JGSA 2026 โ Block-Level Category Scorecard
Snapshot: 2026-04-29 ยท Scheme: โน Sanction Weighted
KHANDWA
8.57
๐ฅ
Completed465
Started1277
Rank#1
SAWER
7.83
๐ฅ
Completed243
Started312
Rank#2
HARSUD
7.81
๐ฅ
Completed457
Started1000
Rank#3
๐ Category Scorecard โ Block Level
313 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
| # | Block | District | Total | Farm Pond | Amrit Sarowar | Dug Well Recharge | Irrigation infrastructure | Water conservation & recharge | Watershed Related Works | Repair & Maintenance (Water Structures) |
|---|---|---|---|---|---|---|---|---|---|---|
| ๐ฅ | KHANDWA โ | KHANDWA | 8.57 |
34.6%
10.00
CategoryFarm Pond
Started / Completed / Phys286 / 130 / 156
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.4%
6.58
CategoryAmrit Sarowar
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.74Cr / 0.61Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.08 / 5.0
Final score6.58 / 10
|
12.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys824 / 296 / 528
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.1%
7.66
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 5 / 6
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.66 / 10
|
20.7%
7.83
CategoryWater conservation & recharge
Started / Completed / Phys101 / 24 / 62
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.69Cr / 0.49Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score7.83 / 10
|
18.7%
6.90
CategoryWatershed Related Works
Started / Completed / Phys45 / 7 / 24
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked1.11Cr / 0.76Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.46 / 5.0
Final score6.90 / 10
|
0.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| ๐ฅ | SAWER โ | INDORE | 7.83 |
55.7%
7.27
CategoryFarm Pond
Started / Completed / Phys100 / 47 / 36
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score7.27 / 10
|
โ |
2.4%
9.00
CategoryDug Well Recharge
Started / Completed / Phys177 / 175 / 1
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)91.7%
Part B score (max 5.0)4.58 / 5.0
Final score9.00 / 10
|
โ |
28.3%
8.67
CategoryWater conservation & recharge
Started / Completed / Phys27 / 16 / 5
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.21Cr / 0.20Cr
Expenditure rate (ongoing)95.5%
Part B score (max 5.0)4.78 / 5.0
Final score8.67 / 10
|
4.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.9%
7.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.19Cr / 0.14Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score7.17 / 10
|
| ๐ฅ | HARSUD โ | KHANDWA | 7.81 |
42.2%
7.19
CategoryFarm Pond
Started / Completed / Phys185 / 127 / 53
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score7.19 / 10
|
โ |
24.6%
8.57
CategoryDug Well Recharge
Started / Completed / Phys756 / 303 / 449
Completion rate99.5%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score8.57 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.2%
7.60
CategoryWater conservation & recharge
Started / Completed / Phys48 / 22 / 20
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.29Cr / 0.19Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score7.60 / 10
|
2.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 4 | KASRAWAD โ | KHARGONE | 7.81 |
21.5%
7.52
CategoryFarm Pond
Started / Completed / Phys322 / 112 / 198
Completion rate96.3%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.20Cr / 0.11Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score7.52 / 10
|
3.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
7.76
CategoryDug Well Recharge
Started / Completed / Phys556 / 202 / 346
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.83 / 5.0
Final score7.76 / 10
|
1.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
66.3%
7.69
CategoryWater conservation & recharge
Started / Completed / Phys338 / 54 / 224
Completion rate82.2%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked3.06Cr / 2.19Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score7.69 / 10
|
0.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 5 | BALADI โ | KHANDWA | 7.78 |
52.5%
7.73
CategoryFarm Pond
Started / Completed / Phys96 / 69 / 22
Completion rate94.8%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score7.73 / 10
|
5.0%
3.48
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
|
28.9%
8.65
CategoryDug Well Recharge
Started / Completed / Phys334 / 141 / 187
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.74 / 5.0
Final score8.65 / 10
|
โ |
11.7%
7.35
CategoryWater conservation & recharge
Started / Completed / Phys22 / 6 / 11
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.49 / 5.0
Final score7.35 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 6 | PUNASA โ | KHANDWA | 7.73 |
47.3%
7.06
CategoryFarm Pond
Started / Completed / Phys342 / 119 / 216
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.22Cr / 0.09Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score7.06 / 10
|
2.5%
2.21
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.22Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score2.21 / 10
|
14.9%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1,132 / 257 / 875
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
20.4%
7.84
CategoryWater conservation & recharge
Started / Completed / Phys114 / 15 / 87
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.67Cr / 0.45Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score7.84 / 10
|
9.9%
7.59
CategoryWatershed Related Works
Started / Completed / Phys35 / 8 / 23
Completion rate88.6%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.59 / 10
|
4.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 7 | CHHAIGAON MAKHAN โ | KHANDWA | 7.47 |
45.2%
6.84
CategoryFarm Pond
Started / Completed / Phys322 / 213 / 104
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing sanction / booked0.14Cr / 0.05Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score6.84 / 10
|
5.7%
5.73
CategoryAmrit Sarowar
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.62Cr / 0.55Cr
Expenditure rate (ongoing)89.5%
Part B score (max 5.0)4.48 / 5.0
Final score5.73 / 10
|
15.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys838 / 733 / 105
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.4%
7.87
CategoryWater conservation & recharge
Started / Completed / Phys83 / 34 / 40
Completion rate89.2%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.49Cr / 0.34Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score7.87 / 10
|
7.2%
6.37
CategoryWatershed Related Works
Started / Completed / Phys18 / 4 / 6
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.48Cr / 0.35Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.37 / 10
|
3.9%
6.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 7
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.39 / 10
|
| 8 | BINA โ | SAGAR | 7.46 |
37.3%
3.19
CategoryFarm Pond
Started / Completed / Phys124 / 22 / 29
Completion rate41.1%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked1.06Cr / 0.24Cr
Expenditure rate (ongoing)22.6%
Part B score (max 5.0)1.13 / 5.0
Final score3.19 / 10
|
โ |
10.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys417 / 378 / 39
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
50.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys39 / 7 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 9 | ZIRAPUR โ | RAJGARH | 7.35 |
24.8%
6.25
CategoryFarm Pond
Started / Completed / Phys479 / 316 / 124
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.81Cr / 0.27Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.65 / 5.0
Final score6.25 / 10
|
โ |
4.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys642 / 577 / 65
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.6%
5.19
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.19 / 10
|
63.6%
7.61
CategoryWater conservation & recharge
Started / Completed / Phys218 / 35 / 130
Completion rate75.7%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked5.98Cr / 4.58Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score7.61 / 10
|
0.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
6.4%
7.32
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 3 / 13
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.91Cr / 0.77Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score7.32 / 10
|
| 10 | TARANA โ | UJJAIN | 7.33 |
29.4%
10.00
CategoryFarm Pond
Started / Completed / Phys118 / 26 / 92
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
20.5%
3.82
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.47Cr / 0.92Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score3.82 / 10
|
24.6%
7.22
CategoryDug Well Recharge
Started / Completed / Phys833 / 589 / 232
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.29 / 5.0
Final score7.22 / 10
|
โ |
13.5%
7.25
CategoryWater conservation & recharge
Started / Completed / Phys45 / 20 / 16
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score7.25 / 10
|
12.0%
7.11
CategoryWatershed Related Works
Started / Completed / Phys36 / 28 / 3
Completion rate86.1%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score7.11 / 10
|
โ |
| 11 | BAMORI โ | GUNA | 7.29 |
25.9%
6.26
CategoryFarm Pond
Started / Completed / Phys84 / 79 / 0
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score6.26 / 10
|
โ |
2.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys60 / 15 / 45
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
35.7%
5.65
CategoryWater conservation & recharge
Started / Completed / Phys13 / 3 / 6
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.79Cr / 0.34Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score5.65 / 10
|
5.2%
6.34
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score6.34 / 10
|
30.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 12 | KHALAWA โ | KHANDWA | 7.27 |
27.9%
6.85
CategoryFarm Pond
Started / Completed / Phys384 / 119 / 261
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.90 / 5.0
Final score6.85 / 10
|
5.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
10.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys1,097 / 54 / 1,043
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.3%
5.39
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 3
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.29Cr / 0.13Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score5.39 / 10
|
39.7%
6.99
CategoryWater conservation & recharge
Started / Completed / Phys195 / 15 / 141
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked3.64Cr / 2.18Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score6.99 / 10
|
10.5%
6.20
CategoryWatershed Related Works
Started / Completed / Phys44 / 5 / 24
Completion rate65.9%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked0.94Cr / 0.55Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score6.20 / 10
|
3.9%
6.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 5 / 7
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.38Cr / 0.20Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.56 / 5.0
Final score6.31 / 10
|
| 13 | MAHIDPUR โ | UJJAIN | 7.25 |
29.6%
10.00
CategoryFarm Pond
Started / Completed / Phys92 / 45 / 47
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.3%
3.28
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.00Cr / 0.66Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score3.28 / 10
|
36.4%
6.19
CategoryDug Well Recharge
Started / Completed / Phys915 / 182 / 729
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)24.2%
Part B score (max 5.0)1.21 / 5.0
Final score6.19 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.4%
8.07
CategoryWater conservation & recharge
Started / Completed / Phys37 / 24 / 11
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score8.07 / 10
|
2.3%
8.21
CategoryWatershed Related Works
Started / Completed / Phys6 / 5 / 0
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.05 / 5.0
Final score8.21 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 14 | PANDHANA โ | KHANDWA | 7.24 |
40.9%
7.04
CategoryFarm Pond
Started / Completed / Phys381 / 239 / 126
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.38Cr / 0.17Cr
Expenditure rate (ongoing)44.9%
Part B score (max 5.0)2.25 / 5.0
Final score7.04 / 10
|
7.2%
3.68
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.75Cr / 1.29Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.68 / 5.0
Final score3.68 / 10
|
12.3%
9.00
CategoryDug Well Recharge
Started / Completed / Phys1,155 / 449 / 686
Completion rate98.3%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.17 / 5.0
Final score9.00 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.6%
7.69
CategoryWater conservation & recharge
Started / Completed / Phys148 / 38 / 87
Completion rate84.5%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked1.49Cr / 1.03Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.47 / 5.0
Final score7.69 / 10
|
5.0%
7.10
CategoryWatershed Related Works
Started / Completed / Phys24 / 6 / 12
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.35Cr / 0.23Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score7.10 / 10
|
6.0%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 3 / 14
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.26Cr / 0.16Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.96 / 10
|
| 15 | MEHANDWANI โ | DINDORI | 7.21 |
50.6%
6.52
CategoryFarm Pond
Started / Completed / Phys290 / 63 / 211
Completion rate94.5%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.54Cr / 0.19Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score6.52 / 10
|
โ |
2.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys189 / 148 / 41
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
19.4%
9.00
CategoryWater conservation & recharge
Started / Completed / Phys89 / 5 / 78
Completion rate93.3%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked1.16Cr / 1.05Cr
Expenditure rate (ongoing)90.5%
Part B score (max 5.0)4.53 / 5.0
Final score9.00 / 10
|
24.5%
7.03
CategoryWatershed Related Works
Started / Completed / Phys44 / 10 / 22
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked1.61Cr / 1.09Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score7.03 / 10
|
2.9%
6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score6.40 / 10
|
| 16 | AMARPUR โ | DINDORI | 7.19 |
38.8%
7.06
CategoryFarm Pond
Started / Completed / Phys257 / 101 / 149
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.22Cr / 0.09Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.19 / 5.0
Final score7.06 / 10
|
โ |
3.0%
10.00
CategoryDug Well Recharge
Started / Completed / Phys200 / 30 / 170
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
33.3%
6.81
CategoryWater conservation & recharge
Started / Completed / Phys60 / 5 / 25
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked4.62Cr / 3.98Cr
Expenditure rate (ongoing)86.1%
Part B score (max 5.0)4.31 / 5.0
Final score6.81 / 10
|
15.3%
8.14
CategoryWatershed Related Works
Started / Completed / Phys31 / 24 / 4
Completion rate90.3%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.62 / 5.0
Final score8.14 / 10
|
9.6%
6.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 9 / 2
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.69Cr / 0.49Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score6.62 / 10
|
| 17 | BADI โ | RAISEN | 7.16 |
79.1%
7.37
CategoryFarm Pond
Started / Completed / Phys329 / 135 / 137
Completion rate82.7%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked1.50Cr / 0.97Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score7.37 / 10
|
โ |
7.3%
8.96
CategoryDug Well Recharge
Started / Completed / Phys183 / 54 / 123
Completion rate96.7%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score8.96 / 10
|
โ |
12.1%
4.37
CategoryWater conservation & recharge
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.64Cr / 0.45Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score4.37 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 18 | ARON โ | GUNA | 7.16 |
51.2%
6.54
CategoryFarm Pond
Started / Completed / Phys379 / 241 / 99
Completion rate89.7%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked1.35Cr / 0.55Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.05 / 5.0
Final score6.54 / 10
|
โ |
2.5%
9.00
CategoryDug Well Recharge
Started / Completed / Phys288 / 107 / 179
Completion rate99.3%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)91.1%
Part B score (max 5.0)4.56 / 5.0
Final score9.00 / 10
|
โ |
42.3%
7.62
CategoryWater conservation & recharge
Started / Completed / Phys155 / 30 / 98
Completion rate82.6%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked2.25Cr / 1.57Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.50 / 5.0
Final score7.62 / 10
|
3.1%
8.86
CategoryWatershed Related Works
Started / Completed / Phys11 / 3 / 7
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)86.2%
Part B score (max 5.0)4.31 / 5.0
Final score8.86 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 19 | THIKRI โ | BARWANI | 7.14 |
69.1%
6.27
CategoryFarm Pond
Started / Completed / Phys137 / 0 / 89
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked0.95Cr / 0.57Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score6.27 / 10
|
โ |
7.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys102 / 2 / 100
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.6%
7.30
CategoryWater conservation & recharge
Started / Completed / Phys14 / 7 / 5
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score7.30 / 10
|
13.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 6 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 20 | UJJAIN โ | UJJAIN | 7.04 |
36.0%
5.54
CategoryFarm Pond
Started / Completed / Phys84 / 6 / 68
Completion rate88.1%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.15Cr / 0.03Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.13 / 5.0
Final score5.54 / 10
|
5.4%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.8%
5.38
CategoryDug Well Recharge
Started / Completed / Phys245 / 47 / 197
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score5.38 / 10
|
โ |
36.6%
8.55
CategoryWater conservation & recharge
Started / Completed / Phys43 / 7 / 32
Completion rate90.7%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.20Cr / 0.16Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score8.55 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 21 | DINDORI โ | DINDORI | 7.02 |
39.9%
6.18
CategoryFarm Pond
Started / Completed / Phys455 / 118 / 276
Completion rate86.6%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked2.36Cr / 0.87Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score6.18 / 10
|
โ |
1.7%
5.49
CategoryDug Well Recharge
Started / Completed / Phys239 / 162 / 74
Completion rate98.7%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)11.1%
Part B score (max 5.0)0.56 / 5.0
Final score5.49 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
31.8%
7.71
CategoryWater conservation & recharge
Started / Completed / Phys116 / 19 / 67
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked4.74Cr / 3.80Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score7.71 / 10
|
23.8%
7.58
CategoryWatershed Related Works
Started / Completed / Phys92 / 31 / 46
Completion rate83.7%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked1.91Cr / 1.30Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score7.58 / 10
|
2.7%
7.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 7 / 4
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score7.13 / 10
|
| 22 | SHAHPURA โ | DINDORI | 7.02 |
25.9%
5.77
CategoryFarm Pond
Started / Completed / Phys418 / 191 / 150
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked1.66Cr / 0.56Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score5.77 / 10
|
1.1%
0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
|
1.8%
10.00
CategoryDug Well Recharge
Started / Completed / Phys221 / 169 / 52
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.2%
7.39
CategoryWater conservation & recharge
Started / Completed / Phys108 / 29 / 43
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked5.32Cr / 4.32Cr
Expenditure rate (ongoing)81.2%
Part B score (max 5.0)4.06 / 5.0
Final score7.39 / 10
|
30.5%
8.10
CategoryWatershed Related Works
Started / Completed / Phys98 / 41 / 46
Completion rate88.8%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked1.19Cr / 0.87Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.66 / 5.0
Final score8.10 / 10
|
6.9%
5.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 4
Completion rate19.0%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked1.88Cr / 1.58Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.14 / 10
|
| 23 | RAJGARH โ | RAJGARH | 7.00 |
19.2%
6.03
CategoryFarm Pond
Started / Completed / Phys457 / 305 / 108
Completion rate90.4%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.88Cr / 0.27Cr
Expenditure rate (ongoing)30.3%
Part B score (max 5.0)1.51 / 5.0
Final score6.03 / 10
|
1.5%
4.85
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.39Cr / 0.19Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score4.85 / 10
|
2.8%
7.41
CategoryDug Well Recharge
Started / Completed / Phys569 / 468 / 85
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score7.41 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
69.5%
7.23
CategoryWater conservation & recharge
Started / Completed / Phys315 / 18 / 190
Completion rate66.0%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked12.78Cr / 10.05Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score7.23 / 10
|
0.6%
5.48
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 2
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.48 / 10
|
5.8%
7.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 7 / 26
Completion rate80.5%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.60Cr / 0.44Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score7.62 / 10
|
| 24 | CHHAPARA โ | SEONI | 6.96 |
35.4%
5.47
CategoryFarm Pond
Started / Completed / Phys210 / 98 / 69
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked1.52Cr / 0.45Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.50 / 5.0
Final score5.47 / 10
|
โ |
2.8%
6.49
CategoryDug Well Recharge
Started / Completed / Phys209 / 62 / 137
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score6.49 / 10
|
7.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.4%
7.52
CategoryWater conservation & recharge
Started / Completed / Phys112 / 51 / 42
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked2.13Cr / 1.43Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.52 / 10
|
11.3%
7.17
CategoryWatershed Related Works
Started / Completed / Phys41 / 26 / 3
Completion rate70.7%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.70Cr / 0.51Cr
Expenditure rate (ongoing)72.6%
Part B score (max 5.0)3.63 / 5.0
Final score7.17 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 25 | CHHINDWARA โ | CHHINDWARA | 6.95 |
19.3%
6.47
CategoryFarm Pond
Started / Completed / Phys97 / 35 / 43
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.38Cr / 0.19Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score6.47 / 10
|
7.3%
3.61
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.46Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.61 / 5.0
Final score3.61 / 10
|
11.0%
6.37
CategoryDug Well Recharge
Started / Completed / Phys360 / 157 / 191
Completion rate96.7%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score6.37 / 10
|
8.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
26.1%
6.50
CategoryWater conservation & recharge
Started / Completed / Phys29 / 5 / 14
Completion rate65.5%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked1.24Cr / 0.80Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score6.50 / 10
|
17.0%
6.52
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 7
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.57Cr / 0.39Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score6.52 / 10
|
10.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 26 | SOHAGPUR โ | NARMADAPURAM | 6.90 |
59.5%
5.55
CategoryFarm Pond
Started / Completed / Phys118 / 42 / 61
Completion rate87.3%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.26Cr / 0.06Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score5.55 / 10
|
โ |
10.9%
5.84
CategoryDug Well Recharge
Started / Completed / Phys133 / 57 / 68
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score5.84 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys13 / 4 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 27 | MAHESHWAR โ | KHARGONE | 6.82 |
35.5%
5.71
CategoryFarm Pond
Started / Completed / Phys216 / 29 / 120
Completion rate69.0%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked1.27Cr / 0.57Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.71 / 10
|
7.1%
7.03
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.25Cr / 0.18Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score7.03 / 10
|
13.0%
7.54
CategoryDug Well Recharge
Started / Completed / Phys572 / 56 / 437
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score7.54 / 10
|
โ |
40.0%
7.34
CategoryWater conservation & recharge
Started / Completed / Phys111 / 11 / 73
Completion rate75.7%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked1.54Cr / 1.10Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score7.34 / 10
|
1.2%
5.38
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.04 / 5.0
Final score5.38 / 10
|
3.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 28 | BIRSA โ | BALAGHAT | 6.82 |
59.1%
6.72
CategoryFarm Pond
Started / Completed / Phys704 / 200 / 230
Completion rate61.1%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked7.40Cr / 5.43Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score6.72 / 10
|
1.4%
1.16
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.12Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score1.16 / 10
|
0.9%
8.18
CategoryDug Well Recharge
Started / Completed / Phys125 / 17 / 81
Completion rate78.4%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score8.18 / 10
|
0.0%
5.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score5.00 / 10
|
36.4%
7.19
CategoryWater conservation & recharge
Started / Completed / Phys259 / 38 / 129
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked6.63Cr / 5.26Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score7.19 / 10
|
1.5%
4.53
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 3
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.37Cr / 0.24Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score4.53 / 10
|
0.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 29 | BHAGVANPURA โ | KHARGONE | 6.79 |
17.2%
7.28
CategoryFarm Pond
Started / Completed / Phys292 / 134 / 113
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.79Cr / 0.48Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score7.28 / 10
|
2.6%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.8%
7.61
CategoryDug Well Recharge
Started / Completed / Phys443 / 230 / 174
Completion rate91.2%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score7.61 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
71.7%
6.40
CategoryWater conservation & recharge
Started / Completed / Phys215 / 40 / 74
Completion rate53.0%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked9.71Cr / 7.27Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.74 / 5.0
Final score6.40 / 10
|
3.5%
8.21
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 8
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.22Cr / 0.20Cr
Expenditure rate (ongoing)89.3%
Part B score (max 5.0)4.46 / 5.0
Final score8.21 / 10
|
1.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 30 | NARWAR โ | SHIVPURI | 6.79 |
30.5%
5.41
CategoryFarm Pond
Started / Completed / Phys242 / 143 / 44
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked1.54Cr / 0.48Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score5.41 / 10
|
โ |
2.3%
5.66
CategoryDug Well Recharge
Started / Completed / Phys207 / 121 / 51
Completion rate83.1%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)30.2%
Part B score (max 5.0)1.51 / 5.0
Final score5.66 / 10
|
0.4%
5.84
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score5.84 / 10
|
46.1%
7.51
CategoryWater conservation & recharge
Started / Completed / Phys180 / 28 / 125
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked1.16Cr / 0.76Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score7.51 / 10
|
19.7%
7.23
CategoryWatershed Related Works
Started / Completed / Phys54 / 15 / 25
Completion rate74.1%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked1.07Cr / 0.75Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.23 / 10
|
0.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 31 | BAJAG โ | DINDORI | 6.76 |
50.7%
6.22
CategoryFarm Pond
Started / Completed / Phys278 / 41 / 185
Completion rate81.3%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked1.92Cr / 0.83Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score6.22 / 10
|
โ |
3.2%
5.00
CategoryDug Well Recharge
Started / Completed / Phys245 / 41 / 202
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score5.00 / 10
|
โ |
33.0%
6.48
CategoryWater conservation & recharge
Started / Completed / Phys71 / 3 / 42
Completion rate63.4%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked3.68Cr / 2.44Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score6.48 / 10
|
9.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys17 / 1 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 32 | BANKHEDI โ | NARMADAPURAM | 6.76 |
38.9%
3.76
CategoryFarm Pond
Started / Completed / Phys100 / 30 / 34
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.76Cr / 0.09Cr
Expenditure rate (ongoing)11.2%
Part B score (max 5.0)0.56 / 5.0
Final score3.76 / 10
|
โ |
6.5%
5.68
CategoryDug Well Recharge
Started / Completed / Phys119 / 67 / 38
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score5.68 / 10
|
0.8%
8.03
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 3 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score8.03 / 10
|
44.2%
8.83
CategoryWater conservation & recharge
Started / Completed / Phys47 / 31 / 13
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score8.83 / 10
|
4.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 10 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 8 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 33 | CHAURAI โ | CHHINDWARA | 6.73 |
27.6%
7.57
CategoryFarm Pond
Started / Completed / Phys99 / 2 / 75
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.61Cr / 0.45Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.69 / 5.0
Final score7.57 / 10
|
3.5%
0.66
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
|
10.3%
6.76
CategoryDug Well Recharge
Started / Completed / Phys475 / 107 / 333
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)42.5%
Part B score (max 5.0)2.13 / 5.0
Final score6.76 / 10
|
0.7%
5.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score5.22 / 10
|
35.0%
7.28
CategoryWater conservation & recharge
Started / Completed / Phys49 / 6 / 30
Completion rate73.5%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked1.74Cr / 1.25Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.61 / 5.0
Final score7.28 / 10
|
20.8%
5.81
CategoryWatershed Related Works
Started / Completed / Phys37 / 9 / 9
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked1.23Cr / 0.83Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score5.81 / 10
|
2.2%
5.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score5.99 / 10
|
| 34 | ZIRANYA โ | KHARGONE | 6.72 |
13.2%
5.99
CategoryFarm Pond
Started / Completed / Phys294 / 49 / 148
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked1.54Cr / 0.81Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.64 / 5.0
Final score5.99 / 10
|
6.9%
7.25
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 10
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score7.25 / 10
|
3.2%
7.65
CategoryDug Well Recharge
Started / Completed / Phys449 / 205 / 188
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score7.65 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
71.6%
6.66
CategoryWater conservation & recharge
Started / Completed / Phys313 / 31 / 144
Completion rate55.9%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked9.83Cr / 7.59Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score6.66 / 10
|
0.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.6%
8.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 12 / 6
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.40Cr / 0.32Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score8.09 / 10
|
| 35 | TIRLA โ | DHAR | 6.72 |
15.3%
4.88
CategoryFarm Pond
Started / Completed / Phys295 / 44 / 120
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked3.32Cr / 1.39Cr
Expenditure rate (ongoing)42.0%
Part B score (max 5.0)2.10 / 5.0
Final score4.88 / 10
|
โ |
2.4%
3.90
CategoryDug Well Recharge
Started / Completed / Phys428 / 58 / 119
Completion rate41.4%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked0.64Cr / 0.24Cr
Expenditure rate (ongoing)36.7%
Part B score (max 5.0)1.84 / 5.0
Final score3.90 / 10
|
โ |
75.2%
7.14
CategoryWater conservation & recharge
Started / Completed / Phys355 / 12 / 210
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked13.67Cr / 10.98Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score7.14 / 10
|
6.0%
7.27
CategoryWatershed Related Works
Started / Completed / Phys67 / 0 / 47
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.01Cr / 0.76Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.27 / 10
|
1.1%
6.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)77.4%
Part B score (max 5.0)3.87 / 5.0
Final score6.87 / 10
|
| 36 | KESLI โ | SAGAR | 6.67 |
27.4%
4.75
CategoryFarm Pond
Started / Completed / Phys178 / 79 / 23
Completion rate57.3%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked1.36Cr / 0.51Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score4.75 / 10
|
โ |
8.3%
6.71
CategoryDug Well Recharge
Started / Completed / Phys377 / 143 / 181
Completion rate85.9%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score6.71 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
47.2%
6.96
CategoryWater conservation & recharge
Started / Completed / Phys164 / 19 / 104
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked1.00Cr / 0.64Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.96 / 10
|
14.2%
8.69
CategoryWatershed Related Works
Started / Completed / Phys31 / 8 / 18
Completion rate83.9%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.28Cr / 0.26Cr
Expenditure rate (ongoing)89.9%
Part B score (max 5.0)4.49 / 5.0
Final score8.69 / 10
|
2.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 37 | BAIHAR โ | BALAGHAT | 6.67 |
57.1%
6.16
CategoryFarm Pond
Started / Completed / Phys731 / 105 / 322
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked7.88Cr / 5.10Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.23 / 5.0
Final score6.16 / 10
|
2.1%
1.53
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.23Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score1.53 / 10
|
1.1%
6.23
CategoryDug Well Recharge
Started / Completed / Phys131 / 63 / 33
Completion rate73.3%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score6.23 / 10
|
โ |
38.0%
7.72
CategoryWater conservation & recharge
Started / Completed / Phys379 / 18 / 266
Completion rate74.9%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked3.44Cr / 2.73Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score7.72 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.2%
6.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score6.01 / 10
|
| 38 | RAJPUR โ | BARWANI | 6.64 |
28.7%
6.19
CategoryFarm Pond
Started / Completed / Phys164 / 0 / 101
Completion rate61.6%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.54Cr / 0.34Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score6.19 / 10
|
โ |
17.4%
8.38
CategoryDug Well Recharge
Started / Completed / Phys383 / 0 / 354
Completion rate92.4%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score8.38 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.8%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys35 / 3 / 22
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.22Cr / 0.13Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score6.53 / 10
|
28.0%
5.91
CategoryWatershed Related Works
Started / Completed / Phys38 / 1 / 30
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.33Cr / 0.12Cr
Expenditure rate (ongoing)36.7%
Part B score (max 5.0)1.83 / 5.0
Final score5.91 / 10
|
2.6%
6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 8
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.35 / 5.0
Final score6.79 / 10
|
| 39 | KAILARAS โ | MORENA | 6.64 |
12.1%
5.87
CategoryFarm Pond
Started / Completed / Phys469 / 329 / 25
Completion rate75.5%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked2.45Cr / 1.03Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score5.87 / 10
|
โ |
0.3%
5.33
CategoryDug Well Recharge
Started / Completed / Phys117 / 91 / 1
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score5.33 / 10
|
1.7%
7.38
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 0 / 11
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score7.38 / 10
|
77.3%
6.70
CategoryWater conservation & recharge
Started / Completed / Phys469 / 12 / 242
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked31.67Cr / 25.26Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.99 / 5.0
Final score6.70 / 10
|
6.4%
7.35
CategoryWatershed Related Works
Started / Completed / Phys38 / 0 / 26
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked1.42Cr / 1.12Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score7.35 / 10
|
2.1%
6.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 9
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.44Cr / 0.24Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score6.44 / 10
|
| 40 | PATI โ | BARWANI | 6.62 |
16.1%
6.51
CategoryFarm Pond
Started / Completed / Phys216 / 4 / 139
Completion rate66.2%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked0.81Cr / 0.52Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score6.51 / 10
|
โ |
13.6%
7.90
CategoryDug Well Recharge
Started / Completed / Phys711 / 19 / 585
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score7.90 / 10
|
โ |
46.2%
6.60
CategoryWater conservation & recharge
Started / Completed / Phys111 / 9 / 69
Completion rate70.3%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.67Cr / 1.03Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score6.60 / 10
|
20.8%
6.31
CategoryWatershed Related Works
Started / Completed / Phys50 / 2 / 32
Completion rate68.0%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.88Cr / 0.51Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score6.31 / 10
|
3.3%
4.21
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 1
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.32Cr / 0.23Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score4.21 / 10
|
| 41 | DHIMERKHEDA โ | KATNI | 6.56 |
17.8%
4.14
CategoryFarm Pond
Started / Completed / Phys317 / 99 / 99
Completion rate62.5%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked1.78Cr / 0.36Cr
Expenditure rate (ongoing)20.3%
Part B score (max 5.0)1.01 / 5.0
Final score4.14 / 10
|
1.3%
4.14
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.33Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score4.14 / 10
|
0.8%
6.71
CategoryDug Well Recharge
Started / Completed / Phys96 / 55 / 35
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)40.5%
Part B score (max 5.0)2.02 / 5.0
Final score6.71 / 10
|
40.7%
7.36
CategoryIrrigation infrastructure
Started / Completed / Phys141 / 11 / 106
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked2.10Cr / 1.35Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score7.36 / 10
|
13.5%
6.46
CategoryWater conservation & recharge
Started / Completed / Phys42 / 7 / 23
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked2.36Cr / 1.36Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score6.46 / 10
|
21.9%
7.48
CategoryWatershed Related Works
Started / Completed / Phys70 / 16 / 36
Completion rate74.3%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked2.26Cr / 1.70Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.48 / 10
|
3.9%
5.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 4
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.82Cr / 0.57Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score5.25 / 10
|
| 42 | SHEOPUR โ | SHEOPUR | 6.55 |
38.5%
4.80
CategoryFarm Pond
Started / Completed / Phys143 / 59 / 30
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked2.17Cr / 0.73Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.68 / 5.0
Final score4.80 / 10
|
โ |
0.8%
7.21
CategoryDug Well Recharge
Started / Completed / Phys43 / 33 / 4
Completion rate86.0%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score7.21 / 10
|
6.4%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 5 / 7
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score9.00 / 10
|
41.4%
7.38
CategoryWater conservation & recharge
Started / Completed / Phys81 / 7 / 52
Completion rate72.8%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked1.37Cr / 1.02Cr
Expenditure rate (ongoing)74.8%
Part B score (max 5.0)3.74 / 5.0
Final score7.38 / 10
|
5.9%
7.67
CategoryWatershed Related Works
Started / Completed / Phys13 / 4 / 5
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.29Cr / 0.24Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score7.67 / 10
|
7.1%
7.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 9
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.84 / 5.0
Final score7.93 / 10
|
| 43 | TAMIA โ | CHHINDWARA | 6.51 |
24.1%
5.60
CategoryFarm Pond
Started / Completed / Phys269 / 105 / 55
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked4.70Cr / 2.47Cr
Expenditure rate (ongoing)52.5%
Part B score (max 5.0)2.62 / 5.0
Final score5.60 / 10
|
4.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.96Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.5%
7.89
CategoryDug Well Recharge
Started / Completed / Phys281 / 155 / 120
Completion rate97.9%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.89 / 10
|
โ |
60.5%
7.08
CategoryWater conservation & recharge
Started / Completed / Phys305 / 67 / 130
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked13.76Cr / 10.59Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score7.08 / 10
|
7.4%
8.38
CategoryWatershed Related Works
Started / Completed / Phys38 / 9 / 22
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.93Cr / 0.80Cr
Expenditure rate (ongoing)86.0%
Part B score (max 5.0)4.30 / 5.0
Final score8.38 / 10
|
2.3%
6.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 1
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.72Cr / 0.57Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score6.11 / 10
|
| 44 | MOHKHED โ | CHHINDWARA | 6.51 |
20.0%
6.85
CategoryFarm Pond
Started / Completed / Phys131 / 12 / 92
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.45Cr / 0.26Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score6.85 / 10
|
โ |
8.7%
6.79
CategoryDug Well Recharge
Started / Completed / Phys380 / 29 / 341
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score6.79 / 10
|
0.4%
3.52
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
|
44.9%
6.57
CategoryWater conservation & recharge
Started / Completed / Phys60 / 10 / 21
Completion rate51.7%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked3.46Cr / 2.76Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score6.57 / 10
|
23.3%
6.38
CategoryWatershed Related Works
Started / Completed / Phys43 / 19 / 6
Completion rate58.1%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked1.10Cr / 0.76Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.38 / 10
|
2.5%
3.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.28Cr / 0.18Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score3.26 / 10
|
| 45 | LANJI โ | BALAGHAT | 6.51 |
57.6%
6.06
CategoryFarm Pond
Started / Completed / Phys369 / 131 / 134
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked2.03Cr / 1.00Cr
Expenditure rate (ongoing)49.4%
Part B score (max 5.0)2.47 / 5.0
Final score6.06 / 10
|
4.1%
1.64
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.22Cr
Expenditure rate (ongoing)32.9%
Part B score (max 5.0)1.64 / 5.0
Final score1.64 / 10
|
2.4%
8.37
CategoryDug Well Recharge
Started / Completed / Phys154 / 63 / 81
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score8.37 / 10
|
โ |
31.5%
7.63
CategoryWater conservation & recharge
Started / Completed / Phys104 / 19 / 57
Completion rate73.1%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked1.70Cr / 1.35Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score7.63 / 10
|
2.7%
8.77
CategoryWatershed Related Works
Started / Completed / Phys14 / 6 / 7
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score8.77 / 10
|
1.7%
6.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score6.08 / 10
|
| 46 | DHARAMPURI โ | DHAR | 6.50 |
5.2%
6.06
CategoryFarm Pond
Started / Completed / Phys137 / 49 / 35
Completion rate61.3%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked0.35Cr / 0.21Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score6.06 / 10
|
โ |
5.5%
6.88
CategoryDug Well Recharge
Started / Completed / Phys378 / 129 / 138
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.29Cr / 0.19Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score6.88 / 10
|
0.3%
3.01
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score3.01 / 10
|
69.3%
6.75
CategoryWater conservation & recharge
Started / Completed / Phys169 / 12 / 85
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked4.06Cr / 3.15Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.88 / 5.0
Final score6.75 / 10
|
14.3%
5.72
CategoryWatershed Related Works
Started / Completed / Phys59 / 2 / 22
Completion rate40.7%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked1.22Cr / 0.90Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score5.72 / 10
|
5.5%
5.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 0 / 7
Completion rate29.2%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked0.70Cr / 0.60Cr
Expenditure rate (ongoing)85.0%
Part B score (max 5.0)4.25 / 5.0
Final score5.71 / 10
|
| 47 | HARAI โ | CHHINDWARA | 6.50 |
43.4%
6.71
CategoryFarm Pond
Started / Completed / Phys396 / 154 / 136
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked2.17Cr / 1.32Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score6.71 / 10
|
โ |
4.9%
8.54
CategoryDug Well Recharge
Started / Completed / Phys327 / 106 / 190
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score8.54 / 10
|
โ |
40.8%
6.16
CategoryWater conservation & recharge
Started / Completed / Phys148 / 23 / 50
Completion rate49.3%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked3.64Cr / 2.69Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score6.16 / 10
|
10.3%
5.84
CategoryWatershed Related Works
Started / Completed / Phys26 / 5 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.92Cr / 0.62Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score5.84 / 10
|
0.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 48 | PARASWADA โ | BALAGHAT | 6.47 |
55.0%
6.08
CategoryFarm Pond
Started / Completed / Phys510 / 265 / 82
Completion rate68.0%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked4.13Cr / 2.21Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.68 / 5.0
Final score6.08 / 10
|
2.9%
2.22
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.33Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score2.22 / 10
|
1.6%
7.19
CategoryDug Well Recharge
Started / Completed / Phys167 / 117 / 22
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score7.19 / 10
|
0.7%
5.79
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)49.2%
Part B score (max 5.0)2.46 / 5.0
Final score5.79 / 10
|
38.1%
7.34
CategoryWater conservation & recharge
Started / Completed / Phys208 / 33 / 110
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked3.67Cr / 2.87Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score7.34 / 10
|
1.2%
6.84
CategoryWatershed Related Works
Started / Completed / Phys7 / 5 / 0
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score6.84 / 10
|
0.6%
5.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score5.58 / 10
|
| 49 | BAHORIBAND โ | KATNI | 6.43 |
36.8%
4.98
CategoryFarm Pond
Started / Completed / Phys392 / 134 / 131
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked2.01Cr / 0.64Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.60 / 5.0
Final score4.98 / 10
|
โ |
4.4%
6.03
CategoryDug Well Recharge
Started / Completed / Phys284 / 134 / 101
Completion rate82.7%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.89 / 5.0
Final score6.03 / 10
|
6.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
22.5%
6.94
CategoryWater conservation & recharge
Started / Completed / Phys52 / 10 / 23
Completion rate63.5%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked2.05Cr / 1.55Cr
Expenditure rate (ongoing)75.4%
Part B score (max 5.0)3.77 / 5.0
Final score6.94 / 10
|
25.5%
6.85
CategoryWatershed Related Works
Started / Completed / Phys73 / 9 / 41
Completion rate68.5%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked1.62Cr / 1.11Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.43 / 5.0
Final score6.85 / 10
|
4.7%
8.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 7
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)89.2%
Part B score (max 5.0)4.46 / 5.0
Final score8.83 / 10
|
| 50 | PANSEMAL โ | BARWANI | 6.41 |
32.9%
5.75
CategoryFarm Pond
Started / Completed / Phys162 / 20 / 116
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.46Cr / 0.14Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score5.75 / 10
|
6.0%
3.65
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.37Cr / 0.15Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score3.65 / 10
|
6.2%
5.21
CategoryDug Well Recharge
Started / Completed / Phys221 / 7 / 167
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.12Cr / 0.03Cr
Expenditure rate (ongoing)25.5%
Part B score (max 5.0)1.27 / 5.0
Final score5.21 / 10
|
โ |
46.3%
7.23
CategoryWater conservation & recharge
Started / Completed / Phys76 / 4 / 57
Completion rate80.3%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked0.35Cr / 0.23Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.22 / 5.0
Final score7.23 / 10
|
7.8%
7.09
CategoryWatershed Related Works
Started / Completed / Phys18 / 7 / 6
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.22Cr / 0.16Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score7.09 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 51 | REHLI โ | SAGAR | 6.41 |
35.7%
5.51
CategoryFarm Pond
Started / Completed / Phys278 / 102 / 94
Completion rate70.5%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked1.64Cr / 0.65Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score5.51 / 10
|
โ |
10.6%
6.41
CategoryDug Well Recharge
Started / Completed / Phys585 / 301 / 242
Completion rate92.8%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)35.5%
Part B score (max 5.0)1.77 / 5.0
Final score6.41 / 10
|
1.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
31.4%
7.00
CategoryWater conservation & recharge
Started / Completed / Phys114 / 27 / 57
Completion rate73.7%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked1.39Cr / 0.92Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score7.00 / 10
|
6.3%
7.73
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 9
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score7.73 / 10
|
14.4%
6.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 4 / 9
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.38Cr / 0.20Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score6.38 / 10
|
| 52 | SEONI โ | SEONI | 6.34 |
19.7%
5.26
CategoryFarm Pond
Started / Completed / Phys121 / 52 / 41
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.62Cr / 0.18Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.41 / 5.0
Final score5.26 / 10
|
โ |
6.6%
6.53
CategoryDug Well Recharge
Started / Completed / Phys434 / 145 / 287
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)31.1%
Part B score (max 5.0)1.55 / 5.0
Final score6.53 / 10
|
3.0%
7.46
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.12Cr / 0.09Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.71 / 5.0
Final score7.46 / 10
|
41.4%
6.54
CategoryWater conservation & recharge
Started / Completed / Phys114 / 41 / 33
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked3.16Cr / 2.08Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score6.54 / 10
|
24.5%
6.70
CategoryWatershed Related Works
Started / Completed / Phys96 / 61 / 14
Completion rate78.1%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.98Cr / 0.55Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score6.70 / 10
|
4.8%
6.32
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 5 / 4
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.34Cr / 0.19Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score6.32 / 10
|
| 53 | SEGAON โ | KHARGONE | 6.33 |
22.1%
6.17
CategoryFarm Pond
Started / Completed / Phys115 / 0 / 71
Completion rate61.7%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked0.83Cr / 0.51Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score6.17 / 10
|
5.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
7.87
CategoryDug Well Recharge
Started / Completed / Phys205 / 17 / 172
Completion rate92.2%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score7.87 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.8%
5.92
CategoryWater conservation & recharge
Started / Completed / Phys70 / 4 / 31
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.76Cr / 1.20Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score5.92 / 10
|
26.4%
5.62
CategoryWatershed Related Works
Started / Completed / Phys28 / 3 / 12
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked1.12Cr / 0.66Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score5.62 / 10
|
2.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 54 | JAISINAGAR โ | SAGAR | 6.32 |
55.7%
4.83
CategoryFarm Pond
Started / Completed / Phys93 / 58 / 6
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked1.01Cr / 0.28Cr
Expenditure rate (ongoing)27.9%
Part B score (max 5.0)1.39 / 5.0
Final score4.83 / 10
|
โ |
18.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys383 / 351 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
22.9%
6.93
CategoryWater conservation & recharge
Started / Completed / Phys19 / 12 / 4
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score6.93 / 10
|
2.8%
6.62
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score6.62 / 10
|
โ |
| 55 | KARANJIYA โ | DINDORI | 6.32 |
45.7%
6.19
CategoryFarm Pond
Started / Completed / Phys342 / 161 / 101
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked2.89Cr / 1.37Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score6.19 / 10
|
3.5%
5.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.40Cr / 0.15Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
|
1.7%
7.58
CategoryDug Well Recharge
Started / Completed / Phys168 / 30 / 134
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score7.58 / 10
|
3.4%
6.48
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.48 / 10
|
41.1%
6.32
CategoryWater conservation & recharge
Started / Completed / Phys127 / 17 / 56
Completion rate57.5%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked6.93Cr / 4.78Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score6.32 / 10
|
1.5%
6.28
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 9
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score6.28 / 10
|
3.1%
8.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 7
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.14Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score8.58 / 10
|
| 56 | KEOLARI โ | SEONI | 6.32 |
64.1%
5.66
CategoryFarm Pond
Started / Completed / Phys505 / 383 / 31
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked2.68Cr / 0.84Cr
Expenditure rate (ongoing)31.3%
Part B score (max 5.0)1.56 / 5.0
Final score5.66 / 10
|
1.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
3.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys302 / 269 / 33
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.2%
8.45
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 5 / 10
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score8.45 / 10
|
16.2%
7.08
CategoryWater conservation & recharge
Started / Completed / Phys62 / 16 / 29
Completion rate72.6%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked1.24Cr / 0.86Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.08 / 10
|
7.7%
7.05
CategoryWatershed Related Works
Started / Completed / Phys31 / 10 / 15
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.27Cr / 0.16Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score7.05 / 10
|
3.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 57 | BARWANI โ | BARWANI | 6.32 |
50.0%
6.32
CategoryFarm Pond
Started / Completed / Phys136 / 7 / 87
Completion rate69.1%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.55Cr / 0.31Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.86 / 5.0
Final score6.32 / 10
|
โ |
18.2%
7.59
CategoryDug Well Recharge
Started / Completed / Phys247 / 22 / 198
Completion rate89.1%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score7.59 / 10
|
โ |
16.3%
5.70
CategoryWater conservation & recharge
Started / Completed / Phys23 / 2 / 9
Completion rate47.8%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked0.25Cr / 0.16Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.30 / 5.0
Final score5.70 / 10
|
15.5%
5.45
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 5
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.28Cr / 0.15Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score5.45 / 10
|
โ |
| 58 | PAHADGARH โ | MORENA | 6.30 |
10.4%
5.03
CategoryFarm Pond
Started / Completed / Phys499 / 406 / 55
Completion rate92.4%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked1.11Cr / 0.09Cr
Expenditure rate (ongoing)8.2%
Part B score (max 5.0)0.41 / 5.0
Final score5.03 / 10
|
0.2%
0.85
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.04Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score0.85 / 10
|
0.3%
4.96
CategoryDug Well Recharge
Started / Completed / Phys126 / 107 / 18
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.96 / 10
|
1.1%
5.18
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.85Cr / 0.67Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score5.18 / 10
|
76.0%
6.48
CategoryWater conservation & recharge
Started / Completed / Phys544 / 6 / 272
Completion rate51.1%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked39.10Cr / 30.66Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score6.48 / 10
|
10.0%
6.57
CategoryWatershed Related Works
Started / Completed / Phys74 / 2 / 37
Completion rate52.7%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked4.93Cr / 3.88Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score6.57 / 10
|
2.0%
6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 8
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.57Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score6.52 / 10
|
| 59 | JOURA โ | MORENA | 6.30 |
16.3%
5.71
CategoryFarm Pond
Started / Completed / Phys230 / 148 / 4
Completion rate66.1%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked3.12Cr / 1.50Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score5.71 / 10
|
0.5%
0.01
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score0.01 / 10
|
0.4%
4.94
CategoryDug Well Recharge
Started / Completed / Phys77 / 45 / 3
Completion rate62.3%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.82 / 5.0
Final score4.94 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
76.6%
6.40
CategoryWater conservation & recharge
Started / Completed / Phys261 / 3 / 138
Completion rate54.0%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked16.71Cr / 12.35Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score6.40 / 10
|
1.3%
8.41
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score8.41 / 10
|
3.8%
6.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 8
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.93Cr / 0.64Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.14 / 10
|
| 60 | BHAINSDEHI โ | BETUL | 6.29 |
13.4%
8.63
CategoryFarm Pond
Started / Completed / Phys164 / 3 / 137
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.38Cr / 0.33Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score8.63 / 10
|
3.0%
2.74
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.55Cr / 0.30Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.74 / 5.0
Final score2.74 / 10
|
5.2%
7.71
CategoryDug Well Recharge
Started / Completed / Phys371 / 28 / 310
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score7.71 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
72.8%
5.90
CategoryWater conservation & recharge
Started / Completed / Phys201 / 10 / 86
Completion rate47.8%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked6.83Cr / 4.79Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score5.90 / 10
|
1.8%
5.36
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
|
3.8%
6.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 6 / 10
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.68 / 10
|
| 61 | BEGUMGANJ โ | RAISEN | 6.27 |
52.8%
6.68
CategoryFarm Pond
Started / Completed / Phys432 / 136 / 242
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked1.35Cr / 0.62Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.30 / 5.0
Final score6.68 / 10
|
2.2%
3.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.26Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score3.00 / 10
|
4.5%
7.86
CategoryDug Well Recharge
Started / Completed / Phys336 / 201 / 125
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score7.86 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.3%
5.69
CategoryWater conservation & recharge
Started / Completed / Phys64 / 13 / 11
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked6.00Cr / 4.58Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score5.69 / 10
|
0.2%
1.97
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.97 / 5.0
Final score1.97 / 10
|
0.2%
4.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score4.27 / 10
|
| 62 | BHANDER โ | DATIA | 6.27 |
36.8%
3.68
CategoryFarm Pond
Started / Completed / Phys212 / 75 / 63
Completion rate65.1%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked1.52Cr / 0.13Cr
Expenditure rate (ongoing)8.4%
Part B score (max 5.0)0.42 / 5.0
Final score3.68 / 10
|
โ |
2.4%
4.66
CategoryDug Well Recharge
Started / Completed / Phys118 / 87 / 23
Completion rate93.2%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.66 / 10
|
3.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.6%
7.01
CategoryWater conservation & recharge
Started / Completed / Phys123 / 18 / 99
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.49Cr / 0.22Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score7.01 / 10
|
5.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys19 / 3 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 3 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 63 | PANDHURNA โ | CHHINDWARA | 6.26 |
21.7%
5.88
CategoryFarm Pond
Started / Completed / Phys135 / 72 / 38
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.41Cr / 0.15Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.88 / 10
|
3.6%
1.15
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.09Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score1.15 / 10
|
8.6%
5.84
CategoryDug Well Recharge
Started / Completed / Phys362 / 39 / 300
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score5.84 / 10
|
7.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.9%
6.26
CategoryWater conservation & recharge
Started / Completed / Phys25 / 7 / 5
Completion rate48.0%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked1.88Cr / 1.45Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score6.26 / 10
|
33.7%
6.02
CategoryWatershed Related Works
Started / Completed / Phys48 / 8 / 18
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked1.52Cr / 1.00Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score6.02 / 10
|
2.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 64 | BURHANPUR โ | BURHANPUR | 6.26 |
26.2%
6.65
CategoryFarm Pond
Started / Completed / Phys268 / 108 / 115
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.80Cr / 0.40Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.49 / 5.0
Final score6.65 / 10
|
8.7%
4.38
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked1.08Cr / 0.68Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score4.38 / 10
|
6.8%
7.47
CategoryDug Well Recharge
Started / Completed / Phys447 / 221 / 205
Completion rate95.3%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score7.47 / 10
|
โ |
53.5%
6.04
CategoryWater conservation & recharge
Started / Completed / Phys133 / 8 / 65
Completion rate54.9%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked3.68Cr / 2.43Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score6.04 / 10
|
3.5%
7.53
CategoryWatershed Related Works
Started / Completed / Phys10 / 2 / 6
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score7.53 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 65 | GOHPARU โ | SHAHDOL | 6.25 |
38.0%
4.48
CategoryFarm Pond
Started / Completed / Phys596 / 237 / 136
Completion rate62.6%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked5.25Cr / 1.42Cr
Expenditure rate (ongoing)27.0%
Part B score (max 5.0)1.35 / 5.0
Final score4.48 / 10
|
1.1%
2.16
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
|
0.8%
5.95
CategoryDug Well Recharge
Started / Completed / Phys98 / 15 / 63
Completion rate79.6%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score5.95 / 10
|
11.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
45.0%
6.95
CategoryWater conservation & recharge
Started / Completed / Phys202 / 18 / 105
Completion rate60.9%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked7.45Cr / 5.82Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score6.95 / 10
|
3.3%
5.73
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 3
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.61Cr / 0.48Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.91 / 5.0
Final score5.73 / 10
|
0.5%
6.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.46 / 10
|
| 66 | KHAIRLANJI โ | BALAGHAT | 6.24 |
61.0%
5.81
CategoryFarm Pond
Started / Completed / Phys474 / 188 / 155
Completion rate72.4%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked3.25Cr / 1.43Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score5.81 / 10
|
2.4%
1.32
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.13Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score1.32 / 10
|
1.4%
7.50
CategoryDug Well Recharge
Started / Completed / Phys113 / 36 / 62
Completion rate86.7%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.50 / 10
|
0.4%
4.71
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.08Cr
Expenditure rate (ongoing)94.2%
Part B score (max 5.0)4.71 / 5.0
Final score4.71 / 10
|
33.4%
7.30
CategoryWater conservation & recharge
Started / Completed / Phys118 / 27 / 52
Completion rate66.9%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked3.31Cr / 2.62Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score7.30 / 10
|
1.0%
6.54
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score6.54 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 67 | GHUGHRI โ | MANDLA | 6.22 |
41.4%
7.25
CategoryFarm Pond
Started / Completed / Phys188 / 141 / 23
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked1.12Cr / 0.64Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.25 / 10
|
4.4%
1.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.24Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score1.49 / 10
|
2.2%
6.59
CategoryDug Well Recharge
Started / Completed / Phys154 / 130 / 9
Completion rate90.3%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score6.59 / 10
|
11.7%
3.56
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked1.86Cr / 0.95Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score3.56 / 10
|
37.7%
6.33
CategoryWater conservation & recharge
Started / Completed / Phys67 / 22 / 15
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked4.75Cr / 3.39Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.57 / 5.0
Final score6.33 / 10
|
2.3%
7.33
CategoryWatershed Related Works
Started / Completed / Phys15 / 5 / 8
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.33 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 68 | BARGHAT โ | SEONI | 6.22 |
56.3%
5.85
CategoryFarm Pond
Started / Completed / Phys440 / 207 / 116
Completion rate73.4%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked3.22Cr / 1.41Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score5.85 / 10
|
โ |
3.0%
6.24
CategoryDug Well Recharge
Started / Completed / Phys254 / 74 / 139
Completion rate83.9%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.11Cr / 0.04Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.24 / 10
|
0.6%
3.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.09Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score3.75 / 10
|
32.5%
6.79
CategoryWater conservation & recharge
Started / Completed / Phys139 / 37 / 55
Completion rate66.2%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked2.23Cr / 1.55Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.79 / 10
|
5.6%
7.33
CategoryWatershed Related Works
Started / Completed / Phys24 / 11 / 10
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score7.33 / 10
|
2.2%
4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.36Cr / 0.23Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score4.96 / 10
|
| 69 | ASHOKNAGAR โ | ASHOK NAGAR | 6.21 |
59.0%
5.26
CategoryFarm Pond
Started / Completed / Phys688 / 265 / 280
Completion rate79.2%
Part A score (max 5.0)3.96 / 5.0
Ongoing sanction / booked3.72Cr / 0.97Cr
Expenditure rate (ongoing)26.1%
Part B score (max 5.0)1.30 / 5.0
Final score5.26 / 10
|
1.5%
3.37
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.33Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
|
1.4%
7.25
CategoryDug Well Recharge
Started / Completed / Phys174 / 110 / 61
Completion rate98.3%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)46.8%
Part B score (max 5.0)2.34 / 5.0
Final score7.25 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.1%
7.92
CategoryWater conservation & recharge
Started / Completed / Phys187 / 60 / 89
Completion rate79.7%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked2.64Cr / 2.08Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score7.92 / 10
|
2.7%
7.38
CategoryWatershed Related Works
Started / Completed / Phys10 / 3 / 5
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score7.38 / 10
|
2.1%
5.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 2 / 1
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.35Cr / 0.24Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score5.34 / 10
|
| 70 | MUNGAOLI โ | ASHOK NAGAR | 6.21 |
41.4%
4.82
CategoryFarm Pond
Started / Completed / Phys413 / 25 / 204
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked6.53Cr / 2.67Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score4.82 / 10
|
2.1%
3.48
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.52Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
|
1.1%
5.62
CategoryDug Well Recharge
Started / Completed / Phys147 / 42 / 67
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score5.62 / 10
|
โ |
51.9%
7.24
CategoryWater conservation & recharge
Started / Completed / Phys395 / 75 / 214
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked5.52Cr / 3.95Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score7.24 / 10
|
2.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.0%
7.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score7.02 / 10
|
| 71 | RAGHOGARH โ | GUNA | 6.21 |
29.8%
4.46
CategoryFarm Pond
Started / Completed / Phys429 / 57 / 215
Completion rate63.4%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked2.83Cr / 0.73Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.29 / 5.0
Final score4.46 / 10
|
โ |
6.2%
5.23
CategoryDug Well Recharge
Started / Completed / Phys598 / 151 / 434
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)6.8%
Part B score (max 5.0)0.34 / 5.0
Final score5.23 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
60.1%
7.05
CategoryWater conservation & recharge
Started / Completed / Phys301 / 37 / 220
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked1.72Cr / 0.95Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score7.05 / 10
|
2.1%
6.39
CategoryWatershed Related Works
Started / Completed / Phys10 / 5 / 2
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score6.39 / 10
|
1.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 72 | MOHGAON โ | MANDLA | 6.20 |
35.7%
6.70
CategoryFarm Pond
Started / Completed / Phys151 / 107 / 10
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked1.34Cr / 0.76Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score6.70 / 10
|
7.0%
1.60
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.15Cr / 0.37Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score1.60 / 10
|
2.0%
5.97
CategoryDug Well Recharge
Started / Completed / Phys117 / 67 / 26
Completion rate79.5%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)1.99 / 5.0
Final score5.97 / 10
|
7.3%
5.27
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score5.27 / 10
|
41.8%
6.64
CategoryWater conservation & recharge
Started / Completed / Phys97 / 34 / 12
Completion rate47.4%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked5.23Cr / 4.47Cr
Expenditure rate (ongoing)85.4%
Part B score (max 5.0)4.27 / 5.0
Final score6.64 / 10
|
3.3%
6.76
CategoryWatershed Related Works
Started / Completed / Phys16 / 3 / 8
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.32 / 5.0
Final score6.76 / 10
|
2.9%
6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 1
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.21Cr
Expenditure rate (ongoing)90.4%
Part B score (max 5.0)4.52 / 5.0
Final score6.52 / 10
|
| 73 | GOHAD โ | BHIND | 6.19 |
19.3%
3.34
CategoryFarm Pond
Started / Completed / Phys218 / 46 / 43
Completion rate40.8%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked3.24Cr / 0.84Cr
Expenditure rate (ongoing)26.0%
Part B score (max 5.0)1.30 / 5.0
Final score3.34 / 10
|
1.0%
0.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
|
0.3%
6.08
CategoryDug Well Recharge
Started / Completed / Phys31 / 0 / 16
Completion rate51.6%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.50 / 5.0
Final score6.08 / 10
|
16.0%
7.04
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 3 / 37
Completion rate74.1%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.91Cr / 0.60Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.34 / 5.0
Final score7.04 / 10
|
56.0%
6.99
CategoryWater conservation & recharge
Started / Completed / Phys152 / 10 / 99
Completion rate71.7%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked3.53Cr / 2.41Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score6.99 / 10
|
6.4%
6.52
CategoryWatershed Related Works
Started / Completed / Phys19 / 5 / 8
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.62Cr / 0.39Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score6.52 / 10
|
1.2%
6.80
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.09Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score6.80 / 10
|
| 74 | GAIRATGANJ โ | RAISEN | 6.18 |
54.3%
7.17
CategoryFarm Pond
Started / Completed / Phys350 / 217 / 61
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked1.55Cr / 0.99Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score7.17 / 10
|
4.1%
3.25
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score3.25 / 10
|
4.4%
9.00
CategoryDug Well Recharge
Started / Completed / Phys202 / 170 / 16
Completion rate92.1%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.04Cr / 0.04Cr
Expenditure rate (ongoing)89.2%
Part B score (max 5.0)4.46 / 5.0
Final score9.00 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
34.9%
4.70
CategoryWater conservation & recharge
Started / Completed / Phys86 / 15 / 3
Completion rate20.9%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked3.58Cr / 2.62Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score4.70 / 10
|
โ |
1.5%
2.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score2.72 / 10
|
| 75 | SHAHGARH โ | SAGAR | 6.18 |
53.8%
3.75
CategoryFarm Pond
Started / Completed / Phys162 / 84 / 17
Completion rate62.3%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked0.93Cr / 0.12Cr
Expenditure rate (ongoing)12.7%
Part B score (max 5.0)0.63 / 5.0
Final score3.75 / 10
|
โ |
11.7%
10.00
CategoryDug Well Recharge
Started / Completed / Phys208 / 145 / 63
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.9%
7.91
CategoryWater conservation & recharge
Started / Completed / Phys32 / 23 / 6
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score7.91 / 10
|
9.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 76 | BARWAH โ | KHARGONE | 6.18 |
35.9%
4.63
CategoryFarm Pond
Started / Completed / Phys216 / 69 / 61
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked1.80Cr / 0.58Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.62 / 5.0
Final score4.63 / 10
|
1.8%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.5%
7.26
CategoryDug Well Recharge
Started / Completed / Phys720 / 106 / 564
Completion rate93.1%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score7.26 / 10
|
1.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.4%
6.50
CategoryWater conservation & recharge
Started / Completed / Phys150 / 49 / 62
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked1.24Cr / 0.69Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score6.50 / 10
|
7.9%
7.64
CategoryWatershed Related Works
Started / Completed / Phys26 / 9 / 13
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score7.64 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 77 | AMBAH โ | MORENA | 6.16 |
12.2%
4.58
CategoryFarm Pond
Started / Completed / Phys156 / 50 / 48
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked0.86Cr / 0.25Cr
Expenditure rate (ongoing)28.9%
Part B score (max 5.0)1.44 / 5.0
Final score4.58 / 10
|
โ |
0.9%
5.83
CategoryDug Well Recharge
Started / Completed / Phys64 / 11 / 50
Completion rate95.3%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.07 / 5.0
Final score5.83 / 10
|
1.7%
7.12
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 4
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.12 / 10
|
73.6%
6.23
CategoryWater conservation & recharge
Started / Completed / Phys110 / 3 / 66
Completion rate62.7%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked5.20Cr / 3.22Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.23 / 10
|
7.7%
7.72
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 8
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.38Cr / 0.30Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score7.72 / 10
|
3.8%
6.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score6.38 / 10
|
| 78 | AMARWARA โ | CHHINDWARA | 6.15 |
50.1%
5.65
CategoryFarm Pond
Started / Completed / Phys353 / 124 / 81
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked4.42Cr / 2.43Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.74 / 5.0
Final score5.65 / 10
|
2.0%
0.10
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.01Cr
Expenditure rate (ongoing)2.0%
Part B score (max 5.0)0.10 / 5.0
Final score0.10 / 10
|
5.1%
10.00
CategoryDug Well Recharge
Started / Completed / Phys382 / 196 / 186
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
34.6%
6.64
CategoryWater conservation & recharge
Started / Completed / Phys111 / 31 / 38
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked2.63Cr / 1.86Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score6.64 / 10
|
5.4%
5.87
CategoryWatershed Related Works
Started / Completed / Phys16 / 4 / 5
Completion rate56.3%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked0.44Cr / 0.27Cr
Expenditure rate (ongoing)61.2%
Part B score (max 5.0)3.06 / 5.0
Final score5.87 / 10
|
2.9%
6.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.52 / 5.0
Final score6.85 / 10
|
| 79 | NISARPUR โ | DHAR | 6.15 |
25.2%
4.03
CategoryFarm Pond
Started / Completed / Phys78 / 23 / 15
Completion rate48.7%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked0.65Cr / 0.21Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.59 / 5.0
Final score4.03 / 10
|
โ |
8.1%
4.60
CategoryDug Well Recharge
Started / Completed / Phys150 / 15 / 47
Completion rate41.3%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked0.23Cr / 0.12Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score4.60 / 10
|
โ |
63.3%
7.24
CategoryWater conservation & recharge
Started / Completed / Phys39 / 12 / 8
Completion rate51.3%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked2.77Cr / 2.59Cr
Expenditure rate (ongoing)93.4%
Part B score (max 5.0)4.67 / 5.0
Final score7.24 / 10
|
3.2%
5.45
CategoryWatershed Related Works
Started / Completed / Phys7 / 3 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score5.45 / 10
|
0.2%
2.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score2.11 / 10
|
| 80 | BANDA โ | SAGAR | 6.14 |
35.8%
4.30
CategoryFarm Pond
Started / Completed / Phys140 / 70 / 12
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked1.07Cr / 0.29Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.37 / 5.0
Final score4.30 / 10
|
โ |
18.2%
7.79
CategoryDug Well Recharge
Started / Completed / Phys541 / 183 / 318
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score7.79 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.9%
6.59
CategoryWater conservation & recharge
Started / Completed / Phys66 / 10 / 43
Completion rate80.3%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.42Cr / 0.21Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score6.59 / 10
|
4.1%
7.07
CategoryWatershed Related Works
Started / Completed / Phys8 / 5 / 2
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.70 / 5.0
Final score7.07 / 10
|
2.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 81 | PARASIA โ | CHHINDWARA | 6.13 |
35.2%
5.57
CategoryFarm Pond
Started / Completed / Phys182 / 30 / 75
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked2.22Cr / 1.19Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score5.57 / 10
|
โ |
10.1%
6.25
CategoryDug Well Recharge
Started / Completed / Phys562 / 127 / 380
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.15Cr / 0.05Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.74 / 5.0
Final score6.25 / 10
|
1.6%
4.30
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.20Cr
Expenditure rate (ongoing)85.9%
Part B score (max 5.0)4.30 / 5.0
Final score4.30 / 10
|
41.9%
6.58
CategoryWater conservation & recharge
Started / Completed / Phys130 / 6 / 72
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked3.71Cr / 2.66Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score6.58 / 10
|
7.9%
6.08
CategoryWatershed Related Works
Started / Completed / Phys26 / 4 / 11
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked0.41Cr / 0.26Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.08 / 10
|
3.4%
7.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 8
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score7.00 / 10
|
| 82 | PETLAWAD โ | JHABUA | 6.13 |
10.9%
4.27
CategoryFarm Pond
Started / Completed / Phys272 / 40 / 58
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked3.00Cr / 1.48Cr
Expenditure rate (ongoing)49.4%
Part B score (max 5.0)2.47 / 5.0
Final score4.27 / 10
|
1.4%
0.70
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.08Cr
Expenditure rate (ongoing)13.9%
Part B score (max 5.0)0.70 / 5.0
Final score0.70 / 10
|
5.0%
6.45
CategoryDug Well Recharge
Started / Completed / Phys832 / 355 / 279
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.51Cr / 0.27Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score6.45 / 10
|
0.1%
6.34
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 2
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.34 / 10
|
75.7%
6.55
CategoryWater conservation & recharge
Started / Completed / Phys372 / 19 / 185
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked13.53Cr / 10.32Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score6.55 / 10
|
4.1%
4.71
CategoryWatershed Related Works
Started / Completed / Phys50 / 0 / 19
Completion rate38.0%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked0.89Cr / 0.50Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.81 / 5.0
Final score4.71 / 10
|
2.8%
6.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 13
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)40.0%
Part B score (max 5.0)2.00 / 5.0
Final score6.12 / 10
|
| 83 | SILWANI โ | RAISEN | 6.13 |
69.3%
6.29
CategoryFarm Pond
Started / Completed / Phys442 / 151 / 154
Completion rate69.0%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked2.12Cr / 1.21Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score6.29 / 10
|
5.6%
4.63
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.96 / 5.0
Final score4.63 / 10
|
11.0%
7.75
CategoryDug Well Recharge
Started / Completed / Phys439 / 312 / 66
Completion rate86.1%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.16Cr / 0.11Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score7.75 / 10
|
โ |
11.4%
4.62
CategoryWater conservation & recharge
Started / Completed / Phys32 / 4 / 6
Completion rate31.3%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked1.03Cr / 0.63Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score4.62 / 10
|
โ |
2.7%
4.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score4.72 / 10
|
| 84 | KHARGONE โ | KHARGONE | 6.10 |
36.0%
4.77
CategoryFarm Pond
Started / Completed / Phys106 / 27 / 56
Completion rate78.3%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked0.50Cr / 0.09Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score4.77 / 10
|
8.5%
4.87
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.39Cr / 0.25Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score4.87 / 10
|
7.9%
5.88
CategoryDug Well Recharge
Started / Completed / Phys245 / 18 / 218
Completion rate96.3%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score5.88 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
43.8%
7.25
CategoryWater conservation & recharge
Started / Completed / Phys47 / 7 / 37
Completion rate93.6%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score7.25 / 10
|
1.8%
6.88
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score6.88 / 10
|
1.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 85 | PANAGAR โ | JABALPUR | 6.07 |
6.8%
0.84
CategoryFarm Pond
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.12Cr / 0.01Cr
Expenditure rate (ongoing)4.4%
Part B score (max 5.0)0.22 / 5.0
Final score0.84 / 10
|
โ |
0.6%
1.13
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.13 / 5.0
Final score1.13 / 10
|
โ |
74.5%
6.93
CategoryWater conservation & recharge
Started / Completed / Phys12 / 10 / 0
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.73Cr / 0.40Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.93 / 10
|
2.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.8%
3.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score3.89 / 10
|
| 86 | MANAWAR โ | DHAR | 6.07 |
18.6%
4.25
CategoryFarm Pond
Started / Completed / Phys234 / 32 / 54
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked2.18Cr / 1.05Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score4.25 / 10
|
โ |
5.4%
5.54
CategoryDug Well Recharge
Started / Completed / Phys386 / 115 / 112
Completion rate58.8%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked0.41Cr / 0.21Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score5.54 / 10
|
1.4%
4.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.24Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.84 / 5.0
Final score4.84 / 10
|
56.9%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys128 / 34 / 35
Completion rate53.9%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked6.96Cr / 5.57Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score6.69 / 10
|
16.0%
6.31
CategoryWatershed Related Works
Started / Completed / Phys76 / 12 / 35
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked1.20Cr / 0.77Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score6.31 / 10
|
1.7%
5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score5.38 / 10
|
| 87 | LALBARRA โ | BALAGHAT | 6.07 |
61.3%
5.54
CategoryFarm Pond
Started / Completed / Phys526 / 333 / 47
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked3.62Cr / 1.39Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score5.54 / 10
|
1.9%
5.28
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score5.28 / 10
|
1.8%
7.76
CategoryDug Well Recharge
Started / Completed / Phys173 / 148 / 19
Completion rate96.5%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.76 / 10
|
1.6%
8.14
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.39 / 5.0
Final score8.14 / 10
|
30.3%
6.85
CategoryWater conservation & recharge
Started / Completed / Phys176 / 38 / 75
Completion rate64.2%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked2.76Cr / 2.01Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.64 / 5.0
Final score6.85 / 10
|
1.6%
6.32
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.13Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.32 / 10
|
1.5%
8.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.06Cr
Expenditure rate (ongoing)87.6%
Part B score (max 5.0)4.38 / 5.0
Final score8.13 / 10
|
| 88 | KATTHIWADA โ | ALIRAJPUR | 6.04 |
19.1%
5.51
CategoryFarm Pond
Started / Completed / Phys188 / 26 / 83
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked3.01Cr / 1.57Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score5.51 / 10
|
2.9%
4.92
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.48Cr / 0.23Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score4.92 / 10
|
4.4%
5.95
CategoryDug Well Recharge
Started / Completed / Phys585 / 89 / 304
Completion rate67.2%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked0.50Cr / 0.26Cr
Expenditure rate (ongoing)51.9%
Part B score (max 5.0)2.60 / 5.0
Final score5.95 / 10
|
โ |
71.4%
6.22
CategoryWater conservation & recharge
Started / Completed / Phys180 / 10 / 70
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked12.71Cr / 10.16Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score6.22 / 10
|
1.8%
6.49
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.50Cr / 0.44Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score6.49 / 10
|
0.4%
7.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.11Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.72 / 5.0
Final score7.22 / 10
|
| 89 | MAJHGAWAN โ | SATNA | 6.04 |
42.8%
5.39
CategoryFarm Pond
Started / Completed / Phys456 / 18 / 267
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked4.76Cr / 2.16Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score5.39 / 10
|
5.0%
1.66
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.50Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score1.66 / 10
|
1.6%
6.70
CategoryDug Well Recharge
Started / Completed / Phys200 / 33 / 112
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score6.70 / 10
|
0.3%
6.40
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.65 / 5.0
Final score6.40 / 10
|
42.5%
7.18
CategoryWater conservation & recharge
Started / Completed / Phys181 / 24 / 92
Completion rate64.1%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked6.66Cr / 5.30Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score7.18 / 10
|
5.7%
6.49
CategoryWatershed Related Works
Started / Completed / Phys39 / 4 / 21
Completion rate64.1%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.67Cr / 0.44Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score6.49 / 10
|
2.1%
4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 4
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.37Cr / 0.20Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score4.96 / 10
|
| 90 | MAJHAULI โ | SIDHI | 6.04 |
50.5%
5.38
CategoryFarm Pond
Started / Completed / Phys356 / 252 / 19
Completion rate76.1%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked2.14Cr / 0.67Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score5.38 / 10
|
โ |
1.4%
7.09
CategoryDug Well Recharge
Started / Completed / Phys96 / 73 / 10
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score7.09 / 10
|
1.5%
7.57
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.19Cr / 0.16Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score7.57 / 10
|
35.6%
6.58
CategoryWater conservation & recharge
Started / Completed / Phys116 / 41 / 31
Completion rate62.1%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked2.09Cr / 1.46Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.58 / 10
|
7.7%
7.42
CategoryWatershed Related Works
Started / Completed / Phys13 / 3 / 7
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score7.42 / 10
|
3.3%
5.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 6 / 1
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score5.96 / 10
|
| 91 | GANDHWANI โ | DHAR | 6.04 |
5.6%
3.11
CategoryFarm Pond
Started / Completed / Phys237 / 10 / 22
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked1.97Cr / 0.96Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score3.11 / 10
|
โ |
2.5%
2.61
CategoryDug Well Recharge
Started / Completed / Phys400 / 50 / 14
Completion rate16.0%
Part A score (max 5.0)0.80 / 5.0
Ongoing sanction / booked0.87Cr / 0.32Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score2.61 / 10
|
โ |
76.0%
6.44
CategoryWater conservation & recharge
Started / Completed / Phys285 / 6 / 144
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked11.90Cr / 9.05Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score6.44 / 10
|
12.1%
5.55
CategoryWatershed Related Works
Started / Completed / Phys164 / 4 / 50
Completion rate32.9%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked3.26Cr / 2.55Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score5.55 / 10
|
3.8%
6.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 14
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.58Cr / 0.26Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score6.10 / 10
|
| 92 | KARKELI โ | UMARIA | 6.03 |
24.6%
4.99
CategoryFarm Pond
Started / Completed / Phys313 / 32 / 132
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked5.03Cr / 2.39Cr
Expenditure rate (ongoing)47.4%
Part B score (max 5.0)2.37 / 5.0
Final score4.99 / 10
|
1.7%
6.26
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.38Cr / 0.28Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score6.26 / 10
|
2.6%
5.59
CategoryDug Well Recharge
Started / Completed / Phys441 / 74 / 223
Completion rate67.3%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked0.37Cr / 0.17Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.23 / 5.0
Final score5.59 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
57.1%
6.49
CategoryWater conservation & recharge
Started / Completed / Phys267 / 12 / 167
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked8.25Cr / 5.17Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.14 / 5.0
Final score6.49 / 10
|
5.6%
6.96
CategoryWatershed Related Works
Started / Completed / Phys30 / 2 / 23
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score6.96 / 10
|
8.3%
5.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys58 / 3 / 23
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked2.13Cr / 1.36Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.19 / 5.0
Final score5.43 / 10
|
| 93 | SARANGPUR โ | RAJGARH | 6.03 |
44.7%
5.14
CategoryFarm Pond
Started / Completed / Phys181 / 125 / 6
Completion rate72.4%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked1.47Cr / 0.45Cr
Expenditure rate (ongoing)30.4%
Part B score (max 5.0)1.52 / 5.0
Final score5.14 / 10
|
โ |
13.5%
8.35
CategoryDug Well Recharge
Started / Completed / Phys614 / 506 / 81
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score8.35 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
23.0%
5.81
CategoryWater conservation & recharge
Started / Completed / Phys39 / 20 / 10
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.29Cr / 0.11Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score5.81 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.9%
6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 3 / 20
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.59Cr / 0.35Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score6.58 / 10
|
| 94 | PUSHPRAJGARH โ | ANUPPUR | 6.02 |
74.2%
5.44
CategoryFarm Pond
Started / Completed / Phys1,443 / 1,006 / 223
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked6.15Cr / 1.45Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.18 / 5.0
Final score5.44 / 10
|
โ |
0.6%
6.17
CategoryDug Well Recharge
Started / Completed / Phys124 / 48 / 72
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.33 / 5.0
Final score6.17 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.4%
7.90
CategoryWater conservation & recharge
Started / Completed / Phys190 / 89 / 63
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked4.36Cr / 3.40Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score7.90 / 10
|
2.6%
8.01
CategoryWatershed Related Works
Started / Completed / Phys18 / 4 / 10
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.80Cr / 0.66Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score8.01 / 10
|
2.7%
6.21
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 5 / 4
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.40Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.21 / 10
|
| 95 | ATER โ | BHIND | 6.02 |
13.3%
3.56
CategoryFarm Pond
Started / Completed / Phys204 / 76 / 22
Completion rate48.0%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked1.81Cr / 0.42Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score3.56 / 10
|
2.7%
0.18
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.02Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.18 / 5.0
Final score0.18 / 10
|
0.2%
4.77
CategoryDug Well Recharge
Started / Completed / Phys24 / 4 / 11
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)32.8%
Part B score (max 5.0)1.64 / 5.0
Final score4.77 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
64.0%
6.75
CategoryWater conservation & recharge
Started / Completed / Phys226 / 46 / 117
Completion rate72.1%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked5.00Cr / 3.14Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.75 / 10
|
12.8%
5.29
CategoryWatershed Related Works
Started / Completed / Phys24 / 5 / 10
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.22Cr / 0.53Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.17 / 5.0
Final score5.29 / 10
|
6.5%
7.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 4 / 16
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score7.59 / 10
|
| 96 | WARASEONI โ | BALAGHAT | 6.02 |
57.3%
4.91
CategoryFarm Pond
Started / Completed / Phys390 / 132 / 167
Completion rate76.7%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked1.68Cr / 0.36Cr
Expenditure rate (ongoing)21.6%
Part B score (max 5.0)1.08 / 5.0
Final score4.91 / 10
|
2.6%
3.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.35Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
|
1.5%
7.23
CategoryDug Well Recharge
Started / Completed / Phys114 / 56 / 49
Completion rate92.1%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)52.5%
Part B score (max 5.0)2.63 / 5.0
Final score7.23 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
34.3%
7.80
CategoryWater conservation & recharge
Started / Completed / Phys157 / 48 / 91
Completion rate88.5%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked1.07Cr / 0.72Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.80 / 10
|
2.3%
7.21
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 1
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.22Cr / 0.18Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score7.21 / 10
|
1.8%
7.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 6 / 1
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score7.88 / 10
|
| 97 | NARSINGHGARH โ | RAJGARH | 6.01 |
41.3%
4.78
CategoryFarm Pond
Started / Completed / Phys263 / 144 / 30
Completion rate66.2%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked2.54Cr / 0.75Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.47 / 5.0
Final score4.78 / 10
|
โ |
9.3%
6.71
CategoryDug Well Recharge
Started / Completed / Phys656 / 324 / 312
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score6.71 / 10
|
1.2%
6.47
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)49.4%
Part B score (max 5.0)2.47 / 5.0
Final score6.47 / 10
|
33.8%
7.14
CategoryWater conservation & recharge
Started / Completed / Phys163 / 40 / 85
Completion rate76.7%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked2.02Cr / 1.34Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score7.14 / 10
|
0.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.4%
6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys31 / 3 / 18
Completion rate67.7%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked0.77Cr / 0.43Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.16 / 10
|
| 98 | JOBAT โ | ALIRAJPUR | 6.01 |
11.3%
2.26
CategoryFarm Pond
Started / Completed / Phys141 / 0 / 2
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked1.82Cr / 0.80Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score2.26 / 10
|
3.0%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
7.0%
4.64
CategoryDug Well Recharge
Started / Completed / Phys442 / 2 / 187
Completion rate42.8%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.65Cr / 0.33Cr
Expenditure rate (ongoing)50.0%
Part B score (max 5.0)2.50 / 5.0
Final score4.64 / 10
|
โ |
72.6%
6.48
CategoryWater conservation & recharge
Started / Completed / Phys87 / 6 / 31
Completion rate42.5%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked9.10Cr / 7.93Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.35 / 5.0
Final score6.48 / 10
|
5.0%
6.77
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 17
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.77 / 10
|
1.1%
7.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score7.78 / 10
|
| 99 | AJAIGARH โ | PANNA | 6.00 |
41.2%
5.08
CategoryFarm Pond
Started / Completed / Phys376 / 59 / 142
Completion rate53.5%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.43Cr / 1.65Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score5.08 / 10
|
2.5%
3.96
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.37Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score3.96 / 10
|
5.4%
6.18
CategoryDug Well Recharge
Started / Completed / Phys396 / 89 / 167
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score6.18 / 10
|
โ |
41.7%
6.86
CategoryWater conservation & recharge
Started / Completed / Phys216 / 24 / 119
Completion rate66.2%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked2.68Cr / 1.90Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score6.86 / 10
|
3.7%
6.26
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 7
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score6.26 / 10
|
5.5%
7.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 9
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.34Cr / 0.25Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score7.01 / 10
|
| 100 | RAHATGARH โ | SAGAR | 6.00 |
22.0%
4.05
CategoryFarm Pond
Started / Completed / Phys237 / 153 / 0
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked1.40Cr / 0.23Cr
Expenditure rate (ongoing)16.5%
Part B score (max 5.0)0.83 / 5.0
Final score4.05 / 10
|
5.0%
2.40
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.43Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.40 / 5.0
Final score2.40 / 10
|
7.6%
7.74
CategoryDug Well Recharge
Started / Completed / Phys531 / 323 / 202
Completion rate98.9%
Part A score (max 5.0)4.94 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score7.74 / 10
|
1.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
48.6%
6.37
CategoryWater conservation & recharge
Started / Completed / Phys117 / 58 / 15
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked3.73Cr / 2.43Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score6.37 / 10
|
10.6%
6.43
CategoryWatershed Related Works
Started / Completed / Phys26 / 16 / 1
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked0.60Cr / 0.38Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score6.43 / 10
|
4.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 101 | BADNAGAR โ | UJJAIN | 6.00 |
59.1%
6.43
CategoryFarm Pond
Started / Completed / Phys168 / 27 / 125
Completion rate90.5%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.41Cr / 0.16Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.90 / 5.0
Final score6.43 / 10
|
16.9%
2.07
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.24Cr / 0.52Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score2.07 / 10
|
0.5%
10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 11 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.6%
7.19
CategoryWater conservation & recharge
Started / Completed / Phys19 / 6 / 11
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.14Cr / 0.08Cr
Expenditure rate (ongoing)54.3%
Part B score (max 5.0)2.71 / 5.0
Final score7.19 / 10
|
1.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 102 | AMLA โ | BETUL | 5.98 |
28.6%
5.40
CategoryFarm Pond
Started / Completed / Phys215 / 15 / 97
Completion rate52.1%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked2.57Cr / 1.44Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score5.40 / 10
|
โ |
6.5%
7.65
CategoryDug Well Recharge
Started / Completed / Phys437 / 57 / 286
Completion rate78.5%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score7.65 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
52.5%
5.85
CategoryWater conservation & recharge
Started / Completed / Phys128 / 5 / 45
Completion rate39.1%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked5.13Cr / 4.00Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score5.85 / 10
|
7.3%
7.04
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 14
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.32Cr / 0.22Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score7.04 / 10
|
5.0%
6.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 2 / 9
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.37Cr / 0.29Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.03 / 5.0
Final score6.93 / 10
|
| 103 | SAMNAPUR โ | DINDORI | 5.98 |
26.3%
5.32
CategoryFarm Pond
Started / Completed / Phys277 / 165 / 83
Completion rate89.5%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.52Cr / 0.09Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score5.32 / 10
|
โ |
2.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys187 / 128 / 59
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.3%
7.59
CategoryWater conservation & recharge
Started / Completed / Phys69 / 16 / 42
Completion rate84.1%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked1.00Cr / 0.67Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.39 / 5.0
Final score7.59 / 10
|
15.9%
6.67
CategoryWatershed Related Works
Started / Completed / Phys28 / 8 / 12
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked1.15Cr / 0.71Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score6.67 / 10
|
23.0%
3.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked4.08Cr / 0.17Cr
Expenditure rate (ongoing)4.2%
Part B score (max 5.0)0.21 / 5.0
Final score3.54 / 10
|
| 104 | GAROTH โ | MANDSAUR | 5.98 |
11.1%
3.87
CategoryFarm Pond
Started / Completed / Phys281 / 19 / 74
Completion rate33.1%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked3.00Cr / 1.33Cr
Expenditure rate (ongoing)44.3%
Part B score (max 5.0)2.21 / 5.0
Final score3.87 / 10
|
3.2%
3.53
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.21Cr / 0.65Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score3.53 / 10
|
5.6%
6.26
CategoryDug Well Recharge
Started / Completed / Phys964 / 71 / 441
Completion rate53.1%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked1.17Cr / 0.84Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score6.26 / 10
|
0.9%
4.80
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 1 / 3
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.32Cr / 0.19Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.98 / 5.0
Final score4.80 / 10
|
74.4%
6.38
CategoryWater conservation & recharge
Started / Completed / Phys372 / 10 / 162
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked15.62Cr / 12.70Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.07 / 5.0
Final score6.38 / 10
|
1.7%
6.45
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 8
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.17Cr / 0.10Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score6.45 / 10
|
3.1%
6.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 1 / 6
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked0.86Cr / 0.71Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score6.04 / 10
|
| 105 | PORSA โ | MORENA | 5.96 |
15.6%
4.96
CategoryFarm Pond
Started / Completed / Phys171 / 74 / 27
Completion rate59.1%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked2.34Cr / 0.94Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score4.96 / 10
|
โ |
0.4%
3.66
CategoryDug Well Recharge
Started / Completed / Phys64 / 21 / 5
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)32.5%
Part B score (max 5.0)1.63 / 5.0
Final score3.66 / 10
|
2.3%
4.29
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 0 / 3
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.80Cr / 0.47Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score4.29 / 10
|
79.2%
6.22
CategoryWater conservation & recharge
Started / Completed / Phys267 / 6 / 126
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked16.80Cr / 12.60Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score6.22 / 10
|
2.1%
5.13
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 8
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.62Cr / 0.37Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.13 / 10
|
0.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 106 | AMARPATAN โ | SATNA | 5.96 |
48.1%
2.71
CategoryFarm Pond
Started / Completed / Phys74 / 0 / 25
Completion rate33.8%
Part A score (max 5.0)1.69 / 5.0
Ongoing sanction / booked1.41Cr / 0.29Cr
Expenditure rate (ongoing)20.4%
Part B score (max 5.0)1.02 / 5.0
Final score2.71 / 10
|
โ |
5.9%
4.49
CategoryDug Well Recharge
Started / Completed / Phys99 / 11 / 69
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)9.0%
Part B score (max 5.0)0.45 / 5.0
Final score4.49 / 10
|
โ |
41.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys31 / 1 / 30
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.9%
5.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.52 / 5.0
Final score5.85 / 10
|
| 107 | MAWAI โ | MANDLA | 5.95 |
47.7%
6.31
CategoryFarm Pond
Started / Completed / Phys247 / 192 / 17
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked1.65Cr / 0.69Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score6.31 / 10
|
5.4%
0.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.06Cr
Expenditure rate (ongoing)4.9%
Part B score (max 5.0)0.24 / 5.0
Final score0.24 / 10
|
1.8%
6.42
CategoryDug Well Recharge
Started / Completed / Phys153 / 42 / 53
Completion rate62.1%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score6.42 / 10
|
2.3%
6.28
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 2
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.22Cr / 0.10Cr
Expenditure rate (ongoing)45.6%
Part B score (max 5.0)2.28 / 5.0
Final score6.28 / 10
|
36.3%
6.15
CategoryWater conservation & recharge
Started / Completed / Phys149 / 55 / 31
Completion rate57.7%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked2.99Cr / 1.95Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score6.15 / 10
|
1.8%
7.01
CategoryWatershed Related Works
Started / Completed / Phys7 / 5 / 0
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score7.01 / 10
|
4.9%
6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 3 / 7
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.47Cr / 0.35Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score6.56 / 10
|
| 108 | SIDHI โ | SIDHI | 5.95 |
43.2%
4.75
CategoryFarm Pond
Started / Completed / Phys485 / 239 / 73
Completion rate64.3%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked4.48Cr / 1.38Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score4.75 / 10
|
โ |
1.1%
5.22
CategoryDug Well Recharge
Started / Completed / Phys130 / 68 / 28
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.53 / 5.0
Final score5.22 / 10
|
0.8%
7.32
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.11Cr / 0.10Cr
Expenditure rate (ongoing)96.3%
Part B score (max 5.0)4.82 / 5.0
Final score7.32 / 10
|
41.5%
7.13
CategoryWater conservation & recharge
Started / Completed / Phys279 / 76 / 97
Completion rate62.0%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked6.15Cr / 4.95Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score7.13 / 10
|
9.1%
5.73
CategoryWatershed Related Works
Started / Completed / Phys57 / 20 / 11
Completion rate54.4%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked1.37Cr / 0.83Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score5.73 / 10
|
4.3%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 13 / 1
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.55Cr / 0.45Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.05 / 5.0
Final score6.96 / 10
|
| 109 | POHRI โ | SHIVPURI | 5.95 |
16.2%
4.74
CategoryFarm Pond
Started / Completed / Phys269 / 148 / 35
Completion rate68.0%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked1.75Cr / 0.47Cr
Expenditure rate (ongoing)26.8%
Part B score (max 5.0)1.34 / 5.0
Final score4.74 / 10
|
0.7%
0.13
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.01Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
|
2.0%
5.30
CategoryDug Well Recharge
Started / Completed / Phys262 / 169 / 43
Completion rate80.9%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.13Cr / 0.03Cr
Expenditure rate (ongoing)25.1%
Part B score (max 5.0)1.26 / 5.0
Final score5.30 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
66.7%
6.11
CategoryWater conservation & recharge
Started / Completed / Phys213 / 23 / 89
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked12.44Cr / 8.66Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.11 / 10
|
8.0%
6.40
CategoryWatershed Related Works
Started / Completed / Phys25 / 3 / 12
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.08Cr / 0.73Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score6.40 / 10
|
6.1%
7.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 2 / 13
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.93Cr / 0.79Cr
Expenditure rate (ongoing)84.9%
Part B score (max 5.0)4.24 / 5.0
Final score7.51 / 10
|
| 110 | SAUSAR โ | CHHINDWARA | 5.94 |
48.3%
6.27
CategoryFarm Pond
Started / Completed / Phys185 / 34 / 83
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.32Cr / 0.82Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score6.27 / 10
|
6.1%
0.48
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.04Cr
Expenditure rate (ongoing)9.6%
Part B score (max 5.0)0.48 / 5.0
Final score0.48 / 10
|
10.4%
7.69
CategoryDug Well Recharge
Started / Completed / Phys262 / 44 / 201
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score7.69 / 10
|
โ |
28.7%
5.85
CategoryWater conservation & recharge
Started / Completed / Phys52 / 1 / 22
Completion rate44.2%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked1.16Cr / 0.84Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score5.85 / 10
|
5.1%
6.51
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 3
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score6.51 / 10
|
1.3%
5.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score5.69 / 10
|
| 111 | BURHAR โ | SHAHDOL | 5.94 |
38.6%
3.95
CategoryFarm Pond
Started / Completed / Phys766 / 88 / 184
Completion rate35.5%
Part A score (max 5.0)1.78 / 5.0
Ongoing sanction / booked16.89Cr / 7.36Cr
Expenditure rate (ongoing)43.5%
Part B score (max 5.0)2.18 / 5.0
Final score3.95 / 10
|
0.7%
0.76
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.08Cr
Expenditure rate (ongoing)15.2%
Part B score (max 5.0)0.76 / 5.0
Final score0.76 / 10
|
0.7%
5.78
CategoryDug Well Recharge
Started / Completed / Phys181 / 23 / 73
Completion rate53.0%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.22Cr / 0.14Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score5.78 / 10
|
5.0%
8.40
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 1
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked1.10Cr / 1.07Cr
Expenditure rate (ongoing)96.7%
Part B score (max 5.0)4.83 / 5.0
Final score8.40 / 10
|
27.6%
5.79
CategoryWater conservation & recharge
Started / Completed / Phys343 / 27 / 108
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked11.34Cr / 8.67Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score5.79 / 10
|
26.0%
8.72
CategoryWatershed Related Works
Started / Completed / Phys185 / 11 / 170
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score8.72 / 10
|
1.4%
6.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 6 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.58Cr / 0.47Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.03 / 5.0
Final score6.03 / 10
|
| 112 | BIJEYPUR โ | SHEOPUR | 5.92 |
8.9%
6.04
CategoryFarm Pond
Started / Completed / Phys333 / 243 / 20
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked1.42Cr / 0.60Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score6.04 / 10
|
3.0%
0.49
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.97Cr / 0.19Cr
Expenditure rate (ongoing)9.7%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
|
0.2%
5.89
CategoryDug Well Recharge
Started / Completed / Phys39 / 35 / 0
Completion rate89.7%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score5.89 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
76.3%
6.19
CategoryWater conservation & recharge
Started / Completed / Phys398 / 8 / 172
Completion rate45.2%
Part A score (max 5.0)2.26 / 5.0
Ongoing sanction / booked26.78Cr / 21.03Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score6.19 / 10
|
8.7%
5.00
CategoryWatershed Related Works
Started / Completed / Phys48 / 0 / 11
Completion rate22.9%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked4.37Cr / 3.37Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score5.00 / 10
|
2.3%
6.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 9
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.44Cr / 0.28Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score6.39 / 10
|
| 113 | ATHNER โ | BETUL | 5.92 |
12.6%
7.83
CategoryFarm Pond
Started / Completed / Phys167 / 15 / 111
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked0.68Cr / 0.55Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.05 / 5.0
Final score7.83 / 10
|
4.3%
0.46
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.09Cr
Expenditure rate (ongoing)9.1%
Part B score (max 5.0)0.46 / 5.0
Final score0.46 / 10
|
4.1%
7.87
CategoryDug Well Recharge
Started / Completed / Phys355 / 46 / 278
Completion rate91.3%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score7.87 / 10
|
โ |
73.8%
5.83
CategoryWater conservation & recharge
Started / Completed / Phys225 / 7 / 96
Completion rate45.8%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked9.23Cr / 6.54Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score5.83 / 10
|
4.3%
5.67
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 2
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.36Cr / 0.22Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score5.67 / 10
|
1.0%
5.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 1 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.16Cr / 0.12Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score5.23 / 10
|
| 114 | KHANIYADHANA โ | SHIVPURI | 5.92 |
35.0%
5.24
CategoryFarm Pond
Started / Completed / Phys321 / 114 / 122
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked2.51Cr / 0.79Cr
Expenditure rate (ongoing)31.3%
Part B score (max 5.0)1.57 / 5.0
Final score5.24 / 10
|
1.6%
0.03
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
|
3.2%
6.04
CategoryDug Well Recharge
Started / Completed / Phys335 / 206 / 92
Completion rate89.0%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.59 / 5.0
Final score6.04 / 10
|
4.0%
5.81
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 4 / 5
Completion rate47.4%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked0.49Cr / 0.34Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score5.81 / 10
|
49.7%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys163 / 33 / 72
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked6.90Cr / 4.53Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score6.51 / 10
|
4.2%
6.67
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 9
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.67 / 10
|
2.3%
6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 4 / 5
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score6.16 / 10
|
| 115 | NAINPUR โ | MANDLA | 5.89 |
59.1%
5.45
CategoryFarm Pond
Started / Completed / Phys337 / 223 / 23
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked4.21Cr / 1.52Cr
Expenditure rate (ongoing)36.0%
Part B score (max 5.0)1.80 / 5.0
Final score5.45 / 10
|
4.3%
0.09
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.02Cr
Expenditure rate (ongoing)1.8%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
|
3.5%
5.28
CategoryDug Well Recharge
Started / Completed / Phys365 / 85 / 209
Completion rate80.5%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.18Cr / 0.05Cr
Expenditure rate (ongoing)25.1%
Part B score (max 5.0)1.26 / 5.0
Final score5.28 / 10
|
3.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.8%
7.26
CategoryWater conservation & recharge
Started / Completed / Phys74 / 33 / 13
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked4.20Cr / 3.48Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score7.26 / 10
|
1.2%
6.02
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score6.02 / 10
|
2.2%
6.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 4 / 1
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score6.59 / 10
|
| 116 | NIWARI โ | NIWARI | 5.89 |
19.4%
2.54
CategoryFarm Pond
Started / Completed / Phys204 / 15 / 18
Completion rate16.2%
Part A score (max 5.0)0.81 / 5.0
Ongoing sanction / booked2.40Cr / 0.83Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.74 / 5.0
Final score2.54 / 10
|
1.1%
0.19
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.01Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.19 / 5.0
Final score0.19 / 10
|
8.9%
4.52
CategoryDug Well Recharge
Started / Completed / Phys508 / 109 / 151
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked0.64Cr / 0.25Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score4.52 / 10
|
โ |
44.8%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys124 / 28 / 45
Completion rate58.9%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked2.69Cr / 1.93Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.53 / 10
|
3.4%
5.75
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score5.75 / 10
|
22.4%
8.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 7 / 32
Completion rate81.3%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.67Cr / 0.57Cr
Expenditure rate (ongoing)85.5%
Part B score (max 5.0)4.28 / 5.0
Final score8.34 / 10
|
| 117 | TIMARNI โ | HARDA | 5.88 |
42.1%
4.23
CategoryFarm Pond
Started / Completed / Phys139 / 17 / 68
Completion rate61.2%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.93Cr / 0.22Cr
Expenditure rate (ongoing)23.4%
Part B score (max 5.0)1.17 / 5.0
Final score4.23 / 10
|
1.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
13.9%
6.20
CategoryDug Well Recharge
Started / Completed / Phys289 / 103 / 169
Completion rate94.1%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score6.20 / 10
|
1.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
26.3%
7.64
CategoryWater conservation & recharge
Started / Completed / Phys56 / 1 / 54
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score7.64 / 10
|
4.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
10.3%
6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 7 / 11
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.06 / 5.0
Final score6.56 / 10
|
| 118 | BAJNA โ | RATLAM | 5.87 |
15.7%
4.31
CategoryFarm Pond
Started / Completed / Phys298 / 111 / 33
Completion rate48.3%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked1.61Cr / 0.61Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score4.31 / 10
|
7.6%
3.67
CategoryAmrit Sarowar
Started / Completed / Phys6 / 1 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.99Cr / 0.40Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score3.67 / 10
|
10.4%
5.80
CategoryDug Well Recharge
Started / Completed / Phys796 / 270 / 315
Completion rate73.5%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.54Cr / 0.23Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score5.80 / 10
|
โ |
65.0%
6.50
CategoryWater conservation & recharge
Started / Completed / Phys147 / 32 / 66
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked3.44Cr / 2.18Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.17 / 5.0
Final score6.50 / 10
|
1.1%
5.75
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score5.75 / 10
|
0.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 119 | PATAN โ | JABALPUR | 5.86 |
53.1%
2.54
CategoryFarm Pond
Started / Completed / Phys46 / 18 / 1
Completion rate41.3%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked0.48Cr / 0.05Cr
Expenditure rate (ongoing)9.5%
Part B score (max 5.0)0.48 / 5.0
Final score2.54 / 10
|
โ |
0.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
38.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys16 / 15 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.5%
5.04
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.04 / 10
|
4.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 120 | BHIKANGAON โ | KHARGONE | 5.86 |
43.9%
4.43
CategoryFarm Pond
Started / Completed / Phys179 / 39 / 60
Completion rate55.3%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked1.52Cr / 0.51Cr
Expenditure rate (ongoing)33.4%
Part B score (max 5.0)1.67 / 5.0
Final score4.43 / 10
|
7.5%
4.42
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.34Cr / 0.13Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score4.42 / 10
|
13.6%
7.20
CategoryDug Well Recharge
Started / Completed / Phys415 / 137 / 238
Completion rate90.4%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score7.20 / 10
|
โ |
35.0%
7.42
CategoryWater conservation & recharge
Started / Completed / Phys42 / 16 / 17
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.78Cr / 0.54Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score7.42 / 10
|
โ | โ |
| 121 | CHITRANGI โ | SINGRAULI | 5.85 |
33.1%
4.87
CategoryFarm Pond
Started / Completed / Phys907 / 511 / 69
Completion rate63.9%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked9.64Cr / 3.22Cr
Expenditure rate (ongoing)33.4%
Part B score (max 5.0)1.67 / 5.0
Final score4.87 / 10
|
3.1%
2.90
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.52Cr / 1.46Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score2.90 / 10
|
1.4%
5.42
CategoryDug Well Recharge
Started / Completed / Phys430 / 215 / 104
Completion rate74.2%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.29Cr / 0.10Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.71 / 5.0
Final score5.42 / 10
|
โ |
55.9%
6.49
CategoryWater conservation & recharge
Started / Completed / Phys563 / 56 / 336
Completion rate69.6%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked13.51Cr / 8.14Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score6.49 / 10
|
3.7%
6.76
CategoryWatershed Related Works
Started / Completed / Phys73 / 17 / 35
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked0.81Cr / 0.52Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score6.76 / 10
|
2.7%
7.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 2 / 14
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.63Cr / 0.43Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score7.02 / 10
|
| 122 | HOSHANGABAD โ | NARMADAPURAM | 5.85 |
36.5%
3.51
CategoryFarm Pond
Started / Completed / Phys49 / 24 / 1
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked0.30Cr / 0.06Cr
Expenditure rate (ongoing)19.1%
Part B score (max 5.0)0.96 / 5.0
Final score3.51 / 10
|
โ |
12.7%
6.04
CategoryDug Well Recharge
Started / Completed / Phys119 / 89 / 1
Completion rate75.6%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.26 / 5.0
Final score6.04 / 10
|
8.9%
7.67
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 21 / 0
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score7.67 / 10
|
28.8%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys29 / 25 / 0
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score6.53 / 10
|
1.4%
5.03
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)50.6%
Part B score (max 5.0)2.53 / 5.0
Final score5.03 / 10
|
11.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 123 | MANASA โ | NEEMUCH | 5.84 |
50.1%
4.56
CategoryFarm Pond
Started / Completed / Phys400 / 51 / 182
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked6.77Cr / 2.24Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score4.56 / 10
|
5.2%
6.06
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.66Cr / 0.42Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score6.06 / 10
|
6.8%
6.25
CategoryDug Well Recharge
Started / Completed / Phys759 / 474 / 238
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.12Cr / 0.04Cr
Expenditure rate (ongoing)31.1%
Part B score (max 5.0)1.56 / 5.0
Final score6.25 / 10
|
4.0%
7.22
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 4 / 12
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score7.22 / 10
|
32.4%
7.35
CategoryWater conservation & recharge
Started / Completed / Phys179 / 19 / 128
Completion rate82.1%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked2.46Cr / 1.59Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score7.35 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 124 | SHAHPUR โ | BETUL | 5.84 |
10.8%
5.10
CategoryFarm Pond
Started / Completed / Phys120 / 1 / 80
Completion rate67.5%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.85Cr / 0.29Cr
Expenditure rate (ongoing)34.5%
Part B score (max 5.0)1.72 / 5.0
Final score5.10 / 10
|
1.7%
2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.17Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
|
4.1%
6.48
CategoryDug Well Recharge
Started / Completed / Phys355 / 33 / 302
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.76 / 5.0
Final score6.48 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
76.1%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys225 / 17 / 109
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked8.63Cr / 5.65Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.07 / 10
|
0.7%
5.06
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score5.06 / 10
|
6.6%
4.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 2 / 11
Completion rate37.1%
Part A score (max 5.0)1.86 / 5.0
Ongoing sanction / booked0.91Cr / 0.57Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.12 / 5.0
Final score4.98 / 10
|
| 125 | KATNI โ | KATNI | 5.83 |
37.5%
3.86
CategoryFarm Pond
Started / Completed / Phys145 / 35 / 37
Completion rate49.7%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked2.63Cr / 0.72Cr
Expenditure rate (ongoing)27.6%
Part B score (max 5.0)1.38 / 5.0
Final score3.86 / 10
|
5.0%
1.89
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.64Cr / 0.24Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score1.89 / 10
|
3.6%
4.58
CategoryDug Well Recharge
Started / Completed / Phys174 / 35 / 109
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)8.9%
Part B score (max 5.0)0.44 / 5.0
Final score4.58 / 10
|
13.8%
7.34
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 1 / 17
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score7.34 / 10
|
11.3%
6.88
CategoryWater conservation & recharge
Started / Completed / Phys34 / 6 / 22
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.88 / 10
|
20.1%
8.28
CategoryWatershed Related Works
Started / Completed / Phys27 / 13 / 13
Completion rate96.3%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score8.28 / 10
|
8.7%
7.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 3 / 9
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.16Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score7.75 / 10
|
| 126 | NEWALI โ | BARWANI | 5.83 |
25.9%
5.04
CategoryFarm Pond
Started / Completed / Phys90 / 9 / 31
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.74Cr / 0.42Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score5.04 / 10
|
โ |
13.4%
8.12
CategoryDug Well Recharge
Started / Completed / Phys265 / 1 / 229
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score8.12 / 10
|
โ |
52.5%
5.65
CategoryWater conservation & recharge
Started / Completed / Phys79 / 16 / 23
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked1.17Cr / 0.75Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score5.65 / 10
|
7.8%
5.51
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score5.51 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 127 | GOGANWA โ | KHARGONE | 5.83 |
47.9%
4.95
CategoryFarm Pond
Started / Completed / Phys110 / 13 / 36
Completion rate44.5%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked1.09Cr / 0.59Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score4.95 / 10
|
7.8%
4.48
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.29Cr
Expenditure rate (ongoing)89.6%
Part B score (max 5.0)4.48 / 5.0
Final score4.48 / 10
|
16.3%
7.46
CategoryDug Well Recharge
Started / Completed / Phys260 / 59 / 190
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score7.46 / 10
|
โ |
26.2%
6.54
CategoryWater conservation & recharge
Started / Completed / Phys21 / 4 / 6
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked0.64Cr / 0.53Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.16 / 5.0
Final score6.54 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 128 | MEHGAON โ | BHIND | 5.82 |
13.9%
2.32
CategoryFarm Pond
Started / Completed / Phys298 / 57 / 31
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.89Cr / 0.49Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.84 / 5.0
Final score2.32 / 10
|
3.2%
1.08
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.21Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.08 / 5.0
Final score1.08 / 10
|
0.3%
4.70
CategoryDug Well Recharge
Started / Completed / Phys28 / 2 / 10
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score4.70 / 10
|
12.2%
5.23
CategoryIrrigation infrastructure
Started / Completed / Phys78 / 6 / 25
Completion rate39.7%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked1.96Cr / 1.27Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score5.23 / 10
|
56.9%
6.85
CategoryWater conservation & recharge
Started / Completed / Phys183 / 10 / 127
Completion rate74.9%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked4.56Cr / 2.84Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.85 / 10
|
9.7%
7.31
CategoryWatershed Related Works
Started / Completed / Phys24 / 1 / 16
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.80Cr / 0.60Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score7.31 / 10
|
3.8%
5.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.46Cr / 0.28Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.53 / 10
|
| 129 | KUSMI โ | SIDHI | 5.82 |
33.5%
5.06
CategoryFarm Pond
Started / Completed / Phys375 / 223 / 14
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked3.15Cr / 1.19Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.90 / 5.0
Final score5.06 / 10
|
โ |
0.9%
5.53
CategoryDug Well Recharge
Started / Completed / Phys88 / 56 / 8
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.89 / 5.0
Final score5.53 / 10
|
6.7%
3.86
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.59Cr / 1.07Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.86 / 10
|
53.5%
6.46
CategoryWater conservation & recharge
Started / Completed / Phys186 / 87 / 16
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked7.97Cr / 5.89Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score6.46 / 10
|
1.1%
7.04
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.22Cr / 0.20Cr
Expenditure rate (ongoing)90.9%
Part B score (max 5.0)4.54 / 5.0
Final score7.04 / 10
|
4.2%
6.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 11 / 1
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.65Cr / 0.48Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score6.65 / 10
|
| 130 | KHURAI โ | SAGAR | 5.81 |
44.5%
3.58
CategoryFarm Pond
Started / Completed / Phys253 / 96 / 19
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked2.49Cr / 0.65Cr
Expenditure rate (ongoing)26.1%
Part B score (max 5.0)1.31 / 5.0
Final score3.58 / 10
|
โ |
8.9%
6.99
CategoryDug Well Recharge
Started / Completed / Phys339 / 206 / 109
Completion rate92.9%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.35 / 5.0
Final score6.99 / 10
|
โ |
44.5%
7.61
CategoryWater conservation & recharge
Started / Completed / Phys115 / 60 / 30
Completion rate78.3%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.84Cr / 0.62Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score7.61 / 10
|
0.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 131 | OBEDULLAHGANJ โ | RAISEN | 5.81 |
49.1%
5.85
CategoryFarm Pond
Started / Completed / Phys208 / 41 / 102
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked1.37Cr / 0.66Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score5.85 / 10
|
1.6%
2.87
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score2.87 / 10
|
4.1%
7.38
CategoryDug Well Recharge
Started / Completed / Phys149 / 73 / 63
Completion rate91.3%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.82 / 5.0
Final score7.38 / 10
|
1.0%
1.71
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score1.71 / 10
|
26.6%
5.58
CategoryWater conservation & recharge
Started / Completed / Phys23 / 1 / 8
Completion rate39.1%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked2.42Cr / 1.75Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score5.58 / 10
|
16.6%
6.22
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.50Cr / 1.37Cr
Expenditure rate (ongoing)91.0%
Part B score (max 5.0)4.55 / 5.0
Final score6.22 / 10
|
1.0%
5.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.25 / 10
|
| 132 | BAGH โ | DHAR | 5.81 |
6.1%
3.92
CategoryFarm Pond
Started / Completed / Phys243 / 11 / 49
Completion rate24.7%
Part A score (max 5.0)1.23 / 5.0
Ongoing sanction / booked2.88Cr / 1.55Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score3.92 / 10
|
โ |
1.5%
3.68
CategoryDug Well Recharge
Started / Completed / Phys365 / 23 / 39
Completion rate17.0%
Part A score (max 5.0)0.85 / 5.0
Ongoing sanction / booked0.78Cr / 0.44Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.83 / 5.0
Final score3.68 / 10
|
โ |
89.5%
6.00
CategoryWater conservation & recharge
Started / Completed / Phys232 / 8 / 64
Completion rate31.0%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked48.33Cr / 43.03Cr
Expenditure rate (ongoing)89.0%
Part B score (max 5.0)4.45 / 5.0
Final score6.00 / 10
|
2.2%
4.92
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked1.37Cr / 1.24Cr
Expenditure rate (ongoing)90.1%
Part B score (max 5.0)4.50 / 5.0
Final score4.92 / 10
|
0.6%
4.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.35Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score4.44 / 10
|
| 133 | BIAORA โ | RAJGARH | 5.81 |
40.5%
5.29
CategoryFarm Pond
Started / Completed / Phys460 / 281 / 45
Completion rate70.9%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked3.11Cr / 1.08Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score5.29 / 10
|
1.5%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
7.10
CategoryDug Well Recharge
Started / Completed / Phys613 / 496 / 109
Completion rate98.7%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score7.10 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
5.80
CategoryWater conservation & recharge
Started / Completed / Phys158 / 25 / 58
Completion rate52.5%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked3.43Cr / 2.17Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score5.80 / 10
|
โ |
16.1%
6.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 0 / 35
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked1.35Cr / 0.71Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.65 / 5.0
Final score6.15 / 10
|
| 134 | GHORA DONGRI โ | BETUL | 5.80 |
20.8%
5.05
CategoryFarm Pond
Started / Completed / Phys221 / 28 / 91
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked4.31Cr / 2.03Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.35 / 5.0
Final score5.05 / 10
|
2.6%
3.57
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.81Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score3.57 / 10
|
2.7%
8.07
CategoryDug Well Recharge
Started / Completed / Phys458 / 165 / 246
Completion rate89.7%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.12Cr / 0.09Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score8.07 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
72.6%
6.00
CategoryWater conservation & recharge
Started / Completed / Phys348 / 5 / 174
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked15.34Cr / 10.53Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score6.00 / 10
|
0.1%
4.10
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)82.0%
Part B score (max 5.0)4.10 / 5.0
Final score4.10 / 10
|
1.1%
6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 6
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.27Cr / 0.21Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score6.16 / 10
|
| 135 | KUKSHI โ | DHAR | 5.80 |
6.0%
3.09
CategoryFarm Pond
Started / Completed / Phys130 / 10 / 15
Completion rate19.2%
Part A score (max 5.0)0.96 / 5.0
Ongoing sanction / booked1.55Cr / 0.66Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score3.09 / 10
|
โ |
1.5%
4.06
CategoryDug Well Recharge
Started / Completed / Phys184 / 63 / 11
Completion rate40.2%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked0.28Cr / 0.12Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.05 / 5.0
Final score4.06 / 10
|
0.2%
1.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
|
87.1%
6.00
CategoryWater conservation & recharge
Started / Completed / Phys260 / 17 / 93
Completion rate42.3%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked16.94Cr / 13.16Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.88 / 5.0
Final score6.00 / 10
|
3.0%
5.88
CategoryWatershed Related Works
Started / Completed / Phys36 / 3 / 14
Completion rate47.2%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked0.44Cr / 0.31Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.52 / 5.0
Final score5.88 / 10
|
2.2%
6.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.20Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score6.43 / 10
|
| 136 | GHATIYA โ | UJJAIN | 5.78 |
41.3%
6.10
CategoryFarm Pond
Started / Completed / Phys68 / 29 / 36
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score6.10 / 10
|
18.7%
1.75
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.48Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.08 / 5.0
Final score1.75 / 10
|
21.4%
5.02
CategoryDug Well Recharge
Started / Completed / Phys303 / 77 / 225
Completion rate99.7%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.7%
Part B score (max 5.0)0.04 / 5.0
Final score5.02 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys19 / 4 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 137 | UMARBAN โ | DHAR | 5.77 |
10.7%
5.82
CategoryFarm Pond
Started / Completed / Phys395 / 214 / 67
Completion rate71.1%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked0.70Cr / 0.32Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.82 / 10
|
โ |
5.6%
5.25
CategoryDug Well Recharge
Started / Completed / Phys474 / 313 / 40
Completion rate74.5%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.31Cr / 0.10Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.53 / 5.0
Final score5.25 / 10
|
0.5%
2.48
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score2.48 / 10
|
53.8%
6.28
CategoryWater conservation & recharge
Started / Completed / Phys124 / 22 / 34
Completion rate45.2%
Part A score (max 5.0)2.26 / 5.0
Ongoing sanction / booked6.16Cr / 4.96Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.02 / 5.0
Final score6.28 / 10
|
24.6%
4.86
CategoryWatershed Related Works
Started / Completed / Phys80 / 4 / 16
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked4.07Cr / 2.94Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score4.86 / 10
|
4.8%
5.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 5
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.70Cr / 0.52Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score5.46 / 10
|
| 138 | JAMAI โ | CHHINDWARA | 5.76 |
24.4%
6.95
CategoryFarm Pond
Started / Completed / Phys472 / 275 / 108
Completion rate81.1%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked2.04Cr / 1.18Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score6.95 / 10
|
3.5%
0.94
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.29Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score0.94 / 10
|
2.8%
8.09
CategoryDug Well Recharge
Started / Completed / Phys466 / 210 / 235
Completion rate95.5%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score8.09 / 10
|
0.1%
3.90
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score3.90 / 10
|
62.5%
5.48
CategoryWater conservation & recharge
Started / Completed / Phys292 / 30 / 49
Completion rate27.1%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked22.79Cr / 18.82Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score5.48 / 10
|
4.9%
5.33
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 2
Completion rate28.0%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked1.62Cr / 1.28Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score5.33 / 10
|
1.9%
6.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 2
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.48Cr / 0.37Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score6.57 / 10
|
| 139 | KHAKNAR โ | BURHANPUR | 5.75 |
48.9%
5.37
CategoryFarm Pond
Started / Completed / Phys429 / 103 / 151
Completion rate59.2%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked3.69Cr / 1.77Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score5.37 / 10
|
3.6%
5.50
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score5.50 / 10
|
10.9%
6.93
CategoryDug Well Recharge
Started / Completed / Phys739 / 227 / 340
Completion rate76.7%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.44Cr / 0.27Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score6.93 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.3%
5.90
CategoryWater conservation & recharge
Started / Completed / Phys154 / 18 / 76
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked1.66Cr / 0.95Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score5.90 / 10
|
5.0%
6.20
CategoryWatershed Related Works
Started / Completed / Phys25 / 6 / 10
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score6.20 / 10
|
1.4%
5.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score5.67 / 10
|
| 140 | MORAR โ | GWALIOR | 5.75 |
44.5%
3.88
CategoryFarm Pond
Started / Completed / Phys236 / 32 / 113
Completion rate61.4%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked1.80Cr / 0.29Cr
Expenditure rate (ongoing)16.1%
Part B score (max 5.0)0.81 / 5.0
Final score3.88 / 10
|
1.7%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.5%
5.47
CategoryDug Well Recharge
Started / Completed / Phys238 / 38 / 157
Completion rate81.9%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.11Cr / 0.03Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.37 / 5.0
Final score5.47 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
40.2%
6.82
CategoryWater conservation & recharge
Started / Completed / Phys47 / 13 / 26
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked2.12Cr / 1.13Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score6.82 / 10
|
5.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 141 | KESLA โ | NARMADAPURAM | 5.74 |
28.4%
2.62
CategoryFarm Pond
Started / Completed / Phys109 / 3 / 38
Completion rate37.6%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked2.66Cr / 0.39Cr
Expenditure rate (ongoing)14.9%
Part B score (max 5.0)0.74 / 5.0
Final score2.62 / 10
|
7.8%
1.29
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.31Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score1.29 / 10
|
2.5%
6.25
CategoryDug Well Recharge
Started / Completed / Phys146 / 19 / 117
Completion rate93.2%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)31.8%
Part B score (max 5.0)1.59 / 5.0
Final score6.25 / 10
|
โ |
59.7%
7.66
CategoryWater conservation & recharge
Started / Completed / Phys121 / 35 / 69
Completion rate86.0%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked2.15Cr / 1.45Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score7.66 / 10
|
0.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 5 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 142 | GANGEV โ | REWA | 5.74 |
57.6%
4.74
CategoryFarm Pond
Started / Completed / Phys227 / 136 / 24
Completion rate70.5%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked0.90Cr / 0.22Cr
Expenditure rate (ongoing)24.3%
Part B score (max 5.0)1.21 / 5.0
Final score4.74 / 10
|
4.8%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys58 / 57 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
7.14
CategoryWater conservation & recharge
Started / Completed / Phys36 / 22 / 10
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score7.14 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 143 | SAILANA โ | RATLAM | 5.74 |
24.0%
3.93
CategoryFarm Pond
Started / Completed / Phys210 / 91 / 16
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked1.55Cr / 0.43Cr
Expenditure rate (ongoing)27.6%
Part B score (max 5.0)1.38 / 5.0
Final score3.93 / 10
|
10.1%
1.73
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.43Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score1.73 / 10
|
7.4%
6.37
CategoryDug Well Recharge
Started / Completed / Phys345 / 70 / 219
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.15Cr / 0.06Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score6.37 / 10
|
โ |
53.4%
6.85
CategoryWater conservation & recharge
Started / Completed / Phys73 / 26 / 20
Completion rate63.0%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked3.24Cr / 2.40Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score6.85 / 10
|
0.2%
2.24
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score2.24 / 10
|
4.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 7 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 144 | DHAR โ | DHAR | 5.73 |
60.3%
4.72
CategoryFarm Pond
Started / Completed / Phys138 / 2 / 75
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked2.05Cr / 0.79Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.93 / 5.0
Final score4.72 / 10
|
โ |
0.7%
5.73
CategoryDug Well Recharge
Started / Completed / Phys18 / 1 / 11
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score5.73 / 10
|
2.6%
5.81
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score5.81 / 10
|
23.8%
7.54
CategoryWater conservation & recharge
Started / Completed / Phys43 / 10 / 29
Completion rate90.7%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score7.54 / 10
|
12.0%
7.23
CategoryWatershed Related Works
Started / Completed / Phys25 / 3 / 17
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score7.23 / 10
|
0.6%
4.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score4.11 / 10
|
| 145 | KHACHAROD โ | UJJAIN | 5.72 |
35.7%
5.03
CategoryFarm Pond
Started / Completed / Phys103 / 54 / 47
Completion rate98.1%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.06Cr / 0.00Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score5.03 / 10
|
16.6%
2.42
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.43Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score2.42 / 10
|
25.0%
4.99
CategoryDug Well Recharge
Started / Completed / Phys511 / 438 / 72
Completion rate99.8%
Part A score (max 5.0)4.99 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.99 / 10
|
โ |
17.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys17 / 8 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 146 | BERASIA โ | BHOPAL | 5.70 |
42.7%
4.51
CategoryFarm Pond
Started / Completed / Phys788 / 160 / 262
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked8.12Cr / 2.98Cr
Expenditure rate (ongoing)36.7%
Part B score (max 5.0)1.84 / 5.0
Final score4.51 / 10
|
3.0%
5.30
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.64Cr / 0.36Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score5.30 / 10
|
3.6%
5.97
CategoryDug Well Recharge
Started / Completed / Phys564 / 307 / 134
Completion rate78.2%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.31Cr / 0.13Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.06 / 5.0
Final score5.97 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.7%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys402 / 84 / 191
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked5.03Cr / 3.29Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.69 / 10
|
1.9%
5.79
CategoryWatershed Related Works
Started / Completed / Phys18 / 2 / 10
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.35Cr / 0.17Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score5.79 / 10
|
5.9%
7.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 2 / 19
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score7.00 / 10
|
| 147 | SHAHNAGAR โ | PANNA | 5.70 |
30.5%
4.64
CategoryFarm Pond
Started / Completed / Phys524 / 70 / 185
Completion rate48.7%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked5.30Cr / 2.34Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.20 / 5.0
Final score4.64 / 10
|
4.0%
0.71
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.36Cr / 0.19Cr
Expenditure rate (ongoing)14.2%
Part B score (max 5.0)0.71 / 5.0
Final score0.71 / 10
|
3.4%
4.56
CategoryDug Well Recharge
Started / Completed / Phys445 / 45 / 190
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked0.54Cr / 0.21Cr
Expenditure rate (ongoing)38.5%
Part B score (max 5.0)1.92 / 5.0
Final score4.56 / 10
|
0.3%
3.80
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
|
38.6%
6.41
CategoryWater conservation & recharge
Started / Completed / Phys307 / 17 / 144
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked6.67Cr / 5.05Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.41 / 10
|
7.1%
6.31
CategoryWatershed Related Works
Started / Completed / Phys48 / 7 / 21
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked1.24Cr / 0.84Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.39 / 5.0
Final score6.31 / 10
|
16.2%
7.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 3 / 38
Completion rate62.1%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked2.07Cr / 1.71Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.14 / 5.0
Final score7.25 / 10
|
| 148 | DEORI โ | SAGAR | 5.70 |
45.0%
3.80
CategoryFarm Pond
Started / Completed / Phys322 / 66 / 77
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked3.98Cr / 1.25Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.58 / 5.0
Final score3.80 / 10
|
โ |
6.8%
6.37
CategoryDug Well Recharge
Started / Completed / Phys422 / 176 / 136
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.28Cr / 0.15Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.37 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.2%
7.25
CategoryWater conservation & recharge
Started / Completed / Phys181 / 90 / 68
Completion rate87.3%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.80Cr / 0.46Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score7.25 / 10
|
6.6%
7.50
CategoryWatershed Related Works
Started / Completed / Phys15 / 9 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.18Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.50 / 5.0
Final score7.50 / 10
|
1.1%
8.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)87.4%
Part B score (max 5.0)4.37 / 5.0
Final score8.12 / 10
|
| 149 | BADOD โ | AGAR-MALWA | 5.68 |
26.6%
3.20
CategoryFarm Pond
Started / Completed / Phys208 / 22 / 19
Completion rate19.7%
Part A score (max 5.0)0.99 / 5.0
Ongoing sanction / booked3.73Cr / 1.65Cr
Expenditure rate (ongoing)44.3%
Part B score (max 5.0)2.22 / 5.0
Final score3.20 / 10
|
3.1%
4.41
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.31Cr / 0.17Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.74 / 5.0
Final score4.41 / 10
|
7.0%
5.57
CategoryDug Well Recharge
Started / Completed / Phys463 / 286 / 89
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.23Cr / 0.07Cr
Expenditure rate (ongoing)30.4%
Part B score (max 5.0)1.52 / 5.0
Final score5.57 / 10
|
1.1%
5.28
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 2
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score5.28 / 10
|
38.3%
6.72
CategoryWater conservation & recharge
Started / Completed / Phys156 / 9 / 96
Completion rate67.3%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked2.26Cr / 1.52Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score6.72 / 10
|
3.0%
5.96
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 8
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score5.96 / 10
|
20.9%
7.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 4 / 56
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked1.23Cr / 0.92Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.75 / 5.0
Final score7.12 / 10
|
| 150 | SANCHI โ | RAISEN | 5.66 |
61.4%
6.27
CategoryFarm Pond
Started / Completed / Phys306 / 238 / 51
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.38Cr / 0.12Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score6.27 / 10
|
0.6%
1.31
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
|
3.9%
7.99
CategoryDug Well Recharge
Started / Completed / Phys160 / 153 / 6
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score7.99 / 10
|
4.2%
4.08
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.44Cr / 0.36Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score4.08 / 10
|
28.4%
4.49
CategoryWater conservation & recharge
Started / Completed / Phys18 / 2 / 0
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked3.00Cr / 2.36Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score4.49 / 10
|
0.4%
1.90
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
|
1.2%
3.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score3.60 / 10
|
| 151 | KHILCHIPUR โ | RAJGARH | 5.66 |
12.1%
5.28
CategoryFarm Pond
Started / Completed / Phys450 / 221 / 97
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked2.27Cr / 0.79Cr
Expenditure rate (ongoing)35.0%
Part B score (max 5.0)1.75 / 5.0
Final score5.28 / 10
|
โ |
2.5%
7.53
CategoryDug Well Recharge
Started / Completed / Phys609 / 398 / 161
Completion rate91.8%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score7.53 / 10
|
2.9%
4.08
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 0 / 4
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked1.67Cr / 1.15Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score4.08 / 10
|
66.6%
5.74
CategoryWater conservation & recharge
Started / Completed / Phys300 / 16 / 84
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked32.73Cr / 26.68Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.08 / 5.0
Final score5.74 / 10
|
3.7%
6.58
CategoryWatershed Related Works
Started / Completed / Phys47 / 6 / 21
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked1.06Cr / 0.79Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score6.58 / 10
|
12.2%
5.32
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 1 / 22
Completion rate25.8%
Part A score (max 5.0)1.29 / 5.0
Ongoing sanction / booked5.87Cr / 4.74Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score5.32 / 10
|
| 152 | SAGAR โ | SAGAR | 5.66 |
22.3%
4.16
CategoryFarm Pond
Started / Completed / Phys205 / 49 / 35
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked2.36Cr / 1.00Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.16 / 10
|
โ |
7.8%
7.45
CategoryDug Well Recharge
Started / Completed / Phys542 / 156 / 327
Completion rate89.1%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score7.45 / 10
|
0.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
61.3%
6.00
CategoryWater conservation & recharge
Started / Completed / Phys234 / 42 / 94
Completion rate58.1%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked4.13Cr / 2.55Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score6.00 / 10
|
2.6%
5.07
CategoryWatershed Related Works
Started / Completed / Phys8 / 2 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.11Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score5.07 / 10
|
5.6%
5.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 4 / 6
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.49Cr / 0.28Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
|
| 153 | GHATIGAON โ | GWALIOR | 5.64 |
31.9%
4.46
CategoryFarm Pond
Started / Completed / Phys176 / 20 / 74
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.49Cr / 1.25Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score4.46 / 10
|
5.3%
1.49
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.17Cr / 0.35Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score1.49 / 10
|
1.8%
5.65
CategoryDug Well Recharge
Started / Completed / Phys149 / 84 / 46
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.29 / 5.0
Final score5.65 / 10
|
6.1%
7.06
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 2 / 4
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.76Cr / 0.66Cr
Expenditure rate (ongoing)86.7%
Part B score (max 5.0)4.34 / 5.0
Final score7.06 / 10
|
44.7%
6.72
CategoryWater conservation & recharge
Started / Completed / Phys101 / 7 / 49
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked6.37Cr / 5.03Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score6.72 / 10
|
8.3%
6.23
CategoryWatershed Related Works
Started / Completed / Phys31 / 5 / 14
Completion rate61.3%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.92Cr / 0.58Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score6.23 / 10
|
1.9%
4.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score4.77 / 10
|
| 154 | SIRONJ โ | VIDISHA | 5.64 |
41.7%
5.95
CategoryFarm Pond
Started / Completed / Phys351 / 178 / 68
Completion rate70.1%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked2.24Cr / 1.09Cr
Expenditure rate (ongoing)48.9%
Part B score (max 5.0)2.44 / 5.0
Final score5.95 / 10
|
4.6%
2.88
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.84Cr / 0.48Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score2.88 / 10
|
3.4%
7.08
CategoryDug Well Recharge
Started / Completed / Phys235 / 99 / 103
Completion rate86.0%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score7.08 / 10
|
โ |
47.0%
5.30
CategoryWater conservation & recharge
Started / Completed / Phys214 / 54 / 32
Completion rate40.2%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked5.54Cr / 3.65Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score5.30 / 10
|
1.8%
8.36
CategoryWatershed Related Works
Started / Completed / Phys21 / 16 / 2
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.07 / 5.0
Final score8.36 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 155 | ALOT โ | RATLAM | 5.63 |
46.6%
4.13
CategoryFarm Pond
Started / Completed / Phys311 / 95 / 51
Completion rate46.9%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked3.37Cr / 1.21Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.79 / 5.0
Final score4.13 / 10
|
โ |
22.0%
5.94
CategoryDug Well Recharge
Started / Completed / Phys1,068 / 414 / 292
Completion rate66.1%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked0.94Cr / 0.49Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score5.94 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.3%
7.53
CategoryWater conservation & recharge
Started / Completed / Phys105 / 60 / 23
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked1.61Cr / 1.15Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score7.53 / 10
|
0.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 156 | BATIYAGARH โ | DAMOH | 5.63 |
14.3%
6.31
CategoryFarm Pond
Started / Completed / Phys208 / 73 / 73
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.50Cr / 0.84Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score6.31 / 10
|
โ |
2.5%
7.16
CategoryDug Well Recharge
Started / Completed / Phys336 / 197 / 87
Completion rate84.5%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score7.16 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
77.4%
5.32
CategoryWater conservation & recharge
Started / Completed / Phys125 / 17 / 32
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked21.84Cr / 14.66Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.36 / 5.0
Final score5.32 / 10
|
3.3%
8.22
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.41Cr / 0.39Cr
Expenditure rate (ongoing)95.2%
Part B score (max 5.0)4.76 / 5.0
Final score8.22 / 10
|
2.3%
5.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.24Cr / 0.17Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score5.92 / 10
|
| 157 | BETUL โ | BETUL | 5.61 |
29.8%
5.37
CategoryFarm Pond
Started / Completed / Phys145 / 0 / 80
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked1.76Cr / 0.92Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.61 / 5.0
Final score5.37 / 10
|
6.5%
3.34
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.77Cr / 0.52Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
|
7.6%
7.29
CategoryDug Well Recharge
Started / Completed / Phys348 / 5 / 317
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score7.29 / 10
|
0.2%
4.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score4.22 / 10
|
36.3%
5.79
CategoryWater conservation & recharge
Started / Completed / Phys87 / 2 / 42
Completion rate50.6%
Part A score (max 5.0)2.53 / 5.0
Ongoing sanction / booked2.21Cr / 1.44Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.26 / 5.0
Final score5.79 / 10
|
11.7%
5.23
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 6
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.91Cr / 0.55Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.23 / 10
|
7.9%
6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.56 / 10
|
| 158 | ISAGARH โ | ASHOK NAGAR | 5.60 |
37.8%
4.78
CategoryFarm Pond
Started / Completed / Phys282 / 38 / 101
Completion rate49.3%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked4.40Cr / 2.04Cr
Expenditure rate (ongoing)46.3%
Part B score (max 5.0)2.32 / 5.0
Final score4.78 / 10
|
3.7%
1.10
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.19Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
|
1.1%
5.66
CategoryDug Well Recharge
Started / Completed / Phys102 / 82 / 6
Completion rate86.3%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)26.9%
Part B score (max 5.0)1.35 / 5.0
Final score5.66 / 10
|
โ |
54.7%
6.49
CategoryWater conservation & recharge
Started / Completed / Phys205 / 64 / 50
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked5.03Cr / 3.74Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score6.49 / 10
|
1.3%
6.47
CategoryWatershed Related Works
Started / Completed / Phys9 / 7 / 0
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.58 / 5.0
Final score6.47 / 10
|
1.3%
4.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score4.15 / 10
|
| 159 | MORENA โ | MORENA | 5.59 |
5.3%
5.01
CategoryFarm Pond
Started / Completed / Phys199 / 86 / 15
Completion rate50.8%
Part A score (max 5.0)2.54 / 5.0
Ongoing sanction / booked1.63Cr / 0.81Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score5.01 / 10
|
1.1%
2.66
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.37Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score2.66 / 10
|
0.6%
3.05
CategoryDug Well Recharge
Started / Completed / Phys152 / 48 / 2
Completion rate32.9%
Part A score (max 5.0)1.64 / 5.0
Ongoing sanction / booked0.26Cr / 0.07Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score3.05 / 10
|
1.3%
4.89
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.74Cr / 0.60Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.06 / 5.0
Final score4.89 / 10
|
87.4%
5.70
CategoryWater conservation & recharge
Started / Completed / Phys405 / 7 / 131
Completion rate34.1%
Part A score (max 5.0)1.70 / 5.0
Ongoing sanction / booked37.82Cr / 30.20Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score5.70 / 10
|
4.2%
5.48
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 7
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked1.80Cr / 1.32Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score5.48 / 10
|
0.2%
3.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
|
| 160 | BADARWAS โ | SHIVPURI | 5.58 |
39.3%
4.70
CategoryFarm Pond
Started / Completed / Phys237 / 73 / 82
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked3.03Cr / 0.86Cr
Expenditure rate (ongoing)28.5%
Part B score (max 5.0)1.43 / 5.0
Final score4.70 / 10
|
โ |
2.1%
5.29
CategoryDug Well Recharge
Started / Completed / Phys181 / 53 / 96
Completion rate82.3%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.08Cr / 0.02Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score5.29 / 10
|
0.8%
3.36
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.12Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
|
44.3%
6.35
CategoryWater conservation & recharge
Started / Completed / Phys132 / 4 / 71
Completion rate56.8%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked4.51Cr / 3.16Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score6.35 / 10
|
7.9%
6.10
CategoryWatershed Related Works
Started / Completed / Phys35 / 6 / 11
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.96Cr / 0.71Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score6.10 / 10
|
5.6%
5.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 5 / 7
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.35Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score5.41 / 10
|
| 161 | DEWAS โ | DEWAS | 5.57 |
43.0%
4.77
CategoryFarm Pond
Started / Completed / Phys125 / 29 / 46
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.39Cr / 0.49Cr
Expenditure rate (ongoing)35.5%
Part B score (max 5.0)1.77 / 5.0
Final score4.77 / 10
|
2.3%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.1%
5.84
CategoryDug Well Recharge
Started / Completed / Phys280 / 6 / 181
Completion rate66.8%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked0.22Cr / 0.11Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.50 / 5.0
Final score5.84 / 10
|
3.3%
7.21
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 3 / 4
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score7.21 / 10
|
33.3%
5.96
CategoryWater conservation & recharge
Started / Completed / Phys104 / 7 / 50
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked1.21Cr / 0.78Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score5.96 / 10
|
6.8%
5.85
CategoryWatershed Related Works
Started / Completed / Phys22 / 3 / 9
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.26Cr / 0.16Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score5.85 / 10
|
3.3%
6.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score6.22 / 10
|
| 162 | PATERA โ | DAMOH | 5.57 |
17.5%
5.65
CategoryFarm Pond
Started / Completed / Phys291 / 59 / 76
Completion rate46.4%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked3.61Cr / 2.40Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score5.65 / 10
|
โ |
1.7%
6.46
CategoryDug Well Recharge
Started / Completed / Phys247 / 79 / 85
Completion rate66.4%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked0.21Cr / 0.14Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.46 / 10
|
0.6%
8.32
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)91.3%
Part B score (max 5.0)4.57 / 5.0
Final score8.32 / 10
|
54.3%
5.12
CategoryWater conservation & recharge
Started / Completed / Phys214 / 8 / 41
Completion rate22.9%
Part A score (max 5.0)1.14 / 5.0
Ongoing sanction / booked17.96Cr / 14.27Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score5.12 / 10
|
19.0%
6.53
CategoryWatershed Related Works
Started / Completed / Phys102 / 16 / 39
Completion rate53.9%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked3.47Cr / 2.66Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score6.53 / 10
|
6.9%
5.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 4 / 7
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.84Cr / 1.53Cr
Expenditure rate (ongoing)83.5%
Part B score (max 5.0)4.17 / 5.0
Final score5.84 / 10
|
| 163 | KURAI โ | SEONI | 5.54 |
42.0%
4.48
CategoryFarm Pond
Started / Completed / Phys260 / 33 / 127
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked3.77Cr / 1.06Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.40 / 5.0
Final score4.48 / 10
|
4.9%
1.22
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.29Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score1.22 / 10
|
2.5%
6.19
CategoryDug Well Recharge
Started / Completed / Phys240 / 23 / 157
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.16Cr / 0.08Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score6.19 / 10
|
โ |
37.9%
7.18
CategoryWater conservation & recharge
Started / Completed / Phys152 / 17 / 94
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked3.13Cr / 2.21Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.18 / 10
|
9.8%
5.55
CategoryWatershed Related Works
Started / Completed / Phys47 / 4 / 19
Completion rate48.9%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked1.26Cr / 0.79Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.11 / 5.0
Final score5.55 / 10
|
2.9%
5.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 2 / 5
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.33Cr / 0.20Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score5.92 / 10
|
| 164 | MALTHONE โ | SAGAR | 5.53 |
39.2%
3.12
CategoryFarm Pond
Started / Completed / Phys179 / 30 / 30
Completion rate33.5%
Part A score (max 5.0)1.68 / 5.0
Ongoing sanction / booked2.35Cr / 0.68Cr
Expenditure rate (ongoing)28.8%
Part B score (max 5.0)1.44 / 5.0
Final score3.12 / 10
|
โ |
8.2%
5.78
CategoryDug Well Recharge
Started / Completed / Phys288 / 181 / 79
Completion rate90.3%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)25.3%
Part B score (max 5.0)1.27 / 5.0
Final score5.78 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
48.1%
7.03
CategoryWater conservation & recharge
Started / Completed / Phys102 / 29 / 47
Completion rate74.5%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.95Cr / 0.63Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score7.03 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 165 | NIWAS โ | MANDLA | 5.53 |
37.6%
6.36
CategoryFarm Pond
Started / Completed / Phys146 / 71 / 10
Completion rate55.5%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked1.81Cr / 1.30Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.36 / 10
|
โ |
3.2%
5.91
CategoryDug Well Recharge
Started / Completed / Phys118 / 46 / 27
Completion rate61.9%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score5.91 / 10
|
11.5%
5.57
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.66Cr / 0.41Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score5.57 / 10
|
31.9%
4.50
CategoryWater conservation & recharge
Started / Completed / Phys61 / 2 / 4
Completion rate9.8%
Part A score (max 5.0)0.49 / 5.0
Ongoing sanction / booked2.75Cr / 2.20Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.01 / 5.0
Final score4.50 / 10
|
1.3%
4.29
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score4.29 / 10
|
14.5%
5.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.25Cr / 1.22Cr
Expenditure rate (ongoing)97.8%
Part B score (max 5.0)4.89 / 5.0
Final score5.60 / 10
|
| 166 | MANDLA โ | MANDLA | 5.51 |
54.8%
5.53
CategoryFarm Pond
Started / Completed / Phys288 / 148 / 11
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked5.66Cr / 3.13Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score5.53 / 10
|
โ |
2.6%
4.57
CategoryDug Well Recharge
Started / Completed / Phys235 / 74 / 55
Completion rate54.9%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.27Cr / 0.10Cr
Expenditure rate (ongoing)36.6%
Part B score (max 5.0)1.83 / 5.0
Final score4.57 / 10
|
11.9%
4.67
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 4 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.86Cr / 0.81Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score4.67 / 10
|
23.8%
5.88
CategoryWater conservation & recharge
Started / Completed / Phys102 / 33 / 10
Completion rate42.2%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked3.91Cr / 2.95Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score5.88 / 10
|
5.0%
6.57
CategoryWatershed Related Works
Started / Completed / Phys31 / 11 / 6
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.55Cr / 0.42Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score6.57 / 10
|
1.8%
4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.37Cr / 0.21Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score4.22 / 10
|
| 167 | BIJADANDI โ | MANDLA | 5.51 |
35.1%
7.11
CategoryFarm Pond
Started / Completed / Phys151 / 101 / 19
Completion rate79.5%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.94Cr / 0.59Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score7.11 / 10
|
18.5%
1.47
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.28Cr / 0.67Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.47 / 5.0
Final score1.47 / 10
|
2.7%
6.97
CategoryDug Well Recharge
Started / Completed / Phys131 / 41 / 70
Completion rate84.7%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score6.97 / 10
|
โ |
39.9%
5.84
CategoryWater conservation & recharge
Started / Completed / Phys60 / 16 / 8
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked3.41Cr / 2.62Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.84 / 5.0
Final score5.84 / 10
|
3.7%
5.68
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score5.68 / 10
|
0.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 168 | NEEMUCH โ | NEEMUCH | 5.51 |
41.7%
3.71
CategoryFarm Pond
Started / Completed / Phys202 / 17 / 93
Completion rate54.5%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked1.50Cr / 0.30Cr
Expenditure rate (ongoing)19.7%
Part B score (max 5.0)0.98 / 5.0
Final score3.71 / 10
|
4.9%
2.58
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.20Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score2.58 / 10
|
20.5%
6.18
CategoryDug Well Recharge
Started / Completed / Phys618 / 245 / 252
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.31Cr / 0.14Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score6.18 / 10
|
2.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
24.0%
7.25
CategoryWater conservation & recharge
Started / Completed / Phys49 / 3 / 40
Completion rate87.8%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.34Cr / 0.19Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.86 / 5.0
Final score7.25 / 10
|
2.4%
7.29
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score7.29 / 10
|
4.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 169 | SABALGARH โ | MORENA | 5.50 |
28.6%
4.76
CategoryFarm Pond
Started / Completed / Phys545 / 182 / 55
Completion rate43.5%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked13.41Cr / 6.93Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score4.76 / 10
|
0.3%
1.86
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
|
0.3%
4.48
CategoryDug Well Recharge
Started / Completed / Phys108 / 63 / 9
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.02Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score4.48 / 10
|
1.1%
5.31
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.62Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score5.31 / 10
|
65.2%
5.85
CategoryWater conservation & recharge
Started / Completed / Phys380 / 3 / 167
Completion rate44.7%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked28.94Cr / 20.90Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score5.85 / 10
|
1.1%
6.84
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.44Cr / 0.31Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score6.84 / 10
|
3.5%
5.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 4
Completion rate21.1%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked2.19Cr / 1.81Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score5.17 / 10
|
| 170 | KHIRKIYA โ | HARDA | 5.50 |
35.1%
3.49
CategoryFarm Pond
Started / Completed / Phys99 / 20 / 15
Completion rate35.4%
Part A score (max 5.0)1.77 / 5.0
Ongoing sanction / booked1.53Cr / 0.53Cr
Expenditure rate (ongoing)34.5%
Part B score (max 5.0)1.73 / 5.0
Final score3.49 / 10
|
2.7%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
10.2%
6.78
CategoryDug Well Recharge
Started / Completed / Phys262 / 126 / 103
Completion rate87.4%
Part A score (max 5.0)4.37 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score6.78 / 10
|
20.8%
7.95
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 2 / 13
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score7.95 / 10
|
14.3%
5.51
CategoryWater conservation & recharge
Started / Completed / Phys23 / 3 / 10
Completion rate56.5%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.53Cr / 0.29Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score5.51 / 10
|
3.0%
6.48
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.48 / 10
|
13.9%
6.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 11
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score6.77 / 10
|
| 171 | VIJAYRAGHAVGADH โ | KATNI | 5.48 |
44.3%
4.28
CategoryFarm Pond
Started / Completed / Phys243 / 57 / 78
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked2.18Cr / 0.66Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score4.28 / 10
|
โ |
9.3%
5.94
CategoryDug Well Recharge
Started / Completed / Phys386 / 152 / 156
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked0.21Cr / 0.08Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score5.94 / 10
|
5.1%
6.71
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 7 / 1
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score6.71 / 10
|
15.5%
7.01
CategoryWater conservation & recharge
Started / Completed / Phys36 / 13 / 17
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.34Cr / 0.19Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score7.01 / 10
|
15.1%
5.22
CategoryWatershed Related Works
Started / Completed / Phys40 / 17 / 7
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.22Cr
Expenditure rate (ongoing)44.3%
Part B score (max 5.0)2.22 / 5.0
Final score5.22 / 10
|
10.8%
7.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 9
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.29Cr / 0.22Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score7.62 / 10
|
| 172 | PRITHVIPUR โ | NIWARI | 5.48 |
18.8%
3.97
CategoryFarm Pond
Started / Completed / Phys287 / 84 / 32
Completion rate40.4%
Part A score (max 5.0)2.02 / 5.0
Ongoing sanction / booked2.78Cr / 1.08Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score3.97 / 10
|
3.5%
3.97
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.67Cr / 0.37Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score3.97 / 10
|
4.5%
4.97
CategoryDug Well Recharge
Started / Completed / Phys456 / 185 / 96
Completion rate61.6%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.45Cr / 0.17Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score4.97 / 10
|
โ |
31.0%
6.17
CategoryWater conservation & recharge
Started / Completed / Phys111 / 13 / 39
Completion rate46.8%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked3.91Cr / 2.99Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score6.17 / 10
|
22.0%
5.02
CategoryWatershed Related Works
Started / Completed / Phys104 / 8 / 21
Completion rate27.9%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked3.59Cr / 2.61Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score5.02 / 10
|
20.2%
6.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys76 / 8 / 32
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked2.35Cr / 1.91Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score6.70 / 10
|
| 173 | JABERA โ | DAMOH | 5.47 |
16.6%
5.20
CategoryFarm Pond
Started / Completed / Phys234 / 43 / 52
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked3.23Cr / 2.05Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score5.20 / 10
|
โ |
2.8%
6.93
CategoryDug Well Recharge
Started / Completed / Phys351 / 120 / 103
Completion rate63.5%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.33Cr / 0.25Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score6.93 / 10
|
โ |
51.2%
5.13
CategoryWater conservation & recharge
Started / Completed / Phys151 / 16 / 25
Completion rate27.2%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked11.57Cr / 8.74Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score5.13 / 10
|
8.5%
5.54
CategoryWatershed Related Works
Started / Completed / Phys42 / 10 / 5
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked1.74Cr / 1.31Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score5.54 / 10
|
20.9%
6.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 4 / 26
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked3.98Cr / 3.39Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score6.26 / 10
|
| 174 | TONK KHURD โ | DEWAS | 5.46 |
41.9%
4.52
CategoryFarm Pond
Started / Completed / Phys95 / 16 / 31
Completion rate49.5%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked1.59Cr / 0.65Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score4.52 / 10
|
3.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
13.7%
6.26
CategoryDug Well Recharge
Started / Completed / Phys395 / 75 / 195
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.32Cr / 0.18Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.84 / 5.0
Final score6.26 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.5%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys77 / 5 / 41
Completion rate59.7%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked1.00Cr / 0.71Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.55 / 5.0
Final score6.53 / 10
|
5.6%
5.03
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 1
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.34Cr / 0.20Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score5.03 / 10
|
2.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 175 | BICHHUA โ | CHHINDWARA | 5.46 |
20.8%
6.63
CategoryFarm Pond
Started / Completed / Phys144 / 3 / 123
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.34Cr / 0.15Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.25 / 5.0
Final score6.63 / 10
|
12.4%
1.05
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 0.33Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score1.05 / 10
|
6.3%
5.19
CategoryDug Well Recharge
Started / Completed / Phys306 / 8 / 284
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)8.3%
Part B score (max 5.0)0.41 / 5.0
Final score5.19 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.5%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys41 / 2 / 16
Completion rate43.9%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked2.61Cr / 2.02Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score6.07 / 10
|
16.0%
5.46
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 8
Completion rate32.0%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked1.36Cr / 1.05Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score5.46 / 10
|
0.7%
5.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score5.77 / 10
|
| 176 | JAWAD โ | NEEMUCH | 5.45 |
33.0%
3.49
CategoryFarm Pond
Started / Completed / Phys198 / 3 / 70
Completion rate36.9%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked2.27Cr / 0.74Cr
Expenditure rate (ongoing)32.8%
Part B score (max 5.0)1.64 / 5.0
Final score3.49 / 10
|
1.0%
1.58
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
|
15.9%
6.16
CategoryDug Well Recharge
Started / Completed / Phys609 / 82 / 399
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.33Cr / 0.15Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score6.16 / 10
|
1.1%
6.10
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.10 / 10
|
39.8%
6.47
CategoryWater conservation & recharge
Started / Completed / Phys90 / 0 / 70
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.77Cr / 0.40Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.59 / 5.0
Final score6.47 / 10
|
2.0%
5.93
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 5
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)32.9%
Part B score (max 5.0)1.64 / 5.0
Final score5.93 / 10
|
7.3%
7.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 2 / 16
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.46 / 10
|
| 177 | BHANPURA โ | MANDSAUR | 5.45 |
23.2%
3.86
CategoryFarm Pond
Started / Completed / Phys156 / 13 / 41
Completion rate34.6%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked2.00Cr / 0.85Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score3.86 / 10
|
โ |
8.3%
5.96
CategoryDug Well Recharge
Started / Completed / Phys459 / 296 / 121
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.41 / 5.0
Final score5.96 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
60.0%
5.60
CategoryWater conservation & recharge
Started / Completed / Phys131 / 6 / 29
Completion rate26.7%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked6.57Cr / 5.60Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score5.60 / 10
|
7.4%
7.95
CategoryWatershed Related Works
Started / Completed / Phys22 / 7 / 8
Completion rate68.2%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.55Cr / 0.50Cr
Expenditure rate (ongoing)90.8%
Part B score (max 5.0)4.54 / 5.0
Final score7.95 / 10
|
0.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 178 | NAGOD โ | SATNA | 5.45 |
43.1%
3.83
CategoryFarm Pond
Started / Completed / Phys363 / 67 / 107
Completion rate47.9%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked3.70Cr / 1.06Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score3.83 / 10
|
2.5%
0.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.04Cr
Expenditure rate (ongoing)11.3%
Part B score (max 5.0)0.56 / 5.0
Final score0.56 / 10
|
3.0%
6.61
CategoryDug Well Recharge
Started / Completed / Phys190 / 17 / 134
Completion rate79.5%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score6.61 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.5%
6.19
CategoryWater conservation & recharge
Started / Completed / Phys136 / 25 / 65
Completion rate66.2%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked2.02Cr / 1.17Cr
Expenditure rate (ongoing)57.6%
Part B score (max 5.0)2.88 / 5.0
Final score6.19 / 10
|
3.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.5%
8.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 3 / 13
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score8.57 / 10
|
| 179 | BALAGHAT โ | BALAGHAT | 5.44 |
58.9%
5.10
CategoryFarm Pond
Started / Completed / Phys357 / 146 / 57
Completion rate56.9%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked3.81Cr / 1.72Cr
Expenditure rate (ongoing)45.1%
Part B score (max 5.0)2.25 / 5.0
Final score5.10 / 10
|
3.0%
0.34
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.03Cr
Expenditure rate (ongoing)6.8%
Part B score (max 5.0)0.34 / 5.0
Final score0.34 / 10
|
2.0%
6.96
CategoryDug Well Recharge
Started / Completed / Phys137 / 71 / 51
Completion rate89.1%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.51 / 5.0
Final score6.96 / 10
|
โ |
32.5%
6.35
CategoryWater conservation & recharge
Started / Completed / Phys75 / 15 / 25
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.80Cr / 2.80Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.68 / 5.0
Final score6.35 / 10
|
2.2%
5.67
CategoryWatershed Related Works
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.67 / 10
|
1.4%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.96 / 10
|
| 180 | JAWA โ | REWA | 5.44 |
42.4%
4.21
CategoryFarm Pond
Started / Completed / Phys229 / 83 / 61
Completion rate62.9%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked2.33Cr / 0.50Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.07 / 5.0
Final score4.21 / 10
|
โ |
0.7%
6.73
CategoryDug Well Recharge
Started / Completed / Phys35 / 22 / 11
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)40.3%
Part B score (max 5.0)2.02 / 5.0
Final score6.73 / 10
|
0.3%
6.80
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.80 / 10
|
41.4%
6.87
CategoryWater conservation & recharge
Started / Completed / Phys84 / 25 / 33
Completion rate69.0%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked2.50Cr / 1.71Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.42 / 5.0
Final score6.87 / 10
|
6.2%
5.37
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 10
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.24Cr / 0.11Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score5.37 / 10
|
9.0%
4.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 2 / 5
Completion rate41.2%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked0.62Cr / 0.31Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score4.54 / 10
|
| 181 | DHANAURA โ | SEONI | 5.43 |
40.1%
4.10
CategoryFarm Pond
Started / Completed / Phys374 / 121 / 43
Completion rate43.9%
Part A score (max 5.0)2.19 / 5.0
Ongoing sanction / booked5.10Cr / 1.95Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score4.10 / 10
|
1.8%
1.53
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score1.53 / 10
|
2.1%
4.98
CategoryDug Well Recharge
Started / Completed / Phys201 / 113 / 87
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.98 / 10
|
โ |
31.6%
6.87
CategoryWater conservation & recharge
Started / Completed / Phys116 / 8 / 69
Completion rate66.4%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked2.50Cr / 1.77Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score6.87 / 10
|
16.3%
6.15
CategoryWatershed Related Works
Started / Completed / Phys37 / 8 / 9
Completion rate45.9%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked1.98Cr / 1.53Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score6.15 / 10
|
8.1%
5.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 5
Completion rate35.3%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked1.23Cr / 1.01Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score5.88 / 10
|
| 182 | SIHAWAL โ | SIDHI | 5.42 |
34.1%
4.34
CategoryFarm Pond
Started / Completed / Phys352 / 153 / 31
Completion rate52.3%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked3.60Cr / 1.24Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score4.34 / 10
|
โ |
1.1%
3.41
CategoryDug Well Recharge
Started / Completed / Phys95 / 18 / 17
Completion rate36.8%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked0.16Cr / 0.05Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score3.41 / 10
|
2.5%
6.92
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 3 / 5
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.22Cr / 0.16Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score6.92 / 10
|
51.1%
5.92
CategoryWater conservation & recharge
Started / Completed / Phys188 / 38 / 43
Completion rate43.1%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked7.62Cr / 5.74Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score5.92 / 10
|
3.0%
6.34
CategoryWatershed Related Works
Started / Completed / Phys22 / 9 / 4
Completion rate59.1%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked0.19Cr / 0.13Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score6.34 / 10
|
8.2%
6.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 8 / 6
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked1.36Cr / 0.97Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score6.23 / 10
|
| 183 | CHANDERI โ | ASHOK NAGAR | 5.42 |
44.2%
4.70
CategoryFarm Pond
Started / Completed / Phys243 / 23 / 98
Completion rate49.8%
Part A score (max 5.0)2.49 / 5.0
Ongoing sanction / booked3.11Cr / 1.38Cr
Expenditure rate (ongoing)44.3%
Part B score (max 5.0)2.21 / 5.0
Final score4.70 / 10
|
โ |
1.6%
7.16
CategoryDug Well Recharge
Started / Completed / Phys100 / 44 / 40
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score7.16 / 10
|
0.5%
4.41
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score4.41 / 10
|
35.1%
5.72
CategoryWater conservation & recharge
Started / Completed / Phys151 / 10 / 55
Completion rate43.0%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked2.93Cr / 2.09Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score5.72 / 10
|
12.2%
6.85
CategoryWatershed Related Works
Started / Completed / Phys13 / 2 / 4
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.87Cr / 0.79Cr
Expenditure rate (ongoing)90.8%
Part B score (max 5.0)4.54 / 5.0
Final score6.85 / 10
|
6.4%
5.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 4
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.62Cr / 0.47Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score5.60 / 10
|
| 184 | BIJAWAR โ | CHHATARPUR | 5.41 |
40.5%
4.31
CategoryFarm Pond
Started / Completed / Phys209 / 63 / 56
Completion rate56.9%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked2.46Cr / 0.72Cr
Expenditure rate (ongoing)29.4%
Part B score (max 5.0)1.47 / 5.0
Final score4.31 / 10
|
3.5%
3.82
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.35Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score3.82 / 10
|
4.4%
5.15
CategoryDug Well Recharge
Started / Completed / Phys417 / 329 / 35
Completion rate87.3%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.07Cr / 0.01Cr
Expenditure rate (ongoing)15.6%
Part B score (max 5.0)0.78 / 5.0
Final score5.15 / 10
|
โ |
48.7%
6.43
CategoryWater conservation & recharge
Started / Completed / Phys147 / 23 / 82
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked2.23Cr / 1.27Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score6.43 / 10
|
1.9%
5.61
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 6
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score5.61 / 10
|
1.1%
6.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score6.63 / 10
|
| 185 | PHANDA โ | BHOPAL | 5.40 |
45.5%
4.31
CategoryFarm Pond
Started / Completed / Phys157 / 66 / 4
Completion rate44.6%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked1.83Cr / 0.76Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score4.31 / 10
|
2.9%
2.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score2.09 / 10
|
5.4%
6.16
CategoryDug Well Recharge
Started / Completed / Phys127 / 51 / 32
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score6.16 / 10
|
โ |
32.7%
6.92
CategoryWater conservation & recharge
Started / Completed / Phys49 / 28 / 12
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.40Cr / 0.22Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score6.92 / 10
|
11.2%
6.07
CategoryWatershed Related Works
Started / Completed / Phys17 / 6 / 7
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)44.9%
Part B score (max 5.0)2.25 / 5.0
Final score6.07 / 10
|
2.4%
4.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score4.51 / 10
|
| 186 | KATANGI โ | BALAGHAT | 5.40 |
62.4%
4.88
CategoryFarm Pond
Started / Completed / Phys462 / 74 / 199
Completion rate59.1%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked4.46Cr / 1.72Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score4.88 / 10
|
2.3%
1.88
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.18Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score1.88 / 10
|
1.9%
5.72
CategoryDug Well Recharge
Started / Completed / Phys148 / 41 / 86
Completion rate85.8%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score5.72 / 10
|
0.5%
6.90
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score6.90 / 10
|
32.3%
6.62
CategoryWater conservation & recharge
Started / Completed / Phys146 / 6 / 77
Completion rate56.8%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked3.36Cr / 2.53Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score6.62 / 10
|
0.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.5%
4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
|
| 187 | LATERI โ | VIDISHA | 5.39 |
47.8%
4.01
CategoryFarm Pond
Started / Completed / Phys215 / 84 / 26
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked3.16Cr / 0.92Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.46 / 5.0
Final score4.01 / 10
|
1.4%
4.90
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.19Cr
Expenditure rate (ongoing)98.0%
Part B score (max 5.0)4.90 / 5.0
Final score4.90 / 10
|
5.3%
6.83
CategoryDug Well Recharge
Started / Completed / Phys301 / 121 / 120
Completion rate80.1%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.82 / 5.0
Final score6.83 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.0%
6.41
CategoryWater conservation & recharge
Started / Completed / Phys168 / 77 / 38
Completion rate68.5%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked1.92Cr / 1.14Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.98 / 5.0
Final score6.41 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 188 | RON โ | BHIND | 5.38 |
14.0%
2.34
CategoryFarm Pond
Started / Completed / Phys88 / 20 / 4
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.97Cr / 0.19Cr
Expenditure rate (ongoing)19.5%
Part B score (max 5.0)0.97 / 5.0
Final score2.34 / 10
|
5.6%
1.95
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.21Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score1.95 / 10
|
0.2%
4.22
CategoryDug Well Recharge
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.22 / 10
|
4.8%
6.58
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.31Cr / 0.26Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score6.58 / 10
|
60.3%
6.26
CategoryWater conservation & recharge
Started / Completed / Phys59 / 18 / 19
Completion rate62.7%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked1.79Cr / 1.12Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score6.26 / 10
|
7.7%
6.11
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.20Cr / 0.09Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score6.11 / 10
|
7.5%
5.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.39Cr / 0.23Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score5.04 / 10
|
| 189 | BHITARWAR โ | GWALIOR | 5.38 |
40.9%
3.53
CategoryFarm Pond
Started / Completed / Phys257 / 29 / 95
Completion rate48.2%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked3.89Cr / 0.87Cr
Expenditure rate (ongoing)22.3%
Part B score (max 5.0)1.12 / 5.0
Final score3.53 / 10
|
3.8%
0.72
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.10Cr
Expenditure rate (ongoing)14.4%
Part B score (max 5.0)0.72 / 5.0
Final score0.72 / 10
|
3.8%
5.66
CategoryDug Well Recharge
Started / Completed / Phys265 / 61 / 155
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.13Cr / 0.04Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score5.66 / 10
|
8.0%
7.78
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 1 / 12
Completion rate81.3%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.32Cr / 0.24Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score7.78 / 10
|
32.5%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys94 / 20 / 47
Completion rate71.3%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked1.06Cr / 0.66Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score6.69 / 10
|
5.6%
7.56
CategoryWatershed Related Works
Started / Completed / Phys13 / 1 / 11
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score7.56 / 10
|
5.4%
8.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 3 / 8
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.11Cr / 0.09Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score8.75 / 10
|
| 190 | KOLARAS โ | SHIVPURI | 5.36 |
44.2%
4.96
CategoryFarm Pond
Started / Completed / Phys238 / 89 / 51
Completion rate58.8%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked3.91Cr / 1.58Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score4.96 / 10
|
1.8%
2.45
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.19Cr
Expenditure rate (ongoing)48.9%
Part B score (max 5.0)2.45 / 5.0
Final score2.45 / 10
|
2.9%
4.95
CategoryDug Well Recharge
Started / Completed / Phys253 / 141 / 56
Completion rate77.9%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score4.95 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
49.6%
5.77
CategoryWater conservation & recharge
Started / Completed / Phys110 / 5 / 44
Completion rate44.5%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked6.08Cr / 4.31Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score5.77 / 10
|
0.6%
4.88
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score4.88 / 10
|
0.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 191 | LAHAR โ | BHIND | 5.36 |
22.9%
2.68
CategoryFarm Pond
Started / Completed / Phys134 / 32 / 18
Completion rate37.3%
Part A score (max 5.0)1.87 / 5.0
Ongoing sanction / booked1.38Cr / 0.22Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.81 / 5.0
Final score2.68 / 10
|
2.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.5%
5.50
CategoryDug Well Recharge
Started / Completed / Phys17 / 0 / 9
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score5.50 / 10
|
4.7%
5.17
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.10Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score5.17 / 10
|
59.5%
6.50
CategoryWater conservation & recharge
Started / Completed / Phys58 / 4 / 36
Completion rate69.0%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked1.67Cr / 1.02Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score6.50 / 10
|
4.2%
4.13
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.27Cr / 0.13Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.47 / 5.0
Final score4.13 / 10
|
5.3%
8.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.07 / 5.0
Final score8.23 / 10
|
| 192 | PALERA โ | TIKAMGARH | 5.35 |
16.3%
3.83
CategoryFarm Pond
Started / Completed / Phys232 / 26 / 44
Completion rate30.2%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked2.44Cr / 1.13Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.32 / 5.0
Final score3.83 / 10
|
2.1%
0.85
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.45Cr / 0.08Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score0.85 / 10
|
7.0%
6.79
CategoryDug Well Recharge
Started / Completed / Phys585 / 180 / 325
Completion rate86.3%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.21Cr / 0.10Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score6.79 / 10
|
0.2%
5.97
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score5.97 / 10
|
61.0%
5.65
CategoryWater conservation & recharge
Started / Completed / Phys279 / 29 / 61
Completion rate32.3%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked9.02Cr / 7.27Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.03 / 5.0
Final score5.65 / 10
|
3.7%
7.00
CategoryWatershed Related Works
Started / Completed / Phys21 / 4 / 8
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.32Cr / 0.27Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score7.00 / 10
|
9.7%
5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 1 / 9
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.53Cr / 1.21Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score5.38 / 10
|
| 193 | BADWARA โ | KATNI | 5.35 |
33.7%
4.09
CategoryFarm Pond
Started / Completed / Phys297 / 67 / 87
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked2.11Cr / 0.63Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score4.09 / 10
|
7.5%
1.74
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.98Cr / 0.34Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score1.74 / 10
|
6.2%
4.94
CategoryDug Well Recharge
Started / Completed / Phys310 / 85 / 124
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked0.26Cr / 0.08Cr
Expenditure rate (ongoing)31.3%
Part B score (max 5.0)1.57 / 5.0
Final score4.94 / 10
|
โ |
20.4%
6.98
CategoryWater conservation & recharge
Started / Completed / Phys52 / 2 / 32
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked1.08Cr / 0.80Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score6.98 / 10
|
24.4%
7.09
CategoryWatershed Related Works
Started / Completed / Phys41 / 15 / 17
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.67Cr / 0.42Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score7.09 / 10
|
8.0%
4.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 5
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.54Cr / 0.29Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.63 / 5.0
Final score4.94 / 10
|
| 194 | SATNA โ | SATNA | 5.34 |
33.3%
4.62
CategoryFarm Pond
Started / Completed / Phys189 / 51 / 57
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.91Cr / 0.32Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score4.62 / 10
|
6.2%
1.48
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score1.48 / 10
|
3.4%
7.02
CategoryDug Well Recharge
Started / Completed / Phys147 / 111 / 7
Completion rate80.3%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score7.02 / 10
|
1.1%
5.31
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score5.31 / 10
|
45.8%
6.22
CategoryWater conservation & recharge
Started / Completed / Phys48 / 12 / 12
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked2.22Cr / 1.65Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score6.22 / 10
|
2.0%
7.35
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.07Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score7.35 / 10
|
8.1%
5.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.33Cr / 0.18Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score5.16 / 10
|
| 195 | PRABHAT PATTAN โ | BETUL | 5.34 |
29.2%
4.58
CategoryFarm Pond
Started / Completed / Phys196 / 8 / 74
Completion rate41.8%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked3.14Cr / 1.56Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score4.58 / 10
|
1.6%
0.38
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.02Cr
Expenditure rate (ongoing)7.6%
Part B score (max 5.0)0.38 / 5.0
Final score0.38 / 10
|
7.9%
6.28
CategoryDug Well Recharge
Started / Completed / Phys538 / 91 / 380
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.17Cr / 0.07Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score6.28 / 10
|
โ |
57.2%
5.76
CategoryWater conservation & recharge
Started / Completed / Phys144 / 8 / 62
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked5.16Cr / 3.44Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.33 / 5.0
Final score5.76 / 10
|
1.8%
5.36
CategoryWatershed Related Works
Started / Completed / Phys8 / 2 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.11Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
|
2.2%
4.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score4.75 / 10
|
| 196 | PANNA โ | PANNA | 5.33 |
42.9%
4.98
CategoryFarm Pond
Started / Completed / Phys327 / 55 / 141
Completion rate59.9%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked2.50Cr / 0.99Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score4.98 / 10
|
3.7%
1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.13Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
|
5.4%
3.98
CategoryDug Well Recharge
Started / Completed / Phys328 / 70 / 58
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked0.52Cr / 0.21Cr
Expenditure rate (ongoing)40.5%
Part B score (max 5.0)2.03 / 5.0
Final score3.98 / 10
|
0.4%
5.98
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 4
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score5.98 / 10
|
26.6%
5.58
CategoryWater conservation & recharge
Started / Completed / Phys114 / 4 / 49
Completion rate46.5%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked2.33Cr / 1.51Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score5.58 / 10
|
9.2%
7.56
CategoryWatershed Related Works
Started / Completed / Phys47 / 3 / 34
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.32Cr / 0.24Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score7.56 / 10
|
11.7%
6.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 10
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.06Cr / 0.79Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score6.25 / 10
|
| 197 | KIRNAPUR โ | BALAGHAT | 5.33 |
65.7%
4.71
CategoryFarm Pond
Started / Completed / Phys457 / 153 / 123
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked4.30Cr / 1.45Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score4.71 / 10
|
3.6%
0.61
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.09Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score0.61 / 10
|
2.0%
7.01
CategoryDug Well Recharge
Started / Completed / Phys155 / 73 / 74
Completion rate94.8%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score7.01 / 10
|
โ |
26.2%
7.06
CategoryWater conservation & recharge
Started / Completed / Phys114 / 26 / 56
Completion rate71.9%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked1.48Cr / 1.02Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score7.06 / 10
|
1.4%
7.90
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score7.90 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 198 | JAORA โ | RATLAM | 5.32 |
52.2%
4.20
CategoryFarm Pond
Started / Completed / Phys160 / 30 / 53
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked3.06Cr / 0.98Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score4.20 / 10
|
9.8%
3.85
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.91Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
|
10.2%
5.82
CategoryDug Well Recharge
Started / Completed / Phys470 / 61 / 230
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.46Cr / 0.25Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score5.82 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.2%
7.51
CategoryWater conservation & recharge
Started / Completed / Phys80 / 29 / 47
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.36Cr / 0.20Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score7.51 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 199 | SUSNER โ | AGAR-MALWA | 5.30 |
23.9%
4.99
CategoryFarm Pond
Started / Completed / Phys208 / 58 / 62
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked1.35Cr / 0.57Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.99 / 10
|
1.3%
3.42
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
|
9.9%
6.38
CategoryDug Well Recharge
Started / Completed / Phys508 / 189 / 246
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.19Cr / 0.08Cr
Expenditure rate (ongoing)42.0%
Part B score (max 5.0)2.10 / 5.0
Final score6.38 / 10
|
0.6%
2.16
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
|
59.0%
5.21
CategoryWater conservation & recharge
Started / Completed / Phys146 / 18 / 45
Completion rate43.2%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked4.99Cr / 3.04Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score5.21 / 10
|
0.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.0%
6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 16
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.9%
Part B score (max 5.0)2.59 / 5.0
Final score6.40 / 10
|
| 200 | MEGHNAGAR โ | JHABUA | 5.29 |
11.1%
3.92
CategoryFarm Pond
Started / Completed / Phys192 / 10 / 47
Completion rate29.7%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.20Cr / 1.07Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score3.92 / 10
|
2.2%
3.77
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.48Cr / 0.20Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.10 / 5.0
Final score3.77 / 10
|
5.1%
5.70
CategoryDug Well Recharge
Started / Completed / Phys653 / 34 / 282
Completion rate48.4%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked0.87Cr / 0.57Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.28 / 5.0
Final score5.70 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
80.3%
5.42
CategoryWater conservation & recharge
Started / Completed / Phys233 / 10 / 70
Completion rate34.3%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked16.33Cr / 12.08Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score5.42 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 201 | MULTAI โ | BETUL | 5.29 |
41.0%
4.61
CategoryFarm Pond
Started / Completed / Phys153 / 4 / 61
Completion rate42.5%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked3.26Cr / 1.63Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score4.61 / 10
|
5.3%
1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.16Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
|
8.5%
5.71
CategoryDug Well Recharge
Started / Completed / Phys461 / 151 / 290
Completion rate95.7%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)18.6%
Part B score (max 5.0)0.93 / 5.0
Final score5.71 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
38.9%
6.03
CategoryWater conservation & recharge
Started / Completed / Phys142 / 12 / 68
Completion rate56.3%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked2.75Cr / 1.76Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.21 / 5.0
Final score6.03 / 10
|
3.4%
7.62
CategoryWatershed Related Works
Started / Completed / Phys18 / 2 / 14
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score7.62 / 10
|
2.9%
8.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 9
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)88.1%
Part B score (max 5.0)4.41 / 5.0
Final score8.50 / 10
|
| 202 | BICHHIYA โ | MANDLA | 5.29 |
36.7%
5.69
CategoryFarm Pond
Started / Completed / Phys346 / 199 / 1
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked6.18Cr / 3.46Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score5.69 / 10
|
4.1%
3.78
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 1.21Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score3.78 / 10
|
2.0%
5.12
CategoryDug Well Recharge
Started / Completed / Phys292 / 88 / 79
Completion rate57.2%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score5.12 / 10
|
11.0%
4.06
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 1
Completion rate13.3%
Part A score (max 5.0)0.67 / 5.0
Ongoing sanction / booked4.25Cr / 2.89Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score4.06 / 10
|
39.1%
5.46
CategoryWater conservation & recharge
Started / Completed / Phys269 / 84 / 9
Completion rate34.6%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked10.47Cr / 7.80Cr
Expenditure rate (ongoing)74.5%
Part B score (max 5.0)3.73 / 5.0
Final score5.46 / 10
|
2.9%
5.50
CategoryWatershed Related Works
Started / Completed / Phys24 / 8 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.78Cr / 0.60Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score5.50 / 10
|
4.3%
4.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 5 / 0
Completion rate29.4%
Part A score (max 5.0)1.47 / 5.0
Ongoing sanction / booked1.02Cr / 0.69Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score4.85 / 10
|
| 203 | BUXWAHA โ | CHHATARPUR | 5.29 |
40.2%
4.88
CategoryFarm Pond
Started / Completed / Phys153 / 49 / 41
Completion rate58.8%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked2.56Cr / 0.99Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.94 / 5.0
Final score4.88 / 10
|
4.5%
4.97
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.45Cr / 0.34Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score4.97 / 10
|
5.6%
6.04
CategoryDug Well Recharge
Started / Completed / Phys356 / 203 / 116
Completion rate89.6%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score6.04 / 10
|
โ |
41.4%
5.80
CategoryWater conservation & recharge
Started / Completed / Phys96 / 11 / 35
Completion rate47.9%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked4.34Cr / 2.96Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score5.80 / 10
|
2.6%
6.38
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score6.38 / 10
|
5.8%
3.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.84Cr / 0.51Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score3.51 / 10
|
| 204 | GUNOR โ | PANNA | 5.28 |
38.0%
3.99
CategoryFarm Pond
Started / Completed / Phys449 / 96 / 99
Completion rate43.4%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked4.35Cr / 1.58Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.82 / 5.0
Final score3.99 / 10
|
โ |
3.4%
3.99
CategoryDug Well Recharge
Started / Completed / Phys274 / 96 / 30
Completion rate46.0%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked0.39Cr / 0.13Cr
Expenditure rate (ongoing)33.9%
Part B score (max 5.0)1.70 / 5.0
Final score3.99 / 10
|
0.5%
3.32
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.32 / 10
|
40.9%
6.11
CategoryWater conservation & recharge
Started / Completed / Phys200 / 17 / 92
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked3.87Cr / 2.62Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.39 / 5.0
Final score6.11 / 10
|
5.0%
5.87
CategoryWatershed Related Works
Started / Completed / Phys21 / 4 / 8
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.49Cr / 0.29Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score5.87 / 10
|
12.2%
6.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys34 / 4 / 19
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.77Cr / 0.52Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score6.74 / 10
|
| 205 | SHIVPURI โ | SHIVPURI | 5.27 |
50.1%
3.49
CategoryFarm Pond
Started / Completed / Phys254 / 59 / 82
Completion rate55.5%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked4.97Cr / 0.71Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.72 / 5.0
Final score3.49 / 10
|
1.3%
2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
|
3.1%
5.72
CategoryDug Well Recharge
Started / Completed / Phys269 / 132 / 73
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.17Cr / 0.06Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.72 / 10
|
โ |
41.2%
7.03
CategoryWater conservation & recharge
Started / Completed / Phys123 / 19 / 76
Completion rate77.2%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked1.88Cr / 1.19Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.16 / 5.0
Final score7.03 / 10
|
2.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 206 | JATARA โ | TIKAMGARH | 5.26 |
10.0%
3.66
CategoryFarm Pond
Started / Completed / Phys261 / 20 / 60
Completion rate30.7%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked2.64Cr / 1.13Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score3.66 / 10
|
2.9%
1.19
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.27Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score1.19 / 10
|
4.6%
6.46
CategoryDug Well Recharge
Started / Completed / Phys661 / 44 / 445
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.45Cr / 0.25Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.46 / 10
|
โ |
65.6%
5.50
CategoryWater conservation & recharge
Started / Completed / Phys342 / 17 / 86
Completion rate30.1%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked17.40Cr / 13.90Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score5.50 / 10
|
2.8%
6.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 6
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.53Cr / 0.41Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score6.00 / 10
|
14.0%
5.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys68 / 1 / 20
Completion rate30.9%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked3.95Cr / 3.17Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score5.56 / 10
|
| 207 | SARDARPUR โ | DHAR | 5.25 |
16.7%
3.49
CategoryFarm Pond
Started / Completed / Phys353 / 22 / 99
Completion rate34.3%
Part A score (max 5.0)1.71 / 5.0
Ongoing sanction / booked6.00Cr / 2.13Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score3.49 / 10
|
โ |
2.4%
5.01
CategoryDug Well Recharge
Started / Completed / Phys489 / 92 / 207
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.49Cr / 0.19Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.95 / 5.0
Final score5.01 / 10
|
0.6%
2.62
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.17Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score2.62 / 10
|
74.0%
5.63
CategoryWater conservation & recharge
Started / Completed / Phys335 / 17 / 103
Completion rate35.8%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked27.08Cr / 20.79Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score5.63 / 10
|
2.8%
4.98
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 9
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked0.70Cr / 0.45Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score4.98 / 10
|
3.5%
6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 10
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.09Cr / 0.86Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score6.58 / 10
|
| 208 | ANUPPUR โ | ANUPPUR | 5.25 |
75.2%
4.53
CategoryFarm Pond
Started / Completed / Phys596 / 377 / 55
Completion rate72.5%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked3.61Cr / 0.66Cr
Expenditure rate (ongoing)18.1%
Part B score (max 5.0)0.91 / 5.0
Final score4.53 / 10
|
โ |
1.6%
6.16
CategoryDug Well Recharge
Started / Completed / Phys108 / 26 / 55
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score6.16 / 10
|
โ |
20.3%
7.38
CategoryWater conservation & recharge
Started / Completed / Phys78 / 29 / 37
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.90Cr / 0.57Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score7.38 / 10
|
โ |
2.8%
8.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score8.68 / 10
|
| 209 | BHIND โ | BHIND | 5.25 |
35.2%
2.94
CategoryFarm Pond
Started / Completed / Phys127 / 39 / 20
Completion rate46.5%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked1.64Cr / 0.20Cr
Expenditure rate (ongoing)12.3%
Part B score (max 5.0)0.62 / 5.0
Final score2.94 / 10
|
9.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.4%
7.77
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 12
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.77 / 10
|
0.6%
4.95
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score4.95 / 10
|
40.8%
6.80
CategoryWater conservation & recharge
Started / Completed / Phys58 / 10 / 36
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.84Cr / 0.48Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score6.80 / 10
|
10.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 210 | MHOW โ | INDORE | 5.25 |
58.5%
4.15
CategoryFarm Pond
Started / Completed / Phys240 / 90 / 15
Completion rate43.8%
Part A score (max 5.0)2.19 / 5.0
Ongoing sanction / booked3.82Cr / 1.50Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score4.15 / 10
|
13.6%
5.66
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.58Cr / 0.31Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score5.66 / 10
|
7.2%
7.31
CategoryDug Well Recharge
Started / Completed / Phys300 / 248 / 23
Completion rate90.3%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score7.31 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.3%
7.94
CategoryWater conservation & recharge
Started / Completed / Phys40 / 18 / 19
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.32 / 5.0
Final score7.94 / 10
|
3.4%
3.28
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.26Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score3.28 / 10
|
1.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 211 | MAKHAN NAGAR โ | NARMADAPURAM | 5.24 |
48.9%
3.34
CategoryFarm Pond
Started / Completed / Phys122 / 47 / 21
Completion rate55.7%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked1.37Cr / 0.15Cr
Expenditure rate (ongoing)11.0%
Part B score (max 5.0)0.55 / 5.0
Final score3.34 / 10
|
โ |
11.5%
4.95
CategoryDug Well Recharge
Started / Completed / Phys182 / 101 / 51
Completion rate83.5%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)15.5%
Part B score (max 5.0)0.77 / 5.0
Final score4.95 / 10
|
1.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
24.9%
7.51
CategoryWater conservation & recharge
Started / Completed / Phys44 / 22 / 19
Completion rate93.2%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.85 / 5.0
Final score7.51 / 10
|
6.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
6.9%
5.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score5.66 / 10
|
| 212 | VIDISHA โ | VIDISHA | 5.24 |
58.4%
4.28
CategoryFarm Pond
Started / Completed / Phys271 / 168 / 10
Completion rate65.7%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked2.24Cr / 0.45Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)1.00 / 5.0
Final score4.28 / 10
|
3.7%
1.09
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.09Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.09 / 5.0
Final score1.09 / 10
|
4.0%
5.82
CategoryDug Well Recharge
Started / Completed / Phys164 / 107 / 53
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score5.82 / 10
|
โ |
29.9%
7.22
CategoryWater conservation & recharge
Started / Completed / Phys76 / 46 / 12
Completion rate76.3%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked1.88Cr / 1.28Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score7.22 / 10
|
1.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.0%
6.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score6.85 / 10
|
| 213 | ICHHAWAR โ | SEHORE | 5.24 |
47.8%
3.74
CategoryFarm Pond
Started / Completed / Phys272 / 4 / 125
Completion rate47.4%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked3.83Cr / 1.04Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.36 / 5.0
Final score3.74 / 10
|
1.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
7.2%
6.62
CategoryDug Well Recharge
Started / Completed / Phys420 / 77 / 273
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.18Cr / 0.09Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score6.62 / 10
|
0.5%
5.24
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.74 / 5.0
Final score5.24 / 10
|
34.2%
6.78
CategoryWater conservation & recharge
Started / Completed / Phys83 / 9 / 47
Completion rate67.5%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked2.17Cr / 1.48Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score6.78 / 10
|
5.9%
7.15
CategoryWatershed Related Works
Started / Completed / Phys18 / 4 / 11
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score7.15 / 10
|
3.0%
6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 6
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.79 / 10
|
| 214 | RAJNAGAR โ | CHHATARPUR | 5.23 |
46.6%
4.40
CategoryFarm Pond
Started / Completed / Phys288 / 66 / 83
Completion rate51.7%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked5.75Cr / 2.08Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score4.40 / 10
|
2.7%
3.54
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.50Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score3.54 / 10
|
2.9%
5.34
CategoryDug Well Recharge
Started / Completed / Phys574 / 492 / 42
Completion rate93.0%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)13.7%
Part B score (max 5.0)0.68 / 5.0
Final score5.34 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.1%
5.78
CategoryWater conservation & recharge
Started / Completed / Phys160 / 9 / 68
Completion rate48.1%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked4.18Cr / 2.82Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score5.78 / 10
|
7.9%
7.47
CategoryWatershed Related Works
Started / Completed / Phys33 / 5 / 19
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.50Cr / 0.38Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score7.47 / 10
|
6.1%
5.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 8
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.84Cr / 0.63Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score5.90 / 10
|
| 215 | MAUGANJ โ | REWA | 5.22 |
48.7%
4.34
CategoryFarm Pond
Started / Completed / Phys255 / 96 / 54
Completion rate58.8%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked2.06Cr / 0.58Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score4.34 / 10
|
โ |
1.6%
3.80
CategoryDug Well Recharge
Started / Completed / Phys61 / 13 / 5
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score3.80 / 10
|
4.4%
4.55
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.18Cr / 0.09Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score4.55 / 10
|
35.4%
6.34
CategoryWater conservation & recharge
Started / Completed / Phys70 / 21 / 22
Completion rate61.4%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked1.10Cr / 0.72Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score6.34 / 10
|
4.5%
5.76
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score5.76 / 10
|
5.5%
6.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 7 / 3
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)50.9%
Part B score (max 5.0)2.55 / 5.0
Final score6.39 / 10
|
| 216 | GUNA โ | GUNA | 5.22 |
37.4%
3.80
CategoryFarm Pond
Started / Completed / Phys243 / 36 / 76
Completion rate46.1%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked6.17Cr / 1.85Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score3.80 / 10
|
โ |
2.8%
6.47
CategoryDug Well Recharge
Started / Completed / Phys329 / 188 / 123
Completion rate94.5%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.9%
Part B score (max 5.0)1.75 / 5.0
Final score6.47 / 10
|
1.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
51.8%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys187 / 29 / 86
Completion rate61.5%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked6.46Cr / 3.86Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score6.07 / 10
|
2.2%
4.80
CategoryWatershed Related Works
Started / Completed / Phys11 / 2 / 3
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.41Cr / 0.21Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.52 / 5.0
Final score4.80 / 10
|
4.2%
4.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 2
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked0.89Cr / 0.61Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.42 / 5.0
Final score4.92 / 10
|
| 217 | CHICHOLI โ | BETUL | 5.22 |
27.6%
3.56
CategoryFarm Pond
Started / Completed / Phys137 / 0 / 33
Completion rate24.1%
Part A score (max 5.0)1.20 / 5.0
Ongoing sanction / booked2.73Cr / 1.28Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.35 / 5.0
Final score3.56 / 10
|
9.3%
2.27
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.55Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score2.27 / 10
|
8.2%
6.23
CategoryDug Well Recharge
Started / Completed / Phys411 / 54 / 219
Completion rate66.4%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.90 / 5.0
Final score6.23 / 10
|
โ |
37.5%
6.49
CategoryWater conservation & recharge
Started / Completed / Phys103 / 7 / 51
Completion rate56.3%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked2.33Cr / 1.71Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.68 / 5.0
Final score6.49 / 10
|
12.5%
6.31
CategoryWatershed Related Works
Started / Completed / Phys37 / 1 / 19
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked0.71Cr / 0.51Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score6.31 / 10
|
4.8%
5.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 8
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.34Cr / 0.26Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score5.90 / 10
|
| 218 | PALI โ | UMARIA | 5.21 |
37.9%
4.93
CategoryFarm Pond
Started / Completed / Phys164 / 6 / 71
Completion rate47.0%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked3.44Cr / 1.78Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score4.93 / 10
|
1.1%
3.24
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
|
3.4%
4.34
CategoryDug Well Recharge
Started / Completed / Phys224 / 0 / 80
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.37Cr / 0.19Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score4.34 / 10
|
โ |
45.0%
5.58
CategoryWater conservation & recharge
Started / Completed / Phys86 / 9 / 26
Completion rate40.7%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked4.98Cr / 3.53Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score5.58 / 10
|
8.9%
4.91
CategoryWatershed Related Works
Started / Completed / Phys11 / 2 / 2
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked1.26Cr / 0.78Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score4.91 / 10
|
3.7%
5.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 3
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.34Cr / 0.26Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.88 / 5.0
Final score5.76 / 10
|
| 219 | HARDA โ | HARDA | 5.20 |
54.1%
2.98
CategoryFarm Pond
Started / Completed / Phys98 / 5 / 36
Completion rate41.8%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked1.89Cr / 0.33Cr
Expenditure rate (ongoing)17.7%
Part B score (max 5.0)0.88 / 5.0
Final score2.98 / 10
|
4.6%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
11.6%
5.34
CategoryDug Well Recharge
Started / Completed / Phys231 / 150 / 57
Completion rate89.6%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score5.34 / 10
|
โ |
20.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
6.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 220 | BADA MALEHARA โ | CHHATARPUR | 5.19 |
46.2%
4.26
CategoryFarm Pond
Started / Completed / Phys284 / 149 / 26
Completion rate61.6%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked3.60Cr / 0.85Cr
Expenditure rate (ongoing)23.6%
Part B score (max 5.0)1.18 / 5.0
Final score4.26 / 10
|
10.7%
3.30
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 1
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked1.84Cr / 1.01Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score3.30 / 10
|
5.3%
5.19
CategoryDug Well Recharge
Started / Completed / Phys698 / 638 / 22
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)9.2%
Part B score (max 5.0)0.46 / 5.0
Final score5.19 / 10
|
1.1%
5.44
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score5.44 / 10
|
27.5%
6.77
CategoryWater conservation & recharge
Started / Completed / Phys145 / 52 / 73
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.90Cr / 0.44Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.46 / 5.0
Final score6.77 / 10
|
4.7%
8.70
CategoryWatershed Related Works
Started / Completed / Phys29 / 15 / 12
Completion rate93.1%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.12Cr / 0.09Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score8.70 / 10
|
4.5%
5.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 8
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.15Cr / 0.06Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score5.83 / 10
|
| 221 | DEOSAR โ | SINGRAULI | 5.19 |
40.0%
5.00
CategoryFarm Pond
Started / Completed / Phys699 / 410 / 21
Completion rate61.7%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked4.79Cr / 1.83Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score5.00 / 10
|
3.5%
2.96
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.07Cr / 0.64Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.96 / 5.0
Final score2.96 / 10
|
3.3%
5.27
CategoryDug Well Recharge
Started / Completed / Phys394 / 280 / 21
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.24Cr / 0.07Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.45 / 5.0
Final score5.27 / 10
|
0.2%
5.24
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
|
44.0%
5.34
CategoryWater conservation & recharge
Started / Completed / Phys224 / 52 / 50
Completion rate45.5%
Part A score (max 5.0)2.28 / 5.0
Ongoing sanction / booked6.93Cr / 4.25Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score5.34 / 10
|
5.4%
5.94
CategoryWatershed Related Works
Started / Completed / Phys25 / 4 / 10
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked0.77Cr / 0.48Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.14 / 5.0
Final score5.94 / 10
|
3.7%
6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 4 / 5
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.51Cr / 0.32Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.40 / 10
|
| 222 | MAJHOULI โ | JABALPUR | 5.15 |
19.2%
2.99
CategoryFarm Pond
Started / Completed / Phys112 / 15 / 17
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked2.31Cr / 0.72Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score2.99 / 10
|
7.9%
2.70
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.61Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score2.70 / 10
|
0.2%
4.55
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.55 / 10
|
โ |
15.2%
6.18
CategoryWater conservation & recharge
Started / Completed / Phys32 / 8 / 9
Completion rate53.1%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked1.41Cr / 0.99Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score6.18 / 10
|
57.2%
5.96
CategoryWatershed Related Works
Started / Completed / Phys112 / 48 / 19
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked3.24Cr / 1.92Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score5.96 / 10
|
0.3%
3.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
|
| 223 | SENDHAWA โ | BARWANI | 5.15 |
34.8%
3.73
CategoryFarm Pond
Started / Completed / Phys297 / 13 / 77
Completion rate30.3%
Part A score (max 5.0)1.52 / 5.0
Ongoing sanction / booked3.83Cr / 1.70Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score3.73 / 10
|
โ |
19.3%
6.91
CategoryDug Well Recharge
Started / Completed / Phys1,190 / 10 / 937
Completion rate79.6%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.63Cr / 0.37Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score6.91 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.8%
5.42
CategoryWater conservation & recharge
Started / Completed / Phys207 / 13 / 87
Completion rate48.3%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked3.45Cr / 2.07Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score5.42 / 10
|
2.0%
5.92
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 4
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)45.6%
Part B score (max 5.0)2.28 / 5.0
Final score5.92 / 10
|
0.9%
5.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 6 / 3
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score5.86 / 10
|
| 224 | RAMNAGAR โ | SATNA | 5.14 |
85.1%
4.29
CategoryFarm Pond
Started / Completed / Phys220 / 29 / 107
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked1.63Cr / 0.39Cr
Expenditure rate (ongoing)24.0%
Part B score (max 5.0)1.20 / 5.0
Final score4.29 / 10
|
โ |
6.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys110 / 0 / 110
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys14 / 7 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 225 | RAMPUR BAGHELAN โ | SATNA | 5.14 |
41.7%
4.00
CategoryFarm Pond
Started / Completed / Phys201 / 14 / 67
Completion rate40.3%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked2.63Cr / 1.05Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score4.00 / 10
|
7.0%
0.47
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.07Cr
Expenditure rate (ongoing)9.3%
Part B score (max 5.0)0.47 / 5.0
Final score0.47 / 10
|
2.9%
6.92
CategoryDug Well Recharge
Started / Completed / Phys126 / 22 / 87
Completion rate86.5%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score6.92 / 10
|
1.3%
6.03
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score6.03 / 10
|
34.6%
7.00
CategoryWater conservation & recharge
Started / Completed / Phys72 / 9 / 41
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked0.81Cr / 0.57Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score7.00 / 10
|
7.0%
5.40
CategoryWatershed Related Works
Started / Completed / Phys15 / 0 / 8
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.32Cr / 0.17Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score5.40 / 10
|
5.5%
6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 3 / 9
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score6.58 / 10
|
| 226 | ASHTA โ | SEHORE | 5.12 |
57.2%
4.31
CategoryFarm Pond
Started / Completed / Phys509 / 87 / 185
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked7.32Cr / 2.40Cr
Expenditure rate (ongoing)32.8%
Part B score (max 5.0)1.64 / 5.0
Final score4.31 / 10
|
5.5%
2.22
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.55Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score2.22 / 10
|
8.3%
6.92
CategoryDug Well Recharge
Started / Completed / Phys727 / 266 / 346
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.30Cr / 0.16Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score6.92 / 10
|
1.5%
5.26
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 1 / 2
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.19Cr / 0.13Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.39 / 5.0
Final score5.26 / 10
|
19.4%
7.26
CategoryWater conservation & recharge
Started / Completed / Phys101 / 19 / 50
Completion rate68.3%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked1.82Cr / 1.40Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score7.26 / 10
|
5.6%
5.96
CategoryWatershed Related Works
Started / Completed / Phys32 / 9 / 8
Completion rate53.1%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked0.54Cr / 0.36Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score5.96 / 10
|
2.6%
5.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 7
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score5.50 / 10
|
| 227 | PICHHORE โ | SHIVPURI | 5.12 |
40.1%
4.06
CategoryFarm Pond
Started / Completed / Phys230 / 66 / 51
Completion rate50.9%
Part A score (max 5.0)2.54 / 5.0
Ongoing sanction / booked2.36Cr / 0.72Cr
Expenditure rate (ongoing)30.4%
Part B score (max 5.0)1.52 / 5.0
Final score4.06 / 10
|
1.7%
2.71
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.11Cr
Expenditure rate (ongoing)54.3%
Part B score (max 5.0)2.71 / 5.0
Final score2.71 / 10
|
4.8%
4.57
CategoryDug Well Recharge
Started / Completed / Phys219 / 88 / 54
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.19Cr / 0.05Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score4.57 / 10
|
2.2%
7.51
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.51 / 10
|
37.3%
5.63
CategoryWater conservation & recharge
Started / Completed / Phys85 / 11 / 35
Completion rate54.1%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked2.19Cr / 1.28Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.93 / 5.0
Final score5.63 / 10
|
8.7%
7.57
CategoryWatershed Related Works
Started / Completed / Phys17 / 4 / 10
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.23Cr / 0.16Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.57 / 10
|
5.2%
5.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.29Cr / 0.15Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score5.86 / 10
|
| 228 | DATIA โ | DATIA | 5.12 |
36.1%
3.08
CategoryFarm Pond
Started / Completed / Phys412 / 76 / 76
Completion rate36.9%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked5.32Cr / 1.32Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score3.08 / 10
|
โ |
3.3%
5.21
CategoryDug Well Recharge
Started / Completed / Phys301 / 44 / 161
Completion rate68.1%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.21 / 10
|
1.9%
8.70
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 8 / 9
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score8.70 / 10
|
47.4%
6.27
CategoryWater conservation & recharge
Started / Completed / Phys184 / 42 / 93
Completion rate73.4%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked2.89Cr / 1.50Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score6.27 / 10
|
5.7%
5.98
CategoryWatershed Related Works
Started / Completed / Phys30 / 7 / 15
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.34Cr / 0.16Cr
Expenditure rate (ongoing)46.3%
Part B score (max 5.0)2.31 / 5.0
Final score5.98 / 10
|
5.6%
6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 7 / 12
Completion rate73.1%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score6.40 / 10
|
| 229 | UNCHAHARA โ | SATNA | 5.12 |
39.9%
2.76
CategoryFarm Pond
Started / Completed / Phys269 / 17 / 74
Completion rate33.8%
Part A score (max 5.0)1.69 / 5.0
Ongoing sanction / booked4.03Cr / 0.86Cr
Expenditure rate (ongoing)21.4%
Part B score (max 5.0)1.07 / 5.0
Final score2.76 / 10
|
โ |
2.2%
6.19
CategoryDug Well Recharge
Started / Completed / Phys114 / 6 / 71
Completion rate67.5%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score6.19 / 10
|
โ |
30.7%
6.44
CategoryWater conservation & recharge
Started / Completed / Phys91 / 3 / 52
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked2.25Cr / 1.54Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score6.44 / 10
|
3.0%
5.96
CategoryWatershed Related Works
Started / Completed / Phys8 / 3 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.13Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.46 / 5.0
Final score5.96 / 10
|
24.2%
7.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 9
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked2.54Cr / 2.03Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score7.11 / 10
|
| 230 | NATERAN โ | VIDISHA | 5.11 |
54.3%
4.50
CategoryFarm Pond
Started / Completed / Phys320 / 132 / 73
Completion rate64.1%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked3.44Cr / 0.89Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score4.50 / 10
|
2.2%
1.18
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.09Cr
Expenditure rate (ongoing)23.6%
Part B score (max 5.0)1.18 / 5.0
Final score1.18 / 10
|
7.1%
6.22
CategoryDug Well Recharge
Started / Completed / Phys484 / 87 / 367
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.08Cr / 0.02Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score6.22 / 10
|
0.4%
6.88
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 1
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score6.88 / 10
|
35.3%
6.02
CategoryWater conservation & recharge
Started / Completed / Phys144 / 45 / 42
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked2.30Cr / 1.38Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score6.02 / 10
|
0.4%
4.77
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)95.4%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
|
0.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 231 | PIPARIYA โ | NARMADAPURAM | 5.10 |
54.2%
3.21
CategoryFarm Pond
Started / Completed / Phys97 / 47 / 1
Completion rate49.5%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked0.89Cr / 0.13Cr
Expenditure rate (ongoing)14.7%
Part B score (max 5.0)0.74 / 5.0
Final score3.21 / 10
|
โ |
9.3%
6.16
CategoryDug Well Recharge
Started / Completed / Phys122 / 105 / 0
Completion rate86.1%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score6.16 / 10
|
โ |
34.2%
7.65
CategoryWater conservation & recharge
Started / Completed / Phys34 / 25 / 1
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.75Cr / 0.57Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score7.65 / 10
|
1.1%
4.75
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score4.75 / 10
|
1.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 232 | HANUMANA โ | REWA | 5.09 |
42.8%
3.45
CategoryFarm Pond
Started / Completed / Phys317 / 125 / 20
Completion rate45.7%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked5.66Cr / 1.31Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score3.45 / 10
|
0.8%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.7%
4.88
CategoryDug Well Recharge
Started / Completed / Phys62 / 26 / 21
Completion rate75.8%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)21.8%
Part B score (max 5.0)1.09 / 5.0
Final score4.88 / 10
|
3.8%
6.64
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 9 / 0
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.14 / 5.0
Final score6.64 / 10
|
28.6%
6.32
CategoryWater conservation & recharge
Started / Completed / Phys139 / 67 / 30
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked1.84Cr / 1.04Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score6.32 / 10
|
11.9%
6.79
CategoryWatershed Related Works
Started / Completed / Phys16 / 5 / 7
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.46Cr / 0.28Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.04 / 5.0
Final score6.79 / 10
|
11.5%
6.24
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 17 / 4
Completion rate72.4%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.74Cr / 0.39Cr
Expenditure rate (ongoing)52.5%
Part B score (max 5.0)2.62 / 5.0
Final score6.24 / 10
|
| 233 | DEPALPUR โ | INDORE | 5.08 |
51.4%
3.16
CategoryFarm Pond
Started / Completed / Phys169 / 14 / 29
Completion rate25.4%
Part A score (max 5.0)1.27 / 5.0
Ongoing sanction / booked3.91Cr / 1.47Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score3.16 / 10
|
0.1%
0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.5%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
|
7.0%
4.83
CategoryDug Well Recharge
Started / Completed / Phys269 / 53 / 107
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked0.28Cr / 0.10Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score4.83 / 10
|
โ |
14.9%
6.57
CategoryWater conservation & recharge
Started / Completed / Phys43 / 12 / 19
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.40Cr / 0.24Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score6.57 / 10
|
19.8%
7.32
CategoryWatershed Related Works
Started / Completed / Phys41 / 12 / 23
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.28Cr / 0.17Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score7.32 / 10
|
6.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 234 | DAHI โ | DHAR | 5.07 |
8.8%
4.07
CategoryFarm Pond
Started / Completed / Phys160 / 3 / 40
Completion rate26.9%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked1.65Cr / 0.90Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score4.07 / 10
|
โ |
2.5%
2.57
CategoryDug Well Recharge
Started / Completed / Phys256 / 41 / 2
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked0.55Cr / 0.19Cr
Expenditure rate (ongoing)34.5%
Part B score (max 5.0)1.73 / 5.0
Final score2.57 / 10
|
โ |
81.3%
5.27
CategoryWater conservation & recharge
Started / Completed / Phys279 / 2 / 93
Completion rate34.1%
Part A score (max 5.0)1.70 / 5.0
Ongoing sanction / booked14.26Cr / 10.18Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score5.27 / 10
|
5.5%
4.11
CategoryWatershed Related Works
Started / Completed / Phys27 / 0 / 8
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked0.88Cr / 0.46Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score4.11 / 10
|
1.8%
7.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 12
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.10 / 5.0
Final score7.26 / 10
|
| 235 | SONDWA โ | ALIRAJPUR | 5.06 |
6.1%
3.95
CategoryFarm Pond
Started / Completed / Phys197 / 3 / 60
Completion rate32.0%
Part A score (max 5.0)1.60 / 5.0
Ongoing sanction / booked2.61Cr / 1.23Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.35 / 5.0
Final score3.95 / 10
|
2.1%
7.40
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.40Cr / 0.29Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score7.40 / 10
|
3.3%
4.25
CategoryDug Well Recharge
Started / Completed / Phys776 / 18 / 264
Completion rate36.3%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked1.28Cr / 0.62Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score4.25 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
84.5%
5.11
CategoryWater conservation & recharge
Started / Completed / Phys275 / 14 / 40
Completion rate19.6%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked36.67Cr / 30.28Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score5.11 / 10
|
0.9%
4.82
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.43Cr / 0.36Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score4.82 / 10
|
2.8%
5.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 2
Completion rate18.8%
Part A score (max 5.0)0.94 / 5.0
Ongoing sanction / booked1.30Cr / 1.07Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score5.06 / 10
|
| 236 | PAWAI โ | PANNA | 5.05 |
41.5%
3.97
CategoryFarm Pond
Started / Completed / Phys479 / 40 / 92
Completion rate27.6%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked9.78Cr / 5.08Cr
Expenditure rate (ongoing)51.9%
Part B score (max 5.0)2.60 / 5.0
Final score3.97 / 10
|
3.3%
3.62
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.10Cr / 0.79Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
|
4.3%
4.76
CategoryDug Well Recharge
Started / Completed / Phys377 / 61 / 95
Completion rate41.4%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked0.85Cr / 0.45Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score4.76 / 10
|
0.1%
2.17
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score2.17 / 10
|
37.6%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys341 / 16 / 134
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked7.63Cr / 5.90Cr
Expenditure rate (ongoing)77.4%
Part B score (max 5.0)3.87 / 5.0
Final score6.07 / 10
|
1.6%
6.02
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 7
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.02 / 10
|
11.7%
5.97
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys46 / 2 / 15
Completion rate37.0%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked2.49Cr / 2.06Cr
Expenditure rate (ongoing)82.4%
Part B score (max 5.0)4.12 / 5.0
Final score5.97 / 10
|
| 237 | UDAIPURA โ | RAISEN | 5.04 |
73.7%
4.87
CategoryFarm Pond
Started / Completed / Phys292 / 12 / 131
Completion rate49.0%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked3.28Cr / 1.59Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.43 / 5.0
Final score4.87 / 10
|
1.8%
3.27
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
|
5.4%
8.92
CategoryDug Well Recharge
Started / Completed / Phys194 / 123 / 65
Completion rate96.9%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score8.92 / 10
|
โ |
17.3%
4.64
CategoryWater conservation & recharge
Started / Completed / Phys20 / 2 / 4
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked1.11Cr / 0.70Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score4.64 / 10
|
0.4%
2.54
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score2.54 / 10
|
1.2%
6.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score6.73 / 10
|
| 238 | PATHARIYA โ | DAMOH | 5.03 |
24.0%
3.79
CategoryFarm Pond
Started / Completed / Phys235 / 91 / 21
Completion rate47.7%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked2.80Cr / 0.79Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score3.79 / 10
|
โ |
5.0%
5.90
CategoryDug Well Recharge
Started / Completed / Phys385 / 189 / 51
Completion rate62.3%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked0.37Cr / 0.21Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score5.90 / 10
|
4.6%
4.72
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.90Cr / 0.85Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.72 / 5.0
Final score4.72 / 10
|
54.7%
5.47
CategoryWater conservation & recharge
Started / Completed / Phys142 / 15 / 22
Completion rate26.1%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked10.21Cr / 8.50Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score5.47 / 10
|
8.3%
5.41
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 2
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.61Cr / 1.51Cr
Expenditure rate (ongoing)94.0%
Part B score (max 5.0)4.70 / 5.0
Final score5.41 / 10
|
3.4%
4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.49Cr / 0.33Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score4.96 / 10
|
| 239 | THANDLA โ | JHABUA | 5.01 |
13.2%
3.48
CategoryFarm Pond
Started / Completed / Phys243 / 8 / 38
Completion rate18.9%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked3.52Cr / 1.79Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score3.48 / 10
|
1.5%
1.90
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.19Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
|
5.9%
4.95
CategoryDug Well Recharge
Started / Completed / Phys737 / 276 / 108
Completion rate52.1%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked0.91Cr / 0.43Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.34 / 5.0
Final score4.95 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
75.9%
5.28
CategoryWater conservation & recharge
Started / Completed / Phys212 / 8 / 55
Completion rate29.7%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked15.76Cr / 11.97Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score5.28 / 10
|
1.9%
6.01
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 5
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.33Cr / 0.20Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score6.01 / 10
|
1.5%
6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 5
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.33Cr / 0.21Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score6.35 / 10
|
| 240 | SHAHPURA โ | JABALPUR | 4.99 |
42.0%
2.86
CategoryFarm Pond
Started / Completed / Phys181 / 64 / 5
Completion rate38.1%
Part A score (max 5.0)1.91 / 5.0
Ongoing sanction / booked3.92Cr / 0.74Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score2.86 / 10
|
3.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.0%
3.99
CategoryDug Well Recharge
Started / Completed / Phys52 / 28 / 2
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.10 / 5.0
Final score3.99 / 10
|
0.7%
5.02
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.69 / 5.0
Final score5.02 / 10
|
45.7%
7.09
CategoryWater conservation & recharge
Started / Completed / Phys122 / 89 / 16
Completion rate86.1%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked1.07Cr / 0.59Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score7.09 / 10
|
2.3%
6.16
CategoryWatershed Related Works
Started / Completed / Phys9 / 8 / 0
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.72 / 5.0
Final score6.16 / 10
|
4.8%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 8 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score6.96 / 10
|
| 241 | WAIDHAN โ | SINGRAULI | 4.99 |
29.9%
4.57
CategoryFarm Pond
Started / Completed / Phys337 / 160 / 14
Completion rate51.6%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked3.09Cr / 1.23Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)1.99 / 5.0
Final score4.57 / 10
|
3.4%
4.63
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score4.63 / 10
|
4.4%
5.66
CategoryDug Well Recharge
Started / Completed / Phys388 / 73 / 194
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.27Cr / 0.12Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score5.66 / 10
|
โ |
44.8%
5.20
CategoryWater conservation & recharge
Started / Completed / Phys129 / 14 / 42
Completion rate43.4%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked5.39Cr / 3.27Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.03 / 5.0
Final score5.20 / 10
|
12.3%
5.15
CategoryWatershed Related Works
Started / Completed / Phys33 / 5 / 8
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked1.46Cr / 0.93Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score5.15 / 10
|
5.3%
4.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 2 / 6
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.36Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score4.86 / 10
|
| 242 | BADNAWAR โ | DHAR | 4.99 |
22.9%
4.78
CategoryFarm Pond
Started / Completed / Phys316 / 25 / 88
Completion rate35.8%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked5.27Cr / 3.15Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score4.78 / 10
|
0.8%
2.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
|
5.2%
5.88
CategoryDug Well Recharge
Started / Completed / Phys602 / 192 / 74
Completion rate44.2%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked0.87Cr / 0.64Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.88 / 10
|
2.3%
4.13
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.57Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score4.13 / 10
|
57.8%
5.00
CategoryWater conservation & recharge
Started / Completed / Phys202 / 4 / 14
Completion rate8.9%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked16.27Cr / 14.81Cr
Expenditure rate (ongoing)91.1%
Part B score (max 5.0)4.55 / 5.0
Final score5.00 / 10
|
10.6%
5.31
CategoryWatershed Related Works
Started / Completed / Phys60 / 2 / 11
Completion rate21.7%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked2.87Cr / 2.42Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score5.31 / 10
|
0.3%
7.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.05Cr
Expenditure rate (ongoing)99.7%
Part B score (max 5.0)4.99 / 5.0
Final score7.49 / 10
|
| 243 | MAIHAR โ | SATNA | 4.98 |
48.1%
4.14
CategoryFarm Pond
Started / Completed / Phys328 / 26 / 136
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked4.44Cr / 1.49Cr
Expenditure rate (ongoing)33.5%
Part B score (max 5.0)1.68 / 5.0
Final score4.14 / 10
|
3.7%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.5%
6.74
CategoryDug Well Recharge
Started / Completed / Phys155 / 65 / 46
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.16 / 5.0
Final score6.74 / 10
|
0.1%
8.33
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score8.33 / 10
|
30.6%
6.44
CategoryWater conservation & recharge
Started / Completed / Phys87 / 8 / 39
Completion rate54.0%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked2.83Cr / 2.11Cr
Expenditure rate (ongoing)74.8%
Part B score (max 5.0)3.74 / 5.0
Final score6.44 / 10
|
6.6%
6.33
CategoryWatershed Related Works
Started / Completed / Phys56 / 8 / 29
Completion rate66.1%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score6.33 / 10
|
9.4%
5.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 7 / 11
Completion rate45.0%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked0.94Cr / 0.56Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score5.25 / 10
|
| 244 | SONKATCH โ | DEWAS | 4.97 |
50.3%
4.02
CategoryFarm Pond
Started / Completed / Phys103 / 24 / 28
Completion rate50.5%
Part A score (max 5.0)2.52 / 5.0
Ongoing sanction / booked1.90Cr / 0.57Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score4.02 / 10
|
2.5%
3.53
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score3.53 / 10
|
12.4%
5.34
CategoryDug Well Recharge
Started / Completed / Phys376 / 66 / 194
Completion rate69.1%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.30Cr / 0.11Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score5.34 / 10
|
โ |
32.7%
6.24
CategoryWater conservation & recharge
Started / Completed / Phys69 / 6 / 45
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.64Cr / 0.33Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score6.24 / 10
|
1.1%
6.15
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 4
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score6.15 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 245 | NALKHEDA โ | AGAR-MALWA | 4.94 |
29.1%
3.91
CategoryFarm Pond
Started / Completed / Phys125 / 2 / 24
Completion rate20.8%
Part A score (max 5.0)1.04 / 5.0
Ongoing sanction / booked2.62Cr / 1.51Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score3.91 / 10
|
โ |
10.9%
6.95
CategoryDug Well Recharge
Started / Completed / Phys464 / 98 / 218
Completion rate68.1%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.38Cr / 0.27Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score6.95 / 10
|
โ |
52.3%
5.05
CategoryWater conservation & recharge
Started / Completed / Phys80 / 1 / 15
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked4.39Cr / 3.56Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score5.05 / 10
|
0.9%
3.51
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
|
6.8%
5.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 0 / 8
Completion rate34.8%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked0.51Cr / 0.38Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.75 / 5.0
Final score5.49 / 10
|
| 246 | KARAHAL โ | SHEOPUR | 4.94 |
33.7%
3.78
CategoryFarm Pond
Started / Completed / Phys229 / 48 / 60
Completion rate47.2%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked4.58Cr / 1.30Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score3.78 / 10
|
3.9%
0.54
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.10Cr
Expenditure rate (ongoing)10.7%
Part B score (max 5.0)0.54 / 5.0
Final score0.54 / 10
|
0.3%
4.22
CategoryDug Well Recharge
Started / Completed / Phys28 / 13 / 7
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)13.0%
Part B score (max 5.0)0.65 / 5.0
Final score4.22 / 10
|
3.6%
8.28
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.15Cr / 0.12Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score8.28 / 10
|
52.5%
5.73
CategoryWater conservation & recharge
Started / Completed / Phys111 / 4 / 49
Completion rate47.7%
Part A score (max 5.0)2.39 / 5.0
Ongoing sanction / booked7.09Cr / 4.74Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score5.73 / 10
|
1.8%
3.75
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 2
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.75 / 5.0
Final score3.75 / 10
|
4.2%
6.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 5
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.45Cr / 0.33Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score6.15 / 10
|
| 247 | RAMA โ | JHABUA | 4.92 |
9.4%
2.69
CategoryFarm Pond
Started / Completed / Phys169 / 0 / 32
Completion rate18.9%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked2.00Cr / 0.70Cr
Expenditure rate (ongoing)34.9%
Part B score (max 5.0)1.75 / 5.0
Final score2.69 / 10
|
3.0%
2.97
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.44Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score2.97 / 10
|
5.9%
5.68
CategoryDug Well Recharge
Started / Completed / Phys594 / 157 / 172
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked0.66Cr / 0.38Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.91 / 5.0
Final score5.68 / 10
|
โ |
78.3%
5.22
CategoryWater conservation & recharge
Started / Completed / Phys98 / 1 / 25
Completion rate26.5%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked12.48Cr / 9.72Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.89 / 5.0
Final score5.22 / 10
|
0.6%
2.05
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score2.05 / 10
|
2.8%
5.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 4
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.33Cr / 0.22Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score5.06 / 10
|
| 248 | SEONDHA โ | DATIA | 4.91 |
52.7%
4.21
CategoryFarm Pond
Started / Completed / Phys296 / 175 / 1
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked2.44Cr / 0.61Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score4.21 / 10
|
2.2%
2.67
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score2.67 / 10
|
4.2%
5.26
CategoryDug Well Recharge
Started / Completed / Phys181 / 171 / 3
Completion rate96.1%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)9.1%
Part B score (max 5.0)0.45 / 5.0
Final score5.26 / 10
|
2.9%
8.57
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 1
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score8.57 / 10
|
29.9%
5.48
CategoryWater conservation & recharge
Started / Completed / Phys74 / 24 / 7
Completion rate41.9%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked1.73Cr / 1.17Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score5.48 / 10
|
4.4%
6.38
CategoryWatershed Related Works
Started / Completed / Phys12 / 7 / 0
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.28Cr / 0.19Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score6.38 / 10
|
3.8%
6.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.12Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.68 / 10
|
| 249 | KARERA โ | SHIVPURI | 4.90 |
43.5%
3.56
CategoryFarm Pond
Started / Completed / Phys224 / 39 / 48
Completion rate38.8%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked4.31Cr / 1.40Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score3.56 / 10
|
โ |
3.3%
5.33
CategoryDug Well Recharge
Started / Completed / Phys210 / 54 / 95
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.15Cr / 0.06Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.79 / 5.0
Final score5.33 / 10
|
1.3%
7.12
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score7.12 / 10
|
27.4%
5.82
CategoryWater conservation & recharge
Started / Completed / Phys98 / 12 / 40
Completion rate53.1%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked2.16Cr / 1.37Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.17 / 5.0
Final score5.82 / 10
|
23.3%
6.00
CategoryWatershed Related Works
Started / Completed / Phys37 / 5 / 13
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked1.96Cr / 1.40Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score6.00 / 10
|
1.2%
7.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score7.81 / 10
|
| 250 | JAISINGHNAGAR โ | SHAHDOL | 4.86 |
46.1%
3.48
CategoryFarm Pond
Started / Completed / Phys925 / 218 / 168
Completion rate41.7%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked13.94Cr / 3.89Cr
Expenditure rate (ongoing)27.9%
Part B score (max 5.0)1.40 / 5.0
Final score3.48 / 10
|
2.8%
1.01
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.29Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score1.01 / 10
|
0.7%
5.91
CategoryDug Well Recharge
Started / Completed / Phys134 / 56 / 38
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score5.91 / 10
|
5.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.9%
5.87
CategoryWater conservation & recharge
Started / Completed / Phys354 / 37 / 114
Completion rate42.7%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked12.79Cr / 9.54Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score5.87 / 10
|
1.4%
4.61
CategoryWatershed Related Works
Started / Completed / Phys15 / 3 / 2
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.53Cr / 0.31Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score4.61 / 10
|
5.9%
6.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 6 / 14
Completion rate48.8%
Part A score (max 5.0)2.44 / 5.0
Ongoing sanction / booked1.56Cr / 1.19Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score6.27 / 10
|
| 251 | BHIMPUR โ | BETUL | 4.84 |
20.9%
3.97
CategoryFarm Pond
Started / Completed / Phys196 / 3 / 38
Completion rate20.9%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked5.29Cr / 3.09Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score3.97 / 10
|
2.9%
1.19
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.93Cr / 0.22Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score1.19 / 10
|
3.6%
7.72
CategoryDug Well Recharge
Started / Completed / Phys433 / 19 / 319
Completion rate78.1%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.25Cr / 0.19Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.81 / 5.0
Final score7.72 / 10
|
โ |
68.1%
5.13
CategoryWater conservation & recharge
Started / Completed / Phys315 / 27 / 72
Completion rate31.4%
Part A score (max 5.0)1.57 / 5.0
Ongoing sanction / booked14.44Cr / 10.27Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.55 / 5.0
Final score5.13 / 10
|
2.0%
5.54
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.42Cr / 0.33Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.87 / 5.0
Final score5.54 / 10
|
2.6%
4.20
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 3
Completion rate15.0%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked0.72Cr / 0.49Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score4.20 / 10
|
| 252 | AGAR โ | AGAR-MALWA | 4.84 |
31.1%
2.53
CategoryFarm Pond
Started / Completed / Phys177 / 2 / 42
Completion rate24.9%
Part A score (max 5.0)1.24 / 5.0
Ongoing sanction / booked3.15Cr / 0.81Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.28 / 5.0
Final score2.53 / 10
|
โ |
11.0%
4.29
CategoryDug Well Recharge
Started / Completed / Phys535 / 50 / 262
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.59Cr / 0.16Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score4.29 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.2%
5.92
CategoryWater conservation & recharge
Started / Completed / Phys72 / 3 / 29
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked3.09Cr / 2.28Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score5.92 / 10
|
6.8%
6.23
CategoryWatershed Related Works
Started / Completed / Phys25 / 11 / 3
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked0.38Cr / 0.26Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score6.23 / 10
|
11.4%
6.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 3 / 24
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked0.36Cr / 0.23Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score6.90 / 10
|
| 253 | TEONTHAR โ | REWA | 4.83 |
44.0%
4.47
CategoryFarm Pond
Started / Completed / Phys284 / 132 / 33
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked2.58Cr / 0.81Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score4.47 / 10
|
4.5%
0.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.03Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
|
1.2%
5.32
CategoryDug Well Recharge
Started / Completed / Phys59 / 22 / 15
Completion rate62.7%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score5.32 / 10
|
6.8%
6.23
CategoryIrrigation infrastructure
Started / Completed / Phys21 / 5 / 5
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked0.25Cr / 0.19Cr
Expenditure rate (ongoing)76.9%
Part B score (max 5.0)3.85 / 5.0
Final score6.23 / 10
|
23.0%
5.27
CategoryWater conservation & recharge
Started / Completed / Phys80 / 35 / 6
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked1.05Cr / 0.57Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score5.27 / 10
|
11.1%
5.71
CategoryWatershed Related Works
Started / Completed / Phys29 / 10 / 7
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked0.65Cr / 0.36Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score5.71 / 10
|
9.4%
5.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 4 / 5
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.24Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score5.57 / 10
|
| 254 | RITHI โ | KATNI | 4.81 |
47.1%
3.32
CategoryFarm Pond
Started / Completed / Phys286 / 23 / 53
Completion rate26.6%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked7.74Cr / 3.09Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)1.99 / 5.0
Final score3.32 / 10
|
2.0%
2.19
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.18Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.19 / 5.0
Final score2.19 / 10
|
3.0%
6.02
CategoryDug Well Recharge
Started / Completed / Phys259 / 188 / 59
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)25.0%
Part B score (max 5.0)1.25 / 5.0
Final score6.02 / 10
|
6.4%
6.81
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 10 / 34
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.42Cr / 0.23Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score6.81 / 10
|
24.1%
6.09
CategoryWater conservation & recharge
Started / Completed / Phys112 / 27 / 36
Completion rate56.3%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked2.24Cr / 1.47Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score6.09 / 10
|
10.9%
6.24
CategoryWatershed Related Works
Started / Completed / Phys51 / 22 / 16
Completion rate74.5%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.29Cr / 0.15Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score6.24 / 10
|
6.7%
6.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 4 / 5
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.40Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score6.72 / 10
|
| 255 | INDORE โ | INDORE | 4.81 |
40.9%
4.37
CategoryFarm Pond
Started / Completed / Phys60 / 27 / 9
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.07Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score4.37 / 10
|
26.1%
2.85
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score2.85 / 10
|
13.3%
6.21
CategoryDug Well Recharge
Started / Completed / Phys124 / 97 / 9
Completion rate85.5%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.21 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.4%
7.32
CategoryWater conservation & recharge
Started / Completed / Phys20 / 15 / 2
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score7.32 / 10
|
1.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.6%
6.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score6.09 / 10
|
| 256 | HATTA โ | DAMOH | 4.79 |
20.8%
2.87
CategoryFarm Pond
Started / Completed / Phys175 / 19 / 9
Completion rate16.0%
Part A score (max 5.0)0.80 / 5.0
Ongoing sanction / booked3.01Cr / 1.24Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.07 / 5.0
Final score2.87 / 10
|
โ |
2.1%
5.48
CategoryDug Well Recharge
Started / Completed / Phys141 / 48 / 44
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.13Cr / 0.06Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score5.48 / 10
|
โ |
53.5%
5.26
CategoryWater conservation & recharge
Started / Completed / Phys96 / 19 / 10
Completion rate30.2%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked7.47Cr / 5.61Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score5.26 / 10
|
17.2%
5.71
CategoryWatershed Related Works
Started / Completed / Phys43 / 7 / 13
Completion rate46.5%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked1.41Cr / 0.95Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score5.71 / 10
|
6.3%
4.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 3
Completion rate23.5%
Part A score (max 5.0)1.18 / 5.0
Ongoing sanction / booked0.78Cr / 0.50Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score4.37 / 10
|
| 257 | DAMOH โ | DAMOH | 4.76 |
17.3%
5.58
CategoryFarm Pond
Started / Completed / Phys230 / 103 / 20
Completion rate53.5%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked2.48Cr / 1.44Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.91 / 5.0
Final score5.58 / 10
|
1.1%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
3.5%
6.70
CategoryDug Well Recharge
Started / Completed / Phys433 / 147 / 105
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked0.47Cr / 0.35Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score6.70 / 10
|
0.1%
4.86
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)97.3%
Part B score (max 5.0)4.86 / 5.0
Final score4.86 / 10
|
56.9%
4.76
CategoryWater conservation & recharge
Started / Completed / Phys201 / 13 / 15
Completion rate13.9%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked17.40Cr / 14.14Cr
Expenditure rate (ongoing)81.3%
Part B score (max 5.0)4.06 / 5.0
Final score4.76 / 10
|
11.2%
4.52
CategoryWatershed Related Works
Started / Completed / Phys70 / 4 / 3
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked3.04Cr / 2.44Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.02 / 5.0
Final score4.52 / 10
|
9.9%
3.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.20Cr / 2.21Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score3.45 / 10
|
| 258 | NOWGOAN โ | CHHATARPUR | 4.75 |
79.7%
3.93
CategoryFarm Pond
Started / Completed / Phys267 / 117 / 36
Completion rate57.3%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked3.68Cr / 0.78Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.06 / 5.0
Final score3.93 / 10
|
โ |
6.2%
5.18
CategoryDug Well Recharge
Started / Completed / Phys456 / 404 / 40
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)6.2%
Part B score (max 5.0)0.31 / 5.0
Final score5.18 / 10
|
โ |
11.5%
9.00
CategoryWater conservation & recharge
Started / Completed / Phys55 / 21 / 31
Completion rate94.5%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)94.2%
Part B score (max 5.0)4.71 / 5.0
Final score9.00 / 10
|
1.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 259 | GYARASPUR โ | VIDISHA | 4.74 |
72.3%
4.21
CategoryFarm Pond
Started / Completed / Phys271 / 134 / 25
Completion rate58.7%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked3.40Cr / 0.87Cr
Expenditure rate (ongoing)25.5%
Part B score (max 5.0)1.28 / 5.0
Final score4.21 / 10
|
โ |
8.4%
6.21
CategoryDug Well Recharge
Started / Completed / Phys346 / 88 / 194
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.17Cr / 0.07Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.14 / 5.0
Final score6.21 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.2%
6.16
CategoryWater conservation & recharge
Started / Completed / Phys75 / 24 / 23
Completion rate62.7%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.84Cr / 0.51Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score6.16 / 10
|
โ |
2.1%
5.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score5.39 / 10
|
| 260 | KAHNAPAS(GHANSAUR) โ | SEONI | 4.73 |
52.0%
3.61
CategoryFarm Pond
Started / Completed / Phys499 / 123 / 40
Completion rate32.7%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked7.98Cr / 3.15Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.97 / 5.0
Final score3.61 / 10
|
โ |
2.6%
6.08
CategoryDug Well Recharge
Started / Completed / Phys226 / 152 / 63
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.33 / 5.0
Final score6.08 / 10
|
โ |
41.4%
5.70
CategoryWater conservation & recharge
Started / Completed / Phys185 / 27 / 73
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked4.39Cr / 2.63Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score5.70 / 10
|
2.2%
6.70
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 5
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.95 / 5.0
Final score6.70 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 261 | CHANCHODA โ | GUNA | 4.72 |
34.3%
2.38
CategoryFarm Pond
Started / Completed / Phys396 / 80 / 36
Completion rate29.3%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked5.78Cr / 1.06Cr
Expenditure rate (ongoing)18.3%
Part B score (max 5.0)0.91 / 5.0
Final score2.38 / 10
|
โ |
9.7%
5.74
CategoryDug Well Recharge
Started / Completed / Phys917 / 532 / 342
Completion rate95.3%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.11Cr / 0.02Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score5.74 / 10
|
0.6%
4.47
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score4.47 / 10
|
47.7%
5.96
CategoryWater conservation & recharge
Started / Completed / Phys204 / 45 / 75
Completion rate58.8%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked4.99Cr / 3.01Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score5.96 / 10
|
0.6%
5.10
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score5.10 / 10
|
7.0%
6.24
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 11 / 10
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.39Cr / 0.19Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score6.24 / 10
|
| 262 | TENDUKHEDA โ | DAMOH | 4.69 |
16.5%
5.24
CategoryFarm Pond
Started / Completed / Phys211 / 91 / 65
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.83Cr / 0.26Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.55 / 5.0
Final score5.24 / 10
|
โ |
5.2%
8.21
CategoryDug Well Recharge
Started / Completed / Phys354 / 111 / 211
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score8.21 / 10
|
โ |
51.8%
4.54
CategoryWater conservation & recharge
Started / Completed / Phys88 / 1 / 18
Completion rate21.6%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked8.22Cr / 5.69Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score4.54 / 10
|
6.8%
3.18
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.77Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score3.18 / 10
|
19.6%
4.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 0 / 3
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked2.59Cr / 1.89Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score4.19 / 10
|
| 263 | BUDNI โ | SEHORE | 4.69 |
60.4%
4.33
CategoryFarm Pond
Started / Completed / Phys81 / 15 / 28
Completion rate53.1%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.67Cr / 0.23Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.33 / 10
|
โ |
16.2%
6.12
CategoryDug Well Recharge
Started / Completed / Phys151 / 44 / 75
Completion rate78.8%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score6.12 / 10
|
15.6%
3.80
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.29Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
|
3.2%
6.74
CategoryWater conservation & recharge
Started / Completed / Phys8 / 1 / 4
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score6.74 / 10
|
2.7%
5.18
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.68 / 5.0
Final score5.18 / 10
|
1.9%
6.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score6.83 / 10
|
| 264 | SIRMOUR โ | REWA | 4.68 |
57.6%
3.68
CategoryFarm Pond
Started / Completed / Phys287 / 167 / 10
Completion rate61.7%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked1.68Cr / 0.20Cr
Expenditure rate (ongoing)11.9%
Part B score (max 5.0)0.60 / 5.0
Final score3.68 / 10
|
3.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.4%
9.00
CategoryDug Well Recharge
Started / Completed / Phys73 / 72 / 0
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score9.00 / 10
|
1.8%
7.07
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 12 / 4
Completion rate94.1%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score7.07 / 10
|
30.7%
6.22
CategoryWater conservation & recharge
Started / Completed / Phys60 / 32 / 13
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.70Cr / 0.35Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score6.22 / 10
|
5.7%
7.51
CategoryWatershed Related Works
Started / Completed / Phys12 / 7 / 4
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.51 / 10
|
0.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 265 | LAKHNADON โ | SEONI | 4.66 |
48.8%
3.67
CategoryFarm Pond
Started / Completed / Phys982 / 318 / 12
Completion rate33.6%
Part A score (max 5.0)1.68 / 5.0
Ongoing sanction / booked12.91Cr / 5.15Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score3.67 / 10
|
โ |
2.5%
6.36
CategoryDug Well Recharge
Started / Completed / Phys391 / 273 / 31
Completion rate77.7%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.22Cr / 0.11Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score6.36 / 10
|
1.1%
4.68
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.25Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.68 / 10
|
38.7%
5.45
CategoryWater conservation & recharge
Started / Completed / Phys401 / 114 / 60
Completion rate43.4%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked9.57Cr / 6.28Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score5.45 / 10
|
4.0%
6.19
CategoryWatershed Related Works
Started / Completed / Phys34 / 10 / 8
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.86Cr / 0.61Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score6.19 / 10
|
4.9%
6.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys36 / 7 / 14
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.76Cr / 0.48Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.06 / 10
|
| 266 | BASODA โ | VIDISHA | 4.65 |
75.8%
3.97
CategoryFarm Pond
Started / Completed / Phys303 / 166 / 21
Completion rate61.7%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked3.05Cr / 0.54Cr
Expenditure rate (ongoing)17.8%
Part B score (max 5.0)0.89 / 5.0
Final score3.97 / 10
|
โ |
2.3%
6.52
CategoryDug Well Recharge
Started / Completed / Phys90 / 48 / 23
Completion rate78.9%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.58 / 5.0
Final score6.52 / 10
|
0.7%
6.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score6.22 / 10
|
19.4%
6.91
CategoryWater conservation & recharge
Started / Completed / Phys95 / 54 / 25
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.56Cr / 0.31Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.75 / 5.0
Final score6.91 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.6%
5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score5.38 / 10
|
| 267 | CHHATARPUR โ | CHHATARPUR | 4.62 |
52.1%
3.54
CategoryFarm Pond
Started / Completed / Phys242 / 90 / 40
Completion rate53.7%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked3.69Cr / 0.63Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score3.54 / 10
|
4.0%
1.19
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.14Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score1.19 / 10
|
7.7%
5.83
CategoryDug Well Recharge
Started / Completed / Phys508 / 284 / 135
Completion rate82.5%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.20Cr / 0.07Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.83 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.5%
6.16
CategoryWater conservation & recharge
Started / Completed / Phys115 / 39 / 29
Completion rate59.1%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked1.94Cr / 1.24Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score6.16 / 10
|
4.2%
6.42
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 12
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.42 / 10
|
4.0%
6.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 6
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score6.66 / 10
|
| 268 | UDAIGARH โ | ALIRAJPUR | 4.62 |
15.5%
3.78
CategoryFarm Pond
Started / Completed / Phys177 / 0 / 47
Completion rate26.6%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked1.94Cr / 0.95Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score3.78 / 10
|
3.6%
3.22
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.41Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score3.22 / 10
|
6.4%
4.40
CategoryDug Well Recharge
Started / Completed / Phys432 / 11 / 135
Completion rate33.8%
Part A score (max 5.0)1.69 / 5.0
Ongoing sanction / booked0.74Cr / 0.40Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score4.40 / 10
|
โ |
69.7%
4.76
CategoryWater conservation & recharge
Started / Completed / Phys66 / 0 / 14
Completion rate21.2%
Part A score (max 5.0)1.06 / 5.0
Ongoing sanction / booked10.55Cr / 7.80Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score4.76 / 10
|
4.8%
6.78
CategoryWatershed Related Works
Started / Completed / Phys22 / 0 / 16
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.78 / 10
|
โ |
| 269 | GOTEGAON โ | NARSINGHPUR | 4.62 |
83.0%
4.26
CategoryFarm Pond
Started / Completed / Phys271 / 178 / 15
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked2.20Cr / 0.31Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score4.26 / 10
|
โ |
1.4%
3.98
CategoryDug Well Recharge
Started / Completed / Phys50 / 37 / 1
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.18 / 5.0
Final score3.98 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.8%
6.34
CategoryWater conservation & recharge
Started / Completed / Phys18 / 6 / 9
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.27Cr / 0.12Cr
Expenditure rate (ongoing)43.5%
Part B score (max 5.0)2.18 / 5.0
Final score6.34 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.3%
7.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score7.65 / 10
|
| 270 | GAURIHAR โ | CHHATARPUR | 4.61 |
51.8%
3.56
CategoryFarm Pond
Started / Completed / Phys201 / 80 / 30
Completion rate54.7%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked3.47Cr / 0.57Cr
Expenditure rate (ongoing)16.4%
Part B score (max 5.0)0.82 / 5.0
Final score3.56 / 10
|
3.5%
0.75
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.08Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score0.75 / 10
|
5.5%
4.56
CategoryDug Well Recharge
Started / Completed / Phys435 / 313 / 30
Completion rate78.9%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.19Cr / 0.02Cr
Expenditure rate (ongoing)12.3%
Part B score (max 5.0)0.61 / 5.0
Final score4.56 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
6.33
CategoryWater conservation & recharge
Started / Completed / Phys130 / 22 / 78
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked1.04Cr / 0.52Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score6.33 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.9%
5.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
|
| 271 | LAUNDI โ | CHHATARPUR | 4.60 |
52.3%
3.49
CategoryFarm Pond
Started / Completed / Phys219 / 74 / 35
Completion rate49.8%
Part A score (max 5.0)2.49 / 5.0
Ongoing sanction / booked4.32Cr / 0.87Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score3.49 / 10
|
1.1%
2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
|
7.5%
6.05
CategoryDug Well Recharge
Started / Completed / Phys474 / 247 / 141
Completion rate81.9%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.22Cr / 0.09Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score6.05 / 10
|
โ |
31.0%
6.08
CategoryWater conservation & recharge
Started / Completed / Phys89 / 10 / 42
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked1.82Cr / 1.15Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score6.08 / 10
|
2.2%
5.09
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 7
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked0.28Cr / 0.18Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score5.09 / 10
|
5.7%
4.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 4
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked0.54Cr / 0.33Cr
Expenditure rate (ongoing)61.2%
Part B score (max 5.0)3.06 / 5.0
Final score4.98 / 10
|
| 272 | SEHORE โ | SEHORE | 4.59 |
66.5%
3.34
CategoryFarm Pond
Started / Completed / Phys451 / 29 / 179
Completion rate46.1%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked6.62Cr / 1.37Cr
Expenditure rate (ongoing)20.7%
Part B score (max 5.0)1.03 / 5.0
Final score3.34 / 10
|
โ |
11.3%
5.92
CategoryDug Well Recharge
Started / Completed / Phys732 / 77 / 550
Completion rate85.7%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.27Cr / 0.09Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.63 / 5.0
Final score5.92 / 10
|
1.0%
5.71
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 1
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.71 / 10
|
17.4%
7.62
CategoryWater conservation & recharge
Started / Completed / Phys121 / 11 / 92
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.71Cr / 0.48Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score7.62 / 10
|
1.6%
6.51
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score6.51 / 10
|
2.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 273 | BAGLI โ | DEWAS | 4.59 |
44.1%
3.36
CategoryFarm Pond
Started / Completed / Phys420 / 81 / 87
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked7.66Cr / 2.08Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score3.36 / 10
|
4.1%
1.54
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.36Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score1.54 / 10
|
12.0%
6.59
CategoryDug Well Recharge
Started / Completed / Phys1,317 / 885 / 302
Completion rate90.1%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.36Cr / 0.15Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.08 / 5.0
Final score6.59 / 10
|
0.5%
2.95
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score2.95 / 10
|
33.9%
5.64
CategoryWater conservation & recharge
Started / Completed / Phys171 / 33 / 38
Completion rate41.5%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked5.92Cr / 4.22Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.57 / 5.0
Final score5.64 / 10
|
4.3%
6.19
CategoryWatershed Related Works
Started / Completed / Phys35 / 8 / 11
Completion rate54.3%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked0.31Cr / 0.22Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.19 / 10
|
1.1%
5.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 1
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score5.70 / 10
|
| 274 | SITAMAU โ | MANDSAUR | 4.59 |
23.0%
2.82
CategoryFarm Pond
Started / Completed / Phys332 / 36 / 15
Completion rate15.4%
Part A score (max 5.0)0.77 / 5.0
Ongoing sanction / booked5.24Cr / 2.15Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score2.82 / 10
|
โ |
10.6%
5.13
CategoryDug Well Recharge
Started / Completed / Phys1,066 / 246 / 149
Completion rate37.1%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked1.74Cr / 1.14Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score5.13 / 10
|
0.5%
5.76
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.43 / 5.0
Final score5.76 / 10
|
60.2%
5.02
CategoryWater conservation & recharge
Started / Completed / Phys360 / 61 / 40
Completion rate28.1%
Part A score (max 5.0)1.40 / 5.0
Ongoing sanction / booked11.75Cr / 8.50Cr
Expenditure rate (ongoing)72.3%
Part B score (max 5.0)3.62 / 5.0
Final score5.02 / 10
|
2.6%
6.60
CategoryWatershed Related Works
Started / Completed / Phys15 / 5 / 2
Completion rate46.7%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked0.41Cr / 0.35Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score6.60 / 10
|
3.1%
5.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 3 / 3
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.32Cr / 0.23Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score5.78 / 10
|
| 275 | BHABRA โ | ALIRAJPUR | 4.59 |
15.2%
4.75
CategoryFarm Pond
Started / Completed / Phys120 / 0 / 50
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked1.83Cr / 0.98Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score4.75 / 10
|
2.2%
3.27
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.32Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
|
4.8%
5.76
CategoryDug Well Recharge
Started / Completed / Phys414 / 2 / 184
Completion rate44.9%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked0.59Cr / 0.41Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score5.76 / 10
|
โ |
76.4%
4.52
CategoryWater conservation & recharge
Started / Completed / Phys90 / 1 / 8
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked16.24Cr / 13.05Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score4.52 / 10
|
1.4%
4.66
CategoryWatershed Related Works
Started / Completed / Phys9 / 1 / 1
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked0.29Cr / 0.20Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score4.66 / 10
|
0.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 276 | KURWAI โ | VIDISHA | 4.58 |
66.1%
3.96
CategoryFarm Pond
Started / Completed / Phys300 / 168 / 11
Completion rate59.7%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked2.64Cr / 0.52Cr
Expenditure rate (ongoing)19.6%
Part B score (max 5.0)0.98 / 5.0
Final score3.96 / 10
|
1.9%
2.57
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score2.57 / 10
|
2.8%
5.14
CategoryDug Well Recharge
Started / Completed / Phys109 / 35 / 50
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score5.14 / 10
|
1.1%
7.30
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 21 / 0
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score7.30 / 10
|
24.5%
5.79
CategoryWater conservation & recharge
Started / Completed / Phys76 / 39 / 5
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.81Cr / 0.47Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score5.79 / 10
|
2.0%
5.57
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score5.57 / 10
|
1.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 277 | ALIRAJPUR โ | ALIRAJPUR | 4.52 |
23.6%
2.42
CategoryFarm Pond
Started / Completed / Phys186 / 1 / 23
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked4.53Cr / 1.61Cr
Expenditure rate (ongoing)35.5%
Part B score (max 5.0)1.77 / 5.0
Final score2.42 / 10
|
2.4%
3.21
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score3.21 / 10
|
7.9%
4.70
CategoryDug Well Recharge
Started / Completed / Phys638 / 31 / 218
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked1.01Cr / 0.55Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score4.70 / 10
|
โ |
65.3%
5.30
CategoryWater conservation & recharge
Started / Completed / Phys140 / 2 / 36
Completion rate27.1%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked9.14Cr / 7.20Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score5.30 / 10
|
0.7%
4.09
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 2
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score4.09 / 10
|
0.1%
8.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)93.3%
Part B score (max 5.0)4.66 / 5.0
Final score8.00 / 10
|
| 278 | SIHORA โ | JABALPUR | 4.51 |
54.9%
1.78
CategoryFarm Pond
Started / Completed / Phys161 / 14 / 10
Completion rate14.9%
Part A score (max 5.0)0.75 / 5.0
Ongoing sanction / booked3.92Cr / 0.81Cr
Expenditure rate (ongoing)20.7%
Part B score (max 5.0)1.04 / 5.0
Final score1.78 / 10
|
2.9%
3.93
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.18Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
|
0.5%
3.12
CategoryDug Well Recharge
Started / Completed / Phys15 / 2 / 6
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)9.0%
Part B score (max 5.0)0.45 / 5.0
Final score3.12 / 10
|
โ |
35.8%
8.08
CategoryWater conservation & recharge
Started / Completed / Phys39 / 19 / 5
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked1.12Cr / 1.55Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score8.08 / 10
|
1.4%
4.53
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.87 / 5.0
Final score4.53 / 10
|
4.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 279 | KOTMA โ | ANUPPUR | 4.45 |
75.6%
3.80
CategoryFarm Pond
Started / Completed / Phys593 / 363 / 6
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked4.38Cr / 0.61Cr
Expenditure rate (ongoing)13.9%
Part B score (max 5.0)0.69 / 5.0
Final score3.80 / 10
|
โ |
0.8%
5.21
CategoryDug Well Recharge
Started / Completed / Phys50 / 5 / 21
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.61 / 5.0
Final score5.21 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.6%
6.48
CategoryWater conservation & recharge
Started / Completed / Phys52 / 20 / 14
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked1.07Cr / 0.69Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.21 / 5.0
Final score6.48 / 10
|
0.9%
3.52
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
|
2.1%
6.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score6.45 / 10
|
| 280 | TIKAMGARH โ | TIKAMGARH | 4.42 |
29.3%
1.79
CategoryFarm Pond
Started / Completed / Phys190 / 2 / 22
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked3.38Cr / 0.79Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.16 / 5.0
Final score1.79 / 10
|
1.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
10.7%
4.35
CategoryDug Well Recharge
Started / Completed / Phys548 / 11 / 320
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked0.56Cr / 0.15Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.33 / 5.0
Final score4.35 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.9%
5.46
CategoryWater conservation & recharge
Started / Completed / Phys167 / 6 / 75
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked3.61Cr / 2.19Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.03 / 5.0
Final score5.46 / 10
|
13.1%
5.93
CategoryWatershed Related Works
Started / Completed / Phys45 / 5 / 24
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.69Cr / 0.38Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score5.93 / 10
|
3.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 281 | KUNDAM โ | JABALPUR | 4.41 |
56.5%
2.95
CategoryFarm Pond
Started / Completed / Phys268 / 14 / 76
Completion rate33.6%
Part A score (max 5.0)1.68 / 5.0
Ongoing sanction / booked6.72Cr / 1.71Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score2.95 / 10
|
9.3%
1.89
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 0.60Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.89 / 5.0
Final score1.89 / 10
|
4.0%
5.92
CategoryDug Well Recharge
Started / Completed / Phys266 / 103 / 149
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score5.92 / 10
|
โ |
22.7%
7.87
CategoryWater conservation & recharge
Started / Completed / Phys95 / 34 / 48
Completion rate86.3%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.88Cr / 0.62Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score7.87 / 10
|
7.5%
7.33
CategoryWatershed Related Works
Started / Completed / Phys42 / 20 / 14
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score7.33 / 10
|
โ |
| 282 | SEONI MALWA โ | NARMADAPURAM | 4.41 |
65.3%
3.18
CategoryFarm Pond
Started / Completed / Phys182 / 71 / 14
Completion rate46.7%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked2.88Cr / 0.48Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score3.18 / 10
|
โ |
7.1%
6.26
CategoryDug Well Recharge
Started / Completed / Phys205 / 83 / 92
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)2.00 / 5.0
Final score6.26 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
23.9%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys58 / 33 / 13
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.66Cr / 0.36Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score6.69 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 6 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.7%
5.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.78 / 5.0
Final score5.54 / 10
|
| 283 | DABRA โ | GWALIOR | 4.41 |
63.8%
4.15
CategoryFarm Pond
Started / Completed / Phys245 / 33 / 137
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked2.04Cr / 0.28Cr
Expenditure rate (ongoing)13.5%
Part B score (max 5.0)0.68 / 5.0
Final score4.15 / 10
|
8.8%
1.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.85Cr / 0.17Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
|
5.1%
4.71
CategoryDug Well Recharge
Started / Completed / Phys192 / 41 / 132
Completion rate90.1%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)4.2%
Part B score (max 5.0)0.21 / 5.0
Final score4.71 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
18.2%
6.35
CategoryWater conservation & recharge
Started / Completed / Phys40 / 3 / 33
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.85 / 5.0
Final score6.35 / 10
|
1.8%
6.95
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.20 / 5.0
Final score6.95 / 10
|
1.6%
5.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score5.28 / 10
|
| 284 | SHAJAPUR โ | SHAJAPUR | 4.39 |
45.0%
2.85
CategoryFarm Pond
Started / Completed / Phys233 / 40 / 20
Completion rate25.8%
Part A score (max 5.0)1.29 / 5.0
Ongoing sanction / booked5.90Cr / 1.84Cr
Expenditure rate (ongoing)31.3%
Part B score (max 5.0)1.56 / 5.0
Final score2.85 / 10
|
3.9%
1.90
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.26Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
|
5.9%
6.00
CategoryDug Well Recharge
Started / Completed / Phys433 / 274 / 60
Completion rate77.1%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.24Cr / 0.10Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score6.00 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
5.58
CategoryWater conservation & recharge
Started / Completed / Phys132 / 21 / 45
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked3.16Cr / 1.95Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score5.58 / 10
|
8.0%
6.96
CategoryWatershed Related Works
Started / Completed / Phys33 / 5 / 19
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.36Cr / 0.24Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.96 / 10
|
1.2%
7.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score7.51 / 10
|
| 285 | BALDEOGARH โ | TIKAMGARH | 4.39 |
29.3%
2.60
CategoryFarm Pond
Started / Completed / Phys238 / 9 / 32
Completion rate17.2%
Part A score (max 5.0)0.86 / 5.0
Ongoing sanction / booked3.72Cr / 1.29Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.74 / 5.0
Final score2.60 / 10
|
8.4%
0.20
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.28Cr / 0.05Cr
Expenditure rate (ongoing)4.1%
Part B score (max 5.0)0.20 / 5.0
Final score0.20 / 10
|
10.2%
5.48
CategoryDug Well Recharge
Started / Completed / Phys605 / 36 / 431
Completion rate77.2%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.35Cr / 0.11Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.62 / 5.0
Final score5.48 / 10
|
0.6%
8.57
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 9 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)96.5%
Part B score (max 5.0)4.82 / 5.0
Final score8.57 / 10
|
40.8%
5.86
CategoryWater conservation & recharge
Started / Completed / Phys262 / 33 / 114
Completion rate56.1%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked3.01Cr / 1.84Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.06 / 5.0
Final score5.86 / 10
|
5.6%
6.01
CategoryWatershed Related Works
Started / Completed / Phys31 / 5 / 12
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked0.42Cr / 0.27Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.01 / 10
|
5.1%
5.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 4
Completion rate31.3%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked0.51Cr / 0.38Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score5.35 / 10
|
| 286 | PIPLODA โ | RATLAM | 4.37 |
60.9%
3.00
CategoryFarm Pond
Started / Completed / Phys97 / 34 / 8
Completion rate43.3%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked1.48Cr / 0.25Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.83 / 5.0
Final score3.00 / 10
|
โ |
14.3%
6.02
CategoryDug Well Recharge
Started / Completed / Phys197 / 58 / 101
Completion rate80.7%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score6.02 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
22.8%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys21 / 11 / 4
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score6.51 / 10
|
1.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 287 | KALAPIPAL โ | SHAJAPUR | 4.35 |
52.6%
3.11
CategoryFarm Pond
Started / Completed / Phys150 / 53 / 12
Completion rate43.3%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked1.73Cr / 0.33Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.95 / 5.0
Final score3.11 / 10
|
5.5%
1.17
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.08Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score1.17 / 10
|
16.1%
5.47
CategoryDug Well Recharge
Started / Completed / Phys400 / 204 / 171
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)15.6%
Part B score (max 5.0)0.78 / 5.0
Final score5.47 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.1%
6.73
CategoryWater conservation & recharge
Started / Completed / Phys40 / 18 / 13
Completion rate77.5%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.26Cr / 0.15Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.73 / 10
|
โ | โ |
| 288 | SHUJALPUR โ | SHAJAPUR | 4.34 |
47.8%
3.01
CategoryFarm Pond
Started / Completed / Phys107 / 32 / 0
Completion rate29.9%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked2.49Cr / 0.75Cr
Expenditure rate (ongoing)30.3%
Part B score (max 5.0)1.51 / 5.0
Final score3.01 / 10
|
2.1%
2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
|
12.4%
5.13
CategoryDug Well Recharge
Started / Completed / Phys365 / 116 / 178
Completion rate80.5%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.17Cr / 0.04Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.11 / 5.0
Final score5.13 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
5.67
CategoryWater conservation & recharge
Started / Completed / Phys50 / 11 / 21
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.84Cr / 0.42Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score5.67 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.6%
6.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.39 / 10
|
| 289 | NAIGARHI โ | REWA | 4.34 |
53.0%
2.90
CategoryFarm Pond
Started / Completed / Phys201 / 34 / 26
Completion rate29.9%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked5.22Cr / 1.47Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score2.90 / 10
|
โ |
0.6%
4.02
CategoryDug Well Recharge
Started / Completed / Phys44 / 7 / 17
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score4.02 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.8%
5.88
CategoryWater conservation & recharge
Started / Completed / Phys91 / 29 / 18
Completion rate51.6%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked2.42Cr / 1.60Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score5.88 / 10
|
7.1%
5.30
CategoryWatershed Related Works
Started / Completed / Phys18 / 3 / 4
Completion rate38.9%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked0.74Cr / 0.50Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score5.30 / 10
|
7.9%
6.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 11 / 2
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.48Cr / 0.34Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score6.70 / 10
|
| 290 | MANPUR โ | UMARIA | 4.34 |
26.7%
3.09
CategoryFarm Pond
Started / Completed / Phys435 / 43 / 70
Completion rate26.0%
Part A score (max 5.0)1.30 / 5.0
Ongoing sanction / booked5.90Cr / 2.11Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score3.09 / 10
|
2.7%
2.33
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.36Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score2.33 / 10
|
4.1%
2.85
CategoryDug Well Recharge
Started / Completed / Phys446 / 45 / 79
Completion rate27.8%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked0.86Cr / 0.25Cr
Expenditure rate (ongoing)29.3%
Part B score (max 5.0)1.46 / 5.0
Final score2.85 / 10
|
0.0%
4.67
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)93.5%
Part B score (max 5.0)4.67 / 5.0
Final score4.67 / 10
|
51.3%
5.06
CategoryWater conservation & recharge
Started / Completed / Phys355 / 34 / 77
Completion rate31.3%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked10.08Cr / 7.05Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.50 / 5.0
Final score5.06 / 10
|
8.4%
4.74
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 3
Completion rate15.8%
Part A score (max 5.0)0.79 / 5.0
Ongoing sanction / booked2.09Cr / 1.65Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score4.74 / 10
|
6.9%
4.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 1 / 12
Completion rate31.7%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked1.48Cr / 0.99Cr
Expenditure rate (ongoing)67.0%
Part B score (max 5.0)3.35 / 5.0
Final score4.93 / 10
|
| 291 | NARAYANGANJ โ | MANDLA | 4.33 |
36.2%
4.92
CategoryFarm Pond
Started / Completed / Phys187 / 27 / 53
Completion rate42.8%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked3.73Cr / 2.08Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score4.92 / 10
|
13.5%
0.40
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.39Cr / 0.19Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score0.40 / 10
|
2.3%
6.37
CategoryDug Well Recharge
Started / Completed / Phys155 / 85 / 21
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score6.37 / 10
|
โ |
29.0%
4.69
CategoryWater conservation & recharge
Started / Completed / Phys92 / 12 / 3
Completion rate16.3%
Part A score (max 5.0)0.82 / 5.0
Ongoing sanction / booked4.52Cr / 3.50Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.87 / 5.0
Final score4.69 / 10
|
18.6%
5.25
CategoryWatershed Related Works
Started / Completed / Phys72 / 20 / 0
Completion rate27.8%
Part A score (max 5.0)1.39 / 5.0
Ongoing sanction / booked2.39Cr / 1.84Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score5.25 / 10
|
0.4%
3.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
|
| 292 | MOMAN BADODIYA โ | SHAJAPUR | 4.29 |
51.2%
2.92
CategoryFarm Pond
Started / Completed / Phys192 / 50 / 14
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked3.30Cr / 0.83Cr
Expenditure rate (ongoing)25.1%
Part B score (max 5.0)1.25 / 5.0
Final score2.92 / 10
|
3.9%
2.90
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score2.90 / 10
|
12.0%
5.45
CategoryDug Well Recharge
Started / Completed / Phys444 / 46 / 316
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.20Cr / 0.06Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.37 / 5.0
Final score5.45 / 10
|
1.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
28.4%
5.83
CategoryWater conservation & recharge
Started / Completed / Phys68 / 14 / 27
Completion rate60.3%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked1.00Cr / 0.56Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score5.83 / 10
|
1.7%
5.31
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.31 / 5.0
Final score5.31 / 10
|
1.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 293 | JABALPUR โ | JABALPUR | 4.29 |
45.5%
2.75
CategoryFarm Pond
Started / Completed / Phys177 / 45 / 24
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked2.76Cr / 0.44Cr
Expenditure rate (ongoing)16.1%
Part B score (max 5.0)0.80 / 5.0
Final score2.75 / 10
|
11.1%
1.27
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.26Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score1.27 / 10
|
6.4%
6.37
CategoryDug Well Recharge
Started / Completed / Phys230 / 111 / 76
Completion rate81.3%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.31 / 5.0
Final score6.37 / 10
|
0.2%
2.26
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score2.26 / 10
|
22.3%
5.97
CategoryWater conservation & recharge
Started / Completed / Phys47 / 13 / 19
Completion rate68.1%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.46Cr / 0.24Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score5.97 / 10
|
7.3%
6.02
CategoryWatershed Related Works
Started / Completed / Phys13 / 9 / 2
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.79 / 5.0
Final score6.02 / 10
|
7.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 12 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 294 | SAIKHEDA (GADARWARA) โ | NARSINGHPUR | 4.28 |
79.1%
3.60
CategoryFarm Pond
Started / Completed / Phys207 / 94 / 25
Completion rate57.5%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked2.05Cr / 0.30Cr
Expenditure rate (ongoing)14.4%
Part B score (max 5.0)0.72 / 5.0
Final score3.60 / 10
|
โ |
2.7%
4.12
CategoryDug Well Recharge
Started / Completed / Phys64 / 29 / 10
Completion rate60.9%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score4.12 / 10
|
โ |
16.0%
7.31
CategoryWater conservation & recharge
Started / Completed / Phys21 / 10 / 9
Completion rate90.5%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score7.31 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.8%
6.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score6.03 / 10
|
| 295 | KANNOD โ | DEWAS | 4.25 |
55.1%
2.46
CategoryFarm Pond
Started / Completed / Phys233 / 38 / 30
Completion rate29.2%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked6.58Cr / 1.32Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.00 / 5.0
Final score2.46 / 10
|
2.3%
2.79
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score2.79 / 10
|
10.3%
5.71
CategoryDug Well Recharge
Started / Completed / Phys676 / 302 / 257
Completion rate82.7%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.30Cr / 0.10Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score5.71 / 10
|
10.9%
6.34
CategoryIrrigation infrastructure
Started / Completed / Phys34 / 13 / 15
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.38Cr / 0.17Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score6.34 / 10
|
19.1%
7.27
CategoryWater conservation & recharge
Started / Completed / Phys68 / 27 / 31
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.74Cr / 0.44Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score7.27 / 10
|
1.9%
6.54
CategoryWatershed Related Works
Started / Completed / Phys16 / 6 / 6
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score6.54 / 10
|
0.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 296 | KHATEGAON โ | DEWAS | 4.25 |
59.3%
2.53
CategoryFarm Pond
Started / Completed / Phys289 / 6 / 71
Completion rate26.6%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked8.79Cr / 2.10Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.19 / 5.0
Final score2.53 / 10
|
โ |
5.4%
3.49
CategoryDug Well Recharge
Started / Completed / Phys428 / 55 / 167
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked0.53Cr / 0.10Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score3.49 / 10
|
2.6%
5.15
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.17Cr / 0.08Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.37 / 5.0
Final score5.15 / 10
|
31.4%
7.37
CategoryWater conservation & recharge
Started / Completed / Phys132 / 0 / 92
Completion rate69.7%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked2.04Cr / 1.59Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score7.37 / 10
|
1.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.3%
4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.18 / 10
|
| 297 | MANDSAUR โ | MANDSAUR | 4.23 |
26.6%
1.58
CategoryFarm Pond
Started / Completed / Phys230 / 28 / 0
Completion rate12.2%
Part A score (max 5.0)0.61 / 5.0
Ongoing sanction / booked2.55Cr / 0.49Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score1.58 / 10
|
โ |
24.0%
4.84
CategoryDug Well Recharge
Started / Completed / Phys991 / 251 / 388
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.91Cr / 0.29Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.62 / 5.0
Final score4.84 / 10
|
โ |
47.8%
5.35
CategoryWater conservation & recharge
Started / Completed / Phys150 / 47 / 30
Completion rate51.3%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked2.91Cr / 1.62Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score5.35 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.3%
4.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score4.65 / 10
|
| 298 | NALCHHA โ | DHAR | 4.21 |
36.9%
2.63
CategoryFarm Pond
Started / Completed / Phys165 / 0 / 10
Completion rate6.1%
Part A score (max 5.0)0.30 / 5.0
Ongoing sanction / booked4.09Cr / 1.90Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score2.63 / 10
|
โ |
7.8%
4.93
CategoryDug Well Recharge
Started / Completed / Phys351 / 89 / 93
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked0.45Cr / 0.21Cr
Expenditure rate (ongoing)46.7%
Part B score (max 5.0)2.33 / 5.0
Final score4.93 / 10
|
1.0%
7.02
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score7.02 / 10
|
45.0%
5.18
CategoryWater conservation & recharge
Started / Completed / Phys100 / 12 / 23
Completion rate35.0%
Part A score (max 5.0)1.75 / 5.0
Ongoing sanction / booked4.09Cr / 2.81Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score5.18 / 10
|
5.6%
4.46
CategoryWatershed Related Works
Started / Completed / Phys26 / 3 / 5
Completion rate30.8%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked0.49Cr / 0.29Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score4.46 / 10
|
3.7%
5.55
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 4 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score5.55 / 10
|
| 299 | KARELI โ | NARSINGHPUR | 4.17 |
81.6%
3.55
CategoryFarm Pond
Started / Completed / Phys211 / 106 / 12
Completion rate55.9%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked2.41Cr / 0.36Cr
Expenditure rate (ongoing)15.1%
Part B score (max 5.0)0.75 / 5.0
Final score3.55 / 10
|
โ |
1.3%
4.90
CategoryDug Well Recharge
Started / Completed / Phys37 / 16 / 12
Completion rate75.7%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)22.3%
Part B score (max 5.0)1.11 / 5.0
Final score4.90 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.8%
7.03
CategoryWater conservation & recharge
Started / Completed / Phys34 / 22 / 7
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score7.03 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.4%
6.05
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 3 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score6.05 / 10
|
| 300 | BEOHARI โ | SHAHDOL | 4.15 |
52.8%
2.31
CategoryFarm Pond
Started / Completed / Phys347 / 81 / 0
Completion rate23.3%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked6.39Cr / 1.46Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.15 / 5.0
Final score2.31 / 10
|
โ |
1.8%
2.75
CategoryDug Well Recharge
Started / Completed / Phys110 / 13 / 24
Completion rate33.6%
Part A score (max 5.0)1.68 / 5.0
Ongoing sanction / booked0.19Cr / 0.04Cr
Expenditure rate (ongoing)21.4%
Part B score (max 5.0)1.07 / 5.0
Final score2.75 / 10
|
18.6%
7.71
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score7.71 / 10
|
12.8%
5.29
CategoryWater conservation & recharge
Started / Completed / Phys56 / 21 / 2
Completion rate41.1%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.34Cr / 0.87Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score5.29 / 10
|
7.4%
4.92
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.67Cr / 0.43Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score4.92 / 10
|
6.6%
6.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 10 / 0
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.45Cr / 0.29Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score6.04 / 10
|
| 301 | RANAPUR โ | JHABUA | 4.07 |
24.9%
1.97
CategoryFarm Pond
Started / Completed / Phys146 / 5 / 1
Completion rate4.1%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked5.13Cr / 1.81Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score1.97 / 10
|
2.1%
2.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.00Cr
Expenditure rate (ongoing)1.3%
Part B score (max 5.0)0.06 / 5.0
Final score2.56 / 10
|
6.1%
4.13
CategoryDug Well Recharge
Started / Completed / Phys524 / 26 / 122
Completion rate28.2%
Part A score (max 5.0)1.41 / 5.0
Ongoing sanction / booked0.96Cr / 0.52Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score4.13 / 10
|
โ |
64.1%
4.86
CategoryWater conservation & recharge
Started / Completed / Phys145 / 6 / 21
Completion rate18.6%
Part A score (max 5.0)0.93 / 5.0
Ongoing sanction / booked10.72Cr / 8.42Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score4.86 / 10
|
2.4%
5.85
CategoryWatershed Related Works
Started / Completed / Phys16 / 1 / 7
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.33Cr / 0.22Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score5.85 / 10
|
0.2%
4.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.25 / 10
|
| 302 | MALHARGARH โ | MANDSAUR | 4.04 |
38.4%
2.03
CategoryFarm Pond
Started / Completed / Phys238 / 23 / 17
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked4.24Cr / 1.01Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.19 / 5.0
Final score2.03 / 10
|
โ |
16.4%
5.08
CategoryDug Well Recharge
Started / Completed / Phys811 / 141 / 281
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked1.01Cr / 0.50Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.48 / 5.0
Final score5.08 / 10
|
โ |
42.8%
5.19
CategoryWater conservation & recharge
Started / Completed / Phys145 / 47 / 24
Completion rate49.0%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked2.82Cr / 1.54Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score5.19 / 10
|
1.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.9%
7.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.09Cr
Expenditure rate (ongoing)93.8%
Part B score (max 5.0)4.69 / 5.0
Final score7.19 / 10
|
| 303 | RAIPUR KARCHULIYAN โ | REWA | 3.99 |
52.2%
3.00
CategoryFarm Pond
Started / Completed / Phys314 / 102 / 46
Completion rate47.1%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked1.92Cr / 0.25Cr
Expenditure rate (ongoing)13.0%
Part B score (max 5.0)0.65 / 5.0
Final score3.00 / 10
|
9.4%
0.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.03Cr
Expenditure rate (ongoing)4.0%
Part B score (max 5.0)0.20 / 5.0
Final score0.20 / 10
|
3.1%
4.75
CategoryDug Well Recharge
Started / Completed / Phys87 / 60 / 15
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)8.7%
Part B score (max 5.0)0.44 / 5.0
Final score4.75 / 10
|
2.5%
5.99
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 5 / 4
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score5.99 / 10
|
25.6%
6.12
CategoryWater conservation & recharge
Started / Completed / Phys50 / 23 / 17
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.08Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.12 / 5.0
Final score6.12 / 10
|
4.5%
5.71
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.54 / 5.0
Final score5.71 / 10
|
2.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 304 | JAITHARI โ | ANUPPUR | 3.98 |
85.9%
3.48
CategoryFarm Pond
Started / Completed / Phys1,067 / 543 / 72
Completion rate57.6%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked14.13Cr / 1.68Cr
Expenditure rate (ongoing)11.9%
Part B score (max 5.0)0.60 / 5.0
Final score3.48 / 10
|
โ |
1.1%
5.98
CategoryDug Well Recharge
Started / Completed / Phys173 / 53 / 97
Completion rate86.7%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score5.98 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.0%
7.03
CategoryWater conservation & recharge
Started / Completed / Phys69 / 30 / 27
Completion rate82.6%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.90Cr / 0.52Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score7.03 / 10
|
0.3%
7.43
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 1
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.43 / 5.0
Final score7.43 / 10
|
3.6%
7.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 16 / 1
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score7.39 / 10
|
| 305 | REWA โ | REWA | 3.97 |
79.2%
3.50
CategoryFarm Pond
Started / Completed / Phys229 / 98 / 24
Completion rate53.3%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked1.61Cr / 0.27Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score3.50 / 10
|
8.8%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 14 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys21 / 21 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 306 | NARSIMHAPUR โ | NARSINGHPUR | 3.93 |
59.9%
3.38
CategoryFarm Pond
Started / Completed / Phys253 / 100 / 27
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked3.75Cr / 0.65Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.87 / 5.0
Final score3.38 / 10
|
9.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.22Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.3%
4.64
CategoryDug Well Recharge
Started / Completed / Phys65 / 12 / 14
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score4.64 / 10
|
โ |
28.4%
6.35
CategoryWater conservation & recharge
Started / Completed / Phys32 / 10 / 9
Completion rate59.4%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked3.06Cr / 2.07Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score6.35 / 10
|
0.8%
4.70
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score4.70 / 10
|
0.3%
3.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score3.48 / 10
|
| 307 | CHAWARPATHA โ | NARSINGHPUR | 3.90 |
78.1%
3.59
CategoryFarm Pond
Started / Completed / Phys237 / 123 / 0
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked2.55Cr / 0.51Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score3.59 / 10
|
4.9%
0.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.4%
Part B score (max 5.0)0.02 / 5.0
Final score0.02 / 10
|
1.9%
4.46
CategoryDug Well Recharge
Started / Completed / Phys53 / 2 / 36
Completion rate71.7%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)17.6%
Part B score (max 5.0)0.88 / 5.0
Final score4.46 / 10
|
0.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
11.1%
6.43
CategoryWater conservation & recharge
Started / Completed / Phys24 / 16 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.43 / 10
|
1.5%
3.73
CategoryWatershed Related Works
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score3.73 / 10
|
2.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 308 | SOHAGPUR โ | SHAHDOL | 3.86 |
47.8%
2.30
CategoryFarm Pond
Started / Completed / Phys493 / 99 / 15
Completion rate23.1%
Part A score (max 5.0)1.16 / 5.0
Ongoing sanction / booked8.83Cr / 2.02Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score2.30 / 10
|
1.1%
2.78
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score2.78 / 10
|
1.1%
4.80
CategoryDug Well Recharge
Started / Completed / Phys97 / 20 / 44
Completion rate66.0%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.50 / 5.0
Final score4.80 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.8%
5.24
CategoryWater conservation & recharge
Started / Completed / Phys87 / 5 / 25
Completion rate34.5%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked7.43Cr / 5.23Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score5.24 / 10
|
0.9%
5.21
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.88 / 5.0
Final score5.21 / 10
|
6.0%
5.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 3 / 9
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.73Cr / 0.44Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score5.14 / 10
|
| 309 | JHABUA โ | JHABUA | 3.83 |
20.2%
2.95
CategoryFarm Pond
Started / Completed / Phys211 / 4 / 3
Completion rate3.3%
Part A score (max 5.0)0.17 / 5.0
Ongoing sanction / booked5.47Cr / 3.04Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score2.95 / 10
|
0.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
6.7%
5.12
CategoryDug Well Recharge
Started / Completed / Phys731 / 248 / 57
Completion rate41.7%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked1.11Cr / 0.67Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score5.12 / 10
|
โ |
71.9%
4.00
CategoryWater conservation & recharge
Started / Completed / Phys308 / 19 / 23
Completion rate13.6%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked16.50Cr / 10.94Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.32 / 5.0
Final score4.00 / 10
|
โ |
0.4%
3.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score3.64 / 10
|
| 310 | RATLAM โ | RATLAM | 3.80 |
64.9%
2.54
CategoryFarm Pond
Started / Completed / Phys376 / 41 / 63
Completion rate27.7%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked10.45Cr / 2.41Cr
Expenditure rate (ongoing)23.1%
Part B score (max 5.0)1.15 / 5.0
Final score2.54 / 10
|
โ |
3.8%
5.43
CategoryDug Well Recharge
Started / Completed / Phys310 / 44 / 209
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.15Cr / 0.04Cr
Expenditure rate (ongoing)26.9%
Part B score (max 5.0)1.34 / 5.0
Final score5.43 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
29.5%
6.21
CategoryWater conservation & recharge
Started / Completed / Phys102 / 29 / 36
Completion rate63.7%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked1.99Cr / 1.21Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score6.21 / 10
|
โ |
1.6%
6.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score6.11 / 10
|
| 311 | BABAI CHICHLI โ | NARSINGHPUR | 3.72 |
86.7%
3.25
CategoryFarm Pond
Started / Completed / Phys210 / 105 / 2
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked2.92Cr / 0.41Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score3.25 / 10
|
โ |
2.0%
4.51
CategoryDug Well Recharge
Started / Completed / Phys53 / 26 / 11
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)20.3%
Part B score (max 5.0)1.02 / 5.0
Final score4.51 / 10
|
โ |
8.9%
6.49
CategoryWater conservation & recharge
Started / Completed / Phys16 / 10 / 4
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score6.49 / 10
|
โ |
2.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 312 | NASRULLAGANJ โ | SEHORE | 3.71 |
58.0%
2.03
CategoryFarm Pond
Started / Completed / Phys178 / 2 / 38
Completion rate22.5%
Part A score (max 5.0)1.12 / 5.0
Ongoing sanction / booked3.68Cr / 0.66Cr
Expenditure rate (ongoing)18.1%
Part B score (max 5.0)0.90 / 5.0
Final score2.03 / 10
|
โ |
15.5%
5.46
CategoryDug Well Recharge
Started / Completed / Phys489 / 41 / 324
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.32Cr / 0.11Cr
Expenditure rate (ongoing)34.5%
Part B score (max 5.0)1.72 / 5.0
Final score5.46 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
18.2%
6.31
CategoryWater conservation & recharge
Started / Completed / Phys45 / 10 / 23
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.31Cr / 0.16Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score6.31 / 10
|
1.5%
5.69
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score5.69 / 10
|
5.6%
6.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 5
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score6.09 / 10
|
| 313 | RAMPUR NAIKIN โ | SIDHI | 3.70 |
42.7%
2.06
CategoryFarm Pond
Started / Completed / Phys306 / 57 / 7
Completion rate20.9%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked4.59Cr / 0.93Cr
Expenditure rate (ongoing)20.4%
Part B score (max 5.0)1.02 / 5.0
Final score2.06 / 10
|
โ |
1.4%
2.45
CategoryDug Well Recharge
Started / Completed / Phys73 / 8 / 16
Completion rate32.9%
Part A score (max 5.0)1.64 / 5.0
Ongoing sanction / booked0.13Cr / 0.02Cr
Expenditure rate (ongoing)16.0%
Part B score (max 5.0)0.80 / 5.0
Final score2.45 / 10
|
3.0%
5.76
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 2 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score5.76 / 10
|
38.2%
4.70
CategoryWater conservation & recharge
Started / Completed / Phys123 / 31 / 13
Completion rate35.8%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked3.36Cr / 1.95Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.91 / 5.0
Final score4.70 / 10
|
1.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
12.7%
4.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 4 / 6
Completion rate37.0%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked0.98Cr / 0.60Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.07 / 5.0
Final score4.92 / 10
|
Scheme: โน Sanction Weighted
Level: Block
Snapshot: 2026-04-29
Units shown: 313
โก Weight % shown is each unit's own auto-computed weight โ not the global admin-set value.
โ๏ธ Step 1 โ Category Weightage
Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.
Weightage = Sanctioned Cost of Category
รท Total Sanctioned Cost (all categories)
e.g. Farm Pond = โน200 Cr out of โน500 Cr total
Weightage = 200 รท 500 = 0.40 (40%)
Computed independently per unit โ two districts with different sanction distributions will have different weightages for the same category.
๐ ฐ Step 2a โ Part A Score (Completion)
Fixed 50% weight on completion of works.
Part A = (Completed + Phys) รท Started ร 5
๐ ฑ Step 2b โ Part B Score (Expenditure)
Fixed 50% weight on expenditure booking on ongoing works.
Part B = (Ongoing Booked รท Ongoing Sanction) ร 5
If all done โ full 5 marks automatically
๐ Step 3 โ Ceiling & Model
Category Score = Part A + Part B
๐ Step 4 โ Final Composite Score
Weighted sum of all category scores (weightages sum to 100%).
Final Score = ฮฃ (Weightage_i ร Score_i)
Example: Farm Pond 40% ร 7.2 + Dug Well 20% ร 6.5 + Amrit Sarovar 40% ร 8.1 โ 7.42
๐ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.