
โ€”
9.2% 5.59
CategoryDug Well Recharge
Started / Completed / Phys122 / 79 / 0
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score5.59 / 10
โ€”
34.0% 7.42
CategoryWater conservation & recharge
Started / Completed / Phys34 / 24 / 1
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.78Cr / 0.58Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.74 / 5.0
Final score7.42 / 10
1.1% 4.75
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score4.75 / 10
1.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
98 ANUPPUR โ†— ANUPPUR 4.81
75.2% 4.56
CategoryFarm Pond
Started / Completed / Phys596 / 345 / 41
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked4.56Cr / 1.21Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.33 / 5.0
Final score4.56 / 10
โ€”
1.6% 4.09
CategoryDug Well Recharge
Started / Completed / Phys108 / 20 / 8
Completion rate25.9%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score4.09 / 10
โ€”
20.3% 5.53
CategoryWater conservation & recharge
Started / Completed / Phys78 / 17 / 19
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked1.80Cr / 1.16Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score5.53 / 10
โ€”
2.8% 6.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.27Cr / 0.22Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score6.57 / 10
99 BICHHIYA โ†— MANDLA 4.80
36.7% 5.43
CategoryFarm Pond
Started / Completed / Phys346 / 172 / 0
Completion rate49.7%
Part A score (max 5.0)2.49 / 5.0
Ongoing sanction / booked7.28Cr / 4.29Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score5.43 / 10
4.1% 3.03
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 0.97Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
2.0% 5.05
CategoryDug Well Recharge
Started / Completed / Phys292 / 76 / 79
Completion rate53.1%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.35Cr / 0.17Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.39 / 5.0
Final score5.05 / 10
11.0% 3.73
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 0
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked4.27Cr / 2.90Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score3.73 / 10
39.1% 4.77
CategoryWater conservation & recharge
Started / Completed / Phys269 / 42 / 6
Completion rate17.8%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked13.66Cr / 10.59Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score4.77 / 10
2.9% 4.75
CategoryWatershed Related Works
Started / Completed / Phys24 / 4 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.01Cr / 0.79Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score4.75 / 10
4.3% 4.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 2 / 0
Completion rate11.8%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked1.50Cr / 1.05Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score4.10 / 10
100 BALAGHAT โ†— BALAGHAT 4.80
58.9% 4.95
CategoryFarm Pond
Started / Completed / Phys357 / 139 / 19
Completion rate44.3%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked5.15Cr / 2.82Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score4.95 / 10
3.0% 0.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.03Cr
Expenditure rate (ongoing)6.0%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
2.0% 6.59
CategoryDug Well Recharge
Started / Completed / Phys137 / 66 / 15
Completion rate59.1%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)72.6%
Part B score (max 5.0)3.63 / 5.0
Final score6.59 / 10
โ€”
32.5% 4.90
CategoryWater conservation & recharge
Started / Completed / Phys75 / 10 / 7
Completion rate22.7%
Part A score (max 5.0)1.13 / 5.0
Ongoing sanction / booked4.75Cr / 3.58Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score4.90 / 10
2.2% 4.43
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.20Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.43 / 5.0
Final score4.43 / 10
1.4% 3.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score3.59 / 10
101 PRABHAT PATTAN โ†— BETUL 4.79
29.2% 4.19
CategoryFarm Pond
Started / Completed / Phys196 / 8 / 52
Completion rate30.6%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked3.61Cr / 1.92Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score4.19 / 10
1.6% 0.16
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.01Cr
Expenditure rate (ongoing)3.2%
Part B score (max 5.0)0.16 / 5.0
Final score0.16 / 10
7.9% 6.73
CategoryDug Well Recharge
Started / Completed / Phys538 / 89 / 347
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.26Cr / 0.14Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.73 / 10
โ€”
57.2% 5.00
CategoryWater conservation & recharge
Started / Completed / Phys144 / 5 / 34
Completion rate27.1%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked7.68Cr / 5.61Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score5.00 / 10
1.8% 4.51
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 2
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score4.51 / 10
2.2% 3.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 2
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.26Cr / 0.13Cr
Expenditure rate (ongoing)50.0%
Part B score (max 5.0)2.50 / 5.0
Final score3.93 / 10
102 KIRNAPUR โ†— BALAGHAT 4.77
65.7% 4.53
CategoryFarm Pond
Started / Completed / Phys457 / 99 / 86
Completion rate40.5%
Part A score (max 5.0)2.02 / 5.0
Ongoing sanction / booked6.71Cr / 3.36Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score4.53 / 10
3.6% 0.55
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.08Cr
Expenditure rate (ongoing)11.1%
Part B score (max 5.0)0.55 / 5.0
Final score0.55 / 10
2.0% 6.54
CategoryDug Well Recharge
Started / Completed / Phys155 / 44 / 34
Completion rate50.3%
Part A score (max 5.0)2.52 / 5.0
Ongoing sanction / booked0.20Cr / 0.16Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score6.54 / 10
โ€”
26.2% 5.59
CategoryWater conservation & recharge
Started / Completed / Phys114 / 11 / 31
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked3.45Cr / 2.59Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.74 / 5.0
Final score5.59 / 10
1.4% 6.62
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.13Cr / 0.11Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score6.62 / 10
1.1% 7.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score7.78 / 10
103 SIDHI โ†— SIDHI 4.75
43.2% 4.69
CategoryFarm Pond
Started / Completed / Phys485 / 217 / 0
Completion rate44.7%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked6.98Cr / 3.42Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score4.69 / 10
โ€”
1.1% 5.01
CategoryDug Well Recharge
Started / Completed / Phys130 / 64 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.17Cr / 0.08Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.51 / 5.0
Final score5.01 / 10
0.8% 4.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.21Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.22 / 10
41.5% 4.98
CategoryWater conservation & recharge
Started / Completed / Phys279 / 48 / 0
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked10.99Cr / 9.06Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score4.98 / 10
9.1% 4.18
CategoryWatershed Related Works
Started / Completed / Phys57 / 10 / 0
Completion rate17.5%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked2.26Cr / 1.49Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score4.18 / 10
4.3% 4.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 4 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.12Cr / 0.78Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score4.33 / 10
104 SEONI โ†— SEONI 4.73
19.7% 4.95
CategoryFarm Pond
Started / Completed / Phys121 / 44 / 0
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked2.09Cr / 1.31Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.14 / 5.0
Final score4.95 / 10
โ€”
6.6% 5.60
CategoryDug Well Recharge
Started / Completed / Phys434 / 127 / 13
Completion rate32.3%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked0.75Cr / 0.60Cr
Expenditure rate (ongoing)79.6%
Part B score (max 5.0)3.98 / 5.0
Final score5.60 / 10
3.0% 5.68
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 3 / 0
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.31Cr / 0.23Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score5.68 / 10
41.4% 4.47
CategoryWater conservation & recharge
Started / Completed / Phys114 / 20 / 0
Completion rate17.5%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked6.26Cr / 4.49Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score4.47 / 10
24.5% 4.74
CategoryWatershed Related Works
Started / Completed / Phys96 / 25 / 0
Completion rate26.0%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked3.11Cr / 2.14Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score4.74 / 10
4.8% 4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 3 / 0
Completion rate23.1%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked0.67Cr / 0.42Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.11 / 5.0
Final score4.26 / 10
105 GHATIGAON โ†— GWALIOR 4.72
31.9% 3.48
CategoryFarm Pond
Started / Completed / Phys176 / 16 / 27
Completion rate24.4%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked5.29Cr / 2.39Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score3.48 / 10
5.3% 1.47
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.17Cr / 0.34Cr
Expenditure rate (ongoing)29.4%
Part B score (max 5.0)1.47 / 5.0
Final score1.47 / 10
1.8% 6.32
CategoryDug Well Recharge
Started / Completed / Phys149 / 81 / 28
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score6.32 / 10
6.1% 6.51
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 2 / 3
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.87Cr / 0.74Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score6.51 / 10
44.7% 5.70
CategoryWater conservation & recharge
Started / Completed / Phys101 / 7 / 28
Completion rate34.7%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked7.58Cr / 6.01Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.97 / 5.0
Final score5.70 / 10
8.3% 4.85
CategoryWatershed Related Works
Started / Completed / Phys31 / 4 / 6
Completion rate32.3%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked1.24Cr / 0.81Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score4.85 / 10
1.9% 3.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.18Cr / 0.08Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.21 / 5.0
Final score3.87 / 10
106 KATANGI โ†— BALAGHAT 4.71
62.4% 4.45
CategoryFarm Pond
Started / Completed / Phys462 / 74 / 70
Completion rate31.2%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked8.33Cr / 4.82Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score4.45 / 10
2.3% 1.86
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.17Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
1.9% 6.58
CategoryDug Well Recharge
Started / Completed / Phys148 / 41 / 51
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.58 / 10
0.5% 6.90
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score6.90 / 10
32.3% 5.28
CategoryWater conservation & recharge
Started / Completed / Phys146 / 5 / 36
Completion rate28.1%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked5.06Cr / 3.92Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score5.28 / 10
0.1% 3.49
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
0.5% 4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
107 JAISINAGAR โ†— SAGAR 4.69
55.7% 3.61
CategoryFarm Pond
Started / Completed / Phys93 / 44 / 0
Completion rate47.3%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked1.63Cr / 0.41Cr
Expenditure rate (ongoing)25.0%
Part B score (max 5.0)1.25 / 5.0
Final score3.61 / 10
โ€”
18.6% 6.74
CategoryDug Well Recharge
Started / Completed / Phys383 / 319 / 0
Completion rate83.3%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score6.74 / 10
โ€”
22.9% 5.56
CategoryWater conservation & recharge
Started / Completed / Phys19 / 8 / 0
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.54Cr / 0.37Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.45 / 5.0
Final score5.56 / 10
2.8% 5.30
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score5.30 / 10
โ€”
108 OBEDULLAHGANJ โ†— RAISEN 4.67
49.1% 5.02
CategoryFarm Pond
Started / Completed / Phys208 / 38 / 29
Completion rate32.2%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked3.23Cr / 2.21Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score5.02 / 10
1.6% 2.87
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score2.87 / 10
4.1% 7.74
CategoryDug Well Recharge
Started / Completed / Phys149 / 73 / 29
Completion rate68.5%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.12Cr / 0.11Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score7.74 / 10
1.0% 1.71
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score1.71 / 10
26.6% 3.83
CategoryWater conservation & recharge
Started / Completed / Phys23 / 1 / 0
Completion rate4.3%
Part A score (max 5.0)0.22 / 5.0
Ongoing sanction / booked2.48Cr / 1.79Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score3.83 / 10
16.6% 4.54
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.55Cr / 1.41Cr
Expenditure rate (ongoing)90.8%
Part B score (max 5.0)4.54 / 5.0
Final score4.54 / 10
1.0% 5.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.25 / 10
109 BAHORIBAND โ†— KATNI 4.66
36.8% 4.43
CategoryFarm Pond
Started / Completed / Phys392 / 98 / 78
Completion rate44.9%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked3.34Cr / 1.46Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score4.43 / 10
โ€”
4.4% 5.21
CategoryDug Well Recharge
Started / Completed / Phys284 / 104 / 57
Completion rate56.7%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)47.4%
Part B score (max 5.0)2.37 / 5.0
Final score5.21 / 10
6.0% 4.36
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.01Cr / 0.88Cr
Expenditure rate (ongoing)87.3%
Part B score (max 5.0)4.36 / 5.0
Final score4.36 / 10
22.5% 5.28
CategoryWater conservation & recharge
Started / Completed / Phys52 / 6 / 9
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked3.18Cr / 2.44Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score5.28 / 10
25.5% 4.56
CategoryWatershed Related Works
Started / Completed / Phys73 / 7 / 5
Completion rate16.4%
Part A score (max 5.0)0.82 / 5.0
Ongoing sanction / booked3.45Cr / 2.57Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.74 / 5.0
Final score4.56 / 10
4.7% 4.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.79Cr / 0.64Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score4.01 / 10
110 KHAKNAR โ†— BURHANPUR 4.66
48.9% 4.57
CategoryFarm Pond
Started / Completed / Phys429 / 76 / 79
Completion rate36.1%
Part A score (max 5.0)1.81 / 5.0
Ongoing sanction / booked5.60Cr / 3.09Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score4.57 / 10
3.6% 3.91
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.48Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score3.91 / 10
10.9% 6.61
CategoryDug Well Recharge
Started / Completed / Phys739 / 187 / 303
Completion rate66.3%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked0.63Cr / 0.42Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score6.61 / 10
0.0% 4.90
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)98.1%
Part B score (max 5.0)4.90 / 5.0
Final score4.90 / 10
30.3% 4.33
CategoryWater conservation & recharge
Started / Completed / Phys154 / 9 / 26
Completion rate22.7%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked3.95Cr / 2.53Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score4.33 / 10
5.0% 3.99
CategoryWatershed Related Works
Started / Completed / Phys25 / 1 / 1
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked0.80Cr / 0.57Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score3.99 / 10
1.4% 4.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.15Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score4.01 / 10
111 GHORA DONGRI โ†— BETUL 4.61
20.9% 4.84
CategoryFarm Pond
Started / Completed / Phys222 / 28 / 77
Completion rate47.3%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked4.95Cr / 2.45Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score4.84 / 10
2.6% 3.56
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.81Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score3.56 / 10
2.7% 7.90
CategoryDug Well Recharge
Started / Completed / Phys458 / 165 / 206
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score7.90 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
72.5% 4.45
CategoryWater conservation & recharge
Started / Completed / Phys348 / 5 / 40
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked29.36Cr / 22.36Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.81 / 5.0
Final score4.45 / 10
0.1% 4.10
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.10 / 10
1.1% 4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.40Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.22 / 10
112 PETLAWAD โ†— JHABUA 4.60
10.9% 3.16
CategoryFarm Pond
Started / Completed / Phys272 / 20 / 1
Completion rate7.7%
Part A score (max 5.0)0.39 / 5.0
Ongoing sanction / booked4.33Cr / 2.40Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.78 / 5.0
Final score3.16 / 10
1.4% 0.66
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.08Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
5.0% 4.92
CategoryDug Well Recharge
Started / Completed / Phys832 / 243 / 15
Completion rate31.0%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked1.48Cr / 1.00Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score4.92 / 10
0.1% 4.20
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score4.20 / 10
75.7% 4.87
CategoryWater conservation & recharge
Started / Completed / Phys372 / 11 / 36
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked28.42Cr / 24.11Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score4.87 / 10
4.1% 4.04
CategoryWatershed Related Works
Started / Completed / Phys50 / 0 / 9
Completion rate18.0%
Part A score (max 5.0)0.90 / 5.0
Ongoing sanction / booked1.34Cr / 0.84Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score4.04 / 10
2.8% 5.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 0 / 3
Completion rate17.6%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked1.03Cr / 0.87Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score5.12 / 10
113 KESLI โ†— SAGAR 4.60
27.6% 4.44
CategoryFarm Pond
Started / Completed / Phys180 / 74 / 0
Completion rate41.1%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked1.93Cr / 0.92Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score4.44 / 10
โ€”
8.4% 5.07
CategoryDug Well Recharge
Started / Completed / Phys386 / 108 / 32
Completion rate36.3%
Part A score (max 5.0)1.81 / 5.0
Ongoing sanction / booked0.64Cr / 0.42Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.07 / 10
0.2% 8.26
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)98.6%
Part B score (max 5.0)4.93 / 5.0
Final score8.26 / 10
47.0% 4.53
CategoryWater conservation & recharge
Started / Completed / Phys164 / 12 / 5
Completion rate10.4%
Part A score (max 5.0)0.52 / 5.0
Ongoing sanction / booked4.89Cr / 3.93Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score4.53 / 10
14.1% 4.79
CategoryWatershed Related Works
Started / Completed / Phys31 / 2 / 0
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked1.54Cr / 1.37Cr
Expenditure rate (ongoing)89.4%
Part B score (max 5.0)4.47 / 5.0
Final score4.79 / 10
2.7% 4.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.31Cr / 0.25Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score4.64 / 10
114 BHITARWAR โ†— GWALIOR 4.59
41.4% 2.95
CategoryFarm Pond
Started / Completed / Phys264 / 23 / 48
Completion rate26.9%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked5.45Cr / 1.75Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score2.95 / 10
3.8% 0.57
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.08Cr
Expenditure rate (ongoing)11.3%
Part B score (max 5.0)0.57 / 5.0
Final score0.57 / 10
3.9% 5.82
CategoryDug Well Recharge
Started / Completed / Phys270 / 60 / 113
Completion rate64.1%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score5.82 / 10
7.9% 7.24
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 1 / 9
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.67Cr / 0.55Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.11 / 5.0
Final score7.24 / 10
32.2% 5.90
CategoryWater conservation & recharge
Started / Completed / Phys94 / 14 / 31
Completion rate47.9%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked2.69Cr / 1.89Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score5.90 / 10
5.5% 5.18
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 5
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked0.62Cr / 0.41Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.18 / 10
5.3% 6.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 1 / 7
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.26Cr / 0.18Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score6.85 / 10
115 TONK KHURD โ†— DEWAS 4.59
41.9% 3.81
CategoryFarm Pond
Started / Completed / Phys95 / 15 / 9
Completion rate25.3%
Part A score (max 5.0)1.26 / 5.0
Ongoing sanction / booked2.37Cr / 1.21Cr
Expenditure rate (ongoing)50.9%
Part B score (max 5.0)2.55 / 5.0
Final score3.81 / 10
3.3% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
13.7% 6.07
CategoryDug Well Recharge
Started / Completed / Phys396 / 73 / 144
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.46Cr / 0.31Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.07 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.4% 5.43
CategoryWater conservation & recharge
Started / Completed / Phys77 / 2 / 22
Completion rate31.2%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked2.34Cr / 1.82Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score5.43 / 10
5.6% 4.36
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.39Cr / 0.23Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score4.36 / 10
2.4% 3.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.13Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score3.53 / 10
116 DEORI โ†— SAGAR 4.58
45.2% 3.26
CategoryFarm Pond
Started / Completed / Phys325 / 48 / 31
Completion rate24.3%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked5.51Cr / 2.25Cr
Expenditure rate (ongoing)40.8%
Part B score (max 5.0)2.04 / 5.0
Final score3.26 / 10
โ€”
6.9% 5.32
CategoryDug Well Recharge
Started / Completed / Phys425 / 142 / 79
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.52Cr / 0.29Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score5.32 / 10
1.3% 5.51
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 1 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score5.51 / 10
39.0% 5.60
CategoryWater conservation & recharge
Started / Completed / Phys181 / 46 / 47
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked2.45Cr / 1.48Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score5.60 / 10
6.5% 6.11
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.27Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.11 / 10
1.1% 8.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)87.4%
Part B score (max 5.0)4.37 / 5.0
Final score8.12 / 10
117 CHANDERI โ†— ASHOK NAGAR 4.57
44.2% 4.20
CategoryFarm Pond
Started / Completed / Phys243 / 20 / 44
Completion rate26.3%
Part A score (max 5.0)1.32 / 5.0
Ongoing sanction / booked4.60Cr / 2.65Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score4.20 / 10
โ€”
1.6% 6.31
CategoryDug Well Recharge
Started / Completed / Phys100 / 41 / 14
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score6.31 / 10
0.5% 4.41
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score4.41 / 10
35.1% 4.72
CategoryWater conservation & recharge
Started / Completed / Phys151 / 9 / 18
Completion rate17.9%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked4.32Cr / 3.30Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score4.72 / 10
12.2% 5.43
CategoryWatershed Related Works
Started / Completed / Phys13 / 1 / 1
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked1.47Cr / 1.37Cr
Expenditure rate (ongoing)93.1%
Part B score (max 5.0)4.66 / 5.0
Final score5.43 / 10
6.4% 4.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 0
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked0.88Cr / 0.70Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score4.29 / 10
118 JAWAD โ†— NEEMUCH 4.57
32.9% 2.72
CategoryFarm Pond
Started / Completed / Phys198 / 3 / 28
Completion rate15.7%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked2.88Cr / 1.12Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score2.72 / 10
1.0% 1.58
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
16.0% 5.41
CategoryDug Well Recharge
Started / Completed / Phys613 / 82 / 245
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.74Cr / 0.40Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score5.41 / 10
1.1% 6.10
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.10 / 10
39.8% 5.66
CategoryWater conservation & recharge
Started / Completed / Phys90 / 0 / 49
Completion rate54.4%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked1.65Cr / 0.97Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.94 / 5.0
Final score5.66 / 10
2.0% 4.71
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score4.71 / 10
7.3% 5.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 2 / 7
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.34Cr / 0.21Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score5.26 / 10
119 SAWER โ†— INDORE 4.56
55.8% 4.49
CategoryFarm Pond
Started / Completed / Phys112 / 42 / 18
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked0.86Cr / 0.31Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score4.49 / 10
4.4% 0.01
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score0.01 / 10
2.3% 6.99
CategoryDug Well Recharge
Started / Completed / Phys188 / 155 / 1
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score6.99 / 10
โ€”
25.3% 5.57
CategoryWater conservation & recharge
Started / Completed / Phys27 / 13 / 3
Completion rate59.3%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked0.24Cr / 0.13Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score5.57 / 10
4.2% 5.47
CategoryWatershed Related Works
Started / Completed / Phys5 / 2 / 1
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score5.47 / 10
7.9% 3.20
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.19Cr / 0.06Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score3.20 / 10
120 KAILARAS โ†— MORENA 4.56
12.1% 5.79
CategoryFarm Pond
Started / Completed / Phys469 / 321 / 5
Completion rate69.5%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked3.05Cr / 1.41Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score5.79 / 10
โ€”
0.3% 5.24
CategoryDug Well Recharge
Started / Completed / Phys117 / 89 / 0
Completion rate76.1%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)28.8%
Part B score (max 5.0)1.44 / 5.0
Final score5.24 / 10
1.7% 4.58
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.53Cr / 1.40Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score4.58 / 10
77.3% 4.38
CategoryWater conservation & recharge
Started / Completed / Phys469 / 5 / 0
Completion rate1.1%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked68.21Cr / 59.03Cr
Expenditure rate (ongoing)86.5%
Part B score (max 5.0)4.33 / 5.0
Final score4.38 / 10
6.4% 4.51
CategoryWatershed Related Works
Started / Completed / Phys38 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.70Cr / 5.14Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score4.51 / 10
2.1% 4.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.89Cr / 1.61Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score4.25 / 10
121 SHAHPUR โ†— BETUL 4.56
10.8% 5.24
CategoryFarm Pond
Started / Completed / Phys120 / 1 / 66
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked1.21Cr / 0.59Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score5.24 / 10
1.7% 2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.17Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
4.1% 7.44
CategoryDug Well Recharge
Started / Completed / Phys355 / 21 / 265
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.42 / 5.0
Final score7.44 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
76.1% 4.41
CategoryWater conservation & recharge
Started / Completed / Phys225 / 3 / 31
Completion rate15.1%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked15.29Cr / 11.19Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.66 / 5.0
Final score4.41 / 10
0.7% 5.06
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score5.06 / 10
6.6% 3.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 2
Completion rate5.7%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked1.43Cr / 1.05Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score3.96 / 10
122 GYARASPUR โ†— VIDISHA 4.55
72.3% 4.05
CategoryFarm Pond
Started / Completed / Phys271 / 133 / 16
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked3.60Cr / 0.93Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.30 / 5.0
Final score4.05 / 10
โ€”
8.4% 6.25
CategoryDug Well Recharge
Started / Completed / Phys346 / 87 / 179
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.21Cr / 0.10Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score6.25 / 10
0.0% 2.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score2.84 / 10
17.2% 5.85
CategoryWater conservation & recharge
Started / Completed / Phys75 / 21 / 22
Completion rate57.3%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked0.96Cr / 0.57Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.98 / 5.0
Final score5.85 / 10
โ€”
2.1% 4.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score4.56 / 10
123 MAJHOULI โ†— JABALPUR 4.55
19.2% 2.86
CategoryFarm Pond
Started / Completed / Phys112 / 13 / 15
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked2.41Cr / 0.78Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score2.86 / 10
7.9% 2.57
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.58Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score2.57 / 10
0.2% 4.55
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.55 / 10
โ€”
15.2% 5.40
CategoryWater conservation & recharge
Started / Completed / Phys32 / 7 / 5
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked1.64Cr / 1.16Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score5.40 / 10
57.2% 5.17
CategoryWatershed Related Works
Started / Completed / Phys112 / 33 / 10
Completion rate38.4%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked5.01Cr / 3.25Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score5.17 / 10
0.3% 3.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
124 KURWAI โ†— VIDISHA 4.55
66.1% 3.92
CategoryFarm Pond
Started / Completed / Phys300 / 160 / 11
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked2.82Cr / 0.60Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.07 / 5.0
Final score3.92 / 10
1.9% 1.55
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.06Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score1.55 / 10
2.8% 5.14
CategoryDug Well Recharge
Started / Completed / Phys109 / 28 / 47
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)33.9%
Part B score (max 5.0)1.70 / 5.0
Final score5.14 / 10
1.1% 6.86
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 17 / 0
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.86 / 10
24.5% 5.86
CategoryWater conservation & recharge
Started / Completed / Phys76 / 37 / 3
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked0.99Cr / 0.64Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score5.86 / 10
2.0% 5.57
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score5.57 / 10
1.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
125 DAMOH โ†— DAMOH 4.54
17.3% 5.39
CategoryFarm Pond
Started / Completed / Phys230 / 99 / 4
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked2.90Cr / 1.82Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score5.39 / 10
1.1% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
3.5% 6.10
CategoryDug Well Recharge
Started / Completed / Phys433 / 144 / 36
Completion rate41.6%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.65Cr / 0.52Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score6.10 / 10
0.1% 4.86
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)97.3%
Part B score (max 5.0)4.86 / 5.0
Final score4.86 / 10
56.9% 4.49
CategoryWater conservation & recharge
Started / Completed / Phys201 / 9 / 8
Completion rate8.5%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked17.88Cr / 14.55Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score4.49 / 10
11.2% 4.44
CategoryWatershed Related Works
Started / Completed / Phys70 / 4 / 2
Completion rate8.6%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked3.12Cr / 2.51Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.02 / 5.0
Final score4.44 / 10
9.9% 3.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.20Cr / 2.21Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.45 / 10
126 BARGHAT โ†— SEONI 4.53
56.3% 4.77
CategoryFarm Pond
Started / Completed / Phys441 / 134 / 0
Completion rate30.4%
Part A score (max 5.0)1.52 / 5.0
Ongoing sanction / booked8.88Cr / 5.77Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.77 / 10
โ€”
3.0% 3.89
CategoryDug Well Recharge
Started / Completed / Phys260 / 37 / 0
Completion rate14.2%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.57Cr / 0.36Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score3.89 / 10
0.6% 3.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.09Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score3.75 / 10
32.4% 4.30
CategoryWater conservation & recharge
Started / Completed / Phys139 / 12 / 0
Completion rate8.6%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked6.58Cr / 5.09Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.86 / 5.0
Final score4.30 / 10
5.6% 4.31
CategoryWatershed Related Works
Started / Completed / Phys24 / 3 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked1.04Cr / 0.76Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score4.31 / 10
2.2% 3.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.35Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score3.65 / 10
127 KHILCHIPUR โ†— RAJGARH 4.53
12.1% 4.49
CategoryFarm Pond
Started / Completed / Phys450 / 204 / 51
Completion rate56.7%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked3.38Cr / 1.12Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score4.49 / 10
โ€”
2.5% 7.43
CategoryDug Well Recharge
Started / Completed / Phys609 / 391 / 104
Completion rate81.3%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.30Cr / 0.20Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.43 / 10
2.9% 3.47
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.89Cr / 1.32Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
66.6% 4.51
CategoryWater conservation & recharge
Started / Completed / Phys300 / 14 / 7
Completion rate7.0%
Part A score (max 5.0)0.35 / 5.0
Ongoing sanction / booked41.73Cr / 34.74Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score4.51 / 10
3.7% 5.27
CategoryWatershed Related Works
Started / Completed / Phys47 / 6 / 6
Completion rate25.5%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked1.80Cr / 1.44Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)4.00 / 5.0
Final score5.27 / 10
12.2% 4.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 1 / 0
Completion rate1.1%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked7.73Cr / 6.28Cr
Expenditure rate (ongoing)81.2%
Part B score (max 5.0)4.06 / 5.0
Final score4.12 / 10
128 BHIMPUR โ†— BETUL 4.53
20.9% 3.72
CategoryFarm Pond
Started / Completed / Phys196 / 3 / 24
Completion rate13.8%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked5.67Cr / 3.44Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score3.72 / 10
2.9% 1.19
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.93Cr / 0.22Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score1.19 / 10
3.6% 7.61
CategoryDug Well Recharge
Started / Completed / Phys433 / 19 / 297
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked0.30Cr / 0.24Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score7.61 / 10
โ€”
68.1% 4.80
CategoryWater conservation & recharge
Started / Completed / Phys315 / 25 / 48
Completion rate23.2%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked16.59Cr / 12.08Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score4.80 / 10
2.0% 3.92
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.48Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score3.92 / 10
2.6% 4.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 2
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.76Cr / 0.53Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score4.02 / 10
129 MORAR โ†— GWALIOR 4.52
44.6% 3.44
CategoryFarm Pond
Started / Completed / Phys237 / 19 / 50
Completion rate29.1%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked3.81Cr / 1.51Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score3.44 / 10
1.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.6% 5.54
CategoryDug Well Recharge
Started / Completed / Phys242 / 36 / 101
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.27Cr / 0.15Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score5.54 / 10
1.3% 4.81
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.31 / 5.0
Final score4.81 / 10
40.1% 5.09
CategoryWater conservation & recharge
Started / Completed / Phys47 / 10 / 12
Completion rate46.8%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked2.87Cr / 1.58Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score5.09 / 10
5.0% 6.40
CategoryWatershed Related Works
Started / Completed / Phys13 / 2 / 8
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score6.40 / 10
1.8% 4.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 1
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score4.74 / 10
130 RAJNAGAR โ†— CHHATARPUR 4.50
47.2% 4.11
CategoryFarm Pond
Started / Completed / Phys296 / 65 / 65
Completion rate43.9%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked6.80Cr / 2.61Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score4.11 / 10
2.7% 2.09
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.29Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score2.09 / 10
2.9% 6.00
CategoryDug Well Recharge
Started / Completed / Phys584 / 480 / 24
Completion rate86.3%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.68 / 5.0
Final score6.00 / 10
0.7% 4.20
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.14Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score4.20 / 10
32.7% 4.90
CategoryWater conservation & recharge
Started / Completed / Phys160 / 5 / 34
Completion rate24.4%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked6.08Cr / 4.48Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.68 / 5.0
Final score4.90 / 10
7.8% 5.05
CategoryWatershed Related Works
Started / Completed / Phys33 / 2 / 4
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked1.65Cr / 1.37Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score5.05 / 10
6.0% 5.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 5
Completion rate23.8%
Part A score (max 5.0)1.19 / 5.0
Ongoing sanction / booked1.17Cr / 0.90Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score5.03 / 10
131 PAHADGARH โ†— MORENA 4.49
10.4% 5.87
CategoryFarm Pond
Started / Completed / Phys499 / 402 / 36
Completion rate87.8%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked1.77Cr / 0.52Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score5.87 / 10
0.2% 0.29
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.01Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.29 / 5.0
Final score0.29 / 10
0.3% 7.09
CategoryDug Well Recharge
Started / Completed / Phys126 / 106 / 4
Completion rate87.3%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score7.09 / 10
1.1% 4.17
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.95Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.17 / 5.0
Final score4.17 / 10
75.9% 4.33
CategoryWater conservation & recharge
Started / Completed / Phys541 / 5 / 0
Completion rate0.9%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked78.85Cr / 67.48Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score4.33 / 10
10.1% 4.42
CategoryWatershed Related Works
Started / Completed / Phys74 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked10.48Cr / 9.12Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.35 / 5.0
Final score4.42 / 10
2.0% 4.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 0
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked1.94Cr / 1.51Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score4.23 / 10
132 MAKHAN NAGAR โ†— NARMADAPURAM 4.48
49.0% 2.92
CategoryFarm Pond
Started / Completed / Phys123 / 35 / 15
Completion rate40.7%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked1.68Cr / 0.30Cr
Expenditure rate (ongoing)17.8%
Part B score (max 5.0)0.89 / 5.0
Final score2.92 / 10
โ€”
11.6% 4.46
CategoryDug Well Recharge
Started / Completed / Phys183 / 78 / 38
Completion rate63.4%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked0.24Cr / 0.06Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score4.46 / 10
1.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.9% 6.25
CategoryWater conservation & recharge
Started / Completed / Phys44 / 19 / 14
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.28Cr / 0.14Cr
Expenditure rate (ongoing)50.0%
Part B score (max 5.0)2.50 / 5.0
Final score6.25 / 10
6.1% 9.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 6
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.85 / 5.0
Final score9.00 / 10
6.9% 3.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)46.2%
Part B score (max 5.0)2.31 / 5.0
Final score3.98 / 10
133 LATERI โ†— VIDISHA 4.48
47.8% 3.77
CategoryFarm Pond
Started / Completed / Phys216 / 82 / 12
Completion rate43.5%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked3.66Cr / 1.17Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.60 / 5.0
Final score3.77 / 10
1.4% 3.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score3.02 / 10
5.3% 5.36
CategoryDug Well Recharge
Started / Completed / Phys301 / 117 / 81
Completion rate65.8%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score5.36 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
42.0% 5.11
CategoryWater conservation & recharge
Started / Completed / Phys168 / 55 / 11
Completion rate39.3%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked3.63Cr / 2.29Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score5.11 / 10
1.1% 3.93
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.68 / 5.0
Final score3.93 / 10
1.9% 5.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 6 / 0
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.50 / 5.0
Final score5.79 / 10
134 SIHAWAL โ†— SIDHI 4.47
34.1% 4.28
CategoryFarm Pond
Started / Completed / Phys352 / 135 / 0
Completion rate38.4%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked4.79Cr / 2.27Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score4.28 / 10
โ€”
1.1% 2.45
CategoryDug Well Recharge
Started / Completed / Phys95 / 12 / 0
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.22Cr / 0.08Cr
Expenditure rate (ongoing)36.4%
Part B score (max 5.0)1.82 / 5.0
Final score2.45 / 10
2.5% 3.91
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 2 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.55Cr / 0.34Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score3.91 / 10
51.1% 4.58
CategoryWater conservation & recharge
Started / Completed / Phys188 / 25 / 0
Completion rate13.3%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked10.68Cr / 8.36Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score4.58 / 10
3.0% 4.85
CategoryWatershed Related Works
Started / Completed / Phys22 / 8 / 0
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.39Cr / 0.23Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score4.85 / 10
8.2% 4.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 7 / 0
Completion rate26.9%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked1.71Cr / 1.22Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score4.91 / 10
135 AJAIGARH โ†— PANNA 4.47
41.2% 4.19
CategoryFarm Pond
Started / Completed / Phys376 / 59 / 0
Completion rate15.7%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked6.41Cr / 4.37Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score4.19 / 10
2.5% 3.96
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.37Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score3.96 / 10
5.4% 5.03
CategoryDug Well Recharge
Started / Completed / Phys396 / 88 / 0
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked0.79Cr / 0.62Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score5.03 / 10
โ€”
41.7% 4.67
CategoryWater conservation & recharge
Started / Completed / Phys216 / 20 / 0
Completion rate9.3%
Part A score (max 5.0)0.46 / 5.0
Ongoing sanction / booked7.31Cr / 6.15Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.21 / 5.0
Final score4.67 / 10
3.7% 4.28
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.59Cr
Expenditure rate (ongoing)85.7%
Part B score (max 5.0)4.28 / 5.0
Final score4.28 / 10
5.5% 4.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.93Cr / 0.79Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score4.88 / 10
136 ICHHAWAR โ†— SEHORE 4.47
47.8% 3.73
CategoryFarm Pond
Started / Completed / Phys272 / 4 / 102
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked4.47Cr / 1.59Cr
Expenditure rate (ongoing)35.6%
Part B score (max 5.0)1.78 / 5.0
Final score3.73 / 10
1.3% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
7.2% 6.73
CategoryDug Well Recharge
Started / Completed / Phys420 / 71 / 251
Completion rate76.7%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score6.73 / 10
0.5% 3.69
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score3.69 / 10
34.2% 5.02
CategoryWater conservation & recharge
Started / Completed / Phys83 / 4 / 20
Completion rate28.9%
Part A score (max 5.0)1.45 / 5.0
Ongoing sanction / booked3.70Cr / 2.65Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score5.02 / 10
5.9% 5.09
CategoryWatershed Related Works
Started / Completed / Phys18 / 1 / 4
Completion rate27.8%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked0.65Cr / 0.48Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score5.09 / 10
3.0% 5.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.26Cr / 0.21Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score5.37 / 10
137 GOTEGAON โ†— NARSINGHPUR 4.46
83.0% 4.37
CategoryFarm Pond
Started / Completed / Phys272 / 165 / 13
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked2.65Cr / 0.58Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.10 / 5.0
Final score4.37 / 10
โ€”
1.4% 4.15
CategoryDug Well Recharge
Started / Completed / Phys50 / 37 / 0
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)8.9%
Part B score (max 5.0)0.45 / 5.0
Final score4.15 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.8% 5.21
CategoryWater conservation & recharge
Started / Completed / Phys18 / 2 / 7
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.45Cr / 0.25Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score5.21 / 10
0.3% 3.69
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.69 / 5.0
Final score3.69 / 10
1.3% 2.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score2.43 / 10
138 UMARBAN โ†— DHAR 4.46
10.7% 4.26
CategoryFarm Pond
Started / Completed / Phys395 / 106 / 0
Completion rate26.8%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked1.72Cr / 1.00Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.92 / 5.0
Final score4.26 / 10
โ€”
5.6% 3.82
CategoryDug Well Recharge
Started / Completed / Phys474 / 157 / 0
Completion rate33.1%
Part A score (max 5.0)1.66 / 5.0
Ongoing sanction / booked0.82Cr / 0.35Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score3.82 / 10
0.5% 2.48
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score2.48 / 10
53.8% 4.79
CategoryWater conservation & recharge
Started / Completed / Phys124 / 4 / 12
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked9.90Cr / 8.20Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.79 / 10
24.6% 3.93
CategoryWatershed Related Works
Started / Completed / Phys80 / 3 / 2
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked4.93Cr / 3.57Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.93 / 10
4.8% 4.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 3
Completion rate21.4%
Part A score (max 5.0)1.07 / 5.0
Ongoing sanction / booked0.89Cr / 0.67Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score4.83 / 10
139 ISAGARH โ†— ASHOK NAGAR 4.45
37.8% 4.14
CategoryFarm Pond
Started / Completed / Phys282 / 21 / 48
Completion rate24.5%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked6.58Cr / 3.84Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.91 / 5.0
Final score4.14 / 10
3.7% 1.05
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.18Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score1.05 / 10
1.1% 4.32
CategoryDug Well Recharge
Started / Completed / Phys102 / 38 / 2
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked0.16Cr / 0.08Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score4.32 / 10
โ€”
54.7% 4.91
CategoryWater conservation & recharge
Started / Completed / Phys205 / 25 / 7
Completion rate15.6%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked10.30Cr / 8.51Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score4.91 / 10
1.3% 4.07
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score4.07 / 10
1.3% 4.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score4.15 / 10
140 JABERA โ†— DAMOH 4.44
16.6% 4.35
CategoryFarm Pond
Started / Completed / Phys234 / 34 / 3
Completion rate15.8%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked4.58Cr / 3.26Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score4.35 / 10
โ€”
2.8% 5.64
CategoryDug Well Recharge
Started / Completed / Phys351 / 101 / 0
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked0.64Cr / 0.54Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score5.64 / 10
โ€”
51.2% 4.27
CategoryWater conservation & recharge
Started / Completed / Phys151 / 5 / 1
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked15.67Cr / 12.76Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score4.27 / 10
8.5% 5.12
CategoryWatershed Related Works
Started / Completed / Phys42 / 9 / 1
Completion rate23.8%
Part A score (max 5.0)1.19 / 5.0
Ongoing sanction / booked2.17Cr / 1.70Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score5.12 / 10
20.9% 4.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.78Cr / 6.11Cr
Expenditure rate (ongoing)90.1%
Part B score (max 5.0)4.50 / 5.0
Final score4.50 / 10
141 DEWAS โ†— DEWAS 4.43
43.0% 4.04
CategoryFarm Pond
Started / Completed / Phys125 / 29 / 8
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.48Cr / 1.27Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score4.04 / 10
2.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.1% 5.41
CategoryDug Well Recharge
Started / Completed / Phys280 / 6 / 130
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.34Cr / 0.20Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score5.41 / 10
3.3% 4.80
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 3 / 0
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score4.80 / 10
33.3% 4.43
CategoryWater conservation & recharge
Started / Completed / Phys104 / 5 / 11
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked2.47Cr / 1.81Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score4.43 / 10
6.8% 4.24
CategoryWatershed Related Works
Started / Completed / Phys22 / 2 / 1
Completion rate13.6%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked0.48Cr / 0.34Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score4.24 / 10
3.3% 3.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score3.25 / 10
142 SHEOPUR โ†— SHEOPUR 4.42
38.5% 4.26
CategoryFarm Pond
Started / Completed / Phys143 / 56 / 0
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked3.45Cr / 1.59Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.30 / 5.0
Final score4.26 / 10
โ€”
0.8% 7.10
CategoryDug Well Recharge
Started / Completed / Phys43 / 31 / 0
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.10 / 10
6.4% 4.36
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.92Cr / 0.80Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.36 / 5.0
Final score4.36 / 10
41.4% 4.52
CategoryWater conservation & recharge
Started / Completed / Phys81 / 3 / 0
Completion rate3.7%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked5.68Cr / 4.92Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score4.52 / 10
5.9% 4.53
CategoryWatershed Related Works
Started / Completed / Phys13 / 1 / 0
Completion rate7.7%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked0.76Cr / 0.63Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score4.53 / 10
7.1% 4.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.90Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score4.36 / 10
143 JOURA โ†— MORENA 4.41
16.3% 5.59
CategoryFarm Pond
Started / Completed / Phys230 / 143 / 0
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked3.42Cr / 1.70Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.48 / 5.0
Final score5.59 / 10
0.5% 0.01
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score0.01 / 10
0.4% 4.91
CategoryDug Well Recharge
Started / Completed / Phys77 / 43 / 0
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score4.91 / 10
1.1% 4.80
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.50Cr
Expenditure rate (ongoing)96.0%
Part B score (max 5.0)4.80 / 5.0
Final score4.80 / 10
76.6% 4.21
CategoryWater conservation & recharge
Started / Completed / Phys261 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked36.65Cr / 30.86Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
1.3% 4.29
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.53Cr
Expenditure rate (ongoing)85.8%
Part B score (max 5.0)4.29 / 5.0
Final score4.29 / 10
3.8% 3.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.83Cr / 1.46Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score3.98 / 10
144 DABRA โ†— GWALIOR 4.40
64.1% 4.17
CategoryFarm Pond
Started / Completed / Phys248 / 30 / 109
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked3.02Cr / 0.82Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.36 / 5.0
Final score4.17 / 10
8.7% 1.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.85Cr / 0.17Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
5.1% 5.64
CategoryDug Well Recharge
Started / Completed / Phys192 / 40 / 113
Completion rate79.7%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score5.64 / 10
0.7% 3.86
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score3.86 / 10
18.0% 6.65
CategoryWater conservation & recharge
Started / Completed / Phys40 / 1 / 28
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.24Cr / 0.15Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.65 / 10
1.8% 3.71
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score3.71 / 10
1.6% 4.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.54 / 5.0
Final score4.04 / 10
145 JAWA โ†— REWA 4.40
42.4% 3.55
CategoryFarm Pond
Started / Completed / Phys229 / 64 / 26
Completion rate39.3%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked3.68Cr / 1.16Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score3.55 / 10
โ€”
0.7% 6.82
CategoryDug Well Recharge
Started / Completed / Phys35 / 20 / 8
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score6.82 / 10
0.3% 3.71
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score3.71 / 10
41.4% 5.37
CategoryWater conservation & recharge
Started / Completed / Phys84 / 20 / 11
Completion rate36.9%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked3.86Cr / 2.72Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score5.37 / 10
6.2% 4.47
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 4
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.62Cr / 0.35Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score4.47 / 10
9.0% 3.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 3
Completion rate23.5%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked0.77Cr / 0.39Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score3.71 / 10
146 RAHATGARH โ†— SAGAR 4.37
22.0% 3.55
CategoryFarm Pond
Started / Completed / Phys237 / 93 / 0
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked2.36Cr / 0.75Cr
Expenditure rate (ongoing)31.8%
Part B score (max 5.0)1.59 / 5.0
Final score3.55 / 10
5.0% 2.02
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.36Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score2.02 / 10
7.6% 5.76
CategoryDug Well Recharge
Started / Completed / Phys531 / 208 / 78
Completion rate53.9%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.63Cr / 0.39Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score5.76 / 10
1.4% 8.16
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.10Cr / 0.10Cr
Expenditure rate (ongoing)96.6%
Part B score (max 5.0)4.83 / 5.0
Final score8.16 / 10
48.6% 4.49
CategoryWater conservation & recharge
Started / Completed / Phys117 / 19 / 0
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked8.25Cr / 6.06Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.49 / 10
10.6% 4.22
CategoryWatershed Related Works
Started / Completed / Phys26 / 3 / 1
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked1.70Cr / 1.17Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score4.22 / 10
4.8% 6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 6 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.27Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score6.35 / 10
147 BHANPURA โ†— MANDSAUR 4.37
23.2% 3.28
CategoryFarm Pond
Started / Completed / Phys156 / 10 / 0
Completion rate6.4%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked2.92Cr / 1.73Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score3.28 / 10
โ€”
8.3% 6.34
CategoryDug Well Recharge
Started / Completed / Phys463 / 264 / 20
Completion rate61.3%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked0.43Cr / 0.28Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score6.34 / 10
0.2% 4.73
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)94.7%
Part B score (max 5.0)4.73 / 5.0
Final score4.73 / 10
60.0% 4.48
CategoryWater conservation & recharge
Started / Completed / Phys131 / 3 / 1
Completion rate3.1%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked7.78Cr / 6.74Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score4.48 / 10
7.4% 4.68
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 0
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked0.94Cr / 0.84Cr
Expenditure rate (ongoing)89.0%
Part B score (max 5.0)4.45 / 5.0
Final score4.68 / 10
0.9% 3.95
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.10Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score3.95 / 10
148 BANDA โ†— SAGAR 4.36
36.6% 3.57
CategoryFarm Pond
Started / Completed / Phys145 / 59 / 7
Completion rate45.5%
Part A score (max 5.0)2.28 / 5.0
Ongoing sanction / booked1.46Cr / 0.38Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score3.57 / 10
โ€”
18.1% 6.25
CategoryDug Well Recharge
Started / Completed / Phys545 / 173 / 138
Completion rate57.1%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked0.60Cr / 0.41Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score6.25 / 10
1.0% 4.63
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)92.6%
Part B score (max 5.0)4.63 / 5.0
Final score4.63 / 10
37.4% 4.05
CategoryWater conservation & recharge
Started / Completed / Phys66 / 5 / 9
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked2.40Cr / 1.44Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score4.05 / 10
4.0% 5.06
CategoryWatershed Related Works
Started / Completed / Phys8 / 3 / 0
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.28Cr / 0.18Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score5.06 / 10
2.9% 5.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 3
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score5.48 / 10
149 BASODA โ†— VIDISHA 4.35
75.8% 3.83
CategoryFarm Pond
Started / Completed / Phys303 / 161 / 19
Completion rate59.4%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked3.20Cr / 0.55Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.86 / 5.0
Final score3.83 / 10
โ€”
2.3% 6.51
CategoryDug Well Recharge
Started / Completed / Phys90 / 47 / 18
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score6.51 / 10
0.7% 4.52
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)40.3%
Part B score (max 5.0)2.02 / 5.0
Final score4.52 / 10
19.4% 6.28
CategoryWater conservation & recharge
Started / Completed / Phys95 / 47 / 21
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.75Cr / 0.40Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.70 / 5.0
Final score6.28 / 10
0.3% 3.58
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score3.58 / 10
1.6% 2.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.71 / 5.0
Final score2.96 / 10
150 CHITRANGI โ†— SINGRAULI 4.35
33.3% 4.70
CategoryFarm Pond
Started / Completed / Phys914 / 481 / 21
Completion rate54.9%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked12.39Cr / 4.85Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score4.70 / 10
3.2% 2.55
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.60Cr / 1.32Cr
Expenditure rate (ongoing)50.9%
Part B score (max 5.0)2.55 / 5.0
Final score2.55 / 10
1.4% 4.83
CategoryDug Well Recharge
Started / Completed / Phys438 / 192 / 37
Completion rate52.3%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked0.54Cr / 0.24Cr
Expenditure rate (ongoing)44.3%
Part B score (max 5.0)2.22 / 5.0
Final score4.83 / 10
โ€”
55.7% 4.24
CategoryWater conservation & recharge
Started / Completed / Phys563 / 35 / 15
Completion rate8.9%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked41.73Cr / 31.64Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score4.24 / 10
3.7% 4.50
CategoryWatershed Related Works
Started / Completed / Phys73 / 12 / 1
Completion rate17.8%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked2.38Cr / 1.72Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.61 / 5.0
Final score4.50 / 10
2.7% 4.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 1 / 0
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked2.14Cr / 1.65Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score4.08 / 10
151 BAGH โ†— DHAR 4.34
6.1% 3.00
CategoryFarm Pond
Started / Completed / Phys243 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.86Cr / 2.32Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score3.00 / 10
โ€”
1.5% 2.73
CategoryDug Well Recharge
Started / Completed / Phys365 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.94Cr / 0.51Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score2.73 / 10
โ€”
89.5% 4.46
CategoryWater conservation & recharge
Started / Completed / Phys232 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked56.31Cr / 50.20Cr
Expenditure rate (ongoing)89.1%
Part B score (max 5.0)4.46 / 5.0
Final score4.46 / 10
2.2% 4.50
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.38Cr / 1.24Cr
Expenditure rate (ongoing)90.0%
Part B score (max 5.0)4.50 / 5.0
Final score4.50 / 10
0.6% 4.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.35Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score4.44 / 10
152 PANDHURNA โ†— CHHINDWARA 4.34
21.8% 5.76
CategoryFarm Pond
Started / Completed / Phys136 / 61 / 31
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.75Cr / 0.36Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score5.76 / 10
3.6% 0.29
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.02Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.29 / 5.0
Final score0.29 / 10
8.6% 6.35
CategoryDug Well Recharge
Started / Completed / Phys366 / 34 / 185
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked0.38Cr / 0.26Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.36 / 5.0
Final score6.35 / 10
7.7% 3.37
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.85Cr / 0.57Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
21.9% 3.91
CategoryWater conservation & recharge
Started / Completed / Phys25 / 0 / 1
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked2.25Cr / 1.67Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score3.91 / 10
33.6% 3.71
CategoryWatershed Related Works
Started / Completed / Phys48 / 1 / 1
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked3.52Cr / 2.46Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score3.71 / 10
2.7% 5.97
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.20Cr / 0.17Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.30 / 5.0
Final score5.97 / 10
153 CHICHOLI โ†— BETUL 4.34
27.6% 3.20
CategoryFarm Pond
Started / Completed / Phys137 / 0 / 18
Completion rate13.1%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked3.12Cr / 1.59Cr
Expenditure rate (ongoing)50.9%
Part B score (max 5.0)2.55 / 5.0
Final score3.20 / 10
9.3% 2.27
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.55Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score2.27 / 10
8.2% 6.16
CategoryDug Well Recharge
Started / Completed / Phys411 / 42 / 215
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.40Cr / 0.24Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.03 / 5.0
Final score6.16 / 10
โ€”
37.5% 5.11
CategoryWater conservation & recharge
Started / Completed / Phys103 / 6 / 19
Completion rate24.3%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked3.94Cr / 3.07Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score5.11 / 10
12.5% 4.86
CategoryWatershed Related Works
Started / Completed / Phys37 / 1 / 6
Completion rate18.9%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked1.29Cr / 1.01Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score4.86 / 10
4.8% 4.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 2
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked0.58Cr / 0.45Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score4.39 / 10
154 BHANDER โ†— DATIA 4.33
36.8% 3.09
CategoryFarm Pond
Started / Completed / Phys212 / 49 / 12
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked3.17Cr / 1.04Cr
Expenditure rate (ongoing)32.9%
Part B score (max 5.0)1.65 / 5.0
Final score3.09 / 10
โ€”
2.4% 6.25
CategoryDug Well Recharge
Started / Completed / Phys118 / 58 / 13
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.25 / 10
3.0% 5.58
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score5.58 / 10
42.6% 4.66
CategoryWater conservation & recharge
Started / Completed / Phys123 / 2 / 47
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked3.07Cr / 1.64Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score4.66 / 10
5.5% 6.22
CategoryWatershed Related Works
Started / Completed / Phys19 / 2 / 11
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score6.22 / 10
9.7% 5.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 8
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.30Cr / 0.19Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score5.72 / 10
155 DHARAMPURI โ†— DHAR 4.33
5.2% 4.52
CategoryFarm Pond
Started / Completed / Phys137 / 29 / 0
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked0.75Cr / 0.52Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score4.52 / 10
โ€”
5.5% 4.53
CategoryDug Well Recharge
Started / Completed / Phys378 / 36 / 0
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked0.89Cr / 0.72Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.05 / 5.0
Final score4.53 / 10
0.3% 3.01
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score3.01 / 10
69.3% 4.41
CategoryWater conservation & recharge
Started / Completed / Phys169 / 3 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked12.31Cr / 10.63Cr
Expenditure rate (ongoing)86.4%
Part B score (max 5.0)4.32 / 5.0
Final score4.41 / 10
14.3% 4.00
CategoryWatershed Related Works
Started / Completed / Phys59 / 1 / 0
Completion rate1.7%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked2.56Cr / 2.00Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.91 / 5.0
Final score4.00 / 10
5.5% 3.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.99Cr / 0.77Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score3.92 / 10
156 CHHAPARA โ†— SEONI 4.33
35.4% 4.24
CategoryFarm Pond
Started / Completed / Phys210 / 62 / 0
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked4.92Cr / 2.73Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score4.24 / 10
โ€”
2.8% 4.28
CategoryDug Well Recharge
Started / Completed / Phys209 / 38 / 0
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked0.44Cr / 0.30Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score4.28 / 10
7.5% 2.64
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.47Cr / 0.77Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score2.64 / 10
41.4% 4.62
CategoryWater conservation & recharge
Started / Completed / Phys112 / 19 / 0
Completion rate17.0%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked7.22Cr / 5.44Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score4.62 / 10
11.3% 4.83
CategoryWatershed Related Works
Started / Completed / Phys41 / 9 / 0
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked1.80Cr / 1.34Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score4.83 / 10
1.8% 3.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.24Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score3.41 / 10
157 GAROTH โ†— MANDSAUR 4.32
11.1% 3.33
CategoryFarm Pond
Started / Completed / Phys281 / 19 / 1
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked4.37Cr / 2.60Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score3.33 / 10
3.2% 3.07
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.46Cr / 0.89Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score3.07 / 10
5.6% 4.68
CategoryDug Well Recharge
Started / Completed / Phys964 / 69 / 42
Completion rate11.5%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked2.21Cr / 1.81Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.68 / 10
0.9% 3.39
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.41Cr / 0.28Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score3.39 / 10
74.4% 4.51
CategoryWater conservation & recharge
Started / Completed / Phys372 / 3 / 0
Completion rate0.8%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked33.10Cr / 29.61Cr
Expenditure rate (ongoing)89.5%
Part B score (max 5.0)4.47 / 5.0
Final score4.51 / 10
1.7% 4.31
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.75Cr / 0.64Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.31 / 5.0
Final score4.31 / 10
3.1% 4.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.41Cr / 1.22Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score4.33 / 10
158 DEOSAR โ†— SINGRAULI 4.32
40.2% 4.79
CategoryFarm Pond
Started / Completed / Phys704 / 388 / 2
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked5.61Cr / 2.27Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score4.79 / 10
3.4% 2.96
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.07Cr / 0.64Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.96 / 5.0
Final score2.96 / 10
3.3% 5.04
CategoryDug Well Recharge
Started / Completed / Phys397 / 255 / 4
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.36Cr / 0.13Cr
Expenditure rate (ongoing)35.5%
Part B score (max 5.0)1.77 / 5.0
Final score5.04 / 10
0.2% 3.39
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.39 / 5.0
Final score3.39 / 10
43.9% 4.04
CategoryWater conservation & recharge
Started / Completed / Phys224 / 23 / 3
Completion rate11.6%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked12.40Cr / 8.58Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score4.04 / 10
5.4% 3.87
CategoryWatershed Related Works
Started / Completed / Phys25 / 1 / 0
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked1.65Cr / 1.21Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score3.87 / 10
3.6% 3.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 0
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.11Cr / 0.77Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score3.83 / 10
159 PORSA โ†— MORENA 4.32
15.6% 4.83
CategoryFarm Pond
Started / Completed / Phys171 / 67 / 9
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked3.44Cr / 1.79Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.61 / 5.0
Final score4.83 / 10
โ€”
0.4% 2.96
CategoryDug Well Recharge
Started / Completed / Phys64 / 11 / 0
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)42.0%
Part B score (max 5.0)2.10 / 5.0
Final score2.96 / 10
2.3% 3.35
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.02Cr / 0.68Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score3.35 / 10
79.2% 4.27
CategoryWater conservation & recharge
Started / Completed / Phys267 / 1 / 0
Completion rate0.4%
Part A score (max 5.0)0.02 / 5.0
Ongoing sanction / booked34.47Cr / 29.30Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score4.27 / 10
2.1% 3.57
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.64Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score3.57 / 10
0.5% 4.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.19Cr
Expenditure rate (ongoing)95.8%
Part B score (max 5.0)4.79 / 5.0
Final score4.79 / 10
160 PATAN โ†— JABALPUR 4.31
53.8% 2.37
CategoryFarm Pond
Started / Completed / Phys47 / 17 / 1
Completion rate38.3%
Part A score (max 5.0)1.91 / 5.0
Ongoing sanction / booked0.52Cr / 0.05Cr
Expenditure rate (ongoing)9.2%
Part B score (max 5.0)0.46 / 5.0
Final score2.37 / 10
โ€”
0.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.4% 6.23
CategoryWater conservation & recharge
Started / Completed / Phys16 / 12 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.24Cr / 0.12Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score6.23 / 10
3.5% 5.04
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.04 / 10
4.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
161 BIJEYPUR โ†— SHEOPUR 4.30
8.9% 6.10
CategoryFarm Pond
Started / Completed / Phys333 / 233 / 0
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked2.04Cr / 1.06Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score6.10 / 10
3.0% 0.49
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.97Cr / 0.19Cr
Expenditure rate (ongoing)9.7%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
0.2% 5.89
CategoryDug Well Recharge
Started / Completed / Phys39 / 35 / 0
Completion rate89.7%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score5.89 / 10
0.5% 4.62
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.32Cr
Expenditure rate (ongoing)92.4%
Part B score (max 5.0)4.62 / 5.0
Final score4.62 / 10
76.3% 4.27
CategoryWater conservation & recharge
Started / Completed / Phys398 / 4 / 0
Completion rate1.0%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked48.87Cr / 41.26Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.27 / 10
8.7% 4.04
CategoryWatershed Related Works
Started / Completed / Phys48 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.65Cr / 4.57Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
2.3% 4.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 1.24Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.08 / 5.0
Final score4.08 / 10
162 SEHORE โ†— SEHORE 4.30
66.5% 3.10
CategoryFarm Pond
Started / Completed / Phys451 / 27 / 147
Completion rate38.6%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked7.38Cr / 1.72Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score3.10 / 10
โ€”
11.3% 6.10
CategoryDug Well Recharge
Started / Completed / Phys732 / 65 / 450
Completion rate70.4%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.57Cr / 0.30Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score6.10 / 10
1.0% 5.71
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 1
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.71 / 10
17.4% 6.76
CategoryWater conservation & recharge
Started / Completed / Phys121 / 5 / 79
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked1.11Cr / 0.73Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score6.76 / 10
1.6% 6.07
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 8
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.07 / 5.0
Final score6.07 / 10
2.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
163 BURHAR โ†— SHAHDOL 4.30
38.6% 3.53
CategoryFarm Pond
Started / Completed / Phys768 / 86 / 18
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked23.07Cr / 13.19Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score3.53 / 10
0.7% 0.76
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.08Cr
Expenditure rate (ongoing)15.2%
Part B score (max 5.0)0.76 / 5.0
Final score0.76 / 10
0.7% 4.42
CategoryDug Well Recharge
Started / Completed / Phys182 / 23 / 0
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.42Cr / 0.31Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score4.42 / 10
5.0% 5.52
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 0
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked3.44Cr / 3.31Cr
Expenditure rate (ongoing)96.0%
Part B score (max 5.0)4.80 / 5.0
Final score5.52 / 10
27.5% 4.48
CategoryWater conservation & recharge
Started / Completed / Phys343 / 18 / 1
Completion rate5.5%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked18.21Cr / 15.30Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score4.48 / 10
26.0% 5.04
CategoryWatershed Related Works
Started / Completed / Phys185 / 4 / 0
Completion rate2.2%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked17.71Cr / 17.45Cr
Expenditure rate (ongoing)98.6%
Part B score (max 5.0)4.93 / 5.0
Final score5.04 / 10
1.4% 5.30
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 3 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.76Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.30 / 5.0
Final score5.30 / 10
164 AMARWARA โ†— CHHINDWARA 4.29
50.1% 4.33
CategoryFarm Pond
Started / Completed / Phys353 / 116 / 0
Completion rate32.9%
Part A score (max 5.0)1.64 / 5.0
Ongoing sanction / booked6.98Cr / 3.76Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score4.33 / 10
2.0% 0.10
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.01Cr
Expenditure rate (ongoing)2.0%
Part B score (max 5.0)0.10 / 5.0
Final score0.10 / 10
5.1% 6.34
CategoryDug Well Recharge
Started / Completed / Phys382 / 176 / 0
Completion rate46.1%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked0.55Cr / 0.44Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score6.34 / 10
โ€”
34.6% 4.38
CategoryWater conservation & recharge
Started / Completed / Phys111 / 14 / 0
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked6.12Cr / 4.59Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score4.38 / 10
5.4% 3.34
CategoryWatershed Related Works
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.08Cr / 0.72Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
2.9% 3.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.58Cr / 0.40Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score3.44 / 10
165 SHAHPURA โ†— JABALPUR 4.28
42.0% 2.61
CategoryFarm Pond
Started / Completed / Phys181 / 52 / 4
Completion rate30.9%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked4.32Cr / 0.92Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.06 / 5.0
Final score2.61 / 10
3.4% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
1.0% 3.99
CategoryDug Well Recharge
Started / Completed / Phys52 / 28 / 2
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.10 / 5.0
Final score3.99 / 10
0.7% 5.02
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.69 / 5.0
Final score5.02 / 10
45.7% 5.92
CategoryWater conservation & recharge
Started / Completed / Phys122 / 61 / 16
Completion rate63.1%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked2.21Cr / 1.22Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.77 / 5.0
Final score5.92 / 10
2.3% 5.70
CategoryWatershed Related Works
Started / Completed / Phys9 / 7 / 0
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.70 / 10
4.8% 5.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 7 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.17Cr / 0.06Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score5.48 / 10
166 HOSHANGABAD โ†— NARMADAPURAM 4.27
36.5% 2.73
CategoryFarm Pond
Started / Completed / Phys49 / 12 / 1
Completion rate26.5%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked0.43Cr / 0.12Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score2.73 / 10
โ€”
12.7% 5.24
CategoryDug Well Recharge
Started / Completed / Phys119 / 57 / 1
Completion rate48.7%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score5.24 / 10
8.9% 6.14
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 12 / 0
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score6.14 / 10
28.8% 4.76
CategoryWater conservation & recharge
Started / Completed / Phys29 / 13 / 0
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)50.4%
Part B score (max 5.0)2.52 / 5.0
Final score4.76 / 10
1.4% 3.06
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score3.06 / 10
11.7% 5.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score5.56 / 10
167 SABALGARH โ†— MORENA 4.26
28.6% 4.51
CategoryFarm Pond
Started / Completed / Phys545 / 179 / 0
Completion rate32.8%
Part A score (max 5.0)1.64 / 5.0
Ongoing sanction / booked16.02Cr / 9.20Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score4.51 / 10
0.3% 1.86
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
0.3% 4.18
CategoryDug Well Recharge
Started / Completed / Phys108 / 59 / 0
Completion rate54.6%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.13Cr / 0.04Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.45 / 5.0
Final score4.18 / 10
1.1% 4.42
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.87Cr / 0.77Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
65.2% 4.14
CategoryWater conservation & recharge
Started / Completed / Phys380 / 3 / 0
Completion rate0.8%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked53.79Cr / 44.11Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.14 / 10
1.1% 5.81
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.89Cr / 0.73Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.14 / 5.0
Final score5.81 / 10
3.5% 4.24
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.86Cr / 2.43Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score4.24 / 10
168 KATTHIWADA โ†— ALIRAJPUR 4.25
19.1% 3.99
CategoryFarm Pond
Started / Completed / Phys188 / 23 / 0
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked5.76Cr / 3.89Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score3.99 / 10
2.9% 2.53
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.98Cr / 0.50Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.53 / 5.0
Final score2.53 / 10
4.4% 4.12
CategoryDug Well Recharge
Started / Completed / Phys585 / 88 / 0
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked1.29Cr / 0.87Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score4.12 / 10
โ€”
71.4% 4.40
CategoryWater conservation & recharge
Started / Completed / Phys180 / 10 / 0
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked23.49Cr / 19.34Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score4.40 / 10
1.8% 4.42
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.55Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
0.4% 4.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)90.8%
Part B score (max 5.0)4.54 / 5.0
Final score4.54 / 10
169 NARWAR โ†— SHIVPURI 4.25
30.7% 4.73
CategoryFarm Pond
Started / Completed / Phys246 / 120 / 0
Completion rate48.8%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked3.73Cr / 1.71Cr
Expenditure rate (ongoing)45.8%
Part B score (max 5.0)2.29 / 5.0
Final score4.73 / 10
โ€”
2.4% 4.30
CategoryDug Well Recharge
Started / Completed / Phys211 / 109 / 4
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked0.25Cr / 0.08Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score4.30 / 10
0.4% 3.49
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
46.0% 4.01
CategoryWater conservation & recharge
Started / Completed / Phys180 / 9 / 0
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked9.36Cr / 7.04Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score4.01 / 10
19.7% 4.05
CategoryWatershed Related Works
Started / Completed / Phys54 / 4 / 0
Completion rate7.4%
Part A score (max 5.0)0.37 / 5.0
Ongoing sanction / booked4.10Cr / 3.02Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score4.05 / 10
0.9% 4.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.17Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score4.17 / 10
170 MALTHONE โ†— SAGAR 4.24
39.2% 2.83
CategoryFarm Pond
Started / Completed / Phys179 / 26 / 23
Completion rate27.4%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked2.55Cr / 0.75Cr
Expenditure rate (ongoing)29.3%
Part B score (max 5.0)1.47 / 5.0
Final score2.83 / 10
โ€”
8.2% 5.02
CategoryDug Well Recharge
Started / Completed / Phys288 / 133 / 48
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked0.27Cr / 0.10Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score5.02 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
48.1% 5.10
CategoryWater conservation & recharge
Started / Completed / Phys102 / 11 / 26
Completion rate36.3%
Part A score (max 5.0)1.81 / 5.0
Ongoing sanction / booked2.60Cr / 1.71Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score5.10 / 10
1.5% 4.67
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score4.67 / 10
2.5% 5.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 2
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.92 / 5.0
Final score5.77 / 10
171 SONDWA โ†— ALIRAJPUR 4.24
6.1% 2.84
CategoryFarm Pond
Started / Completed / Phys197 / 3 / 0
Completion rate1.5%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked3.68Cr / 2.03Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.77 / 5.0
Final score2.84 / 10
2.1% 4.25
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.29Cr / 1.10Cr
Expenditure rate (ongoing)84.9%
Part B score (max 5.0)4.24 / 5.0
Final score4.25 / 10
3.3% 3.07
CategoryDug Well Recharge
Started / Completed / Phys776 / 18 / 0
Completion rate2.3%
Part A score (max 5.0)0.12 / 5.0
Ongoing sanction / booked1.96Cr / 1.16Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score3.07 / 10
0.2% 4.16
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score4.16 / 10
84.5% 4.38
CategoryWater conservation & recharge
Started / Completed / Phys275 / 8 / 0
Completion rate2.9%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked49.88Cr / 42.21Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score4.38 / 10
0.9% 4.82
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.43Cr / 0.36Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score4.82 / 10
2.8% 4.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 0
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked1.62Cr / 1.36Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score4.51 / 10
172 THANDLA โ†— JHABUA 4.22
13.2% 2.85
CategoryFarm Pond
Started / Completed / Phys243 / 5 / 0
Completion rate2.1%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked4.21Cr / 2.31Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score2.85 / 10
1.5% 1.90
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.19Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
5.9% 4.13
CategoryDug Well Recharge
Started / Completed / Phys737 / 190 / 14
Completion rate27.7%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked1.38Cr / 0.76Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score4.13 / 10
0.1% 4.98
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)99.6%
Part B score (max 5.0)4.98 / 5.0
Final score4.98 / 10
75.9% 4.51
CategoryWater conservation & recharge
Started / Completed / Phys212 / 3 / 16
Completion rate9.0%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked22.28Cr / 18.11Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.06 / 5.0
Final score4.51 / 10
1.9% 4.34
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 3
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.47Cr / 0.27Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.84 / 5.0
Final score4.34 / 10
1.5% 4.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 1
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.49Cr / 0.36Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score4.29 / 10
173 MORENA โ†— MORENA 4.22
5.3% 4.82
CategoryFarm Pond
Started / Completed / Phys199 / 85 / 0
Completion rate42.7%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked2.02Cr / 1.08Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score4.82 / 10
1.1% 2.53
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.35Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score2.53 / 10
0.6% 2.99
CategoryDug Well Recharge
Started / Completed / Phys152 / 47 / 0
Completion rate30.9%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked0.27Cr / 0.08Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.44 / 5.0
Final score2.99 / 10
1.3% 4.15
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.73Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score4.15 / 10
87.4% 4.21
CategoryWater conservation & recharge
Started / Completed / Phys405 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked57.40Cr / 48.37Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
4.2% 4.22
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 0
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked2.74Cr / 2.19Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)4.00 / 5.0
Final score4.22 / 10
0.2% 3.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
174 TAMIA โ†— CHHINDWARA 4.22
24.1% 4.42
CategoryFarm Pond
Started / Completed / Phys269 / 63 / 0
Completion rate23.4%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked8.76Cr / 5.70Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.42 / 10
4.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.96Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
1.5% 6.03
CategoryDug Well Recharge
Started / Completed / Phys281 / 115 / 0
Completion rate40.9%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked0.42Cr / 0.33Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.99 / 5.0
Final score6.03 / 10
โ€”
60.5% 4.38
CategoryWater conservation & recharge
Started / Completed / Phys305 / 14 / 0
Completion rate4.6%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked27.18Cr / 22.59Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.15 / 5.0
Final score4.38 / 10
7.4% 4.31
CategoryWatershed Related Works
Started / Completed / Phys38 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.40Cr / 2.93Cr
Expenditure rate (ongoing)86.2%
Part B score (max 5.0)4.31 / 5.0
Final score4.31 / 10
2.3% 4.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.04Cr / 0.83Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.00 / 5.0
Final score4.00 / 10
175 BADNAWAR โ†— DHAR 4.21
22.9% 3.40
CategoryFarm Pond
Started / Completed / Phys316 / 3 / 0
Completion rate0.9%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked6.84Cr / 4.58Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score3.40 / 10
0.8% 2.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
5.2% 4.06
CategoryDug Well Recharge
Started / Completed / Phys602 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.56Cr / 1.27Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.06 / 5.0
Final score4.06 / 10
2.3% 4.13
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.57Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score4.13 / 10
57.8% 4.56
CategoryWater conservation & recharge
Started / Completed / Phys202 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked17.33Cr / 15.80Cr
Expenditure rate (ongoing)91.2%
Part B score (max 5.0)4.56 / 5.0
Final score4.56 / 10
10.6% 4.28
CategoryWatershed Related Works
Started / Completed / Phys60 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.19Cr / 2.73Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score4.28 / 10
0.3% 4.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)97.9%
Part B score (max 5.0)4.89 / 5.0
Final score4.89 / 10
176 BUXWAHA โ†— CHHATARPUR 4.20
40.2% 4.36
CategoryFarm Pond
Started / Completed / Phys153 / 45 / 0
Completion rate29.4%
Part A score (max 5.0)1.47 / 5.0
Ongoing sanction / booked4.40Cr / 2.54Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score4.36 / 10
4.5% 4.11
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.57Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.11 / 5.0
Final score4.11 / 10
5.6% 5.85
CategoryDug Well Recharge
Started / Completed / Phys360 / 198 / 0
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.39Cr / 0.24Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score5.85 / 10
โ€”
41.3% 3.95
CategoryWater conservation & recharge
Started / Completed / Phys96 / 8 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked6.14Cr / 4.34Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score3.95 / 10
2.6% 5.01
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.35Cr / 0.29Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score5.01 / 10
5.8% 2.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.54Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score2.99 / 10
177 SATNA โ†— SATNA 4.20
33.3% 4.00
CategoryFarm Pond
Started / Completed / Phys189 / 33 / 44
Completion rate40.7%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked1.20Cr / 0.47Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score4.00 / 10
6.2% 1.48
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score1.48 / 10
3.4% 6.12
CategoryDug Well Recharge
Started / Completed / Phys147 / 76 / 4
Completion rate54.4%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score6.12 / 10
1.1% 3.27
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
45.8% 4.60
CategoryWater conservation & recharge
Started / Completed / Phys48 / 6 / 5
Completion rate22.9%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked2.62Cr / 1.81Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.46 / 5.0
Final score4.60 / 10
2.0% 7.35
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.07Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score7.35 / 10
8.1% 3.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 0
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.47Cr / 0.27Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score3.39 / 10
178 SAGAR โ†— SAGAR 4.18
22.3% 3.46
CategoryFarm Pond
Started / Completed / Phys205 / 35 / 1
Completion rate17.6%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked3.27Cr / 1.69Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score3.46 / 10
โ€”
7.8% 6.75
CategoryDug Well Recharge
Started / Completed / Phys542 / 155 / 195
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked0.49Cr / 0.35Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score6.75 / 10
0.4% 5.59
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score5.59 / 10
61.3% 4.10
CategoryWater conservation & recharge
Started / Completed / Phys234 / 16 / 4
Completion rate8.5%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked10.09Cr / 7.41Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.10 / 10
2.6% 3.80
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.45Cr / 0.29Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score3.80 / 10
5.6% 4.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 2 / 1
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked0.91Cr / 0.66Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score4.35 / 10
179 GUNA โ†— GUNA 4.17
37.4% 3.16
CategoryFarm Pond
Started / Completed / Phys243 / 27 / 2
Completion rate11.9%
Part A score (max 5.0)0.60 / 5.0
Ongoing sanction / booked10.10Cr / 5.18Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.57 / 5.0
Final score3.16 / 10
โ€”
2.8% 6.49
CategoryDug Well Recharge
Started / Completed / Phys329 / 176 / 118
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score6.49 / 10
1.6% 4.82
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.46Cr
Expenditure rate (ongoing)96.3%
Part B score (max 5.0)4.82 / 5.0
Final score4.82 / 10
51.8% 4.81
CategoryWater conservation & recharge
Started / Completed / Phys187 / 19 / 18
Completion rate19.8%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked14.23Cr / 10.87Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score4.81 / 10
2.2% 3.17
CategoryWatershed Related Works
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.43Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score3.17 / 10
4.2% 3.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.13Cr / 0.79Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score3.99 / 10
180 PRITHVIPUR โ†— NIWARI 4.16
18.9% 3.62
CategoryFarm Pond
Started / Completed / Phys288 / 63 / 6
Completion rate24.0%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked3.76Cr / 1.82Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score3.62 / 10
3.5% 3.07
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.92Cr / 0.57Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score3.07 / 10
4.6% 4.56
CategoryDug Well Recharge
Started / Completed / Phys467 / 176 / 32
Completion rate44.5%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked0.67Cr / 0.31Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score4.56 / 10
โ€”
30.9% 4.33
CategoryWater conservation & recharge
Started / Completed / Phys111 / 3 / 0
Completion rate2.7%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked8.12Cr / 6.82Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score4.33 / 10
22.0% 4.07
CategoryWatershed Related Works
Started / Completed / Phys104 / 3 / 0
Completion rate2.9%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked5.71Cr / 4.49Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score4.07 / 10
20.1% 4.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys76 / 2 / 2
Completion rate5.3%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked5.00Cr / 4.36Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score4.62 / 10
181 KOTMA โ†— ANUPPUR 4.14
75.6% 3.85
CategoryFarm Pond
Started / Completed / Phys593 / 333 / 0
Completion rate56.2%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked5.08Cr / 1.06Cr
Expenditure rate (ongoing)20.8%
Part B score (max 5.0)1.04 / 5.0
Final score3.85 / 10
โ€”
0.8% 3.96
CategoryDug Well Recharge
Started / Completed / Phys50 / 4 / 0
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score3.96 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.6% 4.96
CategoryWater conservation & recharge
Started / Completed / Phys52 / 12 / 0
Completion rate23.1%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked2.73Cr / 2.08Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score4.96 / 10
0.9% 3.52
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
2.1% 4.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score4.75 / 10
182 TIRLA โ†— DHAR 4.13
15.3% 3.59
CategoryFarm Pond
Started / Completed / Phys295 / 42 / 0
Completion rate14.2%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked6.15Cr / 3.54Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.87 / 5.0
Final score3.59 / 10
โ€”
2.4% 2.86
CategoryDug Well Recharge
Started / Completed / Phys428 / 47 / 0
Completion rate11.0%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked0.98Cr / 0.45Cr
Expenditure rate (ongoing)46.3%
Part B score (max 5.0)2.32 / 5.0
Final score2.86 / 10
โ€”
75.2% 4.30
CategoryWater conservation & recharge
Started / Completed / Phys355 / 7 / 0
Completion rate2.0%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked33.55Cr / 28.17Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score4.30 / 10
6.0% 4.06
CategoryWatershed Related Works
Started / Completed / Phys67 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.73Cr / 2.22Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.06 / 5.0
Final score4.06 / 10
1.1% 3.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.36Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score3.75 / 10
183 JAISINGHNAGAR โ†— SHAHDOL 4.13
46.3% 3.43
CategoryFarm Pond
Started / Completed / Phys932 / 206 / 152
Completion rate38.4%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked14.83Cr / 4.46Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.50 / 5.0
Final score3.43 / 10
2.7% 1.01
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.29Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score1.01 / 10
0.7% 5.57
CategoryDug Well Recharge
Started / Completed / Phys134 / 56 / 10
Completion rate49.3%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.11 / 5.0
Final score5.57 / 10
5.3% 4.85
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.79Cr / 2.70Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score4.85 / 10
37.7% 4.89
CategoryWater conservation & recharge
Started / Completed / Phys354 / 22 / 50
Completion rate20.3%
Part A score (max 5.0)1.02 / 5.0
Ongoing sanction / booked16.25Cr / 12.60Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score4.89 / 10
1.4% 4.61
CategoryWatershed Related Works
Started / Completed / Phys15 / 3 / 2
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.53Cr / 0.31Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score4.61 / 10
5.8% 5.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 4 / 8
Completion rate29.3%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked2.15Cr / 1.65Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score5.29 / 10
184 CHHINDWARA โ†— CHHINDWARA 4.13
19.3% 4.73
CategoryFarm Pond
Started / Completed / Phys97 / 25 / 10
Completion rate36.1%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked1.16Cr / 0.68Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score4.73 / 10
7.3% 2.72
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.34Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score2.72 / 10
11.0% 6.99
CategoryDug Well Recharge
Started / Completed / Phys361 / 156 / 143
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.99 / 10
8.7% 4.67
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.66Cr / 0.53Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score4.67 / 10
26.1% 3.45
CategoryWater conservation & recharge
Started / Completed / Phys29 / 3 / 1
Completion rate13.8%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked2.19Cr / 1.21Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score3.45 / 10
17.0% 4.19
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 1
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked1.33Cr / 0.99Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.72 / 5.0
Final score4.19 / 10
10.7% 2.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.93Cr / 0.40Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.15 / 5.0
Final score2.15 / 10
185 KHANIYADHANA โ†— SHIVPURI 4.13
35.0% 4.65
CategoryFarm Pond
Started / Completed / Phys321 / 89 / 60
Completion rate46.4%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked4.88Cr / 2.28Cr
Expenditure rate (ongoing)46.7%
Part B score (max 5.0)2.33 / 5.0
Final score4.65 / 10
1.6% 0.03
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
3.2% 5.70
CategoryDug Well Recharge
Started / Completed / Phys335 / 184 / 53
Completion rate70.7%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.25Cr / 0.11Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score5.70 / 10
4.0% 3.68
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.07Cr / 0.79Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.68 / 5.0
Final score3.68 / 10
49.7% 3.79
CategoryWater conservation & recharge
Started / Completed / Phys163 / 5 / 1
Completion rate3.7%
Part A score (max 5.0)0.18 / 5.0
Ongoing sanction / booked13.14Cr / 9.48Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score3.79 / 10
4.2% 4.29
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 0
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.97Cr / 0.69Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score4.29 / 10
2.3% 4.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 0
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.53Cr / 0.41Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score4.39 / 10
186 ALOT โ†— RATLAM 4.12
46.6% 3.46
CategoryFarm Pond
Started / Completed / Phys311 / 80 / 2
Completion rate26.4%
Part A score (max 5.0)1.32 / 5.0
Ongoing sanction / booked4.59Cr / 1.96Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.14 / 5.0
Final score3.46 / 10
โ€”
22.0% 4.86
CategoryDug Well Recharge
Started / Completed / Phys1,068 / 356 / 1
Completion rate33.4%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.84Cr / 1.17Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.19 / 5.0
Final score4.86 / 10
0.2% 4.06
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.06 / 5.0
Final score4.06 / 10
30.3% 4.56
CategoryWater conservation & recharge
Started / Completed / Phys105 / 24 / 0
Completion rate22.9%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked3.21Cr / 2.19Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score4.56 / 10
0.6% 6.08
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score6.08 / 10
0.4% 4.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)93.6%
Part B score (max 5.0)4.68 / 5.0
Final score4.68 / 10
187 VIJAYRAGHAVGADH โ†— KATNI 4.11
44.3% 3.34
CategoryFarm Pond
Started / Completed / Phys243 / 39 / 29
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked3.51Cr / 1.36Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.95 / 5.0
Final score3.34 / 10
โ€”
9.3% 4.35
CategoryDug Well Recharge
Started / Completed / Phys386 / 103 / 70
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked0.56Cr / 0.23Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score4.35 / 10
5.1% 4.71
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 3 / 0
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.39Cr / 0.26Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score4.71 / 10
15.5% 5.34
CategoryWater conservation & recharge
Started / Completed / Phys36 / 7 / 10
Completion rate47.2%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked0.90Cr / 0.54Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.98 / 5.0
Final score5.34 / 10
15.1% 3.39
CategoryWatershed Related Works
Started / Completed / Phys40 / 2 / 2
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.44Cr / 0.83Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score3.39 / 10
10.8% 5.95
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 6
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.67Cr / 0.49Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.64 / 5.0
Final score5.95 / 10
188 BICHHUA โ†— CHHINDWARA 4.10
20.8% 5.63
CategoryFarm Pond
Started / Completed / Phys144 / 2 / 56
Completion rate40.3%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked1.59Cr / 1.15Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score5.63 / 10
12.4% 1.05
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 0.33Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score1.05 / 10
6.4% 7.11
CategoryDug Well Recharge
Started / Completed / Phys310 / 8 / 260
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.79 / 5.0
Final score7.11 / 10
1.3% 3.66
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.12Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score3.66 / 10
42.5% 4.05
CategoryWater conservation & recharge
Started / Completed / Phys41 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.35Cr / 4.34Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score4.05 / 10
16.0% 3.48
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.01Cr / 1.40Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
0.7% 2.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score2.81 / 10
189 PALERA โ†— TIKAMGARH 4.09
16.5% 3.00
CategoryFarm Pond
Started / Completed / Phys236 / 8 / 5
Completion rate5.5%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked3.32Cr / 1.81Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score3.00 / 10
2.1% 0.85
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.45Cr / 0.08Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.85 / 5.0
Final score0.85 / 10
7.1% 5.20
CategoryDug Well Recharge
Started / Completed / Phys592 / 110 / 20
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked1.19Cr / 0.97Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score5.20 / 10
0.2% 3.91
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score3.91 / 10
60.8% 4.36
CategoryWater conservation & recharge
Started / Completed / Phys279 / 12 / 2
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked12.61Cr / 10.37Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.11 / 5.0
Final score4.36 / 10
3.7% 4.18
CategoryWatershed Related Works
Started / Completed / Phys21 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.79Cr / 0.66Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
9.6% 4.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.05Cr / 1.70Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.14 / 10
190 BIJAWAR โ†— CHHATARPUR 4.09
41.2% 3.74
CategoryFarm Pond
Started / Completed / Phys216 / 58 / 28
Completion rate39.8%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked3.60Cr / 1.26Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score3.74 / 10
3.4% 3.29
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.30Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score3.29 / 10
4.5% 4.94
CategoryDug Well Recharge
Started / Completed / Phys431 / 325 / 33
Completion rate83.1%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.10Cr / 0.02Cr
Expenditure rate (ongoing)15.7%
Part B score (max 5.0)0.79 / 5.0
Final score4.94 / 10
โ€”
47.9% 4.39
CategoryWater conservation & recharge
Started / Completed / Phys147 / 11 / 12
Completion rate15.6%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked5.94Cr / 4.28Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score4.39 / 10
1.9% 3.43
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.17Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score3.43 / 10
1.1% 4.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.12Cr
Expenditure rate (ongoing)85.8%
Part B score (max 5.0)4.29 / 5.0
Final score4.29 / 10
191 ASHTA โ†— SEHORE 4.08
57.2% 3.26
CategoryFarm Pond
Started / Completed / Phys509 / 67 / 131
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked9.39Cr / 2.46Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score3.26 / 10
5.5% 0.81
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.20Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score0.81 / 10
8.3% 5.76
CategoryDug Well Recharge
Started / Completed / Phys727 / 246 / 281
Completion rate72.5%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.52Cr / 0.22Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score5.76 / 10
1.5% 5.10
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 1 / 2
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score5.10 / 10
19.4% 6.24
CategoryWater conservation & recharge
Started / Completed / Phys101 / 15 / 32
Completion rate46.5%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked3.06Cr / 2.40Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score6.24 / 10
5.6% 4.92
CategoryWatershed Related Works
Started / Completed / Phys32 / 7 / 6
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked0.73Cr / 0.42Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score4.92 / 10
2.6% 5.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 5
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.33Cr / 0.23Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score5.31 / 10
192 AMBAH โ†— MORENA 4.08
12.4% 3.60
CategoryFarm Pond
Started / Completed / Phys158 / 38 / 0
Completion rate24.1%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked1.77Cr / 0.85Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score3.60 / 10
โ€”
0.9% 3.64
CategoryDug Well Recharge
Started / Completed / Phys64 / 2 / 0
Completion rate3.1%
Part A score (max 5.0)0.16 / 5.0
Ongoing sanction / booked0.17Cr / 0.12Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score3.64 / 10
1.7% 4.53
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.29Cr
Expenditure rate (ongoing)90.6%
Part B score (max 5.0)4.53 / 5.0
Final score4.53 / 10
73.5% 4.07
CategoryWater conservation & recharge
Started / Completed / Phys110 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked14.19Cr / 11.56Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.07 / 5.0
Final score4.07 / 10
7.7% 4.77
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked1.45Cr / 1.27Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.35 / 5.0
Final score4.77 / 10
3.8% 4.21
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.62Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
193 SUSNER โ†— AGAR-MALWA 4.07
23.9% 4.27
CategoryFarm Pond
Started / Completed / Phys208 / 52 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked2.30Cr / 1.39Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score4.27 / 10
1.3% 3.42
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
9.9% 5.41
CategoryDug Well Recharge
Started / Completed / Phys508 / 161 / 0
Completion rate31.7%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked0.90Cr / 0.69Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score5.41 / 10
0.6% 2.16
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
59.0% 3.81
CategoryWater conservation & recharge
Started / Completed / Phys146 / 8 / 0
Completion rate5.5%
Part A score (max 5.0)0.27 / 5.0
Ongoing sanction / booked7.64Cr / 5.40Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score3.81 / 10
0.2% 3.78
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score3.78 / 10
5.0% 3.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.54Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score3.99 / 10
194 KOLARAS โ†— SHIVPURI 4.07
44.2% 4.28
CategoryFarm Pond
Started / Completed / Phys238 / 76 / 12
Completion rate37.0%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked6.12Cr / 2.97Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score4.28 / 10
1.8% 2.29
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.18Cr
Expenditure rate (ongoing)45.8%
Part B score (max 5.0)2.29 / 5.0
Final score2.29 / 10
2.9% 4.64
CategoryDug Well Recharge
Started / Completed / Phys253 / 107 / 8
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.36Cr / 0.17Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.37 / 5.0
Final score4.64 / 10
0.7% 3.34
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.11Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
49.6% 3.91
CategoryWater conservation & recharge
Started / Completed / Phys110 / 2 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked10.72Cr / 8.18Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score3.91 / 10
0.6% 3.13
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
0.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
195 PARASIA โ†— CHHINDWARA 4.06
35.1% 4.29
CategoryFarm Pond
Started / Completed / Phys182 / 27 / 4
Completion rate17.0%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked4.37Cr / 3.01Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score4.29 / 10
โ€”
10.1% 5.30
CategoryDug Well Recharge
Started / Completed / Phys563 / 85 / 71
Completion rate27.7%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked1.07Cr / 0.84Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score5.30 / 10
1.6% 3.91
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.19Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score3.91 / 10
41.9% 3.67
CategoryWater conservation & recharge
Started / Completed / Phys130 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.15Cr / 4.51Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score3.67 / 10
7.9% 3.69
CategoryWatershed Related Works
Started / Completed / Phys26 / 1 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked1.11Cr / 0.78Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score3.69 / 10
3.4% 3.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.39Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score3.88 / 10
196 SENDHAWA โ†— BARWANI 4.06
33.2% 3.17
CategoryFarm Pond
Started / Completed / Phys297 / 13 / 48
Completion rate20.5%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked4.37Cr / 1.87Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score3.17 / 10
4.5% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.75Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
18.4% 6.21
CategoryDug Well Recharge
Started / Completed / Phys1,190 / 8 / 698
Completion rate59.3%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked1.24Cr / 0.81Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.24 / 5.0
Final score6.21 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
40.9% 4.23
CategoryWater conservation & recharge
Started / Completed / Phys207 / 5 / 48
Completion rate25.6%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked4.73Cr / 2.79Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score4.23 / 10
1.9% 3.85
CategoryWatershed Related Works
Started / Completed / Phys11 / 2 / 1
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.22Cr / 0.11Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score3.85 / 10
0.9% 3.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 2
Completion rate30.8%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score3.99 / 10
197 PATHARIYA โ†— DAMOH 4.05
24.0% 3.35
CategoryFarm Pond
Started / Completed / Phys235 / 64 / 4
Completion rate28.9%
Part A score (max 5.0)1.45 / 5.0
Ongoing sanction / booked3.52Cr / 1.34Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score3.35 / 10
โ€”
5.0% 5.35
CategoryDug Well Recharge
Started / Completed / Phys385 / 170 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.54Cr / 0.33Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score5.35 / 10
4.6% 4.72
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.85Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.72 / 5.0
Final score4.72 / 10
54.7% 4.12
CategoryWater conservation & recharge
Started / Completed / Phys142 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.82Cr / 8.91Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score4.12 / 10
8.3% 4.66
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.64Cr / 1.53Cr
Expenditure rate (ongoing)93.1%
Part B score (max 5.0)4.66 / 5.0
Final score4.66 / 10
3.4% 3.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.48Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
198 KHURAI โ†— SAGAR 4.05
43.5% 2.70
CategoryFarm Pond
Started / Completed / Phys253 / 77 / 5
Completion rate32.4%
Part A score (max 5.0)1.62 / 5.0
Ongoing sanction / booked3.03Cr / 0.65Cr
Expenditure rate (ongoing)21.6%
Part B score (max 5.0)1.08 / 5.0
Final score2.70 / 10
2.4% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
8.7% 5.90
CategoryDug Well Recharge
Started / Completed / Phys339 / 182 / 74
Completion rate75.5%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.22Cr / 0.09Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score5.90 / 10
โ€”
43.4% 5.19
CategoryWater conservation & recharge
Started / Completed / Phys115 / 36 / 11
Completion rate40.9%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked2.51Cr / 1.58Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score5.19 / 10
0.0% 8.33
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.33 / 10
2.0% 5.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
199 BADWARA โ†— KATNI 4.05
33.7% 3.70
CategoryFarm Pond
Started / Completed / Phys297 / 62 / 43
Completion rate35.4%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked2.83Cr / 1.09Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score3.70 / 10
7.5% 1.63
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.98Cr / 0.32Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score1.63 / 10
6.2% 4.44
CategoryDug Well Recharge
Started / Completed / Phys310 / 76 / 77
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked0.41Cr / 0.16Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score4.44 / 10
โ€”
20.4% 5.09
CategoryWater conservation & recharge
Started / Completed / Phys52 / 1 / 10
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked2.19Cr / 1.77Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score5.09 / 10
24.4% 4.65
CategoryWatershed Related Works
Started / Completed / Phys41 / 4 / 5
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked2.52Cr / 1.79Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score4.65 / 10
8.0% 2.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.04Cr / 0.62Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score2.98 / 10
200 MAIHAR โ†— SATNA 4.04
48.1% 3.88
CategoryFarm Pond
Started / Completed / Phys328 / 13 / 103
Completion rate35.4%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked5.70Cr / 2.41Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.12 / 5.0
Final score3.88 / 10
3.7% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
1.5% 5.98
CategoryDug Well Recharge
Started / Completed / Phys155 / 48 / 25
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score5.98 / 10
0.1% 4.98
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)99.6%
Part B score (max 5.0)4.98 / 5.0
Final score4.98 / 10
30.6% 4.64
CategoryWater conservation & recharge
Started / Completed / Phys87 / 0 / 11
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked4.74Cr / 3.80Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score4.64 / 10
6.6% 4.23
CategoryWatershed Related Works
Started / Completed / Phys56 / 4 / 2
Completion rate10.7%
Part A score (max 5.0)0.54 / 5.0
Ongoing sanction / booked0.99Cr / 0.74Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score4.23 / 10
9.4% 4.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 0 / 7
Completion rate17.5%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked1.38Cr / 0.87Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score4.02 / 10
201 NISARPUR โ†— DHAR 4.04
25.2% 2.42
CategoryFarm Pond
Started / Completed / Phys78 / 1 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked1.19Cr / 0.56Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score2.42 / 10
โ€”
8.1% 2.90
CategoryDug Well Recharge
Started / Completed / Phys150 / 2 / 0
Completion rate1.3%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked0.38Cr / 0.22Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score2.90 / 10
โ€”
63.3% 4.81
CategoryWater conservation & recharge
Started / Completed / Phys39 / 2 / 0
Completion rate5.1%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked2.97Cr / 2.70Cr
Expenditure rate (ongoing)91.0%
Part B score (max 5.0)4.55 / 5.0
Final score4.81 / 10
3.2% 4.71
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score4.71 / 10
0.2% 2.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score2.11 / 10
202 SHAJAPUR โ†— SHAJAPUR 4.03
45.0% 2.74
CategoryFarm Pond
Started / Completed / Phys233 / 35 / 18
Completion rate22.7%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked6.14Cr / 1.97Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score2.74 / 10
3.9% 1.88
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.26Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score1.88 / 10
5.9% 5.96
CategoryDug Well Recharge
Started / Completed / Phys433 / 256 / 51
Completion rate70.9%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.30Cr / 0.15Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score5.96 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.4% 4.90
CategoryWater conservation & recharge
Started / Completed / Phys132 / 12 / 33
Completion rate34.1%
Part A score (max 5.0)1.70 / 5.0
Ongoing sanction / booked4.00Cr / 2.56Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.20 / 5.0
Final score4.90 / 10
8.0% 6.45
CategoryWatershed Related Works
Started / Completed / Phys33 / 3 / 18
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.52Cr / 0.34Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score6.45 / 10
1.2% 4.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score4.73 / 10
203 SONKATCH โ†— DEWAS 4.02
50.3% 3.29
CategoryFarm Pond
Started / Completed / Phys103 / 22 / 5
Completion rate26.2%
Part A score (max 5.0)1.31 / 5.0
Ongoing sanction / booked2.91Cr / 1.15Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score3.29 / 10
2.5% 3.49
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
12.5% 5.12
CategoryDug Well Recharge
Started / Completed / Phys377 / 66 / 134
Completion rate53.1%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.46Cr / 0.23Cr
Expenditure rate (ongoing)49.4%
Part B score (max 5.0)2.47 / 5.0
Final score5.12 / 10
โ€”
32.7% 4.82
CategoryWater conservation & recharge
Started / Completed / Phys69 / 4 / 19
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.74Cr / 1.10Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score4.82 / 10
1.1% 2.72
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score2.72 / 10
0.8% 4.42
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.06Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
204 NALKHEDA โ†— AGAR-MALWA 4.02
29.1% 3.25
CategoryFarm Pond
Started / Completed / Phys125 / 2 / 0
Completion rate1.6%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked3.18Cr / 2.01Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score3.25 / 10
โ€”
10.9% 4.85
CategoryDug Well Recharge
Started / Completed / Phys464 / 64 / 0
Completion rate13.8%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked1.03Cr / 0.86Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score4.85 / 10
โ€”
52.3% 4.28
CategoryWater conservation & recharge
Started / Completed / Phys80 / 1 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked5.71Cr / 4.81Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score4.28 / 10
0.9% 3.51
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
6.8% 4.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.75Cr / 0.60Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score4.03 / 10
205 SIHORA โ†— JABALPUR 4.01
54.9% 1.64
CategoryFarm Pond
Started / Completed / Phys161 / 9 / 10
Completion rate11.8%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked4.02Cr / 0.84Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.04 / 5.0
Final score1.64 / 10
2.9% 3.93
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.18Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
0.5% 2.30
CategoryDug Well Recharge
Started / Completed / Phys16 / 2 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score2.30 / 10
โ€”
35.7% 6.92
CategoryWater conservation & recharge
Started / Completed / Phys39 / 12 / 3
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked1.54Cr / 1.83Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score6.92 / 10
1.4% 4.53
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.87 / 5.0
Final score4.53 / 10
4.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
206 BADOD โ†— AGAR-MALWA 4.01
26.6% 2.88
CategoryFarm Pond
Started / Completed / Phys208 / 18 / 0
Completion rate8.7%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked4.24Cr / 2.08Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score2.88 / 10
3.1% 3.45
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.36Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.45 / 10
7.0% 6.03
CategoryDug Well Recharge
Started / Completed / Phys463 / 269 / 0
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked0.50Cr / 0.31Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score6.03 / 10
1.1% 3.54
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score3.54 / 10
38.3% 4.26
CategoryWater conservation & recharge
Started / Completed / Phys156 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.60Cr / 5.62Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score4.26 / 10
3.0% 4.15
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.43Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score4.15 / 10
20.9% 4.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.60Cr / 3.17Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.39 / 5.0
Final score4.39 / 10
207 UDAIPURA โ†— RAISEN 4.00
73.7% 3.78
CategoryFarm Pond
Started / Completed / Phys292 / 12 / 15
Completion rate9.2%
Part A score (max 5.0)0.46 / 5.0
Ongoing sanction / booked6.08Cr / 4.04Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.78 / 10
1.8% 3.27
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
5.4% 8.43
CategoryDug Well Recharge
Started / Completed / Phys194 / 123 / 23
Completion rate75.3%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked0.12Cr / 0.12Cr
Expenditure rate (ongoing)93.3%
Part B score (max 5.0)4.66 / 5.0
Final score8.43 / 10
โ€”
17.3% 3.66
CategoryWater conservation & recharge
Started / Completed / Phys20 / 0 / 1
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked1.40Cr / 0.95Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score3.66 / 10
0.4% 2.54
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score2.54 / 10
1.2% 4.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.10Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score4.15 / 10
208 JATARA โ†— TIKAMGARH 4.00
10.1% 2.95
CategoryFarm Pond
Started / Completed / Phys262 / 12 / 7
Completion rate7.3%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked3.59Cr / 1.85Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score2.95 / 10
2.9% 0.92
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.21Cr
Expenditure rate (ongoing)18.3%
Part B score (max 5.0)0.92 / 5.0
Final score0.92 / 10
4.6% 4.71
CategoryDug Well Recharge
Started / Completed / Phys661 / 28 / 108
Completion rate20.6%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked1.39Cr / 1.02Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score4.71 / 10
โ€”
65.6% 4.22
CategoryWater conservation & recharge
Started / Completed / Phys342 / 6 / 1
Completion rate2.0%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked24.56Cr / 20.23Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score4.22 / 10
2.8% 4.56
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 1
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.06Cr / 0.89Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.21 / 5.0
Final score4.56 / 10
14.0% 4.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys68 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.38Cr / 4.35Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
209 BADARWAS โ†— SHIVPURI 4.00
39.3% 4.06
CategoryFarm Pond
Started / Completed / Phys237 / 63 / 12
Completion rate31.6%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked5.83Cr / 2.89Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score4.06 / 10
โ€”
2.1% 4.41
CategoryDug Well Recharge
Started / Completed / Phys181 / 39 / 0
Completion rate21.5%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked0.36Cr / 0.24Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score4.41 / 10
0.8% 3.36
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.12Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
44.3% 3.88
CategoryWater conservation & recharge
Started / Completed / Phys132 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked9.76Cr / 7.57Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score3.88 / 10
7.9% 4.47
CategoryWatershed Related Works
Started / Completed / Phys35 / 5 / 0
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.52Cr / 1.14Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score4.47 / 10
5.6% 3.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 3 / 0
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked1.16Cr / 0.72Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score3.85 / 10
210 SAUSAR โ†— CHHINDWARA 4.00
48.3% 4.25
CategoryFarm Pond
Started / Completed / Phys185 / 25 / 0
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked2.79Cr / 1.99Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score4.25 / 10
6.1% 0.10
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.01Cr
Expenditure rate (ongoing)2.1%
Part B score (max 5.0)0.10 / 5.0
Final score0.10 / 10
10.4% 5.41
CategoryDug Well Recharge
Started / Completed / Phys262 / 37 / 8
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked0.56Cr / 0.51Cr
Expenditure rate (ongoing)91.0%
Part B score (max 5.0)4.55 / 5.0
Final score5.41 / 10
โ€”
28.7% 3.98
CategoryWater conservation & recharge
Started / Completed / Phys52 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.86Cr / 1.49Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score3.98 / 10
5.1% 3.80
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
1.3% 3.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
211 WAIDHAN โ†— SINGRAULI 3.99
30.2% 4.24
CategoryFarm Pond
Started / Completed / Phys342 / 143 / 1
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked3.77Cr / 1.60Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score4.24 / 10
3.3% 3.14
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.43Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
4.4% 5.06
CategoryDug Well Recharge
Started / Completed / Phys388 / 51 / 113
Completion rate42.3%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.53Cr / 0.31Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score5.06 / 10
โ€”
44.5% 3.86
CategoryWater conservation & recharge
Started / Completed / Phys129 / 6 / 8
Completion rate10.9%
Part A score (max 5.0)0.54 / 5.0
Ongoing sanction / booked8.16Cr / 5.41Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.86 / 10
12.2% 4.01
CategoryWatershed Related Works
Started / Completed / Phys33 / 4 / 0
Completion rate12.1%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked2.34Cr / 1.59Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score4.01 / 10
5.3% 3.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.08Cr / 0.71Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score3.28 / 10
212 JOBAT โ†— ALIRAJPUR 3.99
11.3% 2.18
CategoryFarm Pond
Started / Completed / Phys141 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.84Cr / 0.80Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score2.18 / 10
3.0% 4.64
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.46Cr
Expenditure rate (ongoing)92.8%
Part B score (max 5.0)4.64 / 5.0
Final score4.64 / 10
7.0% 2.86
CategoryDug Well Recharge
Started / Completed / Phys442 / 2 / 0
Completion rate0.5%
Part A score (max 5.0)0.02 / 5.0
Ongoing sanction / booked1.13Cr / 0.64Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score2.86 / 10
โ€”
72.6% 4.33
CategoryWater conservation & recharge
Started / Completed / Phys87 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked11.80Cr / 10.21Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score4.33 / 10
5.0% 4.24
CategoryWatershed Related Works
Started / Completed / Phys22 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.68Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score4.24 / 10
1.1% 4.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.15Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score4.31 / 10
213 BUDNI โ†— SEHORE 3.99
60.4% 3.62
CategoryFarm Pond
Started / Completed / Phys81 / 1 / 23
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked1.04Cr / 0.44Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score3.62 / 10
โ€”
16.2% 5.76
CategoryDug Well Recharge
Started / Completed / Phys151 / 32 / 69
Completion rate66.9%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked0.13Cr / 0.06Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score5.76 / 10
15.6% 3.80
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.29Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
3.2% 4.03
CategoryWater conservation & recharge
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.78 / 5.0
Final score4.03 / 10
2.7% 2.37
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)47.4%
Part B score (max 5.0)2.37 / 5.0
Final score2.37 / 10
1.9% 4.20
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.20 / 5.0
Final score4.20 / 10
214 CHHATARPUR โ†— CHHATARPUR 3.98
52.0% 3.24
CategoryFarm Pond
Started / Completed / Phys242 / 86 / 1
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked5.00Cr / 1.44Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.45 / 5.0
Final score3.24 / 10
3.9% 0.99
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.12Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score0.99 / 10
7.8% 5.79
CategoryDug Well Recharge
Started / Completed / Phys518 / 258 / 0
Completion rate49.8%
Part A score (max 5.0)2.49 / 5.0
Ongoing sanction / booked0.62Cr / 0.41Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score5.79 / 10
0.5% 5.73
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)89.6%
Part B score (max 5.0)4.48 / 5.0
Final score5.73 / 10
27.5% 5.18
CategoryWater conservation & recharge
Started / Completed / Phys115 / 31 / 8
Completion rate33.9%
Part A score (max 5.0)1.70 / 5.0
Ongoing sanction / booked3.18Cr / 2.22Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score5.18 / 10
4.2% 3.80
CategoryWatershed Related Works
Started / Completed / Phys21 / 2 / 0
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked0.54Cr / 0.36Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.80 / 10
4.0% 4.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 0
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.55Cr / 0.45Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.64 / 10
215 POHRI โ†— SHIVPURI 3.97
16.2% 4.30
CategoryFarm Pond
Started / Completed / Phys269 / 103 / 0
Completion rate38.3%
Part A score (max 5.0)1.91 / 5.0
Ongoing sanction / booked3.24Cr / 1.55Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.38 / 5.0
Final score4.30 / 10
0.7% 0.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)1.9%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
2.0% 4.46
CategoryDug Well Recharge
Started / Completed / Phys262 / 108 / 0
Completion rate41.2%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked0.39Cr / 0.19Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.40 / 5.0
Final score4.46 / 10
0.2% 4.93
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.08Cr
Expenditure rate (ongoing)98.7%
Part B score (max 5.0)4.93 / 5.0
Final score4.93 / 10
66.7% 3.88
CategoryWater conservation & recharge
Started / Completed / Phys213 / 3 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked22.17Cr / 16.88Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.81 / 5.0
Final score3.88 / 10
8.0% 4.05
CategoryWatershed Related Works
Started / Completed / Phys25 / 1 / 0
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked2.61Cr / 2.01Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score4.05 / 10
6.1% 4.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.03Cr / 1.73Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score4.27 / 10
216 BERASIA โ†— BHOPAL 3.97
42.7% 3.32
CategoryFarm Pond
Started / Completed / Phys788 / 105 / 19
Completion rate15.7%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked14.00Cr / 7.09Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.53 / 5.0
Final score3.32 / 10
3.0% 3.10
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.16Cr / 0.72Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score3.10 / 10
3.6% 5.20
CategoryDug Well Recharge
Started / Completed / Phys564 / 228 / 55
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked0.70Cr / 0.38Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score5.20 / 10
0.2% 2.45
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)48.9%
Part B score (max 5.0)2.45 / 5.0
Final score2.45 / 10
42.7% 4.41
CategoryWater conservation & recharge
Started / Completed / Phys402 / 20 / 29
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked15.45Cr / 11.74Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score4.41 / 10
1.9% 4.33
CategoryWatershed Related Works
Started / Completed / Phys18 / 1 / 3
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked0.67Cr / 0.43Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.21 / 5.0
Final score4.33 / 10
5.9% 5.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 1 / 5
Completion rate26.1%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked2.00Cr / 1.53Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score5.13 / 10
217 HARDA โ†— HARDA 3.97
54.1% 2.29
CategoryFarm Pond
Started / Completed / Phys98 / 5 / 16
Completion rate21.4%
Part A score (max 5.0)1.07 / 5.0
Ongoing sanction / booked2.35Cr / 0.57Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score2.29 / 10
4.6% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
11.6% 5.47
CategoryDug Well Recharge
Started / Completed / Phys233 / 147 / 22
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score5.47 / 10
โ€”
20.2% 6.07
CategoryWater conservation & recharge
Started / Completed / Phys11 / 1 / 5
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.32Cr / 0.21Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score6.07 / 10
6.1% 8.69
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 6
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)88.1%
Part B score (max 5.0)4.40 / 5.0
Final score8.69 / 10
3.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
218 SIRMOUR โ†— REWA 3.95
57.6% 3.47
CategoryFarm Pond
Started / Completed / Phys287 / 135 / 0
Completion rate47.0%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked2.31Cr / 0.52Cr
Expenditure rate (ongoing)22.3%
Part B score (max 5.0)1.11 / 5.0
Final score3.47 / 10
3.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.4% 8.96
CategoryDug Well Recharge
Started / Completed / Phys73 / 69 / 0
Completion rate94.5%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score8.96 / 10
1.8% 4.77
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 4 / 0
Completion rate23.5%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score4.77 / 10
30.7% 5.04
CategoryWater conservation & recharge
Started / Completed / Phys60 / 20 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.89Cr / 1.27Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score5.04 / 10
5.7% 4.78
CategoryWatershed Related Works
Started / Completed / Phys12 / 5 / 0
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.34Cr / 0.18Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.70 / 5.0
Final score4.78 / 10
0.6% 1.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
219 RAMA โ†— JHABUA 3.94
9.4% 1.82
CategoryFarm Pond
Started / Completed / Phys169 / 0 / 2
Completion rate1.2%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked2.34Cr / 0.82Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score1.82 / 10
3.0% 2.43
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.36Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score2.43 / 10
5.9% 4.07
CategoryDug Well Recharge
Started / Completed / Phys594 / 125 / 35
Completion rate26.9%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked1.08Cr / 0.59Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score4.07 / 10
โ€”
78.3% 4.27
CategoryWater conservation & recharge
Started / Completed / Phys98 / 0 / 1
Completion rate1.0%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked19.49Cr / 16.45Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score4.27 / 10
0.6% 2.05
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score2.05 / 10
2.8% 3.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.49Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
220 BAGLI โ†— DEWAS 3.93
44.1% 3.09
CategoryFarm Pond
Started / Completed / Phys420 / 71 / 43
Completion rate27.1%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked9.50Cr / 3.30Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.74 / 5.0
Final score3.09 / 10
4.1% 1.14
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.27Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score1.14 / 10
12.0% 6.76
CategoryDug Well Recharge
Started / Completed / Phys1,317 / 818 / 211
Completion rate78.1%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.77Cr / 0.44Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score6.76 / 10
0.5% 2.95
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score2.95 / 10
33.9% 4.21
CategoryWater conservation & recharge
Started / Completed / Phys171 / 8 / 16
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked8.45Cr / 5.93Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score4.21 / 10
4.3% 4.80
CategoryWatershed Related Works
Started / Completed / Phys35 / 4 / 3
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.87Cr / 0.66Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score4.80 / 10
1.1% 5.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.23Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score5.35 / 10
221 SHAHNAGAR โ†— PANNA 3.93
30.5% 3.62
CategoryFarm Pond
Started / Completed / Phys524 / 64 / 0
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked9.12Cr / 5.50Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score3.62 / 10
4.0% 0.71
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.36Cr / 0.19Cr
Expenditure rate (ongoing)14.2%
Part B score (max 5.0)0.71 / 5.0
Final score0.71 / 10
3.4% 3.60
CategoryDug Well Recharge
Started / Completed / Phys445 / 45 / 0
Completion rate10.1%
Part A score (max 5.0)0.51 / 5.0
Ongoing sanction / booked1.04Cr / 0.64Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score3.60 / 10
0.3% 3.80
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
38.6% 4.21
CategoryWater conservation & recharge
Started / Completed / Phys307 / 7 / 0
Completion rate2.3%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked12.70Cr / 10.41Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.21 / 10
7.1% 4.28
CategoryWatershed Related Works
Started / Completed / Phys48 / 5 / 0
Completion rate10.4%
Part A score (max 5.0)0.52 / 5.0
Ongoing sanction / booked2.07Cr / 1.56Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score4.28 / 10
16.2% 4.55
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 2 / 0
Completion rate3.0%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked5.36Cr / 4.71Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.40 / 5.0
Final score4.55 / 10
222 MEGHNAGAR โ†— JHABUA 3.92
11.1% 3.07
CategoryFarm Pond
Started / Completed / Phys192 / 4 / 0
Completion rate2.1%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked3.59Cr / 2.13Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.97 / 5.0
Final score3.07 / 10
2.2% 3.05
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.45Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score3.05 / 10
5.1% 2.98
CategoryDug Well Recharge
Started / Completed / Phys653 / 31 / 0
Completion rate4.7%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked1.61Cr / 0.88Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score2.98 / 10
0.2% 3.93
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
80.3% 4.11
CategoryWater conservation & recharge
Started / Completed / Phys233 / 3 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked26.21Cr / 21.22Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score4.11 / 10
0.5% 4.47
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.14Cr
Expenditure rate (ongoing)89.5%
Part B score (max 5.0)4.47 / 5.0
Final score4.47 / 10
0.7% 4.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.24Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.84 / 5.0
Final score4.84 / 10
223 GANDHWANI โ†— DHAR 3.92
5.6% 2.65
CategoryFarm Pond
Started / Completed / Phys237 / 3 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked2.28Cr / 1.18Cr
Expenditure rate (ongoing)51.8%
Part B score (max 5.0)2.59 / 5.0
Final score2.65 / 10
โ€”
2.5% 2.27
CategoryDug Well Recharge
Started / Completed / Phys400 / 26 / 0
Completion rate6.5%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked0.97Cr / 0.38Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score2.27 / 10
โ€”
76.0% 4.08
CategoryWater conservation & recharge
Started / Completed / Phys285 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked31.49Cr / 25.72Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.08 / 5.0
Final score4.08 / 10
12.1% 3.94
CategoryWatershed Related Works
Started / Completed / Phys164 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.03Cr / 3.97Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score3.94 / 10
3.8% 3.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 1.11Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score3.53 / 10
224 SEONDHA โ†— DATIA 3.91
52.7% 3.77
CategoryFarm Pond
Started / Completed / Phys296 / 101 / 0
Completion rate34.1%
Part A score (max 5.0)1.71 / 5.0
Ongoing sanction / booked3.96Cr / 1.63Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score3.77 / 10
2.2% 1.63
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.08Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score1.63 / 10
4.2% 7.24
CategoryDug Well Recharge
Started / Completed / Phys181 / 123 / 1
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.15Cr / 0.11Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score7.24 / 10
2.9% 3.79
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.24Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
29.9% 4.03
CategoryWater conservation & recharge
Started / Completed / Phys74 / 7 / 0
Completion rate9.5%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked3.06Cr / 2.17Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score4.03 / 10
4.4% 3.20
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.20 / 5.0
Final score3.20 / 10
3.8% 3.55
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.31Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score3.55 / 10
225 BAJNA โ†— RATLAM 3.91
15.7% 3.60
CategoryFarm Pond
Started / Completed / Phys298 / 74 / 2
Completion rate25.5%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked2.32Cr / 1.08Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score3.60 / 10
7.6% 2.80
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.49Cr / 0.83Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score2.80 / 10
10.4% 4.48
CategoryDug Well Recharge
Started / Completed / Phys796 / 190 / 6
Completion rate24.6%
Part A score (max 5.0)1.23 / 5.0
Ongoing sanction / booked1.54Cr / 1.00Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.48 / 10
โ€”
65.0% 4.04
CategoryWater conservation & recharge
Started / Completed / Phys147 / 6 / 0
Completion rate4.1%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked12.60Cr / 9.68Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score4.04 / 10
1.1% 2.91
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score2.91 / 10
0.2% 1.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)34.9%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
226 BATIYAGARH โ†— DAMOH 3.91
14.3% 5.63
CategoryFarm Pond
Started / Completed / Phys208 / 60 / 40
Completion rate48.1%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked2.64Cr / 1.71Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score5.63 / 10
โ€”
2.5% 5.52
CategoryDug Well Recharge
Started / Completed / Phys336 / 135 / 0
Completion rate40.2%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked0.51Cr / 0.36Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score5.52 / 10
0.3% 4.12
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score4.12 / 10
77.4% 3.55
CategoryWater conservation & recharge
Started / Completed / Phys125 / 1 / 0
Completion rate0.8%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked26.58Cr / 18.65Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score3.55 / 10
3.3% 3.58
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.12Cr / 0.80Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.58 / 5.0
Final score3.58 / 10
2.3% 3.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.61Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
227 KARELI โ†— NARSINGHPUR 3.90
81.6% 3.47
CategoryFarm Pond
Started / Completed / Phys211 / 90 / 11
Completion rate47.9%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked2.86Cr / 0.62Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score3.47 / 10
โ€”
1.3% 5.20
CategoryDug Well Recharge
Started / Completed / Phys37 / 16 / 7
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score5.20 / 10
0.5% 3.02
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score3.02 / 10
13.8% 5.96
CategoryWater conservation & recharge
Started / Completed / Phys34 / 13 / 5
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.46Cr / 0.31Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score5.96 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 5.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 3 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score5.15 / 10
228 RAMPUR BAGHELAN โ†— SATNA 3.89
41.7% 3.61
CategoryFarm Pond
Started / Completed / Phys201 / 12 / 37
Completion rate24.4%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked3.37Cr / 1.61Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.39 / 5.0
Final score3.61 / 10
7.0% 0.47
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.07Cr
Expenditure rate (ongoing)9.3%
Part B score (max 5.0)0.47 / 5.0
Final score0.47 / 10
2.9% 5.10
CategoryDug Well Recharge
Started / Completed / Phys126 / 10 / 15
Completion rate19.8%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked0.25Cr / 0.20Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.11 / 5.0
Final score5.10 / 10
1.3% 4.76
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.11Cr / 0.09Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score4.76 / 10
34.6% 4.66
CategoryWater conservation & recharge
Started / Completed / Phys72 / 3 / 5
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked3.44Cr / 2.82Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.66 / 10
7.0% 3.64
CategoryWatershed Related Works
Started / Completed / Phys15 / 0 / 1
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked0.69Cr / 0.46Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score3.64 / 10
5.5% 4.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 2 / 2
Completion rate23.5%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked0.51Cr / 0.39Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score4.94 / 10
229 KHIRKIYA โ†— HARDA 3.88
35.1% 3.13
CategoryFarm Pond
Started / Completed / Phys99 / 16 / 0
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked2.01Cr / 0.93Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score3.13 / 10
2.7% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
10.2% 6.66
CategoryDug Well Recharge
Started / Completed / Phys263 / 116 / 55
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score6.66 / 10
20.8% 4.30
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 1 / 1
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked1.27Cr / 0.93Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score4.30 / 10
14.3% 3.29
CategoryWater conservation & recharge
Started / Completed / Phys23 / 1 / 0
Completion rate4.3%
Part A score (max 5.0)0.22 / 5.0
Ongoing sanction / booked0.90Cr / 0.56Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score3.29 / 10
3.0% 3.76
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.20Cr / 0.11Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score3.76 / 10
13.9% 4.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 0
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked0.90Cr / 0.75Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.50 / 10
230 BHABRA โ†— ALIRAJPUR 3.88
15.2% 3.24
CategoryFarm Pond
Started / Completed / Phys120 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.41Cr / 2.21Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
2.2% 3.03
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.29Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
4.8% 3.78
CategoryDug Well Recharge
Started / Completed / Phys414 / 2 / 0
Completion rate0.5%
Part A score (max 5.0)0.02 / 5.0
Ongoing sanction / booked1.07Cr / 0.80Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score3.78 / 10
โ€”
76.4% 4.04
CategoryWater conservation & recharge
Started / Completed / Phys90 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked17.12Cr / 13.85Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
1.4% 3.64
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.23Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score3.64 / 10
0.0% 4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)85.1%
Part B score (max 5.0)4.26 / 5.0
Final score4.26 / 10
231 NARAYANGANJ โ†— MANDLA 3.88
36.2% 4.38
CategoryFarm Pond
Started / Completed / Phys187 / 25 / 25
Completion rate26.7%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked4.71Cr / 2.86Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score4.38 / 10
13.5% 0.36
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.39Cr / 0.17Cr
Expenditure rate (ongoing)7.1%
Part B score (max 5.0)0.36 / 5.0
Final score0.36 / 10
2.3% 6.01
CategoryDug Well Recharge
Started / Completed / Phys155 / 69 / 21
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked0.17Cr / 0.10Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.01 / 10
โ€”
29.0% 4.35
CategoryWater conservation & recharge
Started / Completed / Phys92 / 9 / 0
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked4.78Cr / 3.69Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.86 / 5.0
Final score4.35 / 10
18.6% 4.46
CategoryWatershed Related Works
Started / Completed / Phys72 / 8 / 0
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked2.96Cr / 2.31Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score4.46 / 10
0.4% 3.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
232 PAWAI โ†— PANNA 3.87
41.5% 3.37
CategoryFarm Pond
Started / Completed / Phys479 / 31 / 0
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked12.93Cr / 7.89Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score3.37 / 10
3.3% 3.61
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.10Cr / 0.79Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
4.3% 3.91
CategoryDug Well Recharge
Started / Completed / Phys377 / 51 / 0
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked1.23Cr / 0.80Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.23 / 5.0
Final score3.91 / 10
0.1% 2.17
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score2.17 / 10
37.6% 4.29
CategoryWater conservation & recharge
Started / Completed / Phys341 / 8 / 0
Completion rate2.3%
Part A score (max 5.0)0.12 / 5.0
Ongoing sanction / booked12.20Cr / 10.18Cr
Expenditure rate (ongoing)83.5%
Part B score (max 5.0)4.17 / 5.0
Final score4.29 / 10
1.6% 4.04
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.54Cr / 0.43Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
11.7% 4.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys46 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.85Cr / 3.30Cr
Expenditure rate (ongoing)85.7%
Part B score (max 5.0)4.28 / 5.0
Final score4.28 / 10
233 RITHI โ†— KATNI 3.86
47.1% 2.52
CategoryFarm Pond
Started / Completed / Phys286 / 15 / 29
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked8.85Cr / 3.09Cr
Expenditure rate (ongoing)34.9%
Part B score (max 5.0)1.75 / 5.0
Final score2.52 / 10
2.0% 1.96
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.16Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score1.96 / 10
3.0% 5.18
CategoryDug Well Recharge
Started / Completed / Phys260 / 164 / 50
Completion rate82.3%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.11Cr / 0.02Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.06 / 5.0
Final score5.18 / 10
6.4% 5.89
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 7 / 24
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked0.80Cr / 0.49Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score5.89 / 10
24.1% 4.86
CategoryWater conservation & recharge
Started / Completed / Phys112 / 19 / 21
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked3.34Cr / 2.05Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score4.86 / 10
10.9% 5.61
CategoryWatershed Related Works
Started / Completed / Phys51 / 18 / 10
Completion rate54.9%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked1.14Cr / 0.65Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.87 / 5.0
Final score5.61 / 10
6.7% 4.97
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 4 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.06Cr / 0.70Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score4.97 / 10
234 SAIKHEDA (GADARWARA) โ†— NARSINGHPUR 3.85
79.1% 3.47
CategoryFarm Pond
Started / Completed / Phys207 / 76 / 17
Completion rate44.9%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked2.66Cr / 0.65Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score3.47 / 10
โ€”
2.7% 3.52
CategoryDug Well Recharge
Started / Completed / Phys64 / 26 / 1
Completion rate42.2%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score3.52 / 10
โ€”
16.0% 5.74
CategoryWater conservation & recharge
Started / Completed / Phys21 / 7 / 6
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.39Cr / 0.20Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.64 / 5.0
Final score5.74 / 10
0.5% 4.18
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)83.7%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
1.8% 4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.72 / 5.0
Final score4.22 / 10
235 TENDUKHEDA โ†— DAMOH 3.83
16.5% 4.54
CategoryFarm Pond
Started / Completed / Phys211 / 90 / 0
Completion rate42.7%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked1.72Cr / 0.83Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score4.54 / 10
โ€”
5.2% 5.65
CategoryDug Well Recharge
Started / Completed / Phys354 / 97 / 0
Completion rate27.4%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked0.67Cr / 0.58Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score5.65 / 10
โ€”
51.8% 3.59
CategoryWater conservation & recharge
Started / Completed / Phys88 / 1 / 0
Completion rate1.1%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked9.14Cr / 6.45Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score3.59 / 10
6.8% 3.18
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.77Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score3.18 / 10
19.6% 3.61
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.48Cr / 2.51Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
236 PANNA โ†— PANNA 3.81
42.9% 3.83
CategoryFarm Pond
Started / Completed / Phys327 / 49 / 0
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked5.68Cr / 3.50Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score3.83 / 10
3.7% 1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.13Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
5.4% 3.62
CategoryDug Well Recharge
Started / Completed / Phys328 / 70 / 0
Completion rate21.3%
Part A score (max 5.0)1.07 / 5.0
Ongoing sanction / booked0.68Cr / 0.35Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score3.62 / 10
0.4% 3.40
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score3.40 / 10
26.6% 3.76
CategoryWater conservation & recharge
Started / Completed / Phys114 / 1 / 0
Completion rate0.9%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked4.18Cr / 3.11Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score3.76 / 10
9.2% 4.70
CategoryWatershed Related Works
Started / Completed / Phys47 / 3 / 0
Completion rate6.4%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked1.40Cr / 1.23Cr
Expenditure rate (ongoing)87.5%
Part B score (max 5.0)4.38 / 5.0
Final score4.70 / 10
11.7% 4.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.86Cr / 1.52Cr
Expenditure rate (ongoing)81.9%
Part B score (max 5.0)4.09 / 5.0
Final score4.09 / 10
237 KHATEGAON โ†— DEWAS 3.81
59.4% 2.39
CategoryFarm Pond
Started / Completed / Phys291 / 6 / 49
Completion rate18.9%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked9.82Cr / 2.84Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score2.39 / 10
โ€”
5.4% 3.36
CategoryDug Well Recharge
Started / Completed / Phys428 / 55 / 73
Completion rate29.9%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.78Cr / 0.29Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score3.36 / 10
2.6% 4.79
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.28Cr / 0.18Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score4.79 / 10
31.3% 6.41
CategoryWater conservation & recharge
Started / Completed / Phys132 / 0 / 65
Completion rate49.2%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked3.25Cr / 2.56Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.95 / 5.0
Final score6.41 / 10
1.0% 6.06
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score6.06 / 10
0.3% 4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.18 / 10
238 KALAPIPAL โ†— SHAJAPUR 3.80
52.6% 2.99
CategoryFarm Pond
Started / Completed / Phys150 / 46 / 4
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked2.09Cr / 0.55Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score2.99 / 10
5.5% 0.99
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.07Cr
Expenditure rate (ongoing)19.8%
Part B score (max 5.0)0.99 / 5.0
Final score0.99 / 10
16.1% 5.68
CategoryDug Well Recharge
Started / Completed / Phys400 / 198 / 102
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.93 / 5.0
Final score5.68 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.1% 4.72
CategoryWater conservation & recharge
Started / Completed / Phys40 / 12 / 5
Completion rate42.5%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked1.08Cr / 0.56Cr
Expenditure rate (ongoing)51.8%
Part B score (max 5.0)2.59 / 5.0
Final score4.72 / 10
โ€” โ€”
239 NIWARI โ†— NIWARI 3.80
19.7% 2.19
CategoryFarm Pond
Started / Completed / Phys208 / 8 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked2.84Cr / 1.13Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)1.99 / 5.0
Final score2.19 / 10
1.1% 0.15
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.00Cr
Expenditure rate (ongoing)3.0%
Part B score (max 5.0)0.15 / 5.0
Final score0.15 / 10
8.8% 3.33
CategoryDug Well Recharge
Started / Completed / Phys508 / 70 / 0
Completion rate13.8%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked1.13Cr / 0.60Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score3.33 / 10
โ€”
44.7% 4.31
CategoryWater conservation & recharge
Started / Completed / Phys124 / 5 / 0
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked6.44Cr / 5.29Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.11 / 5.0
Final score4.31 / 10
3.4% 4.12
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.51Cr / 0.42Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score4.12 / 10
22.3% 4.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.32Cr / 3.01Cr
Expenditure rate (ongoing)90.5%
Part B score (max 5.0)4.53 / 5.0
Final score4.53 / 10
240 RANAPUR โ†— JHABUA 3.80
24.9% 1.97
CategoryFarm Pond
Started / Completed / Phys146 / 5 / 1
Completion rate4.1%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked5.13Cr / 1.81Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score1.97 / 10
2.1% 2.01
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.18Cr
Expenditure rate (ongoing)40.3%
Part B score (max 5.0)2.01 / 5.0
Final score2.01 / 10
6.1% 3.78
CategoryDug Well Recharge
Started / Completed / Phys524 / 17 / 79
Completion rate18.3%
Part A score (max 5.0)0.92 / 5.0
Ongoing sanction / booked1.09Cr / 0.62Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.86 / 5.0
Final score3.78 / 10
โ€”
64.1% 4.56
CategoryWater conservation & recharge
Started / Completed / Phys145 / 2 / 15
Completion rate11.7%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked11.91Cr / 9.47Cr
Expenditure rate (ongoing)79.6%
Part B score (max 5.0)3.98 / 5.0
Final score4.56 / 10
2.4% 3.93
CategoryWatershed Related Works
Started / Completed / Phys16 / 0 / 1
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked0.50Cr / 0.36Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.93 / 10
0.2% 3.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 2
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score3.59 / 10
241 TEONTHAR โ†— REWA 3.78
44.0% 3.99
CategoryFarm Pond
Started / Completed / Phys284 / 88 / 23
Completion rate39.1%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked3.55Cr / 1.45Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score3.99 / 10
4.5% 0.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.03Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
1.2% 5.04
CategoryDug Well Recharge
Started / Completed / Phys59 / 19 / 6
Completion rate42.4%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score5.04 / 10
6.8% 5.37
CategoryIrrigation infrastructure
Started / Completed / Phys21 / 2 / 4
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.55Cr / 0.44Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.37 / 10
23.0% 3.91
CategoryWater conservation & recharge
Started / Completed / Phys80 / 7 / 2
Completion rate11.3%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked2.61Cr / 1.75Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score3.91 / 10
11.1% 3.87
CategoryWatershed Related Works
Started / Completed / Phys29 / 0 / 6
Completion rate20.7%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked1.35Cr / 0.76Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score3.87 / 10
9.4% 2.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.19Cr / 0.66Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score2.76 / 10
242 UDAIGARH โ†— ALIRAJPUR 3.77
15.5% 2.88
CategoryFarm Pond
Started / Completed / Phys177 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.69Cr / 1.55Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score2.88 / 10
3.6% 3.22
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.41Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score3.22 / 10
6.4% 3.32
CategoryDug Well Recharge
Started / Completed / Phys432 / 11 / 4
Completion rate3.5%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked1.08Cr / 0.68Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.32 / 10
โ€”
69.7% 4.04
CategoryWater conservation & recharge
Started / Completed / Phys66 / 0 / 3
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked11.99Cr / 9.14Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score4.04 / 10
4.8% 3.78
CategoryWatershed Related Works
Started / Completed / Phys22 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.83Cr / 0.63Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score3.78 / 10
โ€”
243 KARKELI โ†— UMARIA 3.77
24.6% 3.52
CategoryFarm Pond
Started / Completed / Phys313 / 27 / 0
Completion rate8.6%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked9.73Cr / 6.02Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score3.52 / 10
1.7% 3.19
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.47Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score3.19 / 10
2.6% 4.08
CategoryDug Well Recharge
Started / Completed / Phys441 / 67 / 0
Completion rate15.2%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked0.97Cr / 0.64Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.32 / 5.0
Final score4.08 / 10
0.1% 3.40
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score3.40 / 10
57.1% 3.87
CategoryWater conservation & recharge
Started / Completed / Phys267 / 5 / 1
Completion rate2.2%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked24.22Cr / 18.19Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score3.87 / 10
5.6% 4.03
CategoryWatershed Related Works
Started / Completed / Phys30 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.42Cr / 1.95Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.03 / 5.0
Final score4.03 / 10
8.3% 3.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys58 / 1 / 0
Completion rate1.7%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked3.54Cr / 2.53Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score3.66 / 10
244 LAUNDI โ†— CHHATARPUR 3.76
52.6% 3.26
CategoryFarm Pond
Started / Completed / Phys221 / 68 / 5
Completion rate33.0%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked5.73Cr / 1.84Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score3.26 / 10
1.1% 2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
7.5% 5.46
CategoryDug Well Recharge
Started / Completed / Phys476 / 187 / 24
Completion rate44.3%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.69Cr / 0.45Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score5.46 / 10
โ€”
30.9% 4.28
CategoryWater conservation & recharge
Started / Completed / Phys89 / 4 / 1
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked4.85Cr / 3.88Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score4.28 / 10
2.2% 3.40
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.25Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score3.40 / 10
5.7% 3.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.94Cr / 0.70Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score3.75 / 10
245 KUKSHI โ†— DHAR 3.74
6.0% 2.35
CategoryFarm Pond
Started / Completed / Phys130 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.92Cr / 0.90Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.35 / 5.0
Final score2.35 / 10
โ€”
1.5% 2.16
CategoryDug Well Recharge
Started / Completed / Phys184 / 0 / 7
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked0.46Cr / 0.18Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.97 / 5.0
Final score2.16 / 10
0.2% 1.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
87.1% 3.87
CategoryWater conservation & recharge
Started / Completed / Phys260 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked27.90Cr / 21.62Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.87 / 5.0
Final score3.87 / 10
3.0% 3.47
CategoryWatershed Related Works
Started / Completed / Phys36 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.97Cr / 0.67Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
2.2% 3.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.56Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.86 / 5.0
Final score3.86 / 10
246 HANUMANA โ†— REWA 3.74
42.8% 2.52
CategoryFarm Pond
Started / Completed / Phys317 / 46 / 0
Completion rate14.5%
Part A score (max 5.0)0.73 / 5.0
Ongoing sanction / booked8.93Cr / 3.21Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score2.52 / 10
0.8% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.7% 3.54
CategoryDug Well Recharge
Started / Completed / Phys62 / 11 / 0
Completion rate17.7%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score3.54 / 10
3.8% 5.50
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 5 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.44Cr / 0.27Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score5.50 / 10
28.6% 4.75
CategoryWater conservation & recharge
Started / Completed / Phys139 / 38 / 2
Completion rate28.8%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked4.92Cr / 3.26Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score4.75 / 10
11.9% 5.04
CategoryWatershed Related Works
Started / Completed / Phys16 / 5 / 0
Completion rate31.3%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked2.11Cr / 1.47Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score5.04 / 10
11.5% 4.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 6 / 1
Completion rate24.1%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked1.93Cr / 1.11Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score4.09 / 10
247 MANAWAR โ†— DHAR 3.72
18.6% 3.04
CategoryFarm Pond
Started / Completed / Phys234 / 9 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked3.25Cr / 1.85Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.85 / 5.0
Final score3.04 / 10
โ€”
5.4% 3.49
CategoryDug Well Recharge
Started / Completed / Phys386 / 29 / 0
Completion rate7.5%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked0.92Cr / 0.57Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score3.49 / 10
1.4% 4.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.24Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.84 / 5.0
Final score4.84 / 10
56.9% 4.00
CategoryWater conservation & recharge
Started / Completed / Phys128 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.41Cr / 8.34Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.00 / 5.0
Final score4.00 / 10
16.0% 3.52
CategoryWatershed Related Works
Started / Completed / Phys76 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.92Cr / 2.05Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
1.7% 3.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.21Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score3.29 / 10
248 PHANDA โ†— BHOPAL 3.71
45.5% 3.13
CategoryFarm Pond
Started / Completed / Phys157 / 20 / 0
Completion rate12.7%
Part A score (max 5.0)0.64 / 5.0
Ongoing sanction / booked2.57Cr / 1.28Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score3.13 / 10
2.9% 2.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score2.09 / 10
5.4% 4.17
CategoryDug Well Recharge
Started / Completed / Phys127 / 22 / 0
Completion rate17.3%
Part A score (max 5.0)0.87 / 5.0
Ongoing sanction / booked0.27Cr / 0.18Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score4.17 / 10
โ€”
32.7% 4.47
CategoryWater conservation & recharge
Started / Completed / Phys49 / 10 / 0
Completion rate20.4%
Part A score (max 5.0)1.02 / 5.0
Ongoing sanction / booked1.59Cr / 1.09Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score4.47 / 10
11.2% 4.34
CategoryWatershed Related Works
Started / Completed / Phys17 / 2 / 0
Completion rate11.8%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked0.67Cr / 0.51Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score4.34 / 10
2.4% 2.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score2.10 / 10
249 SARDARPUR โ†— DHAR 3.69
16.7% 2.41
CategoryFarm Pond
Started / Completed / Phys353 / 18 / 0
Completion rate5.1%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked8.41Cr / 3.63Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score2.41 / 10
โ€”
2.4% 2.55
CategoryDug Well Recharge
Started / Completed / Phys489 / 54 / 0
Completion rate11.0%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked1.13Cr / 0.45Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)2.00 / 5.0
Final score2.55 / 10
0.6% 2.62
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.17Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score2.62 / 10
74.0% 4.00
CategoryWater conservation & recharge
Started / Completed / Phys335 / 3 / 0
Completion rate0.9%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked39.41Cr / 31.15Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score4.00 / 10
2.8% 3.62
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.48Cr / 1.07Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
3.5% 4.42
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 0
Completion rate4.8%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked1.76Cr / 1.48Cr
Expenditure rate (ongoing)83.7%
Part B score (max 5.0)4.18 / 5.0
Final score4.42 / 10
250 GUNOR โ†— PANNA 3.69
38.0% 3.22
CategoryFarm Pond
Started / Completed / Phys449 / 63 / 0
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked6.83Cr / 3.44Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.52 / 5.0
Final score3.22 / 10
โ€”
3.4% 3.63
CategoryDug Well Recharge
Started / Completed / Phys274 / 88 / 0
Completion rate32.1%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked0.48Cr / 0.20Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score3.63 / 10
0.5% 3.32
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.32 / 10
40.9% 3.94
CategoryWater conservation & recharge
Started / Completed / Phys200 / 5 / 0
Completion rate2.5%
Part A score (max 5.0)0.13 / 5.0
Ongoing sanction / booked8.41Cr / 6.41Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score3.94 / 10
5.0% 3.77
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 0
Completion rate4.8%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked1.01Cr / 0.71Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score3.77 / 10
12.2% 4.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys34 / 3 / 0
Completion rate8.8%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked2.31Cr / 1.80Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score4.33 / 10
251 BADA MALEHARA โ†— CHHATARPUR 3.68
46.6% 3.42
CategoryFarm Pond
Started / Completed / Phys290 / 106 / 0
Completion rate36.6%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked6.13Cr / 1.95Cr
Expenditure rate (ongoing)31.8%
Part B score (max 5.0)1.59 / 5.0
Final score3.42 / 10
10.7% 2.50
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.11Cr / 1.06Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score2.50 / 10
5.3% 6.17
CategoryDug Well Recharge
Started / Completed / Phys703 / 615 / 0
Completion rate87.5%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score6.17 / 10
1.1% 2.34
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.10Cr
Expenditure rate (ongoing)46.8%
Part B score (max 5.0)2.34 / 5.0
Final score2.34 / 10
27.2% 4.21
CategoryWater conservation & recharge
Started / Completed / Phys145 / 19 / 0
Completion rate13.1%
Part A score (max 5.0)0.66 / 5.0
Ongoing sanction / booked4.72Cr / 3.36Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score4.21 / 10
4.6% 3.29
CategoryWatershed Related Works
Started / Completed / Phys29 / 1 / 0
Completion rate3.4%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked0.83Cr / 0.52Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score3.29 / 10
4.4% 3.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.87Cr / 0.67Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
252 MOMAN BADODIYA โ†— SHAJAPUR 3.68
51.2% 2.68
CategoryFarm Pond
Started / Completed / Phys192 / 41 / 5
Completion rate24.0%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked3.67Cr / 1.09Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score2.68 / 10
3.9% 2.80
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.20Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score2.80 / 10
12.0% 5.86
CategoryDug Well Recharge
Started / Completed / Phys444 / 39 / 273
Completion rate70.3%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score5.86 / 10
1.0% 5.47
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score5.47 / 10
28.4% 4.16
CategoryWater conservation & recharge
Started / Completed / Phys68 / 3 / 11
Completion rate20.6%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked1.96Cr / 1.22Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score4.16 / 10
1.7% 4.38
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score4.38 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
253 DAHI โ†— DHAR 3.67
8.8% 3.20
CategoryFarm Pond
Started / Completed / Phys160 / 1 / 0
Completion rate0.6%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked2.30Cr / 1.46Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score3.20 / 10
โ€”
2.5% 1.94
CategoryDug Well Recharge
Started / Completed / Phys256 / 6 / 0
Completion rate2.3%
Part A score (max 5.0)0.12 / 5.0
Ongoing sanction / booked0.65Cr / 0.24Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.83 / 5.0
Final score1.94 / 10
โ€”
81.3% 3.79
CategoryWater conservation & recharge
Started / Completed / Phys279 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked21.25Cr / 16.11Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
5.5% 3.46
CategoryWatershed Related Works
Started / Completed / Phys27 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.43Cr / 0.99Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score3.46 / 10
1.8% 3.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.37Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
254 HATTA โ†— DAMOH 3.66
20.8% 2.37
CategoryFarm Pond
Started / Completed / Phys175 / 6 / 0
Completion rate3.4%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked3.44Cr / 1.51Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score2.37 / 10
โ€”
2.1% 3.69
CategoryDug Well Recharge
Started / Completed / Phys141 / 7 / 0
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked0.35Cr / 0.24Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score3.69 / 10
โ€”
53.5% 4.10
CategoryWater conservation & recharge
Started / Completed / Phys96 / 4 / 0
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked9.05Cr / 7.04Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score4.10 / 10
17.2% 3.91
CategoryWatershed Related Works
Started / Completed / Phys43 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.95Cr / 2.31Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score3.91 / 10
6.3% 3.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.08Cr / 0.77Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score3.56 / 10
255 PALI โ†— UMARIA 3.66
37.9% 3.50
CategoryFarm Pond
Started / Completed / Phys164 / 3 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked6.34Cr / 4.32Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score3.50 / 10
1.1% 3.24
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
3.4% 3.14
CategoryDug Well Recharge
Started / Completed / Phys224 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.36Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
โ€”
45.0% 3.86
CategoryWater conservation & recharge
Started / Completed / Phys86 / 1 / 0
Completion rate1.2%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked7.52Cr / 5.72Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score3.86 / 10
8.9% 3.30
CategoryWatershed Related Works
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.52Cr / 1.00Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score3.30 / 10
3.7% 4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.53Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score4.26 / 10
256 DHANAURA โ†— SEONI 3.63
40.1% 3.30
CategoryFarm Pond
Started / Completed / Phys374 / 93 / 1
Completion rate25.1%
Part A score (max 5.0)1.26 / 5.0
Ongoing sanction / booked6.84Cr / 2.80Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score3.30 / 10
1.8% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
2.1% 6.52
CategoryDug Well Recharge
Started / Completed / Phys201 / 105 / 0
Completion rate52.2%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked0.24Cr / 0.19Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score6.52 / 10
โ€”
31.6% 3.80
CategoryWater conservation & recharge
Started / Completed / Phys116 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked7.17Cr / 5.44Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
16.3% 4.02
CategoryWatershed Related Works
Started / Completed / Phys37 / 2 / 0
Completion rate5.4%
Part A score (max 5.0)0.27 / 5.0
Ongoing sanction / booked3.46Cr / 2.60Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score4.02 / 10
8.1% 3.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.85Cr / 1.43Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score3.88 / 10
257 JABALPUR โ†— JABALPUR 3.63
45.5% 2.19
CategoryFarm Pond
Started / Completed / Phys177 / 29 / 12
Completion rate23.2%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked3.32Cr / 0.69Cr
Expenditure rate (ongoing)20.7%
Part B score (max 5.0)1.04 / 5.0
Final score2.19 / 10
11.1% 1.27
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.26Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score1.27 / 10
6.4% 6.29
CategoryDug Well Recharge
Started / Completed / Phys230 / 108 / 40
Completion rate64.3%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.21Cr / 0.13Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score6.29 / 10
0.2% 2.26
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score2.26 / 10
22.3% 5.13
CategoryWater conservation & recharge
Started / Completed / Phys47 / 8 / 15
Completion rate48.9%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked0.77Cr / 0.41Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score5.13 / 10
7.3% 6.61
CategoryWatershed Related Works
Started / Completed / Phys13 / 8 / 2
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score6.61 / 10
7.1% 6.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 11 / 3
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.28Cr / 0.12Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score6.45 / 10
258 KUNDAM โ†— JABALPUR 3.62
56.5% 2.24
CategoryFarm Pond
Started / Completed / Phys268 / 14 / 24
Completion rate14.2%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked8.43Cr / 2.58Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score2.24 / 10
9.3% 1.37
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 0.44Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.37 / 5.0
Final score1.37 / 10
4.0% 6.61
CategoryDug Well Recharge
Started / Completed / Phys266 / 103 / 134
Completion rate89.1%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score6.61 / 10
โ€”
22.7% 6.70
CategoryWater conservation & recharge
Started / Completed / Phys95 / 32 / 36
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked1.26Cr / 0.78Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score6.70 / 10
7.5% 5.84
CategoryWatershed Related Works
Started / Completed / Phys42 / 19 / 7
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.50Cr / 0.28Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score5.84 / 10
โ€”
259 JAITHARI โ†— ANUPPUR 3.60
85.9% 3.32
CategoryFarm Pond
Started / Completed / Phys1,067 / 465 / 58
Completion rate49.0%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked17.08Cr / 2.97Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score3.32 / 10
โ€”
1.1% 4.22
CategoryDug Well Recharge
Started / Completed / Phys173 / 37 / 36
Completion rate42.2%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.24Cr / 0.10Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.22 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.0% 6.03
CategoryWater conservation & recharge
Started / Completed / Phys69 / 20 / 24
Completion rate63.8%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked1.42Cr / 0.81Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.85 / 5.0
Final score6.03 / 10
0.3% 6.20
CategoryWatershed Related Works
Started / Completed / Phys5 / 2 / 1
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score6.20 / 10
3.6% 3.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 3 / 1
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.10Cr / 0.56Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.55 / 5.0
Final score3.67 / 10
260 SHUJALPUR โ†— SHAJAPUR 3.60
47.7% 2.80
CategoryFarm Pond
Started / Completed / Phys107 / 24 / 0
Completion rate22.4%
Part A score (max 5.0)1.12 / 5.0
Ongoing sanction / booked2.69Cr / 0.90Cr
Expenditure rate (ongoing)33.5%
Part B score (max 5.0)1.68 / 5.0
Final score2.80 / 10
2.1% 2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
12.6% 5.04
CategoryDug Well Recharge
Started / Completed / Phys371 / 99 / 132
Completion rate62.3%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked0.33Cr / 0.13Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score5.04 / 10
1.3% 2.28
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.28 / 5.0
Final score2.28 / 10
35.3% 4.30
CategoryWater conservation & recharge
Started / Completed / Phys50 / 4 / 7
Completion rate22.0%
Part A score (max 5.0)1.10 / 5.0
Ongoing sanction / booked2.32Cr / 1.48Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.20 / 5.0
Final score4.30 / 10
0.4% 4.28
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score4.28 / 10
0.6% 2.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score2.35 / 10
261 MANDSAUR โ†— MANDSAUR 3.60
26.6% 1.32
CategoryFarm Pond
Started / Completed / Phys230 / 7 / 1
Completion rate3.5%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked2.75Cr / 0.63Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score1.32 / 10
โ€”
24.0% 4.41
CategoryDug Well Recharge
Started / Completed / Phys991 / 199 / 289
Completion rate49.2%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked1.30Cr / 0.51Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.94 / 5.0
Final score4.41 / 10
โ€”
47.8% 4.39
CategoryWater conservation & recharge
Started / Completed / Phys150 / 21 / 25
Completion rate30.7%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked4.14Cr / 2.37Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score4.39 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.3% 4.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score4.65 / 10
262 SITAMAU โ†— MANDSAUR 3.60
23.0% 2.40
CategoryFarm Pond
Started / Completed / Phys333 / 14 / 1
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked5.79Cr / 2.52Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score2.40 / 10
โ€”
10.6% 4.09
CategoryDug Well Recharge
Started / Completed / Phys1,066 / 75 / 31
Completion rate9.9%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked2.49Cr / 1.78Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score4.09 / 10
0.5% 3.85
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
60.2% 3.92
CategoryWater conservation & recharge
Started / Completed / Phys360 / 10 / 0
Completion rate2.8%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked15.63Cr / 11.81Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score3.92 / 10
2.5% 4.09
CategoryWatershed Related Works
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.54Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.09 / 5.0
Final score4.09 / 10
3.1% 4.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.82Cr / 0.67Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score4.09 / 10
263 MAUGANJ โ†— REWA 3.59
48.7% 3.17
CategoryFarm Pond
Started / Completed / Phys255 / 66 / 0
Completion rate25.9%
Part A score (max 5.0)1.29 / 5.0
Ongoing sanction / booked3.65Cr / 1.37Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score3.17 / 10
โ€”
1.6% 2.94
CategoryDug Well Recharge
Started / Completed / Phys61 / 7 / 0
Completion rate11.5%
Part A score (max 5.0)0.57 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score2.94 / 10
4.4% 2.98
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.26Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score2.98 / 10
35.4% 4.13
CategoryWater conservation & recharge
Started / Completed / Phys70 / 11 / 0
Completion rate15.7%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked2.74Cr / 1.83Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score4.13 / 10
4.5% 3.26
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.45Cr / 0.29Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score3.26 / 10
5.5% 4.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 5 / 0
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked0.27Cr / 0.15Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score4.81 / 10
264 GOHAD โ†— BHIND 3.59
19.5% 2.75
CategoryFarm Pond
Started / Completed / Phys224 / 30 / 0
Completion rate13.4%
Part A score (max 5.0)0.67 / 5.0
Ongoing sanction / booked5.18Cr / 2.16Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.08 / 5.0
Final score2.75 / 10
1.0% 0.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
0.3% 3.70
CategoryDug Well Recharge
Started / Completed / Phys31 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.70 / 5.0
Final score3.70 / 10
15.9% 3.94
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.81Cr / 3.78Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score3.94 / 10
55.8% 3.85
CategoryWater conservation & recharge
Started / Completed / Phys152 / 1 / 0
Completion rate0.7%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked16.77Cr / 12.79Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.81 / 5.0
Final score3.85 / 10
6.3% 3.60
CategoryWatershed Related Works
Started / Completed / Phys19 / 1 / 0
Completion rate5.3%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked1.84Cr / 1.23Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.60 / 10
1.2% 3.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.23Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score3.26 / 10
265 JAORA โ†— RATLAM 3.58
52.2% 2.78
CategoryFarm Pond
Started / Completed / Phys160 / 26 / 0
Completion rate16.3%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked5.33Cr / 2.10Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score2.78 / 10
9.8% 3.85
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.91Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
10.2% 4.41
CategoryDug Well Recharge
Started / Completed / Phys470 / 61 / 20
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked1.01Cr / 0.72Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score4.41 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.2% 4.23
CategoryWater conservation & recharge
Started / Completed / Phys80 / 8 / 12
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked2.20Cr / 1.31Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score4.23 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 8.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)92.5%
Part B score (max 5.0)4.62 / 5.0
Final score8.37 / 10
266 SHIVPURI โ†— SHIVPURI 3.57
50.1% 3.12
CategoryFarm Pond
Started / Completed / Phys254 / 46 / 4
Completion rate19.7%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked8.97Cr / 3.83Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score3.12 / 10
1.3% 2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
3.1% 5.05
CategoryDug Well Recharge
Started / Completed / Phys269 / 118 / 5
Completion rate45.7%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked0.38Cr / 0.21Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score5.05 / 10
โ€”
41.2% 3.96
CategoryWater conservation & recharge
Started / Completed / Phys123 / 2 / 0
Completion rate1.6%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked9.12Cr / 7.08Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score3.96 / 10
2.1% 4.46
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.41Cr
Expenditure rate (ongoing)89.2%
Part B score (max 5.0)4.46 / 5.0
Final score4.46 / 10
2.2% 4.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.45Cr
Expenditure rate (ongoing)92.5%
Part B score (max 5.0)4.63 / 5.0
Final score4.63 / 10
267 ALIRAJPUR โ†— ALIRAJPUR 3.57
23.6% 1.98
CategoryFarm Pond
Started / Completed / Phys186 / 1 / 0
Completion rate0.5%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked4.87Cr / 1.91Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score1.98 / 10
2.4% 3.21
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score3.21 / 10
7.9% 3.45
CategoryDug Well Recharge
Started / Completed / Phys638 / 31 / 0
Completion rate4.9%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked1.57Cr / 1.01Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score3.45 / 10
โ€”
65.3% 4.17
CategoryWater conservation & recharge
Started / Completed / Phys140 / 1 / 0
Completion rate0.7%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked13.58Cr / 11.24Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.17 / 10
0.7% 3.38
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score3.38 / 10
0.1% 4.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score4.23 / 10
268 PICHHORE โ†— SHIVPURI 3.57
40.1% 3.48
CategoryFarm Pond
Started / Completed / Phys230 / 59 / 0
Completion rate25.7%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked3.50Cr / 1.54Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score3.48 / 10
1.7% 2.32
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.09Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.32 / 5.0
Final score2.32 / 10
4.8% 3.93
CategoryDug Well Recharge
Started / Completed / Phys219 / 69 / 0
Completion rate31.5%
Part A score (max 5.0)1.58 / 5.0
Ongoing sanction / booked0.38Cr / 0.18Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score3.93 / 10
2.2% 4.77
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.24Cr
Expenditure rate (ongoing)95.3%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
37.3% 3.56
CategoryWater conservation & recharge
Started / Completed / Phys85 / 5 / 0
Completion rate5.9%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked4.10Cr / 2.67Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score3.56 / 10
8.7% 3.99
CategoryWatershed Related Works
Started / Completed / Phys17 / 2 / 0
Completion rate11.8%
Part A score (max 5.0)0.59 / 5.0
Ongoing sanction / booked0.91Cr / 0.62Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score3.99 / 10
5.2% 3.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.39Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score3.22 / 10
269 SEONI MALWA โ†— NARMADAPURAM 3.56
66.4% 2.38
CategoryFarm Pond
Started / Completed / Phys194 / 51 / 2
Completion rate27.3%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked3.77Cr / 0.76Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score2.38 / 10
โ€”
6.8% 5.38
CategoryDug Well Recharge
Started / Completed / Phys205 / 54 / 74
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.38 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
23.1% 5.73
CategoryWater conservation & recharge
Started / Completed / Phys58 / 25 / 7
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked0.94Cr / 0.56Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score5.73 / 10
1.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 6 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 5.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.78 / 5.0
Final score5.54 / 10
270 DATIA โ†— DATIA 3.56
36.1% 2.65
CategoryFarm Pond
Started / Completed / Phys412 / 57 / 25
Completion rate19.9%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked6.77Cr / 2.24Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score2.65 / 10
โ€”
3.3% 4.38
CategoryDug Well Recharge
Started / Completed / Phys301 / 29 / 67
Completion rate31.9%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked0.53Cr / 0.30Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score4.38 / 10
1.9% 5.80
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 6 / 2
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.24Cr / 0.17Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score5.80 / 10
47.4% 4.03
CategoryWater conservation & recharge
Started / Completed / Phys184 / 13 / 29
Completion rate22.8%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked8.44Cr / 4.88Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score4.03 / 10
5.7% 3.29
CategoryWatershed Related Works
Started / Completed / Phys30 / 0 / 2
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked1.24Cr / 0.73Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score3.29 / 10
5.6% 4.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 2 / 4
Completion rate23.1%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked1.02Cr / 0.67Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score4.43 / 10
271 AMARPATAN โ†— SATNA 3.55
48.1% 1.75
CategoryFarm Pond
Started / Completed / Phys74 / 0 / 7
Completion rate9.5%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked1.68Cr / 0.43Cr
Expenditure rate (ongoing)25.6%
Part B score (max 5.0)1.28 / 5.0
Final score1.75 / 10
โ€”
5.9% 5.00
CategoryDug Well Recharge
Started / Completed / Phys99 / 11 / 56
Completion rate67.7%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score5.00 / 10
โ€”
41.0% 5.44
CategoryWater conservation & recharge
Started / Completed / Phys31 / 1 / 14
Completion rate48.4%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked0.71Cr / 0.43Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score5.44 / 10
โ€”
4.9% 3.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.83 / 5.0
Final score3.66 / 10
272 NAGOD โ†— SATNA 3.54
43.1% 2.97
CategoryFarm Pond
Started / Completed / Phys363 / 46 / 0
Completion rate12.7%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked6.06Cr / 2.83Cr
Expenditure rate (ongoing)46.7%
Part B score (max 5.0)2.33 / 5.0
Final score2.97 / 10
2.5% 0.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.04Cr
Expenditure rate (ongoing)9.8%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
3.0% 4.16
CategoryDug Well Recharge
Started / Completed / Phys190 / 7 / 2
Completion rate4.7%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked0.46Cr / 0.36Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score4.16 / 10
1.5% 2.95
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.14Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score2.95 / 10
37.5% 3.95
CategoryWater conservation & recharge
Started / Completed / Phys136 / 8 / 0
Completion rate5.9%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked5.76Cr / 4.21Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score3.95 / 10
3.8% 4.20
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 0
Completion rate4.8%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked0.58Cr / 0.46Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score4.20 / 10
8.5% 5.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 4
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.11Cr / 0.90Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score5.18 / 10
273 PIPLODA โ†— RATLAM 3.54
60.9% 2.71
CategoryFarm Pond
Started / Completed / Phys97 / 29 / 0
Completion rate29.9%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked1.71Cr / 0.42Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score2.71 / 10
โ€”
14.3% 5.07
CategoryDug Well Recharge
Started / Completed / Phys197 / 54 / 0
Completion rate27.4%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked0.37Cr / 0.27Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score5.07 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.8% 4.22
CategoryWater conservation & recharge
Started / Completed / Phys21 / 4 / 1
Completion rate23.8%
Part A score (max 5.0)1.19 / 5.0
Ongoing sanction / booked0.65Cr / 0.39Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score4.22 / 10
1.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
274 KURAI โ†— SEONI 3.53
41.7% 3.31
CategoryFarm Pond
Started / Completed / Phys260 / 15 / 0
Completion rate5.8%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked9.75Cr / 5.89Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score3.31 / 10
4.8% 0.83
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.20Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score0.83 / 10
2.5% 3.94
CategoryDug Well Recharge
Started / Completed / Phys240 / 11 / 0
Completion rate4.6%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked0.59Cr / 0.44Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.72 / 5.0
Final score3.94 / 10
โ€”
38.3% 4.06
CategoryWater conservation & recharge
Started / Completed / Phys153 / 7 / 0
Completion rate4.6%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked9.08Cr / 6.97Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score4.06 / 10
9.7% 3.64
CategoryWatershed Related Works
Started / Completed / Phys47 / 1 / 0
Completion rate2.1%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked2.36Cr / 1.67Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score3.64 / 10
2.8% 3.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.49Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
275 RAIPUR KARCHULIYAN โ†— REWA 3.52
52.2% 2.80
CategoryFarm Pond
Started / Completed / Phys314 / 81 / 34
Completion rate36.6%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked2.40Cr / 0.46Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.97 / 5.0
Final score2.80 / 10
9.4% 0.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.03Cr
Expenditure rate (ongoing)4.0%
Part B score (max 5.0)0.20 / 5.0
Final score0.20 / 10
3.1% 4.69
CategoryDug Well Recharge
Started / Completed / Phys87 / 52 / 9
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score4.69 / 10
2.5% 5.71
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 4 / 3
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score5.71 / 10
25.6% 5.61
CategoryWater conservation & recharge
Started / Completed / Phys50 / 17 / 9
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.83Cr / 0.50Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score5.61 / 10
4.5% 4.93
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.60 / 5.0
Final score4.93 / 10
2.8% 3.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.8%
Part B score (max 5.0)2.24 / 5.0
Final score3.49 / 10
276 CHANCHODA โ†— GUNA 3.51
35.0% 1.97
CategoryFarm Pond
Started / Completed / Phys412 / 55 / 8
Completion rate15.3%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked7.20Cr / 1.74Cr
Expenditure rate (ongoing)24.2%
Part B score (max 5.0)1.21 / 5.0
Final score1.97 / 10
โ€”
9.8% 6.11
CategoryDug Well Recharge
Started / Completed / Phys931 / 523 / 295
Completion rate87.9%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.29Cr / 0.10Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score6.11 / 10
0.6% 4.47
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score4.47 / 10
47.2% 4.10
CategoryWater conservation & recharge
Started / Completed / Phys204 / 21 / 12
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked10.08Cr / 6.63Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score4.10 / 10
0.6% 2.73
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score2.73 / 10
6.9% 3.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 0 / 1
Completion rate3.7%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked1.54Cr / 1.03Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score3.53 / 10
277 KARERA โ†— SHIVPURI 3.51
43.5% 2.91
CategoryFarm Pond
Started / Completed / Phys224 / 27 / 2
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked6.12Cr / 2.77Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score2.91 / 10
โ€”
3.3% 3.94
CategoryDug Well Recharge
Started / Completed / Phys210 / 41 / 0
Completion rate19.5%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked0.43Cr / 0.26Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score3.94 / 10
1.3% 3.65
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.15Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.65 / 10
27.4% 3.86
CategoryWater conservation & recharge
Started / Completed / Phys98 / 5 / 0
Completion rate5.1%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked4.24Cr / 3.06Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score3.86 / 10
23.3% 4.17
CategoryWatershed Related Works
Started / Completed / Phys37 / 4 / 0
Completion rate10.8%
Part A score (max 5.0)0.54 / 5.0
Ongoing sanction / booked3.21Cr / 2.33Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score4.17 / 10
1.2% 2.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.11Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score2.84 / 10
278 SAILANA โ†— RATLAM 3.50
24.0% 3.12
CategoryFarm Pond
Started / Completed / Phys210 / 44 / 0
Completion rate21.0%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked2.47Cr / 1.03Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score3.12 / 10
10.1% 1.73
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.43Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score1.73 / 10
7.4% 4.67
CategoryDug Well Recharge
Started / Completed / Phys345 / 55 / 0
Completion rate15.9%
Part A score (max 5.0)0.80 / 5.0
Ongoing sanction / booked0.75Cr / 0.58Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score4.67 / 10
โ€”
53.4% 3.85
CategoryWater conservation & recharge
Started / Completed / Phys73 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked6.45Cr / 4.88Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score3.85 / 10
0.2% 2.24
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score2.24 / 10
4.9% 3.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.41Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
279 SHAHGARH โ†— SAGAR 3.49
53.6% 2.18
CategoryFarm Pond
Started / Completed / Phys163 / 29 / 0
Completion rate17.8%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked2.01Cr / 0.52Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score2.18 / 10
โ€”
12.3% 4.39
CategoryDug Well Recharge
Started / Completed / Phys221 / 90 / 46
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.22Cr / 0.06Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score4.39 / 10
1.1% 4.42
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)88.4%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
21.6% 5.43
CategoryWater conservation & recharge
Started / Completed / Phys32 / 12 / 0
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.82Cr / 0.58Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score5.43 / 10
9.1% 5.44
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score5.44 / 10
2.3% 2.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score2.57 / 10
280 MANPUR โ†— UMARIA 3.44
26.7% 2.73
CategoryFarm Pond
Started / Completed / Phys435 / 35 / 0
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked7.31Cr / 3.40Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score2.73 / 10
2.7% 2.33
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.36Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score2.33 / 10
4.1% 2.40
CategoryDug Well Recharge
Started / Completed / Phys446 / 30 / 0
Completion rate6.7%
Part A score (max 5.0)0.34 / 5.0
Ongoing sanction / booked1.10Cr / 0.46Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.06 / 5.0
Final score2.40 / 10
0.0% 4.67
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)93.5%
Part B score (max 5.0)4.67 / 5.0
Final score4.67 / 10
51.3% 3.86
CategoryWater conservation & recharge
Started / Completed / Phys355 / 4 / 0
Completion rate1.1%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked14.93Cr / 11.35Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.86 / 10
8.4% 3.93
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.46Cr / 1.93Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
6.9% 3.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.01Cr / 1.43Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score3.57 / 10
281 KARAHAL โ†— SHEOPUR 3.43
33.7% 3.06
CategoryFarm Pond
Started / Completed / Phys229 / 47 / 0
Completion rate20.5%
Part A score (max 5.0)1.03 / 5.0
Ongoing sanction / booked6.84Cr / 2.78Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score3.06 / 10
3.9% 0.54
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.10Cr
Expenditure rate (ongoing)10.7%
Part B score (max 5.0)0.54 / 5.0
Final score0.54 / 10
0.3% 3.63
CategoryDug Well Recharge
Started / Completed / Phys28 / 12 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score3.63 / 10
3.6% 4.47
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.80Cr
Expenditure rate (ongoing)89.4%
Part B score (max 5.0)4.47 / 5.0
Final score4.47 / 10
52.5% 3.75
CategoryWater conservation & recharge
Started / Completed / Phys111 / 2 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked12.75Cr / 9.33Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score3.75 / 10
1.8% 3.67
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.32Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score3.67 / 10
4.2% 4.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.83Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score4.04 / 10
282 DEPALPUR โ†— INDORE 3.41
53.1% 2.11
CategoryFarm Pond
Started / Completed / Phys194 / 2 / 11
Completion rate6.7%
Part A score (max 5.0)0.34 / 5.0
Ongoing sanction / booked5.32Cr / 1.88Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score2.11 / 10
1.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
7.1% 3.33
CategoryDug Well Recharge
Started / Completed / Phys292 / 33 / 56
Completion rate30.5%
Part A score (max 5.0)1.52 / 5.0
Ongoing sanction / booked0.52Cr / 0.19Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.80 / 5.0
Final score3.33 / 10
โ€”
13.8% 4.86
CategoryWater conservation & recharge
Started / Completed / Phys43 / 7 / 9
Completion rate37.2%
Part A score (max 5.0)1.86 / 5.0
Ongoing sanction / booked0.84Cr / 0.50Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score4.86 / 10
18.4% 5.46
CategoryWatershed Related Works
Started / Completed / Phys41 / 8 / 10
Completion rate43.9%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked1.09Cr / 0.71Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score5.46 / 10
6.4% 5.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 2 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.17Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.43 / 5.0
Final score5.93 / 10
283 JHABUA โ†— JHABUA 3.38
20.2% 2.65
CategoryFarm Pond
Started / Completed / Phys211 / 2 / 0
Completion rate0.9%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked5.58Cr / 2.90Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score2.65 / 10
0.9% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
6.7% 4.34
CategoryDug Well Recharge
Started / Completed / Phys731 / 162 / 0
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.48Cr / 0.95Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score4.34 / 10
โ€”
71.9% 3.53
CategoryWater conservation & recharge
Started / Completed / Phys308 / 4 / 1
Completion rate1.6%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked19.04Cr / 13.15Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.45 / 5.0
Final score3.53 / 10
โ€”
0.4% 3.61
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
284 BEOHARI โ†— SHAHDOL 3.37
53.1% 2.16
CategoryFarm Pond
Started / Completed / Phys351 / 69 / 0
Completion rate19.7%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked6.78Cr / 1.60Cr
Expenditure rate (ongoing)23.6%
Part B score (max 5.0)1.18 / 5.0
Final score2.16 / 10
โ€”
1.8% 2.16
CategoryDug Well Recharge
Started / Completed / Phys114 / 12 / 0
Completion rate10.5%
Part A score (max 5.0)0.53 / 5.0
Ongoing sanction / booked0.26Cr / 0.09Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.64 / 5.0
Final score2.16 / 10
18.5% 5.59
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked2.26Cr / 2.15Cr
Expenditure rate (ongoing)95.1%
Part B score (max 5.0)4.75 / 5.0
Final score5.59 / 10
12.8% 4.41
CategoryWater conservation & recharge
Started / Completed / Phys56 / 11 / 0
Completion rate19.6%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked1.83Cr / 1.25Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score4.41 / 10
7.3% 4.50
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.67Cr / 0.44Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.50 / 10
6.6% 3.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 1 / 0
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked0.94Cr / 0.70Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score3.99 / 10
285 GAURIHAR โ†— CHHATARPUR 3.36
51.8% 3.15
CategoryFarm Pond
Started / Completed / Phys201 / 63 / 4
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked5.10Cr / 1.52Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score3.15 / 10
3.4% 0.75
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.08Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score0.75 / 10
5.6% 4.73
CategoryDug Well Recharge
Started / Completed / Phys439 / 270 / 4
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked0.33Cr / 0.11Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.61 / 5.0
Final score4.73 / 10
0.5% 3.90
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
35.4% 3.60
CategoryWater conservation & recharge
Started / Completed / Phys130 / 6 / 9
Completion rate11.5%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked4.39Cr / 2.65Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score3.60 / 10
0.5% 1.61
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score1.61 / 10
2.8% 4.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score4.76 / 10
286 MHOW โ†— INDORE 3.35
61.0% 2.73
CategoryFarm Pond
Started / Completed / Phys272 / 74 / 8
Completion rate30.1%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked5.16Cr / 1.26Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.23 / 5.0
Final score2.73 / 10
12.6% 2.27
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.53Cr / 0.70Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score2.27 / 10
7.2% 4.58
CategoryDug Well Recharge
Started / Completed / Phys323 / 225 / 3
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.27Cr / 0.06Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.05 / 5.0
Final score4.58 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.2% 5.89
CategoryWater conservation & recharge
Started / Completed / Phys40 / 10 / 8
Completion rate45.0%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked1.11Cr / 0.80Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score5.89 / 10
3.2% 3.24
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.25Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
1.6% 6.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 1
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.59 / 10
287 AGAR โ†— AGAR-MALWA 3.34
31.1% 1.94
CategoryFarm Pond
Started / Completed / Phys177 / 2 / 0
Completion rate1.1%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked3.94Cr / 1.49Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.89 / 5.0
Final score1.94 / 10
โ€”
11.0% 3.58
CategoryDug Well Recharge
Started / Completed / Phys535 / 50 / 0
Completion rate9.3%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked1.27Cr / 0.79Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score3.58 / 10
0.6% 1.82
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)36.4%
Part B score (max 5.0)1.82 / 5.0
Final score1.82 / 10
39.2% 4.02
CategoryWater conservation & recharge
Started / Completed / Phys72 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked4.85Cr / 3.83Cr
Expenditure rate (ongoing)79.0%
Part B score (max 5.0)3.95 / 5.0
Final score4.02 / 10
6.8% 3.76
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.65Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score3.76 / 10
11.4% 4.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 1 / 0
Completion rate2.7%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked1.42Cr / 1.21Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score4.40 / 10
288 LAKHNADON โ†— SEONI 3.30
48.8% 2.85
CategoryFarm Pond
Started / Completed / Phys982 / 159 / 0
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked16.29Cr / 6.65Cr
Expenditure rate (ongoing)40.8%
Part B score (max 5.0)2.04 / 5.0
Final score2.85 / 10
โ€”
2.5% 3.21
CategoryDug Well Recharge
Started / Completed / Phys391 / 106 / 0
Completion rate27.1%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.73Cr / 0.27Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score3.21 / 10
1.1% 4.68
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.25Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.68 / 10
38.7% 3.72
CategoryWater conservation & recharge
Started / Completed / Phys401 / 26 / 0
Completion rate6.5%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked14.62Cr / 9.92Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.39 / 5.0
Final score3.72 / 10
4.0% 3.85
CategoryWatershed Related Works
Started / Completed / Phys34 / 1 / 0
Completion rate2.9%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked1.51Cr / 1.12Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.71 / 5.0
Final score3.85 / 10
4.9% 3.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys36 / 2 / 0
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked1.82Cr / 1.31Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score3.88 / 10
289 NAIGARHI โ†— REWA 3.30
53.0% 2.43
CategoryFarm Pond
Started / Completed / Phys201 / 19 / 5
Completion rate11.9%
Part A score (max 5.0)0.60 / 5.0
Ongoing sanction / booked6.71Cr / 2.45Cr
Expenditure rate (ongoing)36.6%
Part B score (max 5.0)1.83 / 5.0
Final score2.43 / 10
โ€”
0.6% 3.69
CategoryDug Well Recharge
Started / Completed / Phys44 / 5 / 14
Completion rate43.2%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.53 / 5.0
Final score3.69 / 10
0.5% 3.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
30.8% 4.43
CategoryWater conservation & recharge
Started / Completed / Phys91 / 15 / 3
Completion rate19.8%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked3.68Cr / 2.53Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score4.43 / 10
7.1% 3.61
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.02Cr / 0.73Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
7.9% 4.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 4 / 0
Completion rate19.0%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked0.90Cr / 0.63Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score4.45 / 10
290 KANNOD โ†— DEWAS 3.30
55.1% 2.08
CategoryFarm Pond
Started / Completed / Phys233 / 31 / 6
Completion rate15.9%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked7.90Cr / 2.03Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.29 / 5.0
Final score2.08 / 10
2.3% 2.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.18Cr
Expenditure rate (ongoing)46.0%
Part B score (max 5.0)2.30 / 5.0
Final score2.30 / 10
10.3% 4.75
CategoryDug Well Recharge
Started / Completed / Phys676 / 228 / 129
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked0.83Cr / 0.35Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.75 / 10
10.9% 4.77
CategoryIrrigation infrastructure
Started / Completed / Phys34 / 6 / 6
Completion rate35.3%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked1.14Cr / 0.68Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score4.77 / 10
19.1% 5.23
CategoryWater conservation & recharge
Started / Completed / Phys68 / 14 / 17
Completion rate45.6%
Part A score (max 5.0)2.28 / 5.0
Ongoing sanction / booked2.07Cr / 1.22Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score5.23 / 10
1.9% 3.86
CategoryWatershed Related Works
Started / Completed / Phys16 / 1 / 0
Completion rate6.3%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked0.22Cr / 0.15Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score3.86 / 10
0.3% 4.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.16 / 5.0
Final score4.16 / 10
291 MEHGAON โ†— BHIND 3.30
13.9% 1.74
CategoryFarm Pond
Started / Completed / Phys298 / 19 / 0
Completion rate6.4%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked3.87Cr / 1.10Cr
Expenditure rate (ongoing)28.5%
Part B score (max 5.0)1.43 / 5.0
Final score1.74 / 10
3.2% 1.08
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.21Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.08 / 5.0
Final score1.08 / 10
0.3% 3.13
CategoryDug Well Recharge
Started / Completed / Phys28 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
12.2% 3.47
CategoryIrrigation infrastructure
Started / Completed / Phys78 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.63Cr / 2.53Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score3.47 / 10
56.9% 3.65
CategoryWater conservation & recharge
Started / Completed / Phys183 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked16.92Cr / 12.34Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.65 / 10
9.7% 3.90
CategoryWatershed Related Works
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.88Cr / 2.25Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
3.8% 3.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.79Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
292 DHAR โ†— DHAR 3.29
60.3% 3.18
CategoryFarm Pond
Started / Completed / Phys138 / 1 / 0
Completion rate0.7%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked4.09Cr / 2.57Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.18 / 10
โ€”
0.7% 3.10
CategoryDug Well Recharge
Started / Completed / Phys18 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score3.10 / 10
2.6% 2.68
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score2.68 / 10
23.8% 3.59
CategoryWater conservation & recharge
Started / Completed / Phys43 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.63Cr / 1.17Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score3.59 / 10
12.0% 3.38
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.82Cr / 0.56Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score3.38 / 10
0.6% 4.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score4.11 / 10
293 ATER โ†— BHIND 3.27
14.5% 2.64
CategoryFarm Pond
Started / Completed / Phys228 / 45 / 0
Completion rate19.7%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked3.04Cr / 1.01Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score2.64 / 10
2.6% 0.18
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.02Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.18 / 5.0
Final score0.18 / 10
0.3% 3.02
CategoryDug Well Recharge
Started / Completed / Phys25 / 2 / 0
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)52.5%
Part B score (max 5.0)2.62 / 5.0
Final score3.02 / 10
0.4% 3.82
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score3.82 / 10
62.7% 3.57
CategoryWater conservation & recharge
Started / Completed / Phys226 / 5 / 0
Completion rate2.2%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked15.95Cr / 11.05Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score3.57 / 10
12.6% 3.00
CategoryWatershed Related Works
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.22Cr / 1.93Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score3.00 / 10
7.0% 3.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 1 / 0
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked1.69Cr / 1.12Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score3.52 / 10
294 RAMNAGAR โ†— SATNA 3.27
85.1% 2.69
CategoryFarm Pond
Started / Completed / Phys220 / 15 / 0
Completion rate6.8%
Part A score (max 5.0)0.34 / 5.0
Ongoing sanction / booked3.66Cr / 1.72Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.35 / 5.0
Final score2.69 / 10
โ€”
6.3% 8.16
CategoryDug Well Recharge
Started / Completed / Phys110 / 0 / 84
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)86.9%
Part B score (max 5.0)4.34 / 5.0
Final score8.16 / 10
0.3% 5.85
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score5.85 / 10
5.9% 4.94
CategoryWater conservation & recharge
Started / Completed / Phys14 / 0 / 2
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.26Cr / 0.22Cr
Expenditure rate (ongoing)84.5%
Part B score (max 5.0)4.23 / 5.0
Final score4.94 / 10
1.5% 4.31
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.31 / 5.0
Final score4.31 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
295 BABAI CHICHLI โ†— NARSINGHPUR 3.26
86.7% 2.99
CategoryFarm Pond
Started / Completed / Phys210 / 83 / 0
Completion rate39.5%
Part A score (max 5.0)1.98 / 5.0
Ongoing sanction / booked3.74Cr / 0.76Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score2.99 / 10
โ€”
2.0% 4.40
CategoryDug Well Recharge
Started / Completed / Phys53 / 24 / 5
Completion rate54.7%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score4.40 / 10
โ€”
8.9% 5.28
CategoryWater conservation & recharge
Started / Completed / Phys16 / 7 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.31Cr / 0.17Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score5.28 / 10
โ€”
2.4% 4.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.58 / 5.0
Final score4.91 / 10
296 UNCHAHARA โ†— SATNA 3.16
39.9% 1.95
CategoryFarm Pond
Started / Completed / Phys269 / 8 / 19
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked4.88Cr / 1.42Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score1.95 / 10
โ€”
2.2% 4.43
CategoryDug Well Recharge
Started / Completed / Phys114 / 6 / 8
Completion rate12.3%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked0.26Cr / 0.20Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score4.43 / 10
โ€”
30.7% 3.94
CategoryWater conservation & recharge
Started / Completed / Phys91 / 0 / 9
Completion rate9.9%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked3.78Cr / 2.61Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.94 / 10
3.0% 3.56
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.28Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score3.56 / 10
24.2% 4.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.20Cr / 2.57Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score4.01 / 10
297 RAMPUR NAIKIN โ†— SIDHI 3.15
42.7% 1.98
CategoryFarm Pond
Started / Completed / Phys306 / 48 / 4
Completion rate17.0%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked4.82Cr / 1.09Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.13 / 5.0
Final score1.98 / 10
โ€”
1.4% 2.07
CategoryDug Well Recharge
Started / Completed / Phys73 / 8 / 0
Completion rate11.0%
Part A score (max 5.0)0.55 / 5.0
Ongoing sanction / booked0.17Cr / 0.05Cr
Expenditure rate (ongoing)30.4%
Part B score (max 5.0)1.52 / 5.0
Final score2.07 / 10
3.0% 3.96
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.39Cr / 0.25Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.96 / 10
38.2% 3.92
CategoryWater conservation & recharge
Started / Completed / Phys123 / 23 / 1
Completion rate19.5%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked4.33Cr / 2.55Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score3.92 / 10
1.9% 5.65
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.16Cr / 0.14Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.40 / 5.0
Final score5.65 / 10
12.7% 4.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 4 / 0
Completion rate14.8%
Part A score (max 5.0)0.74 / 5.0
Ongoing sanction / booked1.42Cr / 1.02Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.60 / 5.0
Final score4.34 / 10
298 RON โ†— BHIND 3.13
14.0% 1.69
CategoryFarm Pond
Started / Completed / Phys88 / 7 / 0
Completion rate8.0%
Part A score (max 5.0)0.40 / 5.0
Ongoing sanction / booked1.22Cr / 0.32Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.30 / 5.0
Final score1.69 / 10
5.6% 1.95
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.21Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score1.95 / 10
0.2% 2.94
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score2.94 / 10
4.8% 3.45
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score3.45 / 10
60.3% 3.40
CategoryWater conservation & recharge
Started / Completed / Phys59 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.71Cr / 3.88Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score3.40 / 10
7.7% 3.83
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.56Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score3.83 / 10
7.5% 3.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.71Cr / 0.50Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score3.53 / 10
299 SOHAGPUR โ†— SHAHDOL 3.12
48.6% 2.16
CategoryFarm Pond
Started / Completed / Phys508 / 95 / 5
Completion rate19.7%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked9.46Cr / 2.22Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score2.16 / 10
1.1% 2.78
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score2.78 / 10
1.1% 4.91
CategoryDug Well Recharge
Started / Completed / Phys98 / 20 / 30
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score4.91 / 10
1.3% 3.41
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.20Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score3.41 / 10
41.2% 4.13
CategoryWater conservation & recharge
Started / Completed / Phys87 / 3 / 5
Completion rate9.2%
Part A score (max 5.0)0.46 / 5.0
Ongoing sanction / booked8.84Cr / 6.50Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.13 / 10
0.9% 3.37
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
5.9% 3.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 0 / 2
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.29Cr / 0.82Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score3.54 / 10
300 CHAWARPATHA โ†— NARSINGHPUR 3.10
78.7% 3.22
CategoryFarm Pond
Started / Completed / Phys245 / 93 / 0
Completion rate38.0%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked3.50Cr / 0.92Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score3.22 / 10
4.8% 0.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.4%
Part B score (max 5.0)0.02 / 5.0
Final score0.02 / 10
1.8% 4.67
CategoryDug Well Recharge
Started / Completed / Phys53 / 2 / 27
Completion rate54.7%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score4.67 / 10
0.4% 2.51
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score2.51 / 10
10.8% 3.36
CategoryWater conservation & recharge
Started / Completed / Phys24 / 2 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked0.76Cr / 0.45Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score3.36 / 10
1.5% 3.50
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.50 / 5.0
Final score3.50 / 10
1.9% 2.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.51 / 5.0
Final score2.51 / 10
301 KAHNAPAS(GHANSAUR) โ†— SEONI 3.08
52.0% 2.72
CategoryFarm Pond
Started / Completed / Phys499 / 87 / 0
Completion rate17.4%
Part A score (max 5.0)0.87 / 5.0
Ongoing sanction / booked9.70Cr / 3.59Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score2.72 / 10
โ€”
2.6% 2.59
CategoryDug Well Recharge
Started / Completed / Phys226 / 56 / 0
Completion rate24.8%
Part A score (max 5.0)1.24 / 5.0
Ongoing sanction / booked0.44Cr / 0.12Cr
Expenditure rate (ongoing)27.0%
Part B score (max 5.0)1.35 / 5.0
Final score2.59 / 10
โ€”
41.4% 3.51
CategoryWater conservation & recharge
Started / Completed / Phys185 / 5 / 0
Completion rate2.7%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked9.04Cr / 6.10Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score3.51 / 10
2.2% 3.76
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.37Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score3.76 / 10
1.8% 3.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.41Cr / 0.29Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score3.58 / 10
302 NASRULLAGANJ โ†— SEHORE 3.08
58.0% 1.50
CategoryFarm Pond
Started / Completed / Phys178 / 1 / 15
Completion rate9.0%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked4.33Cr / 0.91Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.05 / 5.0
Final score1.50 / 10
โ€”
15.5% 5.16
CategoryDug Well Recharge
Started / Completed / Phys489 / 41 / 246
Completion rate58.7%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked0.52Cr / 0.23Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score5.16 / 10
1.1% 3.54
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.87 / 5.0
Final score3.54 / 10
18.2% 5.17
CategoryWater conservation & recharge
Started / Completed / Phys45 / 6 / 12
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.82Cr / 0.52Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.17 / 5.0
Final score5.17 / 10
1.5% 5.69
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score5.69 / 10
5.6% 6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.08Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.82 / 5.0
Final score6.16 / 10
303 REWA โ†— REWA 3.05
79.5% 2.88
CategoryFarm Pond
Started / Completed / Phys233 / 69 / 0
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.47Cr / 0.69Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score2.88 / 10
8.7% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 14 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 1.99
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score1.99 / 10
9.3% 6.07
CategoryWater conservation & recharge
Started / Completed / Phys21 / 16 / 0
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.12Cr / 0.05Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score6.07 / 10
0.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 7.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)91.2%
Part B score (max 5.0)4.56 / 5.0
Final score7.89 / 10
304 LAHAR โ†— BHIND 3.05
24.6% 1.70
CategoryFarm Pond
Started / Completed / Phys146 / 9 / 0
Completion rate6.2%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked2.19Cr / 0.61Cr
Expenditure rate (ongoing)27.8%
Part B score (max 5.0)1.39 / 5.0
Final score1.70 / 10
2.9% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.5% 3.42
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
4.6% 2.53
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.22Cr
Expenditure rate (ongoing)50.6%
Part B score (max 5.0)2.53 / 5.0
Final score2.53 / 10
58.2% 3.73
CategoryWater conservation & recharge
Started / Completed / Phys58 / 1 / 0
Completion rate1.7%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked5.46Cr / 3.98Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.64 / 5.0
Final score3.73 / 10
4.1% 3.14
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.24Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
5.2% 3.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.38Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score3.94 / 10
305 NOWGOAN โ†— CHHATARPUR 3.05
79.6% 2.61
CategoryFarm Pond
Started / Completed / Phys267 / 97 / 0
Completion rate36.3%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked5.61Cr / 0.89Cr
Expenditure rate (ongoing)15.8%
Part B score (max 5.0)0.79 / 5.0
Final score2.61 / 10
โ€”
6.3% 4.69
CategoryDug Well Recharge
Started / Completed / Phys466 / 358 / 0
Completion rate76.8%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.16Cr / 0.03Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score4.69 / 10
โ€”
11.5% 4.75
CategoryWater conservation & recharge
Started / Completed / Phys55 / 9 / 0
Completion rate16.4%
Part A score (max 5.0)0.82 / 5.0
Ongoing sanction / booked1.01Cr / 0.80Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score4.75 / 10
1.8% 5.04
CategoryWatershed Related Works
Started / Completed / Phys9 / 1 / 0
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked0.16Cr / 0.14Cr
Expenditure rate (ongoing)89.7%
Part B score (max 5.0)4.49 / 5.0
Final score5.04 / 10
0.8% 4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.09Cr
Expenditure rate (ongoing)99.2%
Part B score (max 5.0)4.96 / 5.0
Final score4.96 / 10
306 NALCHHA โ†— DHAR 3.01
36.9% 2.41
CategoryFarm Pond
Started / Completed / Phys165 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.38Cr / 2.11Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score2.41 / 10
โ€”
7.8% 2.67
CategoryDug Well Recharge
Started / Completed / Phys351 / 3 / 0
Completion rate0.9%
Part A score (max 5.0)0.04 / 5.0
Ongoing sanction / booked0.92Cr / 0.48Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score2.67 / 10
1.0% 3.50
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score3.50 / 10
45.0% 3.52
CategoryWater conservation & recharge
Started / Completed / Phys100 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.34Cr / 3.76Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
5.6% 3.34
CategoryWatershed Related Works
Started / Completed / Phys26 / 1 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked0.66Cr / 0.42Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score3.34 / 10
3.7% 2.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.25Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score2.88 / 10
307 NARSIMHAPUR โ†— NARSINGHPUR 3.01
59.9% 3.01
CategoryFarm Pond
Started / Completed / Phys253 / 80 / 1
Completion rate32.0%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked5.17Cr / 1.45Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score3.01 / 10
9.4% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.22Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
1.3% 3.12
CategoryDug Well Recharge
Started / Completed / Phys65 / 5 / 0
Completion rate7.7%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score3.12 / 10
โ€”
28.4% 4.01
CategoryWater conservation & recharge
Started / Completed / Phys32 / 4 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked3.58Cr / 2.42Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score4.01 / 10
0.8% 2.55
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.55 / 5.0
Final score2.55 / 10
0.3% 3.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
308 BALDEOGARH โ†— TIKAMGARH 2.95
29.6% 2.11
CategoryFarm Pond
Started / Completed / Phys242 / 5 / 0
Completion rate2.1%
Part A score (max 5.0)0.10 / 5.0
Ongoing sanction / booked4.45Cr / 1.78Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score2.11 / 10
8.4% 0.13
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.28Cr / 0.03Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
10.2% 3.41
CategoryDug Well Recharge
Started / Completed / Phys612 / 10 / 11
Completion rate3.4%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked1.51Cr / 0.98Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score3.41 / 10
0.6% 4.67
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)93.5%
Part B score (max 5.0)4.67 / 5.0
Final score4.67 / 10
40.5% 3.77
CategoryWater conservation & recharge
Started / Completed / Phys262 / 10 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked6.00Cr / 4.29Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score3.77 / 10
5.6% 3.81
CategoryWatershed Related Works
Started / Completed / Phys31 / 1 / 0
Completion rate3.2%
Part A score (max 5.0)0.16 / 5.0
Ongoing sanction / booked0.85Cr / 0.62Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.81 / 10
5.1% 4.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.62Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score4.02 / 10
309 TIKAMGARH โ†— TIKAMGARH 2.72
30.2% 1.47
CategoryFarm Pond
Started / Completed / Phys200 / 1 / 0
Completion rate0.5%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked4.09Cr / 1.18Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score1.47 / 10
1.3% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
10.8% 2.85
CategoryDug Well Recharge
Started / Completed / Phys567 / 10 / 0
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked1.45Cr / 0.80Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score2.85 / 10
0.1% 3.37
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
41.2% 3.48
CategoryWater conservation & recharge
Started / Completed / Phys167 / 1 / 0
Completion rate0.6%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked5.55Cr / 3.83Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.48 / 10
12.9% 3.31
CategoryWatershed Related Works
Started / Completed / Phys45 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.75Cr / 1.16Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score3.31 / 10
3.5% 3.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.30Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score3.14 / 10
310 MALHARGARH โ†— MANDSAUR 2.51
38.4% 1.49
CategoryFarm Pond
Started / Completed / Phys238 / 3 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked4.90Cr / 1.40Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score1.49 / 10
โ€”
16.4% 3.32
CategoryDug Well Recharge
Started / Completed / Phys811 / 35 / 24
Completion rate7.3%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked1.95Cr / 1.15Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.95 / 5.0
Final score3.32 / 10
โ€”
42.8% 3.06
CategoryWater conservation & recharge
Started / Completed / Phys145 / 0 / 2
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked5.47Cr / 3.27Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score3.06 / 10
1.4% 3.03
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score3.03 / 10
0.9% 4.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.11Cr
Expenditure rate (ongoing)94.7%
Part B score (max 5.0)4.73 / 5.0
Final score4.73 / 10
311 RATLAM โ†— RATLAM 2.44
64.9% 1.67
CategoryFarm Pond
Started / Completed / Phys376 / 9 / 0
Completion rate2.4%
Part A score (max 5.0)0.12 / 5.0
Ongoing sanction / booked13.60Cr / 4.21Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score1.67 / 10
โ€”
3.8% 3.90
CategoryDug Well Recharge
Started / Completed / Phys310 / 19 / 0
Completion rate6.1%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked0.75Cr / 0.54Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score3.90 / 10
0.2% 1.93
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score1.93 / 10
29.5% 3.89
CategoryWater conservation & recharge
Started / Completed / Phys102 / 5 / 0
Completion rate4.9%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked6.06Cr / 4.42Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score3.89 / 10
โ€”
1.6% 3.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score3.78 / 10
312 BHIND โ†— BHIND 2.42
36.2% 2.14
CategoryFarm Pond
Started / Completed / Phys133 / 17 / 0
Completion rate12.8%
Part A score (max 5.0)0.64 / 5.0
Ongoing sanction / booked3.04Cr / 0.91Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.50 / 5.0
Final score2.14 / 10
9.1% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.4% 4.21
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
0.6% 2.53
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score2.53 / 10
40.2% 2.99
CategoryWater conservation & recharge
Started / Completed / Phys58 / 3 / 0
Completion rate5.2%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked3.79Cr / 2.07Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score2.99 / 10
10.2% 2.84
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.00Cr / 0.57Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score2.84 / 10
3.4% 3.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
313 INDORE โ†— INDORE 2.11
42.1% 2.31
CategoryFarm Pond
Started / Completed / Phys64 / 6 / 0
Completion rate9.4%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked0.58Cr / 0.21Cr
Expenditure rate (ongoing)36.9%
Part B score (max 5.0)1.84 / 5.0
Final score2.31 / 10
25.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
13.5% 2.81
CategoryDug Well Recharge
Started / Completed / Phys133 / 43 / 0
Completion rate32.3%
Part A score (max 5.0)1.62 / 5.0
Ongoing sanction / booked0.18Cr / 0.04Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score2.81 / 10
0.6% 4.30
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)86.0%
Part B score (max 5.0)4.30 / 5.0
Final score4.30 / 10
13.9% 4.30
CategoryWater conservation & recharge
Started / Completed / Phys20 / 4 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score4.30 / 10
1.2% 5.56
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)61.2%
Part B score (max 5.0)3.06 / 5.0
Final score5.56 / 10
3.4% 1.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
Scheme: โ‚น Sanction Weighted Level: Block Snapshot: 2026-04-12 Units shown: 313 โšก Weight % shown is each unit's own auto-computed weight โ€” not the global admin-set value.

โš–๏ธ Step 1 โ€” Category Weightage

Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.

Weightage = Sanctioned Cost of Category รท Total Sanctioned Cost (all categories) e.g. Farm Pond = โ‚น200 Cr out of โ‚น500 Cr total Weightage = 200 รท 500 = 0.40 (40%)

Computed independently per unit โ€” two districts with different sanction distributions will have different weightages for the same category.

๐Ÿ…ฐ Step 2a โ€” Part A Score (Completion)

Fixed 50% weight on completion of works.

Part A = (Completed + Phys) รท Started ร— 5

๐Ÿ…ฑ Step 2b โ€” Part B Score (Expenditure)

Fixed 50% weight on expenditure booking on ongoing works.

Part B = (Ongoing Booked รท Ongoing Sanction) ร— 5 If all done โ†’ full 5 marks automatically

๐Ÿ… Step 3 โ€” Ceiling & Model

Category Score = Part A + Part B

๐Ÿ“Š Step 4 โ€” Final Composite Score

Weighted sum of all category scores (weightages sum to 100%).

Final Score = ฮฃ (Weightage_i ร— Score_i)

Example: Farm Pond 40% ร— 7.2 + Dug Well 20% ร— 6.5 + Amrit Sarovar 40% ร— 8.1 โ†’ 7.42

๐Ÿ’ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.
Score Breakup
Sanction cost in โ‚น Crore  ยท  Marks on a scale of 0โ€“10
Sr. Category Sanction Cost
(โ‚น Crore)
Weightage
for Category
Marks Obtained (scale 0โ€“10) Marks as per
Weightage
For Completion
of Works
For Expenditure
Booking on
Running Works
Total