JGSA 2026 โ Gp-Level Category Scorecard
Snapshot: 2026-04-12 ยท Scheme: โน Sanction Weighted
AAKVI
10.00
๐ฅ
Completed4
Started4
Rank#1
AAKYA
10.00
๐ฅ
Completed1
Started8
Rank#2
AAKYAJASSA
10.00
๐ฅ
Completed0
Started10
Rank#3
๐ Category Scorecard โ Gp Level
1040 units
Showing top 1,000 GPs by score โ use District / Block filters to narrow results
ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
| # | Gp | District | Block | Total |
๐ Trajectory raw achievement % |
Farm Pond | Amrit Sarowar | Dug Well Recharge | Irrigation infrastructure | Water conservation & recharge | Watershed Related Works | Repair & Maintenance (Water Structures) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ๐ฅ | AAKVI โ | INDORE | MHOW | 10.00 | A |
94.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| ๐ฅ | AAKYA โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
10.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
40.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
48.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| ๐ฅ | AAKYAJASSA โ | UJJAIN | MAHIDPUR | 10.00 | A |
81.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 4 | AALAMGANJ โ | REWA | GANGEV | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 5 | AALAMPUR โ | HARDA | TIMARNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 6 | AAMDA โ | BARWANI | PANSEMAL | 10.00 | A |
60.8%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 7 | AAMSAGAR N โ | HARDA | TIMARNI | 10.00 | A |
74.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 8 | AANCHALKHEDA โ | NARMADAPURAM | MAKHAN NAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 9 | AARON (P) โ | GWALIOR | GHATIGAON | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 10 | AARROLI (P) โ | GWALIOR | MORAR | 10.00 | A |
41.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
40.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 11 | ABGAON KHURD โ | HARDA | HARDA | 10.00 | A |
85.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 12 | ABHAYPURA โ | RAJGARH | RAJGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 13 | ABUADHANA โ | VIDISHA | SIRONJ | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 14 | ABUD โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
59.1%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
40.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 12 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 15 | ACHARAUNI โ | SHIVPURI | KHANIYADHANA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 16 | ACHKLPUR โ | GUNA | RAGHOGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 17 | ADAMPUR CHAWANI โ | BHOPAL | PHANDA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 18 | ADMALYA โ | NEEMUCH | NEEMUCH | 10.00 | A |
59.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
40.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 11 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 19 | ADWAD โ | SHEOPUR | SHEOPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 20 | AGADAL โ | REWA | GANGEV | 10.00 | A |
71.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
27.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 21 | AGAR โ | RAJGARH | BIAORA | 10.00 | A |
88.4%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 22 | AGARA โ | GUNA | GUNA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 23 | AGARIYA โ | JABALPUR | SIHORA | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 24 | AGASODA โ | VIDISHA | BASODA | 10.00 | A |
84.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 25 | AGHAWAN โ | KHARGONE | KASRAWAD | 10.00 | A |
33.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
53.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 26 | AGRAKHURD โ | DEWAS | BAGLI | 10.00 | A |
42.4%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
57.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 11 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 27 | AHALWADA โ | HARDA | TIMARNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 28 | AHAMADANAGAR โ | VIDISHA | VIDISHA | 10.00 | A |
95.9%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 29 | AHMADPUR โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
38.5%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
61.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys30 / 30 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 30 | AJABGAON โ | NARMADAPURAM | SOHAGPUR | 10.00 | A |
77.3%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 31 | AJANDA โ | NARSINGHPUR | SAIKHEDA (GADARWARA) | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 31 | AJANDA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 32 | Ajanti โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
51.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 33 | AJAPURA โ | SHEOPUR | SHEOPUR | 10.00 | A |
88.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 34 | AJAYGARH(P) โ | GWALIOR | DABRA | 10.00 | A |
81.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 35 | AJDAWADA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 36 | AJGAR โ | DINDORI | SAMNAPUR | 10.00 | A |
93.9%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
3.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 37 | AJNOD โ | INDORE | SAWER | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 38 | AKAJHIRI โ | SHIVPURI | BADARWAS | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 39 | AKASODA โ | UJJAIN | UJJAIN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 40 | AKBAIBADI(P) โ | GWALIOR | DABRA | 10.00 | A |
93.5%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 41 | AKOLA โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
88.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 41 | AKOLA โ | SEHORE | BUDNI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 41 | AKOLA โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 42 | AKOLIYA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 43 | AKYAJAGIR โ | UJJAIN | KHACHAROD | 10.00 | A |
35.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
65.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 44 | AKYAKOLI โ | UJJAIN | KHACHAROD | 10.00 | A |
74.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 45 | AKYANAJEEK โ | UJJAIN | KHACHAROD | 10.00 | A |
85.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 46 | ALAKHEDA โ | UJJAIN | MAHIDPUR | 10.00 | A |
81.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 47 | ALAMPURA โ | RAJGARH | BIAORA | 10.00 | A | โ | โ |
3.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
97.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 48 | ALANYA โ | SHAJAPUR | KALAPIPAL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 49 | ALAUMROD โ | SHAJAPUR | SHAJAPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 50 | ALHED โ | NEEMUCH | MANASA | 10.00 | A |
11.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
81.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 51 | ALIGANJ โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 52 | ALISARIYA โ | SHAJAPUR | KALAPIPAL | 10.00 | A |
60.8%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 53 | ALLI โ | RAISEN | SANCHI | 10.00 | A |
95.1%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 54 | ALONIKHAPA MAL โ | SEONI | KEOLARI | 10.00 | A |
93.5%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 55 | ALOTJAGIR โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 56 | AMAKHEDA KALOO โ | VIDISHA | NATERAN | 10.00 | A |
58.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
27.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 57 | AMALDA โ | SHEOPUR | SHEOPUR | 10.00 | A |
85.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 58 | AMALPURA โ | KHANDWA | KHANDWA | 10.00 | A |
52.7%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
27.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys26 / 1 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 59 | AMARGARH โ | RAJGARH | BIAORA | 10.00 | A |
12.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
50.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 60 | AMAUKHEDI โ | VIDISHA | VIDISHA | 10.00 | A |
89.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 61 | AMBA โ | RAJGARH | RAJGARH | 10.00 | A |
90.5%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 62 | AMBADA โ | KHANDWA | KHALAWA | 10.00 | A |
46.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 18 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
23.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 63 | AMBAPAT โ | KHANDWA | PANDHANA | 10.00 | A |
53.3%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 0 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 64 | AMDAR โ | BETUL | BETUL | 10.00 | A | โ | โ |
16.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
83.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 65 | AMDOR โ | RAJGARH | BIAORA | 10.00 | A |
58.6%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
34.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 66 | AMEDA(B) โ | BALAGHAT | LANJI | 10.00 | A |
95.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 67 | AMEHATA โ | KATNI | VIJAYRAGHAVGADH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 68 | AMGAON BADA โ | NARSINGHPUR | KARELI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 69 | AMGAON CHHOTA โ | NARSINGHPUR | SAIKHEDA (GADARWARA) | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 70 | AMGAWAN โ | RAISEN | SILWANI | 10.00 | A |
85.8%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 71 | AMILAKI โ | REWA | REWA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 72 | AMILIYA โ | SATNA | MAJHGAWAN | 10.00 | A |
91.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 72 | AMILIYA โ | SIDHI | SIHAWAL | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 73 | AMILWAN โ | SINGRAULI | WAIDHAN | 10.00 | A |
53.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 74 | AMILYA KALAN โ | SATNA | MAIHAR | 10.00 | A |
46.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 75 | AMJHIYA โ | SEHORE | SEHORE | 10.00 | A |
45.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
27.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 76 | AMLA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 77 | AMLAR โ | RAJGARH | NARSINGHGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 78 | AMLAROD โ | RAJGARH | SARANGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 79 | AMLAVDIYA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ | โ | โ |
78.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 80 | AMLIYAHAT โ | RAJGARH | BIAORA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 81 | AMODA โ | NARSINGHPUR | NARSIMHAPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 82 | AMON โ | SEHORE | BUDNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 83 | AMTHERA โ | DINDORI | SHAHPURA | 10.00 | A |
22.0%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
76.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 84 | ANANDIPURA โ | SEHORE | ASHTA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 85 | ANDHIYATOLA โ | BALAGHAT | LANJI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 86 | ANDIYA โ | NARSINGHPUR | CHAWARPATHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 87 | ANDOL โ | RAISEN | SANCHI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 88 | ANDORA โ | SHIVPURI | NARWAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 89 | ANGAI โ | DINDORI | BAJAG | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 7 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 90 | ANJANIYA KHURD โ | KHANDWA | PUNASA | 10.00 | A |
43.0%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
42.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys29 / 5 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
14.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 91 | ANJARUD โ | KHARGONE | BARWAH | 10.00 | A |
50.6%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
34.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 92 | ANJEERA โ | REWA | TEONTHAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 93 | ANTARIYA โ | ANUPPUR | PUSHPRAJGARH | 10.00 | A |
98.9%
10.00
CategoryFarm Pond
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 94 | ANTRALIYA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 95 | ANWLI โ | RAJGARH | NARSINGHGARH | 10.00 | A |
28.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
47.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 96 | AOURANGPUR โ | VIDISHA | BASODA | 10.00 | A |
66.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
33.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 97 | ARGAT โ | SATNA | RAMNAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 98 | ARJALA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 99 | ARNIYARAM โ | SEHORE | ASHTA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 100 | ARNYA โ | INDORE | DEPALPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 101 | ARUD โ | KHANDWA | PANDHANA | 10.00 | A |
54.8%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys33 / 33 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 102 | ASADI โ | UJJAIN | MAHIDPUR | 10.00 | A |
63.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 103 | ASALANA โ | UJJAIN | UJJAIN | 10.00 | A |
35.2%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
62.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 104 | ASANGAON โ | KHARGONE | KHARGONE | 10.00 | A |
43.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 105 | ASAWTA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 106 | ASER โ | UJJAIN | TARANA | 10.00 | A |
75.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
24.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 107 | ASHAPURI โ | RAISEN | OBEDULLAHGANJ | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 108 | ASLODA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 109 | ATARIYA โ | REWA | REWA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 110 | ATARSUMBA โ | KHARGONE | BARWAH | 10.00 | A |
49.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 111 | ATLAWADA โ | UJJAIN | KHACHAROD | 10.00 | A |
47.4%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
52.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys19 / 13 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 112 | ATOOT BHIKARI โ | KHANDWA | KHANDWA | 10.00 | A |
78.0%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys18 / 2 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 113 | ATRALIYA โ | RAJGARH | BIAORA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 114 | ATRIYA โ | CHHINDWARA | HARAI | 10.00 | A |
93.2%
10.00
CategoryFarm Pond
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 115 | ATTAR โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
76.6%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 12 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 116 | AVALI โ | BARWANI | THIKRI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 117 | AWANLIKHEDA โ | SEHORE | SEHORE | 10.00 | A |
69.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 118 | AZIMABADPARDHI โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 119 | BAAROD โ | GUNA | ARON | 10.00 | A |
62.3%
10.00
CategoryFarm Pond
Started / Completed / Phys23 / 16 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 1 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
35.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 120 | BABAI โ | CHHINDWARA | AMARWARA | 10.00 | A |
72.8%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 120 | BABAI โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 121 | BABAIKHURD โ | NARMADAPURAM | KESLA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 122 | BABAIYA โ | REWA | SIRMOUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 123 | BABARIYA โ | NARSINGHPUR | NARSIMHAPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 124 | BABLI โ | KHANDWA | PANDHANA | 10.00 | A |
49.9%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
50.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys49 / 0 / 49
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 125 | BABRI โ | NARMADAPURAM | SEONI MALWA | 10.00 | A |
85.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 126 | BACHAWANI โ | NARMADAPURAM | BANKHEDI | 10.00 | A |
13.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
59.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 127 | BADAGAON โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
38.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 11 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
61.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 128 | BADALKHEDI โ | RAJGARH | RAJGARH | 10.00 | A | โ | โ |
41.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
58.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 129 | BADARKHA โ | INDORE | SAWER | 10.00 | A |
97.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 130 | BADARKHA BERASIA โ | UJJAIN | UJJAIN | 10.00 | A |
10.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
20.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 131 | BADAUAA โ | REWA | NAIGARHI | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 132 | BADBELI โ | RAJGARH | NARSINGHGARH | 10.00 | A |
74.0%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 133 | BADGAON GURJAR โ | KHANDWA | KHANDWA | 10.00 | A |
37.6%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
51.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 134 | BADGAON MAFI โ | BURHANPUR | BURHANPUR | 10.00 | A | โ | โ |
2.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
97.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 135 | BADGAON MALI โ | KHANDWA | KHANDWA | 10.00 | A |
20.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
40.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 136 | BADHARA โ | REWA | SIRMOUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 137 | BADHKUMMED โ | UJJAIN | UJJAIN | 10.00 | A |
50.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
49.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 5 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 138 | BADI โ | KHARGONE | KASRAWAD | 10.00 | A |
28.3%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 5 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
63.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 139 | BADJHIRI โ | BURHANPUR | BURHANPUR | 10.00 | A |
70.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 139 | BADJHIRI โ | HARDA | TIMARNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 139 | BADJHIRI โ | BHOPAL | PHANDA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 140 | BADKHALIYA MAL โ | KHANDWA | HARSUD | 10.00 | A |
39.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
60.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 0 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 141 | BADLAVDA โ | RAJGARH | RAJGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 142 | BADNAGAR โ | RAJGARH | NARSINGHGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 143 | BADNAGAR RAIYAT โ | KHANDWA | PUNASA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 144 | BADODA 2 โ | RAISEN | SANCHI | 10.00 | A |
95.1%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 145 | BADODATAL โ | VIDISHA | SIRONJ | 10.00 | A |
60.7%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 146 | BADODIYA KHAN โ | INDORE | SAWER | 10.00 | A |
15.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
83.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 147 | BADODIYA TALAB โ | RAJGARH | NARSINGHGARH | 10.00 | A |
61.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
38.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 148 | BADOH โ | VIDISHA | KURWAI | 10.00 | A |
13.1%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
72.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
12.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 149 | BADWANI โ | HARDA | TIMARNI | 10.00 | A |
33.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
55.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 150 | BADWASA โ | VIDISHA | BASODA | 10.00 | A |
75.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 151 | BADYALAMATA โ | RATLAM | PIPLODA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 152 | BAFALGAON โ | KHARGONE | BARWAH | 10.00 | A |
55.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 5 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 153 | Bagadiya โ | DHAR | TIRLA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 154 | BAGALDA โ | SHEOPUR | SHEOPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 155 | BAGASPUR โ | RAISEN | OBEDULLAHGANJ | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 155 | BAGASPUR โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 156 | BAGASPURA (P) โ | SAGAR | REHLI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 157 | BAGDA โ | KHANDWA | KHALAWA | 10.00 | A |
97.0%
10.00
CategoryFarm Pond
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 158 | BAGDA BUJURG โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
25.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
74.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 159 | BAGEDI โ | UJJAIN | KHACHAROD | 10.00 | A |
92.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 160 | BAGER โ | SEHORE | ASHTA | 10.00 | A |
88.4%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 161 | BAGHODA โ | BETUL | PRABHAT PATTAN | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 162 | BAGHOLI โ | BALAGHAT | WARASEONI | 10.00 | A |
31.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
65.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 162 | BAGHOLI โ | BALAGHAT | BALAGHAT | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 162 | BAGHOLI โ | BALAGHAT | LALBARRA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 163 | BAGHWAR โ | SIDHI | RAMPUR NAIKIN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 164 | BAGLAI โ | NARSINGHPUR | BABAI CHICHLI | 10.00 | A |
89.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 164 | BAGLAI โ | SEONI | SEONI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 165 | BAGODA โ | UJJAIN | TARANA | 10.00 | A | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 166 | BAGRI โ | VIDISHA | VIDISHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 167 | BAGWA โ | KHARGONE | KHARGONE | 10.00 | A |
23.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
63.9%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 168 | BAHADURPUR (P) โ | SAGAR | RAHATGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 169 | BAHERA โ | DINDORI | AMARPUR | 10.00 | A |
40.5%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
55.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 170 | BAHRAWADA โ | SHEOPUR | SHEOPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 171 | BAIDIYA KHURD โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
64.9%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
35.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 16 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 172 | BAIDWARA (P) โ | SAGAR | REHLI | 10.00 | A |
11.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
79.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 173 | BAIHEDA โ | RAJGARH | BIAORA | 10.00 | A |
92.4%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 174 | BAISA โ | REWA | REWA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 175 | BAJANG MAL โ | DINDORI | BAJAG | 10.00 | A |
81.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 176 | BAJANG RYT โ | DINDORI | BAJAG | 10.00 | A | โ | โ |
13.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
86.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 177 | BAJJAHED โ | SHAJAPUR | SHAJAPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 178 | BAJPUR โ | BETUL | BETUL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 179 | BAJTTA KHURD โ | BARWANI | BARWANI | 10.00 | A |
38.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
61.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 180 | BAKANIYA โ | UJJAIN | UJJAIN | 10.00 | A |
44.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
55.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 181 | BAKTARIYA โ | BARWANI | SENDHAWA | 10.00 | A |
66.6%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 182 | BALCHIDI โ | RAJGARH | BIAORA | 10.00 | A |
56.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
43.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 183 | BALEDI โ | UJJAIN | BADNAGAR | 10.00 | A |
23.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
60.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 184 | BALGHARA โ | INDORE | SAWER | 10.00 | A |
97.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 185 | BALHARPUR โ | BALAGHAT | LALBARRA | 10.00 | A |
85.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 186 | BALKHADGHATI โ | KHANDWA | PANDHANA | 10.00 | A |
64.3%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
35.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys31 / 4 / 27
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 187 | Balrampur โ | VIDISHA | LATERI | 10.00 | A |
58.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
41.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 188 | BALRIYA โ | INDORE | SAWER | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 189 | BALWADI โ | KHARGONE | KHARGONE | 10.00 | A |
62.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 190 | BAMANDA โ | KHARGONE | KASRAWAD | 10.00 | A |
66.1%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 191 | BAMANDA RAIYAT โ | KHANDWA | PANDHANA | 10.00 | A |
31.4%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 0 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
45.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 192 | BAMANGAON โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 193 | BAMANPURI โ | KHARGONE | BARWAH | 10.00 | A |
64.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
35.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 194 | BAMHANI โ | NARSINGHPUR | KARELI | 10.00 | A |
91.3%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 194 | BAMHANI โ | SIDHI | SIDHI | 10.00 | A |
90.8%
10.00
CategoryFarm Pond
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
9.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 195 | BAMHANI LALA โ | CHHINDWARA | CHAURAI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 196 | BAMHORI BARDHA โ | RAISEN | SILWANI | 10.00 | A |
67.0%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
33.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 197 | BAMHORI DHUNDER (P) โ | SAGAR | SAGAR | 10.00 | A |
77.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 198 | BAMHORI GODAD โ | RAISEN | GAIRATGANJ | 10.00 | A |
88.7%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 199 | BAMJHAR โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
68.9%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys18 / 18 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 200 | BAMKHAL โ | KHARGONE | KASRAWAD | 10.00 | A |
44.1%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 201 | BAMLA โ | BETUL | AMLA | 10.00 | A |
23.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
40.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 202 | BAMNALA โ | KHARGONE | BHIKANGAON | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 15 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 203 | BAMNAPATI โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 204 | BAMORA โ | SAGAR | SAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 204 | BAMORA โ | UJJAIN | UJJAIN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 205 | BAMORA (P) โ | SAGAR | BINA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 206 | Bamorasukha โ | RAJGARH | NARSINGHGARH | 10.00 | A |
27.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
62.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 207 | BAMORI โ | GUNA | BAMORI | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 208 | BAMORISHALA โ | VIDISHA | SIRONJ | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 209 | BAMULIYAMUCHALI โ | SHAJAPUR | KALAPIPAL | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 210 | BAMULIYA RAIMAL โ | SEHORE | ASHTA | 10.00 | A |
41.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
58.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 211 | BANAR โ | MANDLA | NARAYANGANJ | 10.00 | A |
85.7%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 212 | BANATHAR โ | SEONI | KEOLARI | 10.00 | A |
96.7%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 213 | BANBANA โ | UJJAIN | KHACHAROD | 10.00 | A |
65.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
34.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 214 | BANBANI โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 215 | BANDAKA โ | UJJAIN | GHATIYA | 10.00 | A |
66.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 216 | BANDERBELA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 217 | BANDHA โ | NARSINGHPUR | CHAWARPATHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 218 | BANDHAN โ | CHHINDWARA | PANDHURNA | 10.00 | A |
80.4%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 219 | BANDRIYABAD โ | BARWANI | PANSEMAL | 10.00 | A |
24.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
63.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 220 | BANDWA โ | VIDISHA | GYARASPUR | 10.00 | A |
86.5%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 221 | BANGARDA โ | KHANDWA | PUNASA | 10.00 | A |
52.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 222 | BANGRED โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 223 | BANI โ | UJJAIN | MAHIDPUR | 10.00 | A |
35.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
65.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 224 | BANJARI โ | UJJAIN | KHACHAROD | 10.00 | A |
55.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 224 | BANJARI โ | UJJAIN | MAHIDPUR | 10.00 | A |
17.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
82.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 224 | BANJARI โ | KHARGONE | MAHESHWAR | 10.00 | A |
14.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
78.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 224 | BANJARI โ | UJJAIN | TARANA | 10.00 | A |
38.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
61.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 225 | BANJARIYA (P) โ | SAGAR | JAISINAGAR | 10.00 | A |
70.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
30.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 226 | BANJRA โ | DINDORI | SAMNAPUR | 10.00 | A |
36.6%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 227 | BANKA MUKASA โ | CHHINDWARA | AMARWARA | 10.00 | A |
61.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
38.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 228 | BANMURI โ | SIDHI | SIDHI | 10.00 | A |
66.8%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
33.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 229 | BANSA (P) โ | SAGAR | JAISINAGAR | 10.00 | A |
74.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 230 | BANSKHEDI โ | UJJAIN | UJJAIN | 10.00 | A |
32.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
67.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys24 / 2 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 230 | BANSKHEDI โ | UJJAIN | GHATIYA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 231 | BANUR โ | BETUL | BHAINSDEHI | 10.00 | A |
23.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
63.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 232 | BANWADA โ | UJJAIN | KHACHAROD | 10.00 | A |
36.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
52.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 233 | BAPACHA โ | SHAJAPUR | SHAJAPUR | 10.00 | A |
85.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 234 | BAPCHADONIYA โ | SEHORE | ASHTA | 10.00 | A |
85.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 235 | BARACHH โ | REWA | JAWA | 10.00 | A |
29.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
62.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 236 | BARAHBARAYARI โ | CHHINDWARA | CHAURAI | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 237 | BARAI โ | DINDORI | MEHANDWANI | 10.00 | A |
28.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
37.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
12.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 238 | BARAKALA โ | SATNA | SATNA | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 239 | BARA KHURD โ | REWA | TEONTHAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 240 | BARAKUND โ | KHANDWA | KHALAWA | 10.00 | A |
60.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
39.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 0 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 241 | BARANA โ | DATIA | BHANDER | 10.00 | A |
67.8%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 242 | BARAYATHA (P) โ | SAGAR | SHAHGARH | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 243 | BARBAH โ | REWA | SIRMOUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 244 | BARCHOLI โ | DATIA | BHANDER | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 245 | BARDIYA โ | NEEMUCH | MANASA | 10.00 | A |
28.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 8 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
22.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
23.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 246 | BARETHA (P) โ | GWALIOR | MORAR | 10.00 | A |
23.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
68.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 247 | BARETHHA โ | VIDISHA | KURWAI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 248 | BARETHI (P) โ | SAGAR | SHAHGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 249 | BARGAON โ | DINDORI | BAJAG | 10.00 | A |
35.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
46.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 250 | BARGWANDARACHI โ | JABALPUR | MAJHOULI | 10.00 | A | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 251 | BARIGAWAN-2 โ | SIDHI | SIDHI | 10.00 | A |
51.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
40.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 252 | BARIKHURD โ | SATNA | SATNA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 253 | BARJHAI โ | DEWAS | BAGLI | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 254 | BARJORPURA โ | DATIA | SEONDHA | 10.00 | A |
88.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 255 | BARKALA โ | HARDA | TIMARNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 256 | BARKHEDAJAORA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 257 | BARKHEDA KHARET โ | SEHORE | SEHORE | 10.00 | A |
74.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 258 | BARKHEDAMADAN โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 259 | BARKHEDA NAI โ | ASHOK NAGAR | ASHOKNAGAR | 10.00 | A |
96.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 260 | Barkheda Sahajpur โ | JABALPUR | SHAHPURA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 261 | BARKHEDASOMA โ | DEWAS | BAGLI | 10.00 | A |
88.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 262 | BARKHEDI-2 โ | RAJGARH | BIAORA | 10.00 | A |
92.1%
10.00
CategoryFarm Pond
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 263 | BARKHEDIBAZAR โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
31.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
68.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 264 | BARKHERA GAUTAM (P) โ | SAGAR | REHLI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 265 | BARKHRDANAJIK โ | UJJAIN | KHACHAROD | 10.00 | A |
74.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 266 | BARLA โ | RAISEN | SANCHI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 267 | BARODA SAGAR (P) โ | SAGAR | JAISINAGAR | 10.00 | A |
81.7%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 268 | BARODIA (P) โ | SAGAR | BINA | 10.00 | A |
41.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
58.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 12 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 269 | BARODIYA โ | GUNA | BAMORI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 270 | BARODIYA NAUNAGIR (P) โ | SAGAR | KHURAI | 10.00 | A |
59.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
40.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 271 | BAROKHAR โ | REWA | GANGEV | 10.00 | A |
23.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
76.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 272 | BAROLI โ | INDORE | SAWER | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 273 | BAROL(P) โ | GWALIOR | DABRA | 10.00 | A |
81.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 274 | BARRUKHAR โ | RAISEN | SANCHI | 10.00 | A |
94.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 275 | BARSLYA (BARUFATAK) โ | BARWANI | THIKRI | 10.00 | A |
94.5%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 276 | BARTHOON โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
17.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
82.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 277 | BARUKHEDA โ | NEEMUCH | NEEMUCH | 10.00 | A |
59.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 278 | BARUKHEDI โ | UJJAIN | MAHIDPUR | 10.00 | A |
35.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
65.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 279 | BARUREWA โ | NARSINGHPUR | NARSIMHAPUR | 10.00 | A |
50.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
49.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 280 | BASEDA โ | REWA | GANGEV | 10.00 | A |
99.4%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 281 | BASIYA โ | DAMOH | BATIYAGARH | 10.00 | A |
97.0%
10.00
CategoryFarm Pond
Started / Completed / Phys19 / 19 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 282 | BASKHAPA โ | NARMADAPURAM | SOHAGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 283 | BASTARI โ | MANDLA | NIWAS | 10.00 | A |
85.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 284 | BASWA โ | KHARGONE | BARWAH | 10.00 | A |
45.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
55.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 285 | BATAULI โ | SIDHI | SIDHI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 286 | BATHOLI โ | KHARGONE | MAHESHWAR | 10.00 | A |
71.0%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 287 | BATLAWADI โ | UJJAIN | KHACHAROD | 10.00 | A |
22.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
52.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
24.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 288 | BATONDHA โ | DINDORI | DINDORI | 10.00 | A |
36.1%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
49.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 289 | BAVADIKHEDA โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 290 | BAVALI โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
13.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
86.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 291 | BAVALYA โ | UJJAIN | MAHIDPUR | 10.00 | A |
51.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 292 | BAWADIKHEDA โ | DEWAS | BAGLI | 10.00 | A |
41.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
58.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 15 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 293 | BAWELLY โ | DINDORI | KARANJIYA | 10.00 | A |
80.3%
10.00
CategoryFarm Pond
Started / Completed / Phys11 / 10 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 294 | BAYAWADI โ | BETUL | BETUL | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 295 | BEDAGAON โ | DEWAS | KANNOD | 10.00 | A |
66.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 296 | BEDAR โ | NARMADAPURAM | BANKHEDI | 10.00 | A |
59.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 297 | BEDARNAGAR โ | SHAJAPUR | MOMAN BADODIYA | 10.00 | A |
63.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
32.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 298 | BEDAVANYA โ | UJJAIN | KHACHAROD | 10.00 | A |
68.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 299 | BEDIYA โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 300 | BEDIYAKLAN โ | HARDA | KHIRKIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 301 | BEDIYAW โ | KHARGONE | KHARGONE | 10.00 | A |
16.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
63.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 302 | BEDWAN โ | UJJAIN | KHACHAROD | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 303 | BEEJANWADA โ | NARMADAPURAM | PIPARIYA | 10.00 | A |
75.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
24.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 304 | BEELADHHANA โ | VIDISHA | BASODA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 305 | BEELKHEDA โ | GUNA | BAMORI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 306 | BEERAKHEDI โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 307 | BEHLOLA โ | UJJAIN | KHACHAROD | 10.00 | A |
30.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
52.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 308 | BELA โ | SATNA | SATNA | 10.00 | A |
63.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
36.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 308 | BELA โ | SATNA | AMARPATAN | 10.00 | A |
74.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 308 | BELA โ | REWA | GANGEV | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 309 | BELAKHEDA โ | UJJAIN | MAHIDPUR | 10.00 | A |
32.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
67.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 310 | BELGAON โ | BALAGHAT | LALBARRA | 10.00 | A |
85.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 311 | BELKHEDA โ | NARSINGHPUR | NARSIMHAPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 312 | BELKHEDI SEDH โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 313 | BELWA KURMIYAN โ | REWA | GANGEV | 10.00 | A |
99.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 314 | BELWA PAIKAN โ | REWA | GANGEV | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 315 | BERCHHA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 316 | BERKHEDI BAZYAFT โ | BHOPAL | PHANDA | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 317 | BERKHEDI KALAN โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 318 | BERKHUWA MAHANT โ | SAGAR | JAISINAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 319 | BERPANI โ | MANDLA | BIJADANDI | 10.00 | A |
86.8%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 320 | BESARKUND โ | KHARGONE | KASRAWAD | 10.00 | A |
18.1%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
67.5%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
7.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 9 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
6.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 321 | BESVAN โ | HARDA | HARDA | 10.00 | A |
46.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
21.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 322 | BGHARI โ | SHIVPURI | KHANIYADHANA | 10.00 | A |
82.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 323 | BHADBHADIYA โ | NEEMUCH | NEEMUCH | 10.00 | A |
63.7%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
36.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 324 | BHADSIMBHA โ | UJJAIN | TARANA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 325 | BHADUS โ | BETUL | BETUL | 10.00 | A |
51.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 326 | BHADWA โ | UJJAIN | MAHIDPUR | 10.00 | A |
34.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
65.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 2 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 327 | BHAGAWA โ | KHANDWA | KHALAWA | 10.00 | A |
30.5%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
45.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 328 | BHAGGASELOT KA TAPAR โ | RATLAM | BAJNA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 329 | BHAGOHAR โ | SIDHI | SIDHI | 10.00 | A |
89.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 330 | BHAGORI โ | RAJGARH | ZIRAPUR | 10.00 | A | โ | โ |
16.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 10 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
83.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 331 | BHAGOTIPURA โ | RAJGARH | BIAORA | 10.00 | A |
83.9%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 332 | BHAHEDI โ | KHANDWA | HARSUD | 10.00 | A |
28.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
56.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 333 | BHAINSA โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
34.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
65.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 334 | BHAINSWAHI โ | DINDORI | AMARPUR | 10.00 | A |
72.3%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 334 | BHAINSWAHI โ | MANDLA | BIJADANDI | 10.00 | A |
94.5%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 335 | BHAISA (P) โ | SAGAR | RAHATGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 336 | BHAISAWA โ | KHANDWA | KHANDWA | 10.00 | A |
63.2%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
36.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 337 | BHAKRADA โ | KHANDWA | KHANDWA | 10.00 | A |
61.7%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
38.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys28 / 0 / 28
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 338 | BHALWARA โ | DINDORI | MEHANDWANI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 4 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 339 | BHALWARA MAL โ | MANDLA | NIWAS | 10.00 | A |
90.3%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 340 | BHAMORI โ | BARWANI | THIKRI | 10.00 | A |
61.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
38.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 341 | BHAMORI KALA โ | NARMADAPURAM | PIPARIYA | 10.00 | A | โ | โ |
13.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
86.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 342 | BHANDAWAD โ | RAJGARH | SARANGPUR | 10.00 | A |
55.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 343 | BHAND BADODIYA โ | UJJAIN | UJJAIN | 10.00 | A |
15.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
84.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys32 / 0 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 344 | BHANWAS โ | RAJGARH | BIAORA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 345 | BHANWASA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 346 | BHANYA KHEDI โ | SHAJAPUR | KALAPIPAL | 10.00 | A |
89.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 347 | BHAPSA โ | DINDORI | AMARPUR | 10.00 | A |
92.0%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 347 | BHAPSA โ | MANDLA | MANDLA | 10.00 | A |
73.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
26.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 348 | BHARATPURA โ | CHHATARPUR | BIJAWAR | 10.00 | A |
90.5%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 349 | BHARDI โ | SHAJAPUR | KALAPIPAL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 350 | BHARIGAWAN โ | REWA | NAIGARHI | 10.00 | A |
74.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 351 | BHARJUNAKALAN โ | SATNA | SATNA | 10.00 | A |
87.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 352 | BHARKACHHA KALAN โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 353 | BHASNER โ | KHARGONE | KHARGONE | 10.00 | A |
55.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 354 | BHATANI โ | VIDISHA | BASODA | 10.00 | A |
95.7%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
4.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 355 | BHATERA โ | NARSINGHPUR | SAIKHEDA (GADARWARA) | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 356 | BHATGAON โ | NARMADAPURAM | SOHAGPUR | 10.00 | A |
78.4%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
21.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 6 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 357 | BHATISUDA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 358 | BHATIWADA (MEHLON) โ | SEONI | SEONI | 10.00 | A |
79.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 359 | BHATKHEDI โ | DEWAS | DEWAS | 10.00 | A |
31.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
52.5%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
16.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 359 | BHATKHEDI โ | RAJGARH | BIAORA | 10.00 | A | โ | โ |
18.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
81.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 359 | BHATKHEDI โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 360 | BHATKI โ | BARWANI | PANSEMAL | 10.00 | A |
65.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
11.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 361 | BHATNI โ | VIDISHA | VIDISHA | 10.00 | A |
66.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
29.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 362 | BHATODIYA KHURD โ | CHHINDWARA | JAMAI | 10.00 | A |
66.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
33.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 363 | BHATPARETIYA โ | HARDA | HARDA | 10.00 | A |
65.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
34.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 364 | BHATTYAN KHURD โ | KHARGONE | KASRAWAD | 10.00 | A |
10.5%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.8%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
55.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 365 | BHAUKHARI KHURD โ | REWA | GANGEV | 10.00 | A |
94.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 366 | BHAUNDI โ | MANDLA | BIJADANDI | 10.00 | A |
93.9%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 367 | BHAURGARH โ | BALAGHAT | KHAIRLANJI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 368 | BHAVRAS โ | HARDA | TIMARNI | 10.00 | A |
46.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
53.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 369 | BHAWANIPURA โ | RAJGARH | NARSINGHGARH | 10.00 | A |
76.1%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 370 | BHAWARLI MAL โ | KHANDWA | HARSUD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 371 | BHEJRI โ | ANUPPUR | PUSHPRAJGARH | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys13 / 12 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 372 | BHENSOLA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
21.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
78.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 373 | BHESANA โ | RAJGARH | NARSINGHGARH | 10.00 | A |
76.4%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 374 | BHESAYANAGAN โ | SHAJAPUR | KALAPIPAL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 375 | BHICCHDODKHALSA โ | UJJAIN | GHATIYA | 10.00 | A |
41.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
58.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 376 | BHICHHDODISTMURAR โ | UJJAIN | GHATIYA | 10.00 | A |
81.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 377 | BHICHHIYAKHURD โ | SATNA | AMARPATAN | 10.00 | A |
51.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 378 | BHIGAWA NANKARI โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
56.6%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
43.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys24 / 24 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 379 | BHIKAMPUR โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys26 / 22 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 380 | BHILIDYA โ | NARMADAPURAM | SOHAGPUR | 10.00 | A | โ | โ |
50.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
49.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 381 | BHILKHEDA โ | BARWANI | BARWANI | 10.00 | A |
41.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
58.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 382 | BHILSUDA โ | UJJAIN | KHACHAROD | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 383 | BHIMAKHEDA โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
18.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
81.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 384 | BHIYANA โ | RAJGARH | SARANGPUR | 10.00 | A |
67.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
32.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 4 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 385 | BHODIYA โ | RAISEN | BADI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 386 | BHOGAWA NIPANI โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 387 | BHOGAWA SIPANI โ | KHARGONE | BARWAH | 10.00 | A |
17.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
74.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 388 | BHOJAKHEDI โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
31.5%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
54.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 389 | BHOJPUR โ | RAISEN | OBEDULLAHGANJ | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 390 | BHOMALVAS โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 391 | BHOOTNEEKHEDA โ | KHANDWA | PANDHANA | 10.00 | A |
63.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 0 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
12.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 392 | BHOURANSA โ | VIDISHA | KURWAI | 10.00 | A |
48.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
51.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 393 | BHUGAOLI (P) โ | SAGAR | KHURAI | 10.00 | A |
79.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 394 | BHUIFAL โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
52.9%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
21.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 14 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
25.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 395 | BHURAKHEDI โ | GUNA | BAMORI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 396 | BHURI โ | DAMOH | DAMOH | 10.00 | A |
65.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 397 | BHURSADONGRI โ | BALAGHAT | LANJI | 10.00 | A |
77.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 398 | BHUSIBENTA โ | RAISEN | SANCHI | 10.00 | A |
96.4%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 399 | BHUTAI โ | CHHINDWARA | MOHKHED | 10.00 | A |
51.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 400 | BIAORA MANDU โ | RAJGARH | SARANGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 401 | BICHUWA โ | KATNI | KATNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 402 | BIDHUIKHURD โ | SATNA | AMARPATAN | 10.00 | A |
51.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 403 | BIGNODIPURA โ | RAJGARH | SARANGPUR | 10.00 | A |
79.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 404 | BIGROD โ | SHAJAPUR | SHAJAPUR | 10.00 | A |
88.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 3 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 405 | BIHAR โ | KHANDWA | PANDHANA | 10.00 | A |
92.7%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 406 | BIHIRWARA โ | CHHATARPUR | BIJAWAR | 10.00 | A |
99.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 407 | BIHRA โ | REWA | REWA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 408 | BIJADANDI โ | MANDLA | BIJADANDI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 409 | BIJAURA โ | DINDORI | DINDORI | 10.00 | A |
87.7%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 410 | BIJOURA โ | ANUPPUR | PUSHPRAJGARH | 10.00 | A |
99.1%
10.00
CategoryFarm Pond
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 411 | BIKOUR โ | NARSINGHPUR | KARELI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 412 | BILAIYA (P) โ | SAGAR | KHURAI | 10.00 | A |
57.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
42.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 413 | BILGADA โ | DINDORI | MEHANDWANI | 10.00 | A |
80.5%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 414 | BILGAON โ | DINDORI | SHAHPURA | 10.00 | A | โ | โ |
1.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
98.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 415 | BILKHERBA โ | JABALPUR | SHAHPURA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 416 | BILLORA BUZURG โ | KHANDWA | PUNASA | 10.00 | A | โ | โ |
15.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
84.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 417 | BILOOD โ | KHANDWA | PANDHANA | 10.00 | A |
73.2%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 418 | BILWANI โ | RAISEN | GAIRATGANJ | 10.00 | A |
93.7%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 419 | BILWANIYA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 420 | BILWAROAD โ | BARWANI | THIKRI | 10.00 | A |
20.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
70.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 421 | BINDRAI โ | CHHINDWARA | JAMAI | 10.00 | A |
59.3%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 422 | BINPURA โ | UJJAIN | MAHIDPUR | 10.00 | A |
58.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 423 | BIRAMKHEDI โ | UJJAIN | GHATIYA | 10.00 | A |
13.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
40.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 424 | BIRGODARANDHIR โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 425 | BIRHOLI โ | RAISEN | SANCHI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 426 | BIRIYAKHEDI โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 427 | BIRPUR โ | SHEOPUR | BIJEYPUR | 10.00 | A |
85.1%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 428 | BISALI โ | DEWAS | BAGLI | 10.00 | A |
61.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
38.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 429 | BISALKHEDI โ | UJJAIN | MAHIDPUR | 10.00 | A |
38.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
61.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 430 | BISANYA โ | RAJGARH | KHILCHIPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 431 | BISAPURKALA โ | CHHINDWARA | MOHKHED | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 432 | BISTRA โ | KATNI | KATNI | 10.00 | A |
81.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 433 | BOLAI โ | SHAJAPUR | MOMAN BADODIYA | 10.00 | A |
84.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 434 | BOLASA โ | UJJAIN | UJJAIN | 10.00 | A |
94.8%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 435 | BORADI MAL โ | KHANDWA | PUNASA | 10.00 | A | โ | โ |
27.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys35 / 0 / 35
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
43.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
29.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 436 | BORDAMADA โ | UJJAIN | TARANA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 437 | BORI โ | BARWANI | BARWANI | 10.00 | A |
68.1%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 438 | BORIPIPARDAHI โ | MANDLA | NAINPUR | 10.00 | A |
85.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 439 | BORI SARAY โ | KHANDWA | HARSUD | 10.00 | A |
29.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
56.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 440 | BORKHEDA โ | KHANDWA | KHALAWA | 10.00 | A |
65.4%
10.00
CategoryFarm Pond
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
34.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys32 / 0 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 441 | BORKHEDABHALLA โ | UJJAIN | GHATIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 442 | BORKHEDAKHURD RAIYAT โ | KHANDWA | PANDHANA | 10.00 | A |
77.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 443 | BORKHEDI โ | RAJGARH | NARSINGHGARH | 10.00 | A |
67.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 444 | BORNAGUJAR โ | NARMADAPURAM | SOHAGPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 445 | BORUTH โ | KHARGONE | BHIKANGAON | 10.00 | A |
85.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 446 | BOTHI โ | HARDA | TIMARNI | 10.00 | A |
43.6%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
39.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 447 | BRUKHODRA โ | BARWANI | BARWANI | 10.00 | A |
72.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 448 | BUCHANKHAPA โ | CHHINDWARA | PANDHURNA | 10.00 | A |
57.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
42.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 449 | BUDARKALA โ | NARMADAPURAM | SEONI MALWA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 450 | BUDAWA โ | REWA | GANGEV | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 451 | BUDHANIYA PANTH โ | INDORE | SAWER | 10.00 | A |
31.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
68.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 452 | BUDHGAON โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys12 / 12 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 453 | BUDHI BARLAI โ | INDORE | SAWER | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 454 | BUDI KONI โ | JABALPUR | PATAN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 455 | BUGHAKHARA โ | SHIVPURI | KHANIYADHANA | 10.00 | A |
88.9%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 456 | BULDAMAAL โ | DINDORI | MEHANDWANI | 10.00 | A |
75.2%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 457 | BURADA โ | DEWAS | KHATEGAON | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 458 | BURANABAD โ | UJJAIN | KHACHAROD | 10.00 | A |
85.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 459 | BURANA KHEDI โ | INDORE | INDORE | 10.00 | A |
63.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
37.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 460 | CANDANIYA โ | ANUPPUR | PUSHPRAJGARH | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys14 / 14 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 461 | CHADAN KHEDA โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 462 | CHAKDAHI โ | SATNA | RAMPUR BAGHELAN | 10.00 | A |
73.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 463 | CHAKERI โ | BARWANI | THIKRI | 10.00 | A |
65.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
34.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 464 | CHAKERI (P) โ | SAGAR | JAISINAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 465 | CHAKRA โ | KHANDWA | KHALAWA | 10.00 | A |
87.6%
10.00
CategoryFarm Pond
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
0.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 466 | CHAK RAGHUNATHPUR โ | VIDISHA | GYARASPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 467 | CHAKRAWADA โ | UJJAIN | GHATIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 468 | CHAMARGAWAN โ | MORENA | KAILARAS | 10.00 | A |
98.8%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 469 | CHANDAN KHEDA โ | NARSINGHPUR | BABAI CHICHLI | 10.00 | A |
82.1%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
17.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 470 | CHANDEE โ | REWA | JAWA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 471 | CHANDEH โ | REWA | GANGEV | 10.00 | A |
99.6%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 472 | CHANDERI โ | NARMADAPURAM | SOHAGPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 473 | CHANDESARA โ | UJJAIN | UJJAIN | 10.00 | A |
6.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
93.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 474 | CHANDESARI โ | UJJAIN | UJJAIN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 475 | CHANDLI โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
83.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
16.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 476 | CHANDNA โ | RAISEN | SANCHI | 10.00 | A |
91.5%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 477 | CHANDODIYA โ | UJJAIN | KHACHAROD | 10.00 | A |
23.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
76.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 478 | CHANDPUR โ | DINDORI | AMARPUR | 10.00 | A |
10.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
43.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 479 | CHANDPURA โ | NARSINGHPUR | NARSIMHAPUR | 10.00 | A |
69.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
30.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 480 | CHANDPUR (P) โ | SAGAR | REHLI | 10.00 | A |
38.1%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
44.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 481 | CHANDVARA โ | CHHATARPUR | GAURIHAR | 10.00 | A |
49.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
42.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 482 | CHANDVASLA โ | UJJAIN | KHACHAROD | 10.00 | A |
62.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
37.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 483 | CHAPAKHEDA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 484 | CHAPARA โ | KATNI | BAHORIBAND | 10.00 | A |
53.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 485 | CHARAISHAMPUR(P) โ | GWALIOR | GHATIGAON | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 486 | CHARGAON โ | RAISEN | BADI | 10.00 | A |
74.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 487 | CHARGAON KARBAL โ | CHHINDWARA | MOHKHED | 10.00 | A | โ | โ |
4.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
95.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 488 | CHARGAONMAL โ | MANDLA | BIJADANDI | 10.00 | A |
88.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 489 | CHARKHEDA (PO.AB.) โ | KHANDWA | HARSUD | 10.00 | A |
52.1%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys39 / 39 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 490 | CHATARKHEDA โ | NARMADAPURAM | SEONI MALWA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 491 | CHATRUKHEDI โ | RAJGARH | SARANGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 492 | CHAUBISA MAAL โ | DINDORI | MEHANDWANI | 10.00 | A |
84.0%
10.00
CategoryFarm Pond
Started / Completed / Phys11 / 3 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
12.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 493 | CHAUDIYAR โ | REWA | RAIPUR KARCHULIYAN | 10.00 | A |
19.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
71.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 494 | CHAURA โ | REWA | SIRMOUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 495 | CHAURAMAL โ | DINDORI | DINDORI | 10.00 | A |
97.7%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 8 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 496 | CHAYANI โ | SHAJAPUR | KALAPIPAL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 497 | CHEEKALI โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 498 | CHEENA โ | DATIA | SEONDHA | 10.00 | A |
92.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 499 | CHENPURA KALAN โ | RAJGARH | NARSINGHGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 500 | CHHALPIKHURD โ | KHANDWA | HARSUD | 10.00 | A |
45.3%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys25 / 0 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 501 | CHHAPAKUND โ | KHANDWA | HARSUD | 10.00 | A |
45.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
54.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys33 / 33 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 502 | CHHAPER โ | ASHOK NAGAR | ASHOKNAGAR | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 503 | CHHAPRI โ | SHAJAPUR | KALAPIPAL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 504 | CHHAWAL โ | BETUL | AMLA | 10.00 | A |
84.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 505 | CHHIDGAON MEL โ | HARDA | TIMARNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 506 | CHHIKARI โ | GUNA | BAMORI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 507 | CHHIND โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 508 | CHHINDI KAMATH โ | CHHINDWARA | JAMAI | 10.00 | A |
85.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 509 | CHHIRAHATA โ | REWA | SIRMOUR | 10.00 | A |
95.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 510 | CHHIRPANI VANGRAM โ | DINDORI | SHAHPURA | 10.00 | A |
91.2%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 511 | CHHIRWA RAIYAT โ | KHANDWA | PANDHANA | 10.00 | A |
57.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
26.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 512 | CHHIRWEL โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
60.0%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 1 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
32.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 513 | CHHITARDEVI โ | UJJAIN | GHATIYA | 10.00 | A |
56.0%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
36.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 514 | CHHIULA โ | REWA | GANGEV | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 515 | CHHTAINEE โ | REWA | JAWA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 516 | CHHUAI(TIKARI) โ | SEONI | SEONI | 10.00 | A |
63.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
36.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 517 | CHICHGAON โ | MANDLA | NAINPUR | 10.00 | A |
91.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 518 | CHICHOLI โ | RAISEN | SILWANI | 10.00 | A |
76.4%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 519 | CHIDLAWNIYA โ | RAJGARH | SARANGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 520 | CHIDORIYA โ | VIDISHA | VIDISHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 521 | CHIKHALI โ | BETUL | GHORA DONGRI | 10.00 | A | โ | โ |
19.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
81.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 522 | CHIKHLI MUKASA โ | CHHINDWARA | PANDHURNA | 10.00 | A |
88.7%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 523 | CHIKLI โ | UJJAIN | TARANA | 10.00 | A |
55.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 524 | CHILWAHA โ | RAISEN | SANCHI | 10.00 | A |
94.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 525 | CHIMNAKHAPA โ | CHHINDWARA | PANDHURNA | 10.00 | A |
83.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 526 | CHINKI โ | NARSINGHPUR | KARELI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 527 | CHIRAGPURA โ | KHARGONE | BHIKANGAON | 10.00 | A |
57.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
42.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 528 | CHIRHOLI โ | RAISEN | SANCHI | 10.00 | A |
88.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 529 | CHIROLA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 530 | CHIRPURA(P) โ | GWALIOR | DABRA | 10.00 | A |
96.9%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 531 | CHITAWAD โ | UJJAIN | MAHIDPUR | 10.00 | A |
50.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
49.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 532 | CHITAWALYAKHEDA โ | UJJAIN | TARANA | 10.00 | A |
82.5%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 533 | CHOBAPIPALYA โ | DEWAS | DEWAS | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 534 | CHOKHANDA โ | RAJGARH | ZIRAPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 535 | CHORAL โ | INDORE | MHOW | 10.00 | A |
30.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
69.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 536 | CHOUPRA KHURD โ | DAMOH | DAMOH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 537 | CHUKLIYA โ | RAJGARH | BIAORA | 10.00 | A |
83.1%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 538 | DABHNI โ | DATIA | SEONDHA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 539 | DABIYA โ | SHIVPURI | SHIVPURI | 10.00 | A |
94.6%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 540 | DABRI โ | UJJAIN | KHACHAROD | 10.00 | A |
45.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
50.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 541 | DADHAWA โ | REWA | RAIPUR KARCHULIYAN | 10.00 | A |
95.8%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 542 | DADOORAR โ | VIDISHA | KURWAI | 10.00 | A |
40.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
59.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 543 | DAGADKHEDI MAL โ | KHANDWA | HARSUD | 10.00 | A |
53.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 544 | DAHEGAON โ | BALAGHAT | LANJI | 10.00 | A |
81.5%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 545 | DAKACHYA โ | INDORE | SAWER | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 546 | DALIPUR โ | CHHATARPUR | BADA MALEHARA | 10.00 | A |
55.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 547 | DALLAHEDA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 548 | DAMADIYA โ | NARMADAPURAM | SEONI MALWA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 549 | DAMODARPURA โ | NEEMUCH | JAWAD | 10.00 | A |
41.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
58.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 550 | DANDBICHHIYA โ | DINDORI | DINDORI | 10.00 | A |
73.1%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
24.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 551 | DANDVIDAYPUR โ | DINDORI | DINDORI | 10.00 | A |
89.6%
10.00
CategoryFarm Pond
Started / Completed / Phys12 / 1 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 552 | DANGARBADA โ | VIDISHA | VIDISHA | 10.00 | A |
46.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
53.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 553 | DANGAVANI PIPARIYA โ | CHHINDWARA | CHHINDWARA | 10.00 | A | โ | โ |
12.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
87.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 554 | DANGICHA โ | SHAJAPUR | MOMAN BADODIYA | 10.00 | A |
67.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
32.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 555 | DANORA โ | BETUL | BETUL | 10.00 | A |
9.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
90.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 556 | DANTHA โ | KHANDWA | BALADI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys24 / 14 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 557 | DANTOLI โ | NEEMUCH | MANASA | 10.00 | A |
91.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 558 | DARAIN โ | SHAHDOL | JAISINGHNAGAR | 10.00 | A |
71.0%
10.00
CategoryFarm Pond
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 559 | DARVAI โ | SEONI | CHHAPARA | 10.00 | A |
91.3%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 560 | DASNAWAL โ | KHARGONE | GOGANWA | 10.00 | A |
42.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
46.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 561 | DATAIRA โ | VIDISHA | KURWAI | 10.00 | A | โ | โ | โ |
100.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
| 562 | DATANA โ | UJJAIN | UJJAIN | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 563 | DATARAWA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 564 | DATWADA โ | BARWANI | THIKRI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 565 | DAUDKHEDI โ | UJJAIN | UJJAIN | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 566 | DAULATPUR(P) โ | GWALIOR | BHITARWAR | 10.00 | A |
22.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
55.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
20.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 567 | DAVIYAJGAN โ | SHIVPURI | KHANIYADHANA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 568 | DAVIYAKALAN โ | SHIVPURI | KHANIYADHANA | 10.00 | A |
92.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 569 | DEEHEE โ | REWA | TEONTHAR | 10.00 | A |
91.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 570 | DEEPGAONKLAN โ | HARDA | KHIRKIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 571 | DEHARA โ | GUNA | BAMORI | 10.00 | A |
20.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ |
80.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 572 | DEHARI โ | NARMADAPURAM | KESLA | 10.00 | A | โ | โ |
50.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
50.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 572 | DEHARI โ | GUNA | BAMORI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 573 | DEHARIKALAN โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 574 | DEHARIYA โ | DEWAS | KANNOD | 10.00 | A |
89.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 574 | DEHARIYA โ | HARDA | TIMARNI | 10.00 | A |
69.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
30.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 575 | DEHARIYASOYAT โ | AGAR-MALWA | SUSNER | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 576 | DEHRIBAMAN โ | RAJGARH | RAJGARH | 10.00 | A |
82.9%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
17.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 577 | DELCHBUZURG โ | UJJAIN | MAHIDPUR | 10.00 | A |
17.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
82.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 578 | DELCHIKHURD โ | UJJAIN | MAHIDPUR | 10.00 | A |
21.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
78.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 579 | Delgaon โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
44.8%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 16 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 580 | DENDALA โ | SHAJAPUR | SHAJAPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 581 | DEOGARH โ | SIDHI | SIDHI | 10.00 | A |
51.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 582 | DEORA โ | SATNA | MAIHAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
0.0%
5.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score5.00 / 10
|
โ | โ | โ |
| 583 | DEORA NO-2 โ | SATNA | RAMPUR BAGHELAN | 10.00 | A |
90.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 584 | DEORI โ | ANUPPUR | PUSHPRAJGARH | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 585 | DEORI JAGIR โ | RAISEN | SILWANI | 10.00 | A |
35.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
65.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 586 | DEORIMAL โ | CHHINDWARA | CHAURAI | 10.00 | A |
83.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 587 | DEOWALPANI (P) โ | SAGAR | REHLI | 10.00 | A |
92.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 588 | DERKHE โ | VIDISHA | BASODA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 589 | DEVAKACHHAR โ | NARSINGHPUR | KARELI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 590 | DEVGOAN (M) โ | BALAGHAT | BIRSA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 591 | DEVJHIRI โ | KHARGONE | BHAGVANPURA | 10.00 | A |
21.7%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
73.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 592 | DEVLA โ | BARWANI | THIKRI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 593 | DEVLI โ | VIDISHA | KURWAI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 594 | DEVPURA โ | DATIA | SEONDHA | 10.00 | A | โ | โ |
53.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 595 | DEVRA PHAREDA โ | REWA | RAIPUR KARCHULIYAN | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 596 | DEVRI โ | CHHINDWARA | BICHHUA | 10.00 | A |
71.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 596 | DEVRI โ | NARMADAPURAM | BANKHEDI | 10.00 | A |
15.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
78.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 597 | DEWAI โ | SIDHI | MAJHAULI | 10.00 | A |
65.7%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
32.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 598 | DEWALDI โ | KHANDWA | HARSUD | 10.00 | A |
71.0%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 7 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys25 / 1 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 599 | DEWLA MAFI โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
58.0%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
42.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys36 / 36 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 600 | DEWLA RAIYAT โ | KHANDWA | PUNASA | 10.00 | A |
40.6%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys21 / 0 / 21
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
30.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 601 | DEWRAJPUR โ | VIDISHA | VIDISHA | 10.00 | A |
94.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
5.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 602 | DEWRIHATAI โ | KATNI | KATNI | 10.00 | A |
90.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 603 | DHABALAGORI โ | UJJAIN | GHATIYA | 10.00 | A |
60.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 604 | DHABLA โ | SEHORE | SEHORE | 10.00 | A |
86.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 604 | DHABLA โ | RAJGARH | NARSINGHGARH | 10.00 | A |
91.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 605 | DHABLASIYA โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 606 | DHABLI โ | INDORE | SAWER | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 607 | DHABONI โ | SEHORE | SEHORE | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 608 | DHADAVPADHAV โ | NARMADAPURAM | BANKHEDI | 10.00 | A |
27.7%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 1 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
57.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 609 | DHADIYA โ | NARSINGHPUR | CHAWARPATHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 610 | DHAGDIYAMAL โ | CHHINDWARA | MOHKHED | 10.00 | A |
35.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
54.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 611 | DHAKANA CHAPNA โ | RAISEN | SANCHI | 10.00 | A |
59.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 612 | DHAKLGAON โ | KHARGONE | BARWAH | 10.00 | A |
32.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
67.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 613 | DHAKNA โ | KHANDWA | KHALAWA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 614 | DHAKORA โ | RAJGARH | BIAORA | 10.00 | A |
73.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 615 | DHAMANKHEDA โ | SEHORE | SEHORE | 10.00 | A |
52.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
32.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 616 | DHAMNIYA โ | RAJGARH | KHILCHIPUR | 10.00 | A |
79.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 616 | DHAMNIYA โ | NARMADAPURAM | SEONI MALWA | 10.00 | A |
68.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 617 | DHANAGWAN โ | JABALPUR | MAJHOULI | 10.00 | A |
15.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
79.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 618 | DHANANA โ | SHAJAPUR | MOMAN BADODIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 619 | DHANASHRI โ | NARMADAPURAM | PIPARIYA | 10.00 | A |
79.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 620 | DHANGAON โ | HARDA | HARDA | 10.00 | A |
67.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
32.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 621 | DHANORA โ | KHANDWA | PANDHANA | 10.00 | A |
56.8%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
37.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys21 / 21 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 622 | DHANWAHIKALAN โ | SATNA | MAIHAR | 10.00 | A |
96.7%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 623 | DHANWASI RYT โ | DINDORI | AMARPUR | 10.00 | A |
84.8%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 624 | DHARAKHEDA โ | UJJAIN | MAHIDPUR | 10.00 | A |
69.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
30.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 625 | Dharampura โ | JABALPUR | SHAHPURA | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 626 | DHARAMPURI โ | KHANDWA | KHANDWA | 10.00 | A |
29.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
56.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 627 | DHARMPURA โ | CHHATARPUR | NOWGOAN | 10.00 | A |
76.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 628 | DHARPIWADA โ | BALAGHAT | LALBARRA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 629 | DHARUKHEDI โ | KHANDWA | HARSUD | 10.00 | A |
60.6%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys31 / 31 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 630 | DHAWADA(CHA) โ | BARWANI | SENDHAWA | 10.00 | A | โ | โ |
24.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
75.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 631 | DHAWADI โ | BARWANI | PANSEMAL | 10.00 | A |
53.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 632 | DHAWAIYA โ | REWA | GANGEV | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 633 | DHAWAIYA 291 โ | REWA | RAIPUR KARCHULIYAN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 634 | DHEGHORA โ | VIDISHA | GYARASPUR | 10.00 | A |
74.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 635 | DHERA โ | REWA | MAUGANJ | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 636 | DHIGSARA โ | NARSINGHPUR | SAIKHEDA (GADARWARA) | 10.00 | A |
98.4%
10.00
CategoryFarm Pond
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 637 | DHIKWADA โ | NARMADAPURAM | SOHAGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 638 | DHIMROLI (P) โ | SAGAR | BINA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 639 | DHOOMAHEDA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 640 | DHORANI โ | KHANDWA | KHANDWA | 10.00 | A |
25.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
62.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 641 | DHUBOTI โ | SHAJAPUR | KALAPIPAL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 642 | DHUETERA โ | SEONI | KEOLARI | 10.00 | A |
93.3%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 643 | DHULET โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 644 | DHUNDHRKA โ | MANDSAUR | MANDSAUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 645 | DHUNDISARAI โ | DINDORI | AMARPUR | 10.00 | A |
37.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
58.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 646 | DHURGADA โ | HARDA | HARDA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 647 | DHURKUTTA โ | DINDORI | SAMNAPUR | 10.00 | A |
90.0%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 648 | DHURUA (P) โ | SAGAR | BINA | 10.00 | A |
23.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
74.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 649 | DIDHOURA โ | JABALPUR | PATAN | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 650 | DIGDOLI โ | GUNA | BAMORI | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 651 | DIHULI โ | SIDHI | SIDHI | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 652 | DINDOLI โ | VIDISHA | BASODA | 10.00 | A |
93.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
6.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 653 | DINKARPURA โ | KHANDWA | HARSUD | 10.00 | A |
51.2%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys22 / 0 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 654 | DIWAL โ | KHANDWA | PANDHANA | 10.00 | A |
81.2%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 655 | DIWANGANJ โ | RAISEN | SANCHI | 10.00 | A |
68.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 656 | DOBDAGUJAR โ | UJJAIN | TARANA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys27 / 7 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 657 | DODIYA โ | CHHINDWARA | MOHKHED | 10.00 | A |
71.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 657 | DODIYA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
59.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 7 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
40.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 658 | DOGAWAN โ | KHARGONE | KASRAWAD | 10.00 | A |
19.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
66.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 659 | DOHAD โ | KHANDWA | PUNASA | 10.00 | A |
42.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
44.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 660 | DOKARBANDI โ | BALAGHAT | LALBARRA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 661 | DOKARGAON โ | SHAJAPUR | MOMAN BADODIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 662 | DOKE โ | BALAGHAT | WARASEONI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 663 | DOL โ | REWA | SIRMOUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 664 | DOLARIYA โ | HARDA | TIMARNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 665 | Dondkheda โ | VIDISHA | LATERI | 10.00 | A |
85.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 666 | DONGAR โ | ASHOK NAGAR | CHANDERI | 10.00 | A | โ | โ |
7.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
92.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 667 | DONGARGAON โ | KHANDWA | PANDHANA | 10.00 | A |
74.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 668 | DONGARI โ | GUNA | BAMORI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 669 | DONGARKHEDA โ | UJJAIN | MAHIDPUR | 10.00 | A |
63.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
36.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 1 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 670 | DONGLA โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 671 | DONGRA PACHAR โ | ASHOK NAGAR | ASHOKNAGAR | 10.00 | A |
80.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 672 | DONI(P) โ | GWALIOR | BHITARWAR | 10.00 | A |
23.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
75.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 673 | DONTA โ | DEWAS | TONK KHURD | 10.00 | A | โ | โ |
50.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
50.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 674 | DORANA โ | MANDSAUR | MANDSAUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 675 | DORLI(MAL) โ | BALAGHAT | WARASEONI | 10.00 | A |
50.6%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 676 | DOTRU โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 677 | DUARI โ | REWA | REWA | 10.00 | A |
92.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 678 | DUBAHAI KHURD โ | REWA | GANGEV | 10.00 | A |
93.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 679 | DUBGAWAN โ | REWA | SIRMOUR | 10.00 | A |
75.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
21.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 680 | DUDADEHALWADA โ | NARMADAPURAM | PIPARIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 681 | DUDHWAS โ | KHANDWA | PUNASA | 10.00 | A |
67.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys18 / 14 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 682 | DUHANIYA โ | DINDORI | DINDORI | 10.00 | A |
69.1%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
27.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 683 | DULADAR โ | MANDLA | GHUGHRI | 10.00 | A |
93.3%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 684 | DULHARI โ | DINDORI | MEHANDWANI | 10.00 | A |
77.7%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 685 | DUNALJA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 686 | DUNDI โ | JABALPUR | JABALPUR | 10.00 | A |
4.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
52.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
16.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 686 | DUNDI โ | JABALPUR | PATAN | 10.00 | A |
46.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
54.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 687 | DUNGARIYA โ | RAISEN | OBEDULLAHGANJ | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 687 | DUNGARIYA โ | UJJAIN | MAHIDPUR | 10.00 | A |
36.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
63.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 687 | DUNGARIYA โ | DINDORI | SAMNAPUR | 10.00 | A |
89.4%
10.00
CategoryFarm Pond
Started / Completed / Phys26 / 23 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 687 | DUNGARIYA โ | SEHORE | BUDNI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 688 | DUNGARIYA KALAN โ | RAISEN | SILWANI | 10.00 | A |
85.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 689 | DUNGARKHEDI โ | UJJAIN | MAHIDPUR | 10.00 | A |
36.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
63.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 690 | DUPADIYA โ | SEHORE | ASHTA | 10.00 | A |
16.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
54.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
| 691 | DUPARIYA โ | VIDISHA | VIDISHA | 10.00 | A | โ | โ |
67.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
32.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 692 | DUPDAWADA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 693 | DUWGAWAN โ | REWA | GANGEV | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 694 | EESARPUR โ | NARMADAPURAM | SOHAGPUR | 10.00 | A |
28.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
71.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 695 | EKALWARA โ | BARWANI | RAJPUR | 10.00 | A |
5.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
81.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 696 | EKHAND โ | KHANDWA | PUNASA | 10.00 | A |
89.2%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 1 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 697 | ERAYA(P) โ | GWALIOR | BHITARWAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 698 | FANGAON โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
31.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 6 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
68.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 699 | FARAHDA โ | ANUPPUR | PUSHPRAJGARH | 10.00 | A |
98.9%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 700 | FATEHPUR โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 701 | FATEPUR โ | DEWAS | TONK KHURD | 10.00 | A |
62.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
38.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 702 | FEFRI SAR. โ | KHANDWA | KHALAWA | 10.00 | A |
44.3%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 703 | FURTALA โ | NARMADAPURAM | MAKHAN NAGAR | 10.00 | A | โ | โ |
16.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
68.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 704 | GADAGHAT โ | JABALPUR | PATAN | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 705 | GADARIYA โ | MANDSAUR | SITAMAU | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 706 | Gadar Piperiya โ | JABALPUR | SHAHPURA | 10.00 | A |
54.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
16.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
28.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 707 | GADARWAS โ | RAISEN | BADI | 10.00 | A |
84.4%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 708 | GADASARAI โ | DINDORI | BAJAG | 10.00 | A |
42.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
52.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 709 | GADIYA โ | RAJGARH | NARSINGHGARH | 10.00 | A |
22.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
52.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 710 | GADLA โ | VIDISHA | VIDISHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 711 | GAGANWADA โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 712 | GAHIRA โ | REWA | REWA | 10.00 | A |
53.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
46.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 713 | GAILPUR โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 714 | GAJANPUR โ | NARMADAPURAM | SEONI MALWA | 10.00 | A |
57.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
42.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 715 | GAJARABAHARA โ | SINGRAULI | DEOSAR | 10.00 | A |
89.9%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 716 | GAJIKHEDI โ | RAISEN | BADI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 717 | GAJNIKHEDI โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 718 | GAJPUR โ | NARMADAPURAM | KESLA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 719 | GANDHIGANJ โ | JABALPUR | MAJHOULI | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 720 | GANESHKHADHA โ | SHIVPURI | KHANIYADHANA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 721 | GANESHPUR โ | DINDORI | SHAHPURA | 10.00 | A |
85.8%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 722 | GANGAHARA โ | REWA | RAIPUR KARCHULIYAN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 723 | GANGEDI โ | UJJAIN | UJJAIN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 724 | GANJ โ | CHHATARPUR | RAJNAGAR | 10.00 | A |
87.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 725 | GANJAS โ | SATNA | RAMNAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 726 | GAONDILODHA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 727 | GARBADI MAL โ | KHANDWA | BALADI | 10.00 | A |
75.1%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
24.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys21 / 21 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 728 | GARBEDI RAIYAT โ | KHANDWA | KHALAWA | 10.00 | A |
75.3%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
24.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 729 | GARHARA โ | REWA | JAWA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 730 | GARI โ | KHARGONE | BHAGVANPURA | 10.00 | A |
76.6%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
23.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 731 | GARI PIPLIYA โ | INDORE | INDORE | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 732 | GAUKHEDI โ | SEHORE | ICHHAWAR | 10.00 | A |
46.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
53.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 733 | GAULKHEDA RAIYAT โ | KHANDWA | PANDHANA | 10.00 | A |
85.3%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 12 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 734 | GAVAKHEDA โ | SEHORE | ASHTA | 10.00 | A |
88.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 735 | GAWA โ | SEHORE | SEHORE | 10.00 | A |
96.4%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 736 | GAWAL โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 737 | GAYAN โ | RAJGARH | SARANGPUR | 10.00 | A |
81.5%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 738 | GEHUNKHEDI โ | RAJGARH | NARSINGHGARH | 10.00 | A |
61.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
27.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 739 | GELAKHEDI โ | UJJAIN | MAHIDPUR | 10.00 | A |
26.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
73.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 740 | GENDI AMA โ | ANUPPUR | PUSHPRAJGARH | 10.00 | A |
81.8%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 741 | GHAGHROLA KALAN โ | NARSINGHPUR | CHAWARPATHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 742 | GHANAGHAT โ | DINDORI | DINDORI | 10.00 | A |
72.3%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
21.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 743 | GHANA KALAN โ | RAISEN | BEGUMGANJ | 10.00 | A |
44.7%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
54.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 744 | GHANAMAILI โ | DAMOH | JABERA | 10.00 | A |
55.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 745 | GHANA UMRI โ | CHHINDWARA | JAMAI | 10.00 | A |
45.9%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
32.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
16.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 746 | GHANSODA โ | SHAJAPUR | MOMAN BADODIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 747 | GHARSONDI(P) โ | GWALIOR | BHITARWAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 748 | GHATHERA โ | JABALPUR | PATAN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 749 | GHATIYA โ | UJJAIN | GHATIYA | 10.00 | A |
68.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 750 | GHATIYABHANA โ | DEWAS | SONKATCH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 751 | GHATLI โ | NARMADAPURAM | KESLA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 752 | GHAT PIPLIYA โ | RAISEN | BADI | 10.00 | A |
89.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 753 | GHATPIPLIYA โ | UJJAIN | MAHIDPUR | 10.00 | A |
19.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
80.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 754 | GHATRA โ | CHHATARPUR | GAURIHAR | 10.00 | A |
86.1%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 755 | GHINODA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 756 | GHMNI โ | DINDORI | MEHANDWANI | 10.00 | A |
94.6%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 4 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 757 | GHODAVADIKHURD โ | CHHINDWARA | JAMAI | 10.00 | A |
43.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
56.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 758 | GHODI BUJURG โ | KHARGONE | ZIRANYA | 10.00 | A |
14.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
83.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 759 | GHOGHATPUR โ | RAJGARH | ZIRAPUR | 10.00 | A |
79.9%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
18.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 760 | GHOGHRA (P) โ | SAGAR | BANDA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 761 | GHOGRA (P) โ | SAGAR | REHLI | 10.00 | A |
55.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 762 | GHONTI BAHRA โ | RAISEN | BADI | 10.00 | A |
74.5%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 763 | GHOPATPUR MAL. โ | DINDORI | BAJAG | 10.00 | A |
94.8%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 7 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 764 | GHORAD โ | CHHINDWARA | BICHHUA | 10.00 | A |
87.3%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 765 | GHOSIKHEDA โ | INDORE | MHOW | 10.00 | A |
79.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
21.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 766 | GHOSUA โ | VIDISHA | GYARASPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 767 | GHOTI โ | BALAGHAT | LANJI | 10.00 | A |
97.3%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 768 | GHUNADI โ | BALAGHAT | BALAGHAT | 10.00 | A |
97.5%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 769 | GILAKHEDI โ | RAJGARH | NARSINGHGARH | 10.00 | A |
66.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
34.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 770 | GINDORHAT โ | RAJGARH | BIAORA | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 771 | GINDORMINA โ | RAJGARH | BIAORA | 10.00 | A |
52.9%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
44.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 772 | GIRWARPUR MAL. โ | DINDORI | BAJAG | 10.00 | A |
67.8%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 773 | GITHAURI RYT โ | DINDORI | AMARPUR | 10.00 | A |
89.1%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 774 | GNIYARI โ | KATNI | KATNI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 775 | GOBARHELA โ | VIDISHA | VIDISHA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 776 | GOCHITARODA โ | NARMADAPURAM | KESLA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 777 | GODAHA โ | REWA | SIRMOUR | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 778 | GODRI โ | HARDA | TIMARNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 779 | GOGAKHEDA โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 780 | GOGAPUR โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 781 | GOHAN โ | INDORE | DEPALPUR | 10.00 | A |
13.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ |
86.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 782 | GOHANADEH MAL โ | NARMADAPURAM | SOHAGPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 783 | GOHCHAR โ | NARSINGHPUR | GOTEGAON | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 784 | GOKULGAON โ | KHANDWA | KHANDWA | 10.00 | A |
60.7%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
39.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 19 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 785 | GOL โ | NARMADAPURAM | MAKHAN NAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 786 | GOLA โ | DEWAS | BAGLI | 10.00 | A |
28.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
71.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys22 / 22 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 787 | GOLAKHEDI โ | GUNA | BAMORI | 10.00 | A |
44.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
55.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 788 | GOLIYA HEDA โ | GUNA | CHANCHODA | 10.00 | A |
13.7%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
78.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 789 | GONDALWADA โ | NARMADAPURAM | MAKHAN NAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 789 | GONDALWADA โ | NARMADAPURAM | BANKHEDI | 10.00 | A |
62.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
38.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 790 | GONDWADI RAIYAT โ | KHANDWA | PANDHANA | 10.00 | A |
77.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 791 | GONSA โ | UJJAIN | GHATIYA | 10.00 | A |
56.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
43.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
| 792 | GOPALNAGAR โ | VIDISHA | SIRONJ | 10.00 | A |
88.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
11.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 793 | GOPALPUR โ | SEHORE | NASRULLAGANJ | 10.00 | A |
79.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 794 | GOPISUR SATKUNDA โ | RAISEN | SANCHI | 10.00 | A |
86.3%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
13.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 795 | GORA โ | NARMADAPURAM | MAKHAN NAGAR | 10.00 | A |
55.8%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ |
44.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 796 | GORADIYA โ | KHANDWA | PUNASA | 10.00 | A |
60.8%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
21.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys28 / 1 / 27
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 797 | GORAIYYA โ | CHHINDWARA | CHHINDWARA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 798 | GORAKHAR โ | BETUL | BETUL | 10.00 | A |
31.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
68.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 0 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 799 | GORAKHPUR โ | CHHINDWARA | MOHKHED | 10.00 | A |
53.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 800 | GORKHA โ | RAISEN | GAIRATGANJ | 10.00 | A |
80.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 801 | GOTHADA โ | UJJAIN | KHACHAROD | 10.00 | A |
74.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 802 | GOTHRA โ | SHEOPUR | KARAHAL | 10.00 | A |
94.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 803 | GOURAKANHARI โ | DINDORI | SAMNAPUR | 10.00 | A |
38.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
60.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 804 | GOVINDA โ | SHAJAPUR | MOMAN BADODIYA | 10.00 | A |
41.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
58.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 805 | GUARA โ | CHHINDWARA | MOHKHED | 10.00 | A |
68.3%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 806 | GubraKala โ | JABALPUR | SHAHPURA | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 807 | GUDARKHEDA โ | RATLAM | PIPLODA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 808 | GUDHA โ | UJJAIN | GHATIYA | 10.00 | A |
51.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 809 | GUDHMELA โ | SEHORE | SEHORE | 10.00 | A |
47.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
52.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 810 | GUDHWA โ | REWA | GANGEV | 10.00 | A |
18.5%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
80.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 811 | GUJARKHEDI โ | NARMADAPURAM | SOHAGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 811 | GUJARKHEDI โ | KHANDWA | PUNASA | 10.00 | A |
55.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
44.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 0 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 812 | GULAUA (P) โ | SAGAR | BINA | 10.00 | A |
71.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 813 | GULGAON RAIYAT โ | KHANDWA | PUNASA | 10.00 | A |
54.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 814 | GULKHEDI โ | RAJGARH | SARANGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 815 | GULLAS โ | HARDA | TIMARNI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 816 | GULON โ | NARMADAPURAM | MAKHAN NAGAR | 10.00 | A |
13.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
52.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 817 | GULWARA โ | KATNI | KATNI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 818 | GUNAI โ | UJJAIN | UJJAIN | 10.00 | A |
24.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
76.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys18 / 0 / 18
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 819 | GUNAWA โ | UJJAIN | GHATIYA | 10.00 | A |
67.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
32.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 820 | GUNAWAD โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 821 | GUNDRAI โ | NARSINGHPUR | CHAWARPATHA | 10.00 | A |
66.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 821 | GUNDRAI โ | NARMADAPURAM | SOHAGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 822 | GUNJALI โ | KHANDWA | PUNASA | 10.00 | A |
7.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
43.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
38.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 823 | GURADIYADASA โ | UJJAIN | MAHIDPUR | 10.00 | A |
21.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
78.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 824 | GURADIYAGUJAR โ | UJJAIN | GHATIYA | 10.00 | A |
30.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
69.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 825 | GURADIYAKALA โ | NARMADAPURAM | MAKHAN NAGAR | 10.00 | A | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 826 | GURADIYAPITRAMAL โ | UJJAIN | KHACHAROD | 10.00 | A |
53.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 827 | GURADIYASANGA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 828 | GURARIYA LASHKARPUR โ | VIDISHA | VIDISHA | 10.00 | A |
43.4%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
52.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 829 | GURLA โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 830 | GURU PIPPRIYA โ | JABALPUR | PATAN | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 831 | GUWADA โ | RAJGARH | SARANGPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 832 | GUYDA โ | KHANDWA | PUNASA | 10.00 | A | โ | โ |
45.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys35 / 0 / 35
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
29.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
24.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 833 | GWALI โ | SEHORE | ASHTA | 10.00 | A |
43.1%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
47.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 834 | GWARDIYA โ | SEHORE | BUDNI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 835 | GYARA โ | DATIA | SEONDHA | 10.00 | A |
92.2%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 836 | GYARASPUR โ | VIDISHA | GYARASPUR | 10.00 | A |
34.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
65.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 837 | GYASABAD โ | RAISEN | SANCHI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 838 | HAIDAR โ | ASHOK NAGAR | ISAGARH | 10.00 | A |
34.4%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
64.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 839 | HALUHEDI KALAN โ | RAJGARH | SARANGPUR | 10.00 | A |
63.5%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 840 | HALWANI โ | CHHATARPUR | BADA MALEHARA | 10.00 | A |
79.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 841 | HAMIDAPUR โ | VIDISHA | BASODA | 10.00 | A |
84.5%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 842 | HAMIRPURA โ | KHARGONE | BARWAH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 843 | HANSAKHEDI โ | INDORE | SAWER | 10.00 | A |
98.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
2.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 844 | HANTIYA โ | KHANDWA | PUNASA | 10.00 | A |
66.6%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys23 / 0 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
10.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 845 | HAPLA โ | KHANDWA | KHANDWA | 10.00 | A |
79.2%
10.00
CategoryFarm Pond
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 846 | HARANBHATA โ | CHHINDWARA | PARASIA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 847 | HARBAKHEDI โ | UJJAIN | MAHIDPUR | 10.00 | A |
32.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
67.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 848 | HARDI โ | REWA | RAIPUR KARCHULIYAN | 10.00 | A |
68.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 849 | HARDUAA โ | REWA | RAIPUR KARCHULIYAN | 10.00 | A |
28.2%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
7.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
39.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 850 | HARDUAKALA โ | JABALPUR | MAJHOULI | 10.00 | A | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 851 | HARIYAKHEDI โ | INDORE | SAWER | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 852 | HARLAI โ | RAJGARH | NARSINGHGARH | 10.00 | A |
32.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
47.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 853 | HARNAVADA โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 854 | HARNAWADA โ | SEHORE | ASHTA | 10.00 | A |
46.3%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
45.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 855 | HARRAHAWA โ | SINGRAULI | WAIDHAN | 10.00 | A |
75.5%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
24.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 856 | HARRATOLA โ | ANUPPUR | PUSHPRAJGARH | 10.00 | A |
97.6%
10.00
CategoryFarm Pond
Started / Completed / Phys26 / 26 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 857 | HARSODAN โ | UJJAIN | UJJAIN | 10.00 | A |
10.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
87.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 858 | HARTOL VANGRAM โ | DINDORI | MEHANDWANI | 10.00 | A |
53.7%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
40.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 859 | HASAMPURA โ | UJJAIN | UJJAIN | 10.00 | A |
85.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 860 | HATAI โ | UJJAIN | KHACHAROD | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 861 | HATHLEVA โ | JABALPUR | MAJHOULI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 862 | HATODA โ | RAISEN | SILWANI | 10.00 | A |
48.6%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
51.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys22 / 22 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 863 | HATUNIYA โ | INDORE | SAWER | 10.00 | A |
90.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 864 | HATWA โ | REWA | SIRMOUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 865 | HEEDI โ | UJJAIN | KHACHAROD | 10.00 | A |
74.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 866 | HEERAPUR โ | NARSINGHPUR | BABAI CHICHLI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 867 | HEERU DEEH โ | REWA | GANGEV | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 868 | HIDWAR โ | REWA | MAUGANJ | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 869 | HIMMATGARH(P) โ | GWALIOR | BHITARWAR | 10.00 | A |
4.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
39.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
52.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 870 | HINAUTABHOI โ | JABALPUR | JABALPUR | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 871 | HINAUTI โ | SATNA | RAMPUR BAGHELAN | 10.00 | A |
77.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 872 | Hinautiya โ | JABALPUR | SHAHPURA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 873 | HINGONYA โ | UJJAIN | MAHIDPUR | 10.00 | A |
82.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 874 | HINGTI (P) โ | SAGAR | BINA | 10.00 | A |
84.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 875 | HINNOD (P) โ | SAGAR | BINA | 10.00 | A |
19.3%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
78.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 875 | HINNOD (P) โ | SAGAR | JAISINAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 876 | HINOTA โ | DINDORI | DINDORI | 10.00 | A |
93.4%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 877 | HINOTI โ | SEHORE | SEHORE | 10.00 | A |
72.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
27.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 878 | HINOTIYA โ | RAISEN | SANCHI | 10.00 | A |
89.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 878 | HINOTIYA โ | RAISEN | OBEDULLAHGANJ | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 879 | HIRAN CHHIPA (P) โ | SAGAR | MALTHONE | 10.00 | A |
83.7%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 880 | HIRAPUR (P) โ | SAGAR | JAISINAGAR | 10.00 | A |
74.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 881 | HIRPURTEKA โ | SHAJAPUR | SHAJAPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 882 | HIWARKHEDI โ | BETUL | BETUL | 10.00 | A |
58.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 883 | HIWRA SONADHWAR โ | CHHINDWARA | PANDHURNA | 10.00 | A |
87.7%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 884 | ICHHAPUR โ | KHARGONE | KHARGONE | 10.00 | A |
65.9%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 885 | ILAMKHEDI โ | UJJAIN | TARANA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 886 | IMALANI โ | VIDISHA | SIRONJ | 10.00 | A |
70.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 887 | IMALIYA โ | NARSINGHPUR | CHAWARPATHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 887 | IMALIYA โ | NARSINGHPUR | KARELI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 888 | IMALIYA BAGHORA โ | NARSINGHPUR | BABAI CHICHLI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 889 | IMALIYAN BHURE KHAN โ | PANNA | GUNOR | 10.00 | A |
82.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 890 | IMALIYA (P) โ | NARSINGHPUR | BABAI CHICHLI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 891 | IMJHIRA โ | NARSINGHPUR | CHAWARPATHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 892 | IMLAI โ | JABALPUR | KUNDAM | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 893 | INDERGHADH โ | SHIVPURI | NARWAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 894 | INDERWAS โ | VIDISHA | GYARASPUR | 10.00 | A |
94.1%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 895 | INDHAWDI โ | KHANDWA | PUNASA | 10.00 | A |
51.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 896 | INDOKH โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 897 | ISHARPUR โ | NARMADAPURAM | BANKHEDI | 10.00 | A |
68.8%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
31.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 898 | ITAMA โ | SATNA | MAIHAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 899 | ITAR โ | REWA | RAIPUR KARCHULIYAN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 900 | ITAWA โ | UJJAIN | MAHIDPUR | 10.00 | A |
17.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
82.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 901 | JABADIYABHEEL โ | SHAJAPUR | KALAPIPAL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 902 | JABDI โ | SHAJAPUR | KALAPIPAL | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 903 | JABDIYAGHARWAS โ | SHAJAPUR | KALAPIPAL | 10.00 | A |
91.8%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 904 | JADASURANG โ | DINDORI | SAMNAPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys13 / 7 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 905 | JAHAGIRPUR โ | SEHORE | SEHORE | 10.00 | A |
35.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 906 | JAHANGIRPUR โ | UJJAIN | BADNAGAR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 907 | JAISINGPURA โ | BURHANPUR | BURHANPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 908 | JAIT โ | SEHORE | BUDNI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 909 | JAITAPUR KALA โ | KHANDWA | BALADI | 10.00 | A |
34.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
65.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 910 | JAITPURI โ | DINDORI | MEHANDWANI | 10.00 | A |
35.3%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
62.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 911 | JAKHAWADI โ | CHHINDWARA | MOHKHED | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 912 | JAKHODA โ | GUNA | ARON | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 913 | JALDA MUDIYA โ | DINDORI | AMARPUR | 10.00 | A |
54.4%
10.00
CategoryFarm Pond
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
40.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 914 | JALGONE โ | BARWANI | PANSEMAL | 10.00 | A |
14.9%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
74.6%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 915 | JALKHA โ | KHARGONE | KASRAWAD | 10.00 | A |
45.7%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 6 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
32.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 916 | JALODIYA โ | UJJAIN | BADNAGAR | 10.00 | A |
32.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
35.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 917 | JALODIYAUNHEL โ | UJJAIN | KHACHAROD | 10.00 | A |
53.3%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
46.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 918 | JALODSANJAR โ | UJJAIN | BADNAGAR | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 919 | JALVA โ | UJJAIN | GHATIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 920 | JAM โ | BALAGHAT | LALBARRA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 921 | JAMALPURA โ | UJJAIN | UJJAIN | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 922 | JAMANYA โ | KHANDWA | CHHAIGAON MAKHAN | 10.00 | A |
74.4%
10.00
CategoryFarm Pond
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys22 / 5 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 923 | JAMARA โ | NARMADAPURAM | PIPARIYA | 10.00 | A |
46.6%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
24.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
12.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 924 | JAMDHAD โ | KHANDWA | KHALAWA | 10.00 | A |
19.9%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
27.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys37 / 0 / 37
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 925 | JAMDIMETA โ | BALAGHAT | KIRNAPUR | 10.00 | A |
93.7%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 926 | JAMLI โ | JHABUA | PETLAWAD | 10.00 | A |
48.6%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
18.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 927 | JAMLI DAMAMI โ | HARDA | HARDA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 928 | JAMLI KALA โ | KHANDWA | PANDHANA | 10.00 | A |
46.1%
10.00
CategoryFarm Pond
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
17.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 15 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
36.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 929 | JAMLI MUNDI โ | KHANDWA | KHANDWA | 10.00 | A |
65.5%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
24.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 930 | JAMLI RAJGARH โ | KHANDWA | PANDHANA | 10.00 | A |
60.1%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
30.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 931 | JAMNYA โ | BARWANI | SENDHAWA | 10.00 | A |
23.7%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
61.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 932 | JAMODI โ | INDORE | SAWER | 10.00 | A |
99.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
1.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 933 | JAMONIYA โ | RAJGARH | BIAORA | 10.00 | A |
93.8%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 934 | JAMONIYA GANESH โ | RAJGARH | NARSINGHGARH | 10.00 | A |
46.6%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
44.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 935 | JAMONIYAGOP CHOHAN โ | RAJGARH | NARSINGHGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 936 | JAMONIYA JOHAR โ | RAJGARH | NARSINGHGARH | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 937 | JAMTI โ | BARWANI | SENDHAWA | 10.00 | A |
45.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
54.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 0 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 938 | JAMULNI โ | BETUL | BHAINSDEHI | 10.00 | A |
33.5%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ |
66.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 939 | JAMUNIYA โ | CHHINDWARA | HARAI | 10.00 | A |
90.5%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 939 | JAMUNIYA โ | RAISEN | SANCHI | 10.00 | A |
51.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
48.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 940 | JAMUNIYA ASHAPUR โ | KHANDWA | KHALAWA | 10.00 | A | โ | โ |
17.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
82.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 941 | JAMUNIYADHIR โ | NARMADAPURAM | BANKHEDI | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 942 | JAMUNIYA GOND (P) โ | SAGAR | JAISINAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 943 | JAMUNIYAKHURD โ | CHHINDWARA | BICHHUA | 10.00 | A |
71.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
29.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 944 | JANAKPUR(P) โ | GWALIOR | DABRA | 10.00 | A |
79.2%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
20.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 945 | JANGALIYA โ | MANDLA | NIWAS | 10.00 | A |
85.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 946 | JANGIBAD โ | RAJGARH | NARSINGHGARH | 10.00 | A |
50.4%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
49.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 947 | JANKAHAI โ | REWA | JAWA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 948 | JANOUR โ | NARSINGHPUR | KARELI | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 949 | JAORA โ | BETUL | ATHNER | 10.00 | A |
18.2%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
76.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 950 | JAREHTA โ | CHHATARPUR | GAURIHAR | 10.00 | A |
85.1%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 951 | JARGUWA โ | VIDISHA | KURWAI | 10.00 | A |
56.7%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
29.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 952 | JARHA โ | REWA | GANGEV | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 953 | JARIYARI โ | SATNA | MAIHAR | 10.00 | A | โ | โ | โ | โ |
100.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 954 | JARJOLA โ | NARSINGHPUR | NARSIMHAPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 955 | JARWAHI โ | KATNI | KATNI | 10.00 | A |
95.0%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 956 | JASALPUR โ | NARMADAPURAM | HOSHANGABAD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 957 | JASERWANI โ | NARMADAPURAM | BANKHEDI | 10.00 | A |
21.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
3.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
55.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 958 | JASMAT โ | SEHORE | ASHTA | 10.00 | A |
81.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 959 | JASWADI โ | KHANDWA | KHANDWA | 10.00 | A |
75.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
24.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 960 | JATPURA MAL โ | HARDA | KHIRKIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 961 | JAWALI โ | NARMADAPURAM | MAKHAN NAGAR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 962 | JAWAR โ | KHANDWA | KHANDWA | 10.00 | A | โ | โ |
11.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 3 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
88.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 963 | JAWASIYAPANTH โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 964 | JAWASIYASOLANKI โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
25.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
48.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
25.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 965 | JAWI โ | NEEMUCH | NEEMUCH | 10.00 | A |
59.1%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
15.8%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 966 | JAYRAMPURA โ | UJJAIN | GHATIYA | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 967 | JEETNAGAR โ | SATNA | MAIHAR | 10.00 | A |
90.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 968 | JELYAKHEDI โ | UJJAIN | MAHIDPUR | 10.00 | A |
58.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 969 | JETHADA โ | SHAJAPUR | SHUJALPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 970 | JHADPIPLIYA โ | RAJGARH | NARSINGHGARH | 10.00 | A |
83.7%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
16.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 971 | JHAGRIYA โ | RAJGARH | NARSINGHGARH | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 972 | JHALARIA โ | UJJAIN | BADNAGAR | 10.00 | A | โ | โ |
11.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
88.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 973 | JHALARIYA โ | INDORE | DEPALPUR | 10.00 | A | โ | โ |
10.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
71.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
18.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 974 | JHAMAR โ | NARSINGHPUR | NARSIMHAPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 975 | JHANJHAKHEDI โ | UJJAIN | KHACHAROD | 10.00 | A |
93.8%
10.00
CategoryFarm Pond
Started / Completed / Phys8 / 5 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
6.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 976 | JHANSI โ | JABALPUR | SIHORA | 10.00 | A | โ | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 977 | JHARANEJHAR โ | DINDORI | MEHANDWANI | 10.00 | A |
95.2%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 978 | JHARIKHEDA โ | KHANDWA | KHALAWA | 10.00 | A |
62.1%
10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
37.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys25 / 0 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 979 | JHARNAGHUGHARI โ | DINDORI | AMARPUR | 10.00 | A |
91.9%
10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
8.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 980 | JHARNAWADA โ | UJJAIN | TARANA | 10.00 | A |
59.0%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
41.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 981 | JHARPAI โ | GUNA | RAGHOGARH | 10.00 | A |
6.1%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
0.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
93.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys11 / 5 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 982 | JHINGADHAD RAIYAT โ | KHANDWA | BALADI | 10.00 | A |
50.9%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
49.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 983 | JHINJHRI โ | KHANDWA | KHALAWA | 10.00 | A |
45.5%
10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
28.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 0 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
25.7%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 984 | JHIRIKHURD โ | NARSINGHPUR | NARSIMHAPUR | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 985 | JHIRNIYA โ | VIDISHA | VIDISHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 986 | JHIRNIYA KHACROD โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ | โ | โ | โ |
100.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 987 | JHIRNIYA UNHEL โ | UJJAIN | KHACHAROD | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 988 | JHIRPA โ | KHANDWA | KHALAWA | 10.00 | A |
43.9%
10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
56.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 989 | JHOLSI (P) โ | SAGAR | MALTHONE | 10.00 | A | โ | โ |
31.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
68.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 990 | JHUMKI โ | UJJAIN | TARANA | 10.00 | A |
19.2%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
42.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 1 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
38.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 991 | JHUNDA (P) โ | SAGAR | REHLI | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 992 | JHUTAWAD โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 993 | JIJAGAON KHURD โ | HARDA | HARDA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 994 | JINDA KHEDA โ | INDORE | SAWER | 10.00 | A |
16.7%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
80.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 995 | JINWANYA โ | HARDA | KHIRKIYA | 10.00 | A | โ | โ |
100.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 996 | JIWAJIPUR โ | VIDISHA | VIDISHA | 10.00 | A |
100.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ | โ | โ |
| 997 | JODH (P) โ | SAGAR | BINA | 10.00 | A |
69.5%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
30.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
| 998 | JODMALAKHA โ | UJJAIN | MAHIDPUR | 10.00 | A | โ | โ |
21.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
79.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 999 | JOGIBEDA โ | KHANDWA | KHALAWA | 10.00 | A |
37.0%
10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
9.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
53.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ |
| 1000 | JOHARI โ | GUNA | BAMORI | 10.00 | A |
22.8%
10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ | โ | โ | โ |
77.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
Scheme: โน Sanction Weighted
Level: Gp
Snapshot: 2026-04-12
Units shown: 1040
โก Weight % shown is each unit's own auto-computed weight โ not the global admin-set value.
24
Day of campaign
103
Total days
79
Days remaining
Flat
Grading scheme
Campaign: 2026-03-19 โ 2026-06-30 ยท Grades based on raw combined achievement % โ no benchmark division.
Grade thresholds (raw combined %):
A โ On Track โฅ 80%
B โ Progressing โฅ 70%
C โ Lagging โฅ 60%
D โ Critical โฅ 0%
N/A No target
Grade distribution โ 1040 gps on this snapshot:
1040
A โ On Track
0
B โ Progressing
0
C โ Lagging
0
D โ Critical
๐ก Flat scheme: Score % = (total score / 10) ร 100. Grade assigned by comparing this % directly against fixed thresholds โ e.g., A+ โฅ 85%, A โฅ 80%.
โ๏ธ Step 1 โ Category Weightage
Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.
Weightage = Sanctioned Cost of Category
รท Total Sanctioned Cost (all categories)
e.g. Farm Pond = โน200 Cr out of โน500 Cr total
Weightage = 200 รท 500 = 0.40 (40%)
Computed independently per unit โ two districts with different sanction distributions will have different weightages for the same category.
๐ ฐ Step 2a โ Part A Score (Completion)
Fixed 50% weight on completion of works.
Part A = (Completed + Phys) รท Started ร 5
๐ ฑ Step 2b โ Part B Score (Expenditure)
Fixed 50% weight on expenditure booking on ongoing works.
Part B = (Ongoing Booked รท Ongoing Sanction) ร 5
If all done โ full 5 marks automatically
๐ Step 3 โ Ceiling & Model
Category Score = Part A + Part B
๐ Step 4 โ Final Composite Score
Weighted sum of all category scores (weightages sum to 100%).
Final Score = ฮฃ (Weightage_i ร Score_i)
Example: Farm Pond 40% ร 7.2 + Dug Well 20% ร 6.5 + Amrit Sarovar 40% ร 8.1 โ 7.42
๐ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.