JGSA 2026 โ District-Level Category Scorecard
Snapshot: 2026-04-29 ยท Scheme: โน Sanction Weighted
KHANDWA
7.49
๐ฅ
Completed3464
Started9141
Rank#1
KHARGONE
7.01
๐ฅ
Completed1767
Started7188
Rank#2
DINDORI
6.72
๐ฅ
Completed1783
Started4828
Rank#3
๐ Category Scorecard โ District Level
52 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
| # | District | Total | Farm Pond | Amrit Sarowar | Dug Well Recharge | Irrigation infrastructure | Water conservation & recharge | Watershed Related Works | Repair & Maintenance (Water Structures) | PMKSY: Watershed | JSJB 2.0 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| ๐ฅ | KHANDWA โ | 7.49 |
36.7%
7.13
CategoryFarm Pond
Started / Completed / Phys1,996 / 1,016 / 938
Completion rate97.9%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked1.06Cr / 0.48Cr
Expenditure rate (ongoing)44.8%
Part B score (max 5.0)2.24 / 5.0
Final score7.13 / 10
|
5.0%
5.61
CategoryAmrit Sarowar
Started / Completed / Phys26 / 3 / 7
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked3.75Cr / 2.77Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score5.61 / 10
|
13.2%
8.98
CategoryDug Well Recharge
Started / Completed / Phys6,136 / 2,233 / 3,873
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.01 / 5.0
Final score8.98 / 10
|
1.8%
6.90
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 11 / 17
Completion rate84.8%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.43Cr / 0.23Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score6.90 / 10
|
25.5%
7.45
CategoryWater conservation & recharge
Started / Completed / Phys711 / 154 / 448
Completion rate84.7%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked7.42Cr / 4.78Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score7.45 / 10
|
8.8%
6.92
CategoryWatershed Related Works
Started / Completed / Phys173 / 35 / 91
Completion rate72.8%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked3.07Cr / 2.01Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.28 / 5.0
Final score6.92 / 10
|
3.5%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 12 / 44
Completion rate84.8%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.69Cr / 0.37Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score6.96 / 10
|
0.4%
4.90
CategoryPMKSY: Watershed
PMKSY Works0 total (79 done / -79 ongoing)
JGSA Target0.50 Cr
JGSA Valuation0.22 Cr
Expenditure0.15 Cr
% Valuation43.3%
Valuation Marks (40%)1.73
Exp Marks (40%)1.17
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score4.90 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works87,739
Target Works9,141
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| ๐ฅ | KHARGONE โ | 7.01 |
22.3%
5.84
CategoryFarm Pond
Started / Completed / Phys1,850 / 472 / 863
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked9.54Cr / 4.26Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score5.84 / 10
|
4.7%
7.11
CategoryAmrit Sarowar
Started / Completed / Phys28 / 2 / 20
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked1.56Cr / 0.99Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.19 / 5.0
Final score7.11 / 10
|
6.5%
7.56
CategoryDug Well Recharge
Started / Completed / Phys3,865 / 1,030 / 2,527
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.79Cr / 0.47Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score7.56 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 8 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
55.1%
7.08
CategoryWater conservation & recharge
Started / Completed / Phys1,307 / 216 / 668
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked28.60Cr / 21.15Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score7.08 / 10
|
3.2%
6.77
CategoryWatershed Related Works
Started / Completed / Phys78 / 16 / 40
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked1.53Cr / 0.97Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score6.77 / 10
|
2.1%
8.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 23 / 21
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.40Cr / 0.32Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score8.58 / 10
|
0.5%
5.48
CategoryPMKSY: Watershed
PMKSY Works0 total (30 done / -30 ongoing)
JGSA Target0.83 Cr
JGSA Valuation0.29 Cr
Expenditure0.44 Cr
% Valuation34.3%
Valuation Marks (40%)1.37
Exp Marks (40%)2.11
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score5.48 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works10,290
Target Works7,188
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| ๐ฅ | DINDORI โ | 6.72 |
34.9%
6.29
CategoryFarm Pond
Started / Completed / Phys2,317 / 840 / 1,155
Completion rate86.1%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked10.10Cr / 4.00Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score6.29 / 10
|
0.6%
3.53
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.75Cr / 0.15Cr
Expenditure rate (ongoing)20.6%
Part B score (max 5.0)1.03 / 5.0
Final score3.53 / 10
|
2.0%
6.29
CategoryDug Well Recharge
Started / Completed / Phys1,449 / 708 / 732
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.32 / 5.0
Final score6.29 / 10
|
0.6%
7.37
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 1 / 6
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score7.37 / 10
|
29.1%
7.32
CategoryWater conservation & recharge
Started / Completed / Phys640 / 94 / 353
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked27.45Cr / 21.04Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score7.32 / 10
|
16.4%
7.59
CategoryWatershed Related Works
Started / Completed / Phys324 / 117 / 155
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked6.16Cr / 4.18Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score7.59 / 10
|
6.0%
4.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys85 / 23 / 31
Completion rate63.5%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked6.97Cr / 2.46Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.77 / 5.0
Final score4.94 / 10
|
5.3%
2.99
CategoryPMKSY: Watershed
PMKSY Works0 total (44 done / -44 ongoing)
JGSA Target10.28 Cr
JGSA Valuation2.56 Cr
Expenditure2.12 Cr
% Valuation24.9%
Valuation Marks (40%)1.00
Exp Marks (40%)0.83
Geotag Marks (10%)0.930
Physical Marks (10%)0.24
Final score2.99 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works162,525
Target Works4,828
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 4 | RAJGARH โ | 6.64 |
22.4%
5.56
CategoryFarm Pond
Started / Completed / Phys2,290 / 1,392 / 410
Completion rate78.7%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked11.09Cr / 3.61Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score5.56 / 10
|
0.5%
5.69
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.39Cr / 0.19Cr
Expenditure rate (ongoing)47.0%
Part B score (max 5.0)2.35 / 5.0
Final score5.69 / 10
|
4.2%
7.64
CategoryDug Well Recharge
Started / Completed / Phys3,703 / 2,769 / 813
Completion rate96.7%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.31Cr / 0.17Cr
Expenditure rate (ongoing)56.2%
Part B score (max 5.0)2.81 / 5.0
Final score7.64 / 10
|
1.2%
5.30
CategoryIrrigation infrastructure
Started / Completed / Phys49 / 4 / 14
Completion rate36.7%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked1.87Cr / 1.29Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score5.30 / 10
|
53.6%
6.90
CategoryWater conservation & recharge
Started / Completed / Phys1,193 / 154 / 557
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked57.24Cr / 44.93Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score6.90 / 10
|
1.3%
6.78
CategoryWatershed Related Works
Started / Completed / Phys67 / 15 / 27
Completion rate62.7%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.25Cr / 0.91Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score6.78 / 10
|
9.8%
6.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys269 / 17 / 134
Completion rate56.1%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked10.10Cr / 7.44Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.68 / 5.0
Final score6.49 / 10
|
2.0%
2.73
CategoryPMKSY: Watershed
PMKSY Works0 total (16 done / -16 ongoing)
JGSA Target4.36 Cr
JGSA Valuation1.41 Cr
Expenditure0.10 Cr
% Valuation32.4%
Valuation Marks (40%)1.30
Exp Marks (40%)0.09
Geotag Marks (10%)0.980
Physical Marks (10%)0.37
Final score2.73 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works37,368
Target Works7,574
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 5 | BALAGHAT โ | 6.47 |
56.4%
5.82
CategoryFarm Pond
Started / Completed / Phys4,980 / 1,727 / 1,516
Completion rate65.1%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked42.54Cr / 21.81Cr
Expenditure rate (ongoing)51.3%
Part B score (max 5.0)2.56 / 5.0
Final score5.82 / 10
|
2.3%
1.83
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 1
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked5.58Cr / 1.81Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score1.83 / 10
|
1.5%
7.27
CategoryDug Well Recharge
Started / Completed / Phys1,417 / 685 / 558
Completion rate87.7%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.45Cr / 0.26Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.88 / 5.0
Final score7.27 / 10
|
0.3%
7.93
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 3 / 9
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.21Cr / 0.19Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score7.93 / 10
|
32.2%
7.30
CategoryWater conservation & recharge
Started / Completed / Phys1,736 / 268 / 938
Completion rate69.5%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked31.23Cr / 23.92Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score7.30 / 10
|
1.3%
6.91
CategoryWatershed Related Works
Started / Completed / Phys68 / 26 / 19
Completion rate66.2%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked1.32Cr / 0.95Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score6.91 / 10
|
1.0%
7.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 13 / 16
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.65Cr / 0.45Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score7.10 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works9,188
Target Works8,282
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 6 | UJJAIN โ | 6.44 |
36.7%
6.29
CategoryFarm Pond
Started / Completed / Phys633 / 187 / 415
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.67Cr / 0.20Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score6.29 / 10
|
15.6%
3.14
CategoryAmrit Sarowar
Started / Completed / Phys23 / 0 / 3
Completion rate13.0%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked5.07Cr / 2.52Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score3.14 / 10
|
19.7%
6.69
CategoryDug Well Recharge
Started / Completed / Phys2,823 / 1,344 / 1,460
Completion rate99.3%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score6.69 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.2%
7.91
CategoryWater conservation & recharge
Started / Completed / Phys180 / 69 / 94
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.64Cr / 0.43Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score7.91 / 10
|
4.3%
7.44
CategoryWatershed Related Works
Started / Completed / Phys57 / 43 / 8
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score7.44 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works5,087
Target Works3,730
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 7 | CHHINDWARA โ | 6.37 |
26.7%
6.35
CategoryFarm Pond
Started / Completed / Phys2,463 / 846 / 909
Completion rate71.3%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked19.06Cr / 10.61Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score6.35 / 10
|
3.3%
0.87
CategoryAmrit Sarowar
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked7.27Cr / 1.26Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score0.87 / 10
|
4.8%
6.98
CategoryDug Well Recharge
Started / Completed / Phys4,163 / 1,178 / 2,761
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.58Cr / 0.26Cr
Expenditure rate (ongoing)44.9%
Part B score (max 5.0)2.24 / 5.0
Final score6.98 / 10
|
1.0%
7.83
CategoryIrrigation infrastructure
Started / Completed / Phys23 / 7 / 11
Completion rate78.3%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.39Cr / 0.31Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score7.83 / 10
|
43.0%
6.46
CategoryWater conservation & recharge
Started / Completed / Phys1,242 / 188 / 447
Completion rate51.1%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked58.62Cr / 45.76Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.90 / 5.0
Final score6.46 / 10
|
9.9%
6.30
CategoryWatershed Related Works
Started / Completed / Phys314 / 71 / 99
Completion rate54.1%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked10.28Cr / 7.40Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.60 / 5.0
Final score6.30 / 10
|
2.2%
6.93
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys61 / 15 / 25
Completion rate65.6%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked2.16Cr / 1.58Cr
Expenditure rate (ongoing)73.0%
Part B score (max 5.0)3.65 / 5.0
Final score6.93 / 10
|
4.0%
4.29
CategoryPMKSY: Watershed
PMKSY Works0 total (167 done / -167 ongoing)
JGSA Target9.01 Cr
JGSA Valuation3.62 Cr
Expenditure2.42 Cr
% Valuation40.2%
Valuation Marks (40%)1.61
Exp Marks (40%)1.07
Geotag Marks (10%)0.930
Physical Marks (10%)0.67
Final score4.29 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works10,193
Target Works8,285
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 8 | MORENA โ | 6.35 |
13.7%
5.63
CategoryFarm Pond
Started / Completed / Phys2,269 / 1,275 / 229
Completion rate66.3%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked24.91Cr / 11.54Cr
Expenditure rate (ongoing)46.3%
Part B score (max 5.0)2.32 / 5.0
Final score5.63 / 10
|
0.3%
1.75
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.51Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
|
0.4%
4.79
CategoryDug Well Recharge
Started / Completed / Phys708 / 386 / 88
Completion rate66.9%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked0.61Cr / 0.18Cr
Expenditure rate (ongoing)28.8%
Part B score (max 5.0)1.44 / 5.0
Final score4.79 / 10
|
1.3%
6.30
CategoryIrrigation infrastructure
Started / Completed / Phys55 / 2 / 26
Completion rate50.9%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked3.33Cr / 2.50Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score6.30 / 10
|
72.0%
6.26
CategoryWater conservation & recharge
Started / Completed / Phys2,436 / 40 / 1,142
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked176.25Cr / 135.18Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score6.26 / 10
|
4.8%
6.61
CategoryWatershed Related Works
Started / Completed / Phys180 / 7 / 94
Completion rate56.1%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked9.62Cr / 7.33Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.81 / 5.0
Final score6.61 / 10
|
2.0%
6.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys72 / 1 / 36
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked4.74Cr / 3.51Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score6.28 / 10
|
0.6%
4.07
CategoryPMKSY: Watershed
PMKSY Works0 total (6 done / -6 ongoing)
JGSA Target2.64 Cr
JGSA Valuation1.02 Cr
Expenditure0.49 Cr
% Valuation38.5%
Valuation Marks (40%)1.54
Exp Marks (40%)0.74
Geotag Marks (10%)0.950
Physical Marks (10%)0.84
Final score4.07 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,236
Target Works5,726
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 9 | BURHANPUR โ | 6.23 |
35.7%
5.84
CategoryFarm Pond
Started / Completed / Phys697 / 211 / 266
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked4.49Cr / 2.17Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score5.84 / 10
|
5.8%
4.77
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 2
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.37Cr / 0.85Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score4.77 / 10
|
8.4%
7.23
CategoryDug Well Recharge
Started / Completed / Phys1,186 / 448 / 545
Completion rate83.7%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.49Cr / 0.30Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score7.23 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.7%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys287 / 26 / 141
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked5.34Cr / 3.37Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score6.07 / 10
|
4.0%
6.59
CategoryWatershed Related Works
Started / Completed / Phys35 / 8 / 16
Completion rate68.6%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.35Cr / 0.22Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score6.59 / 10
|
1.2%
6.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.14 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works2,599
Target Works2,225
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 10 | RAISEN โ | 6.22 |
57.7%
6.50
CategoryFarm Pond
Started / Completed / Phys2,359 / 930 / 878
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked11.54Cr / 6.16Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score6.50 / 10
|
2.3%
3.47
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 1
Completion rate9.1%
Part A score (max 5.0)0.45 / 5.0
Ongoing sanction / booked1.68Cr / 1.01Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score3.47 / 10
|
5.3%
8.20
CategoryDug Well Recharge
Started / Completed / Phys1,663 / 1,086 / 464
Completion rate93.2%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.29Cr / 0.21Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score8.20 / 10
|
1.0%
4.67
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 2 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.54Cr / 0.39Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score4.67 / 10
|
25.5%
5.09
CategoryWater conservation & recharge
Started / Completed / Phys249 / 37 / 33
Completion rate28.1%
Part A score (max 5.0)1.41 / 5.0
Ongoing sanction / booked17.78Cr / 13.09Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score5.09 / 10
|
2.1%
5.80
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.62Cr / 1.42Cr
Expenditure rate (ongoing)87.5%
Part B score (max 5.0)4.38 / 5.0
Final score5.80 / 10
|
1.1%
4.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 3
Completion rate26.7%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked0.64Cr / 0.43Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score4.68 / 10
|
โ |
5.0%
8.75
CategoryJSJB 2.0
Total Works3,776
Target Works4,314
Achievement %87.5%
Weightage5% of composite score
Final score8.75 / 10
|
| 11 | BARWANI โ | 6.14 |
27.5%
5.42
CategoryFarm Pond
Started / Completed / Phys1,202 / 53 / 640
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked7.87Cr / 4.00Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score5.42 / 10
|
0.9%
3.65
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.37Cr / 0.15Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score3.65 / 10
|
12.3%
7.27
CategoryDug Well Recharge
Started / Completed / Phys3,119 / 61 / 2,570
Completion rate84.4%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked1.26Cr / 0.77Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score7.27 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 4 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
34.1%
6.06
CategoryWater conservation & recharge
Started / Completed / Phys545 / 54 / 272
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked7.15Cr / 4.39Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score6.06 / 10
|
10.5%
6.37
CategoryWatershed Related Works
Started / Completed / Phys148 / 23 / 86
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked1.95Cr / 1.04Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score6.37 / 10
|
1.3%
6.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 6 / 15
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.43Cr / 0.29Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score6.47 / 10
|
8.2%
4.70
CategoryPMKSY: Watershed
PMKSY Works0 total (51 done / -51 ongoing)
JGSA Target5.32 Cr
JGSA Valuation2.54 Cr
Expenditure1.17 Cr
% Valuation47.7%
Valuation Marks (40%)1.91
Exp Marks (40%)0.88
Geotag Marks (10%)1.000
Physical Marks (10%)0.91
Final score4.70 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works11,165
Target Works5,060
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 12 | DHAR โ | 6.09 |
12.6%
4.30
CategoryFarm Pond
Started / Completed / Phys2,881 / 445 / 689
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked32.65Cr / 15.22Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score4.30 / 10
|
0.1%
2.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
|
2.9%
4.72
CategoryDug Well Recharge
Started / Completed / Phys4,481 / 1,181 / 907
Completion rate46.6%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked6.19Cr / 2.96Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.39 / 5.0
Final score4.72 / 10
|
0.4%
4.87
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 3 / 3
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked1.54Cr / 1.12Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.62 / 5.0
Final score4.87 / 10
|
69.1%
6.25
CategoryWater conservation & recharge
Started / Completed / Phys2,551 / 168 / 935
Completion rate43.2%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked172.61Cr / 141.15Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score6.25 / 10
|
7.3%
5.77
CategoryWatershed Related Works
Started / Completed / Phys664 / 37 / 234
Completion rate40.8%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked17.81Cr / 13.28Cr
Expenditure rate (ongoing)74.5%
Part B score (max 5.0)3.73 / 5.0
Final score5.77 / 10
|
2.1%
6.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys147 / 5 / 66
Completion rate48.3%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked4.59Cr / 3.39Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score6.11 / 10
|
0.5%
4.68
CategoryPMKSY: Watershed
PMKSY Works0 total (5 done / -5 ongoing)
JGSA Target1.78 Cr
JGSA Valuation0.72 Cr
Expenditure0.48 Cr
% Valuation40.6%
Valuation Marks (40%)1.63
Exp Marks (40%)1.09
Geotag Marks (10%)1.000
Physical Marks (10%)0.96
Final score4.68 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works21,183
Target Works10,749
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 13 | KATNI โ | 6.06 |
30.4%
4.33
CategoryFarm Pond
Started / Completed / Phys1,680 / 415 / 485
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked18.45Cr / 6.10Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.65 / 5.0
Final score4.33 / 10
|
2.1%
2.25
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.44Cr / 1.10Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score2.25 / 10
|
3.3%
5.69
CategoryDug Well Recharge
Started / Completed / Phys1,509 / 649 / 584
Completion rate81.7%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.71Cr / 0.23Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.61 / 5.0
Final score5.69 / 10
|
14.5%
7.33
CategoryIrrigation infrastructure
Started / Completed / Phys240 / 30 / 172
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked2.68Cr / 1.68Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.13 / 5.0
Final score7.33 / 10
|
16.0%
6.63
CategoryWater conservation & recharge
Started / Completed / Phys328 / 65 / 153
Completion rate66.5%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked8.39Cr / 5.55Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score6.63 / 10
|
17.6%
7.05
CategoryWatershed Related Works
Started / Completed / Phys302 / 92 / 130
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked5.46Cr / 3.69Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.38 / 5.0
Final score7.05 / 10
|
5.7%
6.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 9 / 39
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked2.48Cr / 1.69Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score6.62 / 10
|
5.4%
4.88
CategoryPMKSY: Watershed
PMKSY Works0 total (21 done / -21 ongoing)
JGSA Target6.30 Cr
JGSA Valuation4.66 Cr
Expenditure0.02 Cr
% Valuation74.0%
Valuation Marks (40%)2.96
Exp Marks (40%)0.02
Geotag Marks (10%)0.990
Physical Marks (10%)0.92
Final score4.88 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works7,114
Target Works4,146
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 14 | ASHOK NAGAR โ | 6.06 |
41.7%
5.17
CategoryFarm Pond
Started / Completed / Phys1,626 / 351 / 683
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked17.77Cr / 7.06Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score5.17 / 10
|
1.8%
2.47
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.10Cr / 1.04Cr
Expenditure rate (ongoing)49.4%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
|
1.1%
6.35
CategoryDug Well Recharge
Started / Completed / Phys523 / 278 / 174
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)40.6%
Part B score (max 5.0)2.03 / 5.0
Final score6.35 / 10
|
0.1%
5.25
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score5.25 / 10
|
40.0%
6.97
CategoryWater conservation & recharge
Started / Completed / Phys938 / 209 / 408
Completion rate65.8%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked16.13Cr / 11.86Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.97 / 10
|
3.3%
7.87
CategoryWatershed Related Works
Started / Completed / Phys39 / 12 / 16
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked1.08Cr / 0.92Cr
Expenditure rate (ongoing)85.6%
Part B score (max 5.0)4.28 / 5.0
Final score7.87 / 10
|
1.9%
5.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 4 / 9
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked1.13Cr / 0.82Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score5.64 / 10
|
5.0%
2.47
CategoryPMKSY: Watershed
PMKSY Works0 total (9 done / -9 ongoing)
JGSA Target5.91 Cr
JGSA Valuation0.61 Cr
Expenditure0.25 Cr
% Valuation10.3%
Valuation Marks (40%)0.41
Exp Marks (40%)0.17
Geotag Marks (10%)0.890
Physical Marks (10%)0.99
Final score2.47 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works3,779
Target Works3,170
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 15 | SHEOPUR โ | 5.94 |
17.2%
4.87
CategoryFarm Pond
Started / Completed / Phys705 / 350 / 110
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked8.17Cr / 2.63Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score4.87 / 10
|
2.6%
0.50
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.93Cr / 0.29Cr
Expenditure rate (ongoing)10.1%
Part B score (max 5.0)0.50 / 5.0
Final score0.50 / 10
|
0.2%
5.75
CategoryDug Well Recharge
Started / Completed / Phys110 / 81 / 11
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.57 / 5.0
Final score5.75 / 10
|
1.9%
8.81
CategoryIrrigation infrastructure
Started / Completed / Phys22 / 5 / 15
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.30Cr / 0.25Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score8.81 / 10
|
60.0%
6.28
CategoryWater conservation & recharge
Started / Completed / Phys590 / 19 / 273
Completion rate49.5%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked35.24Cr / 26.79Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score6.28 / 10
|
6.1%
5.39
CategoryWatershed Related Works
Started / Completed / Phys71 / 4 / 18
Completion rate31.0%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked4.82Cr / 3.71Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score5.39 / 10
|
3.1%
6.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 23
Completion rate65.7%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked1.04Cr / 0.72Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.47 / 5.0
Final score6.76 / 10
|
3.8%
4.03
CategoryPMKSY: Watershed
PMKSY Works0 total (98 done / -98 ongoing)
JGSA Target4.32 Cr
JGSA Valuation1.72 Cr
Expenditure0.77 Cr
% Valuation39.8%
Valuation Marks (40%)1.59
Exp Marks (40%)0.71
Geotag Marks (10%)0.720
Physical Marks (10%)1.00
Final score4.03 / 10
|
5.0%
8.96
CategoryJSJB 2.0
Total Works1,385
Target Works1,545
Achievement %89.6%
Weightage5% of composite score
Final score8.96 / 10
|
| 16 | BETUL โ | 5.88 |
20.7%
5.19
CategoryFarm Pond
Started / Completed / Phys1,714 / 77 / 802
Completion rate51.3%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked24.97Cr / 13.12Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score5.19 / 10
|
3.1%
2.04
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.97Cr / 2.84Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.04 / 5.0
Final score2.04 / 10
|
4.8%
7.36
CategoryDug Well Recharge
Started / Completed / Phys4,167 / 649 / 2,947
Completion rate86.3%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked1.47Cr / 0.90Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.04 / 5.0
Final score7.36 / 10
|
0.0%
6.01
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 3 / 3
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score6.01 / 10
|
60.0%
5.84
CategoryWater conservation & recharge
Started / Completed / Phys1,918 / 100 / 805
Completion rate47.2%
Part A score (max 5.0)2.36 / 5.0
Ongoing sanction / booked72.06Cr / 50.13Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score5.84 / 10
|
3.2%
6.11
CategoryWatershed Related Works
Started / Completed / Phys150 / 20 / 64
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked3.35Cr / 2.22Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score6.11 / 10
|
3.1%
5.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys169 / 13 / 66
Completion rate46.7%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked3.39Cr / 2.37Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score5.83 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works12,435
Target Works8,149
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 17 | GUNA โ | 5.87 |
34.7%
4.30
CategoryFarm Pond
Started / Completed / Phys1,531 / 493 / 426
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked16.23Cr / 4.22Cr
Expenditure rate (ongoing)26.0%
Part B score (max 5.0)1.30 / 5.0
Final score4.30 / 10
|
โ |
4.5%
5.97
CategoryDug Well Recharge
Started / Completed / Phys2,192 / 993 / 1,123
Completion rate96.5%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.20Cr / 0.04Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score5.97 / 10
|
0.5%
6.13
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score6.13 / 10
|
45.1%
6.67
CategoryWater conservation & recharge
Started / Completed / Phys860 / 144 / 485
Completion rate73.1%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked16.19Cr / 9.74Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score6.67 / 10
|
2.0%
6.19
CategoryWatershed Related Works
Started / Completed / Phys41 / 14 / 13
Completion rate65.9%
Part A score (max 5.0)3.29 / 5.0
Ongoing sanction / booked0.95Cr / 0.55Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score6.19 / 10
|
4.3%
6.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys59 / 15 / 31
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked1.29Cr / 0.80Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score6.99 / 10
|
3.9%
3.73
CategoryPMKSY: Watershed
PMKSY Works0 total (47 done / -47 ongoing)
JGSA Target4.98 Cr
JGSA Valuation1.57 Cr
Expenditure0.74 Cr
% Valuation31.6%
Valuation Marks (40%)1.26
Exp Marks (40%)0.59
Geotag Marks (10%)0.910
Physical Marks (10%)0.97
Final score3.73 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works23,059
Target Works4,689
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 18 | NIWARI โ | 5.79 |
18.1%
3.37
CategoryFarm Pond
Started / Completed / Phys491 / 99 / 50
Completion rate30.3%
Part A score (max 5.0)1.52 / 5.0
Ongoing sanction / booked5.17Cr / 1.92Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score3.37 / 10
|
2.5%
3.23
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.84Cr / 0.37Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score3.23 / 10
|
5.8%
4.74
CategoryDug Well Recharge
Started / Completed / Phys964 / 294 / 247
Completion rate56.1%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked1.10Cr / 0.42Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score4.74 / 10
|
โ |
34.2%
6.39
CategoryWater conservation & recharge
Started / Completed / Phys235 / 41 / 84
Completion rate53.2%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked6.60Cr / 4.92Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score6.39 / 10
|
14.6%
5.07
CategoryWatershed Related Works
Started / Completed / Phys111 / 9 / 24
Completion rate29.7%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked3.80Cr / 2.73Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score5.07 / 10
|
19.9%
7.30
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys124 / 15 / 64
Completion rate63.7%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked3.02Cr / 2.49Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.11 / 5.0
Final score7.30 / 10
|
โ |
5.0%
8.95
CategoryJSJB 2.0
Total Works1,727
Target Works1,930
Achievement %89.5%
Weightage5% of composite score
Final score8.95 / 10
|
| 19 | NEEMUCH โ | 5.76 |
37.5%
4.15
CategoryFarm Pond
Started / Completed / Phys800 / 71 / 345
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked10.54Cr / 3.28Cr
Expenditure rate (ongoing)31.1%
Part B score (max 5.0)1.55 / 5.0
Final score4.15 / 10
|
3.6%
4.85
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 4
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.65Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score4.85 / 10
|
9.1%
6.34
CategoryDug Well Recharge
Started / Completed / Phys1,986 / 801 / 889
Completion rate85.1%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.76Cr / 0.32Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.09 / 5.0
Final score6.34 / 10
|
2.6%
7.13
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 4 / 23
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.03 / 5.0
Final score7.13 / 10
|
27.1%
7.15
CategoryWater conservation & recharge
Started / Completed / Phys318 / 22 / 238
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked3.57Cr / 2.19Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.06 / 5.0
Final score7.15 / 10
|
0.9%
6.55
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 11
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score6.55 / 10
|
2.5%
7.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 3 / 31
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.77 / 10
|
11.7%
4.95
CategoryPMKSY: Watershed
PMKSY Works0 total (13 done / -13 ongoing)
JGSA Target6.58 Cr
JGSA Valuation3.45 Cr
Expenditure1.40 Cr
% Valuation52.5%
Valuation Marks (40%)2.10
Exp Marks (40%)0.85
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score4.95 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,196
Target Works3,198
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 20 | SAGAR โ | 5.76 |
30.3%
4.15
CategoryFarm Pond
Started / Completed / Phys2,171 / 809 / 342
Completion rate53.0%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked19.66Cr / 5.91Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.50 / 5.0
Final score4.15 / 10
|
0.7%
2.40
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.43Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.40 / 5.0
Final score2.40 / 10
|
8.3%
7.12
CategoryDug Well Recharge
Started / Completed / Phys4,633 / 2,543 / 1,728
Completion rate92.2%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.92Cr / 0.46Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.51 / 5.0
Final score7.12 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys25 / 14 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
38.4%
6.90
CategoryWater conservation & recharge
Started / Completed / Phys1,183 / 377 / 500
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked13.40Cr / 8.55Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.90 / 10
|
5.1%
7.35
CategoryWatershed Related Works
Started / Completed / Phys120 / 54 / 40
Completion rate78.3%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked1.68Cr / 1.15Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.35 / 10
|
3.8%
6.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 36 / 38
Completion rate83.1%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.89Cr / 0.49Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score6.91 / 10
|
7.6%
2.88
CategoryPMKSY: Watershed
PMKSY Works0 total (227 done / -227 ongoing)
JGSA Target10.28 Cr
JGSA Valuation2.20 Cr
Expenditure1.31 Cr
% Valuation21.4%
Valuation Marks (40%)0.85
Exp Marks (40%)0.51
Geotag Marks (10%)0.910
Physical Marks (10%)0.61
Final score2.88 / 10
|
5.0%
6.21
CategoryJSJB 2.0
Total Works5,105
Target Works8,224
Achievement %62.1%
Weightage5% of composite score
Final score6.21 / 10
|
| 21 | SEONI โ | 5.76 |
43.7%
4.55
CategoryFarm Pond
Started / Completed / Phys3,391 / 1,335 / 479
Completion rate53.5%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked37.81Cr / 14.18Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.87 / 5.0
Final score4.55 / 10
|
1.0%
1.08
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.91Cr / 0.41Cr
Expenditure rate (ongoing)21.6%
Part B score (max 5.0)1.08 / 5.0
Final score1.08 / 10
|
2.9%
6.80
CategoryDug Well Recharge
Started / Completed / Phys2,257 / 1,111 / 934
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.55Cr / 0.25Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score6.80 / 10
|
1.8%
7.42
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 12 / 11
Completion rate74.2%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.66Cr / 0.49Cr
Expenditure rate (ongoing)74.1%
Part B score (max 5.0)3.71 / 5.0
Final score7.42 / 10
|
33.4%
6.31
CategoryWater conservation & recharge
Started / Completed / Phys1,281 / 311 / 455
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked28.34Cr / 18.82Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.31 / 10
|
8.7%
6.76
CategoryWatershed Related Works
Started / Completed / Phys318 / 131 / 83
Completion rate67.3%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked6.33Cr / 4.30Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score6.76 / 10
|
3.6%
6.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys102 / 20 / 43
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked3.01Cr / 2.11Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score6.60 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works7,543
Target Works7,385
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 22 | MANDLA โ | 5.73 |
39.1%
6.03
CategoryFarm Pond
Started / Completed / Phys2,041 / 1,209 / 167
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked26.64Cr / 14.17Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score6.03 / 10
|
5.1%
1.31
CategoryAmrit Sarowar
Started / Completed / Phys27 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.55Cr / 2.76Cr
Expenditure rate (ongoing)26.1%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
|
2.2%
5.78
CategoryDug Well Recharge
Started / Completed / Phys1,720 / 658 / 549
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.33Cr / 0.60Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.27 / 5.0
Final score5.78 / 10
|
6.3%
4.91
CategoryIrrigation infrastructure
Started / Completed / Phys40 / 12 / 4
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked9.00Cr / 5.23Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score4.91 / 10
|
30.1%
5.87
CategoryWater conservation & recharge
Started / Completed / Phys971 / 291 / 105
Completion rate40.8%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked42.23Cr / 32.37Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score5.87 / 10
|
3.8%
6.01
CategoryWatershed Related Works
Started / Completed / Phys192 / 61 / 25
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked4.51Cr / 3.39Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score6.01 / 10
|
2.8%
6.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 15 / 13
Completion rate42.4%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked3.59Cr / 2.84Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score6.08 / 10
|
5.7%
3.58
CategoryPMKSY: Watershed
PMKSY Works0 total (75 done / -75 ongoing)
JGSA Target11.77 Cr
JGSA Valuation4.19 Cr
Expenditure1.08 Cr
% Valuation35.6%
Valuation Marks (40%)1.42
Exp Marks (40%)0.37
Geotag Marks (10%)1.000
Physical Marks (10%)0.79
Final score3.58 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,341
Target Works5,057
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 23 | BHOPAL โ | 5.72 |
41.0%
4.48
CategoryFarm Pond
Started / Completed / Phys945 / 226 / 266
Completion rate52.1%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked9.95Cr / 3.74Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score4.48 / 10
|
2.8%
4.79
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.82Cr / 0.43Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score4.79 / 10
|
3.7%
6.08
CategoryDug Well Recharge
Started / Completed / Phys691 / 358 / 166
Completion rate75.8%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked0.43Cr / 0.19Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.29 / 5.0
Final score6.08 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.2%
6.73
CategoryWater conservation & recharge
Started / Completed / Phys451 / 112 / 203
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked5.43Cr / 3.52Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.73 / 10
|
3.0%
5.98
CategoryWatershed Related Works
Started / Completed / Phys35 / 8 / 17
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.45Cr / 0.22Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score5.98 / 10
|
5.1%
6.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys25 / 2 / 20
Completion rate88.0%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.19Cr / 0.08Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score6.63 / 10
|
โ |
5.0%
6.87
CategoryJSJB 2.0
Total Works1,482
Target Works2,157
Achievement %68.7%
Weightage5% of composite score
Final score6.87 / 10
|
| 24 | BHIND โ | 5.70 |
16.9%
2.90
CategoryFarm Pond
Started / Completed / Phys1,069 / 270 / 138
Completion rate38.2%
Part A score (max 5.0)1.91 / 5.0
Ongoing sanction / booked11.92Cr / 2.36Cr
Expenditure rate (ongoing)19.8%
Part B score (max 5.0)0.99 / 5.0
Final score2.90 / 10
|
3.0%
0.61
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.62Cr / 0.44Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score0.61 / 10
|
0.3%
5.58
CategoryDug Well Recharge
Started / Completed / Phys120 / 7 / 62
Completion rate57.5%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score5.58 / 10
|
7.9%
5.99
CategoryIrrigation infrastructure
Started / Completed / Phys143 / 9 / 69
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked3.45Cr / 2.25Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score5.99 / 10
|
54.5%
6.78
CategoryWater conservation & recharge
Started / Completed / Phys736 / 98 / 434
Completion rate72.3%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked17.39Cr / 11.00Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.16 / 5.0
Final score6.78 / 10
|
8.5%
6.20
CategoryWatershed Related Works
Started / Completed / Phys78 / 12 / 41
Completion rate67.9%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked3.11Cr / 1.74Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.80 / 5.0
Final score6.20 / 10
|
3.9%
6.73
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys63 / 6 / 39
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked1.08Cr / 0.68Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score6.73 / 10
|
โ |
5.0%
4.47
CategoryJSJB 2.0
Total Works993
Target Works2,221
Achievement %44.7%
Weightage5% of composite score
Final score4.47 / 10
|
| 25 | SINGRAULI โ | 5.70 |
32.5%
4.84
CategoryFarm Pond
Started / Completed / Phys1,943 / 1,081 / 104
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked17.51Cr / 6.29Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score4.84 / 10
|
3.1%
3.34
CategoryAmrit Sarowar
Started / Completed / Phys20 / 0 / 2
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked4.00Cr / 2.27Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score3.34 / 10
|
2.2%
5.47
CategoryDug Well Recharge
Started / Completed / Phys1,212 / 568 / 319
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked0.80Cr / 0.29Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.47 / 10
|
0.1%
5.24
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
|
48.8%
6.03
CategoryWater conservation & recharge
Started / Completed / Phys916 / 122 / 428
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked25.84Cr / 15.66Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.03 / 10
|
5.2%
6.19
CategoryWatershed Related Works
Started / Completed / Phys131 / 26 / 53
Completion rate60.3%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked3.03Cr / 1.93Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score6.19 / 10
|
3.2%
6.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys56 / 8 / 25
Completion rate58.9%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked1.76Cr / 1.11Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score6.09 / 10
|
โ |
5.0%
8.81
CategoryJSJB 2.0
Total Works3,772
Target Works4,281
Achievement %88.1%
Weightage5% of composite score
Final score8.81 / 10
|
| 26 | NARMADAPURAM โ | 5.69 |
40.3%
3.54
CategoryFarm Pond
Started / Completed / Phys777 / 264 / 170
Completion rate55.9%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked9.12Cr / 1.37Cr
Expenditure rate (ongoing)15.0%
Part B score (max 5.0)0.75 / 5.0
Final score3.54 / 10
|
2.7%
1.29
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.31Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score1.29 / 10
|
6.1%
5.78
CategoryDug Well Recharge
Started / Completed / Phys1,026 / 521 / 367
Completion rate86.5%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.36Cr / 0.11Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.45 / 5.0
Final score5.78 / 10
|
0.7%
8.02
CategoryIrrigation infrastructure
Started / Completed / Phys42 / 33 / 3
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score8.02 / 10
|
37.8%
7.65
CategoryWater conservation & recharge
Started / Completed / Phys346 / 175 / 124
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked3.65Cr / 2.43Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score7.65 / 10
|
1.8%
6.88
CategoryWatershed Related Works
Started / Completed / Phys44 / 26 / 14
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)46.7%
Part B score (max 5.0)2.33 / 5.0
Final score6.88 / 10
|
2.8%
6.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 24 / 8
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.40Cr / 0.18Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score6.78 / 10
|
2.9%
4.18
CategoryPMKSY: Watershed
PMKSY Works0 total (1 done / -1 ongoing)
JGSA Target1.29 Cr
JGSA Valuation0.51 Cr
Expenditure0.22 Cr
% Valuation39.8%
Valuation Marks (40%)1.59
Exp Marks (40%)0.69
Geotag Marks (10%)0.900
Physical Marks (10%)1.00
Final score4.18 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,767
Target Works2,276
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 27 | SIDHI โ | 5.67 |
37.2%
4.36
CategoryFarm Pond
Started / Completed / Phys1,874 / 924 / 144
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked17.96Cr / 5.42Cr
Expenditure rate (ongoing)30.2%
Part B score (max 5.0)1.51 / 5.0
Final score4.36 / 10
|
โ |
1.1%
4.62
CategoryDug Well Recharge
Started / Completed / Phys482 / 223 / 79
Completion rate62.7%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.47Cr / 0.14Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.48 / 5.0
Final score4.62 / 10
|
2.7%
5.91
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 6 / 10
Completion rate48.5%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked2.21Cr / 1.54Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.48 / 5.0
Final score5.91 / 10
|
41.5%
6.33
CategoryWater conservation & recharge
Started / Completed / Phys892 / 273 / 200
Completion rate53.0%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked27.19Cr / 19.99Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.68 / 5.0
Final score6.33 / 10
|
4.5%
6.30
CategoryWatershed Related Works
Started / Completed / Phys98 / 34 / 25
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked2.07Cr / 1.36Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score6.30 / 10
|
5.5%
6.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys106 / 42 / 15
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked3.68Cr / 2.55Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.46 / 5.0
Final score6.15 / 10
|
2.4%
4.46
CategoryPMKSY: Watershed
PMKSY Works0 total (27 done / -27 ongoing)
JGSA Target2.89 Cr
JGSA Valuation1.64 Cr
Expenditure0.30 Cr
% Valuation56.7%
Valuation Marks (40%)2.27
Exp Marks (40%)0.41
Geotag Marks (10%)0.860
Physical Marks (10%)0.92
Final score4.46 / 10
|
5.0%
9.57
CategoryJSJB 2.0
Total Works3,335
Target Works3,485
Achievement %95.7%
Weightage5% of composite score
Final score9.57 / 10
|
| 28 | PANNA โ | 5.67 |
36.0%
4.57
CategoryFarm Pond
Started / Completed / Phys2,155 / 320 / 659
Completion rate45.4%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked25.36Cr / 11.64Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.29 / 5.0
Final score4.57 / 10
|
2.7%
2.11
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.52Cr / 1.49Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score2.11 / 10
|
4.0%
4.77
CategoryDug Well Recharge
Started / Completed / Phys1,820 / 361 / 540
Completion rate49.5%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked2.66Cr / 1.22Cr
Expenditure rate (ongoing)45.8%
Part B score (max 5.0)2.29 / 5.0
Final score4.77 / 10
|
0.2%
5.44
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 1 / 4
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.25Cr / 0.17Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.36 / 5.0
Final score5.44 / 10
|
35.8%
6.28
CategoryWater conservation & recharge
Started / Completed / Phys1,178 / 78 / 538
Completion rate52.3%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked23.17Cr / 16.99Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score6.28 / 10
|
4.8%
6.57
CategoryWatershed Related Works
Started / Completed / Phys142 / 14 / 77
Completion rate64.1%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked2.57Cr / 1.73Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score6.57 / 10
|
11.5%
6.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys182 / 11 / 91
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked6.73Cr / 5.32Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score6.76 / 10
|
โ |
5.0%
8.55
CategoryJSJB 2.0
Total Works4,705
Target Works5,503
Achievement %85.5%
Weightage5% of composite score
Final score8.55 / 10
|
| 29 | DATIA โ | 5.66 |
38.2%
3.64
CategoryFarm Pond
Started / Completed / Phys920 / 326 / 140
Completion rate50.7%
Part A score (max 5.0)2.53 / 5.0
Ongoing sanction / booked9.29Cr / 2.05Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.11 / 5.0
Final score3.64 / 10
|
0.5%
2.67
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score2.67 / 10
|
3.1%
5.67
CategoryDug Well Recharge
Started / Completed / Phys600 / 302 / 187
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.29Cr / 0.09Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.60 / 5.0
Final score5.67 / 10
|
2.3%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys28 / 13 / 12
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score9.00 / 10
|
39.9%
6.54
CategoryWater conservation & recharge
Started / Completed / Phys381 / 84 / 199
Completion rate74.3%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked5.10Cr / 2.89Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score6.54 / 10
|
5.1%
6.76
CategoryWatershed Related Works
Started / Completed / Phys61 / 17 / 31
Completion rate78.7%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.62Cr / 0.35Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score6.76 / 10
|
5.9%
7.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 11 / 28
Completion rate81.3%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.46Cr / 0.28Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score7.13 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works2,232
Target Works2,039
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 30 | SHIVPURI โ | 5.66 |
33.2%
4.53
CategoryFarm Pond
Started / Completed / Phys2,015 / 731 / 515
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked24.37Cr / 7.00Cr
Expenditure rate (ongoing)28.7%
Part B score (max 5.0)1.44 / 5.0
Final score4.53 / 10
|
0.8%
1.40
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.56Cr / 0.44Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score1.40 / 10
|
2.6%
5.40
CategoryDug Well Recharge
Started / Completed / Phys1,936 / 964 / 560
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked1.05Cr / 0.31Cr
Expenditure rate (ongoing)29.3%
Part B score (max 5.0)1.47 / 5.0
Final score5.40 / 10
|
1.1%
6.11
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 6 / 11
Completion rate53.1%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked0.79Cr / 0.55Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score6.11 / 10
|
44.7%
6.50
CategoryWater conservation & recharge
Started / Completed / Phys1,104 / 135 / 552
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked37.32Cr / 25.27Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.39 / 5.0
Final score6.50 / 10
|
8.1%
6.71
CategoryWatershed Related Works
Started / Completed / Phys200 / 41 / 87
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked5.73Cr / 4.02Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score6.71 / 10
|
2.9%
6.95
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys79 / 20 / 38
Completion rate73.4%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked2.02Cr / 1.33Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score6.95 / 10
|
1.6%
2.25
CategoryPMKSY: Watershed
PMKSY Works0 total (81 done / -81 ongoing)
JGSA Target3.04 Cr
JGSA Valuation0.05 Cr
Expenditure0.38 Cr
% Valuation1.5%
Valuation Marks (40%)0.06
Exp Marks (40%)0.51
Geotag Marks (10%)0.860
Physical Marks (10%)0.82
Final score2.25 / 10
|
5.0%
5.03
CategoryJSJB 2.0
Total Works2,704
Target Works5,374
Achievement %50.3%
Weightage5% of composite score
Final score5.03 / 10
|
| 31 | INDORE โ | 5.64 |
49.1%
4.29
CategoryFarm Pond
Started / Completed / Phys569 / 178 / 89
Completion rate46.9%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked8.24Cr / 3.20Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.94 / 5.0
Final score4.29 / 10
|
6.8%
4.60
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 3
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.98Cr / 0.54Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score4.60 / 10
|
6.3%
6.19
CategoryDug Well Recharge
Started / Completed / Phys870 / 573 / 140
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.42Cr / 0.17Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score6.19 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.0%
7.59
CategoryWater conservation & recharge
Started / Completed / Phys130 / 61 / 45
Completion rate81.5%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.79Cr / 0.56Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.59 / 10
|
8.8%
7.38
CategoryWatershed Related Works
Started / Completed / Phys50 / 18 / 24
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.67Cr / 0.43Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score7.38 / 10
|
4.2%
8.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 9 / 10
Completion rate90.5%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.20Cr / 0.15Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score8.31 / 10
|
4.8%
3.84
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target1.35 Cr
JGSA Valuation0.64 Cr
Expenditure0.12 Cr
% Valuation47.5%
Valuation Marks (40%)1.90
Exp Marks (40%)0.36
Geotag Marks (10%)0.970
Physical Marks (10%)0.61
Final score3.84 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works10,916
Target Works1,651
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 32 | SATNA โ | 5.63 |
42.5%
4.15
CategoryFarm Pond
Started / Completed / Phys2,100 / 222 / 840
Completion rate50.6%
Part A score (max 5.0)2.53 / 5.0
Ongoing sanction / booked23.51Cr / 7.61Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score4.15 / 10
|
3.4%
1.00
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.66Cr / 0.73Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
|
2.4%
6.67
CategoryDug Well Recharge
Started / Completed / Phys1,141 / 265 / 636
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.51Cr / 0.28Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score6.67 / 10
|
0.5%
6.61
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 11 / 7
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.61 / 10
|
34.1%
6.91
CategoryWater conservation & recharge
Started / Completed / Phys660 / 89 / 338
Completion rate64.7%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked16.79Cr / 12.34Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score6.91 / 10
|
4.5%
6.63
CategoryWatershed Related Works
Started / Completed / Phys143 / 23 / 75
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked1.62Cr / 1.04Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.20 / 5.0
Final score6.63 / 10
|
7.6%
6.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys121 / 19 / 53
Completion rate59.5%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked4.60Cr / 3.23Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score6.48 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works4,351
Target Works4,203
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 33 | HARDA โ | 5.57 |
41.0%
3.64
CategoryFarm Pond
Started / Completed / Phys336 / 42 / 119
Completion rate47.9%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked4.35Cr / 1.08Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score3.64 / 10
|
2.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
11.2%
6.22
CategoryDug Well Recharge
Started / Completed / Phys782 / 379 / 329
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.19Cr / 0.06Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score6.22 / 10
|
8.0%
8.00
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 2 / 16
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score8.00 / 10
|
18.9%
7.07
CategoryWater conservation & recharge
Started / Completed / Phys90 / 5 / 74
Completion rate87.8%
Part A score (max 5.0)4.39 / 5.0
Ongoing sanction / booked0.54Cr / 0.29Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score7.07 / 10
|
4.1%
7.43
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 11
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score7.43 / 10
|
9.1%
6.70
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 10 / 24
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.10 / 5.0
Final score6.70 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works2,589
Target Works1,281
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 34 | AGAR-MALWA โ | 5.54 |
26.1%
3.70
CategoryFarm Pond
Started / Completed / Phys718 / 84 / 147
Completion rate32.2%
Part A score (max 5.0)1.61 / 5.0
Ongoing sanction / booked10.85Cr / 4.54Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score3.70 / 10
|
1.2%
4.24
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.49Cr / 0.29Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score4.24 / 10
|
8.9%
5.74
CategoryDug Well Recharge
Started / Completed / Phys1,970 / 623 / 815
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked1.39Cr / 0.58Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score5.74 / 10
|
0.6%
5.01
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score5.01 / 10
|
44.1%
5.91
CategoryWater conservation & recharge
Started / Completed / Phys454 / 31 / 185
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked14.73Cr / 10.40Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score5.91 / 10
|
2.6%
6.06
CategoryWatershed Related Works
Started / Completed / Phys43 / 12 / 12
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked0.63Cr / 0.41Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score6.06 / 10
|
11.3%
6.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys170 / 7 / 104
Completion rate65.3%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked2.27Cr / 1.63Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score6.85 / 10
|
โ |
5.0%
8.69
CategoryJSJB 2.0
Total Works2,926
Target Works3,366
Achievement %86.9%
Weightage5% of composite score
Final score8.69 / 10
|
| 35 | SHAHDOL โ | 5.49 |
40.6%
3.53
CategoryFarm Pond
Started / Completed / Phys3,127 / 723 / 503
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked51.30Cr / 16.15Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.57 / 5.0
Final score3.53 / 10
|
1.3%
1.31
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.58Cr / 0.68Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
|
0.8%
5.09
CategoryDug Well Recharge
Started / Completed / Phys620 / 127 / 242
Completion rate59.5%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked0.66Cr / 0.28Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score5.09 / 10
|
6.5%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 7 / 22
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked1.12Cr / 1.08Cr
Expenditure rate (ongoing)96.3%
Part B score (max 5.0)4.81 / 5.0
Final score9.00 / 10
|
32.2%
5.95
CategoryWater conservation & recharge
Started / Completed / Phys1,042 / 108 / 354
Completion rate44.3%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked40.35Cr / 30.13Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score5.95 / 10
|
10.3%
7.69
CategoryWatershed Related Works
Started / Completed / Phys229 / 19 / 179
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked2.00Cr / 1.35Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.36 / 5.0
Final score7.69 / 10
|
3.2%
5.98
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys105 / 26 / 24
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked3.34Cr / 2.41Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score5.98 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works37,277
Target Works5,163
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 36 | ALIRAJPUR โ | 5.46 |
12.5%
3.73
CategoryFarm Pond
Started / Completed / Phys1,009 / 30 / 265
Completion rate29.2%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked15.75Cr / 7.14Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.27 / 5.0
Final score3.73 / 10
|
2.4%
5.33
CategoryAmrit Sarowar
Started / Completed / Phys16 / 0 / 7
Completion rate43.8%
Part A score (max 5.0)2.19 / 5.0
Ongoing sanction / booked2.49Cr / 1.56Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score5.33 / 10
|
4.6%
4.90
CategoryDug Well Recharge
Started / Completed / Phys3,287 / 153 / 1,292
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked4.76Cr / 2.58Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score4.90 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
70.6%
5.43
CategoryWater conservation & recharge
Started / Completed / Phys838 / 33 / 199
Completion rate27.7%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked94.43Cr / 76.41Cr
Expenditure rate (ongoing)80.9%
Part B score (max 5.0)4.05 / 5.0
Final score5.43 / 10
|
1.8%
6.64
CategoryWatershed Related Works
Started / Completed / Phys74 / 4 / 38
Completion rate56.8%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked1.61Cr / 1.23Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score6.64 / 10
|
1.1%
6.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 1 / 9
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked1.43Cr / 1.20Cr
Expenditure rate (ongoing)83.5%
Part B score (max 5.0)4.17 / 5.0
Final score6.10 / 10
|
1.9%
5.87
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target3.49 Cr
JGSA Valuation1.68 Cr
Expenditure1.86 Cr
% Valuation48.2%
Valuation Marks (40%)1.93
Exp Marks (40%)2.14
Geotag Marks (10%)0.980
Physical Marks (10%)0.83
Final score5.87 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,501
Target Works5,252
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 37 | UMARIA โ | 5.40 |
25.9%
4.12
CategoryFarm Pond
Started / Completed / Phys912 / 81 / 273
Completion rate38.8%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked14.38Cr / 6.28Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score4.12 / 10
|
1.8%
3.97
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 2
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.35Cr / 0.77Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score3.97 / 10
|
3.0%
4.15
CategoryDug Well Recharge
Started / Completed / Phys1,111 / 119 / 382
Completion rate45.1%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked1.60Cr / 0.61Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score4.15 / 10
|
0.0%
8.01
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)93.5%
Part B score (max 5.0)4.67 / 5.0
Final score8.01 / 10
|
49.2%
5.68
CategoryWater conservation & recharge
Started / Completed / Phys708 / 55 / 270
Completion rate45.9%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked23.31Cr / 15.75Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score5.68 / 10
|
6.7%
6.25
CategoryWatershed Related Works
Started / Completed / Phys60 / 4 / 28
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.56Cr / 2.55Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score6.25 / 10
|
6.5%
5.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys107 / 4 / 38
Completion rate39.3%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked3.95Cr / 2.61Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score5.27 / 10
|
1.9%
4.51
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target1.80 Cr
JGSA Valuation0.89 Cr
Expenditure0.27 Cr
% Valuation49.3%
Valuation Marks (40%)1.97
Exp Marks (40%)0.61
Geotag Marks (10%)0.980
Physical Marks (10%)0.96
Final score4.51 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,935
Target Works2,910
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 38 | RATLAM โ | 5.38 |
36.6%
3.52
CategoryFarm Pond
Started / Completed / Phys1,452 / 402 / 224
Completion rate43.1%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked21.52Cr / 5.88Cr
Expenditure rate (ongoing)27.3%
Part B score (max 5.0)1.37 / 5.0
Final score3.52 / 10
|
4.2%
3.17
CategoryAmrit Sarowar
Started / Completed / Phys16 / 1 / 1
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked3.40Cr / 1.73Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score3.17 / 10
|
8.9%
5.98
CategoryDug Well Recharge
Started / Completed / Phys3,186 / 917 / 1,366
Completion rate71.7%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked2.33Cr / 1.12Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score5.98 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.6%
6.97
CategoryWater conservation & recharge
Started / Completed / Phys528 / 187 / 196
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked10.94Cr / 7.30Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.97 / 10
|
0.5%
6.17
CategoryWatershed Related Works
Started / Completed / Phys11 / 6 / 3
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.08 / 5.0
Final score6.17 / 10
|
1.3%
7.61
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 10 / 8
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score7.61 / 10
|
7.9%
3.83
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target7.33 Cr
JGSA Valuation2.63 Cr
Expenditure1.01 Cr
% Valuation35.8%
Valuation Marks (40%)1.43
Exp Marks (40%)0.55
Geotag Marks (10%)0.850
Physical Marks (10%)1.00
Final score3.83 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,719
Target Works5,220
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 39 | VIDISHA โ | 5.37 |
51.3%
4.42
CategoryFarm Pond
Started / Completed / Phys2,031 / 1,030 / 234
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked20.16Cr / 5.28Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score4.42 / 10
|
2.0%
2.37
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.99Cr / 0.94Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.37 / 5.0
Final score2.37 / 10
|
4.4%
6.56
CategoryDug Well Recharge
Started / Completed / Phys1,729 / 585 / 910
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.60Cr / 0.27Cr
Expenditure rate (ongoing)44.8%
Part B score (max 5.0)2.24 / 5.0
Final score6.56 / 10
|
0.3%
7.75
CategoryIrrigation infrastructure
Started / Completed / Phys37 / 29 / 2
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.57 / 5.0
Final score7.75 / 10
|
29.7%
6.20
CategoryWater conservation & recharge
Started / Completed / Phys848 / 339 / 177
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked13.84Cr / 8.73Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score6.20 / 10
|
0.9%
8.44
CategoryWatershed Related Works
Started / Completed / Phys38 / 25 / 8
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.17Cr / 0.14Cr
Expenditure rate (ongoing)81.9%
Part B score (max 5.0)4.09 / 5.0
Final score8.44 / 10
|
1.4%
6.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 21 / 3
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.21Cr / 0.11Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.64 / 5.0
Final score6.92 / 10
|
5.1%
4.61
CategoryPMKSY: Watershed
PMKSY Works0 total (4 done / -4 ongoing)
JGSA Target5.13 Cr
JGSA Valuation3.40 Cr
Expenditure0.41 Cr
% Valuation66.2%
Valuation Marks (40%)2.65
Exp Marks (40%)0.32
Geotag Marks (10%)0.960
Physical Marks (10%)0.67
Final score4.61 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,776
Target Works4,721
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 40 | GWALIOR โ | 5.37 |
35.2%
4.11
CategoryFarm Pond
Started / Completed / Phys914 / 114 / 419
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked11.22Cr / 2.68Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.20 / 5.0
Final score4.11 / 10
|
4.0%
1.56
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 1
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked2.69Cr / 0.62Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score1.56 / 10
|
3.0%
5.50
CategoryDug Well Recharge
Started / Completed / Phys844 / 224 / 490
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.34Cr / 0.09Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score5.50 / 10
|
4.1%
7.90
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 4 / 20
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked1.08Cr / 0.90Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.15 / 5.0
Final score7.90 / 10
|
30.2%
7.07
CategoryWater conservation & recharge
Started / Completed / Phys282 / 43 / 155
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked9.64Cr / 6.85Cr
Expenditure rate (ongoing)71.1%
Part B score (max 5.0)3.56 / 5.0
Final score7.07 / 10
|
4.9%
7.00
CategoryWatershed Related Works
Started / Completed / Phys61 / 12 / 35
Completion rate77.0%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked1.00Cr / 0.63Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score7.00 / 10
|
2.4%
7.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 10 / 14
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.27Cr / 0.16Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.14 / 10
|
11.1%
1.96
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target8.02 Cr
JGSA Valuation0.55 Cr
Expenditure0.43 Cr
% Valuation6.9%
Valuation Marks (40%)0.28
Exp Marks (40%)0.21
Geotag Marks (10%)0.990
Physical Marks (10%)0.48
Final score1.96 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,428
Target Works2,174
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 41 | CHHATARPUR โ | 5.35 |
46.5%
4.05
CategoryFarm Pond
Started / Completed / Phys1,863 / 688 / 347
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked29.52Cr / 7.49Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score4.05 / 10
|
3.7%
3.05
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 2
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked4.74Cr / 2.50Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score3.05 / 10
|
5.1%
5.72
CategoryDug Well Recharge
Started / Completed / Phys3,918 / 2,910 / 561
Completion rate88.6%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.89Cr / 0.23Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score5.72 / 10
|
0.4%
6.66
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 5 / 5
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score6.66 / 10
|
30.2%
6.50
CategoryWater conservation & recharge
Started / Completed / Phys937 / 187 / 438
Completion rate66.7%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked16.51Cr / 10.45Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.17 / 5.0
Final score6.50 / 10
|
3.5%
7.08
CategoryWatershed Related Works
Started / Completed / Phys125 / 29 / 64
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked1.34Cr / 0.90Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.36 / 5.0
Final score7.08 / 10
|
3.9%
5.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys80 / 5 / 35
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked2.74Cr / 1.75Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score5.69 / 10
|
1.7%
6.38
CategoryPMKSY: Watershed
PMKSY Works0 total (1 done / -1 ongoing)
JGSA Target2.41 Cr
JGSA Valuation2.11 Cr
Expenditure0.82 Cr
% Valuation87.4%
Valuation Marks (40%)3.50
Exp Marks (40%)1.36
Geotag Marks (10%)0.680
Physical Marks (10%)0.84
Final score6.38 / 10
|
5.0%
9.88
CategoryJSJB 2.0
Total Works6,876
Target Works6,958
Achievement %98.8%
Weightage5% of composite score
Final score9.88 / 10
|
| 42 | TIKAMGARH โ | 5.31 |
16.2%
2.95
CategoryFarm Pond
Started / Completed / Phys921 / 57 / 158
Completion rate23.3%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked12.18Cr / 4.34Cr
Expenditure rate (ongoing)35.6%
Part B score (max 5.0)1.78 / 5.0
Final score2.95 / 10
|
3.1%
0.65
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.04Cr / 0.40Cr
Expenditure rate (ongoing)13.1%
Part B score (max 5.0)0.65 / 5.0
Final score0.65 / 10
|
6.4%
5.69
CategoryDug Well Recharge
Started / Completed / Phys2,399 / 271 / 1,521
Completion rate74.7%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked1.58Cr / 0.62Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score5.69 / 10
|
0.1%
7.63
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 10 / 4
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)82.7%
Part B score (max 5.0)4.13 / 5.0
Final score7.63 / 10
|
51.6%
5.82
CategoryWater conservation & recharge
Started / Completed / Phys1,050 / 85 / 336
Completion rate40.1%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked33.03Cr / 25.20Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.81 / 5.0
Final score5.82 / 10
|
4.6%
6.25
CategoryWatershed Related Works
Started / Completed / Phys111 / 14 / 50
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked1.96Cr / 1.32Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score6.25 / 10
|
9.0%
5.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys128 / 3 / 42
Completion rate35.2%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked5.99Cr / 4.76Cr
Expenditure rate (ongoing)79.6%
Part B score (max 5.0)3.98 / 5.0
Final score5.74 / 10
|
3.9%
3.60
CategoryPMKSY: Watershed
PMKSY Works0 total (1 done / -1 ongoing)
JGSA Target3.79 Cr
JGSA Valuation1.58 Cr
Expenditure0.34 Cr
% Valuation41.7%
Valuation Marks (40%)1.67
Exp Marks (40%)0.36
Geotag Marks (10%)0.630
Physical Marks (10%)0.94
Final score3.60 / 10
|
5.0%
9.71
CategoryJSJB 2.0
Total Works4,509
Target Works4,643
Achievement %97.1%
Weightage5% of composite score
Final score9.71 / 10
|
| 43 | DAMOH โ | 5.28 |
16.0%
5.09
CategoryFarm Pond
Started / Completed / Phys1,584 / 479 / 316
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked17.45Cr / 9.02Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.58 / 5.0
Final score5.09 / 10
|
0.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
2.8%
6.81
CategoryDug Well Recharge
Started / Completed / Phys2,247 / 891 / 686
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.73Cr / 1.14Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score6.81 / 10
|
0.6%
5.97
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 0 / 4
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.97Cr / 0.91Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.72 / 5.0
Final score5.97 / 10
|
52.9%
5.02
CategoryWater conservation & recharge
Started / Completed / Phys1,017 / 89 / 163
Completion rate24.8%
Part A score (max 5.0)1.24 / 5.0
Ongoing sanction / booked94.67Cr / 71.61Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score5.02 / 10
|
9.7%
5.73
CategoryWatershed Related Works
Started / Completed / Phys294 / 37 / 71
Completion rate36.7%
Part A score (max 5.0)1.84 / 5.0
Ongoing sanction / booked12.88Cr / 10.03Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.89 / 5.0
Final score5.73 / 10
|
8.8%
5.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys207 / 9 / 47
Completion rate27.1%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked13.12Cr / 10.01Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score5.17 / 10
|
3.9%
1.67
CategoryPMKSY: Watershed
PMKSY Works0 total (4 done / -4 ongoing)
JGSA Target8.25 Cr
JGSA Valuation0.00 Cr
Expenditure0.09 Cr
% Valuation0.0%
Valuation Marks (40%)0.00
Exp Marks (40%)0.04
Geotag Marks (10%)1.000
Physical Marks (10%)0.62
Final score1.67 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works7,172
Target Works5,366
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 44 | MANDSAUR โ | 5.27 |
18.7%
2.79
CategoryFarm Pond
Started / Completed / Phys1,237 / 119 / 147
Completion rate21.5%
Part A score (max 5.0)1.08 / 5.0
Ongoing sanction / booked17.03Cr / 5.84Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.71 / 5.0
Final score2.79 / 10
|
1.3%
3.53
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.21Cr / 0.65Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score3.53 / 10
|
9.5%
5.63
CategoryDug Well Recharge
Started / Completed / Phys4,291 / 1,005 / 1,380
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked4.93Cr / 2.80Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.85 / 5.0
Final score5.63 / 10
|
0.5%
5.92
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 7 / 5
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score5.92 / 10
|
58.1%
5.75
CategoryWater conservation & recharge
Started / Completed / Phys1,158 / 171 / 285
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked39.66Cr / 29.96Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score5.75 / 10
|
2.2%
7.44
CategoryWatershed Related Works
Started / Completed / Phys53 / 16 / 18
Completion rate64.2%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked1.12Cr / 0.95Cr
Expenditure rate (ongoing)84.6%
Part B score (max 5.0)4.23 / 5.0
Final score7.44 / 10
|
2.2%
6.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 8 / 11
Completion rate47.5%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked1.35Cr / 1.05Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.88 / 5.0
Final score6.26 / 10
|
2.5%
3.98
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target2.95 Cr
JGSA Valuation1.94 Cr
Expenditure0.20 Cr
% Valuation65.8%
Valuation Marks (40%)2.64
Exp Marks (40%)0.27
Geotag Marks (10%)0.920
Physical Marks (10%)0.16
Final score3.98 / 10
|
5.0%
7.94
CategoryJSJB 2.0
Total Works5,404
Target Works6,805
Achievement %79.4%
Weightage5% of composite score
Final score7.94 / 10
|
| 45 | JHABUA โ | 5.22 |
13.3%
3.32
CategoryFarm Pond
Started / Completed / Phys1,233 / 67 / 179
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked21.32Cr / 9.89Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score3.32 / 10
|
1.7%
2.37
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 2
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked2.78Cr / 0.92Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.65 / 5.0
Final score2.37 / 10
|
5.3%
5.43
CategoryDug Well Recharge
Started / Completed / Phys4,071 / 1,096 / 1,020
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked5.02Cr / 2.85Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.83 / 5.0
Final score5.43 / 10
|
0.1%
6.49
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 4 / 4
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.49 / 10
|
70.2%
5.33
CategoryWater conservation & recharge
Started / Completed / Phys1,368 / 63 / 379
Completion rate32.3%
Part A score (max 5.0)1.62 / 5.0
Ongoing sanction / booked85.32Cr / 63.45Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score5.33 / 10
|
1.6%
5.10
CategoryWatershed Related Works
Started / Completed / Phys81 / 3 / 33
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked1.71Cr / 0.98Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score5.10 / 10
|
1.4%
5.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 3 / 28
Completion rate62.0%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.93Cr / 0.54Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score5.99 / 10
|
1.3%
2.80
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target2.53 Cr
JGSA Valuation0.74 Cr
Expenditure0.14 Cr
% Valuation29.1%
Valuation Marks (40%)1.16
Exp Marks (40%)0.23
Geotag Marks (10%)0.950
Physical Marks (10%)0.46
Final score2.80 / 10
|
5.0%
9.92
CategoryJSJB 2.0
Total Works6,770
Target Works6,826
Achievement %99.2%
Weightage5% of composite score
Final score9.92 / 10
|
| 46 | JABALPUR โ | 5.18 |
37.6%
2.70
CategoryFarm Pond
Started / Completed / Phys953 / 171 / 133
Completion rate31.9%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked20.22Cr / 4.48Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.11 / 5.0
Final score2.70 / 10
|
6.0%
1.86
CategoryAmrit Sarowar
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.47Cr / 1.66Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
|
2.0%
5.84
CategoryDug Well Recharge
Started / Completed / Phys579 / 246 / 242
Completion rate84.3%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.23Cr / 0.08Cr
Expenditure rate (ongoing)32.5%
Part B score (max 5.0)1.63 / 5.0
Final score5.84 / 10
|
0.2%
5.63
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score5.63 / 10
|
26.1%
7.82
CategoryWater conservation & recharge
Started / Completed / Phys363 / 188 / 98
Completion rate78.8%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked5.66Cr / 4.40Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.88 / 5.0
Final score7.82 / 10
|
14.5%
6.36
CategoryWatershed Related Works
Started / Completed / Phys185 / 90 / 36
Completion rate68.1%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked3.58Cr / 2.11Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score6.36 / 10
|
2.8%
6.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 31 / 10
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.31Cr / 0.16Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score6.67 / 10
|
5.7%
4.74
CategoryPMKSY: Watershed
PMKSY Works0 total (5 done / -5 ongoing)
JGSA Target4.23 Cr
JGSA Valuation2.05 Cr
Expenditure1.37 Cr
% Valuation48.4%
Valuation Marks (40%)1.94
Exp Marks (40%)1.29
Geotag Marks (10%)0.760
Physical Marks (10%)0.76
Final score4.74 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works35,483
Target Works2,153
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 47 | REWA โ | 5.13 |
43.9%
3.88
CategoryFarm Pond
Started / Completed / Phys2,343 / 973 / 298
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked23.96Cr / 5.60Cr
Expenditure rate (ongoing)23.4%
Part B score (max 5.0)1.17 / 5.0
Final score3.88 / 10
|
2.1%
0.13
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.30Cr / 0.06Cr
Expenditure rate (ongoing)2.6%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
|
0.9%
5.60
CategoryDug Well Recharge
Started / Completed / Phys493 / 293 / 85
Completion rate76.7%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked0.28Cr / 0.10Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score5.60 / 10
|
2.4%
6.48
CategoryIrrigation infrastructure
Started / Completed / Phys72 / 33 / 18
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.62Cr / 0.36Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.94 / 5.0
Final score6.48 / 10
|
26.4%
6.44
CategoryWater conservation & recharge
Started / Completed / Phys631 / 275 / 149
Completion rate67.2%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked10.03Cr / 6.19Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score6.44 / 10
|
6.7%
6.21
CategoryWatershed Related Works
Started / Completed / Phys118 / 41 / 36
Completion rate65.3%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked2.31Cr / 1.36Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score6.21 / 10
|
7.0%
6.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys110 / 50 / 25
Completion rate68.2%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked2.41Cr / 1.33Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.77 / 5.0
Final score6.18 / 10
|
5.7%
3.07
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target6.27 Cr
JGSA Valuation1.14 Cr
Expenditure0.87 Cr
% Valuation18.2%
Valuation Marks (40%)0.73
Exp Marks (40%)0.55
Geotag Marks (10%)0.990
Physical Marks (10%)0.79
Final score3.07 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works3,796
Target Works3,776
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 48 | ANUPPUR โ | 5.11 |
68.8%
4.35
CategoryFarm Pond
Started / Completed / Phys3,699 / 2,289 / 356
Completion rate71.5%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked28.28Cr / 4.39Cr
Expenditure rate (ongoing)15.5%
Part B score (max 5.0)0.78 / 5.0
Final score4.35 / 10
|
โ |
0.8%
6.34
CategoryDug Well Recharge
Started / Completed / Phys455 / 132 / 245
Completion rate82.9%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.20Cr / 0.09Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score6.34 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.3%
7.55
CategoryWater conservation & recharge
Started / Completed / Phys389 / 168 / 141
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked7.24Cr / 5.18Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score7.55 / 10
|
1.1%
7.76
CategoryWatershed Related Works
Started / Completed / Phys24 / 7 / 11
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.98Cr / 0.78Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score7.76 / 10
|
2.6%
7.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys44 / 26 / 9
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.89Cr / 0.59Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score7.31 / 10
|
7.1%
2.50
CategoryPMKSY: Watershed
PMKSY Works0 total (43 done / -43 ongoing)
JGSA Target9.68 Cr
JGSA Valuation1.81 Cr
Expenditure0.21 Cr
% Valuation18.7%
Valuation Marks (40%)0.75
Exp Marks (40%)0.09
Geotag Marks (10%)1.000
Physical Marks (10%)0.67
Final score2.50 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,849
Target Works4,615
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 49 | SEHORE โ | 5.10 |
54.1%
3.61
CategoryFarm Pond
Started / Completed / Phys1,491 / 137 / 555
Completion rate46.4%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked22.12Cr / 5.71Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score3.61 / 10
|
2.1%
1.92
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.43Cr / 0.55Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
|
9.4%
6.22
CategoryDug Well Recharge
Started / Completed / Phys2,519 / 505 / 1,568
Completion rate82.3%
Part A score (max 5.0)4.11 / 5.0
Ongoing sanction / booked1.16Cr / 0.49Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.10 / 5.0
Final score6.22 / 10
|
1.5%
6.37
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 5 / 6
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.65Cr / 0.45Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.37 / 10
|
20.2%
7.22
CategoryWater conservation & recharge
Started / Completed / Phys358 / 50 / 216
Completion rate74.3%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked5.02Cr / 3.53Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.22 / 10
|
3.8%
6.48
CategoryWatershed Related Works
Started / Completed / Phys66 / 15 / 29
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.82Cr / 0.52Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.48 / 10
|
2.7%
6.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys38 / 4 / 23
Completion rate71.1%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.32Cr / 0.17Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score6.22 / 10
|
1.1%
4.14
CategoryPMKSY: Watershed
PMKSY Works0 total (4 done / -4 ongoing)
JGSA Target0.79 Cr
JGSA Valuation0.22 Cr
Expenditure0.31 Cr
% Valuation27.4%
Valuation Marks (40%)1.10
Exp Marks (40%)1.59
Geotag Marks (10%)0.880
Physical Marks (10%)0.56
Final score4.14 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,510
Target Works4,497
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 50 | DEWAS โ | 4.93 |
46.7%
3.22
CategoryFarm Pond
Started / Completed / Phys1,265 / 194 / 293
Completion rate38.5%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked27.91Cr / 7.22Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score3.22 / 10
|
2.3%
2.70
CategoryAmrit Sarowar
Started / Completed / Phys11 / 1 / 1
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked2.01Cr / 0.72Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score2.70 / 10
|
9.4%
5.70
CategoryDug Well Recharge
Started / Completed / Phys3,472 / 1,389 / 1,296
Completion rate77.3%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked2.04Cr / 0.75Cr
Expenditure rate (ongoing)36.7%
Part B score (max 5.0)1.83 / 5.0
Final score5.70 / 10
|
3.0%
6.16
CategoryIrrigation infrastructure
Started / Completed / Phys57 / 17 / 24
Completion rate71.9%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.77Cr / 0.40Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score6.16 / 10
|
28.3%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys621 / 78 / 297
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked11.55Cr / 8.07Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score6.51 / 10
|
2.9%
6.22
CategoryWatershed Related Works
Started / Completed / Phys94 / 22 / 37
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked1.00Cr / 0.62Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score6.22 / 10
|
1.0%
6.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 4 / 7
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score6.67 / 10
|
1.5%
3.72
CategoryPMKSY: Watershed
PMKSY Works0 total (22 done / -22 ongoing)
JGSA Target1.42 Cr
JGSA Valuation0.56 Cr
Expenditure0.06 Cr
% Valuation39.3%
Valuation Marks (40%)1.57
Exp Marks (40%)0.16
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score3.72 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,882
Target Works5,536
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 51 | SHAJAPUR โ | 4.79 |
42.3%
3.02
CategoryFarm Pond
Started / Completed / Phys682 / 175 / 46
Completion rate32.4%
Part A score (max 5.0)1.62 / 5.0
Ongoing sanction / booked13.41Cr / 3.75Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score3.02 / 10
|
3.4%
2.02
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.54Cr / 0.62Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score2.02 / 10
|
8.8%
5.68
CategoryDug Well Recharge
Started / Completed / Phys1,642 / 640 / 725
Completion rate83.1%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.67Cr / 0.20Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.52 / 5.0
Final score5.68 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
28.3%
5.85
CategoryWater conservation & recharge
Started / Completed / Phys290 / 64 / 106
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked5.26Cr / 3.07Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score5.85 / 10
|
3.5%
6.81
CategoryWatershed Related Works
Started / Completed / Phys40 / 9 / 20
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.42Cr / 0.27Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.81 / 10
|
0.9%
7.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 4 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score7.53 / 10
|
7.0%
6.66
CategoryPMKSY: Watershed
PMKSY Works0 total (15 done / -15 ongoing)
JGSA Target3.16 Cr
JGSA Valuation2.20 Cr
Expenditure1.53 Cr
% Valuation69.6%
Valuation Marks (40%)2.78
Exp Marks (40%)1.93
Geotag Marks (10%)0.940
Physical Marks (10%)1.00
Final score6.66 / 10
|
5.0%
8.77
CategoryJSJB 2.0
Total Works2,346
Target Works2,676
Achievement %87.7%
Weightage5% of composite score
Final score8.77 / 10
|
| 52 | NARSINGHPUR โ | 4.65 |
65.9%
3.63
CategoryFarm Pond
Started / Completed / Phys1,389 / 706 / 81
Completion rate56.7%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked15.89Cr / 2.53Cr
Expenditure rate (ongoing)15.9%
Part B score (max 5.0)0.80 / 5.0
Final score3.63 / 10
|
2.7%
0.01
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.01 / 10
|
1.4%
4.67
CategoryDug Well Recharge
Started / Completed / Phys322 / 122 / 84
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.30Cr / 0.09Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.48 / 5.0
Final score4.67 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.6%
7.09
CategoryWater conservation & recharge
Started / Completed / Phys145 / 74 / 38
Completion rate77.2%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked3.84Cr / 2.47Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score7.09 / 10
|
0.5%
5.40
CategoryWatershed Related Works
Started / Completed / Phys13 / 6 / 2
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score5.40 / 10
|
1.3%
6.97
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 11 / 5
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.16Cr / 0.11Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score6.97 / 10
|
8.4%
6.28
CategoryPMKSY: Watershed
PMKSY Works0 total (87 done / -87 ongoing)
JGSA Target4.79 Cr
JGSA Valuation3.55 Cr
Expenditure1.87 Cr
% Valuation74.2%
Valuation Marks (40%)2.97
Exp Marks (40%)1.56
Geotag Marks (10%)0.900
Physical Marks (10%)0.84
Final score6.28 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works11,486
Target Works1,902
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
Scheme: โน Sanction Weighted
Level: District
Snapshot: 2026-04-29
Units shown: 52
โก Weight % shown is each unit's own auto-computed weight โ not the global admin-set value.
โ๏ธ Step 1 โ Category Weightage
Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.
Weightage = Sanctioned Cost of Category
รท Total Sanctioned Cost (all categories)
e.g. Farm Pond = โน200 Cr out of โน500 Cr total
Weightage = 200 รท 500 = 0.40 (40%)
Computed independently per unit โ two districts with different sanction distributions will have different weightages for the same category.
๐ ฐ Step 2a โ Part A Score (Completion)
Fixed 50% weight on completion of works.
Part A = (Completed + Phys) รท Started ร 5
๐ ฑ Step 2b โ Part B Score (Expenditure)
Fixed 50% weight on expenditure booking on ongoing works.
Part B = (Ongoing Booked รท Ongoing Sanction) ร 5
If all done โ full 5 marks automatically
๐ Step 3 โ Ceiling & Model
Category Score = Part A + Part B
๐ Step 4 โ Final Composite Score
Weighted sum of all category scores (weightages sum to 100%).
Final Score = ฮฃ (Weightage_i ร Score_i)
Example: Farm Pond 40% ร 7.2 + Dug Well 20% ร 6.5 + Amrit Sarovar 40% ร 8.1 โ 7.42
๐ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.