๐Ÿ“ˆ Off
โšก
Sanction Cost Weighted mode. Each gp's category weight is auto-computed from its own sanction amount proportions. Two units with identical category counts may have different weight distributions.
AAKVI
10.00
๐Ÿฅ‡
Completed4 Started4 Rank#1
AAKYA
10.00
๐Ÿฅˆ
Completed1 Started8 Rank#2
AAKYAJASSA
10.00
๐Ÿฅ‰
Completed0 Started10 Rank#3
๐Ÿ“‹ Category Scorecard โ€” Gp Level
1040 units Showing top 1,000 GPs by score โ€” use District / Block filters to narrow results ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
# Gp District Block Total Farm Pondโ–ถ Amrit Sarowarโ–ถ Dug Well Rechargeโ–ถ Irrigation infrastructureโ–ถ Water conservation & rechargeโ–ถ Watershed Related Worksโ–ถ Repair & Maintenance (Water Structures)โ–ถ
๐Ÿฅ‡ AAKVI โ†— INDORE MHOW 10.00
94.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
๐Ÿฅˆ AAKYA โ†— KHARGONE BARWAH 10.00 โ€” โ€”
10.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
40.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
48.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
๐Ÿฅ‰ AAKYAJASSA โ†— UJJAIN MAHIDPUR 10.00
81.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
4 AALAMGANJ โ†— REWA GANGEV 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
5 AALAMPUR โ†— HARDA TIMARNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
6 AAMDA โ†— BARWANI PANSEMAL 10.00
60.8% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
33.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
7 AAMSAGAR N โ†— HARDA TIMARNI 10.00
74.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
8 AANCHALKHEDA โ†— NARMADAPURAM MAKHAN NAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
9 AARON (P) โ†— GWALIOR GHATIGAON 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
10 AARROLI (P) โ†— GWALIOR MORAR 10.00
41.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
40.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11 ABGAON KHURD โ†— HARDA HARDA 10.00
85.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
12 ABHAYPURA โ†— RAJGARH RAJGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
13 ABUADHANA โ†— VIDISHA SIRONJ 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
14 ABUD โ†— KHANDWA CHHAIGAON MAKHAN 10.00
59.1% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
40.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 12 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
15 ACHARAUNI โ†— SHIVPURI KHANIYADHANA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
16 ACHKLPUR โ†— GUNA RAGHOGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
17 ADAMPUR CHAWANI โ†— BHOPAL PHANDA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
18 ADMALYA โ†— NEEMUCH NEEMUCH 10.00
59.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
40.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 11 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
19 ADWAD โ†— SHEOPUR SHEOPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
20 AGADAL โ†— REWA GANGEV 10.00
71.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
21 AGAR โ†— RAJGARH BIAORA 10.00
88.4% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
22 AGARA โ†— GUNA GUNA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
23 AGARIYA โ†— JABALPUR SIHORA 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
24 AGASODA โ†— VIDISHA BASODA 10.00
84.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
25 AGHAWAN โ†— KHARGONE KASRAWAD 10.00
33.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
53.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
26 AGRAKHURD โ†— DEWAS BAGLI 10.00
42.4% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
57.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 11 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
27 AHALWADA โ†— HARDA TIMARNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
28 AHAMADANAGAR โ†— VIDISHA VIDISHA 10.00
95.9% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
29 AHMADPUR โ†— KHANDWA CHHAIGAON MAKHAN 10.00
38.5% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
61.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys30 / 30 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
30 AJABGAON โ†— NARMADAPURAM SOHAGPUR 10.00
77.3% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
31 AJANDA โ†— NARSINGHPUR SAIKHEDA (GADARWARA) 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
31 AJANDA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
32 Ajanti โ†— KHANDWA CHHAIGAON MAKHAN 10.00
51.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
33 AJAPURA โ†— SHEOPUR SHEOPUR 10.00
88.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
34 AJAYGARH(P) โ†— GWALIOR DABRA 10.00
81.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
35 AJDAWADA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
36 AJGAR โ†— DINDORI SAMNAPUR 10.00
93.9% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
3.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
37 AJNOD โ†— INDORE SAWER 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
38 AKAJHIRI โ†— SHIVPURI BADARWAS 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
39 AKASODA โ†— UJJAIN UJJAIN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
40 AKBAIBADI(P) โ†— GWALIOR DABRA 10.00
93.5% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
41 AKOLA โ†— NARSINGHPUR GOTEGAON 10.00
88.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
41 AKOLA โ†— SEHORE BUDNI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
41 AKOLA โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
42 AKOLIYA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
43 AKYAJAGIR โ†— UJJAIN KHACHAROD 10.00
35.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
65.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
44 AKYAKOLI โ†— UJJAIN KHACHAROD 10.00
74.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
45 AKYANAJEEK โ†— UJJAIN KHACHAROD 10.00
85.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
46 ALAKHEDA โ†— UJJAIN MAHIDPUR 10.00
81.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
47 ALAMPURA โ†— RAJGARH BIAORA 10.00 โ€” โ€”
3.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
97.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
48 ALANYA โ†— SHAJAPUR KALAPIPAL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
49 ALAUMROD โ†— SHAJAPUR SHAJAPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
50 ALHED โ†— NEEMUCH MANASA 10.00
11.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
81.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
51 ALIGANJ โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
52 ALISARIYA โ†— SHAJAPUR KALAPIPAL 10.00
60.8% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
53 ALLI โ†— RAISEN SANCHI 10.00
95.1% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
54 ALONIKHAPA MAL โ†— SEONI KEOLARI 10.00
93.5% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
55 ALOTJAGIR โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
56 AMAKHEDA KALOO โ†— VIDISHA NATERAN 10.00
58.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
57 AMALDA โ†— SHEOPUR SHEOPUR 10.00
85.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
58 AMALPURA โ†— KHANDWA KHANDWA 10.00
52.7% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys26 / 1 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
59 AMARGARH โ†— RAJGARH BIAORA 10.00
12.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
50.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
60 AMAUKHEDI โ†— VIDISHA VIDISHA 10.00
89.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
61 AMBA โ†— RAJGARH RAJGARH 10.00
90.5% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
62 AMBADA โ†— KHANDWA KHALAWA 10.00
46.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 18 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
23.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
63 AMBAPAT โ†— KHANDWA PANDHANA 10.00
53.3% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 0 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
64 AMDAR โ†— BETUL BETUL 10.00 โ€” โ€”
16.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
83.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
65 AMDOR โ†— RAJGARH BIAORA 10.00
58.6% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
34.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
66 AMEDA(B) โ†— BALAGHAT LANJI 10.00
95.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
67 AMEHATA โ†— KATNI VIJAYRAGHAVGADH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
68 AMGAON BADA โ†— NARSINGHPUR KARELI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
69 AMGAON CHHOTA โ†— NARSINGHPUR SAIKHEDA (GADARWARA) 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
70 AMGAWAN โ†— RAISEN SILWANI 10.00
85.8% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
71 AMILAKI โ†— REWA REWA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
72 AMILIYA โ†— SATNA MAJHGAWAN 10.00
91.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
72 AMILIYA โ†— SIDHI SIHAWAL 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
73 AMILWAN โ†— SINGRAULI WAIDHAN 10.00
53.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
74 AMILYA KALAN โ†— SATNA MAIHAR 10.00
46.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
75 AMJHIYA โ†— SEHORE SEHORE 10.00
45.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
76 AMLA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
77 AMLAR โ†— RAJGARH NARSINGHGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
78 AMLAROD โ†— RAJGARH SARANGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
79 AMLAVDIYA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€” โ€” โ€”
78.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
80 AMLIYAHAT โ†— RAJGARH BIAORA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
81 AMODA โ†— NARSINGHPUR NARSIMHAPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
82 AMON โ†— SEHORE BUDNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
83 AMTHERA โ†— DINDORI SHAHPURA 10.00
22.0% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
76.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
84 ANANDIPURA โ†— SEHORE ASHTA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
85 ANDHIYATOLA โ†— BALAGHAT LANJI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
86 ANDIYA โ†— NARSINGHPUR CHAWARPATHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
87 ANDOL โ†— RAISEN SANCHI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
88 ANDORA โ†— SHIVPURI NARWAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
89 ANGAI โ†— DINDORI BAJAG 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 7 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
90 ANJANIYA KHURD โ†— KHANDWA PUNASA 10.00
43.0% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
42.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys29 / 5 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
14.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
91 ANJARUD โ†— KHARGONE BARWAH 10.00
50.6% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
34.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
92 ANJEERA โ†— REWA TEONTHAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
93 ANTARIYA โ†— ANUPPUR PUSHPRAJGARH 10.00
98.9% 10.00
CategoryFarm Pond
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
94 ANTRALIYA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
95 ANWLI โ†— RAJGARH NARSINGHGARH 10.00
28.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
47.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
96 AOURANGPUR โ†— VIDISHA BASODA 10.00
66.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
33.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
97 ARGAT โ†— SATNA RAMNAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
98 ARJALA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
99 ARNIYARAM โ†— SEHORE ASHTA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
100 ARNYA โ†— INDORE DEPALPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
101 ARUD โ†— KHANDWA PANDHANA 10.00
54.8% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys33 / 33 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
102 ASADI โ†— UJJAIN MAHIDPUR 10.00
63.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
103 ASALANA โ†— UJJAIN UJJAIN 10.00
35.2% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
62.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
104 ASANGAON โ†— KHARGONE KHARGONE 10.00
43.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
105 ASAWTA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
106 ASER โ†— UJJAIN TARANA 10.00
75.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
24.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
107 ASHAPURI โ†— RAISEN OBEDULLAHGANJ 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
108 ASLODA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
109 ATARIYA โ†— REWA REWA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
110 ATARSUMBA โ†— KHARGONE BARWAH 10.00
49.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
111 ATLAWADA โ†— UJJAIN KHACHAROD 10.00
47.4% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
52.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys19 / 13 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
112 ATOOT BHIKARI โ†— KHANDWA KHANDWA 10.00
78.0% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys18 / 2 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
113 ATRALIYA โ†— RAJGARH BIAORA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
114 ATRIYA โ†— CHHINDWARA HARAI 10.00
93.2% 10.00
CategoryFarm Pond
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
115 ATTAR โ†— KHANDWA CHHAIGAON MAKHAN 10.00
76.6% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 12 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
116 AVALI โ†— BARWANI THIKRI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
117 AWANLIKHEDA โ†— SEHORE SEHORE 10.00
69.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
118 AZIMABADPARDHI โ†— UJJAIN KHACHAROD 10.00 โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
119 BAAROD โ†— GUNA ARON 10.00
62.3% 10.00
CategoryFarm Pond
Started / Completed / Phys23 / 16 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 1 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
35.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
120 BABAI โ†— CHHINDWARA AMARWARA 10.00
72.8% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
120 BABAI โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
121 BABAIKHURD โ†— NARMADAPURAM KESLA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
122 BABAIYA โ†— REWA SIRMOUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
123 BABARIYA โ†— NARSINGHPUR NARSIMHAPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
124 BABLI โ†— KHANDWA PANDHANA 10.00
49.9% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
50.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys49 / 0 / 49
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
125 BABRI โ†— NARMADAPURAM SEONI MALWA 10.00
85.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
126 BACHAWANI โ†— NARMADAPURAM BANKHEDI 10.00
13.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
59.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
127 BADAGAON โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
38.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 11 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
61.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
128 BADALKHEDI โ†— RAJGARH RAJGARH 10.00 โ€” โ€”
41.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
58.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
129 BADARKHA โ†— INDORE SAWER 10.00
97.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
130 BADARKHA BERASIA โ†— UJJAIN UJJAIN 10.00
10.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
131 BADAUAA โ†— REWA NAIGARHI 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
132 BADBELI โ†— RAJGARH NARSINGHGARH 10.00
74.0% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
133 BADGAON GURJAR โ†— KHANDWA KHANDWA 10.00
37.6% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
51.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
134 BADGAON MAFI โ†— BURHANPUR BURHANPUR 10.00 โ€” โ€”
2.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
97.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
135 BADGAON MALI โ†— KHANDWA KHANDWA 10.00
20.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
40.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
136 BADHARA โ†— REWA SIRMOUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
137 BADHKUMMED โ†— UJJAIN UJJAIN 10.00
50.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
49.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 5 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
138 BADI โ†— KHARGONE KASRAWAD 10.00
28.3% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 5 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
63.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
139 BADJHIRI โ†— BURHANPUR BURHANPUR 10.00
70.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
139 BADJHIRI โ†— HARDA TIMARNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
139 BADJHIRI โ†— BHOPAL PHANDA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
140 BADKHALIYA MAL โ†— KHANDWA HARSUD 10.00
39.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
60.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 0 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
141 BADLAVDA โ†— RAJGARH RAJGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
142 BADNAGAR โ†— RAJGARH NARSINGHGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
143 BADNAGAR RAIYAT โ†— KHANDWA PUNASA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
144 BADODA 2 โ†— RAISEN SANCHI 10.00
95.1% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
145 BADODATAL โ†— VIDISHA SIRONJ 10.00
60.7% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
146 BADODIYA KHAN โ†— INDORE SAWER 10.00
15.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
83.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
147 BADODIYA TALAB โ†— RAJGARH NARSINGHGARH 10.00
61.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
38.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
148 BADOH โ†— VIDISHA KURWAI 10.00
13.1% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
72.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
149 BADWANI โ†— HARDA TIMARNI 10.00
33.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
55.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
150 BADWASA โ†— VIDISHA BASODA 10.00
75.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
151 BADYALAMATA โ†— RATLAM PIPLODA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
152 BAFALGAON โ†— KHARGONE BARWAH 10.00
55.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 5 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
153 Bagadiya โ†— DHAR TIRLA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
154 BAGALDA โ†— SHEOPUR SHEOPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
155 BAGASPUR โ†— RAISEN OBEDULLAHGANJ 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
155 BAGASPUR โ†— NARSINGHPUR GOTEGAON 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
156 BAGASPURA (P) โ†— SAGAR REHLI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
157 BAGDA โ†— KHANDWA KHALAWA 10.00
97.0% 10.00
CategoryFarm Pond
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
158 BAGDA BUJURG โ†— KHARGONE BARWAH 10.00 โ€” โ€”
25.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
74.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
159 BAGEDI โ†— UJJAIN KHACHAROD 10.00
92.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
160 BAGER โ†— SEHORE ASHTA 10.00
88.4% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
161 BAGHODA โ†— BETUL PRABHAT PATTAN 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
162 BAGHOLI โ†— BALAGHAT WARASEONI 10.00
31.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
65.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
162 BAGHOLI โ†— BALAGHAT BALAGHAT 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
162 BAGHOLI โ†— BALAGHAT LALBARRA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
163 BAGHWAR โ†— SIDHI RAMPUR NAIKIN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
164 BAGLAI โ†— NARSINGHPUR BABAI CHICHLI 10.00
89.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
164 BAGLAI โ†— SEONI SEONI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
165 BAGODA โ†— UJJAIN TARANA 10.00 โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
166 BAGRI โ†— VIDISHA VIDISHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
167 BAGWA โ†— KHARGONE KHARGONE 10.00
23.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
63.9% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
168 BAHADURPUR (P) โ†— SAGAR RAHATGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
169 BAHERA โ†— DINDORI AMARPUR 10.00
40.5% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
55.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
170 BAHRAWADA โ†— SHEOPUR SHEOPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
171 BAIDIYA KHURD โ†— KHANDWA CHHAIGAON MAKHAN 10.00
64.9% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
35.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 16 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
172 BAIDWARA (P) โ†— SAGAR REHLI 10.00
11.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
79.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
173 BAIHEDA โ†— RAJGARH BIAORA 10.00
92.4% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
174 BAISA โ†— REWA REWA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
175 BAJANG MAL โ†— DINDORI BAJAG 10.00
81.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
176 BAJANG RYT โ†— DINDORI BAJAG 10.00 โ€” โ€”
13.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
86.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
177 BAJJAHED โ†— SHAJAPUR SHAJAPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
178 BAJPUR โ†— BETUL BETUL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
179 BAJTTA KHURD โ†— BARWANI BARWANI 10.00
38.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
61.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
180 BAKANIYA โ†— UJJAIN UJJAIN 10.00
44.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
55.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
181 BAKTARIYA โ†— BARWANI SENDHAWA 10.00
66.6% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
33.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
182 BALCHIDI โ†— RAJGARH BIAORA 10.00
56.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
43.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
183 BALEDI โ†— UJJAIN BADNAGAR 10.00
23.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
60.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
184 BALGHARA โ†— INDORE SAWER 10.00
97.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
185 BALHARPUR โ†— BALAGHAT LALBARRA 10.00
85.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
186 BALKHADGHATI โ†— KHANDWA PANDHANA 10.00
64.3% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
35.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys31 / 4 / 27
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
187 Balrampur โ†— VIDISHA LATERI 10.00
58.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
41.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
188 BALRIYA โ†— INDORE SAWER 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
189 BALWADI โ†— KHARGONE KHARGONE 10.00
62.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
190 BAMANDA โ†— KHARGONE KASRAWAD 10.00
66.1% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
191 BAMANDA RAIYAT โ†— KHANDWA PANDHANA 10.00
31.4% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 0 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
45.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
192 BAMANGAON โ†— KHARGONE BARWAH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
193 BAMANPURI โ†— KHARGONE BARWAH 10.00
64.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
35.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
194 BAMHANI โ†— NARSINGHPUR KARELI 10.00
91.3% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
194 BAMHANI โ†— SIDHI SIDHI 10.00
90.8% 10.00
CategoryFarm Pond
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
9.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
195 BAMHANI LALA โ†— CHHINDWARA CHAURAI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
196 BAMHORI BARDHA โ†— RAISEN SILWANI 10.00
67.0% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
33.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
197 BAMHORI DHUNDER (P) โ†— SAGAR SAGAR 10.00
77.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
198 BAMHORI GODAD โ†— RAISEN GAIRATGANJ 10.00
88.7% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
199 BAMJHAR โ†— KHANDWA CHHAIGAON MAKHAN 10.00
68.9% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys18 / 18 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
200 BAMKHAL โ†— KHARGONE KASRAWAD 10.00
44.1% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
201 BAMLA โ†— BETUL AMLA 10.00
23.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
40.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
202 BAMNALA โ†— KHARGONE BHIKANGAON 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 15 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
203 BAMNAPATI โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
204 BAMORA โ†— SAGAR SAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
204 BAMORA โ†— UJJAIN UJJAIN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
205 BAMORA (P) โ†— SAGAR BINA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
206 Bamorasukha โ†— RAJGARH NARSINGHGARH 10.00
27.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
62.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
207 BAMORI โ†— GUNA BAMORI 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
208 BAMORISHALA โ†— VIDISHA SIRONJ 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
209 BAMULIYAMUCHALI โ†— SHAJAPUR KALAPIPAL 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
210 BAMULIYA RAIMAL โ†— SEHORE ASHTA 10.00
41.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
58.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
211 BANAR โ†— MANDLA NARAYANGANJ 10.00
85.7% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
212 BANATHAR โ†— SEONI KEOLARI 10.00
96.7% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
213 BANBANA โ†— UJJAIN KHACHAROD 10.00
65.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
34.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
214 BANBANI โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
215 BANDAKA โ†— UJJAIN GHATIYA 10.00
66.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
33.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
216 BANDERBELA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
217 BANDHA โ†— NARSINGHPUR CHAWARPATHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
218 BANDHAN โ†— CHHINDWARA PANDHURNA 10.00
80.4% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
219 BANDRIYABAD โ†— BARWANI PANSEMAL 10.00
24.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
63.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
220 BANDWA โ†— VIDISHA GYARASPUR 10.00
86.5% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
221 BANGARDA โ†— KHANDWA PUNASA 10.00
52.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
222 BANGRED โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
223 BANI โ†— UJJAIN MAHIDPUR 10.00
35.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
65.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
224 BANJARI โ†— UJJAIN KHACHAROD 10.00
55.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
224 BANJARI โ†— UJJAIN MAHIDPUR 10.00
17.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
82.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
224 BANJARI โ†— KHARGONE MAHESHWAR 10.00
14.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
78.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
224 BANJARI โ†— UJJAIN TARANA 10.00
38.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
61.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
225 BANJARIYA (P) โ†— SAGAR JAISINAGAR 10.00
70.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
30.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
226 BANJRA โ†— DINDORI SAMNAPUR 10.00
36.6% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
227 BANKA MUKASA โ†— CHHINDWARA AMARWARA 10.00
61.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
38.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
228 BANMURI โ†— SIDHI SIDHI 10.00
66.8% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
33.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
229 BANSA (P) โ†— SAGAR JAISINAGAR 10.00
74.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
230 BANSKHEDI โ†— UJJAIN UJJAIN 10.00
32.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
67.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys24 / 2 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
230 BANSKHEDI โ†— UJJAIN GHATIYA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
231 BANUR โ†— BETUL BHAINSDEHI 10.00
23.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
63.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
232 BANWADA โ†— UJJAIN KHACHAROD 10.00
36.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
52.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
233 BAPACHA โ†— SHAJAPUR SHAJAPUR 10.00
85.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
234 BAPCHADONIYA โ†— SEHORE ASHTA 10.00
85.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
235 BARACHH โ†— REWA JAWA 10.00
29.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
62.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
236 BARAHBARAYARI โ†— CHHINDWARA CHAURAI 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
237 BARAI โ†— DINDORI MEHANDWANI 10.00
28.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
37.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
238 BARAKALA โ†— SATNA SATNA 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
239 BARA KHURD โ†— REWA TEONTHAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
240 BARAKUND โ†— KHANDWA KHALAWA 10.00
60.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
39.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 0 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
241 BARANA โ†— DATIA BHANDER 10.00
67.8% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
242 BARAYATHA (P) โ†— SAGAR SHAHGARH 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
243 BARBAH โ†— REWA SIRMOUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
244 BARCHOLI โ†— DATIA BHANDER 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
245 BARDIYA โ†— NEEMUCH MANASA 10.00
28.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 8 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
23.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
246 BARETHA (P) โ†— GWALIOR MORAR 10.00
23.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
68.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
247 BARETHHA โ†— VIDISHA KURWAI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
248 BARETHI (P) โ†— SAGAR SHAHGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
249 BARGAON โ†— DINDORI BAJAG 10.00
35.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
46.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
250 BARGWANDARACHI โ†— JABALPUR MAJHOULI 10.00 โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
251 BARIGAWAN-2 โ†— SIDHI SIDHI 10.00
51.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
40.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
252 BARIKHURD โ†— SATNA SATNA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
253 BARJHAI โ†— DEWAS BAGLI 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
254 BARJORPURA โ†— DATIA SEONDHA 10.00
88.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
255 BARKALA โ†— HARDA TIMARNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
256 BARKHEDAJAORA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
257 BARKHEDA KHARET โ†— SEHORE SEHORE 10.00
74.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
258 BARKHEDAMADAN โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
259 BARKHEDA NAI โ†— ASHOK NAGAR ASHOKNAGAR 10.00
96.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
260 Barkheda Sahajpur โ†— JABALPUR SHAHPURA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
261 BARKHEDASOMA โ†— DEWAS BAGLI 10.00
88.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
262 BARKHEDI-2 โ†— RAJGARH BIAORA 10.00
92.1% 10.00
CategoryFarm Pond
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
263 BARKHEDIBAZAR โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
31.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
68.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
264 BARKHERA GAUTAM (P) โ†— SAGAR REHLI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
265 BARKHRDANAJIK โ†— UJJAIN KHACHAROD 10.00
74.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
266 BARLA โ†— RAISEN SANCHI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
267 BARODA SAGAR (P) โ†— SAGAR JAISINAGAR 10.00
81.7% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
268 BARODIA (P) โ†— SAGAR BINA 10.00
41.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
58.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 12 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
269 BARODIYA โ†— GUNA BAMORI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
270 BARODIYA NAUNAGIR (P) โ†— SAGAR KHURAI 10.00
59.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
40.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
271 BAROKHAR โ†— REWA GANGEV 10.00
23.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
76.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
272 BAROLI โ†— INDORE SAWER 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
273 BAROL(P) โ†— GWALIOR DABRA 10.00
81.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
274 BARRUKHAR โ†— RAISEN SANCHI 10.00
94.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
275 BARSLYA (BARUFATAK) โ†— BARWANI THIKRI 10.00
94.5% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
276 BARTHOON โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
17.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
82.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
277 BARUKHEDA โ†— NEEMUCH NEEMUCH 10.00
59.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
278 BARUKHEDI โ†— UJJAIN MAHIDPUR 10.00
35.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
65.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
279 BARUREWA โ†— NARSINGHPUR NARSIMHAPUR 10.00
50.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
49.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
280 BASEDA โ†— REWA GANGEV 10.00
99.4% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
281 BASIYA โ†— DAMOH BATIYAGARH 10.00
97.0% 10.00
CategoryFarm Pond
Started / Completed / Phys19 / 19 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
282 BASKHAPA โ†— NARMADAPURAM SOHAGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
283 BASTARI โ†— MANDLA NIWAS 10.00
85.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
284 BASWA โ†— KHARGONE BARWAH 10.00
45.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
55.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
285 BATAULI โ†— SIDHI SIDHI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
286 BATHOLI โ†— KHARGONE MAHESHWAR 10.00
71.0% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
287 BATLAWADI โ†— UJJAIN KHACHAROD 10.00
22.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
52.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
288 BATONDHA โ†— DINDORI DINDORI 10.00
36.1% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
49.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
289 BAVADIKHEDA โ†— KHARGONE BARWAH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
290 BAVALI โ†— NARSINGHPUR GOTEGAON 10.00
13.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
86.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
291 BAVALYA โ†— UJJAIN MAHIDPUR 10.00
51.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
292 BAWADIKHEDA โ†— DEWAS BAGLI 10.00
41.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
58.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 15 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
293 BAWELLY โ†— DINDORI KARANJIYA 10.00
80.3% 10.00
CategoryFarm Pond
Started / Completed / Phys11 / 10 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
294 BAYAWADI โ†— BETUL BETUL 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
295 BEDAGAON โ†— DEWAS KANNOD 10.00
66.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
33.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
296 BEDAR โ†— NARMADAPURAM BANKHEDI 10.00
59.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
297 BEDARNAGAR โ†— SHAJAPUR MOMAN BADODIYA 10.00
63.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
32.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
298 BEDAVANYA โ†— UJJAIN KHACHAROD 10.00
68.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
299 BEDIYA โ†— KHARGONE BARWAH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
300 BEDIYAKLAN โ†— HARDA KHIRKIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
301 BEDIYAW โ†— KHARGONE KHARGONE 10.00
16.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
63.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
302 BEDWAN โ†— UJJAIN KHACHAROD 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
303 BEEJANWADA โ†— NARMADAPURAM PIPARIYA 10.00
75.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
24.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
304 BEELADHHANA โ†— VIDISHA BASODA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
305 BEELKHEDA โ†— GUNA BAMORI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
306 BEERAKHEDI โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
307 BEHLOLA โ†— UJJAIN KHACHAROD 10.00
30.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
52.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
308 BELA โ†— SATNA SATNA 10.00
63.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
36.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
308 BELA โ†— SATNA AMARPATAN 10.00
74.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
308 BELA โ†— REWA GANGEV 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
309 BELAKHEDA โ†— UJJAIN MAHIDPUR 10.00
32.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
67.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
310 BELGAON โ†— BALAGHAT LALBARRA 10.00
85.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
311 BELKHEDA โ†— NARSINGHPUR NARSIMHAPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
312 BELKHEDI SEDH โ†— NARSINGHPUR GOTEGAON 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
313 BELWA KURMIYAN โ†— REWA GANGEV 10.00
99.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
314 BELWA PAIKAN โ†— REWA GANGEV 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
315 BERCHHA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
316 BERKHEDI BAZYAFT โ†— BHOPAL PHANDA 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
317 BERKHEDI KALAN โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
318 BERKHUWA MAHANT โ†— SAGAR JAISINAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
319 BERPANI โ†— MANDLA BIJADANDI 10.00
86.8% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
320 BESARKUND โ†— KHARGONE KASRAWAD 10.00
18.1% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
67.5% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 9 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
6.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
321 BESVAN โ†— HARDA HARDA 10.00
46.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
21.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
322 BGHARI โ†— SHIVPURI KHANIYADHANA 10.00
82.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
323 BHADBHADIYA โ†— NEEMUCH NEEMUCH 10.00
63.7% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
36.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
324 BHADSIMBHA โ†— UJJAIN TARANA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
325 BHADUS โ†— BETUL BETUL 10.00
51.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
326 BHADWA โ†— UJJAIN MAHIDPUR 10.00
34.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
65.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 2 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
327 BHAGAWA โ†— KHANDWA KHALAWA 10.00
30.5% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
45.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
328 BHAGGASELOT KA TAPAR โ†— RATLAM BAJNA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
329 BHAGOHAR โ†— SIDHI SIDHI 10.00
89.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
330 BHAGORI โ†— RAJGARH ZIRAPUR 10.00 โ€” โ€”
16.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 10 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
83.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
331 BHAGOTIPURA โ†— RAJGARH BIAORA 10.00
83.9% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
332 BHAHEDI โ†— KHANDWA HARSUD 10.00
28.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
56.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
333 BHAINSA โ†— NARSINGHPUR GOTEGAON 10.00
34.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
65.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
334 BHAINSWAHI โ†— DINDORI AMARPUR 10.00
72.3% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
334 BHAINSWAHI โ†— MANDLA BIJADANDI 10.00
94.5% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
335 BHAISA (P) โ†— SAGAR RAHATGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
336 BHAISAWA โ†— KHANDWA KHANDWA 10.00
63.2% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
36.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
337 BHAKRADA โ†— KHANDWA KHANDWA 10.00
61.7% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
38.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys28 / 0 / 28
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
338 BHALWARA โ†— DINDORI MEHANDWANI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 4 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
339 BHALWARA MAL โ†— MANDLA NIWAS 10.00
90.3% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
340 BHAMORI โ†— BARWANI THIKRI 10.00
61.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
38.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
341 BHAMORI KALA โ†— NARMADAPURAM PIPARIYA 10.00 โ€” โ€”
13.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
86.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
342 BHANDAWAD โ†— RAJGARH SARANGPUR 10.00
55.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
343 BHAND BADODIYA โ†— UJJAIN UJJAIN 10.00
15.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
84.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys32 / 0 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
344 BHANWAS โ†— RAJGARH BIAORA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
345 BHANWASA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
346 BHANYA KHEDI โ†— SHAJAPUR KALAPIPAL 10.00
89.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
347 BHAPSA โ†— DINDORI AMARPUR 10.00
92.0% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
347 BHAPSA โ†— MANDLA MANDLA 10.00
73.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
26.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
348 BHARATPURA โ†— CHHATARPUR BIJAWAR 10.00
90.5% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
349 BHARDI โ†— SHAJAPUR KALAPIPAL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
350 BHARIGAWAN โ†— REWA NAIGARHI 10.00
74.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
351 BHARJUNAKALAN โ†— SATNA SATNA 10.00
87.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
352 BHARKACHHA KALAN โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
353 BHASNER โ†— KHARGONE KHARGONE 10.00
55.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
354 BHATANI โ†— VIDISHA BASODA 10.00
95.7% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
4.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
355 BHATERA โ†— NARSINGHPUR SAIKHEDA (GADARWARA) 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
356 BHATGAON โ†— NARMADAPURAM SOHAGPUR 10.00
78.4% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
21.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 6 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
357 BHATISUDA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
358 BHATIWADA (MEHLON) โ†— SEONI SEONI 10.00
79.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
359 BHATKHEDI โ†— DEWAS DEWAS 10.00
31.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
52.5% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
359 BHATKHEDI โ†— RAJGARH BIAORA 10.00 โ€” โ€”
18.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
81.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
359 BHATKHEDI โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
360 BHATKI โ†— BARWANI PANSEMAL 10.00
65.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
11.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
361 BHATNI โ†— VIDISHA VIDISHA 10.00
66.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
29.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
362 BHATODIYA KHURD โ†— CHHINDWARA JAMAI 10.00
66.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
33.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
363 BHATPARETIYA โ†— HARDA HARDA 10.00
65.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
34.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
364 BHATTYAN KHURD โ†— KHARGONE KASRAWAD 10.00
10.5% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.8% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
55.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
365 BHAUKHARI KHURD โ†— REWA GANGEV 10.00
94.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
366 BHAUNDI โ†— MANDLA BIJADANDI 10.00
93.9% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
367 BHAURGARH โ†— BALAGHAT KHAIRLANJI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
368 BHAVRAS โ†— HARDA TIMARNI 10.00
46.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
53.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
369 BHAWANIPURA โ†— RAJGARH NARSINGHGARH 10.00
76.1% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
370 BHAWARLI MAL โ†— KHANDWA HARSUD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
371 BHEJRI โ†— ANUPPUR PUSHPRAJGARH 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys13 / 12 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
372 BHENSOLA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
21.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
78.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
373 BHESANA โ†— RAJGARH NARSINGHGARH 10.00
76.4% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
374 BHESAYANAGAN โ†— SHAJAPUR KALAPIPAL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
375 BHICCHDODKHALSA โ†— UJJAIN GHATIYA 10.00
41.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
58.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
376 BHICHHDODISTMURAR โ†— UJJAIN GHATIYA 10.00
81.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
377 BHICHHIYAKHURD โ†— SATNA AMARPATAN 10.00
51.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
378 BHIGAWA NANKARI โ†— KHANDWA CHHAIGAON MAKHAN 10.00
56.6% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
43.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys24 / 24 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
379 BHIKAMPUR โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys26 / 22 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
380 BHILIDYA โ†— NARMADAPURAM SOHAGPUR 10.00 โ€” โ€”
50.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
49.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
381 BHILKHEDA โ†— BARWANI BARWANI 10.00
41.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
58.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
382 BHILSUDA โ†— UJJAIN KHACHAROD 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
383 BHIMAKHEDA โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
18.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
81.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
384 BHIYANA โ†— RAJGARH SARANGPUR 10.00
67.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
32.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 4 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
385 BHODIYA โ†— RAISEN BADI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
386 BHOGAWA NIPANI โ†— KHARGONE BARWAH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
387 BHOGAWA SIPANI โ†— KHARGONE BARWAH 10.00
17.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
74.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
388 BHOJAKHEDI โ†— KHANDWA CHHAIGAON MAKHAN 10.00
31.5% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
54.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
389 BHOJPUR โ†— RAISEN OBEDULLAHGANJ 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
390 BHOMALVAS โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
391 BHOOTNEEKHEDA โ†— KHANDWA PANDHANA 10.00
63.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 0 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
12.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
392 BHOURANSA โ†— VIDISHA KURWAI 10.00
48.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
51.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
393 BHUGAOLI (P) โ†— SAGAR KHURAI 10.00
79.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
394 BHUIFAL โ†— KHANDWA CHHAIGAON MAKHAN 10.00
52.9% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
21.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 14 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
25.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
395 BHURAKHEDI โ†— GUNA BAMORI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
396 BHURI โ†— DAMOH DAMOH 10.00
65.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
397 BHURSADONGRI โ†— BALAGHAT LANJI 10.00
77.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
398 BHUSIBENTA โ†— RAISEN SANCHI 10.00
96.4% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
399 BHUTAI โ†— CHHINDWARA MOHKHED 10.00
51.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
400 BIAORA MANDU โ†— RAJGARH SARANGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
401 BICHUWA โ†— KATNI KATNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
402 BIDHUIKHURD โ†— SATNA AMARPATAN 10.00
51.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
403 BIGNODIPURA โ†— RAJGARH SARANGPUR 10.00
79.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
404 BIGROD โ†— SHAJAPUR SHAJAPUR 10.00
88.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 3 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
405 BIHAR โ†— KHANDWA PANDHANA 10.00
92.7% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
406 BIHIRWARA โ†— CHHATARPUR BIJAWAR 10.00
99.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
407 BIHRA โ†— REWA REWA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
408 BIJADANDI โ†— MANDLA BIJADANDI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
409 BIJAURA โ†— DINDORI DINDORI 10.00
87.7% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
410 BIJOURA โ†— ANUPPUR PUSHPRAJGARH 10.00
99.1% 10.00
CategoryFarm Pond
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
411 BIKOUR โ†— NARSINGHPUR KARELI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
412 BILAIYA (P) โ†— SAGAR KHURAI 10.00
57.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
42.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
413 BILGADA โ†— DINDORI MEHANDWANI 10.00
80.5% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
414 BILGAON โ†— DINDORI SHAHPURA 10.00 โ€” โ€”
1.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
98.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
415 BILKHERBA โ†— JABALPUR SHAHPURA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
416 BILLORA BUZURG โ†— KHANDWA PUNASA 10.00 โ€” โ€”
15.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
84.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
417 BILOOD โ†— KHANDWA PANDHANA 10.00
73.2% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
418 BILWANI โ†— RAISEN GAIRATGANJ 10.00
93.7% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
419 BILWANIYA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
420 BILWAROAD โ†— BARWANI THIKRI 10.00
20.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
70.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
421 BINDRAI โ†— CHHINDWARA JAMAI 10.00
59.3% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
422 BINPURA โ†— UJJAIN MAHIDPUR 10.00
58.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
423 BIRAMKHEDI โ†— UJJAIN GHATIYA 10.00
13.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
40.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
424 BIRGODARANDHIR โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
425 BIRHOLI โ†— RAISEN SANCHI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
426 BIRIYAKHEDI โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
427 BIRPUR โ†— SHEOPUR BIJEYPUR 10.00
85.1% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
428 BISALI โ†— DEWAS BAGLI 10.00
61.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
38.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
429 BISALKHEDI โ†— UJJAIN MAHIDPUR 10.00
38.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
61.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
430 BISANYA โ†— RAJGARH KHILCHIPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
431 BISAPURKALA โ†— CHHINDWARA MOHKHED 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
432 BISTRA โ†— KATNI KATNI 10.00
81.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
433 BOLAI โ†— SHAJAPUR MOMAN BADODIYA 10.00
84.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
434 BOLASA โ†— UJJAIN UJJAIN 10.00
94.8% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
435 BORADI MAL โ†— KHANDWA PUNASA 10.00 โ€” โ€”
27.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys35 / 0 / 35
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
43.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
29.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
436 BORDAMADA โ†— UJJAIN TARANA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
437 BORI โ†— BARWANI BARWANI 10.00
68.1% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
438 BORIPIPARDAHI โ†— MANDLA NAINPUR 10.00
85.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
439 BORI SARAY โ†— KHANDWA HARSUD 10.00
29.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
56.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
440 BORKHEDA โ†— KHANDWA KHALAWA 10.00
65.4% 10.00
CategoryFarm Pond
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
34.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys32 / 0 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
441 BORKHEDABHALLA โ†— UJJAIN GHATIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
442 BORKHEDAKHURD RAIYAT โ†— KHANDWA PANDHANA 10.00
77.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
443 BORKHEDI โ†— RAJGARH NARSINGHGARH 10.00
67.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
33.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
444 BORNAGUJAR โ†— NARMADAPURAM SOHAGPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
445 BORUTH โ†— KHARGONE BHIKANGAON 10.00
85.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
446 BOTHI โ†— HARDA TIMARNI 10.00
43.6% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
39.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
447 BRUKHODRA โ†— BARWANI BARWANI 10.00
72.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
448 BUCHANKHAPA โ†— CHHINDWARA PANDHURNA 10.00
57.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
42.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
449 BUDARKALA โ†— NARMADAPURAM SEONI MALWA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
450 BUDAWA โ†— REWA GANGEV 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
451 BUDHANIYA PANTH โ†— INDORE SAWER 10.00
31.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
68.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
452 BUDHGAON โ†— NARSINGHPUR GOTEGAON 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys12 / 12 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
453 BUDHI BARLAI โ†— INDORE SAWER 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
454 BUDI KONI โ†— JABALPUR PATAN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
455 BUGHAKHARA โ†— SHIVPURI KHANIYADHANA 10.00
88.9% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
456 BULDAMAAL โ†— DINDORI MEHANDWANI 10.00
75.2% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
457 BURADA โ†— DEWAS KHATEGAON 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
458 BURANABAD โ†— UJJAIN KHACHAROD 10.00
85.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
459 BURANA KHEDI โ†— INDORE INDORE 10.00
63.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
37.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
460 CANDANIYA โ†— ANUPPUR PUSHPRAJGARH 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys14 / 14 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
461 CHADAN KHEDA โ†— NARSINGHPUR GOTEGAON 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
462 CHAKDAHI โ†— SATNA RAMPUR BAGHELAN 10.00
73.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
463 CHAKERI โ†— BARWANI THIKRI 10.00
65.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
34.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
464 CHAKERI (P) โ†— SAGAR JAISINAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
465 CHAKRA โ†— KHANDWA KHALAWA 10.00
87.6% 10.00
CategoryFarm Pond
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
0.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
466 CHAK RAGHUNATHPUR โ†— VIDISHA GYARASPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
467 CHAKRAWADA โ†— UJJAIN GHATIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
468 CHAMARGAWAN โ†— MORENA KAILARAS 10.00
98.8% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
469 CHANDAN KHEDA โ†— NARSINGHPUR BABAI CHICHLI 10.00
82.1% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
17.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
470 CHANDEE โ†— REWA JAWA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
471 CHANDEH โ†— REWA GANGEV 10.00
99.6% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
472 CHANDERI โ†— NARMADAPURAM SOHAGPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
473 CHANDESARA โ†— UJJAIN UJJAIN 10.00
6.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
93.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
474 CHANDESARI โ†— UJJAIN UJJAIN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
475 CHANDLI โ†— NARSINGHPUR GOTEGAON 10.00
83.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
16.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
476 CHANDNA โ†— RAISEN SANCHI 10.00
91.5% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
477 CHANDODIYA โ†— UJJAIN KHACHAROD 10.00
23.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
76.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
478 CHANDPUR โ†— DINDORI AMARPUR 10.00
10.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
43.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
41.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
479 CHANDPURA โ†— NARSINGHPUR NARSIMHAPUR 10.00
69.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
30.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
480 CHANDPUR (P) โ†— SAGAR REHLI 10.00
38.1% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
44.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
481 CHANDVARA โ†— CHHATARPUR GAURIHAR 10.00
49.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
42.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
482 CHANDVASLA โ†— UJJAIN KHACHAROD 10.00
62.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
37.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
483 CHAPAKHEDA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
484 CHAPARA โ†— KATNI BAHORIBAND 10.00
53.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
485 CHARAISHAMPUR(P) โ†— GWALIOR GHATIGAON 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
486 CHARGAON โ†— RAISEN BADI 10.00
74.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
487 CHARGAON KARBAL โ†— CHHINDWARA MOHKHED 10.00 โ€” โ€”
4.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
95.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
488 CHARGAONMAL โ†— MANDLA BIJADANDI 10.00
88.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
489 CHARKHEDA (PO.AB.) โ†— KHANDWA HARSUD 10.00
52.1% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys39 / 39 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
490 CHATARKHEDA โ†— NARMADAPURAM SEONI MALWA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
491 CHATRUKHEDI โ†— RAJGARH SARANGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
492 CHAUBISA MAAL โ†— DINDORI MEHANDWANI 10.00
84.0% 10.00
CategoryFarm Pond
Started / Completed / Phys11 / 3 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
12.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
493 CHAUDIYAR โ†— REWA RAIPUR KARCHULIYAN 10.00
19.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
71.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
494 CHAURA โ†— REWA SIRMOUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
495 CHAURAMAL โ†— DINDORI DINDORI 10.00
97.7% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 8 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
496 CHAYANI โ†— SHAJAPUR KALAPIPAL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
497 CHEEKALI โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
498 CHEENA โ†— DATIA SEONDHA 10.00
92.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
499 CHENPURA KALAN โ†— RAJGARH NARSINGHGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
500 CHHALPIKHURD โ†— KHANDWA HARSUD 10.00
45.3% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys25 / 0 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
501 CHHAPAKUND โ†— KHANDWA HARSUD 10.00
45.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
54.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys33 / 33 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
502 CHHAPER โ†— ASHOK NAGAR ASHOKNAGAR 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
503 CHHAPRI โ†— SHAJAPUR KALAPIPAL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
504 CHHAWAL โ†— BETUL AMLA 10.00
84.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
505 CHHIDGAON MEL โ†— HARDA TIMARNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
506 CHHIKARI โ†— GUNA BAMORI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
507 CHHIND โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
508 CHHINDI KAMATH โ†— CHHINDWARA JAMAI 10.00
85.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
509 CHHIRAHATA โ†— REWA SIRMOUR 10.00
95.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
510 CHHIRPANI VANGRAM โ†— DINDORI SHAHPURA 10.00
91.2% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
511 CHHIRWA RAIYAT โ†— KHANDWA PANDHANA 10.00
57.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
26.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
512 CHHIRWEL โ†— KHANDWA CHHAIGAON MAKHAN 10.00
60.0% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 1 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
32.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
513 CHHITARDEVI โ†— UJJAIN GHATIYA 10.00
56.0% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
36.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
514 CHHIULA โ†— REWA GANGEV 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
515 CHHTAINEE โ†— REWA JAWA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
516 CHHUAI(TIKARI) โ†— SEONI SEONI 10.00
63.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
36.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
517 CHICHGAON โ†— MANDLA NAINPUR 10.00
91.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
518 CHICHOLI โ†— RAISEN SILWANI 10.00
76.4% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
519 CHIDLAWNIYA โ†— RAJGARH SARANGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
520 CHIDORIYA โ†— VIDISHA VIDISHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
521 CHIKHALI โ†— BETUL GHORA DONGRI 10.00 โ€” โ€”
19.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
81.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
522 CHIKHLI MUKASA โ†— CHHINDWARA PANDHURNA 10.00
88.7% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
523 CHIKLI โ†— UJJAIN TARANA 10.00
55.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
524 CHILWAHA โ†— RAISEN SANCHI 10.00
94.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
525 CHIMNAKHAPA โ†— CHHINDWARA PANDHURNA 10.00
83.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
526 CHINKI โ†— NARSINGHPUR KARELI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
527 CHIRAGPURA โ†— KHARGONE BHIKANGAON 10.00
57.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
42.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
528 CHIRHOLI โ†— RAISEN SANCHI 10.00
88.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
529 CHIROLA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
530 CHIRPURA(P) โ†— GWALIOR DABRA 10.00
96.9% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
531 CHITAWAD โ†— UJJAIN MAHIDPUR 10.00
50.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
49.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
532 CHITAWALYAKHEDA โ†— UJJAIN TARANA 10.00
82.5% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
533 CHOBAPIPALYA โ†— DEWAS DEWAS 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
534 CHOKHANDA โ†— RAJGARH ZIRAPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
535 CHORAL โ†— INDORE MHOW 10.00
30.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
69.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
536 CHOUPRA KHURD โ†— DAMOH DAMOH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
537 CHUKLIYA โ†— RAJGARH BIAORA 10.00
83.1% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
538 DABHNI โ†— DATIA SEONDHA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
539 DABIYA โ†— SHIVPURI SHIVPURI 10.00
94.6% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
540 DABRI โ†— UJJAIN KHACHAROD 10.00
45.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
50.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
541 DADHAWA โ†— REWA RAIPUR KARCHULIYAN 10.00
95.8% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
542 DADOORAR โ†— VIDISHA KURWAI 10.00
40.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
59.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
543 DAGADKHEDI MAL โ†— KHANDWA HARSUD 10.00
53.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
544 DAHEGAON โ†— BALAGHAT LANJI 10.00
81.5% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
545 DAKACHYA โ†— INDORE SAWER 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
546 DALIPUR โ†— CHHATARPUR BADA MALEHARA 10.00
55.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
547 DALLAHEDA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
548 DAMADIYA โ†— NARMADAPURAM SEONI MALWA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
549 DAMODARPURA โ†— NEEMUCH JAWAD 10.00
41.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
58.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
550 DANDBICHHIYA โ†— DINDORI DINDORI 10.00
73.1% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
24.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
551 DANDVIDAYPUR โ†— DINDORI DINDORI 10.00
89.6% 10.00
CategoryFarm Pond
Started / Completed / Phys12 / 1 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
552 DANGARBADA โ†— VIDISHA VIDISHA 10.00
46.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
53.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
553 DANGAVANI PIPARIYA โ†— CHHINDWARA CHHINDWARA 10.00 โ€” โ€”
12.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
87.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
554 DANGICHA โ†— SHAJAPUR MOMAN BADODIYA 10.00
67.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
32.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
555 DANORA โ†— BETUL BETUL 10.00
9.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
90.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
556 DANTHA โ†— KHANDWA BALADI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys24 / 14 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
557 DANTOLI โ†— NEEMUCH MANASA 10.00
91.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
558 DARAIN โ†— SHAHDOL JAISINGHNAGAR 10.00
71.0% 10.00
CategoryFarm Pond
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
559 DARVAI โ†— SEONI CHHAPARA 10.00
91.3% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
560 DASNAWAL โ†— KHARGONE GOGANWA 10.00
42.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
46.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
561 DATAIRA โ†— VIDISHA KURWAI 10.00 โ€” โ€” โ€”
100.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
562 DATANA โ†— UJJAIN UJJAIN 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
563 DATARAWA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
564 DATWADA โ†— BARWANI THIKRI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
565 DAUDKHEDI โ†— UJJAIN UJJAIN 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
566 DAULATPUR(P) โ†— GWALIOR BHITARWAR 10.00
22.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
55.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
567 DAVIYAJGAN โ†— SHIVPURI KHANIYADHANA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
568 DAVIYAKALAN โ†— SHIVPURI KHANIYADHANA 10.00
92.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
569 DEEHEE โ†— REWA TEONTHAR 10.00
91.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
570 DEEPGAONKLAN โ†— HARDA KHIRKIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
571 DEHARA โ†— GUNA BAMORI 10.00
20.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€”
80.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
572 DEHARI โ†— NARMADAPURAM KESLA 10.00 โ€” โ€”
50.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
50.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
572 DEHARI โ†— GUNA BAMORI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
573 DEHARIKALAN โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
574 DEHARIYA โ†— DEWAS KANNOD 10.00
89.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
574 DEHARIYA โ†— HARDA TIMARNI 10.00
69.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
30.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
575 DEHARIYASOYAT โ†— AGAR-MALWA SUSNER 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
576 DEHRIBAMAN โ†— RAJGARH RAJGARH 10.00
82.9% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
17.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
577 DELCHBUZURG โ†— UJJAIN MAHIDPUR 10.00
17.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
82.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
578 DELCHIKHURD โ†— UJJAIN MAHIDPUR 10.00
21.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
78.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
579 Delgaon โ†— KHANDWA CHHAIGAON MAKHAN 10.00
44.8% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 16 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
580 DENDALA โ†— SHAJAPUR SHAJAPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
581 DEOGARH โ†— SIDHI SIDHI 10.00
51.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
582 DEORA โ†— SATNA MAIHAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
0.0% 5.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score5.00 / 10
โ€” โ€” โ€”
583 DEORA NO-2 โ†— SATNA RAMPUR BAGHELAN 10.00
90.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
584 DEORI โ†— ANUPPUR PUSHPRAJGARH 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
585 DEORI JAGIR โ†— RAISEN SILWANI 10.00
35.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
65.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
586 DEORIMAL โ†— CHHINDWARA CHAURAI 10.00
83.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
587 DEOWALPANI (P) โ†— SAGAR REHLI 10.00
92.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
588 DERKHE โ†— VIDISHA BASODA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
589 DEVAKACHHAR โ†— NARSINGHPUR KARELI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
590 DEVGOAN (M) โ†— BALAGHAT BIRSA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
591 DEVJHIRI โ†— KHARGONE BHAGVANPURA 10.00
21.7% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
73.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
592 DEVLA โ†— BARWANI THIKRI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
593 DEVLI โ†— VIDISHA KURWAI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
594 DEVPURA โ†— DATIA SEONDHA 10.00 โ€” โ€”
53.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
595 DEVRA PHAREDA โ†— REWA RAIPUR KARCHULIYAN 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
596 DEVRI โ†— CHHINDWARA BICHHUA 10.00
71.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
596 DEVRI โ†— NARMADAPURAM BANKHEDI 10.00
15.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
78.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
597 DEWAI โ†— SIDHI MAJHAULI 10.00
65.7% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
32.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
598 DEWALDI โ†— KHANDWA HARSUD 10.00
71.0% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 7 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys25 / 1 / 24
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
599 DEWLA MAFI โ†— KHANDWA CHHAIGAON MAKHAN 10.00
58.0% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
42.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys36 / 36 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
600 DEWLA RAIYAT โ†— KHANDWA PUNASA 10.00
40.6% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys21 / 0 / 21
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
30.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
601 DEWRAJPUR โ†— VIDISHA VIDISHA 10.00
94.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
5.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
602 DEWRIHATAI โ†— KATNI KATNI 10.00
90.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
603 DHABALAGORI โ†— UJJAIN GHATIYA 10.00
60.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
604 DHABLA โ†— SEHORE SEHORE 10.00
86.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
604 DHABLA โ†— RAJGARH NARSINGHGARH 10.00
91.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
605 DHABLASIYA โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
606 DHABLI โ†— INDORE SAWER 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
607 DHABONI โ†— SEHORE SEHORE 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
608 DHADAVPADHAV โ†— NARMADAPURAM BANKHEDI 10.00
27.7% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 1 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
57.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
609 DHADIYA โ†— NARSINGHPUR CHAWARPATHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
610 DHAGDIYAMAL โ†— CHHINDWARA MOHKHED 10.00
35.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
54.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
611 DHAKANA CHAPNA โ†— RAISEN SANCHI 10.00
59.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
612 DHAKLGAON โ†— KHARGONE BARWAH 10.00
32.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
67.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
613 DHAKNA โ†— KHANDWA KHALAWA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
614 DHAKORA โ†— RAJGARH BIAORA 10.00
73.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
615 DHAMANKHEDA โ†— SEHORE SEHORE 10.00
52.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
32.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
616 DHAMNIYA โ†— RAJGARH KHILCHIPUR 10.00
79.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
616 DHAMNIYA โ†— NARMADAPURAM SEONI MALWA 10.00
68.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
617 DHANAGWAN โ†— JABALPUR MAJHOULI 10.00
15.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
79.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
618 DHANANA โ†— SHAJAPUR MOMAN BADODIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
619 DHANASHRI โ†— NARMADAPURAM PIPARIYA 10.00
79.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
620 DHANGAON โ†— HARDA HARDA 10.00
67.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
32.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
621 DHANORA โ†— KHANDWA PANDHANA 10.00
56.8% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
37.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys21 / 21 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
622 DHANWAHIKALAN โ†— SATNA MAIHAR 10.00
96.7% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
623 DHANWASI RYT โ†— DINDORI AMARPUR 10.00
84.8% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
624 DHARAKHEDA โ†— UJJAIN MAHIDPUR 10.00
69.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
30.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
625 Dharampura โ†— JABALPUR SHAHPURA 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
626 DHARAMPURI โ†— KHANDWA KHANDWA 10.00
29.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
56.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
627 DHARMPURA โ†— CHHATARPUR NOWGOAN 10.00
76.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
628 DHARPIWADA โ†— BALAGHAT LALBARRA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
629 DHARUKHEDI โ†— KHANDWA HARSUD 10.00
60.6% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys31 / 31 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
630 DHAWADA(CHA) โ†— BARWANI SENDHAWA 10.00 โ€” โ€”
24.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
75.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
631 DHAWADI โ†— BARWANI PANSEMAL 10.00
53.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
632 DHAWAIYA โ†— REWA GANGEV 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
633 DHAWAIYA 291 โ†— REWA RAIPUR KARCHULIYAN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
634 DHEGHORA โ†— VIDISHA GYARASPUR 10.00
74.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
635 DHERA โ†— REWA MAUGANJ 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
636 DHIGSARA โ†— NARSINGHPUR SAIKHEDA (GADARWARA) 10.00
98.4% 10.00
CategoryFarm Pond
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
637 DHIKWADA โ†— NARMADAPURAM SOHAGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
638 DHIMROLI (P) โ†— SAGAR BINA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
639 DHOOMAHEDA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
640 DHORANI โ†— KHANDWA KHANDWA 10.00
25.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
62.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
641 DHUBOTI โ†— SHAJAPUR KALAPIPAL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
642 DHUETERA โ†— SEONI KEOLARI 10.00
93.3% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
643 DHULET โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
644 DHUNDHRKA โ†— MANDSAUR MANDSAUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
645 DHUNDISARAI โ†— DINDORI AMARPUR 10.00
37.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
58.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
646 DHURGADA โ†— HARDA HARDA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
647 DHURKUTTA โ†— DINDORI SAMNAPUR 10.00
90.0% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
648 DHURUA (P) โ†— SAGAR BINA 10.00
23.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
74.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
649 DIDHOURA โ†— JABALPUR PATAN 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
650 DIGDOLI โ†— GUNA BAMORI 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
651 DIHULI โ†— SIDHI SIDHI 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
652 DINDOLI โ†— VIDISHA BASODA 10.00
93.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
6.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
653 DINKARPURA โ†— KHANDWA HARSUD 10.00
51.2% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys22 / 0 / 22
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
654 DIWAL โ†— KHANDWA PANDHANA 10.00
81.2% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
655 DIWANGANJ โ†— RAISEN SANCHI 10.00
68.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
656 DOBDAGUJAR โ†— UJJAIN TARANA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys27 / 7 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
657 DODIYA โ†— CHHINDWARA MOHKHED 10.00
71.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
657 DODIYA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
59.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 7 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
40.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
658 DOGAWAN โ†— KHARGONE KASRAWAD 10.00
19.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
66.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
659 DOHAD โ†— KHANDWA PUNASA 10.00
42.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
44.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
660 DOKARBANDI โ†— BALAGHAT LALBARRA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
661 DOKARGAON โ†— SHAJAPUR MOMAN BADODIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
662 DOKE โ†— BALAGHAT WARASEONI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
663 DOL โ†— REWA SIRMOUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
664 DOLARIYA โ†— HARDA TIMARNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
665 Dondkheda โ†— VIDISHA LATERI 10.00
85.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
666 DONGAR โ†— ASHOK NAGAR CHANDERI 10.00 โ€” โ€”
7.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
92.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
667 DONGARGAON โ†— KHANDWA PANDHANA 10.00
74.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
668 DONGARI โ†— GUNA BAMORI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
669 DONGARKHEDA โ†— UJJAIN MAHIDPUR 10.00
63.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
36.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 1 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
670 DONGLA โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
671 DONGRA PACHAR โ†— ASHOK NAGAR ASHOKNAGAR 10.00
80.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
672 DONI(P) โ†— GWALIOR BHITARWAR 10.00
23.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
75.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
673 DONTA โ†— DEWAS TONK KHURD 10.00 โ€” โ€”
50.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
50.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
674 DORANA โ†— MANDSAUR MANDSAUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
675 DORLI(MAL) โ†— BALAGHAT WARASEONI 10.00
50.6% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
676 DOTRU โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
677 DUARI โ†— REWA REWA 10.00
92.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
678 DUBAHAI KHURD โ†— REWA GANGEV 10.00
93.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
679 DUBGAWAN โ†— REWA SIRMOUR 10.00
75.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
21.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
680 DUDADEHALWADA โ†— NARMADAPURAM PIPARIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
681 DUDHWAS โ†— KHANDWA PUNASA 10.00
67.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys18 / 14 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
682 DUHANIYA โ†— DINDORI DINDORI 10.00
69.1% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
683 DULADAR โ†— MANDLA GHUGHRI 10.00
93.3% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
684 DULHARI โ†— DINDORI MEHANDWANI 10.00
77.7% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
685 DUNALJA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
686 DUNDI โ†— JABALPUR JABALPUR 10.00
4.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
52.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
686 DUNDI โ†— JABALPUR PATAN 10.00
46.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
54.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
687 DUNGARIYA โ†— RAISEN OBEDULLAHGANJ 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
687 DUNGARIYA โ†— UJJAIN MAHIDPUR 10.00
36.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
63.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
687 DUNGARIYA โ†— DINDORI SAMNAPUR 10.00
89.4% 10.00
CategoryFarm Pond
Started / Completed / Phys26 / 23 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
687 DUNGARIYA โ†— SEHORE BUDNI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
688 DUNGARIYA KALAN โ†— RAISEN SILWANI 10.00
85.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
689 DUNGARKHEDI โ†— UJJAIN MAHIDPUR 10.00
36.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
63.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
690 DUPADIYA โ†— SEHORE ASHTA 10.00
16.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
54.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
691 DUPARIYA โ†— VIDISHA VIDISHA 10.00 โ€” โ€”
67.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
32.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
692 DUPDAWADA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
693 DUWGAWAN โ†— REWA GANGEV 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
694 EESARPUR โ†— NARMADAPURAM SOHAGPUR 10.00
28.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
71.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
695 EKALWARA โ†— BARWANI RAJPUR 10.00
5.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
81.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
696 EKHAND โ†— KHANDWA PUNASA 10.00
89.2% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 1 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
697 ERAYA(P) โ†— GWALIOR BHITARWAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
698 FANGAON โ†— KHARGONE BARWAH 10.00 โ€” โ€”
31.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 6 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
68.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
699 FARAHDA โ†— ANUPPUR PUSHPRAJGARH 10.00
98.9% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
700 FATEHPUR โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
701 FATEPUR โ†— DEWAS TONK KHURD 10.00
62.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
38.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
702 FEFRI SAR. โ†— KHANDWA KHALAWA 10.00
44.3% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
703 FURTALA โ†— NARMADAPURAM MAKHAN NAGAR 10.00 โ€” โ€”
16.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
68.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
704 GADAGHAT โ†— JABALPUR PATAN 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
705 GADARIYA โ†— MANDSAUR SITAMAU 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
706 Gadar Piperiya โ†— JABALPUR SHAHPURA 10.00
54.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
16.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
707 GADARWAS โ†— RAISEN BADI 10.00
84.4% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
708 GADASARAI โ†— DINDORI BAJAG 10.00
42.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
52.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
709 GADIYA โ†— RAJGARH NARSINGHGARH 10.00
22.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
52.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
710 GADLA โ†— VIDISHA VIDISHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
711 GAGANWADA โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
712 GAHIRA โ†— REWA REWA 10.00
53.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
46.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
713 GAILPUR โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
714 GAJANPUR โ†— NARMADAPURAM SEONI MALWA 10.00
57.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
42.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
715 GAJARABAHARA โ†— SINGRAULI DEOSAR 10.00
89.9% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
716 GAJIKHEDI โ†— RAISEN BADI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
717 GAJNIKHEDI โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
718 GAJPUR โ†— NARMADAPURAM KESLA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
719 GANDHIGANJ โ†— JABALPUR MAJHOULI 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
720 GANESHKHADHA โ†— SHIVPURI KHANIYADHANA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
721 GANESHPUR โ†— DINDORI SHAHPURA 10.00
85.8% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
722 GANGAHARA โ†— REWA RAIPUR KARCHULIYAN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
723 GANGEDI โ†— UJJAIN UJJAIN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
724 GANJ โ†— CHHATARPUR RAJNAGAR 10.00
87.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
725 GANJAS โ†— SATNA RAMNAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
726 GAONDILODHA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
727 GARBADI MAL โ†— KHANDWA BALADI 10.00
75.1% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
24.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys21 / 21 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
728 GARBEDI RAIYAT โ†— KHANDWA KHALAWA 10.00
75.3% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
24.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
729 GARHARA โ†— REWA JAWA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
730 GARI โ†— KHARGONE BHAGVANPURA 10.00
76.6% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
23.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
731 GARI PIPLIYA โ†— INDORE INDORE 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
732 GAUKHEDI โ†— SEHORE ICHHAWAR 10.00
46.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
53.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
733 GAULKHEDA RAIYAT โ†— KHANDWA PANDHANA 10.00
85.3% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 12 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
734 GAVAKHEDA โ†— SEHORE ASHTA 10.00
88.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
735 GAWA โ†— SEHORE SEHORE 10.00
96.4% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
736 GAWAL โ†— KHARGONE BARWAH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
737 GAYAN โ†— RAJGARH SARANGPUR 10.00
81.5% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
738 GEHUNKHEDI โ†— RAJGARH NARSINGHGARH 10.00
61.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
739 GELAKHEDI โ†— UJJAIN MAHIDPUR 10.00
26.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
73.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
740 GENDI AMA โ†— ANUPPUR PUSHPRAJGARH 10.00
81.8% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
741 GHAGHROLA KALAN โ†— NARSINGHPUR CHAWARPATHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
742 GHANAGHAT โ†— DINDORI DINDORI 10.00
72.3% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
21.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
743 GHANA KALAN โ†— RAISEN BEGUMGANJ 10.00
44.7% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
54.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
744 GHANAMAILI โ†— DAMOH JABERA 10.00
55.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
745 GHANA UMRI โ†— CHHINDWARA JAMAI 10.00
45.9% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
32.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
746 GHANSODA โ†— SHAJAPUR MOMAN BADODIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
747 GHARSONDI(P) โ†— GWALIOR BHITARWAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
748 GHATHERA โ†— JABALPUR PATAN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
749 GHATIYA โ†— UJJAIN GHATIYA 10.00
68.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
750 GHATIYABHANA โ†— DEWAS SONKATCH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
751 GHATLI โ†— NARMADAPURAM KESLA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
752 GHAT PIPLIYA โ†— RAISEN BADI 10.00
89.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
753 GHATPIPLIYA โ†— UJJAIN MAHIDPUR 10.00
19.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
80.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
754 GHATRA โ†— CHHATARPUR GAURIHAR 10.00
86.1% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
755 GHINODA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
756 GHMNI โ†— DINDORI MEHANDWANI 10.00
94.6% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 4 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
757 GHODAVADIKHURD โ†— CHHINDWARA JAMAI 10.00
43.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
56.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
758 GHODI BUJURG โ†— KHARGONE ZIRANYA 10.00
14.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
83.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
759 GHOGHATPUR โ†— RAJGARH ZIRAPUR 10.00
79.9% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
18.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
760 GHOGHRA (P) โ†— SAGAR BANDA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
761 GHOGRA (P) โ†— SAGAR REHLI 10.00
55.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
762 GHONTI BAHRA โ†— RAISEN BADI 10.00
74.5% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
763 GHOPATPUR MAL. โ†— DINDORI BAJAG 10.00
94.8% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 7 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
764 GHORAD โ†— CHHINDWARA BICHHUA 10.00
87.3% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
765 GHOSIKHEDA โ†— INDORE MHOW 10.00
79.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
21.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
766 GHOSUA โ†— VIDISHA GYARASPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
767 GHOTI โ†— BALAGHAT LANJI 10.00
97.3% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
768 GHUNADI โ†— BALAGHAT BALAGHAT 10.00
97.5% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
769 GILAKHEDI โ†— RAJGARH NARSINGHGARH 10.00
66.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
34.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
770 GINDORHAT โ†— RAJGARH BIAORA 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
771 GINDORMINA โ†— RAJGARH BIAORA 10.00
52.9% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
44.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
772 GIRWARPUR MAL. โ†— DINDORI BAJAG 10.00
67.8% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
773 GITHAURI RYT โ†— DINDORI AMARPUR 10.00
89.1% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
774 GNIYARI โ†— KATNI KATNI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
775 GOBARHELA โ†— VIDISHA VIDISHA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
776 GOCHITARODA โ†— NARMADAPURAM KESLA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
777 GODAHA โ†— REWA SIRMOUR 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
778 GODRI โ†— HARDA TIMARNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
779 GOGAKHEDA โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
780 GOGAPUR โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
781 GOHAN โ†— INDORE DEPALPUR 10.00
13.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€”
86.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
782 GOHANADEH MAL โ†— NARMADAPURAM SOHAGPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
783 GOHCHAR โ†— NARSINGHPUR GOTEGAON 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
784 GOKULGAON โ†— KHANDWA KHANDWA 10.00
60.7% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
39.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 19 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
785 GOL โ†— NARMADAPURAM MAKHAN NAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
786 GOLA โ†— DEWAS BAGLI 10.00
28.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
71.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys22 / 22 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
787 GOLAKHEDI โ†— GUNA BAMORI 10.00
44.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
55.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
788 GOLIYA HEDA โ†— GUNA CHANCHODA 10.00
13.7% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
78.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
789 GONDALWADA โ†— NARMADAPURAM MAKHAN NAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
789 GONDALWADA โ†— NARMADAPURAM BANKHEDI 10.00
62.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
38.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
790 GONDWADI RAIYAT โ†— KHANDWA PANDHANA 10.00
77.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
791 GONSA โ†— UJJAIN GHATIYA 10.00
56.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
43.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
792 GOPALNAGAR โ†— VIDISHA SIRONJ 10.00
88.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
11.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
793 GOPALPUR โ†— SEHORE NASRULLAGANJ 10.00
79.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
794 GOPISUR SATKUNDA โ†— RAISEN SANCHI 10.00
86.3% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
13.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
795 GORA โ†— NARMADAPURAM MAKHAN NAGAR 10.00
55.8% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€”
44.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
796 GORADIYA โ†— KHANDWA PUNASA 10.00
60.8% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
21.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys28 / 1 / 27
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
797 GORAIYYA โ†— CHHINDWARA CHHINDWARA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
798 GORAKHAR โ†— BETUL BETUL 10.00
31.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
68.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 0 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
799 GORAKHPUR โ†— CHHINDWARA MOHKHED 10.00
53.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
800 GORKHA โ†— RAISEN GAIRATGANJ 10.00
80.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
801 GOTHADA โ†— UJJAIN KHACHAROD 10.00
74.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
802 GOTHRA โ†— SHEOPUR KARAHAL 10.00
94.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
803 GOURAKANHARI โ†— DINDORI SAMNAPUR 10.00
38.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
60.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
804 GOVINDA โ†— SHAJAPUR MOMAN BADODIYA 10.00
41.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
58.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
805 GUARA โ†— CHHINDWARA MOHKHED 10.00
68.3% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
806 GubraKala โ†— JABALPUR SHAHPURA 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
807 GUDARKHEDA โ†— RATLAM PIPLODA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
808 GUDHA โ†— UJJAIN GHATIYA 10.00
51.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
809 GUDHMELA โ†— SEHORE SEHORE 10.00
47.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
52.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
810 GUDHWA โ†— REWA GANGEV 10.00
18.5% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
80.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
811 GUJARKHEDI โ†— NARMADAPURAM SOHAGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
811 GUJARKHEDI โ†— KHANDWA PUNASA 10.00
55.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
44.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 0 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
812 GULAUA (P) โ†— SAGAR BINA 10.00
71.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
813 GULGAON RAIYAT โ†— KHANDWA PUNASA 10.00
54.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
814 GULKHEDI โ†— RAJGARH SARANGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
815 GULLAS โ†— HARDA TIMARNI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
816 GULON โ†— NARMADAPURAM MAKHAN NAGAR 10.00
13.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
52.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
817 GULWARA โ†— KATNI KATNI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
818 GUNAI โ†— UJJAIN UJJAIN 10.00
24.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
76.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys18 / 0 / 18
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
819 GUNAWA โ†— UJJAIN GHATIYA 10.00
67.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
32.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
820 GUNAWAD โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
821 GUNDRAI โ†— NARSINGHPUR CHAWARPATHA 10.00
66.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
33.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
821 GUNDRAI โ†— NARMADAPURAM SOHAGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
822 GUNJALI โ†— KHANDWA PUNASA 10.00
7.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
43.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
38.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
823 GURADIYADASA โ†— UJJAIN MAHIDPUR 10.00
21.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
78.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
824 GURADIYAGUJAR โ†— UJJAIN GHATIYA 10.00
30.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
69.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
825 GURADIYAKALA โ†— NARMADAPURAM MAKHAN NAGAR 10.00 โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
826 GURADIYAPITRAMAL โ†— UJJAIN KHACHAROD 10.00
53.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
827 GURADIYASANGA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
828 GURARIYA LASHKARPUR โ†— VIDISHA VIDISHA 10.00
43.4% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
52.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
829 GURLA โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
830 GURU PIPPRIYA โ†— JABALPUR PATAN 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
831 GUWADA โ†— RAJGARH SARANGPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
832 GUYDA โ†— KHANDWA PUNASA 10.00 โ€” โ€”
45.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys35 / 0 / 35
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
29.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
833 GWALI โ†— SEHORE ASHTA 10.00
43.1% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
47.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
834 GWARDIYA โ†— SEHORE BUDNI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
835 GYARA โ†— DATIA SEONDHA 10.00
92.2% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
836 GYARASPUR โ†— VIDISHA GYARASPUR 10.00
34.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
65.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
837 GYASABAD โ†— RAISEN SANCHI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
838 HAIDAR โ†— ASHOK NAGAR ISAGARH 10.00
34.4% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
64.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
839 HALUHEDI KALAN โ†— RAJGARH SARANGPUR 10.00
63.5% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
840 HALWANI โ†— CHHATARPUR BADA MALEHARA 10.00
79.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
841 HAMIDAPUR โ†— VIDISHA BASODA 10.00
84.5% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
842 HAMIRPURA โ†— KHARGONE BARWAH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
843 HANSAKHEDI โ†— INDORE SAWER 10.00
98.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
2.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
844 HANTIYA โ†— KHANDWA PUNASA 10.00
66.6% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys23 / 0 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
845 HAPLA โ†— KHANDWA KHANDWA 10.00
79.2% 10.00
CategoryFarm Pond
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
846 HARANBHATA โ†— CHHINDWARA PARASIA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
847 HARBAKHEDI โ†— UJJAIN MAHIDPUR 10.00
32.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
67.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
848 HARDI โ†— REWA RAIPUR KARCHULIYAN 10.00
68.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
849 HARDUAA โ†— REWA RAIPUR KARCHULIYAN 10.00
28.2% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
7.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
39.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
850 HARDUAKALA โ†— JABALPUR MAJHOULI 10.00 โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
851 HARIYAKHEDI โ†— INDORE SAWER 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
852 HARLAI โ†— RAJGARH NARSINGHGARH 10.00
32.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
19.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
47.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
853 HARNAVADA โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
854 HARNAWADA โ†— SEHORE ASHTA 10.00
46.3% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
45.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
855 HARRAHAWA โ†— SINGRAULI WAIDHAN 10.00
75.5% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
24.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
856 HARRATOLA โ†— ANUPPUR PUSHPRAJGARH 10.00
97.6% 10.00
CategoryFarm Pond
Started / Completed / Phys26 / 26 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
857 HARSODAN โ†— UJJAIN UJJAIN 10.00
10.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
87.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
858 HARTOL VANGRAM โ†— DINDORI MEHANDWANI 10.00
53.7% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
40.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
859 HASAMPURA โ†— UJJAIN UJJAIN 10.00
85.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
860 HATAI โ†— UJJAIN KHACHAROD 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
861 HATHLEVA โ†— JABALPUR MAJHOULI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
862 HATODA โ†— RAISEN SILWANI 10.00
48.6% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
51.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys22 / 22 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
863 HATUNIYA โ†— INDORE SAWER 10.00
90.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
864 HATWA โ†— REWA SIRMOUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
865 HEEDI โ†— UJJAIN KHACHAROD 10.00
74.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
866 HEERAPUR โ†— NARSINGHPUR BABAI CHICHLI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
867 HEERU DEEH โ†— REWA GANGEV 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
868 HIDWAR โ†— REWA MAUGANJ 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
869 HIMMATGARH(P) โ†— GWALIOR BHITARWAR 10.00
4.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
39.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
52.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
870 HINAUTABHOI โ†— JABALPUR JABALPUR 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
871 HINAUTI โ†— SATNA RAMPUR BAGHELAN 10.00
77.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
872 Hinautiya โ†— JABALPUR SHAHPURA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
873 HINGONYA โ†— UJJAIN MAHIDPUR 10.00
82.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
874 HINGTI (P) โ†— SAGAR BINA 10.00
84.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
875 HINNOD (P) โ†— SAGAR BINA 10.00
19.3% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
78.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
875 HINNOD (P) โ†— SAGAR JAISINAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
876 HINOTA โ†— DINDORI DINDORI 10.00
93.4% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
877 HINOTI โ†— SEHORE SEHORE 10.00
72.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
878 HINOTIYA โ†— RAISEN SANCHI 10.00
89.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
878 HINOTIYA โ†— RAISEN OBEDULLAHGANJ 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
879 HIRAN CHHIPA (P) โ†— SAGAR MALTHONE 10.00
83.7% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
880 HIRAPUR (P) โ†— SAGAR JAISINAGAR 10.00
74.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
881 HIRPURTEKA โ†— SHAJAPUR SHAJAPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
882 HIWARKHEDI โ†— BETUL BETUL 10.00
58.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
883 HIWRA SONADHWAR โ†— CHHINDWARA PANDHURNA 10.00
87.7% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
884 ICHHAPUR โ†— KHARGONE KHARGONE 10.00
65.9% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
885 ILAMKHEDI โ†— UJJAIN TARANA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
886 IMALANI โ†— VIDISHA SIRONJ 10.00
70.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
887 IMALIYA โ†— NARSINGHPUR CHAWARPATHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
887 IMALIYA โ†— NARSINGHPUR KARELI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
888 IMALIYA BAGHORA โ†— NARSINGHPUR BABAI CHICHLI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
889 IMALIYAN BHURE KHAN โ†— PANNA GUNOR 10.00
82.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
890 IMALIYA (P) โ†— NARSINGHPUR BABAI CHICHLI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
891 IMJHIRA โ†— NARSINGHPUR CHAWARPATHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
892 IMLAI โ†— JABALPUR KUNDAM 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
893 INDERGHADH โ†— SHIVPURI NARWAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
894 INDERWAS โ†— VIDISHA GYARASPUR 10.00
94.1% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
895 INDHAWDI โ†— KHANDWA PUNASA 10.00
51.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
896 INDOKH โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
897 ISHARPUR โ†— NARMADAPURAM BANKHEDI 10.00
68.8% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
31.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
898 ITAMA โ†— SATNA MAIHAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
899 ITAR โ†— REWA RAIPUR KARCHULIYAN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
900 ITAWA โ†— UJJAIN MAHIDPUR 10.00
17.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
82.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
901 JABADIYABHEEL โ†— SHAJAPUR KALAPIPAL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
902 JABDI โ†— SHAJAPUR KALAPIPAL 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
903 JABDIYAGHARWAS โ†— SHAJAPUR KALAPIPAL 10.00
91.8% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
904 JADASURANG โ†— DINDORI SAMNAPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys13 / 7 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
905 JAHAGIRPUR โ†— SEHORE SEHORE 10.00
35.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
906 JAHANGIRPUR โ†— UJJAIN BADNAGAR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
907 JAISINGPURA โ†— BURHANPUR BURHANPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
908 JAIT โ†— SEHORE BUDNI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
909 JAITAPUR KALA โ†— KHANDWA BALADI 10.00
34.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
65.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
910 JAITPURI โ†— DINDORI MEHANDWANI 10.00
35.3% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
62.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
911 JAKHAWADI โ†— CHHINDWARA MOHKHED 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
912 JAKHODA โ†— GUNA ARON 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
913 JALDA MUDIYA โ†— DINDORI AMARPUR 10.00
54.4% 10.00
CategoryFarm Pond
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
40.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
914 JALGONE โ†— BARWANI PANSEMAL 10.00
14.9% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
74.6% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
915 JALKHA โ†— KHARGONE KASRAWAD 10.00
45.7% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
22.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 6 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
32.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
916 JALODIYA โ†— UJJAIN BADNAGAR 10.00
32.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
35.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
917 JALODIYAUNHEL โ†— UJJAIN KHACHAROD 10.00
53.3% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
46.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
918 JALODSANJAR โ†— UJJAIN BADNAGAR 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
919 JALVA โ†— UJJAIN GHATIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
920 JAM โ†— BALAGHAT LALBARRA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
921 JAMALPURA โ†— UJJAIN UJJAIN 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
922 JAMANYA โ†— KHANDWA CHHAIGAON MAKHAN 10.00
74.4% 10.00
CategoryFarm Pond
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys22 / 5 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
923 JAMARA โ†— NARMADAPURAM PIPARIYA 10.00
46.6% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
24.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
924 JAMDHAD โ†— KHANDWA KHALAWA 10.00
19.9% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
27.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys37 / 0 / 37
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
925 JAMDIMETA โ†— BALAGHAT KIRNAPUR 10.00
93.7% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
926 JAMLI โ†— JHABUA PETLAWAD 10.00
48.6% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
33.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 9 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
18.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
927 JAMLI DAMAMI โ†— HARDA HARDA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
928 JAMLI KALA โ†— KHANDWA PANDHANA 10.00
46.1% 10.00
CategoryFarm Pond
Started / Completed / Phys10 / 6 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
17.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys15 / 15 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
36.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
929 JAMLI MUNDI โ†— KHANDWA KHANDWA 10.00
65.5% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
24.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
930 JAMLI RAJGARH โ†— KHANDWA PANDHANA 10.00
60.1% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
30.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
931 JAMNYA โ†— BARWANI SENDHAWA 10.00
23.7% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
61.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
932 JAMODI โ†— INDORE SAWER 10.00
99.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
1.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
933 JAMONIYA โ†— RAJGARH BIAORA 10.00
93.8% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
934 JAMONIYA GANESH โ†— RAJGARH NARSINGHGARH 10.00
46.6% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
44.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
935 JAMONIYAGOP CHOHAN โ†— RAJGARH NARSINGHGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
936 JAMONIYA JOHAR โ†— RAJGARH NARSINGHGARH 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
937 JAMTI โ†— BARWANI SENDHAWA 10.00
45.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
54.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 0 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
938 JAMULNI โ†— BETUL BHAINSDEHI 10.00
33.5% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€”
66.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
939 JAMUNIYA โ†— CHHINDWARA HARAI 10.00
90.5% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
939 JAMUNIYA โ†— RAISEN SANCHI 10.00
51.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
48.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
940 JAMUNIYA ASHAPUR โ†— KHANDWA KHALAWA 10.00 โ€” โ€”
17.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys12 / 0 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
82.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
941 JAMUNIYADHIR โ†— NARMADAPURAM BANKHEDI 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
942 JAMUNIYA GOND (P) โ†— SAGAR JAISINAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys10 / 10 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
943 JAMUNIYAKHURD โ†— CHHINDWARA BICHHUA 10.00
71.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
29.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
944 JANAKPUR(P) โ†— GWALIOR DABRA 10.00
79.2% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
20.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
945 JANGALIYA โ†— MANDLA NIWAS 10.00
85.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
946 JANGIBAD โ†— RAJGARH NARSINGHGARH 10.00
50.4% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
49.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
947 JANKAHAI โ†— REWA JAWA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
948 JANOUR โ†— NARSINGHPUR KARELI 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
949 JAORA โ†— BETUL ATHNER 10.00
18.2% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
76.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
950 JAREHTA โ†— CHHATARPUR GAURIHAR 10.00
85.1% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
14.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
951 JARGUWA โ†— VIDISHA KURWAI 10.00
56.7% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
29.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
952 JARHA โ†— REWA GANGEV 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
953 JARIYARI โ†— SATNA MAIHAR 10.00 โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
954 JARJOLA โ†— NARSINGHPUR NARSIMHAPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
955 JARWAHI โ†— KATNI KATNI 10.00
95.0% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
5.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
956 JASALPUR โ†— NARMADAPURAM HOSHANGABAD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
957 JASERWANI โ†— NARMADAPURAM BANKHEDI 10.00
21.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
3.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
55.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
958 JASMAT โ†— SEHORE ASHTA 10.00
81.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
959 JASWADI โ†— KHANDWA KHANDWA 10.00
75.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
24.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
960 JATPURA MAL โ†— HARDA KHIRKIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
961 JAWALI โ†— NARMADAPURAM MAKHAN NAGAR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
962 JAWAR โ†— KHANDWA KHANDWA 10.00 โ€” โ€”
11.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 3 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
88.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
963 JAWASIYAPANTH โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
964 JAWASIYASOLANKI โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
25.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
48.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
25.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
965 JAWI โ†— NEEMUCH NEEMUCH 10.00
59.1% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 13 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
15.8% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
966 JAYRAMPURA โ†— UJJAIN GHATIYA 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
967 JEETNAGAR โ†— SATNA MAIHAR 10.00
90.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
968 JELYAKHEDI โ†— UJJAIN MAHIDPUR 10.00
58.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
969 JETHADA โ†— SHAJAPUR SHUJALPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
970 JHADPIPLIYA โ†— RAJGARH NARSINGHGARH 10.00
83.7% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
16.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
971 JHAGRIYA โ†— RAJGARH NARSINGHGARH 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
972 JHALARIA โ†— UJJAIN BADNAGAR 10.00 โ€” โ€”
11.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
88.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
973 JHALARIYA โ†— INDORE DEPALPUR 10.00 โ€” โ€”
10.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
71.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
974 JHAMAR โ†— NARSINGHPUR NARSIMHAPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
975 JHANJHAKHEDI โ†— UJJAIN KHACHAROD 10.00
93.8% 10.00
CategoryFarm Pond
Started / Completed / Phys8 / 5 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
6.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
976 JHANSI โ†— JABALPUR SIHORA 10.00 โ€” โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
977 JHARANEJHAR โ†— DINDORI MEHANDWANI 10.00
95.2% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
978 JHARIKHEDA โ†— KHANDWA KHALAWA 10.00
62.1% 10.00
CategoryFarm Pond
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
37.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys25 / 0 / 25
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
979 JHARNAGHUGHARI โ†— DINDORI AMARPUR 10.00
91.9% 10.00
CategoryFarm Pond
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
8.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
980 JHARNAWADA โ†— UJJAIN TARANA 10.00
59.0% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
41.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
981 JHARPAI โ†— GUNA RAGHOGARH 10.00
6.1% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
0.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
93.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys11 / 5 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
982 JHINGADHAD RAIYAT โ†— KHANDWA BALADI 10.00
50.9% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
49.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
983 JHINJHRI โ†— KHANDWA KHALAWA 10.00
45.5% 10.00
CategoryFarm Pond
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
28.8% 10.00
CategoryDug Well Recharge
Started / Completed / Phys20 / 0 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
25.7% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
984 JHIRIKHURD โ†— NARSINGHPUR NARSIMHAPUR 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
985 JHIRNIYA โ†— VIDISHA VIDISHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
986 JHIRNIYA KHACROD โ†— UJJAIN KHACHAROD 10.00 โ€” โ€” โ€” โ€” โ€”
100.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
987 JHIRNIYA UNHEL โ†— UJJAIN KHACHAROD 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
988 JHIRPA โ†— KHANDWA KHALAWA 10.00
43.9% 10.00
CategoryFarm Pond
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
56.1% 10.00
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
989 JHOLSI (P) โ†— SAGAR MALTHONE 10.00 โ€” โ€”
31.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
68.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
990 JHUMKI โ†— UJJAIN TARANA 10.00
19.2% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
42.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys13 / 1 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
38.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
991 JHUNDA (P) โ†— SAGAR REHLI 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
992 JHUTAWAD โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
993 JIJAGAON KHURD โ†— HARDA HARDA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
994 JINDA KHEDA โ†— INDORE SAWER 10.00
16.7% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.9% 10.00
CategoryDug Well Recharge
Started / Completed / Phys11 / 11 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
80.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
995 JINWANYA โ†— HARDA KHIRKIYA 10.00 โ€” โ€”
100.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
996 JIWAJIPUR โ†— VIDISHA VIDISHA 10.00
100.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€” โ€” โ€”
997 JODH (P) โ†— SAGAR BINA 10.00
69.5% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
30.5% 10.00
CategoryDug Well Recharge
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
998 JODMALAKHA โ†— UJJAIN MAHIDPUR 10.00 โ€” โ€”
21.0% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
79.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
999 JOGIBEDA โ†— KHANDWA KHALAWA 10.00
37.0% 10.00
CategoryFarm Pond
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
9.7% 10.00
CategoryDug Well Recharge
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
53.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€”
1000 JOHARI โ†— GUNA BAMORI 10.00
22.8% 10.00
CategoryFarm Pond
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€” โ€” โ€” โ€”
77.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
Scheme: โ‚น Sanction Weighted Level: Gp Snapshot: 2026-04-12 Units shown: 1040 โšก Weight % shown is each unit's own auto-computed weight โ€” not the global admin-set value.

โš–๏ธ Step 1 โ€” Category Weightage

Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.

Weightage = Sanctioned Cost of Category รท Total Sanctioned Cost (all categories) e.g. Farm Pond = โ‚น200 Cr out of โ‚น500 Cr total Weightage = 200 รท 500 = 0.40 (40%)

Computed independently per unit โ€” two districts with different sanction distributions will have different weightages for the same category.

๐Ÿ…ฐ Step 2a โ€” Part A Score (Completion)

Fixed 50% weight on completion of works.

Part A = (Completed + Phys) รท Started ร— 5

๐Ÿ…ฑ Step 2b โ€” Part B Score (Expenditure)

Fixed 50% weight on expenditure booking on ongoing works.

Part B = (Ongoing Booked รท Ongoing Sanction) ร— 5 If all done โ†’ full 5 marks automatically

๐Ÿ… Step 3 โ€” Ceiling & Model

Category Score = Part A + Part B

๐Ÿ“Š Step 4 โ€” Final Composite Score

Weighted sum of all category scores (weightages sum to 100%).

Final Score = ฮฃ (Weightage_i ร— Score_i)

Example: Farm Pond 40% ร— 7.2 + Dug Well 20% ร— 6.5 + Amrit Sarovar 40% ร— 8.1 โ†’ 7.42

๐Ÿ’ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.
Score Breakup
Sanction cost in โ‚น Crore  ยท  Marks on a scale of 0โ€“10
Sr. Category Sanction Cost
(โ‚น Crore)
Weightage
for Category
Marks Obtained (scale 0โ€“10) Marks as per
Weightage
For Completion
of Works
For Expenditure
Booking on
Running Works
Total