JGSA 2026 โ Block-Level Category Scorecard
Snapshot: 2026-05-07 ยท Scheme: โน Sanction Weighted
MAHIDPUR
8.28
๐ฅ
Completed256
Started1053
Rank#1
KHANDWA
8.25
๐ฅ
Completed373
Started1277
Rank#2
KASRAWAD
8.09
๐ฅ
Completed372
Started1227
Rank#3
๐ Category Scorecard โ Block Level
313 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
| # | Block | District | Total |
๐ Trajectory raw achievement % |
Farm Pond | Amrit Sarowar | Dug Well Recharge | Irrigation infrastructure | Water conservation & recharge | Watershed Related Works | Repair & Maintenance (Water Structures) |
|---|---|---|---|---|---|---|---|---|---|---|---|
| ๐ฅ | MAHIDPUR โ | UJJAIN | 8.28 | A |
29.7%
9.95
CategoryFarm Pond
Started / Completed / Phys92 / 44 / 47
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.95 / 10
|
15.4%
3.31
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.00Cr / 0.66Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score3.31 / 10
|
36.3%
9.00
CategoryDug Well Recharge
Started / Completed / Phys912 / 182 / 729
Completion rate99.9%
Part A score (max 5.0)4.99 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score9.00 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.4%
7.99
CategoryWater conservation & recharge
Started / Completed / Phys37 / 24 / 11
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score7.99 / 10
|
2.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| ๐ฅ | KHANDWA โ | KHANDWA | 8.25 | A |
34.6%
8.51
CategoryFarm Pond
Started / Completed / Phys286 / 56 / 145
⚠ Works needing verification (Completed/Physically Completed)85 works (exp <30%)
Completion rate70.3%
Part A score (max 5.0)3.51 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score8.51 / 10
|
8.4%
6.70
CategoryAmrit Sarowar
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.74Cr / 0.62Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score6.70 / 10
|
12.0%
9.82
CategoryDug Well Recharge
Started / Completed / Phys824 / 273 / 521
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.82 / 10
|
5.1%
8.10
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 6 / 5
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.11Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.87 / 5.0
Final score8.10 / 10
|
20.7%
8.44
CategoryWater conservation & recharge
Started / Completed / Phys101 / 28 / 59
Completion rate86.1%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.69Cr / 0.57Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score8.44 / 10
|
18.7%
7.23
CategoryWatershed Related Works
Started / Completed / Phys45 / 7 / 24
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked1.11Cr / 0.84Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.79 / 5.0
Final score7.23 / 10
|
0.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| ๐ฅ | KASRAWAD โ | KHARGONE | 8.09 | A |
21.5%
7.23
CategoryFarm Pond
Started / Completed / Phys322 / 112 / 203
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.12Cr / 0.05Cr
Expenditure rate (ongoing)46.8%
Part B score (max 5.0)2.34 / 5.0
Final score7.23 / 10
|
3.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
6.26
CategoryDug Well Recharge
Started / Completed / Phys556 / 200 / 350
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score6.26 / 10
|
1.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
66.3%
8.35
CategoryWater conservation & recharge
Started / Completed / Phys338 / 56 / 243
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked2.07Cr / 1.63Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score8.35 / 10
|
0.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 4 | SAWER โ | INDORE | 7.74 | B |
55.7%
7.12
CategoryFarm Pond
Started / Completed / Phys100 / 45 / 35
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score7.12 / 10
|
โ |
2.4%
9.00
CategoryDug Well Recharge
Started / Completed / Phys177 / 172 / 1
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate97.7%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)91.7%
Part B score (max 5.0)4.58 / 5.0
Final score9.00 / 10
|
โ |
28.3%
8.67
CategoryWater conservation & recharge
Started / Completed / Phys27 / 16 / 5
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.21Cr / 0.20Cr
Expenditure rate (ongoing)95.5%
Part B score (max 5.0)4.78 / 5.0
Final score8.67 / 10
|
4.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.9%
7.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.19Cr / 0.14Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score7.17 / 10
|
| 5 | BAMORI โ | GUNA | 7.62 | B |
25.3%
6.10
CategoryFarm Pond
Started / Completed / Phys81 / 76 / 0
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score6.10 / 10
|
โ |
2.6%
9.92
CategoryDug Well Recharge
Started / Completed / Phys60 / 14 / 45
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
|
โ |
36.0%
6.13
CategoryWater conservation & recharge
Started / Completed / Phys13 / 3 / 7
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.57Cr / 0.26Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.29 / 5.0
Final score6.13 / 10
|
5.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 6 | ZIRAPUR โ | RAJGARH | 7.43 | B |
24.8%
6.48
CategoryFarm Pond
Started / Completed / Phys478 / 316 / 122
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate91.6%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.78Cr / 0.30Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score6.48 / 10
|
โ |
4.4%
9.93
CategoryDug Well Recharge
Started / Completed / Phys642 / 574 / 59
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
|
0.6%
5.19
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.19 / 10
|
63.7%
7.64
CategoryWater conservation & recharge
Started / Completed / Phys218 / 35 / 133
Completion rate77.1%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked5.54Cr / 4.19Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score7.64 / 10
|
0.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
6.4%
7.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 3 / 14
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked0.81Cr / 0.68Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score7.47 / 10
|
| 7 | PUNASA โ | KHANDWA | 7.32 | B |
47.9%
5.67
CategoryFarm Pond
Started / Completed / Phys342 / 47 / 206
⚠ Works needing verification (Completed/Physically Completed)84 works (exp <30%)
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score5.67 / 10
|
1.3%
4.42
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.22Cr
Expenditure rate (ongoing)88.3%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
|
15.1%
9.90
CategoryDug Well Recharge
Started / Completed / Phys1,132 / 250 / 859
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.90 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
20.6%
8.24
CategoryWater conservation & recharge
Started / Completed / Phys114 / 15 / 91
Completion rate93.0%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.57Cr / 0.41Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score8.24 / 10
|
10.0%
8.47
CategoryWatershed Related Works
Started / Completed / Phys35 / 9 / 23
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score8.47 / 10
|
4.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 8 | MEHANDWANI โ | DINDORI | 7.30 | B |
50.6%
6.57
CategoryFarm Pond
Started / Completed / Phys290 / 63 / 213
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.45Cr / 0.16Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.82 / 5.0
Final score6.57 / 10
|
โ |
2.6%
9.92
CategoryDug Well Recharge
Started / Completed / Phys189 / 147 / 39
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
|
โ |
19.4%
9.00
CategoryWater conservation & recharge
Started / Completed / Phys89 / 5 / 79
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.92Cr / 0.82Cr
Expenditure rate (ongoing)89.4%
Part B score (max 5.0)4.47 / 5.0
Final score9.00 / 10
|
24.5%
7.30
CategoryWatershed Related Works
Started / Completed / Phys44 / 13 / 22
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked1.21Cr / 0.81Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score7.30 / 10
|
2.9%
6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score6.40 / 10
|
| 9 | TARANA โ | UJJAIN | 7.25 | B |
29.4%
10.00
CategoryFarm Pond
Started / Completed / Phys118 / 26 / 92
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
20.5%
3.82
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.47Cr / 0.92Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score3.82 / 10
|
24.6%
6.71
CategoryDug Well Recharge
Started / Completed / Phys833 / 590 / 234
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score6.71 / 10
|
โ |
13.5%
7.48
CategoryWater conservation & recharge
Started / Completed / Phys45 / 21 / 17
Completion rate84.4%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.26 / 5.0
Final score7.48 / 10
|
12.0%
7.20
CategoryWatershed Related Works
Started / Completed / Phys36 / 29 / 3
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.75 / 5.0
Final score7.20 / 10
|
โ |
| 10 | AMARPUR โ | DINDORI | 7.25 | B |
38.8%
7.14
CategoryFarm Pond
Started / Completed / Phys257 / 97 / 149
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.22Cr / 0.10Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.35 / 5.0
Final score7.14 / 10
|
โ |
3.0%
9.98
CategoryDug Well Recharge
Started / Completed / Phys200 / 29 / 170
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
|
โ |
33.3%
6.82
CategoryWater conservation & recharge
Started / Completed / Phys60 / 5 / 25
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked4.62Cr / 3.99Cr
Expenditure rate (ongoing)86.4%
Part B score (max 5.0)4.32 / 5.0
Final score6.82 / 10
|
15.3%
8.30
CategoryWatershed Related Works
Started / Completed / Phys31 / 24 / 4
Completion rate90.3%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.79 / 5.0
Final score8.30 / 10
|
9.6%
6.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 9 / 2
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.69Cr / 0.49Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score6.62 / 10
|
| 11 | THIKRI โ | BARWANI | 7.24 | B |
69.1%
6.42
CategoryFarm Pond
Started / Completed / Phys137 / 0 / 99
Completion rate72.3%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.70Cr / 0.40Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.81 / 5.0
Final score6.42 / 10
|
โ |
7.4%
10.00
CategoryDug Well Recharge
Started / Completed / Phys102 / 2 / 100
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
10.6%
7.34
CategoryWater conservation & recharge
Started / Completed / Phys14 / 7 / 5
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score7.34 / 10
|
13.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 6 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 12 | RAJGARH โ | RAJGARH | 7.24 | B |
19.2%
6.24
CategoryFarm Pond
Started / Completed / Phys457 / 305 / 107
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.78Cr / 0.27Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score6.24 / 10
|
1.5%
6.95
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.39Cr / 0.35Cr
Expenditure rate (ongoing)89.0%
Part B score (max 5.0)4.45 / 5.0
Final score6.95 / 10
|
2.8%
7.84
CategoryDug Well Recharge
Started / Completed / Phys569 / 460 / 85
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score7.84 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
69.5%
7.47
CategoryWater conservation & recharge
Started / Completed / Phys315 / 20 / 200
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked11.52Cr / 9.15Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score7.47 / 10
|
0.6%
6.31
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 2
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.15Cr / 0.11Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score6.31 / 10
|
5.8%
7.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 7 / 27
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.52Cr / 0.36Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.56 / 10
|
| 13 | ARON โ | GUNA | 7.24 | B |
51.2%
6.39
CategoryFarm Pond
Started / Completed / Phys379 / 242 / 103
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked1.16Cr / 0.43Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score6.39 / 10
|
โ |
2.5%
9.00
CategoryDug Well Recharge
Started / Completed / Phys288 / 106 / 179
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)91.1%
Part B score (max 5.0)4.56 / 5.0
Final score9.00 / 10
|
โ |
42.3%
7.91
CategoryWater conservation & recharge
Started / Completed / Phys155 / 31 / 111
Completion rate91.6%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked1.28Cr / 0.85Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.33 / 5.0
Final score7.91 / 10
|
3.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 3 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 14 | RAJPUR โ | BARWANI | 7.23 | B |
28.7%
7.09
CategoryFarm Pond
Started / Completed / Phys164 / 0 / 125
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.35Cr / 0.23Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score7.09 / 10
|
โ |
17.4%
8.58
CategoryDug Well Recharge
Started / Completed / Phys383 / 0 / 373
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score8.58 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.8%
7.30
CategoryWater conservation & recharge
Started / Completed / Phys35 / 3 / 23
Completion rate74.3%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.21Cr / 0.15Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score7.30 / 10
|
28.0%
6.26
CategoryWatershed Related Works
Started / Completed / Phys38 / 1 / 31
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.32Cr / 0.13Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.26 / 10
|
2.6%
7.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 8
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score7.84 / 10
|
| 15 | BALADI โ | KHANDWA | 7.19 | B |
52.5%
5.86
CategoryFarm Pond
Started / Completed / Phys96 / 33 / 22
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate57.3%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score5.86 / 10
|
5.0%
3.50
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.50 / 5.0
Final score3.50 / 10
|
28.9%
9.85
CategoryDug Well Recharge
Started / Completed / Phys334 / 132 / 192
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.85 / 10
|
โ |
11.7%
7.69
CategoryWater conservation & recharge
Started / Completed / Phys22 / 6 / 12
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score7.69 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 16 | BINA โ | SAGAR | 7.17 | B |
37.3%
3.08
CategoryFarm Pond
Started / Completed / Phys124 / 20 / 28
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate38.7%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked1.06Cr / 0.24Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score3.08 / 10
|
โ |
10.1%
7.59
CategoryDug Well Recharge
Started / Completed / Phys417 / 196 / 20
⚠ Works needing verification (Completed/Physically Completed)201 works (exp <30%)
Completion rate51.8%
Part A score (max 5.0)2.59 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score7.59 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
50.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys39 / 7 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 17 | HARSUD โ | KHANDWA | 7.16 | B |
42.2%
5.52
CategoryFarm Pond
Started / Completed / Phys185 / 65 / 53
⚠ Works needing verification (Completed/Physically Completed)62 works (exp <30%)
Completion rate63.8%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score5.52 / 10
|
โ |
24.6%
8.73
CategoryDug Well Recharge
Started / Completed / Phys756 / 297 / 449
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate98.7%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score8.73 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.2%
7.67
CategoryWater conservation & recharge
Started / Completed / Phys48 / 22 / 20
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.29Cr / 0.19Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score7.67 / 10
|
2.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 18 | CHHAIGAON MAKHAN โ | KHANDWA | 7.16 | B |
45.2%
5.45
CategoryFarm Pond
Started / Completed / Phys322 / 129 / 103
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate72.0%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score5.45 / 10
|
5.7%
8.27
CategoryAmrit Sarowar
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.20Cr / 0.18Cr
Expenditure rate (ongoing)90.4%
Part B score (max 5.0)4.52 / 5.0
Final score8.27 / 10
|
15.8%
9.93
CategoryDug Well Recharge
Started / Completed / Phys838 / 722 / 105
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate98.7%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.4%
8.00
CategoryWater conservation & recharge
Started / Completed / Phys83 / 35 / 40
Completion rate90.4%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.44Cr / 0.30Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score8.00 / 10
|
7.2%
6.53
CategoryWatershed Related Works
Started / Completed / Phys18 / 4 / 7
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.41Cr / 0.28Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.53 / 10
|
3.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 19 | PATI โ | BARWANI | 7.10 | B |
16.1%
6.91
CategoryFarm Pond
Started / Completed / Phys216 / 4 / 156
Completion rate74.1%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.70Cr / 0.45Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score6.91 / 10
|
โ |
13.6%
8.08
CategoryDug Well Recharge
Started / Completed / Phys711 / 19 / 646
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score8.08 / 10
|
โ |
46.2%
6.95
CategoryWater conservation & recharge
Started / Completed / Phys111 / 9 / 73
Completion rate73.9%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked1.53Cr / 0.99Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score6.95 / 10
|
20.8%
6.98
CategoryWatershed Related Works
Started / Completed / Phys50 / 2 / 36
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.69Cr / 0.44Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score6.98 / 10
|
3.3%
7.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 5
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.21Cr / 0.16Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.89 / 5.0
Final score7.01 / 10
|
| 20 | KHALAWA โ | KHANDWA | 7.09 | B |
27.9%
5.73
CategoryFarm Pond
Started / Completed / Phys384 / 28 / 249
⚠ Works needing verification (Completed/Physically Completed)103 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score5.73 / 10
|
5.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
10.4%
9.98
CategoryDug Well Recharge
Started / Completed / Phys1,097 / 50 / 1,043
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
|
2.3%
5.73
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 3
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.29Cr / 0.15Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score5.73 / 10
|
39.7%
7.18
CategoryWater conservation & recharge
Started / Completed / Phys195 / 15 / 142
Completion rate80.5%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked3.53Cr / 2.23Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.18 / 10
|
10.5%
6.56
CategoryWatershed Related Works
Started / Completed / Phys44 / 5 / 25
Completion rate68.2%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.91Cr / 0.57Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score6.56 / 10
|
3.9%
6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 5 / 7
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.38Cr / 0.21Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.52 / 10
|
| 21 | DHIMERKHEDA โ | KATNI | 7.09 | B |
17.3%
4.63
CategoryFarm Pond
Started / Completed / Phys317 / 106 / 131
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate74.8%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked1.21Cr / 0.22Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score4.63 / 10
|
1.2%
7.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.15Cr
Expenditure rate (ongoing)99.9%
Part B score (max 5.0)4.99 / 5.0
Final score7.49 / 10
|
0.8%
4.56
CategoryDug Well Recharge
Started / Completed / Phys96 / 37 / 26
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate65.6%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)25.6%
Part B score (max 5.0)1.28 / 5.0
Final score4.56 / 10
|
41.9%
7.51
CategoryIrrigation infrastructure
Started / Completed / Phys141 / 15 / 111
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked1.27Cr / 0.78Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score7.51 / 10
|
13.0%
7.21
CategoryWater conservation & recharge
Started / Completed / Phys42 / 8 / 25
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked1.84Cr / 1.21Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score7.21 / 10
|
21.8%
8.45
CategoryWatershed Related Works
Started / Completed / Phys70 / 17 / 42
Completion rate84.3%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked1.68Cr / 1.42Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score8.45 / 10
|
4.0%
5.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.74Cr / 0.52Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score5.77 / 10
|
| 22 | PANDHANA โ | KHANDWA | 7.07 | B |
40.9%
5.95
CategoryFarm Pond
Started / Completed / Phys381 / 178 / 117
⚠ Works needing verification (Completed/Physically Completed)73 works (exp <30%)
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score5.95 / 10
|
7.2%
4.51
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.50Cr / 1.14Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score4.51 / 10
|
12.3%
9.99
CategoryDug Well Recharge
Started / Completed / Phys1,155 / 447 / 706
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate99.8%
Part A score (max 5.0)4.99 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.99 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.6%
7.91
CategoryWater conservation & recharge
Started / Completed / Phys148 / 38 / 90
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked1.31Cr / 0.94Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score7.91 / 10
|
5.0%
7.63
CategoryWatershed Related Works
Started / Completed / Phys24 / 6 / 14
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.26Cr / 0.18Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.47 / 5.0
Final score7.63 / 10
|
6.0%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 3 / 14
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.26Cr / 0.16Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.96 / 10
|
| 23 | BADI โ | RAISEN | 7.07 | B |
79.1%
7.13
CategoryFarm Pond
Started / Completed / Phys329 / 133 / 148
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked1.09Cr / 0.62Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score7.13 / 10
|
โ |
7.3%
8.87
CategoryDug Well Recharge
Started / Completed / Phys183 / 54 / 124
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.00 / 5.0
Final score8.87 / 10
|
โ |
12.1%
5.18
CategoryWater conservation & recharge
Started / Completed / Phys6 / 1 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.61Cr / 0.43Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.52 / 5.0
Final score5.18 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 24 | SHAHPURA โ | DINDORI | 7.05 | B |
25.9%
5.68
CategoryFarm Pond
Started / Completed / Phys418 / 191 / 159
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate83.7%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked1.23Cr / 0.37Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score5.68 / 10
|
1.1%
0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
|
1.8%
9.10
CategoryDug Well Recharge
Started / Completed / Phys221 / 132 / 49
⚠ Works needing verification (Completed/Physically Completed)40 works (exp <30%)
Completion rate81.9%
Part A score (max 5.0)4.10 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.10 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.2%
7.54
CategoryWater conservation & recharge
Started / Completed / Phys108 / 30 / 45
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked4.81Cr / 3.91Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score7.54 / 10
|
30.5%
8.17
CategoryWatershed Related Works
Started / Completed / Phys98 / 43 / 45
Completion rate89.8%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked1.07Cr / 0.79Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score8.17 / 10
|
6.9%
5.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 4
Completion rate19.0%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked1.88Cr / 1.58Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.14 / 10
|
| 25 | DINDORI โ | DINDORI | 7.04 | B |
39.9%
6.12
CategoryFarm Pond
Started / Completed / Phys455 / 119 / 282
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate88.1%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked2.12Cr / 0.73Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.72 / 5.0
Final score6.12 / 10
|
โ |
1.7%
5.39
CategoryDug Well Recharge
Started / Completed / Phys239 / 157 / 74
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate96.7%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)11.1%
Part B score (max 5.0)0.56 / 5.0
Final score5.39 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
31.8%
7.80
CategoryWater conservation & recharge
Started / Completed / Phys116 / 20 / 69
Completion rate76.7%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked4.39Cr / 3.49Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score7.80 / 10
|
23.8%
7.67
CategoryWatershed Related Works
Started / Completed / Phys92 / 32 / 46
Completion rate84.8%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked1.85Cr / 1.27Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.67 / 10
|
2.7%
7.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 7 / 4
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score7.13 / 10
|
| 26 | BIRSA โ | BALAGHAT | 7.04 | B |
59.1%
6.91
CategoryFarm Pond
Started / Completed / Phys704 / 206 / 270
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked5.91Cr / 4.17Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score6.91 / 10
|
1.4%
1.34
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.13Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.34 / 5.0
Final score1.34 / 10
|
0.9%
8.22
CategoryDug Well Recharge
Started / Completed / Phys125 / 17 / 84
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)83.7%
Part B score (max 5.0)4.18 / 5.0
Final score8.22 / 10
|
0.0%
5.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score5.00 / 10
|
36.4%
7.40
CategoryWater conservation & recharge
Started / Completed / Phys259 / 40 / 140
Completion rate69.5%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked6.16Cr / 4.83Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score7.40 / 10
|
1.5%
6.35
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 7
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.18Cr / 0.13Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score6.35 / 10
|
0.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 27 | CHHAPARA โ | SEONI | 7.02 | B |
35.4%
5.40
CategoryFarm Pond
Started / Completed / Phys210 / 97 / 70
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked1.45Cr / 0.41Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score5.40 / 10
|
โ |
2.8%
5.91
CategoryDug Well Recharge
Started / Completed / Phys209 / 53 / 139
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score5.91 / 10
|
7.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.4%
7.68
CategoryWater conservation & recharge
Started / Completed / Phys112 / 52 / 44
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked2.01Cr / 1.36Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score7.68 / 10
|
11.3%
7.54
CategoryWatershed Related Works
Started / Completed / Phys41 / 32 / 3
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.41Cr / 0.27Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score7.54 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 28 | KHACHAROD โ | UJJAIN | 7.00 | B |
35.7%
5.03
CategoryFarm Pond
Started / Completed / Phys103 / 54 / 47
Completion rate98.1%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.06Cr / 0.00Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score5.03 / 10
|
16.6%
2.79
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.49Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score2.79 / 10
|
25.0%
9.89
CategoryDug Well Recharge
Started / Completed / Phys510 / 427 / 72
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.89 / 10
|
โ |
17.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys17 / 8 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 29 | BAIHAR โ | BALAGHAT | 6.99 | C |
57.1%
6.46
CategoryFarm Pond
Started / Completed / Phys731 / 149 / 354
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked5.85Cr / 3.53Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score6.46 / 10
|
2.1%
1.95
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.29Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score1.95 / 10
|
1.1%
6.19
CategoryDug Well Recharge
Started / Completed / Phys131 / 62 / 33
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score6.19 / 10
|
โ |
38.0%
7.96
CategoryWater conservation & recharge
Started / Completed / Phys379 / 29 / 285
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked2.50Cr / 1.91Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score7.96 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 30 | ZIRANYA โ | KHARGONE | 6.97 | C |
13.2%
6.12
CategoryFarm Pond
Started / Completed / Phys294 / 49 / 155
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked1.42Cr / 0.75Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score6.12 / 10
|
6.9%
7.25
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 10
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score7.25 / 10
|
3.2%
7.51
CategoryDug Well Recharge
Started / Completed / Phys449 / 199 / 192
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score7.51 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
71.6%
6.94
CategoryWater conservation & recharge
Started / Completed / Phys313 / 33 / 160
Completion rate61.7%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked8.27Cr / 6.38Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score6.94 / 10
|
0.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.6%
8.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 12 / 8
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.22Cr / 0.19Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score8.90 / 10
|
| 31 | BHAGVANPURA โ | KHARGONE | 6.93 | C |
17.2%
7.40
CategoryFarm Pond
Started / Completed / Phys292 / 135 / 114
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.75Cr / 0.47Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score7.40 / 10
|
2.6%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.8%
7.43
CategoryDug Well Recharge
Started / Completed / Phys443 / 209 / 174
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score7.43 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
71.7%
6.56
CategoryWater conservation & recharge
Started / Completed / Phys215 / 45 / 79
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked8.91Cr / 6.55Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.56 / 10
|
3.5%
8.21
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 8
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.22Cr / 0.20Cr
Expenditure rate (ongoing)89.3%
Part B score (max 5.0)4.46 / 5.0
Final score8.21 / 10
|
1.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 32 | CHHINDWARA โ | CHHINDWARA | 6.91 | C |
19.3%
6.39
CategoryFarm Pond
Started / Completed / Phys97 / 35 / 46
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate83.5%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score6.39 / 10
|
7.3%
3.62
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.46Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
|
11.0%
6.07
CategoryDug Well Recharge
Started / Completed / Phys360 / 155 / 191
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate96.1%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)25.3%
Part B score (max 5.0)1.27 / 5.0
Final score6.07 / 10
|
8.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
26.1%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys29 / 5 / 14
Completion rate65.5%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked1.24Cr / 0.80Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score6.51 / 10
|
17.0%
6.54
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 7
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.57Cr / 0.40Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score6.54 / 10
|
10.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 33 | TIRLA โ | DHAR | 6.89 | C |
15.3%
5.01
CategoryFarm Pond
Started / Completed / Phys295 / 44 / 129
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked3.08Cr / 1.28Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score5.01 / 10
|
โ |
2.4%
3.87
CategoryDug Well Recharge
Started / Completed / Phys428 / 50 / 122
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate40.2%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked0.57Cr / 0.21Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score3.87 / 10
|
โ |
75.2%
7.34
CategoryWater conservation & recharge
Started / Completed / Phys355 / 12 / 224
Completion rate66.5%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked12.26Cr / 9.85Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score7.34 / 10
|
6.0%
7.27
CategoryWatershed Related Works
Started / Completed / Phys67 / 0 / 47
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.01Cr / 0.76Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.27 / 10
|
1.1%
6.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)77.4%
Part B score (max 5.0)3.87 / 5.0
Final score6.87 / 10
|
| 34 | MAHESHWAR โ | KHARGONE | 6.85 | C |
35.5%
5.77
CategoryFarm Pond
Started / Completed / Phys216 / 31 / 137
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.87Cr / 0.33Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.88 / 5.0
Final score5.77 / 10
|
7.1%
7.33
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.25Cr / 0.20Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score7.33 / 10
|
13.0%
7.37
CategoryDug Well Recharge
Started / Completed / Phys572 / 57 / 473
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate92.7%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score7.37 / 10
|
โ |
40.0%
7.36
CategoryWater conservation & recharge
Started / Completed / Phys111 / 12 / 79
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked1.16Cr / 0.76Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.26 / 5.0
Final score7.36 / 10
|
1.2%
5.38
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.04 / 5.0
Final score5.38 / 10
|
3.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 35 | KAILARAS โ | MORENA | 6.84 | C |
12.1%
5.83
CategoryFarm Pond
Started / Completed / Phys469 / 325 / 41
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked2.22Cr / 0.86Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score5.83 / 10
|
โ |
0.3%
5.02
CategoryDug Well Recharge
Started / Completed / Phys117 / 85 / 1
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)26.8%
Part B score (max 5.0)1.34 / 5.0
Final score5.02 / 10
|
1.7%
7.38
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 0 / 11
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score7.38 / 10
|
77.3%
6.95
CategoryWater conservation & recharge
Started / Completed / Phys469 / 12 / 275
Completion rate61.2%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked26.96Cr / 20.99Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.95 / 10
|
6.4%
7.41
CategoryWatershed Related Works
Started / Completed / Phys38 / 0 / 27
Completion rate71.1%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked1.33Cr / 1.02Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score7.41 / 10
|
2.1%
6.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 9
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.44Cr / 0.24Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score6.44 / 10
|
| 36 | BAJAG โ | DINDORI | 6.83 | C |
50.7%
6.36
CategoryFarm Pond
Started / Completed / Phys278 / 41 / 189
Completion rate82.7%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked1.81Cr / 0.81Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.23 / 5.0
Final score6.36 / 10
|
โ |
3.2%
4.61
CategoryDug Well Recharge
Started / Completed / Phys245 / 24 / 200
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score4.61 / 10
|
โ |
33.0%
6.50
CategoryWater conservation & recharge
Started / Completed / Phys71 / 4 / 41
Completion rate63.4%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked3.68Cr / 2.45Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.34 / 5.0
Final score6.50 / 10
|
9.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys17 / 1 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 37 | SEONI โ | SEONI | 6.81 | C |
19.7%
5.26
CategoryFarm Pond
Started / Completed / Phys121 / 52 / 41
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.62Cr / 0.18Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.42 / 5.0
Final score5.26 / 10
|
โ |
6.6%
9.65
CategoryDug Well Recharge
Started / Completed / Phys434 / 119 / 285
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate93.1%
Part A score (max 5.0)4.65 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.65 / 10
|
3.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.4%
6.83
CategoryWater conservation & recharge
Started / Completed / Phys114 / 47 / 33
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked2.89Cr / 1.92Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.83 / 10
|
24.5%
6.94
CategoryWatershed Related Works
Started / Completed / Phys96 / 66 / 14
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.82Cr / 0.45Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.94 / 10
|
4.8%
6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 5 / 4
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.34Cr / 0.20Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score6.35 / 10
|
| 38 | CHAURAI โ | CHHINDWARA | 6.80 | C |
27.6%
7.56
CategoryFarm Pond
Started / Completed / Phys99 / 2 / 80
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.56 / 10
|
3.5%
0.66
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
|
10.3%
6.51
CategoryDug Well Recharge
Started / Completed / Phys475 / 106 / 335
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate92.8%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score6.51 / 10
|
0.7%
5.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score5.22 / 10
|
35.0%
7.46
CategoryWater conservation & recharge
Started / Completed / Phys49 / 8 / 30
Completion rate77.6%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked1.65Cr / 1.18Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score7.46 / 10
|
20.8%
5.98
CategoryWatershed Related Works
Started / Completed / Phys37 / 11 / 8
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked1.21Cr / 0.82Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score5.98 / 10
|
2.2%
5.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score5.99 / 10
|
| 39 | NARWAR โ | SHIVPURI | 6.79 | C |
30.5%
5.37
CategoryFarm Pond
Started / Completed / Phys242 / 139 / 46
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked1.40Cr / 0.43Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.55 / 5.0
Final score5.37 / 10
|
โ |
2.3%
4.89
CategoryDug Well Recharge
Started / Completed / Phys207 / 113 / 27
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)30.2%
Part B score (max 5.0)1.51 / 5.0
Final score4.89 / 10
|
0.4%
5.84
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score5.84 / 10
|
46.1%
7.57
CategoryWater conservation & recharge
Started / Completed / Phys180 / 30 / 126
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.96Cr / 0.62Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score7.57 / 10
|
19.7%
7.23
CategoryWatershed Related Works
Started / Completed / Phys54 / 15 / 25
Completion rate74.1%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked1.07Cr / 0.75Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.23 / 10
|
0.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 40 | MOHGAON โ | MANDLA | 6.78 | C |
35.7%
6.76
CategoryFarm Pond
Started / Completed / Phys151 / 110 / 10
Completion rate79.5%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked1.22Cr / 0.68Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.79 / 5.0
Final score6.76 / 10
|
7.0%
1.63
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.15Cr / 0.38Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.63 / 5.0
Final score1.63 / 10
|
2.0%
5.86
CategoryDug Well Recharge
Started / Completed / Phys117 / 66 / 28
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate80.3%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score5.86 / 10
|
7.3%
5.27
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score5.27 / 10
|
41.8%
7.56
CategoryWater conservation & recharge
Started / Completed / Phys97 / 44 / 18
Completion rate63.9%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked4.76Cr / 4.15Cr
Expenditure rate (ongoing)87.3%
Part B score (max 5.0)4.37 / 5.0
Final score7.56 / 10
|
3.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys16 / 8 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.9%
8.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 1
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.18Cr
Expenditure rate (ongoing)94.9%
Part B score (max 5.0)4.74 / 5.0
Final score8.74 / 10
|
| 41 | MOHKHED โ | CHHINDWARA | 6.77 | C |
20.0%
6.86
CategoryFarm Pond
Started / Completed / Phys131 / 12 / 92
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.45Cr / 0.26Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score6.86 / 10
|
โ |
8.7%
6.83
CategoryDug Well Recharge
Started / Completed / Phys380 / 27 / 341
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score6.83 / 10
|
0.4%
3.67
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score3.67 / 10
|
44.9%
7.00
CategoryWater conservation & recharge
Started / Completed / Phys60 / 10 / 26
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked3.29Cr / 2.63Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.00 / 5.0
Final score7.00 / 10
|
23.3%
6.61
CategoryWatershed Related Works
Started / Completed / Phys43 / 19 / 7
Completion rate60.5%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.09Cr / 0.78Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.61 / 10
|
2.5%
3.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
|
| 42 | DHARAMPURI โ | DHAR | 6.76 | C |
5.2%
6.03
CategoryFarm Pond
Started / Completed / Phys137 / 50 / 35
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate62.0%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.31Cr / 0.18Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score6.03 / 10
|
โ |
5.5%
7.15
CategoryDug Well Recharge
Started / Completed / Phys378 / 128 / 162
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate76.7%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.21Cr / 0.14Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score7.15 / 10
|
0.3%
3.01
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score3.01 / 10
|
69.3%
7.04
CategoryWater conservation & recharge
Started / Completed / Phys169 / 12 / 99
Completion rate65.7%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked3.13Cr / 2.35Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.04 / 10
|
14.3%
5.79
CategoryWatershed Related Works
Started / Completed / Phys59 / 2 / 26
Completion rate47.5%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked0.88Cr / 0.60Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score5.79 / 10
|
5.5%
6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 1 / 9
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.49Cr / 0.40Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.07 / 5.0
Final score6.16 / 10
|
| 43 | BARWANI โ | BARWANI | 6.70 | C |
50.0%
6.83
CategoryFarm Pond
Started / Completed / Phys136 / 5 / 93
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.46Cr / 0.30Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score6.83 / 10
|
โ |
18.2%
6.36
CategoryDug Well Recharge
Started / Completed / Phys247 / 21 / 216
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score6.36 / 10
|
โ |
16.3%
6.74
CategoryWater conservation & recharge
Started / Completed / Phys23 / 2 / 13
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.74 / 10
|
15.5%
6.63
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 7
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score6.63 / 10
|
โ |
| 44 | PANSEMAL โ | BARWANI | 6.68 | C |
32.9%
5.52
CategoryFarm Pond
Started / Completed / Phys162 / 20 / 121
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.35Cr / 0.08Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.16 / 5.0
Final score5.52 / 10
|
6.0%
3.65
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.37Cr / 0.15Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score3.65 / 10
|
6.2%
4.95
CategoryDug Well Recharge
Started / Completed / Phys221 / 6 / 172
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate80.5%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.10Cr / 0.02Cr
Expenditure rate (ongoing)18.4%
Part B score (max 5.0)0.92 / 5.0
Final score4.95 / 10
|
โ |
46.3%
7.77
CategoryWater conservation & recharge
Started / Completed / Phys76 / 4 / 62
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.77 / 10
|
7.8%
8.46
CategoryWatershed Related Works
Started / Completed / Phys18 / 8 / 9
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)74.8%
Part B score (max 5.0)3.74 / 5.0
Final score8.46 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 45 | KATTHIWADA โ | ALIRAJPUR | 6.67 | C |
19.1%
5.99
CategoryFarm Pond
Started / Completed / Phys188 / 27 / 99
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked2.33Cr / 1.23Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score5.99 / 10
|
2.9%
4.92
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.48Cr / 0.23Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score4.92 / 10
|
4.4%
6.19
CategoryDug Well Recharge
Started / Completed / Phys585 / 89 / 312
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.46Cr / 0.25Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score6.19 / 10
|
โ |
71.4%
6.95
CategoryWater conservation & recharge
Started / Completed / Phys180 / 11 / 92
Completion rate57.2%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked9.14Cr / 7.47Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.09 / 5.0
Final score6.95 / 10
|
1.8%
6.49
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.50Cr / 0.44Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score6.49 / 10
|
0.4%
7.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.11Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.72 / 5.0
Final score7.22 / 10
|
| 46 | REHLI โ | SAGAR | 6.63 | C |
35.7%
5.54
CategoryFarm Pond
Started / Completed / Phys278 / 101 / 98
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked1.45Cr / 0.57Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score5.54 / 10
|
โ |
10.6%
6.20
CategoryDug Well Recharge
Started / Completed / Phys585 / 255 / 242
⚠ Works needing verification (Completed/Physically Completed)68 works (exp <30%)
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.95 / 5.0
Final score6.20 / 10
|
1.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
31.4%
7.24
CategoryWater conservation & recharge
Started / Completed / Phys114 / 31 / 60
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.16Cr / 0.76Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score7.24 / 10
|
6.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.4%
6.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 4 / 11
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.28Cr / 0.12Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score6.50 / 10
|
| 47 | KESLI โ | SAGAR | 6.63 | C |
27.4%
4.78
CategoryFarm Pond
Started / Completed / Phys178 / 79 / 27
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked1.27Cr / 0.46Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.81 / 5.0
Final score4.78 / 10
|
โ |
8.3%
5.52
CategoryDug Well Recharge
Started / Completed / Phys377 / 86 / 186
⚠ Works needing verification (Completed/Physically Completed)69 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.52 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
47.2%
6.97
CategoryWater conservation & recharge
Started / Completed / Phys164 / 20 / 104
Completion rate75.6%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.99Cr / 0.63Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score6.97 / 10
|
14.2%
9.00
CategoryWatershed Related Works
Started / Completed / Phys31 / 8 / 22
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.06Cr / 0.06Cr
Expenditure rate (ongoing)91.5%
Part B score (max 5.0)4.57 / 5.0
Final score9.00 / 10
|
2.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 48 | PARASWADA โ | BALAGHAT | 6.60 | C |
55.0%
6.16
CategoryFarm Pond
Started / Completed / Phys510 / 270 / 105
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked3.52Cr / 1.75Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.49 / 5.0
Final score6.16 / 10
|
2.9%
2.42
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.36Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score2.42 / 10
|
1.6%
7.38
CategoryDug Well Recharge
Started / Completed / Phys167 / 120 / 22
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.12 / 5.0
Final score7.38 / 10
|
0.7%
5.79
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)49.2%
Part B score (max 5.0)2.46 / 5.0
Final score5.79 / 10
|
38.1%
7.44
CategoryWater conservation & recharge
Started / Completed / Phys208 / 34 / 113
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked3.53Cr / 2.76Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score7.44 / 10
|
1.2%
8.14
CategoryWatershed Related Works
Started / Completed / Phys7 / 5 / 1
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score8.14 / 10
|
0.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 49 | PARASIA โ | CHHINDWARA | 6.58 | C |
35.2%
5.81
CategoryFarm Pond
Started / Completed / Phys182 / 32 / 82
Completion rate62.6%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.98Cr / 1.06Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score5.81 / 10
|
โ |
10.1%
6.35
CategoryDug Well Recharge
Started / Completed / Phys562 / 127 / 386
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate91.3%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.35 / 10
|
1.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.9%
7.20
CategoryWater conservation & recharge
Started / Completed / Phys130 / 6 / 89
Completion rate73.1%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked3.18Cr / 2.25Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.55 / 5.0
Final score7.20 / 10
|
7.9%
6.25
CategoryWatershed Related Works
Started / Completed / Phys26 / 4 / 12
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.36Cr / 0.23Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.25 / 10
|
3.4%
6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 9
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.79 / 10
|
| 50 | PUSHPRAJGARH โ | ANUPPUR | 6.55 | C |
74.2%
6.05
CategoryFarm Pond
Started / Completed / Phys1,443 / 1,006 / 226
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked5.91Cr / 2.10Cr
Expenditure rate (ongoing)35.6%
Part B score (max 5.0)1.78 / 5.0
Final score6.05 / 10
|
โ |
0.6%
6.38
CategoryDug Well Recharge
Started / Completed / Phys124 / 41 / 69
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate88.7%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.38 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.4%
8.12
CategoryWater conservation & recharge
Started / Completed / Phys190 / 90 / 68
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked4.23Cr / 3.36Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score8.12 / 10
|
2.6%
8.55
CategoryWatershed Related Works
Started / Completed / Phys18 / 5 / 11
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.76Cr / 0.62Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score8.55 / 10
|
2.7%
6.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 6 / 5
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.40Cr / 0.24Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.71 / 10
|
| 51 | SHEOPUR โ | SHEOPUR | 6.53 | C |
38.5%
4.69
CategoryFarm Pond
Started / Completed / Phys143 / 54 / 35
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked1.88Cr / 0.59Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score4.69 / 10
|
โ |
0.8%
6.38
CategoryDug Well Recharge
Started / Completed / Phys43 / 26 / 5
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.38 / 10
|
6.4%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 5 / 7
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score9.00 / 10
|
41.4%
7.63
CategoryWater conservation & recharge
Started / Completed / Phys81 / 7 / 56
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked1.25Cr / 0.93Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.74 / 5.0
Final score7.63 / 10
|
5.9%
7.84
CategoryWatershed Related Works
Started / Completed / Phys13 / 4 / 6
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)4.00 / 5.0
Final score7.84 / 10
|
7.1%
6.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 1 / 9
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score6.81 / 10
|
| 52 | HARAI โ | CHHINDWARA | 6.52 | C |
43.4%
6.71
CategoryFarm Pond
Started / Completed / Phys396 / 154 / 137
Completion rate73.5%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked2.15Cr / 1.30Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.71 / 10
|
โ |
4.9%
8.54
CategoryDug Well Recharge
Started / Completed / Phys327 / 106 / 190
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score8.54 / 10
|
โ |
40.8%
6.22
CategoryWater conservation & recharge
Started / Completed / Phys148 / 24 / 51
Completion rate50.7%
Part A score (max 5.0)2.53 / 5.0
Ongoing sanction / booked3.55Cr / 2.61Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.22 / 10
|
10.3%
5.84
CategoryWatershed Related Works
Started / Completed / Phys26 / 5 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.92Cr / 0.62Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score5.84 / 10
|
0.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 53 | TAMIA โ | CHHINDWARA | 6.52 | C |
24.1%
5.62
CategoryFarm Pond
Started / Completed / Phys269 / 105 / 57
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked4.62Cr / 2.41Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score5.62 / 10
|
4.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.96Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.5%
7.21
CategoryDug Well Recharge
Started / Completed / Phys281 / 156 / 122
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score7.21 / 10
|
โ |
60.5%
7.11
CategoryWater conservation & recharge
Started / Completed / Phys305 / 69 / 130
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked13.65Cr / 10.51Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score7.11 / 10
|
7.4%
8.38
CategoryWatershed Related Works
Started / Completed / Phys38 / 9 / 22
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.93Cr / 0.80Cr
Expenditure rate (ongoing)86.0%
Part B score (max 5.0)4.30 / 5.0
Final score8.38 / 10
|
2.3%
6.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 1
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.72Cr / 0.57Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score6.12 / 10
|
| 54 | LANJI โ | BALAGHAT | 6.50 | C |
57.6%
6.00
CategoryFarm Pond
Started / Completed / Phys369 / 133 / 139
Completion rate73.7%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked1.83Cr / 0.85Cr
Expenditure rate (ongoing)46.3%
Part B score (max 5.0)2.32 / 5.0
Final score6.00 / 10
|
4.1%
1.87
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.25Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score1.87 / 10
|
2.4%
8.37
CategoryDug Well Recharge
Started / Completed / Phys154 / 63 / 81
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score8.37 / 10
|
โ |
31.5%
7.69
CategoryWater conservation & recharge
Started / Completed / Phys104 / 19 / 58
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked1.66Cr / 1.33Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.99 / 5.0
Final score7.69 / 10
|
2.7%
8.77
CategoryWatershed Related Works
Started / Completed / Phys14 / 6 / 7
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score8.77 / 10
|
1.7%
6.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score6.08 / 10
|
| 55 | SIRONJ โ | VIDISHA | 6.49 | C |
41.7%
6.08
CategoryFarm Pond
Started / Completed / Phys351 / 206 / 74
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.50Cr / 0.63Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score6.08 / 10
|
4.6%
2.93
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.84Cr / 0.49Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.93 / 5.0
Final score2.93 / 10
|
3.4%
6.86
CategoryDug Well Recharge
Started / Completed / Phys235 / 102 / 111
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score6.86 / 10
|
โ |
47.0%
6.96
CategoryWater conservation & recharge
Started / Completed / Phys214 / 72 / 76
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked3.01Cr / 2.11Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score6.96 / 10
|
1.8%
8.98
CategoryWatershed Related Works
Started / Completed / Phys21 / 16 / 4
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.22 / 5.0
Final score8.98 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 56 | PAHADGARH โ | MORENA | 6.48 | C |
10.4%
4.91
CategoryFarm Pond
Started / Completed / Phys499 / 400 / 54
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked1.06Cr / 0.08Cr
Expenditure rate (ongoing)7.2%
Part B score (max 5.0)0.36 / 5.0
Final score4.91 / 10
|
0.2%
0.85
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.04Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score0.85 / 10
|
0.3%
4.68
CategoryDug Well Recharge
Started / Completed / Phys126 / 103 / 15
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.68 / 10
|
1.1%
5.18
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.85Cr / 0.67Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score5.18 / 10
|
76.0%
6.70
CategoryWater conservation & recharge
Started / Completed / Phys544 / 6 / 306
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked34.28Cr / 26.25Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score6.70 / 10
|
10.0%
6.78
CategoryWatershed Related Works
Started / Completed / Phys74 / 2 / 40
Completion rate56.8%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked4.53Cr / 3.57Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score6.78 / 10
|
2.0%
6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 8
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.57Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score6.52 / 10
|
| 57 | SANCHI โ | RAISEN | 6.45 | C |
61.4%
6.11
CategoryFarm Pond
Started / Completed / Phys306 / 235 / 52
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.36Cr / 0.10Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score6.11 / 10
|
0.6%
1.31
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
|
3.9%
7.99
CategoryDug Well Recharge
Started / Completed / Phys160 / 153 / 6
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score7.99 / 10
|
4.2%
5.56
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.42Cr / 0.35Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score5.56 / 10
|
28.4%
7.40
CategoryWater conservation & recharge
Started / Completed / Phys18 / 5 / 7
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked2.05Cr / 1.67Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score7.40 / 10
|
0.4%
1.90
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
|
1.2%
3.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score3.60 / 10
|
| 58 | BEGUMGANJ โ | RAISEN | 6.44 | C |
52.8%
6.31
CategoryFarm Pond
Started / Completed / Phys432 / 138 / 253
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.80Cr / 0.29Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.31 / 10
|
2.2%
2.92
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.02Cr
Expenditure rate (ongoing)8.5%
Part B score (max 5.0)0.42 / 5.0
Final score2.92 / 10
|
4.5%
7.01
CategoryDug Well Recharge
Started / Completed / Phys336 / 197 / 131
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)42.5%
Part B score (max 5.0)2.13 / 5.0
Final score7.01 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.3%
6.67
CategoryWater conservation & recharge
Started / Completed / Phys64 / 15 / 22
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked4.76Cr / 3.60Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score6.67 / 10
|
0.2%
1.97
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.97 / 5.0
Final score1.97 / 10
|
0.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 59 | GANGEV โ | REWA | 6.43 | C |
57.6%
5.44
CategoryFarm Pond
Started / Completed / Phys227 / 147 / 17
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.59Cr / 0.21Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.82 / 5.0
Final score5.44 / 10
|
4.8%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys58 / 57 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
26.0%
8.25
CategoryWater conservation & recharge
Started / Completed / Phys36 / 28 / 7
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score8.25 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 60 | PANDHURNA โ | CHHINDWARA | 6.43 | C |
21.7%
5.88
CategoryFarm Pond
Started / Completed / Phys135 / 72 / 38
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.41Cr / 0.15Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.88 / 10
|
3.6%
1.15
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.09Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score1.15 / 10
|
8.6%
5.78
CategoryDug Well Recharge
Started / Completed / Phys362 / 35 / 300
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score5.78 / 10
|
7.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.9%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys25 / 8 / 6
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked1.84Cr / 1.44Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.69 / 10
|
33.7%
6.24
CategoryWatershed Related Works
Started / Completed / Phys48 / 8 / 21
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.38Cr / 0.89Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score6.24 / 10
|
2.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 61 | BAHORIBAND โ | KATNI | 6.43 | C |
36.8%
4.90
CategoryFarm Pond
Started / Completed / Phys392 / 137 / 138
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.77Cr / 0.49Cr
Expenditure rate (ongoing)27.8%
Part B score (max 5.0)1.39 / 5.0
Final score4.90 / 10
|
โ |
4.4%
5.57
CategoryDug Well Recharge
Started / Completed / Phys284 / 126 / 83
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.12Cr / 0.05Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score5.57 / 10
|
6.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
22.5%
7.15
CategoryWater conservation & recharge
Started / Completed / Phys52 / 10 / 26
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked1.56Cr / 1.15Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.69 / 5.0
Final score7.15 / 10
|
25.5%
6.87
CategoryWatershed Related Works
Started / Completed / Phys73 / 9 / 42
Completion rate69.9%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked1.52Cr / 1.03Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score6.87 / 10
|
4.7%
8.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 7
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)89.2%
Part B score (max 5.0)4.46 / 5.0
Final score8.83 / 10
|
| 62 | BANKHEDI โ | NARMADAPURAM | 6.42 | C |
38.9%
3.26
CategoryFarm Pond
Started / Completed / Phys100 / 27 / 25
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.71Cr / 0.09Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score3.26 / 10
|
โ |
6.5%
5.12
CategoryDug Well Recharge
Started / Completed / Phys119 / 62 / 29
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)26.0%
Part B score (max 5.0)1.30 / 5.0
Final score5.12 / 10
|
0.8%
8.03
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 3 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score8.03 / 10
|
44.2%
8.60
CategoryWater conservation & recharge
Started / Completed / Phys47 / 31 / 15
Completion rate97.9%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score8.60 / 10
|
4.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 10 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 8 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 63 | JOURA โ | MORENA | 6.41 | C |
16.3%
5.70
CategoryFarm Pond
Started / Completed / Phys230 / 148 / 4
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate66.1%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked3.09Cr / 1.48Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.40 / 5.0
Final score5.70 / 10
|
0.5%
0.01
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score0.01 / 10
|
0.4%
4.49
CategoryDug Well Recharge
Started / Completed / Phys77 / 38 / 3
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate53.2%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.82 / 5.0
Final score4.49 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
76.6%
6.55
CategoryWater conservation & recharge
Started / Completed / Phys261 / 3 / 149
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked15.16Cr / 11.02Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score6.55 / 10
|
1.3%
8.41
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score8.41 / 10
|
3.8%
6.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 8
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.93Cr / 0.64Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.14 / 10
|
| 64 | BHANDER โ | DATIA | 6.40 | C |
36.8%
3.69
CategoryFarm Pond
Started / Completed / Phys211 / 78 / 59
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked1.51Cr / 0.13Cr
Expenditure rate (ongoing)8.8%
Part B score (max 5.0)0.44 / 5.0
Final score3.69 / 10
|
โ |
2.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys110 / 87 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.7%
7.01
CategoryWater conservation & recharge
Started / Completed / Phys123 / 19 / 98
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.49Cr / 0.22Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score7.01 / 10
|
5.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys19 / 3 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 3 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 65 | JAMAI โ | CHHINDWARA | 6.40 | C |
24.4%
7.56
CategoryFarm Pond
Started / Completed / Phys472 / 276 / 110
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked1.97Cr / 1.37Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score7.56 / 10
|
3.5%
0.94
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.29Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score0.94 / 10
|
2.8%
8.54
CategoryDug Well Recharge
Started / Completed / Phys466 / 218 / 233
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score8.54 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
62.5%
6.14
CategoryWater conservation & recharge
Started / Completed / Phys292 / 46 / 67
Completion rate38.7%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked20.86Cr / 17.56Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score6.14 / 10
|
4.9%
6.14
CategoryWatershed Related Works
Started / Completed / Phys25 / 6 / 4
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked1.32Cr / 1.09Cr
Expenditure rate (ongoing)82.7%
Part B score (max 5.0)4.14 / 5.0
Final score6.14 / 10
|
1.9%
7.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 2
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.48Cr / 0.42Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score7.09 / 10
|
| 66 | KHIRKIYA โ | HARDA | 6.38 | C |
35.1%
3.94
CategoryFarm Pond
Started / Completed / Phys99 / 20 / 28
Completion rate48.5%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked1.31Cr / 0.40Cr
Expenditure rate (ongoing)30.3%
Part B score (max 5.0)1.52 / 5.0
Final score3.94 / 10
|
2.7%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
10.2%
6.69
CategoryDug Well Recharge
Started / Completed / Phys262 / 126 / 115
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score6.69 / 10
|
20.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 2 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.3%
6.84
CategoryWater conservation & recharge
Started / Completed / Phys23 / 4 / 14
Completion rate78.3%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.35Cr / 0.21Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score6.84 / 10
|
3.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.9%
6.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 11
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.23 / 5.0
Final score6.87 / 10
|
| 67 | UJJAIN โ | UJJAIN | 6.37 | C |
36.0%
5.50
CategoryFarm Pond
Started / Completed / Phys84 / 6 / 69
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)20.7%
Part B score (max 5.0)1.04 / 5.0
Final score5.50 / 10
|
5.4%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.8%
5.38
CategoryDug Well Recharge
Started / Completed / Phys245 / 47 / 197
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score5.38 / 10
|
โ |
36.6%
6.74
CategoryWater conservation & recharge
Started / Completed / Phys43 / 7 / 35
Completion rate97.7%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.86 / 5.0
Final score6.74 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 68 | KARANJIYA โ | DINDORI | 6.36 | C |
45.7%
6.26
CategoryFarm Pond
Started / Completed / Phys342 / 161 / 111
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked2.46Cr / 1.12Cr
Expenditure rate (ongoing)45.6%
Part B score (max 5.0)2.28 / 5.0
Final score6.26 / 10
|
3.5%
5.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.40Cr / 0.15Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
|
1.7%
7.24
CategoryDug Well Recharge
Started / Completed / Phys168 / 26 / 133
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score7.24 / 10
|
3.4%
6.48
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.48 / 10
|
41.1%
6.36
CategoryWater conservation & recharge
Started / Completed / Phys127 / 17 / 57
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked6.86Cr / 4.73Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score6.36 / 10
|
1.5%
6.28
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 9
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score6.28 / 10
|
3.1%
8.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 7
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.14Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score8.58 / 10
|
| 69 | KHAIRLANJI โ | BALAGHAT | 6.36 | C |
61.0%
5.84
CategoryFarm Pond
Started / Completed / Phys474 / 188 / 168
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate75.1%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked2.98Cr / 1.24Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.08 / 5.0
Final score5.84 / 10
|
2.4%
1.33
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.13Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score1.33 / 10
|
1.4%
7.48
CategoryDug Well Recharge
Started / Completed / Phys113 / 34 / 63
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.8%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score7.48 / 10
|
0.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.4%
7.50
CategoryWater conservation & recharge
Started / Completed / Phys118 / 27 / 61
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked2.54Cr / 1.92Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score7.50 / 10
|
1.0%
7.59
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score7.59 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 70 | SEGAON โ | KHARGONE | 6.36 | C |
22.1%
6.24
CategoryFarm Pond
Started / Completed / Phys115 / 0 / 73
Completion rate63.5%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked0.74Cr / 0.45Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score6.24 / 10
|
5.1%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
7.66
CategoryDug Well Recharge
Started / Completed / Phys205 / 12 / 174
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate90.7%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score7.66 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.8%
6.00
CategoryWater conservation & recharge
Started / Completed / Phys70 / 4 / 33
Completion rate52.9%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked1.58Cr / 1.06Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score6.00 / 10
|
26.4%
5.62
CategoryWatershed Related Works
Started / Completed / Phys28 / 3 / 12
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked1.12Cr / 0.66Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score5.62 / 10
|
2.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 71 | MAJHAULI โ | SIDHI | 6.35 | C |
50.5%
5.36
CategoryFarm Pond
Started / Completed / Phys356 / 262 / 23
Completion rate80.1%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked1.81Cr / 0.49Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score5.36 / 10
|
โ |
1.4%
7.20
CategoryDug Well Recharge
Started / Completed / Phys96 / 73 / 12
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate88.5%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.77 / 5.0
Final score7.20 / 10
|
1.5%
7.57
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.19Cr / 0.16Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score7.57 / 10
|
35.6%
7.37
CategoryWater conservation & recharge
Started / Completed / Phys116 / 51 / 41
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked1.20Cr / 0.82Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score7.37 / 10
|
7.7%
7.90
CategoryWatershed Related Works
Started / Completed / Phys13 / 3 / 8
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score7.90 / 10
|
3.3%
5.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 6 / 1
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score5.96 / 10
|
| 72 | BIJEYPUR โ | SHEOPUR | 6.35 | C |
8.9%
5.91
CategoryFarm Pond
Started / Completed / Phys333 / 246 / 39
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked1.00Cr / 0.33Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.63 / 5.0
Final score5.91 / 10
|
3.0%
0.49
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.97Cr / 0.19Cr
Expenditure rate (ongoing)9.7%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
|
0.2%
5.76
CategoryDug Well Recharge
Started / Completed / Phys39 / 34 / 0
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score5.76 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
76.3%
6.58
CategoryWater conservation & recharge
Started / Completed / Phys398 / 13 / 204
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked22.51Cr / 17.35Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score6.58 / 10
|
8.7%
6.52
CategoryWatershed Related Works
Started / Completed / Phys48 / 3 / 27
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked2.06Cr / 1.40Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score6.52 / 10
|
2.3%
6.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 10
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.34Cr / 0.21Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.68 / 10
|
| 73 | ASHOKNAGAR โ | ASHOK NAGAR | 6.35 | C |
59.0%
5.32
CategoryFarm Pond
Started / Completed / Phys688 / 267 / 287
Completion rate80.5%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked3.44Cr / 0.89Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score5.32 / 10
|
1.5%
3.37
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.33Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
|
1.4%
6.89
CategoryDug Well Recharge
Started / Completed / Phys174 / 112 / 61
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score6.89 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.1%
8.12
CategoryWater conservation & recharge
Started / Completed / Phys187 / 63 / 93
Completion rate83.4%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked2.37Cr / 1.87Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.95 / 5.0
Final score8.12 / 10
|
2.7%
8.02
CategoryWatershed Related Works
Started / Completed / Phys10 / 4 / 5
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score8.02 / 10
|
2.1%
6.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 2 / 3
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score6.76 / 10
|
| 74 | KEOLARI โ | SEONI | 6.34 | C |
64.1%
5.51
CategoryFarm Pond
Started / Completed / Phys505 / 387 / 35
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked2.23Cr / 0.59Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.33 / 5.0
Final score5.51 / 10
|
1.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
3.4%
9.59
CategoryDug Well Recharge
Started / Completed / Phys302 / 244 / 33
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate91.7%
Part A score (max 5.0)4.59 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.59 / 10
|
4.2%
8.70
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 5 / 10
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score8.70 / 10
|
16.2%
7.62
CategoryWater conservation & recharge
Started / Completed / Phys62 / 20 / 32
Completion rate83.9%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.80Cr / 0.55Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.62 / 10
|
7.7%
7.51
CategoryWatershed Related Works
Started / Completed / Phys31 / 12 / 15
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.51 / 10
|
3.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 75 | AMARWARA โ | CHHINDWARA | 6.33 | C |
50.1%
5.63
CategoryFarm Pond
Started / Completed / Phys353 / 111 / 97
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate58.9%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked3.97Cr / 2.13Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score5.63 / 10
|
2.0%
1.31
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.11Cr
Expenditure rate (ongoing)26.3%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
|
5.1%
9.41
CategoryDug Well Recharge
Started / Completed / Phys382 / 156 / 181
⚠ Works needing verification (Completed/Physically Completed)45 works (exp <30%)
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.41 / 10
|
โ |
34.6%
7.16
CategoryWater conservation & recharge
Started / Completed / Phys111 / 37 / 42
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked2.01Cr / 1.44Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.60 / 5.0
Final score7.16 / 10
|
5.4%
6.23
CategoryWatershed Related Works
Started / Completed / Phys16 / 5 / 6
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.37Cr / 0.21Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score6.23 / 10
|
2.9%
6.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.52 / 5.0
Final score6.85 / 10
|
| 76 | BURHANPUR โ | BURHANPUR | 6.31 | C |
26.2%
6.69
CategoryFarm Pond
Started / Completed / Phys268 / 110 / 113
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.80Cr / 0.41Cr
Expenditure rate (ongoing)50.6%
Part B score (max 5.0)2.53 / 5.0
Final score6.69 / 10
|
8.7%
4.39
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked1.08Cr / 0.68Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score4.39 / 10
|
6.8%
7.41
CategoryDug Well Recharge
Started / Completed / Phys447 / 220 / 203
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score7.41 / 10
|
โ |
53.5%
6.12
CategoryWater conservation & recharge
Started / Completed / Phys133 / 10 / 65
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked3.64Cr / 2.40Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score6.12 / 10
|
3.5%
7.63
CategoryWatershed Related Works
Started / Completed / Phys10 / 2 / 6
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score7.63 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 77 | MUNGAOLI โ | ASHOK NAGAR | 6.29 | C |
41.4%
4.88
CategoryFarm Pond
Started / Completed / Phys413 / 24 / 222
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked5.89Cr / 2.25Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score4.88 / 10
|
2.1%
4.68
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.50Cr / 0.30Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score4.68 / 10
|
1.1%
5.26
CategoryDug Well Recharge
Started / Completed / Phys147 / 36 / 67
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate70.1%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score5.26 / 10
|
โ |
51.9%
7.31
CategoryWater conservation & recharge
Started / Completed / Phys395 / 76 / 222
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked4.87Cr / 3.44Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score7.31 / 10
|
2.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.0%
7.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score7.02 / 10
|
| 78 | GAIRATGANJ โ | RAISEN | 6.28 | C |
54.3%
7.19
CategoryFarm Pond
Started / Completed / Phys350 / 218 / 61
Completion rate79.7%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.53Cr / 0.98Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score7.19 / 10
|
4.1%
3.25
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score3.25 / 10
|
4.4%
9.00
CategoryDug Well Recharge
Started / Completed / Phys202 / 169 / 21
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate94.1%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.32 / 5.0
Final score9.00 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
34.9%
4.94
CategoryWater conservation & recharge
Started / Completed / Phys86 / 17 / 5
Completion rate25.6%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked3.44Cr / 2.52Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score4.94 / 10
|
โ |
1.5%
2.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score2.72 / 10
|
| 79 | SILWANI โ | RAISEN | 6.28 | C |
69.3%
6.25
CategoryFarm Pond
Started / Completed / Phys442 / 153 / 205
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked1.11Cr / 0.49Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score6.25 / 10
|
5.6%
4.63
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.96 / 5.0
Final score4.63 / 10
|
11.0%
7.42
CategoryDug Well Recharge
Started / Completed / Phys439 / 322 / 97
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score7.42 / 10
|
โ |
11.4%
5.24
CategoryWater conservation & recharge
Started / Completed / Phys32 / 5 / 10
Completion rate46.9%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked0.71Cr / 0.41Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score5.24 / 10
|
โ |
2.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 80 | GUNA โ | GUNA | 6.27 | C |
33.6%
5.29
CategoryFarm Pond
Started / Completed / Phys205 / 38 / 94
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked3.45Cr / 1.43Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score5.29 / 10
|
โ |
2.9%
7.70
CategoryDug Well Recharge
Started / Completed / Phys324 / 191 / 122
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score7.70 / 10
|
1.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
55.0%
6.65
CategoryWater conservation & recharge
Started / Completed / Phys187 / 37 / 101
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked5.12Cr / 3.03Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score6.65 / 10
|
2.4%
6.34
CategoryWatershed Related Works
Started / Completed / Phys11 / 3 / 5
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.34Cr / 0.18Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.34 / 10
|
4.5%
6.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 5
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.31Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.66 / 5.0
Final score6.66 / 10
|
| 81 | GOHPARU โ | SHAHDOL | 6.27 | C |
38.0%
4.47
CategoryFarm Pond
Started / Completed / Phys596 / 236 / 136
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked5.25Cr / 1.42Cr
Expenditure rate (ongoing)27.1%
Part B score (max 5.0)1.35 / 5.0
Final score4.47 / 10
|
1.1%
2.16
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
|
0.8%
5.85
CategoryDug Well Recharge
Started / Completed / Phys98 / 15 / 61
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate77.6%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score5.85 / 10
|
11.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
45.0%
7.00
CategoryWater conservation & recharge
Started / Completed / Phys202 / 18 / 107
Completion rate61.9%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked7.34Cr / 5.74Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score7.00 / 10
|
3.3%
5.74
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 3
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.61Cr / 0.48Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score5.74 / 10
|
0.5%
6.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.46 / 10
|
| 82 | BHAINSDEHI โ | BETUL | 6.26 | C |
13.4%
8.68
CategoryFarm Pond
Started / Completed / Phys164 / 3 / 140
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.34Cr / 0.29Cr
Expenditure rate (ongoing)86.4%
Part B score (max 5.0)4.32 / 5.0
Final score8.68 / 10
|
3.0%
2.74
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.55Cr / 0.30Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.74 / 5.0
Final score2.74 / 10
|
5.2%
7.71
CategoryDug Well Recharge
Started / Completed / Phys371 / 28 / 310
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score7.71 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
72.8%
5.86
CategoryWater conservation & recharge
Started / Completed / Phys201 / 9 / 91
Completion rate49.8%
Part A score (max 5.0)2.49 / 5.0
Ongoing sanction / booked6.13Cr / 4.13Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score5.86 / 10
|
1.8%
5.36
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
|
3.8%
6.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 6 / 10
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.68 / 10
|
| 83 | ATHNER โ | BETUL | 6.26 | C |
12.6%
8.16
CategoryFarm Pond
Started / Completed / Phys167 / 19 / 123
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.43Cr / 0.33Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.90 / 5.0
Final score8.16 / 10
|
4.3%
0.49
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.09Cr
Expenditure rate (ongoing)9.8%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
|
4.1%
7.83
CategoryDug Well Recharge
Started / Completed / Phys355 / 46 / 281
Completion rate92.1%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score7.83 / 10
|
โ |
73.8%
6.21
CategoryWater conservation & recharge
Started / Completed / Phys225 / 11 / 116
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked7.46Cr / 5.05Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score6.21 / 10
|
4.3%
6.01
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.20Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score6.01 / 10
|
1.0%
6.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 3 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.11Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score6.06 / 10
|
| 84 | RAGHOGARH โ | GUNA | 6.25 | C |
29.8%
4.44
CategoryFarm Pond
Started / Completed / Phys429 / 57 / 253
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate72.3%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked2.15Cr / 0.36Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score4.44 / 10
|
โ |
6.2%
4.78
CategoryDug Well Recharge
Started / Completed / Phys598 / 144 / 423
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate94.8%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score4.78 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
60.1%
7.14
CategoryWater conservation & recharge
Started / Completed / Phys301 / 38 / 241
Completion rate92.7%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.93Cr / 0.47Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score7.14 / 10
|
2.1%
7.15
CategoryWatershed Related Works
Started / Completed / Phys10 / 5 / 4
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score7.15 / 10
|
1.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 85 | BARGHAT โ | SEONI | 6.24 | C |
56.3%
5.79
CategoryFarm Pond
Started / Completed / Phys440 / 219 / 115
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate75.9%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked2.82Cr / 1.12Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)1.99 / 5.0
Final score5.79 / 10
|
โ |
3.0%
5.79
CategoryDug Well Recharge
Started / Completed / Phys254 / 58 / 139
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate77.6%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score5.79 / 10
|
0.6%
4.79
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.12Cr
Expenditure rate (ongoing)95.8%
Part B score (max 5.0)4.79 / 5.0
Final score4.79 / 10
|
32.5%
6.97
CategoryWater conservation & recharge
Started / Completed / Phys139 / 43 / 56
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked1.99Cr / 1.36Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score6.97 / 10
|
5.6%
7.33
CategoryWatershed Related Works
Started / Completed / Phys24 / 12 / 9
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score7.33 / 10
|
2.2%
5.24
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.11Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score5.24 / 10
|
| 86 | PETLAWAD โ | JHABUA | 6.23 | C |
10.9%
4.38
CategoryFarm Pond
Started / Completed / Phys272 / 45 / 61
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked2.87Cr / 1.40Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.44 / 5.0
Final score4.38 / 10
|
1.4%
0.73
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.09Cr
Expenditure rate (ongoing)14.7%
Part B score (max 5.0)0.73 / 5.0
Final score0.73 / 10
|
5.0%
6.56
CategoryDug Well Recharge
Started / Completed / Phys832 / 357 / 300
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.42Cr / 0.22Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score6.56 / 10
|
0.1%
6.34
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 5 / 1
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.34 / 10
|
75.7%
6.67
CategoryWater conservation & recharge
Started / Completed / Phys372 / 22 / 190
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked13.10Cr / 10.00Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score6.67 / 10
|
4.1%
4.71
CategoryWatershed Related Works
Started / Completed / Phys50 / 0 / 19
Completion rate38.0%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked0.89Cr / 0.50Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score4.71 / 10
|
2.8%
6.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 13
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)40.5%
Part B score (max 5.0)2.03 / 5.0
Final score6.14 / 10
|
| 87 | GOHAD โ | BHIND | 6.23 | C |
19.3%
3.44
CategoryFarm Pond
Started / Completed / Phys218 / 46 / 48
Completion rate43.1%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked3.13Cr / 0.80Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.28 / 5.0
Final score3.44 / 10
|
1.0%
0.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
|
0.3%
6.55
CategoryDug Well Recharge
Started / Completed / Phys31 / 0 / 20
Completion rate64.5%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.55 / 10
|
16.0%
7.16
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 4 / 37
Completion rate75.9%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.78Cr / 0.53Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score7.16 / 10
|
56.0%
7.01
CategoryWater conservation & recharge
Started / Completed / Phys152 / 10 / 110
Completion rate78.9%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked2.35Cr / 1.44Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.07 / 5.0
Final score7.01 / 10
|
6.4%
6.43
CategoryWatershed Related Works
Started / Completed / Phys19 / 5 / 9
Completion rate73.7%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.48Cr / 0.26Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score6.43 / 10
|
1.2%
6.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score6.33 / 10
|
| 88 | GHUGHRI โ | MANDLA | 6.23 | C |
41.4%
7.29
CategoryFarm Pond
Started / Completed / Phys188 / 141 / 23
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked1.12Cr / 0.65Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.29 / 10
|
4.4%
1.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.24Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score1.49 / 10
|
2.2%
6.26
CategoryDug Well Recharge
Started / Completed / Phys154 / 131 / 9
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score6.26 / 10
|
11.7%
3.56
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked1.86Cr / 0.95Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score3.56 / 10
|
37.7%
6.33
CategoryWater conservation & recharge
Started / Completed / Phys67 / 22 / 15
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked4.75Cr / 3.39Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score6.33 / 10
|
2.3%
7.33
CategoryWatershed Related Works
Started / Completed / Phys15 / 5 / 8
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.33 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 89 | BARWAH โ | KHARGONE | 6.21 | C |
35.9%
4.66
CategoryFarm Pond
Started / Completed / Phys216 / 69 / 66
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.69Cr / 0.52Cr
Expenditure rate (ongoing)30.7%
Part B score (max 5.0)1.54 / 5.0
Final score4.66 / 10
|
1.8%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.5%
6.91
CategoryDug Well Recharge
Started / Completed / Phys720 / 104 / 583
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score6.91 / 10
|
1.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.4%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys150 / 53 / 67
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.94Cr / 0.51Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.69 / 5.0
Final score6.69 / 10
|
7.9%
7.65
CategoryWatershed Related Works
Started / Completed / Phys26 / 9 / 14
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score7.65 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 90 | MAJHGAWAN โ | SATNA | 6.21 | C |
42.8%
5.38
CategoryFarm Pond
Started / Completed / Phys456 / 19 / 279
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked4.44Cr / 1.87Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score5.38 / 10
|
5.0%
1.66
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.50Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score1.66 / 10
|
1.6%
6.69
CategoryDug Well Recharge
Started / Completed / Phys200 / 38 / 117
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate77.5%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score6.69 / 10
|
0.3%
6.40
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.65 / 5.0
Final score6.40 / 10
|
42.5%
7.52
CategoryWater conservation & recharge
Started / Completed / Phys181 / 35 / 93
Completion rate70.7%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked6.37Cr / 5.08Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score7.52 / 10
|
5.7%
7.08
CategoryWatershed Related Works
Started / Completed / Phys39 / 6 / 22
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.54Cr / 0.37Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.08 / 10
|
2.1%
4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 4
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.37Cr / 0.20Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score4.96 / 10
|
| 91 | BADNAGAR โ | UJJAIN | 6.20 | C |
58.8%
6.74
CategoryFarm Pond
Started / Completed / Phys167 / 26 / 126
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.25Cr / 0.11Cr
Expenditure rate (ongoing)43.8%
Part B score (max 5.0)2.19 / 5.0
Final score6.74 / 10
|
17.0%
2.21
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.24Cr / 0.55Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score2.21 / 10
|
0.6%
10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 11 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.7%
7.19
CategoryWater conservation & recharge
Started / Completed / Phys19 / 6 / 11
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.14Cr / 0.08Cr
Expenditure rate (ongoing)54.3%
Part B score (max 5.0)2.71 / 5.0
Final score7.19 / 10
|
1.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 92 | LALBARRA โ | BALAGHAT | 6.19 | C |
61.3%
5.48
CategoryFarm Pond
Started / Completed / Phys526 / 348 / 55
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked2.95Cr / 0.97Cr
Expenditure rate (ongoing)32.9%
Part B score (max 5.0)1.65 / 5.0
Final score5.48 / 10
|
1.9%
6.67
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.21Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score6.67 / 10
|
1.8%
7.37
CategoryDug Well Recharge
Started / Completed / Phys173 / 148 / 20
Completion rate97.1%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score7.37 / 10
|
1.6%
8.14
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.39 / 5.0
Final score8.14 / 10
|
30.3%
7.31
CategoryWater conservation & recharge
Started / Completed / Phys176 / 39 / 91
Completion rate73.9%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked2.15Cr / 1.55Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score7.31 / 10
|
1.6%
6.32
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.13Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.32 / 10
|
1.5%
8.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.06Cr
Expenditure rate (ongoing)87.6%
Part B score (max 5.0)4.38 / 5.0
Final score8.13 / 10
|
| 93 | KHARGONE โ | KHARGONE | 6.17 | C |
36.0%
4.65
CategoryFarm Pond
Started / Completed / Phys106 / 25 / 57
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.48Cr / 0.08Cr
Expenditure rate (ongoing)15.7%
Part B score (max 5.0)0.78 / 5.0
Final score4.65 / 10
|
8.5%
5.12
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.39Cr / 0.27Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.45 / 5.0
Final score5.12 / 10
|
7.9%
5.88
CategoryDug Well Recharge
Started / Completed / Phys245 / 18 / 218
Completion rate96.3%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score5.88 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
43.8%
7.38
CategoryWater conservation & recharge
Started / Completed / Phys47 / 7 / 38
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)51.9%
Part B score (max 5.0)2.59 / 5.0
Final score7.38 / 10
|
1.8%
8.65
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)92.9%
Part B score (max 5.0)4.65 / 5.0
Final score8.65 / 10
|
1.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 94 | NISARPUR โ | DHAR | 6.16 | C |
25.2%
4.09
CategoryFarm Pond
Started / Completed / Phys78 / 23 / 16
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.63Cr / 0.20Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.59 / 5.0
Final score4.09 / 10
|
โ |
8.1%
4.63
CategoryDug Well Recharge
Started / Completed / Phys150 / 15 / 51
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.21Cr / 0.10Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score4.63 / 10
|
โ |
63.3%
7.24
CategoryWater conservation & recharge
Started / Completed / Phys39 / 12 / 8
Completion rate51.3%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked2.77Cr / 2.59Cr
Expenditure rate (ongoing)93.4%
Part B score (max 5.0)4.67 / 5.0
Final score7.24 / 10
|
3.2%
5.45
CategoryWatershed Related Works
Started / Completed / Phys7 / 3 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score5.45 / 10
|
0.2%
2.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score2.11 / 10
|
| 95 | MHOW โ | INDORE | 6.16 | C |
58.5%
4.82
CategoryFarm Pond
Started / Completed / Phys240 / 88 / 54
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate59.2%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked2.70Cr / 1.01Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score4.82 / 10
|
13.6%
5.84
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.08Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score5.84 / 10
|
7.2%
6.61
CategoryDug Well Recharge
Started / Completed / Phys300 / 199 / 25
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate74.7%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score6.61 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys40 / 19 / 21
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 96 | AMBAH โ | MORENA | 6.16 | C |
12.2%
4.58
CategoryFarm Pond
Started / Completed / Phys156 / 50 / 49
Completion rate63.5%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked0.84Cr / 0.24Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score4.58 / 10
|
โ |
0.9%
5.36
CategoryDug Well Recharge
Started / Completed / Phys64 / 11 / 44
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate85.9%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.07 / 5.0
Final score5.36 / 10
|
1.7%
7.12
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 4
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.12 / 10
|
73.6%
6.24
CategoryWater conservation & recharge
Started / Completed / Phys110 / 3 / 67
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked5.06Cr / 3.09Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score6.24 / 10
|
7.7%
7.72
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 8
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.38Cr / 0.30Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score7.72 / 10
|
3.8%
6.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score6.38 / 10
|
| 97 | MAWAI โ | MANDLA | 6.15 | C |
47.7%
6.23
CategoryFarm Pond
Started / Completed / Phys247 / 198 / 17
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked1.38Cr / 0.52Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score6.23 / 10
|
5.4%
0.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.06Cr
Expenditure rate (ongoing)4.9%
Part B score (max 5.0)0.24 / 5.0
Final score0.24 / 10
|
1.8%
7.00
CategoryDug Well Recharge
Started / Completed / Phys153 / 44 / 75
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score7.00 / 10
|
2.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
36.3%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys149 / 64 / 31
Completion rate63.8%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked2.57Cr / 1.71Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.53 / 10
|
1.8%
7.01
CategoryWatershed Related Works
Started / Completed / Phys7 / 5 / 0
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score7.01 / 10
|
4.9%
6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 3 / 7
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.47Cr / 0.35Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score6.56 / 10
|
| 98 | KATNI โ | KATNI | 6.14 | C |
37.5%
3.85
CategoryFarm Pond
Started / Completed / Phys145 / 35 / 41
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked2.43Cr / 0.60Cr
Expenditure rate (ongoing)24.7%
Part B score (max 5.0)1.23 / 5.0
Final score3.85 / 10
|
5.0%
1.89
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.64Cr / 0.24Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score1.89 / 10
|
3.6%
3.48
CategoryDug Well Recharge
Started / Completed / Phys174 / 26 / 90
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.00Cr
Expenditure rate (ongoing)2.9%
Part B score (max 5.0)0.14 / 5.0
Final score3.48 / 10
|
13.8%
7.34
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 1 / 17
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score7.34 / 10
|
11.3%
6.92
CategoryWater conservation & recharge
Started / Completed / Phys34 / 7 / 22
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.26Cr / 0.14Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score6.92 / 10
|
20.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys27 / 17 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.7%
7.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 5 / 7
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.16Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score7.75 / 10
|
| 99 | NIWAS โ | MANDLA | 6.14 | C |
37.6%
6.62
CategoryFarm Pond
Started / Completed / Phys146 / 71 / 24
Completion rate65.1%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked1.41Cr / 0.95Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.36 / 5.0
Final score6.62 / 10
|
โ |
3.2%
5.50
CategoryDug Well Recharge
Started / Completed / Phys118 / 38 / 38
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)45.6%
Part B score (max 5.0)2.28 / 5.0
Final score5.50 / 10
|
11.5%
5.57
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.66Cr / 0.41Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score5.57 / 10
|
31.9%
5.97
CategoryWater conservation & recharge
Started / Completed / Phys61 / 2 / 23
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.99Cr / 1.56Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score5.97 / 10
|
1.3%
4.29
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score4.29 / 10
|
14.5%
6.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.03 / 10
|
| 100 | GAROTH โ | MANDSAUR | 6.14 | C |
11.1%
3.97
CategoryFarm Pond
Started / Completed / Phys281 / 19 / 88
Completion rate38.1%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked2.83Cr / 1.17Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score3.97 / 10
|
3.2%
3.54
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.21Cr / 0.65Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score3.54 / 10
|
5.6%
6.36
CategoryDug Well Recharge
Started / Completed / Phys964 / 71 / 480
Completion rate57.2%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked1.07Cr / 0.75Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score6.36 / 10
|
0.9%
5.52
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 2 / 4
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.29Cr / 0.16Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score5.52 / 10
|
74.4%
6.54
CategoryWater conservation & recharge
Started / Completed / Phys372 / 11 / 179
Completion rate51.1%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked14.26Cr / 11.39Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score6.54 / 10
|
1.7%
6.50
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 9
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score6.50 / 10
|
3.1%
6.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 2 / 6
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.81Cr / 0.67Cr
Expenditure rate (ongoing)83.2%
Part B score (max 5.0)4.16 / 5.0
Final score6.38 / 10
|
| 101 | KARKELI โ | UMARIA | 6.13 | C |
24.6%
5.00
CategoryFarm Pond
Started / Completed / Phys313 / 32 / 132
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked5.00Cr / 2.38Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score5.00 / 10
|
1.7%
6.26
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.38Cr / 0.28Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score6.26 / 10
|
2.6%
5.68
CategoryDug Well Recharge
Started / Completed / Phys441 / 76 / 225
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate68.3%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.34Cr / 0.16Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score5.68 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
57.1%
6.60
CategoryWater conservation & recharge
Started / Completed / Phys267 / 12 / 171
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked8.05Cr / 5.11Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score6.60 / 10
|
5.6%
7.49
CategoryWatershed Related Works
Started / Completed / Phys30 / 2 / 23
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.21Cr / 0.14Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.32 / 5.0
Final score7.49 / 10
|
8.3%
5.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys58 / 3 / 23
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked2.13Cr / 1.36Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score5.44 / 10
|
| 102 | BATIYAGARH โ | DAMOH | 6.12 | C |
14.3%
6.33
CategoryFarm Pond
Started / Completed / Phys208 / 72 / 86
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked1.18Cr / 0.60Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score6.33 / 10
|
โ |
2.5%
6.94
CategoryDug Well Recharge
Started / Completed / Phys336 / 186 / 84
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.93 / 5.0
Final score6.94 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
77.4%
5.93
CategoryWater conservation & recharge
Started / Completed / Phys125 / 18 / 55
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked17.12Cr / 10.31Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score5.93 / 10
|
3.3%
8.22
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.41Cr / 0.39Cr
Expenditure rate (ongoing)95.2%
Part B score (max 5.0)4.76 / 5.0
Final score8.22 / 10
|
2.3%
6.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 7
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score6.63 / 10
|
| 103 | AJAIGARH โ | PANNA | 6.09 | C |
41.2%
5.18
CategoryFarm Pond
Started / Completed / Phys376 / 60 / 156
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked3.12Cr / 1.44Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.30 / 5.0
Final score5.18 / 10
|
2.5%
3.96
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.37Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score3.96 / 10
|
5.4%
6.23
CategoryDug Well Recharge
Started / Completed / Phys396 / 89 / 178
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked0.33Cr / 0.19Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score6.23 / 10
|
โ |
41.7%
6.98
CategoryWater conservation & recharge
Started / Completed / Phys216 / 24 / 126
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked2.49Cr / 1.74Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score6.98 / 10
|
3.7%
6.26
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 7
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score6.26 / 10
|
5.5%
7.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 9
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.34Cr / 0.25Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score7.01 / 10
|
| 104 | ATER โ | BHIND | 6.09 | C |
13.3%
3.57
CategoryFarm Pond
Started / Completed / Phys204 / 76 / 23
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked1.80Cr / 0.41Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.15 / 5.0
Final score3.57 / 10
|
2.7%
0.18
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.02Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.18 / 5.0
Final score0.18 / 10
|
0.2%
4.63
CategoryDug Well Recharge
Started / Completed / Phys24 / 4 / 12
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.30 / 5.0
Final score4.63 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
64.0%
6.86
CategoryWater conservation & recharge
Started / Completed / Phys226 / 48 / 124
Completion rate76.1%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked3.98Cr / 2.43Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score6.86 / 10
|
12.8%
5.29
CategoryWatershed Related Works
Started / Completed / Phys24 / 5 / 10
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.22Cr / 0.53Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.17 / 5.0
Final score5.29 / 10
|
6.5%
7.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 4 / 16
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score7.59 / 10
|
| 105 | SIDHI โ | SIDHI | 6.09 | C |
43.2%
4.55
CategoryFarm Pond
Started / Completed / Phys485 / 247 / 92
Completion rate69.9%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked3.76Cr / 0.80Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score4.55 / 10
|
โ |
1.1%
4.74
CategoryDug Well Recharge
Started / Completed / Phys130 / 62 / 32
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate72.3%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.12 / 5.0
Final score4.74 / 10
|
0.8%
7.32
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.11Cr / 0.10Cr
Expenditure rate (ongoing)96.3%
Part B score (max 5.0)4.82 / 5.0
Final score7.32 / 10
|
41.5%
7.47
CategoryWater conservation & recharge
Started / Completed / Phys279 / 78 / 119
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked4.94Cr / 3.89Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score7.47 / 10
|
9.1%
6.21
CategoryWatershed Related Works
Started / Completed / Phys57 / 25 / 11
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.23Cr / 0.75Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.06 / 5.0
Final score6.21 / 10
|
4.3%
8.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 13 / 5
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.42Cr / 0.37Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score8.15 / 10
|
| 106 | BUDNI โ | SEHORE | 6.09 | C |
59.8%
4.80
CategoryFarm Pond
Started / Completed / Phys78 / 22 / 33
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate70.5%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.42Cr / 0.11Cr
Expenditure rate (ongoing)25.5%
Part B score (max 5.0)1.28 / 5.0
Final score4.80 / 10
|
โ |
16.4%
5.91
CategoryDug Well Recharge
Started / Completed / Phys151 / 45 / 82
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate84.1%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.70 / 5.0
Final score5.91 / 10
|
15.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.3%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.7%
5.32
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.57 / 5.0
Final score5.32 / 10
|
1.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 107 | MANASA โ | NEEMUCH | 6.08 | C |
50.1%
4.61
CategoryFarm Pond
Started / Completed / Phys400 / 52 / 200
Completion rate63.0%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked5.96Cr / 1.75Cr
Expenditure rate (ongoing)29.3%
Part B score (max 5.0)1.46 / 5.0
Final score4.61 / 10
|
5.2%
6.33
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.66Cr / 0.46Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.33 / 10
|
6.8%
5.49
CategoryDug Well Recharge
Started / Completed / Phys759 / 473 / 251
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.07Cr / 0.01Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.72 / 5.0
Final score5.49 / 10
|
4.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 4 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.4%
7.77
CategoryWater conservation & recharge
Started / Completed / Phys179 / 23 / 140
Completion rate91.1%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked1.69Cr / 1.09Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score7.77 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 108 | AMLA โ | BETUL | 6.08 | C |
28.6%
5.43
CategoryFarm Pond
Started / Completed / Phys215 / 15 / 99
Completion rate53.0%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked2.52Cr / 1.40Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score5.43 / 10
|
โ |
6.5%
7.68
CategoryDug Well Recharge
Started / Completed / Phys437 / 56 / 288
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)74.8%
Part B score (max 5.0)3.74 / 5.0
Final score7.68 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
52.5%
5.97
CategoryWater conservation & recharge
Started / Completed / Phys128 / 5 / 50
Completion rate43.0%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked4.47Cr / 3.42Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score5.97 / 10
|
7.3%
7.12
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 15
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.27Cr / 0.18Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score7.12 / 10
|
5.0%
7.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 2 / 10
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked0.35Cr / 0.28Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)4.00 / 5.0
Final score7.15 / 10
|
| 109 | PANAGAR โ | JABALPUR | 6.07 | C |
6.8%
0.85
CategoryFarm Pond
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.12Cr / 0.01Cr
Expenditure rate (ongoing)4.4%
Part B score (max 5.0)0.22 / 5.0
Final score0.85 / 10
|
โ |
0.6%
1.13
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.13 / 5.0
Final score1.13 / 10
|
โ |
74.5%
6.93
CategoryWater conservation & recharge
Started / Completed / Phys12 / 10 / 0
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.73Cr / 0.40Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.93 / 10
|
2.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.8%
3.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score3.89 / 10
|
| 110 | SARANGPUR โ | RAJGARH | 6.07 | C |
44.7%
5.15
CategoryFarm Pond
Started / Completed / Phys181 / 123 / 6
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate71.3%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked1.33Cr / 0.42Cr
Expenditure rate (ongoing)31.8%
Part B score (max 5.0)1.59 / 5.0
Final score5.15 / 10
|
โ |
13.5%
7.97
CategoryDug Well Recharge
Started / Completed / Phys614 / 501 / 87
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score7.97 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
23.0%
6.17
CategoryWater conservation & recharge
Started / Completed / Phys39 / 23 / 10
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.20Cr / 0.08Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.17 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.9%
6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 3 / 20
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.59Cr / 0.35Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score6.58 / 10
|
| 111 | NARSINGHGARH โ | RAJGARH | 6.06 | C |
41.3%
4.87
CategoryFarm Pond
Started / Completed / Phys263 / 149 / 33
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked2.34Cr / 0.66Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.41 / 5.0
Final score4.87 / 10
|
โ |
9.3%
5.92
CategoryDug Well Recharge
Started / Completed / Phys656 / 331 / 303
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.09 / 5.0
Final score5.92 / 10
|
1.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.8%
7.26
CategoryWater conservation & recharge
Started / Completed / Phys163 / 41 / 90
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked1.77Cr / 1.15Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score7.26 / 10
|
0.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.4%
6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys31 / 3 / 19
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.71Cr / 0.37Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.61 / 5.0
Final score6.16 / 10
|
| 112 | MANAWAR โ | DHAR | 6.05 | C |
18.6%
4.21
CategoryFarm Pond
Started / Completed / Phys234 / 30 / 54
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate35.9%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked2.18Cr / 1.05Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score4.21 / 10
|
โ |
5.4%
5.42
CategoryDug Well Recharge
Started / Completed / Phys386 / 107 / 112
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate56.7%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked0.40Cr / 0.21Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score5.42 / 10
|
1.4%
4.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.24Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.84 / 5.0
Final score4.84 / 10
|
56.9%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys128 / 34 / 35
Completion rate53.9%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked6.96Cr / 5.57Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score6.69 / 10
|
16.0%
6.31
CategoryWatershed Related Works
Started / Completed / Phys76 / 12 / 35
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked1.20Cr / 0.77Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score6.31 / 10
|
1.7%
5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score5.38 / 10
|
| 113 | JOBAT โ | ALIRAJPUR | 6.05 | C |
11.3%
2.26
CategoryFarm Pond
Started / Completed / Phys141 / 0 / 2
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked1.82Cr / 0.80Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score2.26 / 10
|
3.0%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
7.0%
5.17
CategoryDug Well Recharge
Started / Completed / Phys442 / 2 / 235
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked0.52Cr / 0.26Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score5.17 / 10
|
โ |
72.6%
6.48
CategoryWater conservation & recharge
Started / Completed / Phys87 / 6 / 31
Completion rate42.5%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked9.10Cr / 7.93Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.35 / 5.0
Final score6.48 / 10
|
5.0%
6.77
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 17
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.77 / 10
|
1.1%
7.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score7.78 / 10
|
| 114 | GHORA DONGRI โ | BETUL | 6.05 | C |
20.8%
5.11
CategoryFarm Pond
Started / Completed / Phys221 / 29 / 97
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked4.04Cr / 1.83Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.11 / 10
|
2.6%
3.57
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.81Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score3.57 / 10
|
2.7%
8.01
CategoryDug Well Recharge
Started / Completed / Phys458 / 166 / 253
Completion rate91.5%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score8.01 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
72.6%
6.31
CategoryWater conservation & recharge
Started / Completed / Phys348 / 5 / 202
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked13.02Cr / 8.70Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.31 / 10
|
0.1%
5.14
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.64 / 5.0
Final score5.14 / 10
|
1.1%
6.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 8
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.86 / 10
|
| 115 | DHANAURA โ | SEONI | 6.04 | C |
40.1%
4.00
CategoryFarm Pond
Started / Completed / Phys374 / 127 / 54
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate48.4%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked4.42Cr / 1.40Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score4.00 / 10
|
1.8%
1.53
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score1.53 / 10
|
2.1%
9.48
CategoryDug Well Recharge
Started / Completed / Phys200 / 93 / 86
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate89.5%
Part A score (max 5.0)4.48 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.48 / 10
|
โ |
31.6%
7.54
CategoryWater conservation & recharge
Started / Completed / Phys116 / 18 / 75
Completion rate80.2%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked1.92Cr / 1.36Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score7.54 / 10
|
16.3%
8.04
CategoryWatershed Related Works
Started / Completed / Phys37 / 12 / 18
Completion rate81.1%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.74Cr / 0.59Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score8.04 / 10
|
8.1%
6.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 7
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked1.00Cr / 0.81Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.02 / 5.0
Final score6.37 / 10
|
| 116 | NEWALI โ | BARWANI | 6.04 | C |
24.4%
6.14
CategoryFarm Pond
Started / Completed / Phys83 / 8 / 37
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked0.55Cr / 0.37Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.43 / 5.0
Final score6.14 / 10
|
โ |
13.6%
5.02
CategoryDug Well Recharge
Started / Completed / Phys265 / 1 / 262
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.1%
Part B score (max 5.0)0.05 / 5.0
Final score5.02 / 10
|
โ |
53.6%
6.15
CategoryWater conservation & recharge
Started / Completed / Phys79 / 16 / 30
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked1.04Cr / 0.67Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.15 / 10
|
7.9%
6.49
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score6.49 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 117 | GANDHWANI โ | DHAR | 6.03 | C |
5.6%
3.12
CategoryFarm Pond
Started / Completed / Phys237 / 10 / 22
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked1.97Cr / 0.96Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score3.12 / 10
|
โ |
2.5%
2.51
CategoryDug Well Recharge
Started / Completed / Phys400 / 47 / 9
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked0.87Cr / 0.32Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score2.51 / 10
|
โ |
76.0%
6.44
CategoryWater conservation & recharge
Started / Completed / Phys285 / 6 / 144
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked11.90Cr / 9.05Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score6.44 / 10
|
12.1%
5.55
CategoryWatershed Related Works
Started / Completed / Phys164 / 4 / 50
Completion rate32.9%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked3.26Cr / 2.55Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score5.55 / 10
|
3.8%
6.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 14
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.58Cr / 0.26Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score6.10 / 10
|
| 118 | WARASEONI โ | BALAGHAT | 6.02 | C |
57.3%
4.85
CategoryFarm Pond
Started / Completed / Phys390 / 132 / 177
Completion rate79.2%
Part A score (max 5.0)3.96 / 5.0
Ongoing sanction / booked1.52Cr / 0.27Cr
Expenditure rate (ongoing)17.8%
Part B score (max 5.0)0.89 / 5.0
Final score4.85 / 10
|
2.6%
3.69
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.37Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score3.69 / 10
|
1.5%
6.57
CategoryDug Well Recharge
Started / Completed / Phys114 / 56 / 53
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.57 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
34.3%
7.94
CategoryWater conservation & recharge
Started / Completed / Phys157 / 49 / 92
Completion rate89.8%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.99Cr / 0.68Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.94 / 10
|
2.3%
6.99
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.99 / 10
|
1.8%
7.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 6 / 1
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score7.88 / 10
|
| 119 | PORSA โ | MORENA | 6.02 | C |
15.6%
5.01
CategoryFarm Pond
Started / Completed / Phys171 / 75 / 41
Completion rate67.8%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked1.81Cr / 0.59Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.62 / 5.0
Final score5.01 / 10
|
โ |
0.4%
3.85
CategoryDug Well Recharge
Started / Completed / Phys63 / 24 / 5
Completion rate46.0%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score3.85 / 10
|
2.3%
4.29
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 0 / 3
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.80Cr / 0.47Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score4.29 / 10
|
79.2%
6.28
CategoryWater conservation & recharge
Started / Completed / Phys267 / 6 / 128
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked16.50Cr / 12.43Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score6.28 / 10
|
2.1%
5.13
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 8
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.62Cr / 0.37Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.13 / 10
|
0.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 120 | POHRI โ | SHIVPURI | 6.01 | C |
16.2%
4.74
CategoryFarm Pond
Started / Completed / Phys269 / 149 / 35
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked1.73Cr / 0.46Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score4.74 / 10
|
0.7%
0.13
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.01Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
|
2.0%
5.00
CategoryDug Well Recharge
Started / Completed / Phys262 / 156 / 42
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate75.6%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.12Cr / 0.03Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score5.00 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
66.7%
6.19
CategoryWater conservation & recharge
Started / Completed / Phys213 / 26 / 89
Completion rate54.0%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked12.29Cr / 8.59Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.50 / 5.0
Final score6.19 / 10
|
8.0%
6.52
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 12
Completion rate68.0%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.84Cr / 0.52Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score6.52 / 10
|
6.1%
7.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 3 / 13
Completion rate69.6%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked0.90Cr / 0.75Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score7.65 / 10
|
| 121 | SOHAGPUR โ | NARMADAPURAM | 6.00 | C |
59.5%
4.08
CategoryFarm Pond
Started / Completed / Phys118 / 29 / 43
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked0.26Cr / 0.05Cr
Expenditure rate (ongoing)20.5%
Part B score (max 5.0)1.03 / 5.0
Final score4.08 / 10
|
โ |
10.9%
5.65
CategoryDug Well Recharge
Started / Completed / Phys133 / 56 / 64
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score5.65 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.1%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys13 / 4 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 122 | LATERI โ | VIDISHA | 6.00 | C |
47.8%
4.64
CategoryFarm Pond
Started / Completed / Phys215 / 87 / 26
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked3.01Cr / 1.21Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score4.64 / 10
|
1.4%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.3%
6.43
CategoryDug Well Recharge
Started / Completed / Phys301 / 106 / 113
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate72.8%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score6.43 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.0%
7.03
CategoryWater conservation & recharge
Started / Completed / Phys168 / 78 / 51
Completion rate76.8%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked1.29Cr / 0.82Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score7.03 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 5 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 123 | KHILCHIPUR โ | RAJGARH | 6.00 | D |
12.0%
4.99
CategoryFarm Pond
Started / Completed / Phys445 / 206 / 106
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.79Cr / 0.53Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.48 / 5.0
Final score4.99 / 10
|
โ |
2.4%
7.82
CategoryDug Well Recharge
Started / Completed / Phys605 / 398 / 173
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score7.82 / 10
|
3.0%
4.14
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 0 / 4
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked1.67Cr / 1.17Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.50 / 5.0
Final score4.14 / 10
|
66.7%
6.19
CategoryWater conservation & recharge
Started / Completed / Phys300 / 17 / 112
Completion rate43.0%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked28.85Cr / 23.32Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score6.19 / 10
|
3.7%
6.58
CategoryWatershed Related Works
Started / Completed / Phys47 / 6 / 21
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked1.06Cr / 0.79Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score6.58 / 10
|
12.2%
5.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 1 / 32
Completion rate37.1%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked5.06Cr / 4.04Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score5.85 / 10
|
| 124 | SAMNAPUR โ | DINDORI | 5.99 | D |
26.3%
5.17
CategoryFarm Pond
Started / Completed / Phys277 / 157 / 83
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate86.6%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.49Cr / 0.08Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score5.17 / 10
|
โ |
2.4%
9.63
CategoryDug Well Recharge
Started / Completed / Phys187 / 119 / 54
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.63 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.3%
7.69
CategoryWater conservation & recharge
Started / Completed / Phys69 / 16 / 43
Completion rate85.5%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.96Cr / 0.65Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score7.69 / 10
|
15.9%
6.85
CategoryWatershed Related Works
Started / Completed / Phys28 / 8 / 12
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked1.15Cr / 0.75Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score6.85 / 10
|
23.0%
3.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked4.08Cr / 0.17Cr
Expenditure rate (ongoing)4.2%
Part B score (max 5.0)0.21 / 5.0
Final score3.54 / 10
|
| 125 | NIWARI โ | NIWARI | 5.99 | D |
19.4%
2.62
CategoryFarm Pond
Started / Completed / Phys204 / 18 / 19
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate18.1%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked2.32Cr / 0.80Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.71 / 5.0
Final score2.62 / 10
|
1.1%
0.19
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.01Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.19 / 5.0
Final score0.19 / 10
|
8.9%
4.36
CategoryDug Well Recharge
Started / Completed / Phys508 / 76 / 155
⚠ Works needing verification (Completed/Physically Completed)39 works (exp <30%)
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.62Cr / 0.26Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score4.36 / 10
|
โ |
44.8%
6.68
CategoryWater conservation & recharge
Started / Completed / Phys124 / 31 / 48
Completion rate63.7%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked2.36Cr / 1.65Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score6.68 / 10
|
3.4%
5.75
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score5.75 / 10
|
22.4%
8.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 7 / 37
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.28Cr / 0.22Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score8.51 / 10
|
| 126 | BAJNA โ | RATLAM | 5.97 | D |
15.6%
4.42
CategoryFarm Pond
Started / Completed / Phys297 / 119 / 36
Completion rate52.2%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked1.49Cr / 0.54Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score4.42 / 10
|
7.6%
3.67
CategoryAmrit Sarowar
Started / Completed / Phys6 / 1 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.99Cr / 0.40Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score3.67 / 10
|
10.4%
5.75
CategoryDug Well Recharge
Started / Completed / Phys795 / 282 / 331
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate77.1%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.38Cr / 0.15Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.90 / 5.0
Final score5.75 / 10
|
โ |
65.1%
6.57
CategoryWater conservation & recharge
Started / Completed / Phys147 / 36 / 73
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked2.52Cr / 1.44Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.86 / 5.0
Final score6.57 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 127 | BANDA โ | SAGAR | 5.97 | D |
35.8%
4.23
CategoryFarm Pond
Started / Completed / Phys140 / 70 / 10
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked1.05Cr / 0.29Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score4.23 / 10
|
โ |
18.2%
6.40
CategoryDug Well Recharge
Started / Completed / Phys541 / 97 / 305
⚠ Works needing verification (Completed/Physically Completed)111 works (exp <30%)
Completion rate74.3%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score6.40 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.9%
6.76
CategoryWater conservation & recharge
Started / Completed / Phys66 / 13 / 44
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.29Cr / 0.14Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score6.76 / 10
|
4.1%
8.13
CategoryWatershed Related Works
Started / Completed / Phys8 / 5 / 2
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score8.13 / 10
|
2.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 128 | BHIKANGAON โ | KHARGONE | 5.97 | D |
43.9%
4.55
CategoryFarm Pond
Started / Completed / Phys179 / 39 / 69
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate60.3%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.33Cr / 0.41Cr
Expenditure rate (ongoing)30.7%
Part B score (max 5.0)1.53 / 5.0
Final score4.55 / 10
|
7.5%
4.71
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.34Cr / 0.15Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.21 / 5.0
Final score4.71 / 10
|
13.6%
7.21
CategoryDug Well Recharge
Started / Completed / Phys415 / 133 / 246
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score7.21 / 10
|
โ |
35.0%
7.53
CategoryWater conservation & recharge
Started / Completed / Phys42 / 16 / 18
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.63Cr / 0.44Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.49 / 5.0
Final score7.53 / 10
|
โ | โ |
| 129 | SAUSAR โ | CHHINDWARA | 5.97 | D |
48.3%
6.30
CategoryFarm Pond
Started / Completed / Phys185 / 34 / 83
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.32Cr / 0.83Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score6.30 / 10
|
6.1%
0.58
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)11.6%
Part B score (max 5.0)0.58 / 5.0
Final score0.58 / 10
|
10.4%
7.69
CategoryDug Well Recharge
Started / Completed / Phys262 / 44 / 201
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score7.69 / 10
|
โ |
28.7%
5.85
CategoryWater conservation & recharge
Started / Completed / Phys52 / 1 / 22
Completion rate44.2%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked1.16Cr / 0.84Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score5.85 / 10
|
5.1%
6.51
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 3
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score6.51 / 10
|
1.3%
5.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score5.69 / 10
|
| 130 | DEWAS โ | DEWAS | 5.96 | D |
43.0%
4.97
CategoryFarm Pond
Started / Completed / Phys125 / 29 / 55
Completion rate67.2%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked1.21Cr / 0.39Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.61 / 5.0
Final score4.97 / 10
|
2.3%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.1%
6.06
CategoryDug Well Recharge
Started / Completed / Phys280 / 6 / 193
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate71.1%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score6.06 / 10
|
3.3%
7.36
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 3 / 5
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.36 / 5.0
Final score7.36 / 10
|
33.3%
6.61
CategoryWater conservation & recharge
Started / Completed / Phys104 / 8 / 67
Completion rate72.1%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.75Cr / 0.45Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score6.61 / 10
|
6.8%
6.74
CategoryWatershed Related Works
Started / Completed / Phys22 / 3 / 13
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score6.74 / 10
|
3.3%
6.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score6.22 / 10
|
| 131 | BAGH โ | DHAR | 5.96 | D |
6.1%
4.00
CategoryFarm Pond
Started / Completed / Phys243 / 11 / 55
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate27.2%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked2.77Cr / 1.46Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score4.00 / 10
|
โ |
1.5%
3.72
CategoryDug Well Recharge
Started / Completed / Phys365 / 14 / 50
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate17.5%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked0.74Cr / 0.42Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.85 / 5.0
Final score3.72 / 10
|
โ |
89.5%
6.17
CategoryWater conservation & recharge
Started / Completed / Phys232 / 9 / 71
Completion rate34.5%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked47.39Cr / 42.12Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score6.17 / 10
|
2.2%
4.92
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked1.37Cr / 1.24Cr
Expenditure rate (ongoing)90.1%
Part B score (max 5.0)4.50 / 5.0
Final score4.92 / 10
|
0.6%
4.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.35Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score4.44 / 10
|
| 132 | BURHAR โ | SHAHDOL | 5.96 | D |
38.6%
3.99
CategoryFarm Pond
Started / Completed / Phys766 / 87 / 198
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate37.2%
Part A score (max 5.0)1.86 / 5.0
Ongoing sanction / booked16.46Cr / 7.02Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score3.99 / 10
|
0.7%
0.76
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.08Cr
Expenditure rate (ongoing)15.2%
Part B score (max 5.0)0.76 / 5.0
Final score0.76 / 10
|
0.7%
5.78
CategoryDug Well Recharge
Started / Completed / Phys181 / 22 / 73
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked0.22Cr / 0.14Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score5.78 / 10
|
5.0%
8.40
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 1
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked1.10Cr / 1.07Cr
Expenditure rate (ongoing)96.7%
Part B score (max 5.0)4.83 / 5.0
Final score8.40 / 10
|
27.6%
5.79
CategoryWater conservation & recharge
Started / Completed / Phys343 / 27 / 108
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked11.34Cr / 8.68Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score5.79 / 10
|
26.0%
8.72
CategoryWatershed Related Works
Started / Completed / Phys185 / 11 / 170
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score8.72 / 10
|
1.4%
6.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 6 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.58Cr / 0.47Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.03 / 5.0
Final score6.03 / 10
|
| 133 | AMARPATAN โ | SATNA | 5.95 | D |
48.1%
2.71
CategoryFarm Pond
Started / Completed / Phys74 / 0 / 26
Completion rate35.1%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked1.36Cr / 0.26Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score2.71 / 10
|
โ |
5.9%
4.37
CategoryDug Well Recharge
Started / Completed / Phys99 / 12 / 69
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)5.6%
Part B score (max 5.0)0.28 / 5.0
Final score4.37 / 10
|
โ |
41.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys31 / 1 / 30
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
4.9%
5.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.52 / 5.0
Final score5.85 / 10
|
| 134 | KUKSHI โ | DHAR | 5.95 | D |
6.0%
3.06
CategoryFarm Pond
Started / Completed / Phys130 / 10 / 14
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate18.5%
Part A score (max 5.0)0.92 / 5.0
Ongoing sanction / booked1.55Cr / 0.66Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score3.06 / 10
|
โ |
1.5%
4.11
CategoryDug Well Recharge
Started / Completed / Phys184 / 55 / 20
⚠ Works needing verification (Completed/Physically Completed)24 works (exp <30%)
Completion rate40.8%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked0.22Cr / 0.09Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score4.11 / 10
|
0.2%
1.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
|
87.1%
6.17
CategoryWater conservation & recharge
Started / Completed / Phys260 / 18 / 99
Completion rate45.0%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked16.33Cr / 12.80Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score6.17 / 10
|
3.0%
6.01
CategoryWatershed Related Works
Started / Completed / Phys36 / 3 / 15
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.40Cr / 0.28Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score6.01 / 10
|
2.2%
6.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.20Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score6.43 / 10
|
| 135 | SHAHPUR โ | BETUL | 5.94 | D |
10.8%
4.93
CategoryFarm Pond
Started / Completed / Phys120 / 0 / 83
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.77Cr / 0.23Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.47 / 5.0
Final score4.93 / 10
|
1.7%
2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.17Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
|
4.1%
6.21
CategoryDug Well Recharge
Started / Completed / Phys355 / 33 / 307
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score6.21 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
76.1%
6.20
CategoryWater conservation & recharge
Started / Completed / Phys225 / 19 / 115
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked8.24Cr / 5.31Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score6.20 / 10
|
0.7%
5.06
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score5.06 / 10
|
6.6%
5.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 2 / 15
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.81Cr / 0.50Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score5.51 / 10
|
| 136 | CHITRANGI โ | SINGRAULI | 5.93 | D |
33.0%
4.97
CategoryFarm Pond
Started / Completed / Phys900 / 526 / 81
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked8.56Cr / 2.74Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score4.97 / 10
|
3.1%
2.91
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.52Cr / 1.47Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score2.91 / 10
|
1.3%
5.32
CategoryDug Well Recharge
Started / Completed / Phys406 / 182 / 132
⚠ Works needing verification (Completed/Physically Completed)38 works (exp <30%)
Completion rate77.3%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.14Cr / 0.04Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score5.32 / 10
|
โ |
56.1%
6.57
CategoryWater conservation & recharge
Started / Completed / Phys563 / 60 / 349
Completion rate72.6%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked12.12Cr / 7.13Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score6.57 / 10
|
3.7%
6.81
CategoryWatershed Related Works
Started / Completed / Phys73 / 17 / 36
Completion rate72.6%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.78Cr / 0.50Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score6.81 / 10
|
2.7%
7.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 2 / 14
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.63Cr / 0.43Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score7.02 / 10
|
| 137 | NAINPUR โ | MANDLA | 5.93 | D |
59.1%
5.43
CategoryFarm Pond
Started / Completed / Phys337 / 232 / 24
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked3.79Cr / 1.24Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score5.43 / 10
|
4.3%
0.09
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.02Cr
Expenditure rate (ongoing)1.8%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
|
3.5%
4.91
CategoryDug Well Recharge
Started / Completed / Phys365 / 76 / 201
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate75.9%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked0.16Cr / 0.04Cr
Expenditure rate (ongoing)22.3%
Part B score (max 5.0)1.11 / 5.0
Final score4.91 / 10
|
3.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.8%
7.53
CategoryWater conservation & recharge
Started / Completed / Phys74 / 40 / 10
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked4.12Cr / 3.43Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.16 / 5.0
Final score7.53 / 10
|
1.2%
6.02
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score6.02 / 10
|
2.2%
6.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 1
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.23 / 10
|
| 138 | RAHATGARH โ | SAGAR | 5.91 | D |
22.0%
4.01
CategoryFarm Pond
Started / Completed / Phys237 / 150 / 0
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate63.3%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.40Cr / 0.24Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score4.01 / 10
|
5.0%
2.61
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.46Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score2.61 / 10
|
7.6%
6.16
CategoryDug Well Recharge
Started / Completed / Phys531 / 272 / 201
⚠ Works needing verification (Completed/Physically Completed)54 works (exp <30%)
Completion rate89.1%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score6.16 / 10
|
1.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
48.6%
6.40
CategoryWater conservation & recharge
Started / Completed / Phys117 / 58 / 15
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked3.73Cr / 2.45Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score6.40 / 10
|
10.6%
6.61
CategoryWatershed Related Works
Started / Completed / Phys26 / 16 / 1
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked0.60Cr / 0.40Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.61 / 10
|
4.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 139 | THANDLA โ | JHABUA | 5.91 | D |
13.2%
3.71
CategoryFarm Pond
Started / Completed / Phys243 / 13 / 49
Completion rate25.5%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked3.25Cr / 1.58Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score3.71 / 10
|
1.5%
1.90
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.19Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
|
5.9%
4.99
CategoryDug Well Recharge
Started / Completed / Phys737 / 274 / 131
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.84Cr / 0.38Cr
Expenditure rate (ongoing)44.9%
Part B score (max 5.0)2.25 / 5.0
Final score4.99 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
75.9%
6.39
CategoryWater conservation & recharge
Started / Completed / Phys212 / 11 / 101
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked12.18Cr / 9.12Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.75 / 5.0
Final score6.39 / 10
|
1.9%
6.08
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 8
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.11Cr / 0.03Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score6.08 / 10
|
1.5%
8.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 6
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.4%
Part B score (max 5.0)3.77 / 5.0
Final score8.14 / 10
|
| 140 | KHANIYADHANA โ | SHIVPURI | 5.90 | D |
35.0%
5.25
CategoryFarm Pond
Started / Completed / Phys321 / 117 / 120
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked2.47Cr / 0.77Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score5.25 / 10
|
1.6%
0.03
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
|
3.2%
4.94
CategoryDug Well Recharge
Started / Completed / Phys335 / 144 / 80
⚠ Works needing verification (Completed/Physically Completed)74 works (exp <30%)
Completion rate66.9%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.59 / 5.0
Final score4.94 / 10
|
4.0%
5.79
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 5 / 6
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score5.79 / 10
|
49.7%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys163 / 33 / 73
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked6.85Cr / 4.49Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.28 / 5.0
Final score6.53 / 10
|
4.2%
6.67
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 9
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.67 / 10
|
2.3%
6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 4 / 5
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score6.16 / 10
|
| 141 | PATAN โ | JABALPUR | 5.89 | D |
53.1%
2.54
CategoryFarm Pond
Started / Completed / Phys46 / 18 / 1
Completion rate41.3%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked0.48Cr / 0.05Cr
Expenditure rate (ongoing)9.5%
Part B score (max 5.0)0.48 / 5.0
Final score2.54 / 10
|
โ |
0.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
38.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys16 / 15 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.5%
5.64
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)46.0%
Part B score (max 5.0)2.30 / 5.0
Final score5.64 / 10
|
4.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 142 | SHAHNAGAR โ | PANNA | 5.88 | D |
30.5%
4.71
CategoryFarm Pond
Started / Completed / Phys524 / 71 / 192
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked5.12Cr / 2.25Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score4.71 / 10
|
4.0%
0.73
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.36Cr / 0.20Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.73 / 5.0
Final score0.73 / 10
|
3.4%
4.51
CategoryDug Well Recharge
Started / Completed / Phys445 / 40 / 191
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate51.9%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.53Cr / 0.20Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score4.51 / 10
|
0.3%
3.80
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
|
38.6%
6.70
CategoryWater conservation & recharge
Started / Completed / Phys307 / 17 / 161
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked5.71Cr / 4.33Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score6.70 / 10
|
7.1%
6.60
CategoryWatershed Related Works
Started / Completed / Phys48 / 7 / 23
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.17Cr / 0.81Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.60 / 10
|
16.2%
7.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 3 / 40
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked1.96Cr / 1.62Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score7.39 / 10
|
| 143 | SENDHAWA โ | BARWANI | 5.87 | D |
33.6%
4.56
CategoryFarm Pond
Started / Completed / Phys282 / 13 / 101
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate40.4%
Part A score (max 5.0)2.02 / 5.0
Ongoing sanction / booked3.10Cr / 1.57Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.53 / 5.0
Final score4.56 / 10
|
โ |
19.4%
7.38
CategoryDug Well Recharge
Started / Completed / Phys1,168 / 9 / 1,052
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.27Cr / 0.15Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score7.38 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
43.8%
6.15
CategoryWater conservation & recharge
Started / Completed / Phys207 / 14 / 111
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked2.82Cr / 1.76Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.15 / 10
|
2.0%
6.14
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 6
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score6.14 / 10
|
0.9%
7.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 6 / 5
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score7.13 / 10
|
| 144 | BIAORA โ | RAJGARH | 5.87 | D |
40.5%
5.36
CategoryFarm Pond
Started / Completed / Phys460 / 281 / 51
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked2.97Cr / 1.04Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.76 / 5.0
Final score5.36 / 10
|
1.5%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
6.89
CategoryDug Well Recharge
Started / Completed / Phys613 / 474 / 105
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate94.5%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score6.89 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
5.91
CategoryWater conservation & recharge
Started / Completed / Phys158 / 25 / 60
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked3.36Cr / 2.16Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score5.91 / 10
|
โ |
16.1%
6.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 0 / 35
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked1.35Cr / 0.72Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score6.19 / 10
|
| 145 | SAILANA โ | RATLAM | 5.87 | D |
24.0%
4.09
CategoryFarm Pond
Started / Completed / Phys210 / 100 / 22
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked1.34Cr / 0.32Cr
Expenditure rate (ongoing)23.6%
Part B score (max 5.0)1.18 / 5.0
Final score4.09 / 10
|
10.1%
1.73
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.43Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score1.73 / 10
|
7.4%
5.88
CategoryDug Well Recharge
Started / Completed / Phys345 / 67 / 240
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate89.0%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score5.88 / 10
|
โ |
53.4%
7.09
CategoryWater conservation & recharge
Started / Completed / Phys73 / 26 / 25
Completion rate69.9%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked2.26Cr / 1.63Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score7.09 / 10
|
0.2%
2.24
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score2.24 / 10
|
4.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 7 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 146 | SAGAR โ | SAGAR | 5.87 | D |
22.3%
4.49
CategoryFarm Pond
Started / Completed / Phys205 / 51 / 58
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate53.2%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked1.84Cr / 0.67Cr
Expenditure rate (ongoing)36.6%
Part B score (max 5.0)1.83 / 5.0
Final score4.49 / 10
|
โ |
7.8%
7.64
CategoryDug Well Recharge
Started / Completed / Phys542 / 155 / 339
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score7.64 / 10
|
0.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
61.3%
6.12
CategoryWater conservation & recharge
Started / Completed / Phys234 / 55 / 98
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked3.27Cr / 1.87Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.12 / 10
|
2.6%
5.93
CategoryWatershed Related Works
Started / Completed / Phys8 / 3 / 2
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.81 / 5.0
Final score5.93 / 10
|
5.6%
5.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 4 / 8
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.24Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score5.84 / 10
|
| 147 | KESLA โ | NARMADAPURAM | 5.86 | D |
28.4%
2.71
CategoryFarm Pond
Started / Completed / Phys109 / 3 / 43
Completion rate42.2%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked2.46Cr / 0.30Cr
Expenditure rate (ongoing)12.1%
Part B score (max 5.0)0.60 / 5.0
Final score2.71 / 10
|
7.8%
1.29
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.31Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score1.29 / 10
|
2.5%
5.49
CategoryDug Well Recharge
Started / Completed / Phys145 / 19 / 116
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate93.1%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.83 / 5.0
Final score5.49 / 10
|
โ |
59.7%
7.85
CategoryWater conservation & recharge
Started / Completed / Phys121 / 35 / 73
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked2.09Cr / 1.42Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score7.85 / 10
|
0.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 148 | BADOD โ | AGAR-MALWA | 5.84 | D |
26.6%
3.44
CategoryFarm Pond
Started / Completed / Phys208 / 22 / 34
Completion rate26.9%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked3.48Cr / 1.46Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score3.44 / 10
|
3.1%
4.41
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.31Cr / 0.17Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.74 / 5.0
Final score4.41 / 10
|
7.0%
5.15
CategoryDug Well Recharge
Started / Completed / Phys463 / 251 / 94
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate74.5%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.21Cr / 0.06Cr
Expenditure rate (ongoing)28.5%
Part B score (max 5.0)1.42 / 5.0
Final score5.15 / 10
|
1.1%
6.78
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score6.78 / 10
|
38.3%
6.93
CategoryWater conservation & recharge
Started / Completed / Phys156 / 9 / 103
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked2.07Cr / 1.39Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.93 / 10
|
3.0%
5.87
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 9
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.29 / 5.0
Final score5.87 / 10
|
20.9%
7.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 4 / 59
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked1.19Cr / 0.89Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score7.27 / 10
|
| 149 | ISAGARH โ | ASHOK NAGAR | 5.83 | D |
37.8%
4.90
CategoryFarm Pond
Started / Completed / Phys282 / 42 / 109
Completion rate53.5%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked4.01Cr / 1.78Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.23 / 5.0
Final score4.90 / 10
|
3.7%
1.17
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.20Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score1.17 / 10
|
1.1%
5.12
CategoryDug Well Recharge
Started / Completed / Phys102 / 73 / 6
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.25 / 5.0
Final score5.12 / 10
|
โ |
54.7%
6.84
CategoryWater conservation & recharge
Started / Completed / Phys205 / 69 / 59
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked4.32Cr / 3.21Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score6.84 / 10
|
1.3%
6.47
CategoryWatershed Related Works
Started / Completed / Phys9 / 7 / 0
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.58 / 5.0
Final score6.47 / 10
|
1.3%
4.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score4.15 / 10
|
| 150 | MEHGAON โ | BHIND | 5.83 | D |
13.9%
2.32
CategoryFarm Pond
Started / Completed / Phys298 / 57 / 31
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.89Cr / 0.49Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.84 / 5.0
Final score2.32 / 10
|
3.2%
1.08
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.21Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.08 / 5.0
Final score1.08 / 10
|
0.3%
4.58
CategoryDug Well Recharge
Started / Completed / Phys28 / 1 / 11
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score4.58 / 10
|
12.2%
5.30
CategoryIrrigation infrastructure
Started / Completed / Phys78 / 6 / 26
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.94Cr / 1.26Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score5.30 / 10
|
56.9%
6.85
CategoryWater conservation & recharge
Started / Completed / Phys183 / 10 / 127
Completion rate74.9%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked4.56Cr / 2.84Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.85 / 10
|
9.7%
7.31
CategoryWatershed Related Works
Started / Completed / Phys24 / 1 / 16
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.80Cr / 0.60Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score7.31 / 10
|
3.8%
5.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.46Cr / 0.28Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.53 / 10
|
| 151 | TIMARNI โ | HARDA | 5.83 | D |
42.1%
4.18
CategoryFarm Pond
Started / Completed / Phys139 / 15 / 81
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate69.1%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked0.69Cr / 0.10Cr
Expenditure rate (ongoing)14.6%
Part B score (max 5.0)0.73 / 5.0
Final score4.18 / 10
|
1.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
13.9%
5.96
CategoryDug Well Recharge
Started / Completed / Phys289 / 103 / 165
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate92.7%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.33 / 5.0
Final score5.96 / 10
|
1.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
26.3%
7.64
CategoryWater conservation & recharge
Started / Completed / Phys56 / 1 / 54
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score7.64 / 10
|
4.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
10.3%
6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 7 / 11
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.06 / 5.0
Final score6.56 / 10
|
| 152 | OBEDULLAHGANJ โ | RAISEN | 5.82 | D |
49.1%
5.88
CategoryFarm Pond
Started / Completed / Phys208 / 42 / 102
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked1.35Cr / 0.65Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score5.88 / 10
|
1.6%
2.87
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score2.87 / 10
|
4.1%
7.38
CategoryDug Well Recharge
Started / Completed / Phys149 / 73 / 63
Completion rate91.3%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.82 / 5.0
Final score7.38 / 10
|
1.0%
1.71
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score1.71 / 10
|
26.6%
5.58
CategoryWater conservation & recharge
Started / Completed / Phys23 / 1 / 8
Completion rate39.1%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked2.42Cr / 1.75Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score5.58 / 10
|
16.6%
6.22
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.50Cr / 1.37Cr
Expenditure rate (ongoing)91.0%
Part B score (max 5.0)4.55 / 5.0
Final score6.22 / 10
|
1.0%
5.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.25 / 10
|
| 153 | DHAR โ | DHAR | 5.80 | D |
60.3%
4.74
CategoryFarm Pond
Started / Completed / Phys138 / 2 / 76
Completion rate56.5%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked2.03Cr / 0.78Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score4.74 / 10
|
โ |
0.7%
5.73
CategoryDug Well Recharge
Started / Completed / Phys18 / 1 / 11
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score5.73 / 10
|
2.6%
5.81
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score5.81 / 10
|
23.8%
7.54
CategoryWater conservation & recharge
Started / Completed / Phys43 / 10 / 29
Completion rate90.7%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score7.54 / 10
|
12.0%
7.44
CategoryWatershed Related Works
Started / Completed / Phys25 / 4 / 17
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.23Cr / 0.15Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score7.44 / 10
|
0.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 154 | KHAKNAR โ | BURHANPUR | 5.80 | D |
48.9%
5.40
CategoryFarm Pond
Started / Completed / Phys429 / 107 / 154
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked3.51Cr / 1.65Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.35 / 5.0
Final score5.40 / 10
|
3.6%
5.50
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score5.50 / 10
|
10.9%
7.03
CategoryDug Well Recharge
Started / Completed / Phys739 / 233 / 343
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate77.9%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.40Cr / 0.25Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score7.03 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.3%
5.97
CategoryWater conservation & recharge
Started / Completed / Phys154 / 23 / 74
Completion rate63.0%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked1.57Cr / 0.88Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.82 / 5.0
Final score5.97 / 10
|
5.0%
6.20
CategoryWatershed Related Works
Started / Completed / Phys25 / 6 / 10
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score6.20 / 10
|
1.4%
5.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score5.67 / 10
|
| 155 | KHURAI โ | SAGAR | 5.80 | D |
44.5%
3.65
CategoryFarm Pond
Started / Completed / Phys253 / 99 / 23
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate48.2%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked2.32Cr / 0.57Cr
Expenditure rate (ongoing)24.7%
Part B score (max 5.0)1.24 / 5.0
Final score3.65 / 10
|
โ |
8.9%
5.80
CategoryDug Well Recharge
Started / Completed / Phys339 / 129 / 103
⚠ Works needing verification (Completed/Physically Completed)88 works (exp <30%)
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.38 / 5.0
Final score5.80 / 10
|
โ |
44.5%
7.75
CategoryWater conservation & recharge
Started / Completed / Phys115 / 68 / 30
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.50Cr / 0.35Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.75 / 10
|
0.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 156 | JAISINAGAR โ | SAGAR | 5.79 | D |
55.7%
3.86
CategoryFarm Pond
Started / Completed / Phys93 / 39 / 5
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate47.3%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked0.90Cr / 0.27Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.50 / 5.0
Final score3.86 / 10
|
โ |
18.6%
8.83
CategoryDug Well Recharge
Started / Completed / Phys383 / 261 / 32
⚠ Works needing verification (Completed/Physically Completed)90 works (exp <30%)
Completion rate76.5%
Part A score (max 5.0)3.83 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score8.83 / 10
|
โ |
22.9%
7.49
CategoryWater conservation & recharge
Started / Completed / Phys19 / 12 / 4
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score7.49 / 10
|
2.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 157 | JABERA โ | DAMOH | 5.78 | D |
16.6%
5.46
CategoryFarm Pond
Started / Completed / Phys234 / 43 / 70
Completion rate48.3%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked2.82Cr / 1.72Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.04 / 5.0
Final score5.46 / 10
|
โ |
2.8%
7.23
CategoryDug Well Recharge
Started / Completed / Phys351 / 119 / 131
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score7.23 / 10
|
โ |
51.2%
5.49
CategoryWater conservation & recharge
Started / Completed / Phys151 / 16 / 36
Completion rate34.4%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked10.48Cr / 7.89Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score5.49 / 10
|
8.5%
5.54
CategoryWatershed Related Works
Started / Completed / Phys42 / 10 / 5
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked1.74Cr / 1.31Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score5.54 / 10
|
20.9%
6.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 4 / 32
Completion rate48.0%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked3.50Cr / 2.98Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score6.66 / 10
|
| 158 | GHATIGAON โ | GWALIOR | 5.77 | D |
31.9%
4.51
CategoryFarm Pond
Started / Completed / Phys176 / 20 / 74
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.40Cr / 1.25Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score4.51 / 10
|
5.3%
1.71
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.17Cr / 0.40Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.70 / 5.0
Final score1.71 / 10
|
1.8%
5.77
CategoryDug Well Recharge
Started / Completed / Phys149 / 84 / 46
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score5.77 / 10
|
6.1%
7.06
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 2 / 4
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.76Cr / 0.66Cr
Expenditure rate (ongoing)86.7%
Part B score (max 5.0)4.34 / 5.0
Final score7.06 / 10
|
44.7%
6.89
CategoryWater conservation & recharge
Started / Completed / Phys101 / 7 / 53
Completion rate59.4%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked5.80Cr / 4.54Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score6.89 / 10
|
8.3%
6.42
CategoryWatershed Related Works
Started / Completed / Phys31 / 5 / 14
Completion rate61.3%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.92Cr / 0.62Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score6.42 / 10
|
1.9%
4.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score4.77 / 10
|
| 159 | KUSMI โ | SIDHI | 5.77 | D |
33.5%
5.07
CategoryFarm Pond
Started / Completed / Phys375 / 228 / 16
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate65.1%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked2.96Cr / 1.07Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.07 / 10
|
โ |
0.9%
4.96
CategoryDug Well Recharge
Started / Completed / Phys88 / 58 / 12
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)19.6%
Part B score (max 5.0)0.98 / 5.0
Final score4.96 / 10
|
6.7%
4.37
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 2 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked1.56Cr / 1.05Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score4.37 / 10
|
53.5%
6.21
CategoryWater conservation & recharge
Started / Completed / Phys186 / 100 / 18
Completion rate63.4%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked4.41Cr / 2.68Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.21 / 10
|
1.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.2%
6.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 12 / 1
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked0.63Cr / 0.46Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score6.91 / 10
|
| 160 | JAWAD โ | NEEMUCH | 5.75 | D |
33.0%
3.89
CategoryFarm Pond
Started / Completed / Phys198 / 3 / 92
Completion rate48.0%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked1.99Cr / 0.59Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score3.89 / 10
|
1.0%
1.58
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
|
15.9%
6.04
CategoryDug Well Recharge
Started / Completed / Phys609 / 82 / 449
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.20Cr / 0.07Cr
Expenditure rate (ongoing)33.5%
Part B score (max 5.0)1.68 / 5.0
Final score6.04 / 10
|
1.1%
6.50
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.50 / 10
|
39.8%
6.73
CategoryWater conservation & recharge
Started / Completed / Phys90 / 0 / 77
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.55Cr / 0.27Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score6.73 / 10
|
2.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
7.3%
7.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 2 / 16
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.46 / 10
|
| 161 | DEORI โ | SAGAR | 5.75 | D |
45.0%
3.85
CategoryFarm Pond
Started / Completed / Phys322 / 75 / 87
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate50.3%
Part A score (max 5.0)2.52 / 5.0
Ongoing sanction / booked3.54Cr / 0.94Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score3.85 / 10
|
โ |
6.8%
6.59
CategoryDug Well Recharge
Started / Completed / Phys422 / 174 / 177
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score6.59 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.2%
7.31
CategoryWater conservation & recharge
Started / Completed / Phys181 / 90 / 70
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.74Cr / 0.43Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.31 / 10
|
6.6%
7.30
CategoryWatershed Related Works
Started / Completed / Phys15 / 9 / 4
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score7.30 / 10
|
1.1%
8.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)87.4%
Part B score (max 5.0)4.37 / 5.0
Final score8.12 / 10
|
| 162 | UMARBAN โ | DHAR | 5.75 | D |
10.7%
5.78
CategoryFarm Pond
Started / Completed / Phys395 / 214 / 65
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.69Cr / 0.31Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score5.78 / 10
|
โ |
5.6%
4.92
CategoryDug Well Recharge
Started / Completed / Phys474 / 289 / 33
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate67.9%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.31Cr / 0.10Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.53 / 5.0
Final score4.92 / 10
|
0.5%
2.48
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score2.48 / 10
|
53.8%
6.28
CategoryWater conservation & recharge
Started / Completed / Phys124 / 22 / 34
Completion rate45.2%
Part A score (max 5.0)2.26 / 5.0
Ongoing sanction / booked6.16Cr / 4.96Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.02 / 5.0
Final score6.28 / 10
|
24.6%
4.86
CategoryWatershed Related Works
Started / Completed / Phys80 / 4 / 16
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked4.07Cr / 2.94Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score4.86 / 10
|
4.8%
5.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 5
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.70Cr / 0.52Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score5.46 / 10
|
| 163 | BHANPURA โ | MANDSAUR | 5.74 | D |
23.2%
3.90
CategoryFarm Pond
Started / Completed / Phys156 / 13 / 43
Completion rate35.9%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked1.97Cr / 0.83Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score3.90 / 10
|
โ |
8.2%
5.36
CategoryDug Well Recharge
Started / Completed / Phys458 / 311 / 112
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate92.4%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)14.9%
Part B score (max 5.0)0.75 / 5.0
Final score5.36 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
60.0%
6.16
CategoryWater conservation & recharge
Started / Completed / Phys131 / 7 / 48
Completion rate42.0%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked4.79Cr / 3.89Cr
Expenditure rate (ongoing)81.2%
Part B score (max 5.0)4.06 / 5.0
Final score6.16 / 10
|
7.4%
7.97
CategoryWatershed Related Works
Started / Completed / Phys22 / 7 / 9
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.30Cr / 0.26Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score7.97 / 10
|
0.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 164 | BIJADANDI โ | MANDLA | 5.74 | D |
35.1%
7.13
CategoryFarm Pond
Started / Completed / Phys151 / 102 / 21
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.85Cr / 0.52Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score7.13 / 10
|
18.5%
1.60
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.28Cr / 0.73Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.60 / 5.0
Final score1.60 / 10
|
2.7%
5.71
CategoryDug Well Recharge
Started / Completed / Phys131 / 37 / 80
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)25.0%
Part B score (max 5.0)1.25 / 5.0
Final score5.71 / 10
|
โ |
39.9%
6.33
CategoryWater conservation & recharge
Started / Completed / Phys60 / 21 / 9
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked3.32Cr / 2.55Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score6.33 / 10
|
3.7%
6.69
CategoryWatershed Related Works
Started / Completed / Phys15 / 10 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score6.69 / 10
|
0.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 165 | PATERA โ | DAMOH | 5.73 | D |
17.5%
5.88
CategoryFarm Pond
Started / Completed / Phys291 / 59 / 102
Completion rate55.3%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked3.05Cr / 1.90Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score5.88 / 10
|
โ |
1.7%
6.50
CategoryDug Well Recharge
Started / Completed / Phys247 / 79 / 94
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.11Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score6.50 / 10
|
0.6%
8.32
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)91.3%
Part B score (max 5.0)4.57 / 5.0
Final score8.32 / 10
|
54.3%
5.33
CategoryWater conservation & recharge
Started / Completed / Phys214 / 9 / 50
Completion rate27.6%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked17.25Cr / 13.65Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.96 / 5.0
Final score5.33 / 10
|
19.0%
6.52
CategoryWatershed Related Works
Started / Completed / Phys102 / 19 / 36
Completion rate53.9%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked3.47Cr / 2.65Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score6.52 / 10
|
6.9%
5.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 4 / 7
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.84Cr / 1.53Cr
Expenditure rate (ongoing)83.5%
Part B score (max 5.0)4.17 / 5.0
Final score5.84 / 10
|
| 166 | HOSHANGABAD โ | NARMADAPURAM | 5.73 | D |
36.5%
3.39
CategoryFarm Pond
Started / Completed / Phys49 / 24 / 1
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked0.27Cr / 0.05Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score3.39 / 10
|
โ |
12.7%
5.70
CategoryDug Well Recharge
Started / Completed / Phys119 / 86 / 2
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)40.0%
Part B score (max 5.0)2.00 / 5.0
Final score5.70 / 10
|
8.9%
7.13
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 21 / 1
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score7.13 / 10
|
28.8%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys29 / 25 / 0
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score6.53 / 10
|
1.4%
5.76
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.01 / 5.0
Final score5.76 / 10
|
11.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 167 | BERASIA โ | BHOPAL | 5.72 | D |
42.7%
4.50
CategoryFarm Pond
Started / Completed / Phys788 / 156 / 271
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked7.69Cr / 2.75Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.79 / 5.0
Final score4.50 / 10
|
3.0%
5.30
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.64Cr / 0.36Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score5.30 / 10
|
3.6%
5.67
CategoryDug Well Recharge
Started / Completed / Phys564 / 275 / 131
⚠ Works needing verification (Completed/Physically Completed)49 works (exp <30%)
Completion rate72.0%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.28Cr / 0.12Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score5.67 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.7%
6.78
CategoryWater conservation & recharge
Started / Completed / Phys402 / 90 / 191
Completion rate69.9%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked4.79Cr / 3.15Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score6.78 / 10
|
1.9%
5.80
CategoryWatershed Related Works
Started / Completed / Phys18 / 2 / 10
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.35Cr / 0.18Cr
Expenditure rate (ongoing)49.4%
Part B score (max 5.0)2.47 / 5.0
Final score5.80 / 10
|
5.9%
7.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 2 / 19
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score7.00 / 10
|
| 168 | SIHAWAL โ | SIDHI | 5.72 | D |
34.1%
4.24
CategoryFarm Pond
Started / Completed / Phys352 / 162 / 50
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked2.96Cr / 0.73Cr
Expenditure rate (ongoing)24.6%
Part B score (max 5.0)1.23 / 5.0
Final score4.24 / 10
|
โ |
1.1%
3.20
CategoryDug Well Recharge
Started / Completed / Phys95 / 18 / 16
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate35.8%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.15Cr / 0.04Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score3.20 / 10
|
2.5%
6.92
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 3 / 5
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.22Cr / 0.16Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score6.92 / 10
|
51.1%
6.45
CategoryWater conservation & recharge
Started / Completed / Phys188 / 41 / 65
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked5.93Cr / 4.31Cr
Expenditure rate (ongoing)72.6%
Part B score (max 5.0)3.63 / 5.0
Final score6.45 / 10
|
3.0%
7.66
CategoryWatershed Related Works
Started / Completed / Phys22 / 13 / 6
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score7.66 / 10
|
8.2%
6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 9 / 8
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked1.01Cr / 0.65Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score6.52 / 10
|
| 169 | SHAHGARH โ | SAGAR | 5.71 | D |
53.8%
3.25
CategoryFarm Pond
Started / Completed / Phys162 / 71 / 14
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked0.92Cr / 0.11Cr
Expenditure rate (ongoing)12.5%
Part B score (max 5.0)0.63 / 5.0
Final score3.25 / 10
|
โ |
11.7%
8.41
CategoryDug Well Recharge
Started / Completed / Phys208 / 79 / 63
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate68.3%
Part A score (max 5.0)3.41 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score8.41 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
21.9%
7.85
CategoryWater conservation & recharge
Started / Completed / Phys32 / 23 / 6
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score7.85 / 10
|
9.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 170 | RON โ | BHIND | 5.71 | D |
13.9%
2.27
CategoryFarm Pond
Started / Completed / Phys86 / 23 / 4
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate31.4%
Part A score (max 5.0)1.57 / 5.0
Ongoing sanction / booked0.78Cr / 0.11Cr
Expenditure rate (ongoing)14.1%
Part B score (max 5.0)0.70 / 5.0
Final score2.27 / 10
|
5.7%
1.95
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.21Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score1.95 / 10
|
0.2%
4.22
CategoryDug Well Recharge
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.22 / 10
|
4.9%
6.58
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.31Cr / 0.26Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score6.58 / 10
|
60.9%
6.68
CategoryWater conservation & recharge
Started / Completed / Phys58 / 21 / 19
Completion rate69.0%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked1.44Cr / 0.93Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.23 / 5.0
Final score6.68 / 10
|
7.8%
6.11
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.20Cr / 0.09Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score6.11 / 10
|
6.6%
6.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score6.13 / 10
|
| 171 | GHATIYA โ | UJJAIN | 5.70 | D |
41.3%
5.95
CategoryFarm Pond
Started / Completed / Phys68 / 29 / 34
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score5.95 / 10
|
18.7%
1.75
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.48Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.08 / 5.0
Final score1.75 / 10
|
21.4%
4.92
CategoryDug Well Recharge
Started / Completed / Phys303 / 74 / 222
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate97.7%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.7%
Part B score (max 5.0)0.04 / 5.0
Final score4.92 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys19 / 4 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 172 | NAGOD โ | SATNA | 5.68 | D |
43.1%
4.02
CategoryFarm Pond
Started / Completed / Phys363 / 81 / 133
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate59.0%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked2.83Cr / 0.61Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score4.02 / 10
|
2.5%
0.66
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)13.1%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
|
3.0%
7.01
CategoryDug Well Recharge
Started / Completed / Phys190 / 18 / 153
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score7.01 / 10
|
1.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.5%
6.55
CategoryWater conservation & recharge
Started / Completed / Phys136 / 27 / 83
Completion rate80.9%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked1.37Cr / 0.69Cr
Expenditure rate (ongoing)50.0%
Part B score (max 5.0)2.50 / 5.0
Final score6.55 / 10
|
3.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
8.5%
8.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 3 / 13
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score8.57 / 10
|
| 173 | GOGANWA โ | KHARGONE | 5.68 | D |
47.9%
4.95
CategoryFarm Pond
Started / Completed / Phys110 / 13 / 35
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate43.6%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked1.09Cr / 0.60Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score4.95 / 10
|
7.8%
4.77
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.31Cr
Expenditure rate (ongoing)95.4%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
|
16.3%
6.31
CategoryDug Well Recharge
Started / Completed / Phys260 / 58 / 195
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.3%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score6.31 / 10
|
โ |
26.2%
6.60
CategoryWater conservation & recharge
Started / Completed / Phys21 / 5 / 5
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked0.64Cr / 0.54Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score6.60 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 174 | PRITHVIPUR โ | NIWARI | 5.68 | D |
18.8%
3.96
CategoryFarm Pond
Started / Completed / Phys287 / 82 / 31
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked2.70Cr / 1.08Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score3.96 / 10
|
3.5%
4.17
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.67Cr / 0.39Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score4.17 / 10
|
4.5%
4.56
CategoryDug Well Recharge
Started / Completed / Phys456 / 148 / 97
⚠ Works needing verification (Completed/Physically Completed)46 works (exp <30%)
Completion rate53.7%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.43Cr / 0.16Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score4.56 / 10
|
โ |
31.0%
6.46
CategoryWater conservation & recharge
Started / Completed / Phys111 / 15 / 45
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked3.11Cr / 2.33Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score6.46 / 10
|
22.0%
5.56
CategoryWatershed Related Works
Started / Completed / Phys104 / 14 / 27
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked3.31Cr / 2.38Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.56 / 10
|
20.2%
6.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys76 / 9 / 32
Completion rate53.9%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked2.30Cr / 1.86Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score6.72 / 10
|
| 175 | MAUGANJ โ | REWA | 5.68 | D |
48.7%
4.88
CategoryFarm Pond
Started / Completed / Phys255 / 99 / 55
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.69Cr / 0.63Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.86 / 5.0
Final score4.88 / 10
|
โ |
1.6%
5.63
CategoryDug Well Recharge
Started / Completed / Phys61 / 15 / 17
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score5.63 / 10
|
4.4%
5.63
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.18Cr / 0.13Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score5.63 / 10
|
35.4%
6.64
CategoryWater conservation & recharge
Started / Completed / Phys70 / 24 / 24
Completion rate68.6%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.83Cr / 0.53Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.64 / 10
|
4.5%
5.76
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score5.76 / 10
|
5.5%
6.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 7 / 5
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score6.57 / 10
|
| 176 | NEEMUCH โ | NEEMUCH | 5.66 | D |
41.7%
3.80
CategoryFarm Pond
Started / Completed / Phys202 / 17 / 102
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate58.9%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked1.33Cr / 0.23Cr
Expenditure rate (ongoing)17.2%
Part B score (max 5.0)0.86 / 5.0
Final score3.80 / 10
|
4.9%
2.69
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.20Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score2.69 / 10
|
20.5%
6.24
CategoryDug Well Recharge
Started / Completed / Phys618 / 238 / 300
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.19Cr / 0.07Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score6.24 / 10
|
2.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
24.0%
7.38
CategoryWater conservation & recharge
Started / Completed / Phys49 / 3 / 41
Completion rate89.8%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.32Cr / 0.18Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.38 / 10
|
2.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 177 | BADA MALEHARA โ | CHHATARPUR | 5.64 | D |
46.2%
4.19
CategoryFarm Pond
Started / Completed / Phys284 / 154 / 36
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate66.9%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked2.50Cr / 0.42Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.85 / 5.0
Final score4.19 / 10
|
10.7%
4.50
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.36Cr / 0.77Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score4.50 / 10
|
5.3%
5.04
CategoryDug Well Recharge
Started / Completed / Phys698 / 623 / 23
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)8.3%
Part B score (max 5.0)0.42 / 5.0
Final score5.04 / 10
|
1.1%
7.03
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score7.03 / 10
|
27.5%
7.64
CategoryWater conservation & recharge
Started / Completed / Phys145 / 61 / 77
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.42Cr / 0.24Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.88 / 5.0
Final score7.64 / 10
|
4.7%
10.00
CategoryWatershed Related Works
Started / Completed / Phys29 / 17 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
4.5%
6.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 9
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score6.84 / 10
|
| 178 | MORAR โ | GWALIOR | 5.64 | D |
44.5%
3.69
CategoryFarm Pond
Started / Completed / Phys236 / 32 / 117
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate63.1%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.50Cr / 0.16Cr
Expenditure rate (ongoing)10.6%
Part B score (max 5.0)0.53 / 5.0
Final score3.69 / 10
|
1.7%
10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.5%
5.07
CategoryDug Well Recharge
Started / Completed / Phys238 / 35 / 165
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score5.07 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
40.2%
6.82
CategoryWater conservation & recharge
Started / Completed / Phys47 / 13 / 26
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked2.12Cr / 1.13Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score6.82 / 10
|
5.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 179 | MORENA โ | MORENA | 5.64 | D |
5.3%
5.07
CategoryFarm Pond
Started / Completed / Phys198 / 87 / 15
Completion rate51.5%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked1.60Cr / 0.80Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score5.07 / 10
|
1.1%
2.89
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.40Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score2.89 / 10
|
0.6%
3.34
CategoryDug Well Recharge
Started / Completed / Phys146 / 52 / 1
Completion rate36.3%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.24Cr / 0.07Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score3.34 / 10
|
1.3%
4.89
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.74Cr / 0.60Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.06 / 5.0
Final score4.89 / 10
|
87.4%
5.74
CategoryWater conservation & recharge
Started / Completed / Phys405 / 7 / 133
Completion rate34.6%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked37.53Cr / 30.13Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score5.74 / 10
|
4.2%
5.48
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 7
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked1.80Cr / 1.32Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score5.48 / 10
|
0.2%
3.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
|
| 180 | BETUL โ | BETUL | 5.63 | D |
29.8%
5.39
CategoryFarm Pond
Started / Completed / Phys145 / 0 / 80
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked1.76Cr / 0.93Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score5.39 / 10
|
6.5%
3.34
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.77Cr / 0.52Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
|
7.6%
7.19
CategoryDug Well Recharge
Started / Completed / Phys348 / 5 / 321
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score7.19 / 10
|
0.2%
4.82
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.32 / 5.0
Final score4.82 / 10
|
36.3%
5.85
CategoryWater conservation & recharge
Started / Completed / Phys87 / 2 / 43
Completion rate51.7%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked2.17Cr / 1.42Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.85 / 10
|
11.7%
5.24
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 6
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.91Cr / 0.55Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.04 / 5.0
Final score5.24 / 10
|
7.9%
6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.56 / 10
|
| 181 | BADARWAS โ | SHIVPURI | 5.63 | D |
39.3%
4.68
CategoryFarm Pond
Started / Completed / Phys237 / 75 / 84
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate67.1%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked2.89Cr / 0.77Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score4.68 / 10
|
โ |
2.1%
5.12
CategoryDug Well Recharge
Started / Completed / Phys181 / 48 / 95
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.08Cr / 0.02Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score5.12 / 10
|
0.8%
3.36
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.12Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
|
44.3%
6.48
CategoryWater conservation & recharge
Started / Completed / Phys132 / 6 / 73
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked4.36Cr / 3.04Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score6.48 / 10
|
7.9%
6.10
CategoryWatershed Related Works
Started / Completed / Phys35 / 6 / 11
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.96Cr / 0.71Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score6.10 / 10
|
5.6%
5.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 5 / 7
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.35Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score5.41 / 10
|
| 182 | JAWA โ | REWA | 5.63 | D |
42.3%
4.13
CategoryFarm Pond
Started / Completed / Phys227 / 91 / 61
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked1.89Cr / 0.30Cr
Expenditure rate (ongoing)15.6%
Part B score (max 5.0)0.78 / 5.0
Final score4.13 / 10
|
โ |
0.7%
5.72
CategoryDug Well Recharge
Started / Completed / Phys35 / 21 / 12
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score5.72 / 10
|
0.3%
6.80
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.80 / 10
|
41.5%
7.26
CategoryWater conservation & recharge
Started / Completed / Phys84 / 29 / 36
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked2.26Cr / 1.53Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score7.26 / 10
|
6.2%
6.05
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 12
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.16Cr / 0.08Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score6.05 / 10
|
9.1%
4.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 2 / 6
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked0.54Cr / 0.27Cr
Expenditure rate (ongoing)50.4%
Part B score (max 5.0)2.52 / 5.0
Final score4.87 / 10
|
| 183 | CHANDERI โ | ASHOK NAGAR | 5.62 | D |
44.2%
4.79
CategoryFarm Pond
Started / Completed / Phys243 / 24 / 106
Completion rate53.5%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked2.84Cr / 1.20Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.79 / 10
|
โ |
1.6%
7.11
CategoryDug Well Recharge
Started / Completed / Phys100 / 45 / 38
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score7.11 / 10
|
0.5%
4.41
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score4.41 / 10
|
35.1%
5.78
CategoryWater conservation & recharge
Started / Completed / Phys151 / 11 / 59
Completion rate46.4%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked2.58Cr / 1.79Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score5.78 / 10
|
12.2%
8.07
CategoryWatershed Related Works
Started / Completed / Phys13 / 3 / 6
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.47Cr / 0.44Cr
Expenditure rate (ongoing)92.2%
Part B score (max 5.0)4.61 / 5.0
Final score8.07 / 10
|
6.4%
5.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 4
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.62Cr / 0.47Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score5.60 / 10
|
| 184 | BUXWAHA โ | CHHATARPUR | 5.62 | D |
40.2%
4.89
CategoryFarm Pond
Started / Completed / Phys153 / 48 / 47
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.1%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked2.32Cr / 0.83Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score4.89 / 10
|
4.5%
5.04
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.45Cr / 0.34Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score5.04 / 10
|
5.6%
5.60
CategoryDug Well Recharge
Started / Completed / Phys356 / 195 / 119
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score5.60 / 10
|
โ |
41.4%
6.29
CategoryWater conservation & recharge
Started / Completed / Phys96 / 14 / 44
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked3.54Cr / 2.31Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score6.29 / 10
|
2.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.8%
4.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 4
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.65Cr / 0.32Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.48 / 5.0
Final score4.48 / 10
|
| 185 | MANDLA โ | MANDLA | 5.62 | D |
54.8%
5.57
CategoryFarm Pond
Started / Completed / Phys288 / 149 / 14
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked5.48Cr / 3.00Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score5.57 / 10
|
โ |
2.6%
4.66
CategoryDug Well Recharge
Started / Completed / Phys235 / 74 / 63
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score4.66 / 10
|
11.9%
4.70
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 4 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.86Cr / 0.82Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score4.70 / 10
|
23.8%
6.16
CategoryWater conservation & recharge
Started / Completed / Phys102 / 38 / 11
Completion rate48.0%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked3.68Cr / 2.76Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score6.16 / 10
|
5.0%
6.85
CategoryWatershed Related Works
Started / Completed / Phys31 / 11 / 8
Completion rate61.3%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.49Cr / 0.37Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score6.85 / 10
|
1.8%
4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.37Cr / 0.21Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score4.22 / 10
|
| 186 | KURAI โ | SEONI | 5.59 | D |
42.0%
4.42
CategoryFarm Pond
Started / Completed / Phys260 / 33 / 135
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked3.41Cr / 0.81Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score4.42 / 10
|
4.9%
1.22
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.29Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score1.22 / 10
|
2.5%
6.01
CategoryDug Well Recharge
Started / Completed / Phys240 / 23 / 181
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.76 / 5.0
Final score6.01 / 10
|
โ |
37.9%
7.27
CategoryWater conservation & recharge
Started / Completed / Phys152 / 18 / 102
Completion rate78.9%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked2.40Cr / 1.60Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score7.27 / 10
|
9.8%
6.06
CategoryWatershed Related Works
Started / Completed / Phys47 / 5 / 27
Completion rate68.1%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.79Cr / 0.42Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.65 / 5.0
Final score6.06 / 10
|
2.9%
5.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 2 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.61 / 5.0
Final score5.94 / 10
|
| 187 | RAJNAGAR โ | CHHATARPUR | 5.59 | D |
46.6%
4.57
CategoryFarm Pond
Started / Completed / Phys288 / 70 / 98
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked4.85Cr / 1.60Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score4.57 / 10
|
2.7%
3.54
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.50Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score3.54 / 10
|
2.9%
5.26
CategoryDug Well Recharge
Started / Completed / Phys574 / 460 / 41
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate87.3%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score5.26 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
33.1%
6.37
CategoryWater conservation & recharge
Started / Completed / Phys160 / 11 / 85
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked3.36Cr / 2.27Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score6.37 / 10
|
7.9%
7.46
CategoryWatershed Related Works
Started / Completed / Phys33 / 6 / 25
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.77 / 5.0
Final score7.46 / 10
|
6.1%
7.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 14
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.50Cr / 0.37Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score7.28 / 10
|
| 188 | MALTHONE โ | SAGAR | 5.58 | D |
39.2%
3.22
CategoryFarm Pond
Started / Completed / Phys179 / 34 / 34
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate38.0%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked2.11Cr / 0.56Cr
Expenditure rate (ongoing)26.3%
Part B score (max 5.0)1.32 / 5.0
Final score3.22 / 10
|
โ |
8.2%
4.72
CategoryDug Well Recharge
Started / Completed / Phys288 / 145 / 74
⚠ Works needing verification (Completed/Physically Completed)48 works (exp <30%)
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)18.3%
Part B score (max 5.0)0.91 / 5.0
Final score4.72 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
48.1%
7.22
CategoryWater conservation & recharge
Started / Completed / Phys102 / 31 / 50
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.79Cr / 0.51Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score7.22 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 189 | VIJAYRAGHAVGADH โ | KATNI | 5.57 | D |
44.3%
4.19
CategoryFarm Pond
Started / Completed / Phys243 / 50 / 85
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked2.01Cr / 0.57Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score4.19 / 10
|
โ |
9.3%
5.44
CategoryDug Well Recharge
Started / Completed / Phys386 / 142 / 143
⚠ Works needing verification (Completed/Physically Completed)41 works (exp <30%)
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked0.16Cr / 0.05Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score5.44 / 10
|
5.1%
6.71
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 7 / 1
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score6.71 / 10
|
15.5%
7.02
CategoryWater conservation & recharge
Started / Completed / Phys36 / 13 / 19
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score7.02 / 10
|
15.1%
5.86
CategoryWatershed Related Works
Started / Completed / Phys40 / 22 / 7
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.45Cr / 0.20Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score5.86 / 10
|
10.8%
8.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 10
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score8.34 / 10
|
| 190 | NALKHEDA โ | AGAR-MALWA | 5.57 | D |
29.1%
4.31
CategoryFarm Pond
Started / Completed / Phys125 / 2 / 45
Completion rate37.6%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked2.08Cr / 1.01Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.43 / 5.0
Final score4.31 / 10
|
โ |
10.9%
7.05
CategoryDug Well Recharge
Started / Completed / Phys464 / 100 / 233
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.34Cr / 0.23Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score7.05 / 10
|
โ |
52.3%
5.94
CategoryWater conservation & recharge
Started / Completed / Phys80 / 1 / 31
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked3.41Cr / 2.69Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.94 / 10
|
0.9%
3.51
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
|
6.8%
5.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 2 / 11
Completion rate56.5%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score5.94 / 10
|
| 191 | LAHAR โ | BHIND | 5.57 | D |
22.9%
2.70
CategoryFarm Pond
Started / Completed / Phys134 / 32 / 23
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.24Cr / 0.16Cr
Expenditure rate (ongoing)13.0%
Part B score (max 5.0)0.65 / 5.0
Final score2.70 / 10
|
2.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.4%
7.46
CategoryDug Well Recharge
Started / Completed / Phys15 / 0 / 11
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score7.46 / 10
|
4.8%
5.17
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.10Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score5.17 / 10
|
59.5%
6.67
CategoryWater conservation & recharge
Started / Completed / Phys58 / 4 / 37
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked1.52Cr / 0.95Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.14 / 5.0
Final score6.67 / 10
|
4.2%
4.13
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.27Cr / 0.13Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.47 / 5.0
Final score4.13 / 10
|
5.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 192 | SUSNER โ | AGAR-MALWA | 5.56 | D |
23.9%
5.02
CategoryFarm Pond
Started / Completed / Phys208 / 62 / 63
Completion rate60.1%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.28Cr / 0.52Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score5.02 / 10
|
1.3%
3.42
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
|
9.9%
6.10
CategoryDug Well Recharge
Started / Completed / Phys508 / 186 / 252
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.14Cr / 0.05Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.10 / 10
|
0.6%
2.73
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score2.73 / 10
|
59.0%
5.68
CategoryWater conservation & recharge
Started / Completed / Phys146 / 35 / 42
Completion rate52.7%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked4.76Cr / 2.90Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score5.68 / 10
|
0.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.0%
6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 16
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.9%
Part B score (max 5.0)2.59 / 5.0
Final score6.40 / 10
|
| 193 | BIJAWAR โ | CHHATARPUR | 5.56 | D |
40.5%
4.30
CategoryFarm Pond
Started / Completed / Phys209 / 64 / 59
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate58.9%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked2.23Cr / 0.61Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score4.30 / 10
|
3.5%
3.82
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.35Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score3.82 / 10
|
4.4%
4.76
CategoryDug Well Recharge
Started / Completed / Phys417 / 300 / 32
⚠ Works needing verification (Completed/Physically Completed)34 works (exp <30%)
Completion rate79.6%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.07Cr / 0.01Cr
Expenditure rate (ongoing)15.6%
Part B score (max 5.0)0.78 / 5.0
Final score4.76 / 10
|
โ |
48.7%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys147 / 23 / 90
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked1.76Cr / 0.94Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score6.53 / 10
|
1.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 194 | BALAGHAT โ | BALAGHAT | 5.56 | D |
58.9%
5.11
CategoryFarm Pond
Started / Completed / Phys357 / 151 / 67
Completion rate61.1%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked3.34Cr / 1.37Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.05 / 5.0
Final score5.11 / 10
|
3.0%
0.36
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.04Cr
Expenditure rate (ongoing)7.2%
Part B score (max 5.0)0.36 / 5.0
Final score0.36 / 10
|
2.0%
7.25
CategoryDug Well Recharge
Started / Completed / Phys137 / 71 / 53
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score7.25 / 10
|
โ |
32.5%
6.68
CategoryWater conservation & recharge
Started / Completed / Phys75 / 16 / 29
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked3.61Cr / 2.65Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.68 / 10
|
2.2%
5.67
CategoryWatershed Related Works
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.67 / 10
|
1.4%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.96 / 10
|
| 195 | BADWARA โ | KATNI | 5.55 | D |
33.7%
4.16
CategoryFarm Pond
Started / Completed / Phys297 / 73 / 92
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked1.92Cr / 0.53Cr
Expenditure rate (ongoing)27.6%
Part B score (max 5.0)1.38 / 5.0
Final score4.16 / 10
|
7.5%
2.03
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.98Cr / 0.40Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score2.03 / 10
|
6.2%
4.68
CategoryDug Well Recharge
Started / Completed / Phys310 / 70 / 126
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked0.24Cr / 0.07Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.52 / 5.0
Final score4.68 / 10
|
โ |
20.4%
7.69
CategoryWater conservation & recharge
Started / Completed / Phys52 / 3 / 36
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.74Cr / 0.58Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score7.69 / 10
|
24.4%
7.10
CategoryWatershed Related Works
Started / Completed / Phys41 / 16 / 19
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.45Cr / 0.25Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score7.10 / 10
|
8.0%
5.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 6
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.47Cr / 0.23Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score5.17 / 10
|
| 196 | GOTEGAON โ | NARSINGHPUR | 5.53 | D |
81.9%
4.88
CategoryFarm Pond
Started / Completed / Phys248 / 181 / 15
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked1.46Cr / 0.27Cr
Expenditure rate (ongoing)18.6%
Part B score (max 5.0)0.93 / 5.0
Final score4.88 / 10
|
โ |
1.3%
4.64
CategoryDug Well Recharge
Started / Completed / Phys44 / 37 / 1
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)6.4%
Part B score (max 5.0)0.32 / 5.0
Final score4.64 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.9%
8.62
CategoryWater conservation & recharge
Started / Completed / Phys18 / 8 / 9
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score8.62 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 197 | SABALGARH โ | MORENA | 5.53 | D |
28.6%
4.81
CategoryFarm Pond
Started / Completed / Phys545 / 188 / 55
Completion rate44.6%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked13.14Cr / 6.78Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score4.81 / 10
|
0.3%
1.86
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
|
0.3%
4.15
CategoryDug Well Recharge
Started / Completed / Phys108 / 58 / 12
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)18.2%
Part B score (max 5.0)0.91 / 5.0
Final score4.15 / 10
|
1.1%
5.31
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.62Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score5.31 / 10
|
65.2%
5.87
CategoryWater conservation & recharge
Started / Completed / Phys380 / 4 / 166
Completion rate44.7%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked28.94Cr / 21.06Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score5.87 / 10
|
1.1%
6.84
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.44Cr / 0.31Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score6.84 / 10
|
3.5%
5.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 4
Completion rate21.1%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked2.19Cr / 1.80Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.10 / 5.0
Final score5.16 / 10
|
| 198 | ALOT โ | RATLAM | 5.53 | D |
46.6%
4.29
CategoryFarm Pond
Started / Completed / Phys311 / 97 / 69
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.01Cr / 0.98Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score4.29 / 10
|
โ |
21.9%
6.08
CategoryDug Well Recharge
Started / Completed / Phys1,067 / 359 / 406
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate71.7%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.61Cr / 0.31Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.50 / 5.0
Final score6.08 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.3%
6.85
CategoryWater conservation & recharge
Started / Completed / Phys105 / 60 / 28
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.79Cr / 0.42Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score6.85 / 10
|
0.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 199 | BICHHUA โ | CHHINDWARA | 5.53 | D |
20.8%
6.55
CategoryFarm Pond
Started / Completed / Phys144 / 3 / 125
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.31Cr / 0.13Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.11 / 5.0
Final score6.55 / 10
|
12.4%
1.05
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 0.33Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score1.05 / 10
|
6.3%
4.88
CategoryDug Well Recharge
Started / Completed / Phys306 / 8 / 285
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)1.9%
Part B score (max 5.0)0.10 / 5.0
Final score4.88 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
42.5%
6.24
CategoryWater conservation & recharge
Started / Completed / Phys41 / 2 / 17
Completion rate46.3%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked2.53Cr / 1.99Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score6.24 / 10
|
16.0%
5.65
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 9
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked1.32Cr / 1.02Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score5.65 / 10
|
0.7%
5.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score5.87 / 10
|
| 200 | ANUPPUR โ | ANUPPUR | 5.51 | D |
75.2%
4.86
CategoryFarm Pond
Started / Completed / Phys596 / 378 / 59
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked3.44Cr / 0.82Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.19 / 5.0
Final score4.86 / 10
|
โ |
1.6%
6.06
CategoryDug Well Recharge
Started / Completed / Phys108 / 15 / 58
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score6.06 / 10
|
โ |
20.3%
7.42
CategoryWater conservation & recharge
Started / Completed / Phys78 / 30 / 39
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.74Cr / 0.44Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score7.42 / 10
|
โ |
2.8%
8.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score8.68 / 10
|
| 201 | NATERAN โ | VIDISHA | 5.50 | D |
54.3%
4.89
CategoryFarm Pond
Started / Completed / Phys320 / 132 / 73
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate64.1%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked3.36Cr / 1.13Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.68 / 5.0
Final score4.89 / 10
|
2.2%
1.58
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.12Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
|
7.1%
5.87
CategoryDug Well Recharge
Started / Completed / Phys484 / 67 / 347
⚠ Works needing verification (Completed/Physically Completed)47 works (exp <30%)
Completion rate85.5%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score5.87 / 10
|
0.4%
5.89
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 2
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score5.89 / 10
|
35.3%
6.59
CategoryWater conservation & recharge
Started / Completed / Phys144 / 53 / 51
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked1.90Cr / 1.13Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score6.59 / 10
|
0.4%
4.77
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)95.4%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
|
0.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 202 | BADNAWAR โ | DHAR | 5.49 | D |
22.9%
4.99
CategoryFarm Pond
Started / Completed / Phys316 / 25 / 120
Completion rate45.9%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked4.50Cr / 2.43Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.70 / 5.0
Final score4.99 / 10
|
0.8%
2.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
|
5.2%
5.93
CategoryDug Well Recharge
Started / Completed / Phys602 / 192 / 84
Completion rate45.8%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked0.84Cr / 0.61Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score5.93 / 10
|
2.3%
4.80
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.61Cr / 0.50Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score4.80 / 10
|
57.8%
5.63
CategoryWater conservation & recharge
Started / Completed / Phys202 / 4 / 40
Completion rate21.8%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked15.04Cr / 13.66Cr
Expenditure rate (ongoing)90.8%
Part B score (max 5.0)4.54 / 5.0
Final score5.63 / 10
|
10.6%
5.95
CategoryWatershed Related Works
Started / Completed / Phys60 / 2 / 20
Completion rate36.7%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked2.32Cr / 1.91Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score5.95 / 10
|
0.3%
7.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.05Cr
Expenditure rate (ongoing)99.7%
Part B score (max 5.0)4.99 / 5.0
Final score7.49 / 10
|
| 203 | BHITARWAR โ | GWALIOR | 5.49 | D |
40.9%
3.61
CategoryFarm Pond
Started / Completed / Phys257 / 28 / 99
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked3.83Cr / 0.87Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.14 / 5.0
Final score3.61 / 10
|
3.8%
0.81
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.11Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score0.81 / 10
|
3.8%
5.26
CategoryDug Well Recharge
Started / Completed / Phys265 / 57 / 162
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate82.6%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.11Cr / 0.02Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.13 / 5.0
Final score5.26 / 10
|
8.0%
7.92
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 2 / 12
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.24Cr / 0.17Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score7.92 / 10
|
32.5%
6.93
CategoryWater conservation & recharge
Started / Completed / Phys94 / 20 / 53
Completion rate77.7%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.85Cr / 0.52Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score6.93 / 10
|
5.6%
7.56
CategoryWatershed Related Works
Started / Completed / Phys13 / 2 / 10
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score7.56 / 10
|
5.4%
8.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 3 / 8
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.11Cr / 0.09Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score8.75 / 10
|
| 204 | VIDISHA โ | VIDISHA | 5.48 | D |
58.4%
4.27
CategoryFarm Pond
Started / Completed / Phys271 / 172 / 12
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate67.9%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked1.89Cr / 0.33Cr
Expenditure rate (ongoing)17.5%
Part B score (max 5.0)0.87 / 5.0
Final score4.27 / 10
|
3.7%
1.09
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.09Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.09 / 5.0
Final score1.09 / 10
|
4.0%
4.50
CategoryDug Well Recharge
Started / Completed / Phys164 / 93 / 53
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate89.0%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.50 / 10
|
โ |
29.9%
7.93
CategoryWater conservation & recharge
Started / Completed / Phys76 / 50 / 19
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked1.49Cr / 1.01Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score7.93 / 10
|
1.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 205 | CHICHOLI โ | BETUL | 5.48 | D |
27.6%
3.71
CategoryFarm Pond
Started / Completed / Phys137 / 0 / 41
Completion rate29.9%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked2.53Cr / 1.12Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score3.71 / 10
|
9.3%
2.27
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.55Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score2.27 / 10
|
8.2%
6.40
CategoryDug Well Recharge
Started / Completed / Phys411 / 57 / 237
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate71.5%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.82 / 5.0
Final score6.40 / 10
|
โ |
37.5%
6.83
CategoryWater conservation & recharge
Started / Completed / Phys103 / 14 / 51
Completion rate63.1%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked2.03Cr / 1.49Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.83 / 10
|
12.5%
7.01
CategoryWatershed Related Works
Started / Completed / Phys37 / 1 / 25
Completion rate70.3%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked0.47Cr / 0.33Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score7.01 / 10
|
4.8%
5.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 9
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked0.26Cr / 0.18Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.39 / 5.0
Final score5.77 / 10
|
| 206 | TONK KHURD โ | DEWAS | 5.48 | D |
41.9%
4.59
CategoryFarm Pond
Started / Completed / Phys95 / 18 / 33
Completion rate53.7%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked1.44Cr / 0.55Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score4.59 / 10
|
3.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
13.7%
6.29
CategoryDug Well Recharge
Started / Completed / Phys395 / 75 / 207
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.29Cr / 0.16Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score6.29 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
32.5%
6.53
CategoryWater conservation & recharge
Started / Completed / Phys77 / 6 / 44
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked0.70Cr / 0.46Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score6.53 / 10
|
5.6%
4.86
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 2
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.19Cr / 0.08Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.01 / 5.0
Final score4.86 / 10
|
2.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 207 | BICHHIYA โ | MANDLA | 5.46 | D |
36.7%
5.78
CategoryFarm Pond
Started / Completed / Phys346 / 207 / 4
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked5.70Cr / 3.11Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score5.78 / 10
|
4.1%
3.79
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 1.21Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
|
2.0%
5.14
CategoryDug Well Recharge
Started / Completed / Phys292 / 90 / 80
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked0.31Cr / 0.14Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.23 / 5.0
Final score5.14 / 10
|
11.0%
4.06
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 1
Completion rate13.3%
Part A score (max 5.0)0.67 / 5.0
Ongoing sanction / booked4.25Cr / 2.89Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score4.06 / 10
|
39.1%
5.74
CategoryWater conservation & recharge
Started / Completed / Phys269 / 97 / 12
Completion rate40.5%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked10.06Cr / 7.47Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score5.74 / 10
|
2.9%
6.38
CategoryWatershed Related Works
Started / Completed / Phys24 / 12 / 1
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked0.55Cr / 0.40Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score6.38 / 10
|
4.3%
4.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 5 / 0
Completion rate29.4%
Part A score (max 5.0)1.47 / 5.0
Ongoing sanction / booked1.02Cr / 0.69Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score4.85 / 10
|
| 208 | GUNOR โ | PANNA | 5.45 | D |
38.0%
4.12
CategoryFarm Pond
Started / Completed / Phys449 / 106 / 103
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate46.5%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked4.08Cr / 1.47Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.80 / 5.0
Final score4.12 / 10
|
โ |
3.4%
4.14
CategoryDug Well Recharge
Started / Completed / Phys274 / 102 / 31
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.36Cr / 0.12Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score4.14 / 10
|
0.5%
3.32
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.32 / 10
|
40.9%
6.32
CategoryWater conservation & recharge
Started / Completed / Phys200 / 20 / 102
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked3.12Cr / 2.04Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.32 / 10
|
5.0%
6.22
CategoryWatershed Related Works
Started / Completed / Phys21 / 4 / 9
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.44Cr / 0.28Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.22 / 10
|
12.2%
6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys34 / 4 / 19
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.77Cr / 0.52Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score6.79 / 10
|
| 209 | MEGHNAGAR โ | JHABUA | 5.45 | D |
11.1%
4.32
CategoryFarm Pond
Started / Completed / Phys192 / 11 / 60
Completion rate37.0%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked1.99Cr / 0.98Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score4.32 / 10
|
2.2%
3.82
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.48Cr / 0.21Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score3.82 / 10
|
5.1%
6.65
CategoryDug Well Recharge
Started / Completed / Phys653 / 34 / 447
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate73.7%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.44Cr / 0.26Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.97 / 5.0
Final score6.65 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
80.3%
5.49
CategoryWater conservation & recharge
Started / Completed / Phys233 / 10 / 75
Completion rate36.5%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked15.76Cr / 11.57Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.49 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.7%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 210 | PRABHAT PATTAN โ | BETUL | 5.44 | D |
29.2%
4.73
CategoryFarm Pond
Started / Completed / Phys196 / 10 / 80
Completion rate45.9%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked3.02Cr / 1.47Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.44 / 5.0
Final score4.73 / 10
|
1.6%
0.38
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.02Cr
Expenditure rate (ongoing)7.6%
Part B score (max 5.0)0.38 / 5.0
Final score0.38 / 10
|
7.9%
6.18
CategoryDug Well Recharge
Started / Completed / Phys538 / 91 / 390
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.15Cr / 0.05Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score6.18 / 10
|
โ |
57.2%
5.83
CategoryWater conservation & recharge
Started / Completed / Phys144 / 8 / 64
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked5.12Cr / 3.41Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score5.83 / 10
|
1.8%
5.36
CategoryWatershed Related Works
Started / Completed / Phys8 / 2 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.11Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
|
2.2%
5.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 2
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score5.69 / 10
|
| 211 | PALERA โ | TIKAMGARH | 5.44 | D |
16.3%
4.00
CategoryFarm Pond
Started / Completed / Phys232 / 30 / 53
Completion rate35.8%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked2.25Cr / 0.99Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.21 / 5.0
Final score4.00 / 10
|
2.1%
0.88
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.45Cr / 0.08Cr
Expenditure rate (ongoing)17.6%
Part B score (max 5.0)0.88 / 5.0
Final score0.88 / 10
|
7.0%
6.76
CategoryDug Well Recharge
Started / Completed / Phys585 / 179 / 319
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.20Cr / 0.10Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score6.76 / 10
|
0.2%
5.97
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score5.97 / 10
|
61.0%
5.72
CategoryWater conservation & recharge
Started / Completed / Phys279 / 32 / 61
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked8.98Cr / 7.28Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.05 / 5.0
Final score5.72 / 10
|
3.7%
7.28
CategoryWatershed Related Works
Started / Completed / Phys21 / 4 / 10
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.23Cr / 0.18Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score7.28 / 10
|
9.7%
5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 1 / 9
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.53Cr / 1.21Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score5.38 / 10
|
| 212 | MAIHAR โ | SATNA | 5.43 | D |
48.1%
4.37
CategoryFarm Pond
Started / Completed / Phys328 / 35 / 148
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked3.91Cr / 1.24Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score4.37 / 10
|
3.7%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.5%
7.05
CategoryDug Well Recharge
Started / Completed / Phys155 / 73 / 50
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.09 / 5.0
Final score7.05 / 10
|
0.1%
8.33
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score8.33 / 10
|
30.6%
7.36
CategoryWater conservation & recharge
Started / Completed / Phys87 / 18 / 43
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked2.36Cr / 1.82Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score7.36 / 10
|
6.6%
6.73
CategoryWatershed Related Works
Started / Completed / Phys56 / 11 / 29
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.32Cr / 0.20Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.16 / 5.0
Final score6.73 / 10
|
9.4%
5.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 9 / 11
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.85Cr / 0.52Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score5.57 / 10
|
| 213 | KATANGI โ | BALAGHAT | 5.43 | D |
62.4%
4.86
CategoryFarm Pond
Started / Completed / Phys462 / 75 / 205
Completion rate60.6%
Part A score (max 5.0)3.03 / 5.0
Ongoing sanction / booked4.25Cr / 1.56Cr
Expenditure rate (ongoing)36.7%
Part B score (max 5.0)1.83 / 5.0
Final score4.86 / 10
|
2.3%
1.88
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.18Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score1.88 / 10
|
1.9%
5.50
CategoryDug Well Recharge
Started / Completed / Phys148 / 41 / 88
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score5.50 / 10
|
0.5%
6.90
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score6.90 / 10
|
32.3%
6.76
CategoryWater conservation & recharge
Started / Completed / Phys146 / 6 / 82
Completion rate60.3%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked3.19Cr / 2.39Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score6.76 / 10
|
0.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.5%
4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
|
| 214 | PANNA โ | PANNA | 5.43 | D |
42.9%
4.98
CategoryFarm Pond
Started / Completed / Phys327 / 55 / 146
Completion rate61.5%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked2.41Cr / 0.92Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score4.98 / 10
|
3.7%
1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.13Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
|
5.4%
4.11
CategoryDug Well Recharge
Started / Completed / Phys328 / 71 / 58
Completion rate39.3%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked0.52Cr / 0.22Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score4.11 / 10
|
0.4%
5.98
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 4
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score5.98 / 10
|
26.6%
5.72
CategoryWater conservation & recharge
Started / Completed / Phys114 / 7 / 50
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked2.17Cr / 1.40Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score5.72 / 10
|
9.2%
7.56
CategoryWatershed Related Works
Started / Completed / Phys47 / 3 / 34
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.32Cr / 0.24Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score7.56 / 10
|
11.7%
6.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 12
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.66Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score6.69 / 10
|
| 215 | PHANDA โ | BHOPAL | 5.43 | D |
45.5%
4.30
CategoryFarm Pond
Started / Completed / Phys157 / 66 / 6
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate45.9%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked1.73Cr / 0.69Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score4.30 / 10
|
2.9%
2.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score2.09 / 10
|
5.4%
6.34
CategoryDug Well Recharge
Started / Completed / Phys127 / 52 / 35
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score6.34 / 10
|
โ |
32.7%
6.92
CategoryWater conservation & recharge
Started / Completed / Phys49 / 28 / 12
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.40Cr / 0.22Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score6.92 / 10
|
11.2%
6.26
CategoryWatershed Related Works
Started / Completed / Phys17 / 7 / 7
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.14 / 5.0
Final score6.26 / 10
|
2.4%
4.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score4.51 / 10
|
| 216 | MULTAI โ | BETUL | 5.42 | D |
41.0%
4.76
CategoryFarm Pond
Started / Completed / Phys153 / 4 / 72
Completion rate49.7%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked2.94Cr / 1.34Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.28 / 5.0
Final score4.76 / 10
|
5.3%
1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.16Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
|
8.5%
5.69
CategoryDug Well Recharge
Started / Completed / Phys461 / 150 / 289
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)18.6%
Part B score (max 5.0)0.93 / 5.0
Final score5.69 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
38.9%
6.37
CategoryWater conservation & recharge
Started / Completed / Phys142 / 16 / 77
Completion rate65.5%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked2.43Cr / 1.50Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score6.37 / 10
|
3.4%
7.49
CategoryWatershed Related Works
Started / Completed / Phys18 / 2 / 15
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score7.49 / 10
|
2.9%
6.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 10
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score6.65 / 10
|
| 217 | DATIA โ | DATIA | 5.42 | D |
35.8%
3.24
CategoryFarm Pond
Started / Completed / Phys406 / 78 / 80
Completion rate38.9%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked5.09Cr / 1.32Cr
Expenditure rate (ongoing)26.0%
Part B score (max 5.0)1.30 / 5.0
Final score3.24 / 10
|
โ |
3.3%
5.44
CategoryDug Well Recharge
Started / Completed / Phys297 / 50 / 171
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.19Cr / 0.07Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score5.44 / 10
|
1.9%
8.70
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 9 / 8
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score8.70 / 10
|
47.7%
6.63
CategoryWater conservation & recharge
Started / Completed / Phys184 / 46 / 100
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked2.45Cr / 1.30Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score6.63 / 10
|
5.7%
6.46
CategoryWatershed Related Works
Started / Completed / Phys30 / 7 / 19
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.24Cr / 0.10Cr
Expenditure rate (ongoing)42.5%
Part B score (max 5.0)2.12 / 5.0
Final score6.46 / 10
|
5.7%
6.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 7 / 14
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.28Cr / 0.15Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.74 / 10
|
| 218 | PAWAI โ | PANNA | 5.41 | D |
41.5%
4.21
CategoryFarm Pond
Started / Completed / Phys479 / 41 / 134
Completion rate36.5%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked8.60Cr / 4.11Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.39 / 5.0
Final score4.21 / 10
|
3.3%
3.62
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.10Cr / 0.79Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
|
4.3%
4.96
CategoryDug Well Recharge
Started / Completed / Phys377 / 61 / 128
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate50.1%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked0.71Cr / 0.35Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score4.96 / 10
|
0.1%
2.17
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score2.17 / 10
|
37.6%
6.63
CategoryWater conservation & recharge
Started / Completed / Phys341 / 24 / 170
Completion rate56.9%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked6.26Cr / 4.74Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score6.63 / 10
|
1.6%
6.41
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score6.41 / 10
|
11.7%
6.24
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys46 / 2 / 18
Completion rate43.5%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked2.26Cr / 1.84Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score6.24 / 10
|
| 219 | RAMPUR BAGHELAN โ | SATNA | 5.40 | D |
41.7%
4.06
CategoryFarm Pond
Started / Completed / Phys201 / 14 / 72
Completion rate42.8%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked2.52Cr / 0.96Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score4.06 / 10
|
7.0%
0.47
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.07Cr
Expenditure rate (ongoing)9.3%
Part B score (max 5.0)0.47 / 5.0
Final score0.47 / 10
|
2.9%
6.92
CategoryDug Well Recharge
Started / Completed / Phys126 / 22 / 89
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate88.1%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.51 / 5.0
Final score6.92 / 10
|
1.3%
6.03
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score6.03 / 10
|
34.6%
7.47
CategoryWater conservation & recharge
Started / Completed / Phys72 / 9 / 46
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.62Cr / 0.46Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score7.47 / 10
|
7.0%
6.42
CategoryWatershed Related Works
Started / Completed / Phys15 / 0 / 10
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score6.42 / 10
|
5.5%
6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 3 / 9
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score6.58 / 10
|
| 220 | RAMA โ | JHABUA | 5.39 | D |
9.4%
2.86
CategoryFarm Pond
Started / Completed / Phys169 / 0 / 42
Completion rate24.9%
Part A score (max 5.0)1.24 / 5.0
Ongoing sanction / booked1.89Cr / 0.61Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.61 / 5.0
Final score2.86 / 10
|
3.0%
2.97
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.44Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score2.97 / 10
|
5.9%
6.18
CategoryDug Well Recharge
Started / Completed / Phys594 / 160 / 249
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.45Cr / 0.25Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score6.18 / 10
|
โ |
78.3%
5.67
CategoryWater conservation & recharge
Started / Completed / Phys98 / 2 / 33
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked11.19Cr / 8.70Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.89 / 5.0
Final score5.67 / 10
|
0.6%
2.05
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score2.05 / 10
|
2.8%
7.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 3 / 5
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.15Cr / 0.12Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.04 / 5.0
Final score7.67 / 10
|
| 221 | TEONTHAR โ | REWA | 5.39 | D |
43.8%
4.67
CategoryFarm Pond
Started / Completed / Phys282 / 148 / 34
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.5%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked2.06Cr / 0.60Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score4.67 / 10
|
4.5%
0.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.03Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
|
1.2%
5.50
CategoryDug Well Recharge
Started / Completed / Phys59 / 24 / 16
Completion rate67.8%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.11 / 5.0
Final score5.50 / 10
|
6.8%
6.73
CategoryIrrigation infrastructure
Started / Completed / Phys21 / 10 / 2
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.24Cr / 0.19Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.87 / 5.0
Final score6.73 / 10
|
23.1%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys80 / 53 / 5
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.69Cr / 0.40Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score6.51 / 10
|
11.2%
6.14
CategoryWatershed Related Works
Started / Completed / Phys29 / 15 / 7
Completion rate75.9%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked0.36Cr / 0.17Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.34 / 5.0
Final score6.14 / 10
|
9.4%
6.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 6 / 5
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.31Cr / 0.18Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score6.54 / 10
|
| 222 | KIRNAPUR โ | BALAGHAT | 5.39 | D |
65.7%
4.69
CategoryFarm Pond
Started / Completed / Phys457 / 159 / 134
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.1%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked3.82Cr / 1.13Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score4.69 / 10
|
3.6%
0.81
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.12Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.81 / 5.0
Final score0.81 / 10
|
2.0%
6.71
CategoryDug Well Recharge
Started / Completed / Phys155 / 73 / 75
Completion rate95.5%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.94 / 5.0
Final score6.71 / 10
|
โ |
26.2%
7.21
CategoryWater conservation & recharge
Started / Completed / Phys114 / 27 / 66
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.83Cr / 0.52Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score7.21 / 10
|
1.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 223 | AGAR โ | AGAR-MALWA | 5.38 | D |
31.1%
2.78
CategoryFarm Pond
Started / Completed / Phys177 / 2 / 53
Completion rate31.1%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked2.97Cr / 0.73Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.23 / 5.0
Final score2.78 / 10
|
โ |
11.0%
4.21
CategoryDug Well Recharge
Started / Completed / Phys535 / 44 / 283
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.53Cr / 0.12Cr
Expenditure rate (ongoing)23.1%
Part B score (max 5.0)1.15 / 5.0
Final score4.21 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.2%
6.65
CategoryWater conservation & recharge
Started / Completed / Phys72 / 9 / 35
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked2.32Cr / 1.67Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.59 / 5.0
Final score6.65 / 10
|
6.8%
7.84
CategoryWatershed Related Works
Started / Completed / Phys25 / 16 / 7
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score7.84 / 10
|
11.4%
7.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 4 / 28
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score7.56 / 10
|
| 224 | ICHHAWAR โ | SEHORE | 5.38 | D |
47.9%
3.82
CategoryFarm Pond
Started / Completed / Phys272 / 4 / 150
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked3.13Cr / 0.62Cr
Expenditure rate (ongoing)19.8%
Part B score (max 5.0)0.99 / 5.0
Final score3.82 / 10
|
1.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
7.2%
6.73
CategoryDug Well Recharge
Started / Completed / Phys418 / 78 / 298
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.23 / 5.0
Final score6.73 / 10
|
0.5%
5.24
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.74 / 5.0
Final score5.24 / 10
|
34.2%
7.04
CategoryWater conservation & recharge
Started / Completed / Phys83 / 9 / 51
Completion rate72.3%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked1.95Cr / 1.33Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.43 / 5.0
Final score7.04 / 10
|
5.9%
7.15
CategoryWatershed Related Works
Started / Completed / Phys18 / 4 / 12
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score7.15 / 10
|
3.0%
6.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 7
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score6.86 / 10
|
| 225 | DEOSAR โ | SINGRAULI | 5.38 | D |
39.8%
5.21
CategoryFarm Pond
Started / Completed / Phys691 / 431 / 28
Completion rate66.4%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked4.12Cr / 1.56Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.89 / 5.0
Final score5.21 / 10
|
3.5%
2.97
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.07Cr / 0.64Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score2.97 / 10
|
3.1%
6.00
CategoryDug Well Recharge
Started / Completed / Phys365 / 270 / 22
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.05Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)2.00 / 5.0
Final score6.00 / 10
|
0.2%
5.24
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
|
44.3%
5.50
CategoryWater conservation & recharge
Started / Completed / Phys224 / 57 / 54
Completion rate49.6%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked6.28Cr / 3.80Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score5.50 / 10
|
5.4%
6.11
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 10
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.75Cr / 0.47Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score6.11 / 10
|
3.7%
6.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 4 / 5
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.51Cr / 0.32Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.41 / 10
|
| 226 | UDAIGARH โ | ALIRAJPUR | 5.37 | D |
15.5%
3.80
CategoryFarm Pond
Started / Completed / Phys177 / 0 / 47
Completion rate26.6%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked1.94Cr / 0.96Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score3.80 / 10
|
3.6%
3.22
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.41Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score3.22 / 10
|
6.4%
4.55
CategoryDug Well Recharge
Started / Completed / Phys432 / 10 / 148
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate36.6%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked0.70Cr / 0.38Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score4.55 / 10
|
โ |
69.7%
5.76
CategoryWater conservation & recharge
Started / Completed / Phys66 / 0 / 28
Completion rate42.4%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked9.28Cr / 6.75Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score5.76 / 10
|
4.8%
7.56
CategoryWatershed Related Works
Started / Completed / Phys22 / 0 / 18
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score7.56 / 10
|
โ |
| 227 | BHABRA โ | ALIRAJPUR | 5.37 | D |
15.2%
4.81
CategoryFarm Pond
Started / Completed / Phys120 / 0 / 53
Completion rate44.2%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked1.70Cr / 0.88Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score4.81 / 10
|
2.2%
3.51
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.34Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
|
4.8%
6.30
CategoryDug Well Recharge
Started / Completed / Phys414 / 2 / 258
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked0.40Cr / 0.25Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score6.30 / 10
|
โ |
76.4%
5.48
CategoryWater conservation & recharge
Started / Completed / Phys90 / 3 / 23
Completion rate28.9%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked13.66Cr / 11.01Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score5.48 / 10
|
1.4%
5.58
CategoryWatershed Related Works
Started / Completed / Phys9 / 1 / 3
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.21Cr / 0.14Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score5.58 / 10
|
0.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 228 | KARAHAL โ | SHEOPUR | 5.37 | D |
33.7%
3.84
CategoryFarm Pond
Started / Completed / Phys229 / 40 / 81
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked3.65Cr / 0.87Cr
Expenditure rate (ongoing)24.0%
Part B score (max 5.0)1.20 / 5.0
Final score3.84 / 10
|
3.9%
0.54
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.10Cr
Expenditure rate (ongoing)10.7%
Part B score (max 5.0)0.54 / 5.0
Final score0.54 / 10
|
0.3%
4.04
CategoryDug Well Recharge
Started / Completed / Phys28 / 10 / 6
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.18 / 5.0
Final score4.04 / 10
|
3.6%
8.28
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.15Cr / 0.12Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score8.28 / 10
|
52.5%
6.41
CategoryWater conservation & recharge
Started / Completed / Phys111 / 4 / 68
Completion rate64.9%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked4.74Cr / 3.00Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.41 / 10
|
1.8%
6.07
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 5
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.07 / 5.0
Final score6.07 / 10
|
4.2%
6.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.20Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score6.26 / 10
|
| 229 | KOLARAS โ | SHIVPURI | 5.36 | D |
44.2%
4.74
CategoryFarm Pond
Started / Completed / Phys238 / 91 / 68
Completion rate66.8%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked3.09Cr / 0.86Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score4.74 / 10
|
1.8%
2.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.20Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score2.56 / 10
|
2.9%
4.59
CategoryDug Well Recharge
Started / Completed / Phys253 / 128 / 51
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score4.59 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
49.6%
5.99
CategoryWater conservation & recharge
Started / Completed / Phys110 / 9 / 45
Completion rate49.1%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked5.50Cr / 3.89Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score5.99 / 10
|
0.6%
4.88
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score4.88 / 10
|
0.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 230 | KAHNAPAS(GHANSAUR) โ | SEONI | 5.34 | D |
52.0%
3.89
CategoryFarm Pond
Started / Completed / Phys499 / 142 / 51
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate38.7%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked7.17Cr / 2.81Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score3.89 / 10
|
โ |
2.6%
4.28
CategoryDug Well Recharge
Started / Completed / Phys226 / 92 / 62
⚠ Works needing verification (Completed/Physically Completed)67 works (exp <30%)
Completion rate68.1%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score4.28 / 10
|
โ |
41.4%
6.93
CategoryWater conservation & recharge
Started / Completed / Phys185 / 46 / 76
Completion rate65.9%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked3.48Cr / 2.53Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.63 / 5.0
Final score6.93 / 10
|
2.2%
7.16
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 5
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score7.16 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 231 | SATNA โ | SATNA | 5.34 | D |
33.3%
4.59
CategoryFarm Pond
Started / Completed / Phys189 / 51 / 56
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.90Cr / 0.32Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.76 / 5.0
Final score4.59 / 10
|
6.2%
1.49
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score1.49 / 10
|
3.4%
6.95
CategoryDug Well Recharge
Started / Completed / Phys147 / 110 / 5
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate78.2%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.95 / 10
|
1.1%
5.31
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score5.31 / 10
|
45.8%
6.22
CategoryWater conservation & recharge
Started / Completed / Phys48 / 12 / 12
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked2.22Cr / 1.65Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score6.22 / 10
|
2.0%
7.35
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.07Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score7.35 / 10
|
8.1%
5.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.33Cr / 0.18Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score5.16 / 10
|
| 232 | ASHTA โ | SEHORE | 5.31 | D |
57.2%
4.36
CategoryFarm Pond
Started / Completed / Phys509 / 90 / 198
⚠ Works needing verification (Completed/Physically Completed)28 works (exp <30%)
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked6.15Cr / 1.88Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score4.36 / 10
|
5.5%
2.22
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.55Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score2.22 / 10
|
8.3%
6.60
CategoryDug Well Recharge
Started / Completed / Phys725 / 273 / 356
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score6.60 / 10
|
1.5%
6.96
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 4
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.96 / 10
|
19.4%
7.71
CategoryWater conservation & recharge
Started / Completed / Phys101 / 19 / 58
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked1.71Cr / 1.33Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score7.71 / 10
|
5.6%
6.98
CategoryWatershed Related Works
Started / Completed / Phys32 / 11 / 12
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.37Cr / 0.25Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score6.98 / 10
|
2.6%
6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 9
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score6.35 / 10
|
| 233 | JATARA โ | TIKAMGARH | 5.31 | D |
10.0%
3.61
CategoryFarm Pond
Started / Completed / Phys261 / 19 / 58
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.64Cr / 1.13Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score3.61 / 10
|
2.9%
1.19
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.27Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score1.19 / 10
|
4.6%
6.29
CategoryDug Well Recharge
Started / Completed / Phys661 / 33 / 434
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.43Cr / 0.24Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.75 / 5.0
Final score6.29 / 10
|
โ |
65.6%
5.60
CategoryWater conservation & recharge
Started / Completed / Phys342 / 17 / 92
Completion rate31.9%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked16.84Cr / 13.50Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score5.60 / 10
|
2.8%
6.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 6
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.53Cr / 0.41Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score6.00 / 10
|
14.0%
5.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys68 / 1 / 20
Completion rate30.9%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked3.95Cr / 3.17Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score5.56 / 10
|
| 234 | PICHHORE โ | SHIVPURI | 5.31 | D |
40.1%
4.09
CategoryFarm Pond
Started / Completed / Phys230 / 64 / 56
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate52.2%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked2.24Cr / 0.67Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score4.09 / 10
|
1.7%
3.10
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score3.10 / 10
|
4.8%
4.58
CategoryDug Well Recharge
Started / Completed / Phys219 / 82 / 69
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate68.9%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked0.15Cr / 0.03Cr
Expenditure rate (ongoing)22.6%
Part B score (max 5.0)1.13 / 5.0
Final score4.58 / 10
|
2.2%
7.51
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.51 / 10
|
37.3%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys85 / 11 / 43
Completion rate63.5%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked1.88Cr / 1.09Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score6.07 / 10
|
8.7%
7.57
CategoryWatershed Related Works
Started / Completed / Phys17 / 4 / 10
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.23Cr / 0.16Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.57 / 10
|
5.2%
5.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.29Cr / 0.15Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score5.86 / 10
|
| 235 | SHIVPURI โ | SHIVPURI | 5.27 | D |
50.1%
3.48
CategoryFarm Pond
Started / Completed / Phys254 / 59 / 82
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate55.5%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked4.92Cr / 0.70Cr
Expenditure rate (ongoing)14.1%
Part B score (max 5.0)0.71 / 5.0
Final score3.48 / 10
|
1.3%
2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
|
3.1%
5.50
CategoryDug Well Recharge
Started / Completed / Phys269 / 125 / 70
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate72.5%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.16Cr / 0.06Cr
Expenditure rate (ongoing)37.4%
Part B score (max 5.0)1.87 / 5.0
Final score5.50 / 10
|
โ |
41.2%
7.05
CategoryWater conservation & recharge
Started / Completed / Phys123 / 20 / 76
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked1.84Cr / 1.16Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score7.05 / 10
|
2.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 236 | SARDARPUR โ | DHAR | 5.27 | D |
16.7%
3.56
CategoryFarm Pond
Started / Completed / Phys353 / 21 / 116
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate38.8%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked5.28Cr / 1.71Cr
Expenditure rate (ongoing)32.5%
Part B score (max 5.0)1.62 / 5.0
Final score3.56 / 10
|
โ |
2.4%
4.10
CategoryDug Well Recharge
Started / Completed / Phys489 / 87 / 123
⚠ Works needing verification (Completed/Physically Completed)119 works (exp <30%)
Completion rate42.9%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked0.41Cr / 0.16Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.95 / 5.0
Final score4.10 / 10
|
0.6%
2.62
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.17Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score2.62 / 10
|
74.0%
5.64
CategoryWater conservation & recharge
Started / Completed / Phys335 / 18 / 103
Completion rate36.1%
Part A score (max 5.0)1.81 / 5.0
Ongoing sanction / booked27.08Cr / 20.78Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score5.64 / 10
|
2.8%
5.35
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 11
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.64Cr / 0.40Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score5.35 / 10
|
3.5%
6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 10
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.09Cr / 0.86Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score6.58 / 10
|
| 237 | DAHI โ | DHAR | 5.26 | D |
8.8%
4.07
CategoryFarm Pond
Started / Completed / Phys160 / 3 / 40
Completion rate26.9%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked1.65Cr / 0.90Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score4.07 / 10
|
โ |
2.5%
2.66
CategoryDug Well Recharge
Started / Completed / Phys256 / 37 / 13
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate19.5%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked0.52Cr / 0.18Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score2.66 / 10
|
โ |
81.3%
5.51
CategoryWater conservation & recharge
Started / Completed / Phys279 / 2 / 115
Completion rate41.9%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked12.14Cr / 8.28Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score5.51 / 10
|
5.5%
4.11
CategoryWatershed Related Works
Started / Completed / Phys27 / 0 / 8
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked0.88Cr / 0.46Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score4.11 / 10
|
1.8%
7.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 12
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.10 / 5.0
Final score7.26 / 10
|
| 238 | BAGLI โ | DEWAS | 5.25 | D |
44.1%
3.57
CategoryFarm Pond
Started / Completed / Phys420 / 99 / 109
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate49.5%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked6.41Cr / 1.41Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.10 / 5.0
Final score3.57 / 10
|
4.1%
1.54
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.36Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score1.54 / 10
|
12.0%
6.33
CategoryDug Well Recharge
Started / Completed / Phys1,317 / 895 / 315
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.26Cr / 0.09Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score6.33 / 10
|
0.5%
5.70
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score5.70 / 10
|
33.9%
7.19
CategoryWater conservation & recharge
Started / Completed / Phys171 / 41 / 88
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked2.48Cr / 1.69Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score7.19 / 10
|
4.3%
6.34
CategoryWatershed Related Works
Started / Completed / Phys35 / 8 / 22
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.06 / 5.0
Final score6.34 / 10
|
1.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 239 | HATTA โ | DAMOH | 5.24 | D |
20.8%
3.16
CategoryFarm Pond
Started / Completed / Phys175 / 19 / 29
Completion rate27.4%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked2.59Cr / 0.93Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score3.16 / 10
|
โ |
2.1%
5.64
CategoryDug Well Recharge
Started / Completed / Phys141 / 48 / 60
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score5.64 / 10
|
โ |
53.5%
5.81
CategoryWater conservation & recharge
Started / Completed / Phys96 / 21 / 20
Completion rate42.7%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked6.01Cr / 4.42Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score5.81 / 10
|
17.2%
6.07
CategoryWatershed Related Works
Started / Completed / Phys43 / 10 / 17
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked0.90Cr / 0.53Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score6.07 / 10
|
6.3%
4.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 5
Completion rate35.3%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked0.70Cr / 0.44Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score4.87 / 10
|
| 240 | PATHARIYA โ | DAMOH | 5.24 | D |
24.0%
3.79
CategoryFarm Pond
Started / Completed / Phys235 / 91 / 21
Completion rate47.7%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked2.80Cr / 0.79Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score3.79 / 10
|
โ |
5.0%
5.80
CategoryDug Well Recharge
Started / Completed / Phys385 / 182 / 52
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked0.37Cr / 0.20Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score5.80 / 10
|
4.6%
5.15
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.66Cr / 0.61Cr
Expenditure rate (ongoing)93.0%
Part B score (max 5.0)4.65 / 5.0
Final score5.15 / 10
|
54.7%
5.71
CategoryWater conservation & recharge
Started / Completed / Phys142 / 15 / 33
Completion rate33.8%
Part A score (max 5.0)1.69 / 5.0
Ongoing sanction / booked8.34Cr / 6.70Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score5.71 / 10
|
8.3%
6.14
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 4
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.31Cr / 1.24Cr
Expenditure rate (ongoing)94.2%
Part B score (max 5.0)4.71 / 5.0
Final score6.14 / 10
|
3.4%
4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.49Cr / 0.33Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score4.96 / 10
|
| 241 | PALI โ | UMARIA | 5.23 | D |
37.9%
4.97
CategoryFarm Pond
Started / Completed / Phys164 / 6 / 73
Completion rate48.2%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked3.37Cr / 1.72Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score4.97 / 10
|
1.1%
3.24
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
|
3.4%
4.39
CategoryDug Well Recharge
Started / Completed / Phys224 / 0 / 83
Completion rate37.1%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked0.36Cr / 0.18Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score4.39 / 10
|
โ |
45.0%
5.58
CategoryWater conservation & recharge
Started / Completed / Phys86 / 9 / 26
Completion rate40.7%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked4.98Cr / 3.53Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score5.58 / 10
|
8.9%
4.91
CategoryWatershed Related Works
Started / Completed / Phys11 / 2 / 2
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked1.26Cr / 0.78Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score4.91 / 10
|
3.7%
5.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 3
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.34Cr / 0.26Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.88 / 5.0
Final score5.76 / 10
|
| 242 | UNCHAHARA โ | SATNA | 5.23 | D |
39.9%
2.82
CategoryFarm Pond
Started / Completed / Phys269 / 20 / 77
Completion rate36.1%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked3.84Cr / 0.78Cr
Expenditure rate (ongoing)20.3%
Part B score (max 5.0)1.01 / 5.0
Final score2.82 / 10
|
โ |
2.2%
6.17
CategoryDug Well Recharge
Started / Completed / Phys114 / 7 / 74
Completion rate71.1%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score6.17 / 10
|
โ |
30.7%
6.74
CategoryWater conservation & recharge
Started / Completed / Phys91 / 3 / 57
Completion rate65.9%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked2.06Cr / 1.42Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score6.74 / 10
|
3.0%
6.62
CategoryWatershed Related Works
Started / Completed / Phys8 / 3 / 2
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.18Cr / 0.13Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score6.62 / 10
|
24.2%
7.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 11
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.85Cr / 0.55Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score7.01 / 10
|
| 243 | PIPARIYA โ | NARMADAPURAM | 5.22 | D |
54.2%
3.29
CategoryFarm Pond
Started / Completed / Phys97 / 51 / 1
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked0.69Cr / 0.08Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score3.29 / 10
|
โ |
9.3%
5.72
CategoryDug Well Recharge
Started / Completed / Phys122 / 111 / 0
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score5.72 / 10
|
โ |
34.2%
7.94
CategoryWater conservation & recharge
Started / Completed / Phys34 / 25 / 2
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.70Cr / 0.55Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score7.94 / 10
|
1.1%
6.23
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score6.23 / 10
|
1.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 244 | DEPALPUR โ | INDORE | 5.22 | D |
51.4%
3.40
CategoryFarm Pond
Started / Completed / Phys169 / 14 / 34
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate28.4%
Part A score (max 5.0)1.42 / 5.0
Ongoing sanction / booked3.68Cr / 1.46Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score3.40 / 10
|
0.1%
0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.5%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
|
7.0%
4.71
CategoryDug Well Recharge
Started / Completed / Phys269 / 50 / 114
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked0.26Cr / 0.09Cr
Expenditure rate (ongoing)33.3%
Part B score (max 5.0)1.67 / 5.0
Final score4.71 / 10
|
โ |
14.9%
6.80
CategoryWater conservation & recharge
Started / Completed / Phys43 / 12 / 20
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score6.80 / 10
|
19.8%
7.30
CategoryWatershed Related Works
Started / Completed / Phys41 / 13 / 25
Completion rate92.7%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score7.30 / 10
|
6.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 245 | SONDWA โ | ALIRAJPUR | 5.21 | D |
6.1%
4.16
CategoryFarm Pond
Started / Completed / Phys197 / 3 / 72
Completion rate38.1%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked2.36Cr / 1.07Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score4.16 / 10
|
2.1%
7.40
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.40Cr / 0.29Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score7.40 / 10
|
3.3%
4.42
CategoryDug Well Recharge
Started / Completed / Phys776 / 17 / 302
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate41.1%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked1.17Cr / 0.56Cr
Expenditure rate (ongoing)47.4%
Part B score (max 5.0)2.37 / 5.0
Final score4.42 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
84.5%
5.20
CategoryWater conservation & recharge
Started / Completed / Phys275 / 17 / 41
Completion rate21.1%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked36.58Cr / 30.34Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score5.20 / 10
|
0.9%
7.34
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 4
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.19Cr / 0.16Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score7.34 / 10
|
2.8%
6.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 6
Completion rate43.8%
Part A score (max 5.0)2.19 / 5.0
Ongoing sanction / booked0.94Cr / 0.75Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score6.17 / 10
|
| 246 | BHIND โ | BHIND | 5.20 | D |
35.2%
2.86
CategoryFarm Pond
Started / Completed / Phys127 / 38 / 19
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate44.9%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked1.60Cr / 0.20Cr
Expenditure rate (ongoing)12.3%
Part B score (max 5.0)0.62 / 5.0
Final score2.86 / 10
|
9.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.4%
7.33
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 13
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score7.33 / 10
|
0.6%
4.95
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score4.95 / 10
|
40.8%
6.75
CategoryWater conservation & recharge
Started / Completed / Phys58 / 10 / 37
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.70Cr / 0.38Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.75 / 10
|
10.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 247 | SEONDHA โ | DATIA | 5.20 | D |
52.3%
4.33
CategoryFarm Pond
Started / Completed / Phys291 / 188 / 1
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked2.04Cr / 0.44Cr
Expenditure rate (ongoing)21.6%
Part B score (max 5.0)1.08 / 5.0
Final score4.33 / 10
|
2.2%
2.67
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score2.67 / 10
|
4.2%
5.50
CategoryDug Well Recharge
Started / Completed / Phys179 / 171 / 3
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)12.7%
Part B score (max 5.0)0.63 / 5.0
Final score5.50 / 10
|
2.9%
8.57
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 1
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score8.57 / 10
|
30.1%
6.22
CategoryWater conservation & recharge
Started / Completed / Phys74 / 32 / 9
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked1.13Cr / 0.78Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score6.22 / 10
|
4.4%
6.40
CategoryWatershed Related Works
Started / Completed / Phys12 / 7 / 0
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.28Cr / 0.19Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.40 / 10
|
3.9%
6.20
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score6.20 / 10
|
| 248 | WAIDHAN โ | SINGRAULI | 5.19 | D |
29.6%
4.83
CategoryFarm Pond
Started / Completed / Phys332 / 163 / 31
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked2.61Cr / 1.00Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score4.83 / 10
|
3.4%
4.66
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.16 / 5.0
Final score4.66 / 10
|
4.4%
5.94
CategoryDug Well Recharge
Started / Completed / Phys385 / 73 / 220
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate76.1%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.20Cr / 0.08Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score5.94 / 10
|
โ |
44.9%
5.30
CategoryWater conservation & recharge
Started / Completed / Phys129 / 15 / 44
Completion rate45.7%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked5.27Cr / 3.17Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score5.30 / 10
|
12.3%
5.45
CategoryWatershed Related Works
Started / Completed / Phys33 / 5 / 12
Completion rate51.5%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked1.00Cr / 0.58Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score5.45 / 10
|
5.3%
5.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 3 / 8
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.39Cr / 0.21Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score5.46 / 10
|
| 249 | MAJHOULI โ | JABALPUR | 5.19 | D |
19.2%
3.04
CategoryFarm Pond
Started / Completed / Phys110 / 15 / 17
Completion rate29.1%
Part A score (max 5.0)1.45 / 5.0
Ongoing sanction / booked2.30Cr / 0.73Cr
Expenditure rate (ongoing)31.7%
Part B score (max 5.0)1.58 / 5.0
Final score3.04 / 10
|
7.9%
2.71
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.61Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score2.71 / 10
|
0.2%
4.55
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.55 / 10
|
โ |
15.2%
6.18
CategoryWater conservation & recharge
Started / Completed / Phys32 / 8 / 9
Completion rate53.1%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked1.41Cr / 0.99Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score6.18 / 10
|
57.2%
6.01
CategoryWatershed Related Works
Started / Completed / Phys112 / 48 / 19
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked3.24Cr / 1.95Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score6.01 / 10
|
0.3%
3.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
|
| 250 | SHAJAPUR โ | SHAJAPUR | 5.19 | D |
44.9%
3.33
CategoryFarm Pond
Started / Completed / Phys232 / 71 / 24
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate40.9%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked4.49Cr / 1.15Cr
Expenditure rate (ongoing)25.6%
Part B score (max 5.0)1.28 / 5.0
Final score3.33 / 10
|
3.9%
1.92
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.26Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
|
5.9%
5.37
CategoryDug Well Recharge
Started / Completed / Phys432 / 300 / 82
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score5.37 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
6.56
CategoryWater conservation & recharge
Started / Completed / Phys132 / 41 / 51
Completion rate69.7%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked2.11Cr / 1.30Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score6.56 / 10
|
8.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys33 / 13 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 251 | HARDA โ | HARDA | 5.18 | D |
54.1%
2.97
CategoryFarm Pond
Started / Completed / Phys98 / 5 / 36
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate41.8%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked1.88Cr / 0.33Cr
Expenditure rate (ongoing)17.5%
Part B score (max 5.0)0.88 / 5.0
Final score2.97 / 10
|
4.6%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
11.6%
5.26
CategoryDug Well Recharge
Started / Completed / Phys231 / 151 / 54
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate88.7%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)16.5%
Part B score (max 5.0)0.82 / 5.0
Final score5.26 / 10
|
โ |
20.2%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
6.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 252 | BHIMPUR โ | BETUL | 5.18 | D |
20.9%
4.22
CategoryFarm Pond
Started / Completed / Phys196 / 3 / 54
Completion rate29.1%
Part A score (max 5.0)1.45 / 5.0
Ongoing sanction / booked4.78Cr / 2.65Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score4.22 / 10
|
2.9%
1.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.93Cr / 0.22Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.20 / 5.0
Final score1.20 / 10
|
3.6%
7.76
CategoryDug Well Recharge
Started / Completed / Phys433 / 19 / 325
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score7.76 / 10
|
โ |
68.1%
5.51
CategoryWater conservation & recharge
Started / Completed / Phys315 / 34 / 95
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked13.11Cr / 9.09Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score5.51 / 10
|
2.0%
6.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 4
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.37Cr / 0.28Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score6.00 / 10
|
2.6%
4.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 1 / 3
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.49Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score4.47 / 10
|
| 253 | JAORA โ | RATLAM | 5.16 | D |
52.2%
3.81
CategoryFarm Pond
Started / Completed / Phys160 / 30 / 44
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate46.3%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked2.99Cr / 0.89Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score3.81 / 10
|
9.8%
3.85
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.91Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
|
10.2%
5.81
CategoryDug Well Recharge
Started / Completed / Phys470 / 58 / 262
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate68.1%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.37Cr / 0.18Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score5.81 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.2%
7.72
CategoryWater conservation & recharge
Started / Completed / Phys80 / 33 / 45
Completion rate97.5%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.29Cr / 0.16Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.84 / 5.0
Final score7.72 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 254 | RAMNAGAR โ | SATNA | 5.14 | D |
85.1%
4.29
CategoryFarm Pond
Started / Completed / Phys220 / 29 / 107
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked1.63Cr / 0.39Cr
Expenditure rate (ongoing)24.0%
Part B score (max 5.0)1.20 / 5.0
Final score4.29 / 10
|
โ |
6.3%
10.00
CategoryDug Well Recharge
Started / Completed / Phys110 / 0 / 110
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
5.9%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys14 / 7 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 255 | HANUMANA โ | REWA | 5.12 | D |
42.6%
3.43
CategoryFarm Pond
Started / Completed / Phys315 / 132 / 18
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked5.12Cr / 1.07Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score3.43 / 10
|
0.8%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.7%
4.15
CategoryDug Well Recharge
Started / Completed / Phys62 / 20 / 19
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate62.9%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score4.15 / 10
|
3.8%
6.64
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 9 / 0
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.14 / 5.0
Final score6.64 / 10
|
28.7%
6.46
CategoryWater conservation & recharge
Started / Completed / Phys139 / 79 / 30
Completion rate78.4%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked1.32Cr / 0.67Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score6.46 / 10
|
11.9%
6.79
CategoryWatershed Related Works
Started / Completed / Phys16 / 6 / 6
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.46Cr / 0.28Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.79 / 10
|
11.5%
6.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 19 / 4
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.51Cr / 0.24Cr
Expenditure rate (ongoing)46.0%
Part B score (max 5.0)2.30 / 5.0
Final score6.27 / 10
|
| 256 | SONKATCH โ | DEWAS | 5.10 | D |
50.3%
4.16
CategoryFarm Pond
Started / Completed / Phys103 / 26 / 34
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked1.54Cr / 0.38Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.25 / 5.0
Final score4.16 / 10
|
2.5%
4.21
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.17Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
|
12.4%
5.17
CategoryDug Well Recharge
Started / Completed / Phys376 / 66 / 226
Completion rate77.7%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.22Cr / 0.06Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score5.17 / 10
|
โ |
32.7%
6.44
CategoryWater conservation & recharge
Started / Completed / Phys69 / 6 / 50
Completion rate81.2%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.42Cr / 0.20Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.38 / 5.0
Final score6.44 / 10
|
1.1%
6.15
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 4
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score6.15 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 257 | LAUNDI โ | CHHATARPUR | 5.08 | D |
52.3%
3.74
CategoryFarm Pond
Started / Completed / Phys219 / 80 / 47
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked3.44Cr / 0.58Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.84 / 5.0
Final score3.74 / 10
|
1.1%
2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
|
7.5%
5.40
CategoryDug Well Recharge
Started / Completed / Phys474 / 243 / 169
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate86.9%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.13Cr / 0.03Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score5.40 / 10
|
โ |
31.0%
7.10
CategoryWater conservation & recharge
Started / Completed / Phys89 / 15 / 58
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked1.01Cr / 0.60Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score7.10 / 10
|
2.2%
7.34
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 15
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.34 / 10
|
5.7%
5.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 6
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.45Cr / 0.27Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score5.74 / 10
|
| 258 | UDAIPURA โ | RAISEN | 5.06 | D |
73.7%
4.87
CategoryFarm Pond
Started / Completed / Phys292 / 12 / 132
Completion rate49.3%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked3.24Cr / 1.56Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.40 / 5.0
Final score4.87 / 10
|
1.8%
3.27
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
|
5.4%
8.70
CategoryDug Well Recharge
Started / Completed / Phys194 / 122 / 67
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score8.70 / 10
|
โ |
17.3%
4.64
CategoryWater conservation & recharge
Started / Completed / Phys20 / 2 / 4
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked1.11Cr / 0.70Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score4.64 / 10
|
0.4%
2.54
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score2.54 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 259 | DAMOH โ | DAMOH | 5.06 | D |
17.3%
5.61
CategoryFarm Pond
Started / Completed / Phys230 / 103 / 22
Completion rate54.3%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked2.45Cr / 1.42Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score5.61 / 10
|
1.1%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
3.5%
6.72
CategoryDug Well Recharge
Started / Completed / Phys433 / 144 / 111
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate58.9%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked0.45Cr / 0.34Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score6.72 / 10
|
0.1%
4.86
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)97.3%
Part B score (max 5.0)4.86 / 5.0
Final score4.86 / 10
|
56.9%
5.09
CategoryWater conservation & recharge
Started / Completed / Phys201 / 14 / 30
Completion rate21.9%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked15.57Cr / 12.43Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score5.09 / 10
|
11.2%
5.33
CategoryWatershed Related Works
Started / Completed / Phys70 / 8 / 11
Completion rate27.1%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked2.65Cr / 2.10Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score5.33 / 10
|
9.9%
3.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 2
Completion rate5.7%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked3.02Cr / 2.05Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score3.68 / 10
|
| 260 | RITHI โ | KATNI | 5.02 | D |
47.1%
3.39
CategoryFarm Pond
Started / Completed / Phys286 / 24 / 58
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate28.7%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked7.22Cr / 2.82Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.95 / 5.0
Final score3.39 / 10
|
2.0%
2.19
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.18Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.19 / 5.0
Final score2.19 / 10
|
3.0%
5.63
CategoryDug Well Recharge
Started / Completed / Phys259 / 127 / 56
⚠ Works needing verification (Completed/Physically Completed)70 works (exp <30%)
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score5.63 / 10
|
6.4%
6.81
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 10 / 34
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.42Cr / 0.23Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score6.81 / 10
|
24.1%
6.37
CategoryWater conservation & recharge
Started / Completed / Phys112 / 32 / 38
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked2.01Cr / 1.30Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.37 / 10
|
10.9%
6.94
CategoryWatershed Related Works
Started / Completed / Phys51 / 24 / 16
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate78.4%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score6.94 / 10
|
6.7%
7.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 5 / 6
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.36Cr / 0.27Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score7.40 / 10
|
| 261 | SHAHPURA โ | JABALPUR | 5.02 | D |
41.8%
2.90
CategoryFarm Pond
Started / Completed / Phys180 / 64 / 5
Completion rate38.3%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked3.87Cr / 0.76Cr
Expenditure rate (ongoing)19.6%
Part B score (max 5.0)0.98 / 5.0
Final score2.90 / 10
|
3.4%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
1.0%
3.70
CategoryDug Well Recharge
Started / Completed / Phys52 / 25 / 2
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate51.9%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.10 / 5.0
Final score3.70 / 10
|
0.7%
5.02
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.69 / 5.0
Final score5.02 / 10
|
45.9%
7.09
CategoryWater conservation & recharge
Started / Completed / Phys122 / 89 / 16
Completion rate86.1%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked1.07Cr / 0.59Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score7.09 / 10
|
2.4%
6.16
CategoryWatershed Related Works
Started / Completed / Phys9 / 8 / 0
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.72 / 5.0
Final score6.16 / 10
|
4.9%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 8 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score6.96 / 10
|
| 262 | KARERA โ | SHIVPURI | 5.00 | D |
43.5%
3.63
CategoryFarm Pond
Started / Completed / Phys224 / 39 / 55
Completion rate42.0%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked4.08Cr / 1.25Cr
Expenditure rate (ongoing)30.7%
Part B score (max 5.0)1.53 / 5.0
Final score3.63 / 10
|
โ |
3.3%
5.00
CategoryDug Well Recharge
Started / Completed / Phys210 / 42 / 97
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate66.2%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked0.14Cr / 0.05Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score5.00 / 10
|
1.3%
7.12
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score7.12 / 10
|
27.4%
5.90
CategoryWater conservation & recharge
Started / Completed / Phys98 / 15 / 40
Completion rate56.1%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked2.07Cr / 1.28Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score5.90 / 10
|
23.3%
6.25
CategoryWatershed Related Works
Started / Completed / Phys37 / 5 / 15
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked1.78Cr / 1.26Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.55 / 5.0
Final score6.25 / 10
|
1.2%
7.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score7.81 / 10
|
| 263 | JAISINGHNAGAR โ | SHAHDOL | 5.00 | D |
46.1%
3.50
CategoryFarm Pond
Started / Completed / Phys925 / 220 / 176
Completion rate42.8%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked13.71Cr / 3.73Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score3.50 / 10
|
2.8%
1.01
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.29Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score1.01 / 10
|
0.7%
5.84
CategoryDug Well Recharge
Started / Completed / Phys134 / 55 / 41
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.84 / 10
|
5.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
37.9%
6.20
CategoryWater conservation & recharge
Started / Completed / Phys354 / 41 / 134
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked11.80Cr / 8.79Cr
Expenditure rate (ongoing)74.5%
Part B score (max 5.0)3.73 / 5.0
Final score6.20 / 10
|
1.4%
4.90
CategoryWatershed Related Works
Started / Completed / Phys15 / 3 / 3
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.51Cr / 0.29Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score4.90 / 10
|
5.9%
6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 6 / 15
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked1.41Cr / 1.07Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score6.35 / 10
|
| 264 | KURWAI โ | VIDISHA | 4.96 | D |
66.1%
4.37
CategoryFarm Pond
Started / Completed / Phys300 / 171 / 11
Completion rate60.7%
Part A score (max 5.0)3.03 / 5.0
Ongoing sanction / booked2.56Cr / 0.68Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.34 / 5.0
Final score4.37 / 10
|
1.9%
2.57
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score2.57 / 10
|
2.8%
5.06
CategoryDug Well Recharge
Started / Completed / Phys109 / 34 / 51
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.16 / 5.0
Final score5.06 / 10
|
1.1%
7.30
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 21 / 0
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score7.30 / 10
|
24.5%
6.25
CategoryWater conservation & recharge
Started / Completed / Phys76 / 42 / 7
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.68Cr / 0.41Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score6.25 / 10
|
2.0%
5.57
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score5.57 / 10
|
1.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 265 | MAKHAN NAGAR โ | NARMADAPURAM | 4.96 | D |
49.0%
3.18
CategoryFarm Pond
Started / Completed / Phys122 / 45 / 19
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.36Cr / 0.15Cr
Expenditure rate (ongoing)11.0%
Part B score (max 5.0)0.55 / 5.0
Final score3.18 / 10
|
โ |
11.5%
4.84
CategoryDug Well Recharge
Started / Completed / Phys181 / 96 / 50
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate80.7%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score4.84 / 10
|
1.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.0%
6.77
CategoryWater conservation & recharge
Started / Completed / Phys44 / 22 / 20
Completion rate95.5%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)40.0%
Part B score (max 5.0)2.00 / 5.0
Final score6.77 / 10
|
6.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
6.9%
5.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score5.66 / 10
|
| 266 | NAIGARHI โ | REWA | 4.94 | D |
52.2%
3.31
CategoryFarm Pond
Started / Completed / Phys196 / 51 / 30
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate41.3%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked4.15Cr / 1.03Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score3.31 / 10
|
โ |
0.7%
3.98
CategoryDug Well Recharge
Started / Completed / Phys44 / 10 / 17
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate61.4%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)18.2%
Part B score (max 5.0)0.91 / 5.0
Final score3.98 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
31.3%
6.65
CategoryWater conservation & recharge
Started / Completed / Phys91 / 40 / 24
Completion rate70.3%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked1.56Cr / 0.98Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.65 / 10
|
7.2%
5.96
CategoryWatershed Related Works
Started / Completed / Phys18 / 5 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.54Cr / 0.35Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score5.96 / 10
|
8.1%
7.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 14 / 4
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.71 / 10
|
| 267 | TENDUKHEDA โ | DAMOH | 4.89 | D |
16.5%
4.90
CategoryFarm Pond
Started / Completed / Phys211 / 89 / 62
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.74Cr / 0.20Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score4.90 / 10
|
โ |
5.2%
8.37
CategoryDug Well Recharge
Started / Completed / Phys354 / 104 / 218
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score8.37 / 10
|
โ |
51.8%
4.87
CategoryWater conservation & recharge
Started / Completed / Phys88 / 1 / 26
Completion rate30.7%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked7.38Cr / 4.92Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.33 / 5.0
Final score4.87 / 10
|
6.8%
3.43
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.06Cr / 0.62Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.93 / 5.0
Final score3.43 / 10
|
19.6%
4.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 0 / 5
Completion rate18.5%
Part A score (max 5.0)0.93 / 5.0
Ongoing sanction / booked2.40Cr / 1.72Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score4.52 / 10
|
| 268 | LAKHNADON โ | SEONI | 4.89 | D |
48.7%
3.83
CategoryFarm Pond
Started / Completed / Phys979 / 378 / 8
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked11.64Cr / 4.32Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score3.83 / 10
|
โ |
2.5%
5.48
CategoryDug Well Recharge
Started / Completed / Phys388 / 179 / 31
⚠ Works needing verification (Completed/Physically Completed)113 works (exp <30%)
Completion rate54.1%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.77 / 5.0
Final score5.48 / 10
|
1.1%
4.68
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.25Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.68 / 10
|
38.8%
5.90
CategoryWater conservation & recharge
Started / Completed / Phys401 / 148 / 53
Completion rate50.1%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked8.88Cr / 6.02Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score5.90 / 10
|
4.0%
6.22
CategoryWatershed Related Works
Started / Completed / Phys34 / 11 / 7
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.86Cr / 0.61Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score6.22 / 10
|
4.9%
6.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys36 / 13 / 8
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.76Cr / 0.49Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score6.12 / 10
|
| 269 | SIRMOUR โ | REWA | 4.88 | D |
57.5%
3.52
CategoryFarm Pond
Started / Completed / Phys286 / 162 / 10
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate60.1%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked1.57Cr / 0.16Cr
Expenditure rate (ongoing)10.3%
Part B score (max 5.0)0.51 / 5.0
Final score3.52 / 10
|
3.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.4%
9.86
CategoryDug Well Recharge
Started / Completed / Phys73 / 70 / 1
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score9.86 / 10
|
1.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 13 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
30.8%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys60 / 38 / 11
Completion rate81.7%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.55Cr / 0.27Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score6.51 / 10
|
5.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 8 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 270 | SEHORE โ | SEHORE | 4.84 | D |
66.1%
3.61
CategoryFarm Pond
Started / Completed / Phys443 / 30 / 199
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate51.7%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked5.64Cr / 1.16Cr
Expenditure rate (ongoing)20.5%
Part B score (max 5.0)1.03 / 5.0
Final score3.61 / 10
|
โ |
11.4%
5.88
CategoryDug Well Recharge
Started / Completed / Phys729 / 80 / 571
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.20Cr / 0.06Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.42 / 5.0
Final score5.88 / 10
|
1.0%
5.71
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 1
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.71 / 10
|
17.6%
7.95
CategoryWater conservation & recharge
Started / Completed / Phys121 / 11 / 96
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.58Cr / 0.41Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score7.95 / 10
|
1.6%
6.51
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score6.51 / 10
|
2.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 271 | CHANCHODA โ | GUNA | 4.83 | D |
34.3%
2.57
CategoryFarm Pond
Started / Completed / Phys396 / 88 / 54
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate35.9%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked4.93Cr / 0.77Cr
Expenditure rate (ongoing)15.5%
Part B score (max 5.0)0.78 / 5.0
Final score2.57 / 10
|
โ |
9.7%
4.79
CategoryDug Well Recharge
Started / Completed / Phys917 / 491 / 339
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.07Cr / 0.00Cr
Expenditure rate (ongoing)5.4%
Part B score (max 5.0)0.27 / 5.0
Final score4.79 / 10
|
0.6%
5.29
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score5.29 / 10
|
47.7%
6.25
CategoryWater conservation & recharge
Started / Completed / Phys204 / 51 / 107
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked2.39Cr / 1.14Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score6.25 / 10
|
0.6%
5.10
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score5.10 / 10
|
7.0%
6.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 12 / 11
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score6.18 / 10
|
| 272 | BASODA โ | VIDISHA | 4.80 | D |
75.8%
4.11
CategoryFarm Pond
Started / Completed / Phys303 / 167 / 21
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.0%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked2.99Cr / 0.60Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score4.11 / 10
|
โ |
2.3%
6.20
CategoryDug Well Recharge
Started / Completed / Phys90 / 43 / 23
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)50.6%
Part B score (max 5.0)2.53 / 5.0
Final score6.20 / 10
|
0.7%
6.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score6.22 / 10
|
19.4%
7.15
CategoryWater conservation & recharge
Started / Completed / Phys95 / 57 / 25
Completion rate86.3%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.52Cr / 0.29Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score7.15 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.6%
5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score5.38 / 10
|
| 273 | GYARASPUR โ | VIDISHA | 4.79 | D |
72.3%
4.23
CategoryFarm Pond
Started / Completed / Phys271 / 133 / 28
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate59.4%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked3.27Cr / 0.82Cr
Expenditure rate (ongoing)25.2%
Part B score (max 5.0)1.26 / 5.0
Final score4.23 / 10
|
โ |
8.4%
6.42
CategoryDug Well Recharge
Started / Completed / Phys346 / 63 / 200
⚠ Works needing verification (Completed/Physically Completed)34 works (exp <30%)
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score6.42 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.2%
6.20
CategoryWater conservation & recharge
Started / Completed / Phys75 / 24 / 29
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.62Cr / 0.33Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score6.20 / 10
|
โ |
2.1%
5.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score5.78 / 10
|
| 274 | KOTMA โ | ANUPPUR | 4.78 | D |
75.6%
4.11
CategoryFarm Pond
Started / Completed / Phys593 / 369 / 8
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked4.19Cr / 0.78Cr
Expenditure rate (ongoing)18.7%
Part B score (max 5.0)0.94 / 5.0
Final score4.11 / 10
|
โ |
0.8%
5.88
CategoryDug Well Recharge
Started / Completed / Phys50 / 2 / 35
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score5.88 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
19.6%
6.95
CategoryWater conservation & recharge
Started / Completed / Phys52 / 21 / 15
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked1.01Cr / 0.70Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score6.95 / 10
|
0.9%
3.52
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
|
2.1%
6.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score6.45 / 10
|
| 275 | SITAMAU โ | MANDSAUR | 4.78 | D |
23.0%
2.92
CategoryFarm Pond
Started / Completed / Phys332 / 40 / 19
Completion rate17.8%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked5.12Cr / 2.08Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score2.92 / 10
|
โ |
10.6%
5.36
CategoryDug Well Recharge
Started / Completed / Phys1,066 / 272 / 176
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate42.0%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked1.55Cr / 1.01Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.36 / 10
|
0.5%
5.76
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.43 / 5.0
Final score5.76 / 10
|
60.2%
5.24
CategoryWater conservation & recharge
Started / Completed / Phys360 / 71 / 46
Completion rate32.5%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked11.09Cr / 8.02Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score5.24 / 10
|
2.6%
6.60
CategoryWatershed Related Works
Started / Completed / Phys15 / 5 / 2
Completion rate46.7%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked0.41Cr / 0.35Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score6.60 / 10
|
3.1%
5.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 3 / 3
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.32Cr / 0.23Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score5.78 / 10
|
| 276 | INDORE โ | INDORE | 4.77 | D |
40.9%
4.50
CategoryFarm Pond
Started / Completed / Phys60 / 26 / 9
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.22Cr / 0.07Cr
Expenditure rate (ongoing)31.7%
Part B score (max 5.0)1.58 / 5.0
Final score4.50 / 10
|
26.1%
2.85
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score2.85 / 10
|
13.3%
5.01
CategoryDug Well Recharge
Started / Completed / Phys124 / 66 / 9
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate60.5%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score5.01 / 10
|
0.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.4%
7.80
CategoryWater conservation & recharge
Started / Completed / Phys20 / 16 / 2
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score7.80 / 10
|
1.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.6%
6.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score6.09 / 10
|
| 277 | SAIKHEDA (GADARWARA) โ | NARSINGHPUR | 4.76 | D |
79.1%
3.52
CategoryFarm Pond
Started / Completed / Phys207 / 96 / 28
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate59.9%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.91Cr / 0.20Cr
Expenditure rate (ongoing)10.6%
Part B score (max 5.0)0.53 / 5.0
Final score3.52 / 10
|
โ |
2.7%
5.65
CategoryDug Well Recharge
Started / Completed / Phys64 / 29 / 8
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score5.65 / 10
|
โ |
16.0%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys21 / 11 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 278 | GAURIHAR โ | CHHATARPUR | 4.75 | D |
51.8%
3.58
CategoryFarm Pond
Started / Completed / Phys201 / 82 / 34
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate57.7%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked3.20Cr / 0.45Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score3.58 / 10
|
3.5%
0.86
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.09Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.86 / 5.0
Final score0.86 / 10
|
5.5%
4.47
CategoryDug Well Recharge
Started / Completed / Phys435 / 313 / 29
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.18Cr / 0.02Cr
Expenditure rate (ongoing)10.8%
Part B score (max 5.0)0.54 / 5.0
Final score4.47 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.4%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys130 / 28 / 83
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.56Cr / 0.27Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score6.69 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.9%
5.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score5.37 / 10
|
| 279 | KUNDAM โ | JABALPUR | 4.66 | D |
56.5%
3.11
CategoryFarm Pond
Started / Completed / Phys268 / 14 / 79
Completion rate34.7%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked6.62Cr / 1.82Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score3.11 / 10
|
9.3%
1.92
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 0.61Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
|
4.0%
6.06
CategoryDug Well Recharge
Started / Completed / Phys266 / 103 / 149
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.33 / 5.0
Final score6.06 / 10
|
โ |
22.7%
8.30
CategoryWater conservation & recharge
Started / Completed / Phys95 / 35 / 50
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.77Cr / 0.59Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score8.30 / 10
|
7.5%
8.06
CategoryWatershed Related Works
Started / Completed / Phys42 / 22 / 14
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score8.06 / 10
|
โ |
| 280 | MANPUR โ | UMARIA | 4.65 | D |
26.7%
3.10
CategoryFarm Pond
Started / Completed / Phys435 / 45 / 80
Completion rate28.7%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked5.59Cr / 1.86Cr
Expenditure rate (ongoing)33.3%
Part B score (max 5.0)1.67 / 5.0
Final score3.10 / 10
|
2.7%
2.33
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.36Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score2.33 / 10
|
4.1%
2.80
CategoryDug Well Recharge
Started / Completed / Phys446 / 31 / 96
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate28.5%
Part A score (max 5.0)1.42 / 5.0
Ongoing sanction / booked0.82Cr / 0.22Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.38 / 5.0
Final score2.80 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
51.3%
5.35
CategoryWater conservation & recharge
Started / Completed / Phys355 / 47 / 93
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked8.54Cr / 5.78Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score5.35 / 10
|
8.4%
6.18
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 11
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.54Cr / 0.35Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score6.18 / 10
|
6.9%
5.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 4 / 17
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked1.03Cr / 0.61Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score5.54 / 10
|
| 281 | CHHATARPUR โ | CHHATARPUR | 4.65 | D |
52.1%
3.48
CategoryFarm Pond
Started / Completed / Phys242 / 88 / 46
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked3.27Cr / 0.47Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.71 / 5.0
Final score3.48 / 10
|
4.0%
1.26
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.15Cr
Expenditure rate (ongoing)25.2%
Part B score (max 5.0)1.26 / 5.0
Final score1.26 / 10
|
7.7%
5.23
CategoryDug Well Recharge
Started / Completed / Phys508 / 292 / 143
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)19.1%
Part B score (max 5.0)0.95 / 5.0
Final score5.23 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
27.5%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys115 / 43 / 40
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked1.37Cr / 0.80Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score6.51 / 10
|
4.2%
6.42
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 12
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.42 / 10
|
4.0%
6.82
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 2 / 6
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score6.82 / 10
|
| 282 | ALIRAJPUR โ | ALIRAJPUR | 4.63 | D |
23.6%
2.46
CategoryFarm Pond
Started / Completed / Phys186 / 1 / 25
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked4.51Cr / 1.59Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score2.46 / 10
|
2.4%
3.21
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score3.21 / 10
|
7.9%
4.85
CategoryDug Well Recharge
Started / Completed / Phys638 / 26 / 287
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate49.1%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked0.83Cr / 0.40Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.40 / 5.0
Final score4.85 / 10
|
โ |
65.3%
5.44
CategoryWater conservation & recharge
Started / Completed / Phys140 / 2 / 40
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked8.89Cr / 7.01Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score5.44 / 10
|
0.7%
4.09
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 2
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score4.09 / 10
|
0.1%
8.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)93.3%
Part B score (max 5.0)4.66 / 5.0
Final score8.00 / 10
|
| 283 | SIHORA โ | JABALPUR | 4.63 | D |
54.9%
1.84
CategoryFarm Pond
Started / Completed / Phys161 / 16 / 11
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked3.81Cr / 0.76Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.84 / 10
|
2.9%
3.93
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.18Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
|
0.5%
2.78
CategoryDug Well Recharge
Started / Completed / Phys15 / 1 / 6
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate46.7%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)9.0%
Part B score (max 5.0)0.45 / 5.0
Final score2.78 / 10
|
โ |
35.8%
8.33
CategoryWater conservation & recharge
Started / Completed / Phys39 / 21 / 5
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked1.02Cr / 1.47Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score8.33 / 10
|
1.4%
4.53
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.87 / 5.0
Final score4.53 / 10
|
4.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 284 | TIKAMGARH โ | TIKAMGARH | 4.61 | D |
29.3%
1.80
CategoryFarm Pond
Started / Completed / Phys190 / 2 / 22
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked3.37Cr / 0.79Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score1.80 / 10
|
1.3%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
10.7%
4.40
CategoryDug Well Recharge
Started / Completed / Phys548 / 8 / 322
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked0.48Cr / 0.13Cr
Expenditure rate (ongoing)27.8%
Part B score (max 5.0)1.39 / 5.0
Final score4.40 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.9%
5.82
CategoryWater conservation & recharge
Started / Completed / Phys167 / 15 / 79
Completion rate56.3%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked3.33Cr / 2.01Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score5.82 / 10
|
13.1%
6.14
CategoryWatershed Related Works
Started / Completed / Phys45 / 5 / 25
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.63Cr / 0.35Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.80 / 5.0
Final score6.14 / 10
|
3.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 285 | BEOHARI โ | SHAHDOL | 4.57 | D |
52.8%
2.32
CategoryFarm Pond
Started / Completed / Phys347 / 81 / 0
Completion rate23.3%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked6.39Cr / 1.47Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score2.32 / 10
|
โ |
1.8%
2.71
CategoryDug Well Recharge
Started / Completed / Phys110 / 12 / 24
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate32.7%
Part A score (max 5.0)1.64 / 5.0
Ongoing sanction / booked0.19Cr / 0.04Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score2.71 / 10
|
18.6%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
12.8%
5.29
CategoryWater conservation & recharge
Started / Completed / Phys56 / 21 / 2
Completion rate41.1%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.34Cr / 0.87Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score5.29 / 10
|
7.4%
4.92
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.67Cr / 0.43Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.26 / 5.0
Final score4.92 / 10
|
6.6%
6.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 10 / 0
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.45Cr / 0.29Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score6.04 / 10
|
| 286 | BALDEOGARH โ | TIKAMGARH | 4.56 | D |
29.3%
2.72
CategoryFarm Pond
Started / Completed / Phys238 / 10 / 36
Completion rate19.3%
Part A score (max 5.0)0.97 / 5.0
Ongoing sanction / booked3.63Cr / 1.27Cr
Expenditure rate (ongoing)35.0%
Part B score (max 5.0)1.75 / 5.0
Final score2.72 / 10
|
8.4%
0.30
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.28Cr / 0.08Cr
Expenditure rate (ongoing)6.1%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
|
10.2%
5.38
CategoryDug Well Recharge
Started / Completed / Phys605 / 17 / 439
⚠ Works needing verification (Completed/Physically Completed)24 works (exp <30%)
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked0.32Cr / 0.10Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score5.38 / 10
|
0.6%
8.57
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 9 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)96.5%
Part B score (max 5.0)4.82 / 5.0
Final score8.57 / 10
|
40.8%
6.03
CategoryWater conservation & recharge
Started / Completed / Phys262 / 34 / 123
Completion rate59.9%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked2.79Cr / 1.69Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.03 / 10
|
5.6%
6.32
CategoryWatershed Related Works
Started / Completed / Phys31 / 7 / 13
Completion rate64.5%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked0.34Cr / 0.21Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score6.32 / 10
|
5.1%
6.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 6
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.45Cr / 0.35Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score6.38 / 10
|
| 287 | NARAYANGANJ โ | MANDLA | 4.50 | D |
36.2%
5.15
CategoryFarm Pond
Started / Completed / Phys187 / 39 / 61
Completion rate53.5%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked2.86Cr / 1.42Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score5.15 / 10
|
13.5%
0.42
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.39Cr / 0.20Cr
Expenditure rate (ongoing)8.3%
Part B score (max 5.0)0.42 / 5.0
Final score0.42 / 10
|
2.3%
6.36
CategoryDug Well Recharge
Started / Completed / Phys155 / 86 / 21
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate69.0%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.91 / 5.0
Final score6.36 / 10
|
โ |
29.0%
4.95
CategoryWater conservation & recharge
Started / Completed / Phys92 / 15 / 5
Completion rate21.7%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked4.20Cr / 3.25Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score4.95 / 10
|
18.6%
5.31
CategoryWatershed Related Works
Started / Completed / Phys72 / 21 / 0
Completion rate29.2%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked2.34Cr / 1.81Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score5.31 / 10
|
0.4%
3.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
|
| 288 | KALAPIPAL โ | SHAJAPUR | 4.50 | D |
52.6%
3.52
CategoryFarm Pond
Started / Completed / Phys150 / 68 / 11
Completion rate52.7%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked1.61Cr / 0.28Cr
Expenditure rate (ongoing)17.7%
Part B score (max 5.0)0.88 / 5.0
Final score3.52 / 10
|
5.5%
1.25
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.09Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.25 / 5.0
Final score1.25 / 10
|
16.0%
4.84
CategoryDug Well Recharge
Started / Completed / Phys397 / 203 / 153
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate89.7%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)7.0%
Part B score (max 5.0)0.35 / 5.0
Final score4.84 / 10
|
0.9%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
25.1%
6.88
CategoryWater conservation & recharge
Started / Completed / Phys40 / 20 / 13
Completion rate82.5%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score6.88 / 10
|
โ | โ |
| 289 | NARSIMHAPUR โ | NARSINGHPUR | 4.49 | D |
64.1%
3.57
CategoryFarm Pond
Started / Completed / Phys245 / 112 / 28
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked3.18Cr / 0.45Cr
Expenditure rate (ongoing)14.2%
Part B score (max 5.0)0.71 / 5.0
Final score3.57 / 10
|
2.3%
0.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)1.6%
Part B score (max 5.0)0.08 / 5.0
Final score0.08 / 10
|
1.4%
5.00
CategoryDug Well Recharge
Started / Completed / Phys65 / 11 / 30
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate63.1%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)36.9%
Part B score (max 5.0)1.84 / 5.0
Final score5.00 / 10
|
โ |
31.1%
6.65
CategoryWater conservation & recharge
Started / Completed / Phys32 / 11 / 10
Completion rate65.6%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked3.00Cr / 2.02Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score6.65 / 10
|
0.8%
6.10
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.10 / 10
|
0.3%
6.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score6.00 / 10
|
| 290 | NALCHHA โ | DHAR | 4.47 | D |
36.9%
3.03
CategoryFarm Pond
Started / Completed / Phys165 / 1 / 28
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate17.6%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked3.76Cr / 1.62Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score3.03 / 10
|
โ |
7.8%
4.43
CategoryDug Well Recharge
Started / Completed / Phys351 / 52 / 92
⚠ Works needing verification (Completed/Physically Completed)59 works (exp <30%)
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked0.39Cr / 0.19Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score4.43 / 10
|
1.0%
7.02
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score7.02 / 10
|
45.0%
5.47
CategoryWater conservation & recharge
Started / Completed / Phys100 / 14 / 27
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked3.82Cr / 2.61Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score5.47 / 10
|
5.6%
4.85
CategoryWatershed Related Works
Started / Completed / Phys26 / 5 / 6
Completion rate42.3%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked0.40Cr / 0.22Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score4.85 / 10
|
3.7%
5.55
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 4 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score5.55 / 10
|
| 291 | KANNOD โ | DEWAS | 4.46 | D |
55.1%
2.68
CategoryFarm Pond
Started / Completed / Phys233 / 46 / 39
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate36.5%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked5.76Cr / 0.98Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score2.68 / 10
|
2.3%
2.79
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score2.79 / 10
|
10.3%
5.31
CategoryDug Well Recharge
Started / Completed / Phys676 / 286 / 300
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.18Cr / 0.03Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score5.31 / 10
|
10.9%
6.83
CategoryIrrigation infrastructure
Started / Completed / Phys34 / 13 / 18
Completion rate91.2%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score6.83 / 10
|
19.1%
7.59
CategoryWater conservation & recharge
Started / Completed / Phys68 / 30 / 32
Completion rate91.2%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.61Cr / 0.37Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score7.59 / 10
|
1.9%
7.78
CategoryWatershed Related Works
Started / Completed / Phys16 / 8 / 6
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score7.78 / 10
|
0.3%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 292 | RAIPUR KARCHULIYAN โ | REWA | 4.45 | D |
51.6%
3.52
CategoryFarm Pond
Started / Completed / Phys305 / 97 / 44
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked1.65Cr / 0.40Cr
Expenditure rate (ongoing)24.1%
Part B score (max 5.0)1.20 / 5.0
Final score3.52 / 10
|
9.5%
0.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.03Cr
Expenditure rate (ongoing)4.0%
Part B score (max 5.0)0.20 / 5.0
Final score0.20 / 10
|
3.1%
4.52
CategoryDug Well Recharge
Started / Completed / Phys87 / 49 / 14
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate72.4%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score4.52 / 10
|
2.5%
6.53
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 6 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score6.53 / 10
|
25.9%
6.67
CategoryWater conservation & recharge
Started / Completed / Phys50 / 23 / 17
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.67 / 10
|
4.6%
6.41
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score6.41 / 10
|
2.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 293 | MOMAN BADODIYA โ | SHAJAPUR | 4.43 | D |
51.2%
3.01
CategoryFarm Pond
Started / Completed / Phys192 / 59 / 11
Completion rate36.5%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked3.20Cr / 0.76Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score3.01 / 10
|
3.9%
2.97
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score2.97 / 10
|
11.9%
5.08
CategoryDug Well Recharge
Started / Completed / Phys443 / 50 / 325
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate84.7%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.16Cr / 0.03Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score5.08 / 10
|
1.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
28.4%
6.31
CategoryWater conservation & recharge
Started / Completed / Phys68 / 21 / 28
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.74Cr / 0.40Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score6.31 / 10
|
1.7%
5.31
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.31 / 5.0
Final score5.31 / 10
|
1.9%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 294 | DABRA โ | GWALIOR | 4.42 | D |
63.8%
4.08
CategoryFarm Pond
Started / Completed / Phys245 / 33 / 141
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked1.92Cr / 0.20Cr
Expenditure rate (ongoing)10.5%
Part B score (max 5.0)0.53 / 5.0
Final score4.08 / 10
|
8.8%
1.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.85Cr / 0.17Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
|
5.1%
4.68
CategoryDug Well Recharge
Started / Completed / Phys192 / 41 / 133
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)3.0%
Part B score (max 5.0)0.15 / 5.0
Final score4.68 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
18.2%
6.35
CategoryWater conservation & recharge
Started / Completed / Phys40 / 3 / 33
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.85 / 5.0
Final score6.35 / 10
|
1.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.6%
5.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score5.28 / 10
|
| 295 | BABAI CHICHLI โ | NARSINGHPUR | 4.41 | D |
86.3%
3.62
CategoryFarm Pond
Started / Completed / Phys198 / 112 / 3
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked2.33Cr / 0.33Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.71 / 5.0
Final score3.62 / 10
|
โ |
1.8%
5.74
CategoryDug Well Recharge
Started / Completed / Phys45 / 26 / 16
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.07 / 5.0
Final score5.74 / 10
|
โ |
9.4%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys16 / 10 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
2.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 296 | KHATEGAON โ | DEWAS | 4.40 | D |
59.3%
2.60
CategoryFarm Pond
Started / Completed / Phys289 / 6 / 84
Completion rate31.1%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked8.22Cr / 1.71Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.04 / 5.0
Final score2.60 / 10
|
โ |
5.4%
3.56
CategoryDug Well Recharge
Started / Completed / Phys428 / 55 / 183
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.49Cr / 0.08Cr
Expenditure rate (ongoing)15.6%
Part B score (max 5.0)0.78 / 5.0
Final score3.56 / 10
|
2.6%
5.28
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.17Cr / 0.08Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.51 / 5.0
Final score5.28 / 10
|
31.4%
7.68
CategoryWater conservation & recharge
Started / Completed / Phys132 / 0 / 100
Completion rate75.8%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked1.52Cr / 1.18Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score7.68 / 10
|
1.0%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.3%
4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.18 / 10
|
| 297 | NOWGOAN โ | CHHATARPUR | 4.37 | D |
79.7%
3.50
CategoryFarm Pond
Started / Completed / Phys267 / 105 / 29
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked3.43Cr / 0.68Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score3.50 / 10
|
โ |
6.2%
4.49
CategoryDug Well Recharge
Started / Completed / Phys456 / 366 / 8
⚠ Works needing verification (Completed/Physically Completed)75 works (exp <30%)
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)7.7%
Part B score (max 5.0)0.38 / 5.0
Final score4.49 / 10
|
โ |
11.5%
9.00
CategoryWater conservation & recharge
Started / Completed / Phys55 / 22 / 30
Completion rate94.5%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)94.2%
Part B score (max 5.0)4.71 / 5.0
Final score9.00 / 10
|
1.8%
10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.8%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 298 | SHUJALPUR โ | SHAJAPUR | 4.34 | D |
47.6%
3.04
CategoryFarm Pond
Started / Completed / Phys106 / 32 / 0
Completion rate30.2%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked2.46Cr / 0.75Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score3.04 / 10
|
2.1%
2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
|
12.4%
4.96
CategoryDug Well Recharge
Started / Completed / Phys364 / 111 / 180
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate79.9%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.96 / 5.0
Final score4.96 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.6%
5.67
CategoryWater conservation & recharge
Started / Completed / Phys50 / 11 / 21
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.84Cr / 0.42Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score5.67 / 10
|
0.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.6%
6.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.39 / 10
|
| 299 | RANAPUR โ | JHABUA | 4.31 | D |
24.9%
1.97
CategoryFarm Pond
Started / Completed / Phys146 / 5 / 1
Completion rate4.1%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked5.13Cr / 1.81Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score1.97 / 10
|
2.1%
2.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.00Cr
Expenditure rate (ongoing)1.3%
Part B score (max 5.0)0.06 / 5.0
Final score2.56 / 10
|
6.1%
4.26
CategoryDug Well Recharge
Started / Completed / Phys524 / 89 / 74
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate31.1%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked0.91Cr / 0.49Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score4.26 / 10
|
โ |
64.1%
5.23
CategoryWater conservation & recharge
Started / Completed / Phys145 / 11 / 30
Completion rate28.3%
Part A score (max 5.0)1.41 / 5.0
Ongoing sanction / booked9.02Cr / 6.88Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score5.23 / 10
|
2.4%
5.85
CategoryWatershed Related Works
Started / Completed / Phys16 / 2 / 6
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.33Cr / 0.22Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score5.85 / 10
|
0.2%
4.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.25 / 10
|
| 300 | JABALPUR โ | JABALPUR | 4.31 | D |
45.5%
2.76
CategoryFarm Pond
Started / Completed / Phys177 / 45 / 24
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked2.76Cr / 0.45Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.82 / 5.0
Final score2.76 / 10
|
11.1%
1.27
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.26Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score1.27 / 10
|
6.4%
6.39
CategoryDug Well Recharge
Started / Completed / Phys230 / 111 / 76
Completion rate81.3%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score6.39 / 10
|
0.2%
2.26
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score2.26 / 10
|
22.3%
6.05
CategoryWater conservation & recharge
Started / Completed / Phys47 / 13 / 19
Completion rate68.1%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.46Cr / 0.24Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score6.05 / 10
|
7.3%
6.02
CategoryWatershed Related Works
Started / Completed / Phys13 / 9 / 2
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.79 / 5.0
Final score6.02 / 10
|
7.1%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 12 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 301 | JAITHARI โ | ANUPPUR | 4.26 | D |
85.9%
3.64
CategoryFarm Pond
Started / Completed / Phys1,067 / 496 / 76
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked12.76Cr / 2.45Cr
Expenditure rate (ongoing)19.2%
Part B score (max 5.0)0.96 / 5.0
Final score3.64 / 10
|
โ |
1.1%
6.23
CategoryDug Well Recharge
Started / Completed / Phys173 / 24 / 98
⚠ Works needing verification (Completed/Physically Completed)40 works (exp <30%)
Completion rate70.5%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score6.23 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.0%
7.38
CategoryWater conservation & recharge
Started / Completed / Phys69 / 32 / 29
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.77Cr / 0.45Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score7.38 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
3.6%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 16 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 302 | SEONI MALWA โ | NARMADAPURAM | 4.25 | D |
65.4%
2.87
CategoryFarm Pond
Started / Completed / Phys182 / 65 / 15
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked2.56Cr / 0.34Cr
Expenditure rate (ongoing)13.5%
Part B score (max 5.0)0.67 / 5.0
Final score2.87 / 10
|
โ |
6.9%
6.27
CategoryDug Well Recharge
Started / Completed / Phys199 / 64 / 101
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)42.5%
Part B score (max 5.0)2.13 / 5.0
Final score6.27 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
23.9%
6.85
CategoryWater conservation & recharge
Started / Completed / Phys58 / 34 / 14
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.63Cr / 0.34Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score6.85 / 10
|
1.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 6 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.7%
5.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.78 / 5.0
Final score5.54 / 10
|
| 303 | KARELI โ | NARSINGHPUR | 4.24 | D |
81.6%
3.59
CategoryFarm Pond
Started / Completed / Phys211 / 117 / 13
Completion rate61.6%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked2.16Cr / 0.22Cr
Expenditure rate (ongoing)10.3%
Part B score (max 5.0)0.51 / 5.0
Final score3.59 / 10
|
โ |
1.3%
4.85
CategoryDug Well Recharge
Started / Completed / Phys37 / 15 / 13
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate75.7%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score4.85 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
13.8%
6.62
CategoryWater conservation & recharge
Started / Completed / Phys34 / 25 / 8
Completion rate97.1%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score6.62 / 10
|
0.5%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.4%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 304 | RAMPUR NAIKIN โ | SIDHI | 4.23 | D |
42.7%
2.16
CategoryFarm Pond
Started / Completed / Phys306 / 65 / 9
Completion rate24.2%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked4.41Cr / 0.84Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score2.16 / 10
|
โ |
1.4%
2.62
CategoryDug Well Recharge
Started / Completed / Phys73 / 8 / 17
Completion rate34.2%
Part A score (max 5.0)1.71 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)18.1%
Part B score (max 5.0)0.90 / 5.0
Final score2.62 / 10
|
3.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 3 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
38.2%
5.49
CategoryWater conservation & recharge
Started / Completed / Phys123 / 40 / 23
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked2.84Cr / 1.66Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.93 / 5.0
Final score5.49 / 10
|
1.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
12.7%
5.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 6 / 8
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked0.72Cr / 0.39Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score5.33 / 10
|
| 305 | PIPLODA โ | RATLAM | 4.22 | D |
60.9%
2.79
CategoryFarm Pond
Started / Completed / Phys97 / 30 / 8
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked1.48Cr / 0.25Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.84 / 5.0
Final score2.79 / 10
|
โ |
14.3%
5.82
CategoryDug Well Recharge
Started / Completed / Phys197 / 44 / 102
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score5.82 / 10
|
0.8%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
22.8%
6.51
CategoryWater conservation & recharge
Started / Completed / Phys21 / 11 / 4
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score6.51 / 10
|
1.2%
10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
| 306 | MALHARGARH โ | MANDSAUR | 4.20 | D |
38.4%
2.17
CategoryFarm Pond
Started / Completed / Phys238 / 29 / 23
Completion rate21.8%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked3.99Cr / 0.86Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score2.17 / 10
|
โ |
16.4%
5.10
CategoryDug Well Recharge
Started / Completed / Phys811 / 140 / 293
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.95Cr / 0.46Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.43 / 5.0
Final score5.10 / 10
|
โ |
42.8%
5.44
CategoryWater conservation & recharge
Started / Completed / Phys145 / 50 / 31
Completion rate55.9%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked2.39Cr / 1.26Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score5.44 / 10
|
1.4%
10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.9%
7.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.09Cr
Expenditure rate (ongoing)93.8%
Part B score (max 5.0)4.69 / 5.0
Final score7.19 / 10
|
| 307 | MANDSAUR โ | MANDSAUR | 4.15 | D |
26.6%
1.54
CategoryFarm Pond
Started / Completed / Phys230 / 26 / 0
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate11.3%
Part A score (max 5.0)0.57 / 5.0
Ongoing sanction / booked2.55Cr / 0.49Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score1.54 / 10
|
โ |
24.0%
4.55
CategoryDug Well Recharge
Started / Completed / Phys991 / 199 / 382
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked0.91Cr / 0.30Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score4.55 / 10
|
โ |
47.8%
5.36
CategoryWater conservation & recharge
Started / Completed / Phys150 / 47 / 30
Completion rate51.3%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked2.91Cr / 1.63Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score5.36 / 10
|
0.3%
10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.3%
4.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score4.65 / 10
|
| 308 | CHAWARPATHA โ | NARSINGHPUR | 4.07 | D |
78.1%
3.63
CategoryFarm Pond
Started / Completed / Phys237 / 138 / 0
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked2.21Cr / 0.32Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.71 / 5.0
Final score3.63 / 10
|
4.9%
0.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.4%
Part B score (max 5.0)0.02 / 5.0
Final score0.02 / 10
|
1.9%
4.40
CategoryDug Well Recharge
Started / Completed / Phys53 / 2 / 37
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.72 / 5.0
Final score4.40 / 10
|
0.4%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
11.1%
7.43
CategoryWater conservation & recharge
Started / Completed / Phys24 / 21 / 2
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.64 / 5.0
Final score7.43 / 10
|
1.5%
5.50
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score5.50 / 10
|
2.0%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 309 | JHABUA โ | JHABUA | 4.04 | D |
20.2%
3.06
CategoryFarm Pond
Started / Completed / Phys211 / 6 / 7
Completion rate6.2%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked5.27Cr / 2.91Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score3.06 / 10
|
0.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
6.7%
5.45
CategoryDug Well Recharge
Started / Completed / Phys731 / 251 / 93
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked0.99Cr / 0.61Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score5.45 / 10
|
โ |
71.9%
4.24
CategoryWater conservation & recharge
Started / Completed / Phys308 / 23 / 35
Completion rate18.8%
Part A score (max 5.0)0.94 / 5.0
Ongoing sanction / booked15.64Cr / 10.31Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score4.24 / 10
|
โ |
0.4%
3.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score3.64 / 10
|
| 310 | RATLAM โ | RATLAM | 3.92 | D |
64.8%
2.63
CategoryFarm Pond
Started / Completed / Phys373 / 52 / 59
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate29.8%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked9.93Cr / 2.26Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score2.63 / 10
|
โ |
3.8%
5.15
CategoryDug Well Recharge
Started / Completed / Phys310 / 44 / 215
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate83.5%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.11Cr / 0.02Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score5.15 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
29.7%
6.34
CategoryWater conservation & recharge
Started / Completed / Phys102 / 32 / 41
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked1.54Cr / 0.85Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.34 / 10
|
โ |
1.6%
7.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score7.66 / 10
|
| 311 | REWA โ | REWA | 3.89 | D |
78.9%
3.39
CategoryFarm Pond
Started / Completed / Phys225 / 95 / 25
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked1.39Cr / 0.20Cr
Expenditure rate (ongoing)14.4%
Part B score (max 5.0)0.72 / 5.0
Final score3.39 / 10
|
8.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
0.2%
10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 14 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.5%
10.00
CategoryWater conservation & recharge
Started / Completed / Phys21 / 21 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
0.6%
10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
1.5%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
| 312 | NASRULLAGANJ โ | SEHORE | 3.88 | D |
58.1%
2.19
CategoryFarm Pond
Started / Completed / Phys178 / 2 / 46
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate27.0%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked3.38Cr / 0.57Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.84 / 5.0
Final score2.19 / 10
|
โ |
15.5%
5.56
CategoryDug Well Recharge
Started / Completed / Phys488 / 41 / 349
Completion rate79.9%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.08Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score5.56 / 10
|
1.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
18.2%
6.64
CategoryWater conservation & recharge
Started / Completed / Phys45 / 11 / 24
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.26Cr / 0.14Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score6.64 / 10
|
1.5%
5.69
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score5.69 / 10
|
5.6%
6.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 5
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score6.09 / 10
|
| 313 | SOHAGPUR โ | SHAHDOL | 3.86 | D |
47.8%
2.29
CategoryFarm Pond
Started / Completed / Phys493 / 98 / 15
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate22.9%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked8.83Cr / 2.02Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.15 / 5.0
Final score2.29 / 10
|
1.1%
2.78
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score2.78 / 10
|
1.1%
4.73
CategoryDug Well Recharge
Started / Completed / Phys97 / 18 / 41
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score4.73 / 10
|
1.3%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
41.8%
5.24
CategoryWater conservation & recharge
Started / Completed / Phys87 / 5 / 25
Completion rate34.5%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked7.43Cr / 5.23Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score5.24 / 10
|
0.9%
5.21
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.88 / 5.0
Final score5.21 / 10
|
6.0%
5.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 3 / 9
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.73Cr / 0.44Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score5.14 / 10
|
Scheme: โน Sanction Weighted
Level: Block
Snapshot: 2026-05-07
Units shown: 313
โก Weight % shown is each unit's own auto-computed weight โ not the global admin-set value.
49
Day of campaign
103
Total days
54
Days remaining
Flat
Grading scheme
Campaign: 2026-03-19 โ 2026-06-30 ยท Grades based on raw combined achievement % โ no benchmark division.
Grade thresholds (raw combined %):
A โ On Track โฅ 80%
B โ Progressing โฅ 70%
C โ Lagging โฅ 60%
D โ Critical โฅ 0%
N/A No target
Grade distribution โ 313 blocks on this snapshot:
3
A โ On Track
25
B โ Progressing
94
C โ Lagging
191
D โ Critical
๐ก Flat scheme: Score % = (total score / 10) ร 100. Grade assigned by comparing this % directly against fixed thresholds โ e.g., A+ โฅ 85%, A โฅ 80%.
โ๏ธ Step 1 โ Category Weightage
Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.
Weightage = Sanctioned Cost of Category
รท Total Sanctioned Cost (all categories)
e.g. Farm Pond = โน200 Cr out of โน500 Cr total
Weightage = 200 รท 500 = 0.40 (40%)
Computed independently per unit โ two districts with different sanction distributions will have different weightages for the same category.
๐ ฐ Step 2a โ Part A Score (Completion)
Fixed 50% weight on completion of works.
Part A = (Completed + Phys) รท Started ร 5
๐ ฑ Step 2b โ Part B Score (Expenditure)
Fixed 50% weight on expenditure booking on ongoing works.
Part B = (Ongoing Booked รท Ongoing Sanction) ร 5
If all done โ full 5 marks automatically
๐ Step 3 โ Ceiling & Model
Category Score = Part A + Part B
๐ Step 4 โ Final Composite Score
Weighted sum of all category scores (weightages sum to 100%).
Final Score = ฮฃ (Weightage_i ร Score_i)
Example: Farm Pond 40% ร 7.2 + Dug Well 20% ร 6.5 + Amrit Sarovar 40% ร 8.1 โ 7.42
๐ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.