Sanction Cost Weighted mode. Each district's category weight is auto-computed from its own sanction amount proportions. Two units with identical category counts may have different weight distributions.
KHANDWA
7.00
๐Ÿฅ‡
Completed3261 Started9141 Rank#1
UJJAIN
6.34
๐Ÿฅˆ
Completed1526 Started3759 Rank#2
KHARGONE
6.34
๐Ÿฅ‰
Completed1605 Started7202 Rank#3
๐Ÿ“‹ Category Scorecard โ€” District Level
52 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
# District Total Farm Pondโ–ถ Amrit Sarowarโ–ถ Dug Well Rechargeโ–ถ Irrigation infrastructureโ–ถ Water conservation & rechargeโ–ถ Watershed Related Worksโ–ถ Repair & Maintenance (Water Structures)โ–ถ PMKSY: Watershedโ–ถ JSJB 2.0โ–ถ
๐Ÿฅ‡ KHANDWA โ†— 7.00
36.7% 7.16
CategoryFarm Pond
Started / Completed / Phys1,996 / 922 / 884
Completion rate90.5%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked3.97Cr / 2.09Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score7.16 / 10
5.0% 4.21
CategoryAmrit Sarowar
Started / Completed / Phys26 / 3 / 4
Completion rate26.9%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked4.40Cr / 2.52Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.87 / 5.0
Final score4.21 / 10
13.2% 8.21
CategoryDug Well Recharge
Started / Completed / Phys6,136 / 2,170 / 3,701
Completion rate95.7%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.68Cr / 0.47Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score8.21 / 10
1.8% 6.39
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 10 / 12
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.85Cr / 0.52Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score6.39 / 10
25.5% 6.67
CategoryWater conservation & recharge
Started / Completed / Phys711 / 122 / 361
Completion rate67.9%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked15.42Cr / 10.08Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.67 / 10
8.8% 5.90
CategoryWatershed Related Works
Started / Completed / Phys173 / 25 / 71
Completion rate55.5%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked4.83Cr / 3.02Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.12 / 5.0
Final score5.90 / 10
3.5% 6.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 9 / 30
Completion rate59.1%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked1.76Cr / 1.19Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score6.33 / 10
0.4% 4.90
CategoryPMKSY: Watershed
PMKSY Works0 total  (79 done / -79 ongoing)
JGSA Target0.50 Cr
JGSA Valuation0.22 Cr
Expenditure0.15 Cr
% Valuation43.3%
Valuation Marks (40%)1.73
Exp Marks (40%)1.17
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score4.90 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works34,592
Target Works9,141
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
๐Ÿฅˆ UJJAIN โ†— 6.34
36.9% 6.85
CategoryFarm Pond
Started / Completed / Phys647 / 169 / 343
Completion rate79.1%
Part A score (max 5.0)3.96 / 5.0
Ongoing sanction / booked2.72Cr / 1.57Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score6.85 / 10
15.5% 2.33
CategoryAmrit Sarowar
Started / Completed / Phys23 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.71Cr / 2.66Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score2.33 / 10
19.7% 7.68
CategoryDug Well Recharge
Started / Completed / Phys2,838 / 1,276 / 1,337
Completion rate92.1%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.57Cr / 0.35Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score7.68 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.1% 6.51
CategoryWater conservation & recharge
Started / Completed / Phys180 / 53 / 58
Completion rate61.7%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked2.53Cr / 1.73Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score6.51 / 10
4.3% 5.25
CategoryWatershed Related Works
Started / Completed / Phys57 / 23 / 4
Completion rate47.4%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked0.87Cr / 0.50Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.88 / 5.0
Final score5.25 / 10
1.2% 6.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 5
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.17Cr / 0.08Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.37 / 5.0
Final score6.46 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works4,951
Target Works3,759
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
๐Ÿฅ‰ KHARGONE โ†— 6.34
22.4% 5.43
CategoryFarm Pond
Started / Completed / Phys1,858 / 432 / 608
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked15.22Cr / 8.01Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.63 / 5.0
Final score5.43 / 10
4.7% 6.17
CategoryAmrit Sarowar
Started / Completed / Phys28 / 2 / 12
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked3.57Cr / 2.62Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score6.17 / 10
6.5% 7.18
CategoryDug Well Recharge
Started / Completed / Phys3,871 / 972 / 2,017
Completion rate77.2%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked2.25Cr / 1.50Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.32 / 5.0
Final score7.18 / 10
0.5% 7.40
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 7 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score7.40 / 10
55.1% 6.25
CategoryWater conservation & recharge
Started / Completed / Phys1,307 / 163 / 470
Completion rate48.4%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked44.62Cr / 34.19Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score6.25 / 10
3.2% 6.24
CategoryWatershed Related Works
Started / Completed / Phys78 / 14 / 33
Completion rate60.3%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked2.07Cr / 1.34Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score6.24 / 10
2.1% 7.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 15 / 16
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked1.47Cr / 1.26Cr
Expenditure rate (ongoing)86.2%
Part B score (max 5.0)4.31 / 5.0
Final score7.54 / 10
0.5% 5.48
CategoryPMKSY: Watershed
PMKSY Works0 total  (30 done / -30 ongoing)
JGSA Target0.83 Cr
JGSA Valuation0.29 Cr
Expenditure0.44 Cr
% Valuation34.3%
Valuation Marks (40%)1.37
Exp Marks (40%)2.11
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score5.48 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works10,116
Target Works7,202
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
4 DINDORI โ†— 6.24
34.9% 6.20
CategoryFarm Pond
Started / Completed / Phys2,317 / 817 / 1,036
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked14.43Cr / 6.35Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score6.20 / 10
0.6% 3.53
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.75Cr / 0.15Cr
Expenditure rate (ongoing)20.6%
Part B score (max 5.0)1.03 / 5.0
Final score3.53 / 10
2.0% 6.46
CategoryDug Well Recharge
Started / Completed / Phys1,449 / 706 / 732
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score6.46 / 10
0.6% 5.63
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.92Cr / 0.73Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score5.63 / 10
29.1% 6.35
CategoryWater conservation & recharge
Started / Completed / Phys640 / 69 / 244
Completion rate48.9%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked38.94Cr / 30.38Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score6.35 / 10
16.4% 6.82
CategoryWatershed Related Works
Started / Completed / Phys324 / 94 / 122
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked11.61Cr / 8.10Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score6.82 / 10
6.0% 4.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys85 / 20 / 19
Completion rate45.9%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked8.25Cr / 3.47Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.10 / 5.0
Final score4.40 / 10
5.3% 2.99
CategoryPMKSY: Watershed
PMKSY Works0 total  (44 done / -44 ongoing)
JGSA Target10.28 Cr
JGSA Valuation2.56 Cr
Expenditure2.12 Cr
% Valuation24.9%
Valuation Marks (40%)1.00
Exp Marks (40%)0.83
Geotag Marks (10%)0.930
Physical Marks (10%)0.24
Final score2.99 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works73,512
Target Works4,828
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
5 BALAGHAT โ†— 5.53
56.4% 5.41
CategoryFarm Pond
Started / Completed / Phys4,980 / 1,509 / 638
Completion rate43.1%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked75.29Cr / 49.04Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.26 / 5.0
Final score5.41 / 10
2.3% 1.54
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.79Cr / 1.79Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score1.54 / 10
1.5% 6.94
CategoryDug Well Recharge
Started / Completed / Phys1,417 / 623 / 271
Completion rate63.1%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked1.35Cr / 1.02Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.79 / 5.0
Final score6.94 / 10
0.3% 6.26
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 1 / 5
Completion rate35.3%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked0.66Cr / 0.59Cr
Expenditure rate (ongoing)90.0%
Part B score (max 5.0)4.50 / 5.0
Final score6.26 / 10
32.2% 5.40
CategoryWater conservation & recharge
Started / Completed / Phys1,736 / 155 / 319
Completion rate27.3%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked61.18Cr / 49.37Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.04 / 5.0
Final score5.40 / 10
1.3% 5.13
CategoryWatershed Related Works
Started / Completed / Phys68 / 10 / 10
Completion rate29.4%
Part A score (max 5.0)1.47 / 5.0
Ongoing sanction / booked2.18Cr / 1.60Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score5.13 / 10
1.0% 5.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 7 / 6
Completion rate32.5%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked1.74Cr / 1.27Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score5.29 / 10
โ€”
5.0% 9.15
CategoryJSJB 2.0
Total Works7,581
Target Works8,282
Achievement %91.5%
Weightage5% of composite score
Final score9.15 / 10
6 RAJGARH โ†— 5.51
22.4% 5.25
CategoryFarm Pond
Started / Completed / Phys2,290 / 1,328 / 327
Completion rate72.3%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked14.35Cr / 4.69Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.63 / 5.0
Final score5.25 / 10
0.5% 3.44
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.79Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score3.44 / 10
4.2% 7.69
CategoryDug Well Recharge
Started / Completed / Phys3,704 / 2,716 / 690
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.77Cr / 0.47Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score7.69 / 10
1.2% 4.12
CategoryIrrigation infrastructure
Started / Completed / Phys49 / 2 / 4
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked2.48Cr / 1.74Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score4.12 / 10
53.6% 5.29
CategoryWater conservation & recharge
Started / Completed / Phys1,193 / 134 / 137
Completion rate22.7%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked104.39Cr / 86.68Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score5.29 / 10
1.3% 5.16
CategoryWatershed Related Works
Started / Completed / Phys67 / 9 / 8
Completion rate25.4%
Part A score (max 5.0)1.27 / 5.0
Ongoing sanction / booked2.19Cr / 1.71Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.89 / 5.0
Final score5.16 / 10
9.8% 4.95
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys269 / 12 / 41
Completion rate19.7%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked17.71Cr / 14.04Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score4.95 / 10
2.0% 2.73
CategoryPMKSY: Watershed
PMKSY Works0 total  (16 done / -16 ongoing)
JGSA Target4.36 Cr
JGSA Valuation1.41 Cr
Expenditure0.10 Cr
% Valuation32.4%
Valuation Marks (40%)1.30
Exp Marks (40%)0.09
Geotag Marks (10%)0.980
Physical Marks (10%)0.37
Final score2.73 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works26,854
Target Works7,575
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
7 RAISEN โ†— 5.28
57.7% 5.63
CategoryFarm Pond
Started / Completed / Phys2,359 / 813 / 172
Completion rate41.8%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked29.35Cr / 20.78Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score5.63 / 10
2.3% 3.15
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.87Cr / 1.18Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score3.15 / 10
5.3% 7.84
CategoryDug Well Recharge
Started / Completed / Phys1,663 / 1,028 / 186
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked1.16Cr / 0.97Cr
Expenditure rate (ongoing)83.9%
Part B score (max 5.0)4.19 / 5.0
Final score7.84 / 10
1.0% 4.67
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 2 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.54Cr / 0.39Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score4.67 / 10
25.5% 4.10
CategoryWater conservation & recharge
Started / Completed / Phys249 / 17 / 2
Completion rate7.6%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked19.64Cr / 14.61Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score4.10 / 10
2.1% 4.38
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.69Cr / 1.48Cr
Expenditure rate (ongoing)87.5%
Part B score (max 5.0)4.38 / 5.0
Final score4.38 / 10
1.1% 3.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 0
Completion rate6.7%
Part A score (max 5.0)0.33 / 5.0
Ongoing sanction / booked0.87Cr / 0.60Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score3.79 / 10
โ€”
5.0% 6.40
CategoryJSJB 2.0
Total Works2,759
Target Works4,314
Achievement %64.0%
Weightage5% of composite score
Final score6.40 / 10
8 NEEMUCH โ†— 5.28
37.5% 3.73
CategoryFarm Pond
Started / Completed / Phys801 / 67 / 227
Completion rate36.7%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked13.34Cr / 5.05Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score3.73 / 10
3.6% 4.83
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 4
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.64Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score4.83 / 10
9.2% 6.08
CategoryDug Well Recharge
Started / Completed / Phys1,995 / 781 / 584
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked1.63Cr / 0.86Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score6.08 / 10
2.6% 6.12
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 2 / 19
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.42Cr / 0.25Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score6.12 / 10
27.1% 6.36
CategoryWater conservation & recharge
Started / Completed / Phys318 / 13 / 193
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked6.10Cr / 3.80Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score6.36 / 10
0.9% 5.20
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 8
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.25Cr / 0.12Cr
Expenditure rate (ongoing)46.8%
Part B score (max 5.0)2.34 / 5.0
Final score5.20 / 10
2.5% 5.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 3 / 19
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked0.43Cr / 0.25Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score5.92 / 10
11.7% 4.95
CategoryPMKSY: Watershed
PMKSY Works0 total  (13 done / -13 ongoing)
JGSA Target6.58 Cr
JGSA Valuation3.45 Cr
Expenditure1.40 Cr
% Valuation52.5%
Valuation Marks (40%)2.10
Exp Marks (40%)0.85
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score4.95 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works4,083
Target Works3,208
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
9 BETUL โ†— 5.28
20.8% 4.93
CategoryFarm Pond
Started / Completed / Phys1,715 / 75 / 650
Completion rate42.3%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked28.73Cr / 16.17Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score4.93 / 10
3.1% 2.01
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.97Cr / 2.81Cr
Expenditure rate (ongoing)40.3%
Part B score (max 5.0)2.01 / 5.0
Final score2.01 / 10
4.8% 7.43
CategoryDug Well Recharge
Started / Completed / Phys4,167 / 613 / 2,713
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked2.17Cr / 1.49Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score7.43 / 10
0.0% 6.03
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 2 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score6.03 / 10
60.0% 5.02
CategoryWater conservation & recharge
Started / Completed / Phys1,918 / 67 / 439
Completion rate26.4%
Part A score (max 5.0)1.32 / 5.0
Ongoing sanction / booked105.41Cr / 78.06Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.70 / 5.0
Final score5.02 / 10
3.2% 5.30
CategoryWatershed Related Works
Started / Completed / Phys150 / 9 / 43
Completion rate34.7%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked4.86Cr / 3.47Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score5.30 / 10
3.1% 4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys169 / 6 / 36
Completion rate24.9%
Part A score (max 5.0)1.24 / 5.0
Ongoing sanction / booked4.95Cr / 3.68Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.72 / 5.0
Final score4.96 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works10,226
Target Works8,150
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
10 BARWANI โ†— 5.22
27.6% 4.57
CategoryFarm Pond
Started / Completed / Phys1,243 / 52 / 481
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked10.82Cr / 5.26Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score4.57 / 10
2.9% 0.92
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 1
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked1.74Cr / 0.13Cr
Expenditure rate (ongoing)7.3%
Part B score (max 5.0)0.37 / 5.0
Final score0.92 / 10
12.1% 6.60
CategoryDug Well Recharge
Started / Completed / Phys3,160 / 59 / 2,132
Completion rate69.3%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked2.50Cr / 1.56Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score6.60 / 10
0.2% 5.60
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 4 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.60 / 5.0
Final score5.60 / 10
32.9% 4.96
CategoryWater conservation & recharge
Started / Completed / Phys545 / 43 / 130
Completion rate31.7%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked14.44Cr / 9.75Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score4.96 / 10
10.2% 5.53
CategoryWatershed Related Works
Started / Completed / Phys148 / 20 / 57
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked3.48Cr / 2.04Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.93 / 5.0
Final score5.53 / 10
1.2% 4.21
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 2 / 4
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked0.75Cr / 0.49Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score4.21 / 10
7.9% 4.70
CategoryPMKSY: Watershed
PMKSY Works0 total  (51 done / -51 ongoing)
JGSA Target5.32 Cr
JGSA Valuation2.54 Cr
Expenditure1.17 Cr
% Valuation47.7%
Valuation Marks (40%)1.91
Exp Marks (40%)0.88
Geotag Marks (10%)1.000
Physical Marks (10%)0.91
Final score4.70 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works7,258
Target Works5,148
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
11 MANDLA โ†— 5.15
39.1% 5.87
CategoryFarm Pond
Started / Completed / Phys2,041 / 1,111 / 89
Completion rate58.8%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked33.83Cr / 19.79Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.93 / 5.0
Final score5.87 / 10
5.1% 1.06
CategoryAmrit Sarowar
Started / Completed / Phys27 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.55Cr / 2.25Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.06 / 5.0
Final score1.06 / 10
2.2% 5.48
CategoryDug Well Recharge
Started / Completed / Phys1,720 / 588 / 373
Completion rate55.9%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked1.97Cr / 1.06Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score5.48 / 10
6.3% 3.98
CategoryIrrigation infrastructure
Started / Completed / Phys40 / 4 / 2
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked12.70Cr / 8.20Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score3.98 / 10
30.1% 4.94
CategoryWater conservation & recharge
Started / Completed / Phys971 / 165 / 37
Completion rate20.8%
Part A score (max 5.0)1.04 / 5.0
Ongoing sanction / booked53.90Cr / 42.03Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score4.94 / 10
3.8% 4.71
CategoryWatershed Related Works
Started / Completed / Phys192 / 29 / 6
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked6.60Cr / 5.01Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score4.71 / 10
2.8% 4.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 5 / 4
Completion rate13.6%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked5.02Cr / 3.99Cr
Expenditure rate (ongoing)79.6%
Part B score (max 5.0)3.98 / 5.0
Final score4.66 / 10
5.7% 3.58
CategoryPMKSY: Watershed
PMKSY Works0 total  (75 done / -75 ongoing)
JGSA Target11.77 Cr
JGSA Valuation4.19 Cr
Expenditure1.08 Cr
% Valuation35.6%
Valuation Marks (40%)1.42
Exp Marks (40%)0.37
Geotag Marks (10%)1.000
Physical Marks (10%)0.79
Final score3.58 / 10
5.0% 8.75
CategoryJSJB 2.0
Total Works4,425
Target Works5,057
Achievement %87.5%
Weightage5% of composite score
Final score8.75 / 10
12 ASHOK NAGAR โ†— 5.12
41.7% 4.94
CategoryFarm Pond
Started / Completed / Phys1,626 / 285 / 421
Completion rate43.4%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked27.97Cr / 15.46Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score4.94 / 10
1.8% 2.39
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.10Cr / 1.00Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.39 / 5.0
Final score2.39 / 10
1.1% 5.76
CategoryDug Well Recharge
Started / Completed / Phys523 / 206 / 92
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked0.57Cr / 0.33Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.92 / 5.0
Final score5.76 / 10
0.1% 5.25
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score5.25 / 10
40.0% 5.40
CategoryWater conservation & recharge
Started / Completed / Phys938 / 109 / 132
Completion rate25.7%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked35.77Cr / 29.42Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score5.40 / 10
3.3% 5.61
CategoryWatershed Related Works
Started / Completed / Phys39 / 5 / 6
Completion rate28.2%
Part A score (max 5.0)1.41 / 5.0
Ongoing sanction / booked2.82Cr / 2.37Cr
Expenditure rate (ongoing)84.1%
Part B score (max 5.0)4.20 / 5.0
Final score5.61 / 10
1.9% 4.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 3 / 0
Completion rate9.4%
Part A score (max 5.0)0.47 / 5.0
Ongoing sanction / booked1.92Cr / 1.49Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.89 / 5.0
Final score4.36 / 10
5.0% 2.47
CategoryPMKSY: Watershed
PMKSY Works0 total  (9 done / -9 ongoing)
JGSA Target5.91 Cr
JGSA Valuation0.61 Cr
Expenditure0.25 Cr
% Valuation10.3%
Valuation Marks (40%)0.41
Exp Marks (40%)0.17
Geotag Marks (10%)0.890
Physical Marks (10%)0.99
Final score2.47 / 10
5.0% 7.89
CategoryJSJB 2.0
Total Works2,501
Target Works3,170
Achievement %78.9%
Weightage5% of composite score
Final score7.89 / 10
13 NARMADAPURAM โ†— 5.10
40.7% 3.04
CategoryFarm Pond
Started / Completed / Phys794 / 208 / 111
Completion rate40.2%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked11.94Cr / 2.47Cr
Expenditure rate (ongoing)20.7%
Part B score (max 5.0)1.03 / 5.0
Final score3.04 / 10
2.7% 1.29
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.31Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score1.29 / 10
6.0% 5.44
CategoryDug Well Recharge
Started / Completed / Phys1,028 / 400 / 289
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked0.88Cr / 0.37Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.09 / 5.0
Final score5.44 / 10
0.7% 7.05
CategoryIrrigation infrastructure
Started / Completed / Phys42 / 24 / 3
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score7.05 / 10
37.5% 6.77
CategoryWater conservation & recharge
Started / Completed / Phys346 / 147 / 89
Completion rate68.2%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked5.88Cr / 3.95Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score6.77 / 10
1.8% 7.81
CategoryWatershed Related Works
Started / Completed / Phys44 / 24 / 13
Completion rate84.1%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score7.81 / 10
2.7% 5.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 20 / 3
Completion rate65.7%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked0.48Cr / 0.22Cr
Expenditure rate (ongoing)45.8%
Part B score (max 5.0)2.29 / 5.0
Final score5.58 / 10
2.9% 4.18
CategoryPMKSY: Watershed
PMKSY Works0 total  (1 done / -1 ongoing)
JGSA Target1.29 Cr
JGSA Valuation0.51 Cr
Expenditure0.22 Cr
% Valuation39.8%
Valuation Marks (40%)1.59
Exp Marks (40%)0.69
Geotag Marks (10%)0.900
Physical Marks (10%)1.00
Final score4.18 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works2,736
Target Works2,295
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
14 GUNA โ†— 4.95
34.8% 4.16
CategoryFarm Pond
Started / Completed / Phys1,547 / 434 / 179
Completion rate39.6%
Part A score (max 5.0)1.98 / 5.0
Ongoing sanction / booked25.42Cr / 11.09Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score4.16 / 10
โ€”
4.5% 6.41
CategoryDug Well Recharge
Started / Completed / Phys2,206 / 960 / 1,015
Completion rate89.5%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.60Cr / 0.23Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.41 / 10
0.5% 5.29
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.62Cr / 0.56Cr
Expenditure rate (ongoing)89.2%
Part B score (max 5.0)4.46 / 5.0
Final score5.29 / 10
45.0% 5.00
CategoryWater conservation & recharge
Started / Completed / Phys860 / 81 / 126
Completion rate24.1%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked45.49Cr / 34.54Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score5.00 / 10
2.0% 5.11
CategoryWatershed Related Works
Started / Completed / Phys41 / 9 / 4
Completion rate31.7%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked1.80Cr / 1.27Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score5.11 / 10
4.3% 4.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys59 / 2 / 7
Completion rate15.3%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked4.07Cr / 2.89Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score4.31 / 10
3.9% 3.73
CategoryPMKSY: Watershed
PMKSY Works0 total  (47 done / -47 ongoing)
JGSA Target4.98 Cr
JGSA Valuation1.57 Cr
Expenditure0.74 Cr
% Valuation31.6%
Valuation Marks (40%)1.26
Exp Marks (40%)0.59
Geotag Marks (10%)0.910
Physical Marks (10%)0.97
Final score3.73 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works8,105
Target Works4,719
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
15 KATNI โ†— 4.94
30.6% 3.47
CategoryFarm Pond
Started / Completed / Phys1,680 / 316 / 247
Completion rate33.5%
Part A score (max 5.0)1.68 / 5.0
Ongoing sanction / booked25.25Cr / 9.07Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.80 / 5.0
Final score3.47 / 10
2.1% 2.17
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.44Cr / 1.06Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.17 / 5.0
Final score2.17 / 10
3.3% 4.78
CategoryDug Well Recharge
Started / Completed / Phys1,510 / 511 / 350
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked1.68Cr / 0.65Cr
Expenditure rate (ongoing)38.5%
Part B score (max 5.0)1.93 / 5.0
Final score4.78 / 10
14.5% 5.96
CategoryIrrigation infrastructure
Started / Completed / Phys240 / 20 / 87
Completion rate44.6%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked9.75Cr / 7.28Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score5.96 / 10
16.0% 5.33
CategoryWater conservation & recharge
Started / Completed / Phys328 / 43 / 80
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked13.26Cr / 9.17Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score5.33 / 10
17.5% 5.19
CategoryWatershed Related Works
Started / Completed / Phys302 / 55 / 51
Completion rate35.1%
Part A score (max 5.0)1.75 / 5.0
Ongoing sanction / booked13.34Cr / 9.17Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score5.19 / 10
5.7% 5.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 7 / 16
Completion rate30.7%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked4.93Cr / 3.43Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score5.01 / 10
5.4% 4.88
CategoryPMKSY: Watershed
PMKSY Works0 total  (21 done / -21 ongoing)
JGSA Target6.30 Cr
JGSA Valuation4.66 Cr
Expenditure0.02 Cr
% Valuation74.0%
Valuation Marks (40%)2.96
Exp Marks (40%)0.02
Geotag Marks (10%)0.990
Physical Marks (10%)0.92
Final score4.88 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works4,412
Target Works4,147
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
16 BURHANPUR โ†— 4.89
35.7% 5.07
CategoryFarm Pond
Started / Completed / Phys697 / 177 / 130
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked7.68Cr / 4.40Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score5.07 / 10
5.8% 3.51
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.10Cr / 1.47Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
8.4% 7.07
CategoryDug Well Recharge
Started / Completed / Phys1,186 / 406 / 463
Completion rate73.3%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked0.81Cr / 0.55Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score7.07 / 10
0.0% 4.90
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)98.1%
Part B score (max 5.0)4.90 / 5.0
Final score4.90 / 10
39.7% 4.34
CategoryWater conservation & recharge
Started / Completed / Phys287 / 11 / 38
Completion rate17.1%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked11.63Cr / 8.10Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score4.34 / 10
4.0% 4.35
CategoryWatershed Related Works
Started / Completed / Phys35 / 2 / 3
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.25Cr / 0.91Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score4.35 / 10
1.2% 3.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 1
Completion rate7.7%
Part A score (max 5.0)0.38 / 5.0
Ongoing sanction / booked0.42Cr / 0.29Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score3.88 / 10
โ€”
5.0% 6.70
CategoryJSJB 2.0
Total Works1,490
Target Works2,225
Achievement %67.0%
Weightage5% of composite score
Final score6.70 / 10
17 VIDISHA โ†— 4.69
51.3% 4.28
CategoryFarm Pond
Started / Completed / Phys2,032 / 994 / 169
Completion rate57.2%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked22.61Cr / 6.40Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.42 / 5.0
Final score4.28 / 10
2.0% 1.37
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.99Cr / 0.55Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score1.37 / 10
4.4% 6.28
CategoryDug Well Recharge
Started / Completed / Phys1,729 / 558 / 745
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked1.08Cr / 0.54Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score6.28 / 10
0.3% 5.84
CategoryIrrigation infrastructure
Started / Completed / Phys37 / 23 / 1
Completion rate64.9%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score5.84 / 10
29.7% 5.51
CategoryWater conservation & recharge
Started / Completed / Phys848 / 287 / 107
Completion rate46.5%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked18.31Cr / 11.67Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.19 / 5.0
Final score5.51 / 10
0.9% 5.91
CategoryWatershed Related Works
Started / Completed / Phys38 / 16 / 2
Completion rate47.4%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked0.50Cr / 0.35Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score5.91 / 10
1.4% 5.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 13 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.61Cr / 0.37Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score5.58 / 10
5.1% 4.61
CategoryPMKSY: Watershed
PMKSY Works0 total  (4 done / -4 ongoing)
JGSA Target5.13 Cr
JGSA Valuation3.40 Cr
Expenditure0.41 Cr
% Valuation66.2%
Valuation Marks (40%)2.65
Exp Marks (40%)0.32
Geotag Marks (10%)0.960
Physical Marks (10%)0.67
Final score4.61 / 10
5.0% 3.56
CategoryJSJB 2.0
Total Works1,680
Target Works4,722
Achievement %35.6%
Weightage5% of composite score
Final score3.56 / 10
18 HARDA โ†— 4.62
41.1% 2.98
CategoryFarm Pond
Started / Completed / Phys339 / 28 / 58
Completion rate25.4%
Part A score (max 5.0)1.27 / 5.0
Ongoing sanction / booked6.08Cr / 2.09Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.71 / 5.0
Final score2.98 / 10
2.9% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
11.2% 6.36
CategoryDug Well Recharge
Started / Completed / Phys785 / 345 / 231
Completion rate73.4%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.55Cr / 0.30Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.69 / 5.0
Final score6.36 / 10
7.9% 4.99
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 1 / 4
Completion rate26.3%
Part A score (max 5.0)1.32 / 5.0
Ongoing sanction / booked1.27Cr / 0.93Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score4.99 / 10
18.8% 5.64
CategoryWater conservation & recharge
Started / Completed / Phys90 / 2 / 42
Completion rate48.9%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked2.02Cr / 1.29Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.20 / 5.0
Final score5.64 / 10
4.1% 6.06
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 8
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score6.06 / 10
9.0% 5.29
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 2 / 10
Completion rate32.4%
Part A score (max 5.0)1.62 / 5.0
Ongoing sanction / booked1.19Cr / 0.87Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.29 / 10
โ€”
5.0% 10.00
CategoryJSJB 2.0
Total Works2,453
Target Works1,287
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
19 CHHINDWARA โ†— 4.61
26.7% 5.34
CategoryFarm Pond
Started / Completed / Phys2,464 / 703 / 301
Completion rate40.7%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked38.02Cr / 25.14Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score5.34 / 10
3.3% 0.72
CategoryAmrit Sarowar
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked7.27Cr / 1.05Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.72 / 5.0
Final score0.72 / 10
4.8% 6.93
CategoryDug Well Recharge
Started / Completed / Phys4,176 / 1,043 / 1,390
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked4.50Cr / 3.62Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score6.93 / 10
1.0% 4.06
CategoryIrrigation infrastructure
Started / Completed / Phys23 / 0 / 2
Completion rate8.7%
Part A score (max 5.0)0.43 / 5.0
Ongoing sanction / booked2.06Cr / 1.50Cr
Expenditure rate (ongoing)72.6%
Part B score (max 5.0)3.63 / 5.0
Final score4.06 / 10
43.0% 4.36
CategoryWater conservation & recharge
Started / Completed / Phys1,242 / 61 / 37
Completion rate7.9%
Part A score (max 5.0)0.39 / 5.0
Ongoing sanction / booked91.30Cr / 72.48Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score4.36 / 10
9.9% 4.14
CategoryWatershed Related Works
Started / Completed / Phys314 / 22 / 6
Completion rate8.9%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked20.06Cr / 14.81Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score4.14 / 10
2.2% 3.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys61 / 4 / 2
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked4.66Cr / 3.12Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score3.84 / 10
4.0% 4.29
CategoryPMKSY: Watershed
PMKSY Works0 total  (167 done / -167 ongoing)
JGSA Target9.01 Cr
JGSA Valuation3.62 Cr
Expenditure2.42 Cr
% Valuation40.2%
Valuation Marks (40%)1.61
Exp Marks (40%)1.07
Geotag Marks (10%)0.930
Physical Marks (10%)0.67
Final score4.29 / 10
5.0% 4.81
CategoryJSJB 2.0
Total Works3,994
Target Works8,299
Achievement %48.1%
Weightage5% of composite score
Final score4.81 / 10
20 JABALPUR โ†— 4.57
37.7% 2.32
CategoryFarm Pond
Started / Completed / Phys954 / 135 / 66
Completion rate21.1%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked23.14Cr / 5.86Cr
Expenditure rate (ongoing)25.3%
Part B score (max 5.0)1.27 / 5.0
Final score2.32 / 10
6.0% 1.64
CategoryAmrit Sarowar
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.47Cr / 1.46Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.64 / 5.0
Final score1.64 / 10
2.0% 6.08
CategoryDug Well Recharge
Started / Completed / Phys580 / 243 / 187
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.39Cr / 0.18Cr
Expenditure rate (ongoing)47.4%
Part B score (max 5.0)2.37 / 5.0
Final score6.08 / 10
0.2% 5.63
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score5.63 / 10
26.1% 6.54
CategoryWater conservation & recharge
Started / Completed / Phys363 / 141 / 75
Completion rate59.5%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked8.59Cr / 6.13Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.57 / 5.0
Final score6.54 / 10
14.5% 5.63
CategoryWatershed Related Works
Started / Completed / Phys185 / 71 / 20
Completion rate49.2%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked5.79Cr / 3.68Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score5.63 / 10
2.8% 5.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 29 / 9
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.65Cr / 0.27Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score5.90 / 10
5.7% 4.74
CategoryPMKSY: Watershed
PMKSY Works0 total  (5 done / -5 ongoing)
JGSA Target4.23 Cr
JGSA Valuation2.05 Cr
Expenditure1.37 Cr
% Valuation48.4%
Valuation Marks (40%)1.94
Exp Marks (40%)1.29
Geotag Marks (10%)0.760
Physical Marks (10%)0.76
Final score4.74 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works5,579
Target Works2,155
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
21 ANUPPUR โ†— 4.53
68.8% 4.36
CategoryFarm Pond
Started / Completed / Phys3,699 / 2,091 / 274
Completion rate63.9%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked35.63Cr / 8.29Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.16 / 5.0
Final score4.36 / 10
โ€”
0.8% 4.50
CategoryDug Well Recharge
Started / Completed / Phys455 / 109 / 50
Completion rate34.9%
Part A score (max 5.0)1.75 / 5.0
Ongoing sanction / booked0.75Cr / 0.41Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score4.50 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.3% 5.82
CategoryWater conservation & recharge
Started / Completed / Phys389 / 96 / 71
Completion rate42.9%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked13.22Cr / 9.70Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.82 / 10
1.1% 5.54
CategoryWatershed Related Works
Started / Completed / Phys24 / 2 / 5
Completion rate29.2%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked1.39Cr / 1.13Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score5.54 / 10
2.6% 4.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys44 / 5 / 4
Completion rate20.5%
Part A score (max 5.0)1.02 / 5.0
Ongoing sanction / booked2.90Cr / 1.82Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score4.17 / 10
7.1% 2.50
CategoryPMKSY: Watershed
PMKSY Works0 total  (43 done / -43 ongoing)
JGSA Target9.68 Cr
JGSA Valuation1.81 Cr
Expenditure0.21 Cr
% Valuation18.7%
Valuation Marks (40%)0.75
Exp Marks (40%)0.09
Geotag Marks (10%)1.000
Physical Marks (10%)0.67
Final score2.50 / 10
5.0% 5.79
CategoryJSJB 2.0
Total Works2,672
Target Works4,615
Achievement %57.9%
Weightage5% of composite score
Final score5.79 / 10
22 DAMOH โ†— 4.50
16.0% 4.47
CategoryFarm Pond
Started / Completed / Phys1,584 / 410 / 74
Completion rate30.6%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked23.54Cr / 13.86Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.95 / 5.0
Final score4.47 / 10
0.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
2.8% 5.65
CategoryDug Well Recharge
Started / Completed / Phys2,247 / 731 / 107
Completion rate37.3%
Part A score (max 5.0)1.86 / 5.0
Ongoing sanction / booked3.64Cr / 2.76Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score5.65 / 10
0.6% 4.65
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.27Cr / 1.18Cr
Expenditure rate (ongoing)93.1%
Part B score (max 5.0)4.65 / 5.0
Final score4.65 / 10
52.9% 4.15
CategoryWater conservation & recharge
Started / Completed / Phys1,017 / 27 / 32
Completion rate5.8%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked108.16Cr / 83.56Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.86 / 5.0
Final score4.15 / 10
9.7% 4.83
CategoryWatershed Related Works
Started / Completed / Phys294 / 28 / 23
Completion rate17.3%
Part A score (max 5.0)0.87 / 5.0
Ongoing sanction / booked17.06Cr / 13.50Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score4.83 / 10
8.8% 4.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys207 / 4 / 2
Completion rate2.9%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked18.11Cr / 14.46Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score4.14 / 10
3.9% 1.67
CategoryPMKSY: Watershed
PMKSY Works0 total  (4 done / -4 ongoing)
JGSA Target8.25 Cr
JGSA Valuation0.00 Cr
Expenditure0.09 Cr
% Valuation0.0%
Valuation Marks (40%)0.00
Exp Marks (40%)0.04
Geotag Marks (10%)1.000
Physical Marks (10%)0.62
Final score1.67 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works5,971
Target Works5,366
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
23 SIDHI โ†— 4.48
37.2% 4.33
CategoryFarm Pond
Started / Completed / Phys1,874 / 815 / 4
Completion rate43.7%
Part A score (max 5.0)2.19 / 5.0
Ongoing sanction / booked24.12Cr / 10.34Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.14 / 5.0
Final score4.33 / 10
โ€”
1.1% 4.28
CategoryDug Well Recharge
Started / Completed / Phys482 / 208 / 1
Completion rate43.4%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked0.72Cr / 0.30Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.28 / 10
2.7% 4.03
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 4 / 0
Completion rate12.1%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked3.18Cr / 2.17Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score4.03 / 10
41.5% 4.83
CategoryWater conservation & recharge
Started / Completed / Phys892 / 177 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked42.42Cr / 32.47Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score4.83 / 10
4.5% 4.61
CategoryWatershed Related Works
Started / Completed / Phys98 / 20 / 0
Completion rate20.4%
Part A score (max 5.0)1.02 / 5.0
Ongoing sanction / booked4.42Cr / 3.17Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score4.61 / 10
5.5% 4.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys106 / 27 / 0
Completion rate25.5%
Part A score (max 5.0)1.27 / 5.0
Ongoing sanction / booked5.59Cr / 3.93Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score4.79 / 10
2.4% 4.46
CategoryPMKSY: Watershed
PMKSY Works0 total  (27 done / -27 ongoing)
JGSA Target2.89 Cr
JGSA Valuation1.64 Cr
Expenditure0.30 Cr
% Valuation56.7%
Valuation Marks (40%)2.27
Exp Marks (40%)0.41
Geotag Marks (10%)0.860
Physical Marks (10%)0.92
Final score4.46 / 10
5.0% 2.67
CategoryJSJB 2.0
Total Works929
Target Works3,485
Achievement %26.7%
Weightage5% of composite score
Final score2.67 / 10
24 SHAHDOL โ†— 4.44
40.9% 3.50
CategoryFarm Pond
Started / Completed / Phys3,162 / 685 / 306
Completion rate31.3%
Part A score (max 5.0)1.57 / 5.0
Ongoing sanction / booked59.92Cr / 23.16Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score3.50 / 10
1.3% 1.31
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.58Cr / 0.68Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
0.8% 4.62
CategoryDug Well Recharge
Started / Completed / Phys626 / 126 / 94
Completion rate35.1%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked1.07Cr / 0.61Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score4.62 / 10
6.5% 5.59
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 1 / 4
Completion rate15.6%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked11.49Cr / 11.04Cr
Expenditure rate (ongoing)96.1%
Part B score (max 5.0)4.80 / 5.0
Final score5.59 / 10
32.1% 4.95
CategoryWater conservation & recharge
Started / Completed / Phys1,042 / 59 / 140
Completion rate19.1%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked56.34Cr / 45.07Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score4.95 / 10
10.3% 5.02
CategoryWatershed Related Works
Started / Completed / Phys229 / 10 / 2
Completion rate5.2%
Part A score (max 5.0)0.26 / 5.0
Ongoing sanction / booked20.27Cr / 19.30Cr
Expenditure rate (ongoing)95.3%
Part B score (max 5.0)4.76 / 5.0
Final score5.02 / 10
3.2% 4.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys105 / 8 / 11
Completion rate18.1%
Part A score (max 5.0)0.90 / 5.0
Ongoing sanction / booked5.39Cr / 4.04Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score4.65 / 10
โ€”
5.0% 6.68
CategoryJSJB 2.0
Total Works3,478
Target Works5,204
Achievement %66.8%
Weightage5% of composite score
Final score6.68 / 10
25 MORENA โ†— 4.38
13.7% 5.46
CategoryFarm Pond
Started / Completed / Phys2,271 / 1,235 / 50
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked31.49Cr / 16.56Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score5.46 / 10
0.3% 1.59
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.46Cr
Expenditure rate (ongoing)31.8%
Part B score (max 5.0)1.59 / 5.0
Final score1.59 / 10
0.4% 4.60
CategoryDug Well Recharge
Started / Completed / Phys708 / 357 / 4
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked0.91Cr / 0.37Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score4.60 / 10
1.3% 4.24
CategoryIrrigation infrastructure
Started / Completed / Phys55 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.29Cr / 5.33Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score4.24 / 10
71.9% 4.26
CategoryWater conservation & recharge
Started / Completed / Phys2,433 / 14 / 0
Completion rate0.6%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked343.55Cr / 290.71Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score4.26 / 10
4.8% 4.47
CategoryWatershed Related Works
Started / Completed / Phys180 / 6 / 0
Completion rate3.3%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked22.77Cr / 19.62Cr
Expenditure rate (ongoing)86.2%
Part B score (max 5.0)4.31 / 5.0
Final score4.47 / 10
2.0% 4.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys72 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked9.58Cr / 7.89Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score4.19 / 10
0.6% 4.07
CategoryPMKSY: Watershed
PMKSY Works0 total  (6 done / -6 ongoing)
JGSA Target2.64 Cr
JGSA Valuation1.02 Cr
Expenditure0.49 Cr
% Valuation38.5%
Valuation Marks (40%)1.54
Exp Marks (40%)0.74
Geotag Marks (10%)0.950
Physical Marks (10%)0.84
Final score4.07 / 10
5.0% 3.33
CategoryJSJB 2.0
Total Works1,908
Target Works5,725
Achievement %33.3%
Weightage5% of composite score
Final score3.33 / 10
26 GWALIOR โ†— 4.36
35.4% 3.58
CategoryFarm Pond
Started / Completed / Phys925 / 88 / 234
Completion rate34.8%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked17.57Cr / 6.48Cr
Expenditure rate (ongoing)36.9%
Part B score (max 5.0)1.84 / 5.0
Final score3.58 / 10
4.0% 1.51
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 1
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked2.69Cr / 0.59Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.09 / 5.0
Final score1.51 / 10
3.0% 5.88
CategoryDug Well Recharge
Started / Completed / Phys853 / 217 / 355
Completion rate67.1%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked0.73Cr / 0.37Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.52 / 5.0
Final score5.88 / 10
4.1% 6.67
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 3 / 13
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.61Cr / 1.34Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score6.67 / 10
30.1% 5.92
CategoryWater conservation & recharge
Started / Completed / Phys282 / 32 / 99
Completion rate46.5%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked13.38Cr / 9.62Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.59 / 5.0
Final score5.92 / 10
4.9% 5.31
CategoryWatershed Related Works
Started / Completed / Phys61 / 6 / 20
Completion rate42.6%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked2.06Cr / 1.31Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score5.31 / 10
2.4% 5.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 4 / 11
Completion rate51.7%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked0.61Cr / 0.35Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.84 / 5.0
Final score5.43 / 10
11.1% 1.96
CategoryPMKSY: Watershed
PMKSY Works0 total  (2 done / -2 ongoing)
JGSA Target8.02 Cr
JGSA Valuation0.55 Cr
Expenditure0.43 Cr
% Valuation6.9%
Valuation Marks (40%)0.28
Exp Marks (40%)0.21
Geotag Marks (10%)0.990
Physical Marks (10%)0.48
Final score1.96 / 10
5.0% 3.78
CategoryJSJB 2.0
Total Works830
Target Works2,194
Achievement %37.8%
Weightage5% of composite score
Final score3.78 / 10
27 SHEOPUR โ†— 4.32
17.2% 4.59
CategoryFarm Pond
Started / Completed / Phys705 / 336 / 0
Completion rate47.7%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked12.32Cr / 5.43Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.20 / 5.0
Final score4.59 / 10
2.6% 0.50
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.93Cr / 0.29Cr
Expenditure rate (ongoing)10.1%
Part B score (max 5.0)0.50 / 5.0
Final score0.50 / 10
0.2% 5.78
CategoryDug Well Recharge
Started / Completed / Phys110 / 78 / 0
Completion rate70.9%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.23 / 5.0
Final score5.78 / 10
1.9% 4.44
CategoryIrrigation infrastructure
Started / Completed / Phys22 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.16Cr / 1.92Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score4.44 / 10
60.0% 4.20
CategoryWater conservation & recharge
Started / Completed / Phys590 / 9 / 0
Completion rate1.5%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked67.31Cr / 55.52Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score4.20 / 10
6.1% 4.10
CategoryWatershed Related Works
Started / Completed / Phys71 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked6.85Cr / 5.52Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score4.10 / 10
3.1% 4.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.58Cr / 2.97Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score4.15 / 10
3.8% 4.03
CategoryPMKSY: Watershed
PMKSY Works0 total  (98 done / -98 ongoing)
JGSA Target4.32 Cr
JGSA Valuation1.72 Cr
Expenditure0.77 Cr
% Valuation39.8%
Valuation Marks (40%)1.59
Exp Marks (40%)0.71
Geotag Marks (10%)0.720
Physical Marks (10%)1.00
Final score4.03 / 10
5.0% 7.35
CategoryJSJB 2.0
Total Works1,136
Target Works1,545
Achievement %73.5%
Weightage5% of composite score
Final score7.35 / 10
28 SEHORE โ†— 4.28
54.1% 3.08
CategoryFarm Pond
Started / Completed / Phys1,491 / 100 / 418
Completion rate34.7%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked26.62Cr / 7.13Cr
Expenditure rate (ongoing)26.8%
Part B score (max 5.0)1.34 / 5.0
Final score3.08 / 10
2.1% 0.70
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.43Cr / 0.20Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score0.70 / 10
9.4% 5.88
CategoryDug Well Recharge
Started / Completed / Phys2,519 / 455 / 1,297
Completion rate69.6%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked1.99Cr / 0.96Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.40 / 5.0
Final score5.88 / 10
1.5% 5.46
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 4 / 4
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.76Cr / 0.51Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.36 / 5.0
Final score5.46 / 10
20.2% 6.06
CategoryWater conservation & recharge
Started / Completed / Phys358 / 30 / 145
Completion rate48.9%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked8.75Cr / 6.33Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score6.06 / 10
3.8% 5.22
CategoryWatershed Related Works
Started / Completed / Phys66 / 9 / 18
Completion rate40.9%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.56Cr / 0.99Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score5.22 / 10
2.7% 5.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys38 / 3 / 14
Completion rate44.7%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked0.78Cr / 0.56Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.63 / 5.0
Final score5.87 / 10
1.1% 4.14
CategoryPMKSY: Watershed
PMKSY Works0 total  (4 done / -4 ongoing)
JGSA Target0.79 Cr
JGSA Valuation0.22 Cr
Expenditure0.31 Cr
% Valuation27.4%
Valuation Marks (40%)1.10
Exp Marks (40%)1.59
Geotag Marks (10%)0.880
Physical Marks (10%)0.56
Final score4.14 / 10
5.0% 6.62
CategoryJSJB 2.0
Total Works2,977
Target Works4,497
Achievement %66.2%
Weightage5% of composite score
Final score6.62 / 10
29 SAGAR โ†— 4.27
30.4% 3.43
CategoryFarm Pond
Started / Completed / Phys2,184 / 586 / 134
Completion rate33.0%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked27.76Cr / 9.91Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.78 / 5.0
Final score3.43 / 10
0.8% 1.58
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.36Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
8.4% 6.00
CategoryDug Well Recharge
Started / Completed / Phys4,663 / 2,110 / 855
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked4.32Cr / 2.44Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.82 / 5.0
Final score6.00 / 10
0.7% 6.47
CategoryIrrigation infrastructure
Started / Completed / Phys25 / 5 / 6
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.40Cr / 0.34Cr
Expenditure rate (ongoing)85.5%
Part B score (max 5.0)4.27 / 5.0
Final score6.47 / 10
38.3% 4.97
CategoryWater conservation & recharge
Started / Completed / Phys1,183 / 178 / 157
Completion rate28.3%
Part A score (max 5.0)1.42 / 5.0
Ongoing sanction / booked37.67Cr / 26.78Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score4.97 / 10
5.1% 5.19
CategoryWatershed Related Works
Started / Completed / Phys120 / 23 / 14
Completion rate30.8%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked5.16Cr / 3.76Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score5.19 / 10
3.8% 5.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 15 / 20
Completion rate39.3%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked2.81Cr / 1.89Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score5.33 / 10
7.6% 2.88
CategoryPMKSY: Watershed
PMKSY Works0 total  (227 done / -227 ongoing)
JGSA Target10.28 Cr
JGSA Valuation2.20 Cr
Expenditure1.31 Cr
% Valuation21.4%
Valuation Marks (40%)0.85
Exp Marks (40%)0.51
Geotag Marks (10%)0.910
Physical Marks (10%)0.61
Final score2.88 / 10
5.0% 1.52
CategoryJSJB 2.0
Total Works1,258
Target Works8,268
Achievement %15.2%
Weightage5% of composite score
Final score1.52 / 10
30 SINGRAULI โ†— 4.23
32.7% 4.65
CategoryFarm Pond
Started / Completed / Phys1,960 / 1,012 / 24
Completion rate52.9%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked21.76Cr / 8.72Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score4.65 / 10
3.1% 2.74
CategoryAmrit Sarowar
Started / Completed / Phys21 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.36Cr / 2.39Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score2.74 / 10
2.2% 5.04
CategoryDug Well Recharge
Started / Completed / Phys1,223 / 498 / 154
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked1.43Cr / 0.68Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.38 / 5.0
Final score5.04 / 10
0.1% 3.39
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.39 / 5.0
Final score3.39 / 10
48.6% 4.16
CategoryWater conservation & recharge
Started / Completed / Phys916 / 64 / 26
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked62.29Cr / 45.64Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score4.16 / 10
5.1% 4.24
CategoryWatershed Related Works
Started / Completed / Phys131 / 17 / 1
Completion rate13.7%
Part A score (max 5.0)0.69 / 5.0
Ongoing sanction / booked6.37Cr / 4.53Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score4.24 / 10
3.2% 3.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys56 / 2 / 0
Completion rate3.6%
Part A score (max 5.0)0.18 / 5.0
Ongoing sanction / booked4.33Cr / 3.13Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score3.79 / 10
โ€”
5.0% 3.17
CategoryJSJB 2.0
Total Works1,367
Target Works4,310
Achievement %31.7%
Weightage5% of composite score
Final score3.17 / 10
31 CHHATARPUR โ†— 4.21
46.7% 3.49
CategoryFarm Pond
Started / Completed / Phys1,886 / 588 / 103
Completion rate36.6%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked42.36Cr / 14.05Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score3.49 / 10
3.7% 2.39
CategoryAmrit Sarowar
Started / Completed / Phys25 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked5.25Cr / 2.50Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.39 / 5.0
Final score2.39 / 10
5.1% 6.13
CategoryDug Well Recharge
Started / Completed / Phys3,977 / 2,691 / 85
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked2.52Cr / 1.33Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.64 / 5.0
Final score6.13 / 10
0.4% 3.84
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 1 / 0
Completion rate9.1%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked0.50Cr / 0.34Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score3.84 / 10
30.0% 4.42
CategoryWater conservation & recharge
Started / Completed / Phys937 / 93 / 64
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked36.31Cr / 26.00Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score4.42 / 10
3.4% 4.14
CategoryWatershed Related Works
Started / Completed / Phys125 / 7 / 4
Completion rate8.8%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked4.21Cr / 3.12Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score4.14 / 10
3.9% 4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys80 / 1 / 7
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked4.99Cr / 3.71Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.72 / 5.0
Final score4.22 / 10
1.7% 6.38
CategoryPMKSY: Watershed
PMKSY Works0 total  (1 done / -1 ongoing)
JGSA Target2.41 Cr
JGSA Valuation2.11 Cr
Expenditure0.82 Cr
% Valuation87.4%
Valuation Marks (40%)3.50
Exp Marks (40%)1.36
Geotag Marks (10%)0.680
Physical Marks (10%)0.84
Final score6.38 / 10
5.0% 8.44
CategoryJSJB 2.0
Total Works5,944
Target Works7,041
Achievement %84.4%
Weightage5% of composite score
Final score8.44 / 10
32 SEONI โ†— 4.19
43.7% 3.82
CategoryFarm Pond
Started / Completed / Phys3,392 / 922 / 1
Completion rate27.2%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked63.66Cr / 31.27Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score3.82 / 10
1.0% 0.52
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.91Cr / 0.20Cr
Expenditure rate (ongoing)10.4%
Part B score (max 5.0)0.52 / 5.0
Final score0.52 / 10
2.9% 4.65
CategoryDug Well Recharge
Started / Completed / Phys2,263 / 717 / 13
Completion rate32.3%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked3.94Cr / 2.39Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score4.65 / 10
1.8% 3.94
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 4 / 0
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked3.22Cr / 2.12Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score3.94 / 10
33.4% 4.00
CategoryWater conservation & recharge
Started / Completed / Phys1,282 / 94 / 0
Completion rate7.3%
Part A score (max 5.0)0.37 / 5.0
Ongoing sanction / booked63.64Cr / 46.30Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score4.00 / 10
8.7% 4.32
CategoryWatershed Related Works
Started / Completed / Phys318 / 43 / 0
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked15.47Cr / 11.29Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score4.32 / 10
3.6% 3.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys102 / 5 / 0
Completion rate4.9%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked6.99Cr / 5.13Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score3.91 / 10
โ€”
5.0% 9.26
CategoryJSJB 2.0
Total Works6,848
Target Works7,393
Achievement %92.6%
Weightage5% of composite score
Final score9.26 / 10
33 REWA โ†— 4.19
44.0% 3.36
CategoryFarm Pond
Started / Completed / Phys2,351 / 690 / 105
Completion rate33.8%
Part A score (max 5.0)1.69 / 5.0
Ongoing sanction / booked34.98Cr / 11.66Cr
Expenditure rate (ongoing)33.3%
Part B score (max 5.0)1.67 / 5.0
Final score3.36 / 10
2.1% 0.13
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.30Cr / 0.06Cr
Expenditure rate (ongoing)2.6%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
0.9% 5.27
CategoryDug Well Recharge
Started / Completed / Phys495 / 254 / 38
Completion rate59.0%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked0.50Cr / 0.23Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.32 / 5.0
Final score5.27 / 10
2.4% 4.90
CategoryIrrigation infrastructure
Started / Completed / Phys72 / 15 / 7
Completion rate30.6%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked1.71Cr / 1.15Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score4.90 / 10
26.4% 4.89
CategoryWater conservation & recharge
Started / Completed / Phys631 / 157 / 37
Completion rate30.7%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked21.09Cr / 14.13Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score4.89 / 10
6.7% 4.68
CategoryWatershed Related Works
Started / Completed / Phys118 / 22 / 13
Completion rate29.7%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked5.97Cr / 3.82Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score4.68 / 10
7.0% 4.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys110 / 22 / 8
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked5.29Cr / 3.06Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score4.26 / 10
5.7% 3.07
CategoryPMKSY: Watershed
PMKSY Works0 total  (2 done / -2 ongoing)
JGSA Target6.27 Cr
JGSA Valuation1.14 Cr
Expenditure0.87 Cr
% Valuation18.2%
Valuation Marks (40%)0.73
Exp Marks (40%)0.55
Geotag Marks (10%)0.990
Physical Marks (10%)0.79
Final score3.07 / 10
5.0% 9.59
CategoryJSJB 2.0
Total Works3,631
Target Works3,786
Achievement %95.9%
Weightage5% of composite score
Final score9.59 / 10
34 NARSINGHPUR โ†— 4.18
66.0% 3.46
CategoryFarm Pond
Started / Completed / Phys1,398 / 587 / 42
Completion rate45.0%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked20.58Cr / 4.98Cr
Expenditure rate (ongoing)24.2%
Part B score (max 5.0)1.21 / 5.0
Final score3.46 / 10
2.7% 0.01
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.01 / 10
1.4% 4.29
CategoryDug Well Recharge
Started / Completed / Phys322 / 110 / 40
Completion rate46.6%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked0.44Cr / 0.17Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score4.29 / 10
0.1% 3.62
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 0
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.79 / 5.0
Final score3.62 / 10
14.5% 5.05
CategoryWater conservation & recharge
Started / Completed / Phys145 / 35 / 19
Completion rate37.2%
Part A score (max 5.0)1.86 / 5.0
Ongoing sanction / booked5.95Cr / 3.79Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score5.05 / 10
0.5% 4.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 3 / 0
Completion rate23.1%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked0.26Cr / 0.15Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score4.00 / 10
1.3% 3.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 3 / 3
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.48Cr / 0.23Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score3.79 / 10
8.3% 6.28
CategoryPMKSY: Watershed
PMKSY Works0 total  (87 done / -87 ongoing)
JGSA Target4.79 Cr
JGSA Valuation3.55 Cr
Expenditure1.87 Cr
% Valuation74.2%
Valuation Marks (40%)2.97
Exp Marks (40%)1.56
Geotag Marks (10%)0.900
Physical Marks (10%)0.84
Final score6.28 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works6,069
Target Works1,911
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
35 DEWAS โ†— 4.13
46.7% 2.85
CategoryFarm Pond
Started / Completed / Phys1,267 / 174 / 120
Completion rate23.2%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked34.98Cr / 11.80Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.69 / 5.0
Final score2.85 / 10
2.3% 2.37
CategoryAmrit Sarowar
Started / Completed / Phys11 / 1 / 1
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked2.01Cr / 0.59Cr
Expenditure rate (ongoing)29.2%
Part B score (max 5.0)1.46 / 5.0
Final score2.37 / 10
9.4% 5.47
CategoryDug Well Recharge
Started / Completed / Phys3,474 / 1,246 / 821
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked3.63Cr / 1.81Cr
Expenditure rate (ongoing)50.0%
Part B score (max 5.0)2.50 / 5.0
Final score5.47 / 10
3.0% 4.72
CategoryIrrigation infrastructure
Started / Completed / Phys57 / 10 / 9
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.74Cr / 1.06Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score4.72 / 10
28.2% 5.03
CategoryWater conservation & recharge
Started / Completed / Phys621 / 33 / 150
Completion rate29.5%
Part A score (max 5.0)1.47 / 5.0
Ongoing sanction / booked20.33Cr / 14.45Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score5.03 / 10
2.9% 4.38
CategoryWatershed Related Works
Started / Completed / Phys94 / 10 / 6
Completion rate17.0%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked2.18Cr / 1.54Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score4.38 / 10
1.0% 4.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 1
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.84Cr / 0.63Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score4.39 / 10
1.5% 3.72
CategoryPMKSY: Watershed
PMKSY Works0 total  (22 done / -22 ongoing)
JGSA Target1.42 Cr
JGSA Valuation0.56 Cr
Expenditure0.06 Cr
% Valuation39.3%
Valuation Marks (40%)1.57
Exp Marks (40%)0.16
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score3.72 / 10
5.0% 8.87
CategoryJSJB 2.0
Total Works4,916
Target Works5,540
Achievement %88.7%
Weightage5% of composite score
Final score8.87 / 10
36 DHAR โ†— 4.08
12.6% 3.15
CategoryFarm Pond
Started / Completed / Phys2,881 / 213 / 0
Completion rate7.4%
Part A score (max 5.0)0.37 / 5.0
Ongoing sanction / booked47.13Cr / 26.23Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score3.15 / 10
0.1% 2.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
2.9% 3.16
CategoryDug Well Recharge
Started / Completed / Phys4,481 / 360 / 7
Completion rate8.2%
Part A score (max 5.0)0.41 / 5.0
Ongoing sanction / booked10.65Cr / 5.85Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score3.16 / 10
0.4% 3.56
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.77Cr / 1.26Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score3.56 / 10
69.1% 4.20
CategoryWater conservation & recharge
Started / Completed / Phys2,551 / 19 / 12
Completion rate1.2%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked269.80Cr / 223.57Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.14 / 5.0
Final score4.20 / 10
7.3% 3.89
CategoryWatershed Related Works
Started / Completed / Phys664 / 7 / 2
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked28.17Cr / 21.53Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score3.89 / 10
2.1% 3.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys147 / 1 / 3
Completion rate2.7%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked8.18Cr / 6.25Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score3.96 / 10
0.5% 4.68
CategoryPMKSY: Watershed
PMKSY Works0 total  (5 done / -5 ongoing)
JGSA Target1.78 Cr
JGSA Valuation0.72 Cr
Expenditure0.48 Cr
% Valuation40.6%
Valuation Marks (40%)1.63
Exp Marks (40%)1.09
Geotag Marks (10%)1.000
Physical Marks (10%)0.96
Final score4.68 / 10
5.0% 5.58
CategoryJSJB 2.0
Total Works6,000
Target Works10,749
Achievement %55.8%
Weightage5% of composite score
Final score5.58 / 10
37 JHABUA โ†— 4.08
13.3% 2.62
CategoryFarm Pond
Started / Completed / Phys1,233 / 36 / 4
Completion rate3.2%
Part A score (max 5.0)0.16 / 5.0
Ongoing sanction / booked25.17Cr / 12.38Cr
Expenditure rate (ongoing)49.2%
Part B score (max 5.0)2.46 / 5.0
Final score2.62 / 10
1.7% 1.92
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.27Cr / 1.26Cr
Expenditure rate (ongoing)38.5%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
5.3% 4.08
CategoryDug Well Recharge
Started / Completed / Phys4,071 / 768 / 143
Completion rate22.4%
Part A score (max 5.0)1.12 / 5.0
Ongoing sanction / booked8.12Cr / 4.81Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score4.08 / 10
0.1% 4.24
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.10Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.24 / 5.0
Final score4.24 / 10
70.2% 4.36
CategoryWater conservation & recharge
Started / Completed / Phys1,368 / 23 / 69
Completion rate6.7%
Part A score (max 5.0)0.34 / 5.0
Ongoing sanction / booked127.35Cr / 102.51Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.02 / 5.0
Final score4.36 / 10
1.6% 3.99
CategoryWatershed Related Works
Started / Completed / Phys81 / 0 / 13
Completion rate16.0%
Part A score (max 5.0)0.80 / 5.0
Ongoing sanction / booked2.63Cr / 1.68Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score3.99 / 10
1.4% 4.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 0 / 6
Completion rate12.0%
Part A score (max 5.0)0.60 / 5.0
Ongoing sanction / booked2.61Cr / 2.05Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score4.54 / 10
1.3% 2.80
CategoryPMKSY: Watershed
PMKSY Works0 total  (0 done / 0 ongoing)
JGSA Target2.53 Cr
JGSA Valuation0.74 Cr
Expenditure0.14 Cr
% Valuation29.1%
Valuation Marks (40%)1.16
Exp Marks (40%)0.23
Geotag Marks (10%)0.950
Physical Marks (10%)0.46
Final score2.80 / 10
5.0% 4.95
CategoryJSJB 2.0
Total Works3,379
Target Works6,826
Achievement %49.5%
Weightage5% of composite score
Final score4.95 / 10
38 BHOPAL โ†— 4.04
41.0% 3.29
CategoryFarm Pond
Started / Completed / Phys945 / 125 / 19
Completion rate15.2%
Part A score (max 5.0)0.76 / 5.0
Ongoing sanction / booked16.57Cr / 8.37Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score3.29 / 10
2.8% 2.97
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.33Cr / 0.79Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score2.97 / 10
3.7% 5.07
CategoryDug Well Recharge
Started / Completed / Phys691 / 250 / 55
Completion rate44.1%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked0.97Cr / 0.56Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.86 / 5.0
Final score5.07 / 10
0.2% 2.45
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)48.9%
Part B score (max 5.0)2.45 / 5.0
Final score2.45 / 10
39.2% 4.42
CategoryWater conservation & recharge
Started / Completed / Phys451 / 30 / 29
Completion rate13.1%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked17.03Cr / 12.83Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score4.42 / 10
3.0% 4.34
CategoryWatershed Related Works
Started / Completed / Phys35 / 3 / 3
Completion rate17.1%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked1.35Cr / 0.94Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score4.34 / 10
5.1% 4.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys25 / 1 / 5
Completion rate24.0%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked2.15Cr / 1.59Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score4.91 / 10
โ€”
5.0% 6.03
CategoryJSJB 2.0
Total Works1,300
Target Works2,157
Achievement %60.3%
Weightage5% of composite score
Final score6.03 / 10
39 PANNA โ†— 4.04
36.0% 3.63
CategoryFarm Pond
Started / Completed / Phys2,155 / 266 / 0
Completion rate12.3%
Part A score (max 5.0)0.62 / 5.0
Ongoing sanction / booked40.97Cr / 24.68Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score3.63 / 10
2.7% 2.11
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.52Cr / 1.48Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score2.11 / 10
4.0% 4.02
CategoryDug Well Recharge
Started / Completed / Phys1,820 / 342 / 0
Completion rate18.8%
Part A score (max 5.0)0.94 / 5.0
Ongoing sanction / booked4.22Cr / 2.60Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score4.02 / 10
0.2% 3.43
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.20Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score3.43 / 10
35.8% 4.22
CategoryWater conservation & recharge
Started / Completed / Phys1,178 / 41 / 0
Completion rate3.5%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked44.81Cr / 36.27Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.05 / 5.0
Final score4.22 / 10
4.8% 4.28
CategoryWatershed Related Works
Started / Completed / Phys142 / 9 / 0
Completion rate6.3%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked5.70Cr / 4.52Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score4.28 / 10
11.5% 4.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys182 / 7 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked14.30Cr / 12.11Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.24 / 5.0
Final score4.43 / 10
โ€”
5.0% 5.60
CategoryJSJB 2.0
Total Works3,081
Target Works5,503
Achievement %56.0%
Weightage5% of composite score
Final score5.60 / 10
40 SATNA โ†— 4.02
42.5% 3.51
CategoryFarm Pond
Started / Completed / Phys2,100 / 139 / 360
Completion rate23.8%
Part A score (max 5.0)1.19 / 5.0
Ongoing sanction / booked34.91Cr / 16.24Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score3.51 / 10
3.4% 0.99
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.66Cr / 0.72Cr
Expenditure rate (ongoing)19.8%
Part B score (max 5.0)0.99 / 5.0
Final score0.99 / 10
2.4% 5.71
CategoryDug Well Recharge
Started / Completed / Phys1,141 / 185 / 252
Completion rate38.3%
Part A score (max 5.0)1.91 / 5.0
Ongoing sanction / booked1.62Cr / 1.23Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score5.71 / 10
0.5% 4.02
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 1 / 3
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked0.48Cr / 0.31Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score4.02 / 10
34.1% 4.84
CategoryWater conservation & recharge
Started / Completed / Phys660 / 23 / 104
Completion rate19.2%
Part A score (max 5.0)0.96 / 5.0
Ongoing sanction / booked31.25Cr / 24.24Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score4.84 / 10
4.5% 4.54
CategoryWatershed Related Works
Started / Completed / Phys143 / 6 / 18
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked3.97Cr / 2.94Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score4.54 / 10
7.6% 4.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys121 / 4 / 16
Completion rate16.5%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked7.43Cr / 5.45Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score4.50 / 10
โ€”
5.0% 2.86
CategoryJSJB 2.0
Total Works1,203
Target Works4,203
Achievement %28.6%
Weightage5% of composite score
Final score2.86 / 10
41 SHAJAPUR โ†— 3.98
42.3% 2.82
CategoryFarm Pond
Started / Completed / Phys682 / 146 / 27
Completion rate25.4%
Part A score (max 5.0)1.27 / 5.0
Ongoing sanction / booked14.60Cr / 4.52Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score2.82 / 10
3.4% 1.95
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.54Cr / 0.60Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score1.95 / 10
8.9% 5.65
CategoryDug Well Recharge
Started / Completed / Phys1,648 / 592 / 558
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked1.21Cr / 0.52Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score5.65 / 10
0.7% 5.51
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.51 / 5.0
Final score5.51 / 10
28.3% 4.61
CategoryWater conservation & recharge
Started / Completed / Phys290 / 31 / 56
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked9.36Cr / 5.83Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score4.61 / 10
3.5% 6.08
CategoryWatershed Related Works
Started / Completed / Phys40 / 3 / 19
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.67Cr / 0.45Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.33 / 5.0
Final score6.08 / 10
0.9% 5.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 2
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score5.11 / 10
7.0% 6.66
CategoryPMKSY: Watershed
PMKSY Works0 total  (15 done / -15 ongoing)
JGSA Target3.16 Cr
JGSA Valuation2.20 Cr
Expenditure1.53 Cr
% Valuation69.6%
Valuation Marks (40%)2.78
Exp Marks (40%)1.93
Geotag Marks (10%)0.940
Physical Marks (10%)1.00
Final score6.66 / 10
5.0% 3.12
CategoryJSJB 2.0
Total Works836
Target Works2,682
Achievement %31.2%
Weightage5% of composite score
Final score3.12 / 10
42 NIWARI โ†— 3.96
18.2% 3.01
CategoryFarm Pond
Started / Completed / Phys496 / 71 / 6
Completion rate15.5%
Part A score (max 5.0)0.78 / 5.0
Ongoing sanction / booked6.60Cr / 2.95Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.23 / 5.0
Final score3.01 / 10
2.5% 2.63
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.09Cr / 0.57Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.63 / 5.0
Final score2.63 / 10
5.8% 3.95
CategoryDug Well Recharge
Started / Completed / Phys975 / 246 / 32
Completion rate28.5%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.81Cr / 0.91Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.52 / 5.0
Final score3.95 / 10
โ€”
34.1% 4.33
CategoryWater conservation & recharge
Started / Completed / Phys235 / 8 / 0
Completion rate3.4%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked14.56Cr / 12.11Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.16 / 5.0
Final score4.33 / 10
14.5% 4.08
CategoryWatershed Related Works
Started / Completed / Phys111 / 3 / 0
Completion rate2.7%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked6.22Cr / 4.90Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score4.08 / 10
19.9% 4.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys124 / 2 / 2
Completion rate3.2%
Part A score (max 5.0)0.16 / 5.0
Ongoing sanction / booked8.32Cr / 7.36Cr
Expenditure rate (ongoing)88.5%
Part B score (max 5.0)4.42 / 5.0
Final score4.59 / 10
โ€”
5.0% 2.68
CategoryJSJB 2.0
Total Works522
Target Works1,946
Achievement %26.8%
Weightage5% of composite score
Final score2.68 / 10
43 DATIA โ†— 3.95
38.2% 3.10
CategoryFarm Pond
Started / Completed / Phys920 / 207 / 37
Completion rate26.5%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked13.91Cr / 4.92Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score3.10 / 10
0.5% 1.63
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.08Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score1.63 / 10
3.1% 5.47
CategoryDug Well Recharge
Started / Completed / Phys600 / 210 / 81
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.80Cr / 0.48Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score5.47 / 10
2.3% 5.32
CategoryIrrigation infrastructure
Started / Completed / Phys28 / 6 / 4
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.63Cr / 0.45Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score5.32 / 10
39.9% 4.27
CategoryWater conservation & recharge
Started / Completed / Phys381 / 22 / 76
Completion rate25.7%
Part A score (max 5.0)1.29 / 5.0
Ongoing sanction / booked14.57Cr / 8.69Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score4.27 / 10
5.1% 4.23
CategoryWatershed Related Works
Started / Completed / Phys61 / 2 / 13
Completion rate24.6%
Part A score (max 5.0)1.23 / 5.0
Ongoing sanction / booked1.95Cr / 1.17Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score4.23 / 10
5.9% 4.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 3 / 12
Completion rate31.3%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked1.76Cr / 1.16Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score4.87 / 10
โ€”
5.0% 5.13
CategoryJSJB 2.0
Total Works1,047
Target Works2,039
Achievement %51.3%
Weightage5% of composite score
Final score5.13 / 10
44 ALIRAJPUR โ†— 3.94
12.5% 2.92
CategoryFarm Pond
Started / Completed / Phys1,009 / 27 / 0
Completion rate2.7%
Part A score (max 5.0)0.13 / 5.0
Ongoing sanction / booked22.25Cr / 12.39Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.79 / 5.0
Final score2.92 / 10
2.4% 3.51
CategoryAmrit Sarowar
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.37Cr / 3.06Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
4.6% 3.42
CategoryDug Well Recharge
Started / Completed / Phys3,287 / 152 / 4
Completion rate4.7%
Part A score (max 5.0)0.24 / 5.0
Ongoing sanction / booked8.09Cr / 5.16Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.19 / 5.0
Final score3.42 / 10
0.1% 4.16
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score4.16 / 10
70.6% 4.28
CategoryWater conservation & recharge
Started / Completed / Phys838 / 19 / 3
Completion rate2.6%
Part A score (max 5.0)0.13 / 5.0
Ongoing sanction / booked127.86Cr / 105.99Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.14 / 5.0
Final score4.28 / 10
1.8% 4.11
CategoryWatershed Related Works
Started / Completed / Phys74 / 1 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked3.15Cr / 2.55Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.05 / 5.0
Final score4.11 / 10
1.1% 4.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 1 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked1.97Cr / 1.67Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score4.43 / 10
1.9% 5.87
CategoryPMKSY: Watershed
PMKSY Works0 total  (0 done / 0 ongoing)
JGSA Target3.49 Cr
JGSA Valuation1.68 Cr
Expenditure1.86 Cr
% Valuation48.2%
Valuation Marks (40%)1.93
Exp Marks (40%)2.14
Geotag Marks (10%)0.980
Physical Marks (10%)0.83
Final score5.87 / 10
5.0% 1.50
CategoryJSJB 2.0
Total Works788
Target Works5,252
Achievement %15.0%
Weightage5% of composite score
Final score1.50 / 10
45 RATLAM โ†— 3.92
36.6% 2.71
CategoryFarm Pond
Started / Completed / Phys1,452 / 262 / 4
Completion rate18.3%
Part A score (max 5.0)0.92 / 5.0
Ongoing sanction / booked30.03Cr / 10.79Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.80 / 5.0
Final score2.71 / 10
4.2% 2.78
CategoryAmrit Sarowar
Started / Completed / Phys16 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.90Cr / 2.17Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score2.78 / 10
8.9% 4.62
CategoryDug Well Recharge
Started / Completed / Phys3,186 / 735 / 27
Completion rate23.9%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked6.27Cr / 4.29Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score4.62 / 10
0.2% 4.94
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score4.94 / 10
35.6% 4.25
CategoryWater conservation & recharge
Started / Completed / Phys528 / 48 / 13
Completion rate11.6%
Part A score (max 5.0)0.58 / 5.0
Ongoing sanction / booked31.18Cr / 22.88Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score4.25 / 10
0.5% 5.19
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 1
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.27Cr / 0.16Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.91 / 5.0
Final score5.19 / 10
1.3% 4.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 1 / 2
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked1.06Cr / 0.76Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score4.36 / 10
7.9% 3.83
CategoryPMKSY: Watershed
PMKSY Works0 total  (0 done / 0 ongoing)
JGSA Target7.33 Cr
JGSA Valuation2.63 Cr
Expenditure1.01 Cr
% Valuation35.8%
Valuation Marks (40%)1.43
Exp Marks (40%)0.55
Geotag Marks (10%)0.850
Physical Marks (10%)1.00
Final score3.83 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works5,538
Target Works5,220
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
46 SHIVPURI โ†— 3.88
33.3% 3.97
CategoryFarm Pond
Started / Completed / Phys2,019 / 583 / 90
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked42.39Cr / 19.53Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.30 / 5.0
Final score3.97 / 10
0.8% 1.31
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.56Cr / 0.41Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
2.6% 4.73
CategoryDug Well Recharge
Started / Completed / Phys1,940 / 775 / 70
Completion rate43.6%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked2.81Cr / 1.44Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score4.73 / 10
1.1% 3.80
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.03Cr / 1.55Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
44.7% 3.90
CategoryWater conservation & recharge
Started / Completed / Phys1,104 / 31 / 1
Completion rate2.9%
Part A score (max 5.0)0.14 / 5.0
Ongoing sanction / booked82.61Cr / 61.96Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score3.90 / 10
8.1% 4.18
CategoryWatershed Related Works
Started / Completed / Phys200 / 19 / 0
Completion rate9.5%
Part A score (max 5.0)0.48 / 5.0
Ongoing sanction / booked13.92Cr / 10.31Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score4.18 / 10
2.9% 4.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys79 / 5 / 0
Completion rate6.3%
Part A score (max 5.0)0.32 / 5.0
Ongoing sanction / booked5.21Cr / 3.99Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score4.14 / 10
1.6% 2.25
CategoryPMKSY: Watershed
PMKSY Works0 total  (81 done / -81 ongoing)
JGSA Target3.04 Cr
JGSA Valuation0.05 Cr
Expenditure0.38 Cr
% Valuation1.5%
Valuation Marks (40%)0.06
Exp Marks (40%)0.51
Geotag Marks (10%)0.860
Physical Marks (10%)0.82
Final score2.25 / 10
5.0% 3.09
CategoryJSJB 2.0
Total Works1,665
Target Works5,382
Achievement %30.9%
Weightage5% of composite score
Final score3.09 / 10
47 MANDSAUR โ†— 3.88
18.7% 2.37
CategoryFarm Pond
Started / Completed / Phys1,238 / 53 / 3
Completion rate4.5%
Part A score (max 5.0)0.23 / 5.0
Ongoing sanction / booked20.73Cr / 8.88Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score2.37 / 10
1.2% 3.07
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.46Cr / 0.89Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score3.07 / 10
9.5% 4.52
CategoryDug Well Recharge
Started / Completed / Phys4,295 / 642 / 406
Completion rate24.4%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked8.37Cr / 5.53Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score4.52 / 10
0.5% 3.55
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.40Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score3.55 / 10
58.0% 4.35
CategoryWater conservation & recharge
Started / Completed / Phys1,158 / 37 / 28
Completion rate5.6%
Part A score (max 5.0)0.28 / 5.0
Ongoing sanction / booked66.13Cr / 53.80Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score4.35 / 10
2.2% 4.40
CategoryWatershed Related Works
Started / Completed / Phys53 / 2 / 0
Completion rate3.8%
Part A score (max 5.0)0.19 / 5.0
Ongoing sanction / booked2.53Cr / 2.13Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score4.40 / 10
2.2% 4.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 2 / 0
Completion rate5.0%
Part A score (max 5.0)0.25 / 5.0
Ongoing sanction / booked2.54Cr / 2.13Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score4.44 / 10
2.5% 3.98
CategoryPMKSY: Watershed
PMKSY Works0 total  (2 done / -2 ongoing)
JGSA Target2.95 Cr
JGSA Valuation1.94 Cr
Expenditure0.20 Cr
% Valuation65.8%
Valuation Marks (40%)2.64
Exp Marks (40%)0.27
Geotag Marks (10%)0.920
Physical Marks (10%)0.16
Final score3.98 / 10
5.0% 2.64
CategoryJSJB 2.0
Total Works1,799
Target Works6,810
Achievement %26.4%
Weightage5% of composite score
Final score2.64 / 10
48 INDORE โ†— 3.86
51.0% 2.80
CategoryFarm Pond
Started / Completed / Phys642 / 124 / 37
Completion rate25.1%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked11.92Cr / 3.68Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score2.80 / 10
7.2% 1.58
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.20Cr / 0.70Cr
Expenditure rate (ongoing)31.7%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
6.3% 4.26
CategoryDug Well Recharge
Started / Completed / Phys936 / 456 / 60
Completion rate55.1%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked0.99Cr / 0.30Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score4.26 / 10
0.1% 5.97
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)86.0%
Part B score (max 5.0)4.30 / 5.0
Final score5.97 / 10
13.9% 5.36
CategoryWater conservation & recharge
Started / Completed / Phys130 / 34 / 20
Completion rate41.5%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked2.39Cr / 1.57Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score5.36 / 10
8.2% 5.44
CategoryWatershed Related Works
Started / Completed / Phys50 / 11 / 11
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked1.53Cr / 0.99Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score5.44 / 10
3.9% 4.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 4 / 5
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.52Cr / 0.27Cr
Expenditure rate (ongoing)51.8%
Part B score (max 5.0)2.59 / 5.0
Final score4.73 / 10
4.4% 3.84
CategoryPMKSY: Watershed
PMKSY Works0 total  (2 done / -2 ongoing)
JGSA Target1.35 Cr
JGSA Valuation0.64 Cr
Expenditure0.12 Cr
% Valuation47.5%
Valuation Marks (40%)1.90
Exp Marks (40%)0.36
Geotag Marks (10%)0.970
Physical Marks (10%)0.61
Final score3.84 / 10
5.0% 10.00
CategoryJSJB 2.0
Total Works10,915
Target Works1,792
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
49 AGAR-MALWA โ†— 3.84
26.1% 3.07
CategoryFarm Pond
Started / Completed / Phys718 / 74 / 0
Completion rate10.3%
Part A score (max 5.0)0.52 / 5.0
Ongoing sanction / booked13.66Cr / 6.97Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score3.07 / 10
1.2% 3.44
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.71Cr / 0.49Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score3.44 / 10
8.9% 4.96
CategoryDug Well Recharge
Started / Completed / Phys1,970 / 544 / 0
Completion rate27.6%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked3.70Cr / 2.65Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score4.96 / 10
0.6% 2.86
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.20Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score2.86 / 10
44.1% 4.07
CategoryWater conservation & recharge
Started / Completed / Phys454 / 10 / 0
Completion rate2.2%
Part A score (max 5.0)0.11 / 5.0
Ongoing sanction / booked24.80Cr / 19.66Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score4.07 / 10
2.6% 3.88
CategoryWatershed Related Works
Started / Completed / Phys43 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 1.17Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score3.88 / 10
11.3% 4.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys170 / 1 / 0
Completion rate0.6%
Part A score (max 5.0)0.03 / 5.0
Ongoing sanction / booked6.44Cr / 5.51Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score4.31 / 10
โ€”
5.0% 2.98
CategoryJSJB 2.0
Total Works1,003
Target Works3,366
Achievement %29.8%
Weightage5% of composite score
Final score2.98 / 10
50 UMARIA โ†— 3.58
25.9% 3.30
CategoryFarm Pond
Started / Completed / Phys912 / 65 / 0
Completion rate7.1%
Part A score (max 5.0)0.36 / 5.0
Ongoing sanction / booked23.37Cr / 13.74Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score3.30 / 10
1.8% 2.80
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.70Cr / 0.96Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.80 / 5.0
Final score2.80 / 10
3.0% 3.19
CategoryDug Well Recharge
Started / Completed / Phys1,111 / 97 / 0
Completion rate8.7%
Part A score (max 5.0)0.44 / 5.0
Ongoing sanction / booked2.65Cr / 1.46Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score3.19 / 10
0.0% 3.79
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
49.2% 3.85
CategoryWater conservation & recharge
Started / Completed / Phys708 / 10 / 1
Completion rate1.6%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked46.67Cr / 35.25Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score3.85 / 10
6.7% 3.82
CategoryWatershed Related Works
Started / Completed / Phys60 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.40Cr / 4.89Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score3.82 / 10
6.5% 3.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys107 / 1 / 0
Completion rate0.9%
Part A score (max 5.0)0.05 / 5.0
Ongoing sanction / booked6.18Cr / 4.50Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score3.69 / 10
1.9% 4.51
CategoryPMKSY: Watershed
PMKSY Works0 total  (2 done / -2 ongoing)
JGSA Target1.80 Cr
JGSA Valuation0.89 Cr
Expenditure0.27 Cr
% Valuation49.3%
Valuation Marks (40%)1.97
Exp Marks (40%)0.61
Geotag Marks (10%)0.980
Physical Marks (10%)0.96
Final score4.51 / 10
5.0% 2.10
CategoryJSJB 2.0
Total Works612
Target Works2,910
Achievement %21.0%
Weightage5% of composite score
Final score2.10 / 10
51 TIKAMGARH โ†— 3.53
16.5% 2.35
CategoryFarm Pond
Started / Completed / Phys940 / 26 / 12
Completion rate4.0%
Part A score (max 5.0)0.20 / 5.0
Ongoing sanction / booked15.45Cr / 6.64Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.15 / 5.0
Final score2.35 / 10
3.1% 0.52
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.04Cr / 0.31Cr
Expenditure rate (ongoing)10.4%
Part B score (max 5.0)0.52 / 5.0
Final score0.52 / 10
6.5% 4.02
CategoryDug Well Recharge
Started / Completed / Phys2,432 / 158 / 139
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked5.53Cr / 3.77Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score4.02 / 10
0.1% 4.39
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)87.8%
Part B score (max 5.0)4.39 / 5.0
Final score4.39 / 10
51.4% 4.13
CategoryWater conservation & recharge
Started / Completed / Phys1,050 / 29 / 3
Completion rate3.0%
Part A score (max 5.0)0.15 / 5.0
Ongoing sanction / booked48.73Cr / 38.72Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score4.13 / 10
4.6% 3.83
CategoryWatershed Related Works
Started / Completed / Phys111 / 1 / 1
Completion rate1.8%
Part A score (max 5.0)0.09 / 5.0
Ongoing sanction / booked4.44Cr / 3.33Cr
Expenditure rate (ongoing)74.8%
Part B score (max 5.0)3.74 / 5.0
Final score3.83 / 10
8.9% 4.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys128 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked8.69Cr / 6.97Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score4.01 / 10
3.9% 3.60
CategoryPMKSY: Watershed
PMKSY Works0 total  (1 done / -1 ongoing)
JGSA Target3.79 Cr
JGSA Valuation1.58 Cr
Expenditure0.34 Cr
% Valuation41.7%
Valuation Marks (40%)1.67
Exp Marks (40%)0.36
Geotag Marks (10%)0.630
Physical Marks (10%)0.94
Final score3.60 / 10
5.0% 1.25
CategoryJSJB 2.0
Total Works588
Target Works4,695
Achievement %12.5%
Weightage5% of composite score
Final score1.25 / 10
52 BHIND โ†— 3.25
17.4% 2.21
CategoryFarm Pond
Started / Completed / Phys1,117 / 127 / 0
Completion rate11.4%
Part A score (max 5.0)0.57 / 5.0
Ongoing sanction / booked18.54Cr / 6.11Cr
Expenditure rate (ongoing)32.9%
Part B score (max 5.0)1.65 / 5.0
Final score2.21 / 10
3.0% 0.61
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.62Cr / 0.44Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score0.61 / 10
0.3% 3.41
CategoryDug Well Recharge
Started / Completed / Phys121 / 2 / 0
Completion rate1.7%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked0.32Cr / 0.21Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score3.41 / 10
7.9% 3.66
CategoryIrrigation infrastructure
Started / Completed / Phys144 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked9.49Cr / 6.95Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score3.66 / 10
54.0% 3.64
CategoryWater conservation & recharge
Started / Completed / Phys736 / 10 / 0
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked64.60Cr / 46.11Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score3.64 / 10
8.4% 3.43
CategoryWatershed Related Works
Started / Completed / Phys78 / 1 / 0
Completion rate1.3%
Part A score (max 5.0)0.06 / 5.0
Ongoing sanction / booked10.05Cr / 6.78Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score3.43 / 10
4.0% 3.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys64 / 1 / 0
Completion rate1.6%
Part A score (max 5.0)0.08 / 5.0
Ongoing sanction / booked4.70Cr / 3.28Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score3.57 / 10
โ€”
5.0% 3.02
CategoryJSJB 2.0
Total Works687
Target Works2,272
Achievement %30.2%
Weightage5% of composite score
Final score3.02 / 10
Scheme: โ‚น Sanction Weighted Level: District Snapshot: 2026-04-12 Units shown: 52 โšก Weight % shown is each unit's own auto-computed weight โ€” not the global admin-set value.

โš–๏ธ Step 1 โ€” Category Weightage

Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.

Weightage = Sanctioned Cost of Category รท Total Sanctioned Cost (all categories) e.g. Farm Pond = โ‚น200 Cr out of โ‚น500 Cr total Weightage = 200 รท 500 = 0.40 (40%)

Computed independently per unit โ€” two districts with different sanction distributions will have different weightages for the same category.

๐Ÿ…ฐ Step 2a โ€” Part A Score (Completion)

Fixed 50% weight on completion of works.

Part A = (Completed + Phys) รท Started ร— 5

๐Ÿ…ฑ Step 2b โ€” Part B Score (Expenditure)

Fixed 50% weight on expenditure booking on ongoing works.

Part B = (Ongoing Booked รท Ongoing Sanction) ร— 5 If all done โ†’ full 5 marks automatically

๐Ÿ… Step 3 โ€” Ceiling & Model

Category Score = Part A + Part B

๐Ÿ“Š Step 4 โ€” Final Composite Score

Weighted sum of all category scores (weightages sum to 100%).

Final Score = ฮฃ (Weightage_i ร— Score_i)

Example: Farm Pond 40% ร— 7.2 + Dug Well 20% ร— 6.5 + Amrit Sarovar 40% ร— 8.1 โ†’ 7.42

๐Ÿ’ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.
Score Breakup
Sanction cost in โ‚น Crore  ยท  Marks on a scale of 0โ€“10
Sr. Category Sanction Cost
(โ‚น Crore)
Weightage
for Category
Marks Obtained (scale 0โ€“10) Marks as per
Weightage
For Completion
of Works
For Expenditure
Booking on
Running Works
Total