๐Ÿ“ˆ On
โšก
Sanction Cost Weighted mode. Each block's category weight is auto-computed from its own sanction amount proportions. Two units with identical category counts may have different weight distributions.
MAHIDPUR
8.28
๐Ÿฅ‡
Completed256 Started1053 Rank#1
KHANDWA
8.25
๐Ÿฅˆ
Completed373 Started1277 Rank#2
KASRAWAD
8.09
๐Ÿฅ‰
Completed372 Started1227 Rank#3
๐Ÿ“‹ Category Scorecard โ€” Block Level
313 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
# Block District Total ๐Ÿ“ˆ Trajectory
raw achievement %
Farm Pondโ–ถ Amrit Sarowarโ–ถ Dug Well Rechargeโ–ถ Irrigation infrastructureโ–ถ Water conservation & rechargeโ–ถ Watershed Related Worksโ–ถ Repair & Maintenance (Water Structures)โ–ถ
๐Ÿฅ‡ MAHIDPUR โ†— UJJAIN 8.28 A
29.7% 9.95
CategoryFarm Pond
Started / Completed / Phys92 / 44 / 47
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.95 / 10
15.4% 3.31
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.00Cr / 0.66Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score3.31 / 10
36.3% 9.00
CategoryDug Well Recharge
Started / Completed / Phys912 / 182 / 729
Completion rate99.9%
Part A score (max 5.0)4.99 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score9.00 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.4% 7.99
CategoryWater conservation & recharge
Started / Completed / Phys37 / 24 / 11
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score7.99 / 10
2.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
๐Ÿฅˆ KHANDWA โ†— KHANDWA 8.25 A
34.6% 8.51
CategoryFarm Pond
Started / Completed / Phys286 / 56 / 145
⚠ Works needing verification (Completed/Physically Completed)85 works (exp <30%)
Completion rate70.3%
Part A score (max 5.0)3.51 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.51 / 10
8.4% 6.70
CategoryAmrit Sarowar
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.74Cr / 0.62Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score6.70 / 10
12.0% 9.82
CategoryDug Well Recharge
Started / Completed / Phys824 / 273 / 521
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate96.4%
Part A score (max 5.0)4.82 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.82 / 10
5.1% 8.10
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 6 / 5
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.11Cr
Expenditure rate (ongoing)77.3%
Part B score (max 5.0)3.87 / 5.0
Final score8.10 / 10
20.7% 8.44
CategoryWater conservation & recharge
Started / Completed / Phys101 / 28 / 59
Completion rate86.1%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.69Cr / 0.57Cr
Expenditure rate (ongoing)82.8%
Part B score (max 5.0)4.14 / 5.0
Final score8.44 / 10
18.7% 7.23
CategoryWatershed Related Works
Started / Completed / Phys45 / 7 / 24
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked1.11Cr / 0.84Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.79 / 5.0
Final score7.23 / 10
0.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
๐Ÿฅ‰ KASRAWAD โ†— KHARGONE 8.09 A
21.5% 7.23
CategoryFarm Pond
Started / Completed / Phys322 / 112 / 203
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.12Cr / 0.05Cr
Expenditure rate (ongoing)46.8%
Part B score (max 5.0)2.34 / 5.0
Final score7.23 / 10
3.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.9% 6.26
CategoryDug Well Recharge
Started / Completed / Phys556 / 200 / 350
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score6.26 / 10
1.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
66.3% 8.35
CategoryWater conservation & recharge
Started / Completed / Phys338 / 56 / 243
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked2.07Cr / 1.63Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score8.35 / 10
0.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4 SAWER โ†— INDORE 7.74 B
55.7% 7.12
CategoryFarm Pond
Started / Completed / Phys100 / 45 / 35
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score7.12 / 10
โ€”
2.4% 9.00
CategoryDug Well Recharge
Started / Completed / Phys177 / 172 / 1
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate97.7%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)91.7%
Part B score (max 5.0)4.58 / 5.0
Final score9.00 / 10
โ€”
28.3% 8.67
CategoryWater conservation & recharge
Started / Completed / Phys27 / 16 / 5
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.21Cr / 0.20Cr
Expenditure rate (ongoing)95.5%
Part B score (max 5.0)4.78 / 5.0
Final score8.67 / 10
4.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.9% 7.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.19Cr / 0.14Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score7.17 / 10
5 BAMORI โ†— GUNA 7.62 B
25.3% 6.10
CategoryFarm Pond
Started / Completed / Phys81 / 76 / 0
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score6.10 / 10
โ€”
2.6% 9.92
CategoryDug Well Recharge
Started / Completed / Phys60 / 14 / 45
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.3%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
โ€”
36.0% 6.13
CategoryWater conservation & recharge
Started / Completed / Phys13 / 3 / 7
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.57Cr / 0.26Cr
Expenditure rate (ongoing)45.7%
Part B score (max 5.0)2.29 / 5.0
Final score6.13 / 10
5.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6 ZIRAPUR โ†— RAJGARH 7.43 B
24.8% 6.48
CategoryFarm Pond
Started / Completed / Phys478 / 316 / 122
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate91.6%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.78Cr / 0.30Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score6.48 / 10
โ€”
4.4% 9.93
CategoryDug Well Recharge
Started / Completed / Phys642 / 574 / 59
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate98.6%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
0.6% 5.19
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 0
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.19 / 10
63.7% 7.64
CategoryWater conservation & recharge
Started / Completed / Phys218 / 35 / 133
Completion rate77.1%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked5.54Cr / 4.19Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score7.64 / 10
0.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.4% 7.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 3 / 14
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked0.81Cr / 0.68Cr
Expenditure rate (ongoing)84.0%
Part B score (max 5.0)4.20 / 5.0
Final score7.47 / 10
7 PUNASA โ†— KHANDWA 7.32 B
47.9% 5.67
CategoryFarm Pond
Started / Completed / Phys342 / 47 / 206
⚠ Works needing verification (Completed/Physically Completed)84 works (exp <30%)
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score5.67 / 10
1.3% 4.42
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.22Cr
Expenditure rate (ongoing)88.3%
Part B score (max 5.0)4.42 / 5.0
Final score4.42 / 10
15.1% 9.90
CategoryDug Well Recharge
Started / Completed / Phys1,132 / 250 / 859
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate98.0%
Part A score (max 5.0)4.90 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.90 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.6% 8.24
CategoryWater conservation & recharge
Started / Completed / Phys114 / 15 / 91
Completion rate93.0%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.57Cr / 0.41Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score8.24 / 10
10.0% 8.47
CategoryWatershed Related Works
Started / Completed / Phys35 / 9 / 23
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)78.0%
Part B score (max 5.0)3.90 / 5.0
Final score8.47 / 10
4.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8 MEHANDWANI โ†— DINDORI 7.30 B
50.6% 6.57
CategoryFarm Pond
Started / Completed / Phys290 / 63 / 213
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.45Cr / 0.16Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.82 / 5.0
Final score6.57 / 10
โ€”
2.6% 9.92
CategoryDug Well Recharge
Started / Completed / Phys189 / 147 / 39
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.4%
Part A score (max 5.0)4.92 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.92 / 10
โ€”
19.4% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys89 / 5 / 79
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.92Cr / 0.82Cr
Expenditure rate (ongoing)89.4%
Part B score (max 5.0)4.47 / 5.0
Final score9.00 / 10
24.5% 7.30
CategoryWatershed Related Works
Started / Completed / Phys44 / 13 / 22
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked1.21Cr / 0.81Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score7.30 / 10
2.9% 6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score6.40 / 10
9 TARANA โ†— UJJAIN 7.25 B
29.4% 10.00
CategoryFarm Pond
Started / Completed / Phys118 / 26 / 92
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
20.5% 3.82
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.47Cr / 0.92Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score3.82 / 10
24.6% 6.71
CategoryDug Well Recharge
Started / Completed / Phys833 / 590 / 234
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score6.71 / 10
โ€”
13.5% 7.48
CategoryWater conservation & recharge
Started / Completed / Phys45 / 21 / 17
Completion rate84.4%
Part A score (max 5.0)4.22 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.26 / 5.0
Final score7.48 / 10
12.0% 7.20
CategoryWatershed Related Works
Started / Completed / Phys36 / 29 / 3
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.75 / 5.0
Final score7.20 / 10
โ€”
10 AMARPUR โ†— DINDORI 7.25 B
38.8% 7.14
CategoryFarm Pond
Started / Completed / Phys257 / 97 / 149
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.22Cr / 0.10Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.35 / 5.0
Final score7.14 / 10
โ€”
3.0% 9.98
CategoryDug Well Recharge
Started / Completed / Phys200 / 29 / 170
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.5%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
โ€”
33.3% 6.82
CategoryWater conservation & recharge
Started / Completed / Phys60 / 5 / 25
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked4.62Cr / 3.99Cr
Expenditure rate (ongoing)86.4%
Part B score (max 5.0)4.32 / 5.0
Final score6.82 / 10
15.3% 8.30
CategoryWatershed Related Works
Started / Completed / Phys31 / 24 / 4
Completion rate90.3%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.79 / 5.0
Final score8.30 / 10
9.6% 6.62
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 9 / 2
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.69Cr / 0.49Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score6.62 / 10
11 THIKRI โ†— BARWANI 7.24 B
69.1% 6.42
CategoryFarm Pond
Started / Completed / Phys137 / 0 / 99
Completion rate72.3%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.70Cr / 0.40Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.81 / 5.0
Final score6.42 / 10
โ€”
7.4% 10.00
CategoryDug Well Recharge
Started / Completed / Phys102 / 2 / 100
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
10.6% 7.34
CategoryWater conservation & recharge
Started / Completed / Phys14 / 7 / 5
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score7.34 / 10
13.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 6 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
12 RAJGARH โ†— RAJGARH 7.24 B
19.2% 6.24
CategoryFarm Pond
Started / Completed / Phys457 / 305 / 107
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.78Cr / 0.27Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score6.24 / 10
1.5% 6.95
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.39Cr / 0.35Cr
Expenditure rate (ongoing)89.0%
Part B score (max 5.0)4.45 / 5.0
Final score6.95 / 10
2.8% 7.84
CategoryDug Well Recharge
Started / Completed / Phys569 / 460 / 85
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.05 / 5.0
Final score7.84 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
69.5% 7.47
CategoryWater conservation & recharge
Started / Completed / Phys315 / 20 / 200
Completion rate69.8%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked11.52Cr / 9.15Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score7.47 / 10
0.6% 6.31
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 2
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.15Cr / 0.11Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score6.31 / 10
5.8% 7.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 7 / 27
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.52Cr / 0.36Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.56 / 10
13 ARON โ†— GUNA 7.24 B
51.2% 6.39
CategoryFarm Pond
Started / Completed / Phys379 / 242 / 103
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked1.16Cr / 0.43Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score6.39 / 10
โ€”
2.5% 9.00
CategoryDug Well Recharge
Started / Completed / Phys288 / 106 / 179
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)91.1%
Part B score (max 5.0)4.56 / 5.0
Final score9.00 / 10
โ€”
42.3% 7.91
CategoryWater conservation & recharge
Started / Completed / Phys155 / 31 / 111
Completion rate91.6%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked1.28Cr / 0.85Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.33 / 5.0
Final score7.91 / 10
3.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 3 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14 RAJPUR โ†— BARWANI 7.23 B
28.7% 7.09
CategoryFarm Pond
Started / Completed / Phys164 / 0 / 125
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.35Cr / 0.23Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score7.09 / 10
โ€”
17.4% 8.58
CategoryDug Well Recharge
Started / Completed / Phys383 / 0 / 373
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score8.58 / 10
1.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 4 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.8% 7.30
CategoryWater conservation & recharge
Started / Completed / Phys35 / 3 / 23
Completion rate74.3%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.21Cr / 0.15Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score7.30 / 10
28.0% 6.26
CategoryWatershed Related Works
Started / Completed / Phys38 / 1 / 31
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.32Cr / 0.13Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.26 / 10
2.6% 7.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 8
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score7.84 / 10
15 BALADI โ†— KHANDWA 7.19 B
52.5% 5.86
CategoryFarm Pond
Started / Completed / Phys96 / 33 / 22
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate57.3%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score5.86 / 10
5.0% 3.50
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.50 / 5.0
Final score3.50 / 10
28.9% 9.85
CategoryDug Well Recharge
Started / Completed / Phys334 / 132 / 192
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate97.0%
Part A score (max 5.0)4.85 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.85 / 10
โ€”
11.7% 7.69
CategoryWater conservation & recharge
Started / Completed / Phys22 / 6 / 12
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score7.69 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
16 BINA โ†— SAGAR 7.17 B
37.3% 3.08
CategoryFarm Pond
Started / Completed / Phys124 / 20 / 28
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate38.7%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked1.06Cr / 0.24Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score3.08 / 10
โ€”
10.1% 7.59
CategoryDug Well Recharge
Started / Completed / Phys417 / 196 / 20
⚠ Works needing verification (Completed/Physically Completed)201 works (exp <30%)
Completion rate51.8%
Part A score (max 5.0)2.59 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score7.59 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
50.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys39 / 7 / 32
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17 HARSUD โ†— KHANDWA 7.16 B
42.2% 5.52
CategoryFarm Pond
Started / Completed / Phys185 / 65 / 53
⚠ Works needing verification (Completed/Physically Completed)62 works (exp <30%)
Completion rate63.8%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score5.52 / 10
โ€”
24.6% 8.73
CategoryDug Well Recharge
Started / Completed / Phys756 / 297 / 449
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate98.7%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score8.73 / 10
1.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.2% 7.67
CategoryWater conservation & recharge
Started / Completed / Phys48 / 22 / 20
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.29Cr / 0.19Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score7.67 / 10
2.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18 CHHAIGAON MAKHAN โ†— KHANDWA 7.16 B
45.2% 5.45
CategoryFarm Pond
Started / Completed / Phys322 / 129 / 103
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate72.0%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)37.0%
Part B score (max 5.0)1.85 / 5.0
Final score5.45 / 10
5.7% 8.27
CategoryAmrit Sarowar
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.20Cr / 0.18Cr
Expenditure rate (ongoing)90.4%
Part B score (max 5.0)4.52 / 5.0
Final score8.27 / 10
15.8% 9.93
CategoryDug Well Recharge
Started / Completed / Phys838 / 722 / 105
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate98.7%
Part A score (max 5.0)4.93 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.93 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.4% 8.00
CategoryWater conservation & recharge
Started / Completed / Phys83 / 35 / 40
Completion rate90.4%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.44Cr / 0.30Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score8.00 / 10
7.2% 6.53
CategoryWatershed Related Works
Started / Completed / Phys18 / 4 / 7
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.41Cr / 0.28Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.53 / 10
3.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 2 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19 PATI โ†— BARWANI 7.10 B
16.1% 6.91
CategoryFarm Pond
Started / Completed / Phys216 / 4 / 156
Completion rate74.1%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.70Cr / 0.45Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score6.91 / 10
โ€”
13.6% 8.08
CategoryDug Well Recharge
Started / Completed / Phys711 / 19 / 646
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score8.08 / 10
โ€”
46.2% 6.95
CategoryWater conservation & recharge
Started / Completed / Phys111 / 9 / 73
Completion rate73.9%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked1.53Cr / 0.99Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score6.95 / 10
20.8% 6.98
CategoryWatershed Related Works
Started / Completed / Phys50 / 2 / 36
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.69Cr / 0.44Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score6.98 / 10
3.3% 7.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 5
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.21Cr / 0.16Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.89 / 5.0
Final score7.01 / 10
20 KHALAWA โ†— KHANDWA 7.09 B
27.9% 5.73
CategoryFarm Pond
Started / Completed / Phys384 / 28 / 249
⚠ Works needing verification (Completed/Physically Completed)103 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score5.73 / 10
5.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.4% 9.98
CategoryDug Well Recharge
Started / Completed / Phys1,097 / 50 / 1,043
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.98 / 10
2.3% 5.73
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 3
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.29Cr / 0.15Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score5.73 / 10
39.7% 7.18
CategoryWater conservation & recharge
Started / Completed / Phys195 / 15 / 142
Completion rate80.5%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked3.53Cr / 2.23Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.18 / 10
10.5% 6.56
CategoryWatershed Related Works
Started / Completed / Phys44 / 5 / 25
Completion rate68.2%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.91Cr / 0.57Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score6.56 / 10
3.9% 6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 5 / 7
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.38Cr / 0.21Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.52 / 10
21 DHIMERKHEDA โ†— KATNI 7.09 B
17.3% 4.63
CategoryFarm Pond
Started / Completed / Phys317 / 106 / 131
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate74.8%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked1.21Cr / 0.22Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score4.63 / 10
1.2% 7.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.15Cr
Expenditure rate (ongoing)99.9%
Part B score (max 5.0)4.99 / 5.0
Final score7.49 / 10
0.8% 4.56
CategoryDug Well Recharge
Started / Completed / Phys96 / 37 / 26
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate65.6%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)25.6%
Part B score (max 5.0)1.28 / 5.0
Final score4.56 / 10
41.9% 7.51
CategoryIrrigation infrastructure
Started / Completed / Phys141 / 15 / 111
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked1.27Cr / 0.78Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score7.51 / 10
13.0% 7.21
CategoryWater conservation & recharge
Started / Completed / Phys42 / 8 / 25
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked1.84Cr / 1.21Cr
Expenditure rate (ongoing)65.6%
Part B score (max 5.0)3.28 / 5.0
Final score7.21 / 10
21.8% 8.45
CategoryWatershed Related Works
Started / Completed / Phys70 / 17 / 42
Completion rate84.3%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked1.68Cr / 1.42Cr
Expenditure rate (ongoing)84.7%
Part B score (max 5.0)4.23 / 5.0
Final score8.45 / 10
4.0% 5.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.74Cr / 0.52Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score5.77 / 10
22 PANDHANA โ†— KHANDWA 7.07 B
40.9% 5.95
CategoryFarm Pond
Started / Completed / Phys381 / 178 / 117
⚠ Works needing verification (Completed/Physically Completed)73 works (exp <30%)
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score5.95 / 10
7.2% 4.51
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked1.50Cr / 1.14Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score4.51 / 10
12.3% 9.99
CategoryDug Well Recharge
Started / Completed / Phys1,155 / 447 / 706
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate99.8%
Part A score (max 5.0)4.99 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.99 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.6% 7.91
CategoryWater conservation & recharge
Started / Completed / Phys148 / 38 / 90
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked1.31Cr / 0.94Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score7.91 / 10
5.0% 7.63
CategoryWatershed Related Works
Started / Completed / Phys24 / 6 / 14
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.26Cr / 0.18Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.47 / 5.0
Final score7.63 / 10
6.0% 6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 3 / 14
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.26Cr / 0.16Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.96 / 10
23 BADI โ†— RAISEN 7.07 B
79.1% 7.13
CategoryFarm Pond
Started / Completed / Phys329 / 133 / 148
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked1.09Cr / 0.62Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score7.13 / 10
โ€”
7.3% 8.87
CategoryDug Well Recharge
Started / Completed / Phys183 / 54 / 124
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.00 / 5.0
Final score8.87 / 10
โ€”
12.1% 5.18
CategoryWater conservation & recharge
Started / Completed / Phys6 / 1 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.61Cr / 0.43Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.52 / 5.0
Final score5.18 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24 SHAHPURA โ†— DINDORI 7.05 B
25.9% 5.68
CategoryFarm Pond
Started / Completed / Phys418 / 191 / 159
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate83.7%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked1.23Cr / 0.37Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score5.68 / 10
1.1% 0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
1.8% 9.10
CategoryDug Well Recharge
Started / Completed / Phys221 / 132 / 49
⚠ Works needing verification (Completed/Physically Completed)40 works (exp <30%)
Completion rate81.9%
Part A score (max 5.0)4.10 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.10 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.2% 7.54
CategoryWater conservation & recharge
Started / Completed / Phys108 / 30 / 45
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked4.81Cr / 3.91Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score7.54 / 10
30.5% 8.17
CategoryWatershed Related Works
Started / Completed / Phys98 / 43 / 45
Completion rate89.8%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked1.07Cr / 0.79Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score8.17 / 10
6.9% 5.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 4
Completion rate19.0%
Part A score (max 5.0)0.95 / 5.0
Ongoing sanction / booked1.88Cr / 1.58Cr
Expenditure rate (ongoing)83.8%
Part B score (max 5.0)4.19 / 5.0
Final score5.14 / 10
25 DINDORI โ†— DINDORI 7.04 B
39.9% 6.12
CategoryFarm Pond
Started / Completed / Phys455 / 119 / 282
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate88.1%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked2.12Cr / 0.73Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.72 / 5.0
Final score6.12 / 10
โ€”
1.7% 5.39
CategoryDug Well Recharge
Started / Completed / Phys239 / 157 / 74
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate96.7%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)11.1%
Part B score (max 5.0)0.56 / 5.0
Final score5.39 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.8% 7.80
CategoryWater conservation & recharge
Started / Completed / Phys116 / 20 / 69
Completion rate76.7%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked4.39Cr / 3.49Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score7.80 / 10
23.8% 7.67
CategoryWatershed Related Works
Started / Completed / Phys92 / 32 / 46
Completion rate84.8%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked1.85Cr / 1.27Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.67 / 10
2.7% 7.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 7 / 4
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score7.13 / 10
26 BIRSA โ†— BALAGHAT 7.04 B
59.1% 6.91
CategoryFarm Pond
Started / Completed / Phys704 / 206 / 270
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked5.91Cr / 4.17Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score6.91 / 10
1.4% 1.34
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.13Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.34 / 5.0
Final score1.34 / 10
0.9% 8.22
CategoryDug Well Recharge
Started / Completed / Phys125 / 17 / 84
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)83.7%
Part B score (max 5.0)4.18 / 5.0
Final score8.22 / 10
0.0% 5.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score5.00 / 10
36.4% 7.40
CategoryWater conservation & recharge
Started / Completed / Phys259 / 40 / 140
Completion rate69.5%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked6.16Cr / 4.83Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score7.40 / 10
1.5% 6.35
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 7
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.18Cr / 0.13Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score6.35 / 10
0.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27 CHHAPARA โ†— SEONI 7.02 B
35.4% 5.40
CategoryFarm Pond
Started / Completed / Phys210 / 97 / 70
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked1.45Cr / 0.41Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score5.40 / 10
โ€”
2.8% 5.91
CategoryDug Well Recharge
Started / Completed / Phys209 / 53 / 139
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score5.91 / 10
7.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
41.4% 7.68
CategoryWater conservation & recharge
Started / Completed / Phys112 / 52 / 44
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked2.01Cr / 1.36Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score7.68 / 10
11.3% 7.54
CategoryWatershed Related Works
Started / Completed / Phys41 / 32 / 3
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.41Cr / 0.27Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score7.54 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28 KHACHAROD โ†— UJJAIN 7.00 B
35.7% 5.03
CategoryFarm Pond
Started / Completed / Phys103 / 54 / 47
Completion rate98.1%
Part A score (max 5.0)4.90 / 5.0
Ongoing sanction / booked0.06Cr / 0.00Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score5.03 / 10
16.6% 2.79
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.49Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score2.79 / 10
25.0% 9.89
CategoryDug Well Recharge
Started / Completed / Phys510 / 427 / 72
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.89 / 10
โ€”
17.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys17 / 8 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
29 BAIHAR โ†— BALAGHAT 6.99 C
57.1% 6.46
CategoryFarm Pond
Started / Completed / Phys731 / 149 / 354
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked5.85Cr / 3.53Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score6.46 / 10
2.1% 1.95
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.29Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score1.95 / 10
1.1% 6.19
CategoryDug Well Recharge
Started / Completed / Phys131 / 62 / 33
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)51.2%
Part B score (max 5.0)2.56 / 5.0
Final score6.19 / 10
โ€”
38.0% 7.96
CategoryWater conservation & recharge
Started / Completed / Phys379 / 29 / 285
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked2.50Cr / 1.91Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score7.96 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30 ZIRANYA โ†— KHARGONE 6.97 C
13.2% 6.12
CategoryFarm Pond
Started / Completed / Phys294 / 49 / 155
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked1.42Cr / 0.75Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score6.12 / 10
6.9% 7.25
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 10
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score7.25 / 10
3.2% 7.51
CategoryDug Well Recharge
Started / Completed / Phys449 / 199 / 192
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score7.51 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
71.6% 6.94
CategoryWater conservation & recharge
Started / Completed / Phys313 / 33 / 160
Completion rate61.7%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked8.27Cr / 6.38Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score6.94 / 10
0.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.6% 8.90
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 12 / 8
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.22Cr / 0.19Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score8.90 / 10
31 BHAGVANPURA โ†— KHARGONE 6.93 C
17.2% 7.40
CategoryFarm Pond
Started / Completed / Phys292 / 135 / 114
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.75Cr / 0.47Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score7.40 / 10
2.6% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.8% 7.43
CategoryDug Well Recharge
Started / Completed / Phys443 / 209 / 174
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score7.43 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
71.7% 6.56
CategoryWater conservation & recharge
Started / Completed / Phys215 / 45 / 79
Completion rate57.7%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked8.91Cr / 6.55Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.56 / 10
3.5% 8.21
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 8
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.22Cr / 0.20Cr
Expenditure rate (ongoing)89.3%
Part B score (max 5.0)4.46 / 5.0
Final score8.21 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32 CHHINDWARA โ†— CHHINDWARA 6.91 C
19.3% 6.39
CategoryFarm Pond
Started / Completed / Phys97 / 35 / 46
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate83.5%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score6.39 / 10
7.3% 3.62
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.46Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
11.0% 6.07
CategoryDug Well Recharge
Started / Completed / Phys360 / 155 / 191
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate96.1%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)25.3%
Part B score (max 5.0)1.27 / 5.0
Final score6.07 / 10
8.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.1% 6.51
CategoryWater conservation & recharge
Started / Completed / Phys29 / 5 / 14
Completion rate65.5%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked1.24Cr / 0.80Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score6.51 / 10
17.0% 6.54
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 7
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.57Cr / 0.40Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.45 / 5.0
Final score6.54 / 10
10.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33 TIRLA โ†— DHAR 6.89 C
15.3% 5.01
CategoryFarm Pond
Started / Completed / Phys295 / 44 / 129
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked3.08Cr / 1.28Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score5.01 / 10
โ€”
2.4% 3.87
CategoryDug Well Recharge
Started / Completed / Phys428 / 50 / 122
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate40.2%
Part A score (max 5.0)2.01 / 5.0
Ongoing sanction / booked0.57Cr / 0.21Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score3.87 / 10
โ€”
75.2% 7.34
CategoryWater conservation & recharge
Started / Completed / Phys355 / 12 / 224
Completion rate66.5%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked12.26Cr / 9.85Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score7.34 / 10
6.0% 7.27
CategoryWatershed Related Works
Started / Completed / Phys67 / 0 / 47
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.01Cr / 0.76Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.27 / 10
1.1% 6.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)77.4%
Part B score (max 5.0)3.87 / 5.0
Final score6.87 / 10
34 MAHESHWAR โ†— KHARGONE 6.85 C
35.5% 5.77
CategoryFarm Pond
Started / Completed / Phys216 / 31 / 137
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.87Cr / 0.33Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.88 / 5.0
Final score5.77 / 10
7.1% 7.33
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.25Cr / 0.20Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score7.33 / 10
13.0% 7.37
CategoryDug Well Recharge
Started / Completed / Phys572 / 57 / 473
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate92.7%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score7.37 / 10
โ€”
40.0% 7.36
CategoryWater conservation & recharge
Started / Completed / Phys111 / 12 / 79
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked1.16Cr / 0.76Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.26 / 5.0
Final score7.36 / 10
1.2% 5.38
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.04 / 5.0
Final score5.38 / 10
3.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35 KAILARAS โ†— MORENA 6.84 C
12.1% 5.83
CategoryFarm Pond
Started / Completed / Phys469 / 325 / 41
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked2.22Cr / 0.86Cr
Expenditure rate (ongoing)38.6%
Part B score (max 5.0)1.93 / 5.0
Final score5.83 / 10
โ€”
0.3% 5.02
CategoryDug Well Recharge
Started / Completed / Phys117 / 85 / 1
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)26.8%
Part B score (max 5.0)1.34 / 5.0
Final score5.02 / 10
1.7% 7.38
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 0 / 11
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.20Cr / 0.13Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score7.38 / 10
77.3% 6.95
CategoryWater conservation & recharge
Started / Completed / Phys469 / 12 / 275
Completion rate61.2%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked26.96Cr / 20.99Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.95 / 10
6.4% 7.41
CategoryWatershed Related Works
Started / Completed / Phys38 / 0 / 27
Completion rate71.1%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked1.33Cr / 1.02Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score7.41 / 10
2.1% 6.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 0 / 9
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.44Cr / 0.24Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score6.44 / 10
36 BAJAG โ†— DINDORI 6.83 C
50.7% 6.36
CategoryFarm Pond
Started / Completed / Phys278 / 41 / 189
Completion rate82.7%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked1.81Cr / 0.81Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.23 / 5.0
Final score6.36 / 10
โ€”
3.2% 4.61
CategoryDug Well Recharge
Started / Completed / Phys245 / 24 / 200
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score4.61 / 10
โ€”
33.0% 6.50
CategoryWater conservation & recharge
Started / Completed / Phys71 / 4 / 41
Completion rate63.4%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked3.68Cr / 2.45Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.34 / 5.0
Final score6.50 / 10
9.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys17 / 1 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37 SEONI โ†— SEONI 6.81 C
19.7% 5.26
CategoryFarm Pond
Started / Completed / Phys121 / 52 / 41
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.62Cr / 0.18Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.42 / 5.0
Final score5.26 / 10
โ€”
6.6% 9.65
CategoryDug Well Recharge
Started / Completed / Phys434 / 119 / 285
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate93.1%
Part A score (max 5.0)4.65 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.65 / 10
3.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 8 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
41.4% 6.83
CategoryWater conservation & recharge
Started / Completed / Phys114 / 47 / 33
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked2.89Cr / 1.92Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.83 / 10
24.5% 6.94
CategoryWatershed Related Works
Started / Completed / Phys96 / 66 / 14
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.82Cr / 0.45Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.94 / 10
4.8% 6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 5 / 4
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.34Cr / 0.20Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score6.35 / 10
38 CHAURAI โ†— CHHINDWARA 6.80 C
27.6% 7.56
CategoryFarm Pond
Started / Completed / Phys99 / 2 / 80
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.46Cr / 0.32Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.56 / 10
3.5% 0.66
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
10.3% 6.51
CategoryDug Well Recharge
Started / Completed / Phys475 / 106 / 335
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate92.8%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score6.51 / 10
0.7% 5.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score5.22 / 10
35.0% 7.46
CategoryWater conservation & recharge
Started / Completed / Phys49 / 8 / 30
Completion rate77.6%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked1.65Cr / 1.18Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score7.46 / 10
20.8% 5.98
CategoryWatershed Related Works
Started / Completed / Phys37 / 11 / 8
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked1.21Cr / 0.82Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score5.98 / 10
2.2% 5.99
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score5.99 / 10
39 NARWAR โ†— SHIVPURI 6.79 C
30.5% 5.37
CategoryFarm Pond
Started / Completed / Phys242 / 139 / 46
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked1.40Cr / 0.43Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.55 / 5.0
Final score5.37 / 10
โ€”
2.3% 4.89
CategoryDug Well Recharge
Started / Completed / Phys207 / 113 / 27
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)30.2%
Part B score (max 5.0)1.51 / 5.0
Final score4.89 / 10
0.4% 5.84
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.34 / 5.0
Final score5.84 / 10
46.1% 7.57
CategoryWater conservation & recharge
Started / Completed / Phys180 / 30 / 126
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.96Cr / 0.62Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score7.57 / 10
19.7% 7.23
CategoryWatershed Related Works
Started / Completed / Phys54 / 15 / 25
Completion rate74.1%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked1.07Cr / 0.75Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.23 / 10
0.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
40 MOHGAON โ†— MANDLA 6.78 C
35.7% 6.76
CategoryFarm Pond
Started / Completed / Phys151 / 110 / 10
Completion rate79.5%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked1.22Cr / 0.68Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.79 / 5.0
Final score6.76 / 10
7.0% 1.63
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.15Cr / 0.38Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.63 / 5.0
Final score1.63 / 10
2.0% 5.86
CategoryDug Well Recharge
Started / Completed / Phys117 / 66 / 28
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate80.3%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score5.86 / 10
7.3% 5.27
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score5.27 / 10
41.8% 7.56
CategoryWater conservation & recharge
Started / Completed / Phys97 / 44 / 18
Completion rate63.9%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked4.76Cr / 4.15Cr
Expenditure rate (ongoing)87.3%
Part B score (max 5.0)4.37 / 5.0
Final score7.56 / 10
3.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys16 / 8 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.9% 8.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 1
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.18Cr
Expenditure rate (ongoing)94.9%
Part B score (max 5.0)4.74 / 5.0
Final score8.74 / 10
41 MOHKHED โ†— CHHINDWARA 6.77 C
20.0% 6.86
CategoryFarm Pond
Started / Completed / Phys131 / 12 / 92
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.45Cr / 0.26Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score6.86 / 10
โ€”
8.7% 6.83
CategoryDug Well Recharge
Started / Completed / Phys380 / 27 / 341
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score6.83 / 10
0.4% 3.67
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score3.67 / 10
44.9% 7.00
CategoryWater conservation & recharge
Started / Completed / Phys60 / 10 / 26
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked3.29Cr / 2.63Cr
Expenditure rate (ongoing)80.1%
Part B score (max 5.0)4.00 / 5.0
Final score7.00 / 10
23.3% 6.61
CategoryWatershed Related Works
Started / Completed / Phys43 / 19 / 7
Completion rate60.5%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.09Cr / 0.78Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score6.61 / 10
2.5% 3.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.49 / 5.0
Final score3.49 / 10
42 DHARAMPURI โ†— DHAR 6.76 C
5.2% 6.03
CategoryFarm Pond
Started / Completed / Phys137 / 50 / 35
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate62.0%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.31Cr / 0.18Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score6.03 / 10
โ€”
5.5% 7.15
CategoryDug Well Recharge
Started / Completed / Phys378 / 128 / 162
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate76.7%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked0.21Cr / 0.14Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score7.15 / 10
0.3% 3.01
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score3.01 / 10
69.3% 7.04
CategoryWater conservation & recharge
Started / Completed / Phys169 / 12 / 99
Completion rate65.7%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked3.13Cr / 2.35Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.04 / 10
14.3% 5.79
CategoryWatershed Related Works
Started / Completed / Phys59 / 2 / 26
Completion rate47.5%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked0.88Cr / 0.60Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score5.79 / 10
5.5% 6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 1 / 9
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.49Cr / 0.40Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.07 / 5.0
Final score6.16 / 10
43 BARWANI โ†— BARWANI 6.70 C
50.0% 6.83
CategoryFarm Pond
Started / Completed / Phys136 / 5 / 93
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.46Cr / 0.30Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score6.83 / 10
โ€”
18.2% 6.36
CategoryDug Well Recharge
Started / Completed / Phys247 / 21 / 216
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score6.36 / 10
โ€”
16.3% 6.74
CategoryWater conservation & recharge
Started / Completed / Phys23 / 2 / 13
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.20Cr / 0.14Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.74 / 10
15.5% 6.63
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 7
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score6.63 / 10
โ€”
44 PANSEMAL โ†— BARWANI 6.68 C
32.9% 5.52
CategoryFarm Pond
Started / Completed / Phys162 / 20 / 121
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.35Cr / 0.08Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.16 / 5.0
Final score5.52 / 10
6.0% 3.65
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.37Cr / 0.15Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score3.65 / 10
6.2% 4.95
CategoryDug Well Recharge
Started / Completed / Phys221 / 6 / 172
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate80.5%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.10Cr / 0.02Cr
Expenditure rate (ongoing)18.4%
Part B score (max 5.0)0.92 / 5.0
Final score4.95 / 10
โ€”
46.3% 7.77
CategoryWater conservation & recharge
Started / Completed / Phys76 / 4 / 62
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.24Cr / 0.16Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.77 / 10
7.8% 8.46
CategoryWatershed Related Works
Started / Completed / Phys18 / 8 / 9
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)74.8%
Part B score (max 5.0)3.74 / 5.0
Final score8.46 / 10
0.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
45 KATTHIWADA โ†— ALIRAJPUR 6.67 C
19.1% 5.99
CategoryFarm Pond
Started / Completed / Phys188 / 27 / 99
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked2.33Cr / 1.23Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score5.99 / 10
2.9% 4.92
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.48Cr / 0.23Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score4.92 / 10
4.4% 6.19
CategoryDug Well Recharge
Started / Completed / Phys585 / 89 / 312
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.46Cr / 0.25Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score6.19 / 10
โ€”
71.4% 6.95
CategoryWater conservation & recharge
Started / Completed / Phys180 / 11 / 92
Completion rate57.2%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked9.14Cr / 7.47Cr
Expenditure rate (ongoing)81.7%
Part B score (max 5.0)4.09 / 5.0
Final score6.95 / 10
1.8% 6.49
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.50Cr / 0.44Cr
Expenditure rate (ongoing)87.0%
Part B score (max 5.0)4.35 / 5.0
Final score6.49 / 10
0.4% 7.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.11Cr
Expenditure rate (ongoing)94.5%
Part B score (max 5.0)4.72 / 5.0
Final score7.22 / 10
46 REHLI โ†— SAGAR 6.63 C
35.7% 5.54
CategoryFarm Pond
Started / Completed / Phys278 / 101 / 98
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked1.45Cr / 0.57Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score5.54 / 10
โ€”
10.6% 6.20
CategoryDug Well Recharge
Started / Completed / Phys585 / 255 / 242
⚠ Works needing verification (Completed/Physically Completed)68 works (exp <30%)
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)38.9%
Part B score (max 5.0)1.95 / 5.0
Final score6.20 / 10
1.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.4% 7.24
CategoryWater conservation & recharge
Started / Completed / Phys114 / 31 / 60
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.16Cr / 0.76Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score7.24 / 10
6.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.4% 6.50
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 4 / 11
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.28Cr / 0.12Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score6.50 / 10
47 KESLI โ†— SAGAR 6.63 C
27.4% 4.78
CategoryFarm Pond
Started / Completed / Phys178 / 79 / 27
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked1.27Cr / 0.46Cr
Expenditure rate (ongoing)36.1%
Part B score (max 5.0)1.81 / 5.0
Final score4.78 / 10
โ€”
8.3% 5.52
CategoryDug Well Recharge
Started / Completed / Phys377 / 86 / 186
⚠ Works needing verification (Completed/Physically Completed)69 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.52 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
47.2% 6.97
CategoryWater conservation & recharge
Started / Completed / Phys164 / 20 / 104
Completion rate75.6%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.99Cr / 0.63Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score6.97 / 10
14.2% 9.00
CategoryWatershed Related Works
Started / Completed / Phys31 / 8 / 22
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.06Cr / 0.06Cr
Expenditure rate (ongoing)91.5%
Part B score (max 5.0)4.57 / 5.0
Final score9.00 / 10
2.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
48 PARASWADA โ†— BALAGHAT 6.60 C
55.0% 6.16
CategoryFarm Pond
Started / Completed / Phys510 / 270 / 105
Completion rate73.5%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked3.52Cr / 1.75Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.49 / 5.0
Final score6.16 / 10
2.9% 2.42
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.36Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score2.42 / 10
1.6% 7.38
CategoryDug Well Recharge
Started / Completed / Phys167 / 120 / 22
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)62.5%
Part B score (max 5.0)3.12 / 5.0
Final score7.38 / 10
0.7% 5.79
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)49.2%
Part B score (max 5.0)2.46 / 5.0
Final score5.79 / 10
38.1% 7.44
CategoryWater conservation & recharge
Started / Completed / Phys208 / 34 / 113
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked3.53Cr / 2.76Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score7.44 / 10
1.2% 8.14
CategoryWatershed Related Works
Started / Completed / Phys7 / 5 / 1
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score8.14 / 10
0.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
49 PARASIA โ†— CHHINDWARA 6.58 C
35.2% 5.81
CategoryFarm Pond
Started / Completed / Phys182 / 32 / 82
Completion rate62.6%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.98Cr / 1.06Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score5.81 / 10
โ€”
10.1% 6.35
CategoryDug Well Recharge
Started / Completed / Phys562 / 127 / 386
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate91.3%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.35 / 10
1.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
41.9% 7.20
CategoryWater conservation & recharge
Started / Completed / Phys130 / 6 / 89
Completion rate73.1%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked3.18Cr / 2.25Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.55 / 5.0
Final score7.20 / 10
7.9% 6.25
CategoryWatershed Related Works
Started / Completed / Phys26 / 4 / 12
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.36Cr / 0.23Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.25 / 10
3.4% 6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 9
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.79 / 10
50 PUSHPRAJGARH โ†— ANUPPUR 6.55 C
74.2% 6.05
CategoryFarm Pond
Started / Completed / Phys1,443 / 1,006 / 226
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked5.91Cr / 2.10Cr
Expenditure rate (ongoing)35.6%
Part B score (max 5.0)1.78 / 5.0
Final score6.05 / 10
โ€”
0.6% 6.38
CategoryDug Well Recharge
Started / Completed / Phys124 / 41 / 69
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate88.7%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.38 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.4% 8.12
CategoryWater conservation & recharge
Started / Completed / Phys190 / 90 / 68
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked4.23Cr / 3.36Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score8.12 / 10
2.6% 8.55
CategoryWatershed Related Works
Started / Completed / Phys18 / 5 / 11
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.76Cr / 0.62Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score8.55 / 10
2.7% 6.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 6 / 5
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.40Cr / 0.24Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.71 / 10
51 SHEOPUR โ†— SHEOPUR 6.53 C
38.5% 4.69
CategoryFarm Pond
Started / Completed / Phys143 / 54 / 35
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate62.2%
Part A score (max 5.0)3.11 / 5.0
Ongoing sanction / booked1.88Cr / 0.59Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score4.69 / 10
โ€”
0.8% 6.38
CategoryDug Well Recharge
Started / Completed / Phys43 / 26 / 5
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.38 / 10
6.4% 9.00
CategoryIrrigation infrastructure
Started / Completed / Phys13 / 5 / 7
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score9.00 / 10
41.4% 7.63
CategoryWater conservation & recharge
Started / Completed / Phys81 / 7 / 56
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked1.25Cr / 0.93Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.74 / 5.0
Final score7.63 / 10
5.9% 7.84
CategoryWatershed Related Works
Started / Completed / Phys13 / 4 / 6
Completion rate76.9%
Part A score (max 5.0)3.85 / 5.0
Ongoing sanction / booked0.14Cr / 0.11Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)4.00 / 5.0
Final score7.84 / 10
7.1% 6.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 1 / 9
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score6.81 / 10
52 HARAI โ†— CHHINDWARA 6.52 C
43.4% 6.71
CategoryFarm Pond
Started / Completed / Phys396 / 154 / 137
Completion rate73.5%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked2.15Cr / 1.30Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.71 / 10
โ€”
4.9% 8.54
CategoryDug Well Recharge
Started / Completed / Phys327 / 106 / 190
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score8.54 / 10
โ€”
40.8% 6.22
CategoryWater conservation & recharge
Started / Completed / Phys148 / 24 / 51
Completion rate50.7%
Part A score (max 5.0)2.53 / 5.0
Ongoing sanction / booked3.55Cr / 2.61Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.22 / 10
10.3% 5.84
CategoryWatershed Related Works
Started / Completed / Phys26 / 5 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.92Cr / 0.62Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score5.84 / 10
0.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
53 TAMIA โ†— CHHINDWARA 6.52 C
24.1% 5.62
CategoryFarm Pond
Started / Completed / Phys269 / 105 / 57
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked4.62Cr / 2.41Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score5.62 / 10
4.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.96Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
1.5% 7.21
CategoryDug Well Recharge
Started / Completed / Phys281 / 156 / 122
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate98.9%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score7.21 / 10
โ€”
60.5% 7.11
CategoryWater conservation & recharge
Started / Completed / Phys305 / 69 / 130
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked13.65Cr / 10.51Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score7.11 / 10
7.4% 8.38
CategoryWatershed Related Works
Started / Completed / Phys38 / 9 / 22
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.93Cr / 0.80Cr
Expenditure rate (ongoing)86.0%
Part B score (max 5.0)4.30 / 5.0
Final score8.38 / 10
2.3% 6.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 1
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.72Cr / 0.57Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score6.12 / 10
54 LANJI โ†— BALAGHAT 6.50 C
57.6% 6.00
CategoryFarm Pond
Started / Completed / Phys369 / 133 / 139
Completion rate73.7%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked1.83Cr / 0.85Cr
Expenditure rate (ongoing)46.3%
Part B score (max 5.0)2.32 / 5.0
Final score6.00 / 10
4.1% 1.87
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.25Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score1.87 / 10
2.4% 8.37
CategoryDug Well Recharge
Started / Completed / Phys154 / 63 / 81
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score8.37 / 10
โ€”
31.5% 7.69
CategoryWater conservation & recharge
Started / Completed / Phys104 / 19 / 58
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked1.66Cr / 1.33Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.99 / 5.0
Final score7.69 / 10
2.7% 8.77
CategoryWatershed Related Works
Started / Completed / Phys14 / 6 / 7
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score8.77 / 10
1.7% 6.08
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 2
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score6.08 / 10
55 SIRONJ โ†— VIDISHA 6.49 C
41.7% 6.08
CategoryFarm Pond
Started / Completed / Phys351 / 206 / 74
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.50Cr / 0.63Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score6.08 / 10
4.6% 2.93
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.84Cr / 0.49Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.93 / 5.0
Final score2.93 / 10
3.4% 6.86
CategoryDug Well Recharge
Started / Completed / Phys235 / 102 / 111
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score6.86 / 10
โ€”
47.0% 6.96
CategoryWater conservation & recharge
Started / Completed / Phys214 / 72 / 76
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked3.01Cr / 2.11Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score6.96 / 10
1.8% 8.98
CategoryWatershed Related Works
Started / Completed / Phys21 / 16 / 4
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.22 / 5.0
Final score8.98 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
56 PAHADGARH โ†— MORENA 6.48 C
10.4% 4.91
CategoryFarm Pond
Started / Completed / Phys499 / 400 / 54
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked1.06Cr / 0.08Cr
Expenditure rate (ongoing)7.2%
Part B score (max 5.0)0.36 / 5.0
Final score4.91 / 10
0.2% 0.85
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.04Cr
Expenditure rate (ongoing)17.1%
Part B score (max 5.0)0.85 / 5.0
Final score0.85 / 10
0.3% 4.68
CategoryDug Well Recharge
Started / Completed / Phys126 / 103 / 15
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score4.68 / 10
1.1% 5.18
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 0 / 2
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.85Cr / 0.67Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score5.18 / 10
76.0% 6.70
CategoryWater conservation & recharge
Started / Completed / Phys544 / 6 / 306
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked34.28Cr / 26.25Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score6.70 / 10
10.0% 6.78
CategoryWatershed Related Works
Started / Completed / Phys74 / 2 / 40
Completion rate56.8%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked4.53Cr / 3.57Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score6.78 / 10
2.0% 6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 8
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.57Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score6.52 / 10
57 SANCHI โ†— RAISEN 6.45 C
61.4% 6.11
CategoryFarm Pond
Started / Completed / Phys306 / 235 / 52
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.36Cr / 0.10Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score6.11 / 10
0.6% 1.31
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
3.9% 7.99
CategoryDug Well Recharge
Started / Completed / Phys160 / 153 / 6
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.02 / 5.0
Final score7.99 / 10
4.2% 5.56
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.42Cr / 0.35Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score5.56 / 10
28.4% 7.40
CategoryWater conservation & recharge
Started / Completed / Phys18 / 5 / 7
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked2.05Cr / 1.67Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score7.40 / 10
0.4% 1.90
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
1.2% 3.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.13Cr / 0.09Cr
Expenditure rate (ongoing)72.1%
Part B score (max 5.0)3.60 / 5.0
Final score3.60 / 10
58 BEGUMGANJ โ†— RAISEN 6.44 C
52.8% 6.31
CategoryFarm Pond
Started / Completed / Phys432 / 138 / 253
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.80Cr / 0.29Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.31 / 10
2.2% 2.92
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.02Cr
Expenditure rate (ongoing)8.5%
Part B score (max 5.0)0.42 / 5.0
Final score2.92 / 10
4.5% 7.01
CategoryDug Well Recharge
Started / Completed / Phys336 / 197 / 131
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate97.6%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)42.5%
Part B score (max 5.0)2.13 / 5.0
Final score7.01 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
39.3% 6.67
CategoryWater conservation & recharge
Started / Completed / Phys64 / 15 / 22
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked4.76Cr / 3.60Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score6.67 / 10
0.2% 1.97
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.97 / 5.0
Final score1.97 / 10
0.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
59 GANGEV โ†— REWA 6.43 C
57.6% 5.44
CategoryFarm Pond
Started / Completed / Phys227 / 147 / 17
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.59Cr / 0.21Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.82 / 5.0
Final score5.44 / 10
4.8% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.26Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys58 / 57 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
26.0% 8.25
CategoryWater conservation & recharge
Started / Completed / Phys36 / 28 / 7
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score8.25 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 4 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
60 PANDHURNA โ†— CHHINDWARA 6.43 C
21.7% 5.88
CategoryFarm Pond
Started / Completed / Phys135 / 72 / 38
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.41Cr / 0.15Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.88 / 10
3.6% 1.15
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.09Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score1.15 / 10
8.6% 5.78
CategoryDug Well Recharge
Started / Completed / Phys362 / 35 / 300
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score5.78 / 10
7.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.9% 6.69
CategoryWater conservation & recharge
Started / Completed / Phys25 / 8 / 6
Completion rate56.0%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked1.84Cr / 1.44Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.69 / 10
33.7% 6.24
CategoryWatershed Related Works
Started / Completed / Phys48 / 8 / 21
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.38Cr / 0.89Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score6.24 / 10
2.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
61 BAHORIBAND โ†— KATNI 6.43 C
36.8% 4.90
CategoryFarm Pond
Started / Completed / Phys392 / 137 / 138
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.77Cr / 0.49Cr
Expenditure rate (ongoing)27.8%
Part B score (max 5.0)1.39 / 5.0
Final score4.90 / 10
โ€”
4.4% 5.57
CategoryDug Well Recharge
Started / Completed / Phys284 / 126 / 83
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.12Cr / 0.05Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score5.57 / 10
6.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.5% 7.15
CategoryWater conservation & recharge
Started / Completed / Phys52 / 10 / 26
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked1.56Cr / 1.15Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.69 / 5.0
Final score7.15 / 10
25.5% 6.87
CategoryWatershed Related Works
Started / Completed / Phys73 / 9 / 42
Completion rate69.9%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked1.52Cr / 1.03Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score6.87 / 10
4.7% 8.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 7
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.07Cr / 0.06Cr
Expenditure rate (ongoing)89.2%
Part B score (max 5.0)4.46 / 5.0
Final score8.83 / 10
62 BANKHEDI โ†— NARMADAPURAM 6.42 C
38.9% 3.26
CategoryFarm Pond
Started / Completed / Phys100 / 27 / 25
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.71Cr / 0.09Cr
Expenditure rate (ongoing)13.2%
Part B score (max 5.0)0.66 / 5.0
Final score3.26 / 10
โ€”
6.5% 5.12
CategoryDug Well Recharge
Started / Completed / Phys119 / 62 / 29
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)26.0%
Part B score (max 5.0)1.30 / 5.0
Final score5.12 / 10
0.8% 8.03
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 3 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score8.03 / 10
44.2% 8.60
CategoryWater conservation & recharge
Started / Completed / Phys47 / 31 / 15
Completion rate97.9%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score8.60 / 10
4.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 10 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 8 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
63 JOURA โ†— MORENA 6.41 C
16.3% 5.70
CategoryFarm Pond
Started / Completed / Phys230 / 148 / 4
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate66.1%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked3.09Cr / 1.48Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.40 / 5.0
Final score5.70 / 10
0.5% 0.01
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.01 / 5.0
Final score0.01 / 10
0.4% 4.49
CategoryDug Well Recharge
Started / Completed / Phys77 / 38 / 3
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate53.2%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.82 / 5.0
Final score4.49 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
76.6% 6.55
CategoryWater conservation & recharge
Started / Completed / Phys261 / 3 / 149
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked15.16Cr / 11.02Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score6.55 / 10
1.3% 8.41
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score8.41 / 10
3.8% 6.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 0 / 8
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.93Cr / 0.64Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.14 / 10
64 BHANDER โ†— DATIA 6.40 C
36.8% 3.69
CategoryFarm Pond
Started / Completed / Phys211 / 78 / 59
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked1.51Cr / 0.13Cr
Expenditure rate (ongoing)8.8%
Part B score (max 5.0)0.44 / 5.0
Final score3.69 / 10
โ€”
2.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys110 / 87 / 23
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
42.7% 7.01
CategoryWater conservation & recharge
Started / Completed / Phys123 / 19 / 98
Completion rate95.1%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.49Cr / 0.22Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score7.01 / 10
5.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys19 / 3 / 16
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 3 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
65 JAMAI โ†— CHHINDWARA 6.40 C
24.4% 7.56
CategoryFarm Pond
Started / Completed / Phys472 / 276 / 110
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked1.97Cr / 1.37Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score7.56 / 10
3.5% 0.94
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.29Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score0.94 / 10
2.8% 8.54
CategoryDug Well Recharge
Started / Completed / Phys466 / 218 / 233
Completion rate96.8%
Part A score (max 5.0)4.84 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score8.54 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
62.5% 6.14
CategoryWater conservation & recharge
Started / Completed / Phys292 / 46 / 67
Completion rate38.7%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked20.86Cr / 17.56Cr
Expenditure rate (ongoing)84.2%
Part B score (max 5.0)4.21 / 5.0
Final score6.14 / 10
4.9% 6.14
CategoryWatershed Related Works
Started / Completed / Phys25 / 6 / 4
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked1.32Cr / 1.09Cr
Expenditure rate (ongoing)82.7%
Part B score (max 5.0)4.14 / 5.0
Final score6.14 / 10
1.9% 7.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 2
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.48Cr / 0.42Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score7.09 / 10
66 KHIRKIYA โ†— HARDA 6.38 C
35.1% 3.94
CategoryFarm Pond
Started / Completed / Phys99 / 20 / 28
Completion rate48.5%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked1.31Cr / 0.40Cr
Expenditure rate (ongoing)30.3%
Part B score (max 5.0)1.52 / 5.0
Final score3.94 / 10
2.7% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
10.2% 6.69
CategoryDug Well Recharge
Started / Completed / Phys262 / 126 / 115
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score6.69 / 10
20.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 2 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.3% 6.84
CategoryWater conservation & recharge
Started / Completed / Phys23 / 4 / 14
Completion rate78.3%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.35Cr / 0.21Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score6.84 / 10
3.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.9% 6.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 11
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.23 / 5.0
Final score6.87 / 10
67 UJJAIN โ†— UJJAIN 6.37 C
36.0% 5.50
CategoryFarm Pond
Started / Completed / Phys84 / 6 / 69
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)20.7%
Part B score (max 5.0)1.04 / 5.0
Final score5.50 / 10
5.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.8% 5.38
CategoryDug Well Recharge
Started / Completed / Phys245 / 47 / 197
Completion rate99.6%
Part A score (max 5.0)4.98 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)8.1%
Part B score (max 5.0)0.40 / 5.0
Final score5.38 / 10
โ€”
36.6% 6.74
CategoryWater conservation & recharge
Started / Completed / Phys43 / 7 / 35
Completion rate97.7%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.86 / 5.0
Final score6.74 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
68 KARANJIYA โ†— DINDORI 6.36 C
45.7% 6.26
CategoryFarm Pond
Started / Completed / Phys342 / 161 / 111
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked2.46Cr / 1.12Cr
Expenditure rate (ongoing)45.6%
Part B score (max 5.0)2.28 / 5.0
Final score6.26 / 10
3.5% 5.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.40Cr / 0.15Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
1.7% 7.24
CategoryDug Well Recharge
Started / Completed / Phys168 / 26 / 133
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score7.24 / 10
3.4% 6.48
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.48 / 10
41.1% 6.36
CategoryWater conservation & recharge
Started / Completed / Phys127 / 17 / 57
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked6.86Cr / 4.73Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score6.36 / 10
1.5% 6.28
CategoryWatershed Related Works
Started / Completed / Phys14 / 2 / 9
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score6.28 / 10
3.1% 8.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 7
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.14Cr
Expenditure rate (ongoing)91.6%
Part B score (max 5.0)4.58 / 5.0
Final score8.58 / 10
69 KHAIRLANJI โ†— BALAGHAT 6.36 C
61.0% 5.84
CategoryFarm Pond
Started / Completed / Phys474 / 188 / 168
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate75.1%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked2.98Cr / 1.24Cr
Expenditure rate (ongoing)41.7%
Part B score (max 5.0)2.08 / 5.0
Final score5.84 / 10
2.4% 1.33
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.13Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score1.33 / 10
1.4% 7.48
CategoryDug Well Recharge
Started / Completed / Phys113 / 34 / 63
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.8%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score7.48 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.4% 7.50
CategoryWater conservation & recharge
Started / Completed / Phys118 / 27 / 61
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked2.54Cr / 1.92Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.78 / 5.0
Final score7.50 / 10
1.0% 7.59
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.59 / 5.0
Final score7.59 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
70 SEGAON โ†— KHARGONE 6.36 C
22.1% 6.24
CategoryFarm Pond
Started / Completed / Phys115 / 0 / 73
Completion rate63.5%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked0.74Cr / 0.45Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score6.24 / 10
5.1% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.9% 7.66
CategoryDug Well Recharge
Started / Completed / Phys205 / 12 / 174
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate90.7%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score7.66 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.8% 6.00
CategoryWater conservation & recharge
Started / Completed / Phys70 / 4 / 33
Completion rate52.9%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked1.58Cr / 1.06Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score6.00 / 10
26.4% 5.62
CategoryWatershed Related Works
Started / Completed / Phys28 / 3 / 12
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked1.12Cr / 0.66Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score5.62 / 10
2.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
71 MAJHAULI โ†— SIDHI 6.35 C
50.5% 5.36
CategoryFarm Pond
Started / Completed / Phys356 / 262 / 23
Completion rate80.1%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked1.81Cr / 0.49Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score5.36 / 10
โ€”
1.4% 7.20
CategoryDug Well Recharge
Started / Completed / Phys96 / 73 / 12
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate88.5%
Part A score (max 5.0)4.43 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.77 / 5.0
Final score7.20 / 10
1.5% 7.57
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.19Cr / 0.16Cr
Expenditure rate (ongoing)84.8%
Part B score (max 5.0)4.24 / 5.0
Final score7.57 / 10
35.6% 7.37
CategoryWater conservation & recharge
Started / Completed / Phys116 / 51 / 41
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked1.20Cr / 0.82Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score7.37 / 10
7.7% 7.90
CategoryWatershed Related Works
Started / Completed / Phys13 / 3 / 8
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score7.90 / 10
3.3% 5.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 6 / 1
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.13Cr / 0.05Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score5.96 / 10
72 BIJEYPUR โ†— SHEOPUR 6.35 C
8.9% 5.91
CategoryFarm Pond
Started / Completed / Phys333 / 246 / 39
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked1.00Cr / 0.33Cr
Expenditure rate (ongoing)32.7%
Part B score (max 5.0)1.63 / 5.0
Final score5.91 / 10
3.0% 0.49
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.97Cr / 0.19Cr
Expenditure rate (ongoing)9.7%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
0.2% 5.76
CategoryDug Well Recharge
Started / Completed / Phys39 / 34 / 0
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score5.76 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
76.3% 6.58
CategoryWater conservation & recharge
Started / Completed / Phys398 / 13 / 204
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked22.51Cr / 17.35Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score6.58 / 10
8.7% 6.52
CategoryWatershed Related Works
Started / Completed / Phys48 / 3 / 27
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked2.06Cr / 1.40Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score6.52 / 10
2.3% 6.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 10
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.34Cr / 0.21Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.68 / 10
73 ASHOKNAGAR โ†— ASHOK NAGAR 6.35 C
59.0% 5.32
CategoryFarm Pond
Started / Completed / Phys688 / 267 / 287
Completion rate80.5%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked3.44Cr / 0.89Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score5.32 / 10
1.5% 3.37
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.33Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score3.37 / 10
1.4% 6.89
CategoryDug Well Recharge
Started / Completed / Phys174 / 112 / 61
Completion rate99.4%
Part A score (max 5.0)4.97 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score6.89 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.1% 8.12
CategoryWater conservation & recharge
Started / Completed / Phys187 / 63 / 93
Completion rate83.4%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked2.37Cr / 1.87Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.95 / 5.0
Final score8.12 / 10
2.7% 8.02
CategoryWatershed Related Works
Started / Completed / Phys10 / 4 / 5
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score8.02 / 10
2.1% 6.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 2 / 3
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score6.76 / 10
74 KEOLARI โ†— SEONI 6.34 C
64.1% 5.51
CategoryFarm Pond
Started / Completed / Phys505 / 387 / 35
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked2.23Cr / 0.59Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.33 / 5.0
Final score5.51 / 10
1.4% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
3.4% 9.59
CategoryDug Well Recharge
Started / Completed / Phys302 / 244 / 33
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate91.7%
Part A score (max 5.0)4.59 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.59 / 10
4.2% 8.70
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 5 / 10
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score8.70 / 10
16.2% 7.62
CategoryWater conservation & recharge
Started / Completed / Phys62 / 20 / 32
Completion rate83.9%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.80Cr / 0.55Cr
Expenditure rate (ongoing)68.6%
Part B score (max 5.0)3.43 / 5.0
Final score7.62 / 10
7.7% 7.51
CategoryWatershed Related Works
Started / Completed / Phys31 / 12 / 15
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)63.2%
Part B score (max 5.0)3.16 / 5.0
Final score7.51 / 10
3.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
75 AMARWARA โ†— CHHINDWARA 6.33 C
50.1% 5.63
CategoryFarm Pond
Started / Completed / Phys353 / 111 / 97
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate58.9%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked3.97Cr / 2.13Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score5.63 / 10
2.0% 1.31
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.11Cr
Expenditure rate (ongoing)26.3%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
5.1% 9.41
CategoryDug Well Recharge
Started / Completed / Phys382 / 156 / 181
⚠ Works needing verification (Completed/Physically Completed)45 works (exp <30%)
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.41 / 10
โ€”
34.6% 7.16
CategoryWater conservation & recharge
Started / Completed / Phys111 / 37 / 42
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked2.01Cr / 1.44Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.60 / 5.0
Final score7.16 / 10
5.4% 6.23
CategoryWatershed Related Works
Started / Completed / Phys16 / 5 / 6
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.37Cr / 0.21Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score6.23 / 10
2.9% 6.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.52 / 5.0
Final score6.85 / 10
76 BURHANPUR โ†— BURHANPUR 6.31 C
26.2% 6.69
CategoryFarm Pond
Started / Completed / Phys268 / 110 / 113
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.80Cr / 0.41Cr
Expenditure rate (ongoing)50.6%
Part B score (max 5.0)2.53 / 5.0
Final score6.69 / 10
8.7% 4.39
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked1.08Cr / 0.68Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score4.39 / 10
6.8% 7.41
CategoryDug Well Recharge
Started / Completed / Phys447 / 220 / 203
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate94.6%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score7.41 / 10
โ€”
53.5% 6.12
CategoryWater conservation & recharge
Started / Completed / Phys133 / 10 / 65
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked3.64Cr / 2.40Cr
Expenditure rate (ongoing)66.0%
Part B score (max 5.0)3.30 / 5.0
Final score6.12 / 10
3.5% 7.63
CategoryWatershed Related Works
Started / Completed / Phys10 / 2 / 6
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score7.63 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
77 MUNGAOLI โ†— ASHOK NAGAR 6.29 C
41.4% 4.88
CategoryFarm Pond
Started / Completed / Phys413 / 24 / 222
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked5.89Cr / 2.25Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score4.88 / 10
2.1% 4.68
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.50Cr / 0.30Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score4.68 / 10
1.1% 5.26
CategoryDug Well Recharge
Started / Completed / Phys147 / 36 / 67
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate70.1%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score5.26 / 10
โ€”
51.9% 7.31
CategoryWater conservation & recharge
Started / Completed / Phys395 / 76 / 222
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked4.87Cr / 3.44Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score7.31 / 10
2.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 7.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score7.02 / 10
78 GAIRATGANJ โ†— RAISEN 6.28 C
54.3% 7.19
CategoryFarm Pond
Started / Completed / Phys350 / 218 / 61
Completion rate79.7%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked1.53Cr / 0.98Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score7.19 / 10
4.1% 3.25
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score3.25 / 10
4.4% 9.00
CategoryDug Well Recharge
Started / Completed / Phys202 / 169 / 21
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate94.1%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.32 / 5.0
Final score9.00 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
34.9% 4.94
CategoryWater conservation & recharge
Started / Completed / Phys86 / 17 / 5
Completion rate25.6%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked3.44Cr / 2.52Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score4.94 / 10
โ€”
1.5% 2.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score2.72 / 10
79 SILWANI โ†— RAISEN 6.28 C
69.3% 6.25
CategoryFarm Pond
Started / Completed / Phys442 / 153 / 205
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked1.11Cr / 0.49Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score6.25 / 10
5.6% 4.63
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.96 / 5.0
Final score4.63 / 10
11.0% 7.42
CategoryDug Well Recharge
Started / Completed / Phys439 / 322 / 97
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score7.42 / 10
โ€”
11.4% 5.24
CategoryWater conservation & recharge
Started / Completed / Phys32 / 5 / 10
Completion rate46.9%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked0.71Cr / 0.41Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score5.24 / 10
โ€”
2.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
80 GUNA โ†— GUNA 6.27 C
33.6% 5.29
CategoryFarm Pond
Started / Completed / Phys205 / 38 / 94
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked3.45Cr / 1.43Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score5.29 / 10
โ€”
2.9% 7.70
CategoryDug Well Recharge
Started / Completed / Phys324 / 191 / 122
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score7.70 / 10
1.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
55.0% 6.65
CategoryWater conservation & recharge
Started / Completed / Phys187 / 37 / 101
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked5.12Cr / 3.03Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score6.65 / 10
2.4% 6.34
CategoryWatershed Related Works
Started / Completed / Phys11 / 3 / 5
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.34Cr / 0.18Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.34 / 10
4.5% 6.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 1 / 5
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.31Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.66 / 5.0
Final score6.66 / 10
81 GOHPARU โ†— SHAHDOL 6.27 C
38.0% 4.47
CategoryFarm Pond
Started / Completed / Phys596 / 236 / 136
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked5.25Cr / 1.42Cr
Expenditure rate (ongoing)27.1%
Part B score (max 5.0)1.35 / 5.0
Final score4.47 / 10
1.1% 2.16
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)43.2%
Part B score (max 5.0)2.16 / 5.0
Final score2.16 / 10
0.8% 5.85
CategoryDug Well Recharge
Started / Completed / Phys98 / 15 / 61
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate77.6%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)39.4%
Part B score (max 5.0)1.97 / 5.0
Final score5.85 / 10
11.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 2 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
45.0% 7.00
CategoryWater conservation & recharge
Started / Completed / Phys202 / 18 / 107
Completion rate61.9%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked7.34Cr / 5.74Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score7.00 / 10
3.3% 5.74
CategoryWatershed Related Works
Started / Completed / Phys11 / 1 / 3
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.61Cr / 0.48Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score5.74 / 10
0.5% 6.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.46 / 10
82 BHAINSDEHI โ†— BETUL 6.26 C
13.4% 8.68
CategoryFarm Pond
Started / Completed / Phys164 / 3 / 140
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.34Cr / 0.29Cr
Expenditure rate (ongoing)86.4%
Part B score (max 5.0)4.32 / 5.0
Final score8.68 / 10
3.0% 2.74
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.55Cr / 0.30Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.74 / 5.0
Final score2.74 / 10
5.2% 7.71
CategoryDug Well Recharge
Started / Completed / Phys371 / 28 / 310
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score7.71 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
72.8% 5.86
CategoryWater conservation & recharge
Started / Completed / Phys201 / 9 / 91
Completion rate49.8%
Part A score (max 5.0)2.49 / 5.0
Ongoing sanction / booked6.13Cr / 4.13Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score5.86 / 10
1.8% 5.36
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
3.8% 6.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 6 / 10
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.68 / 10
83 ATHNER โ†— BETUL 6.26 C
12.6% 8.16
CategoryFarm Pond
Started / Completed / Phys167 / 19 / 123
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.43Cr / 0.33Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.90 / 5.0
Final score8.16 / 10
4.3% 0.49
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.09Cr
Expenditure rate (ongoing)9.8%
Part B score (max 5.0)0.49 / 5.0
Final score0.49 / 10
4.1% 7.83
CategoryDug Well Recharge
Started / Completed / Phys355 / 46 / 281
Completion rate92.1%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.23 / 5.0
Final score7.83 / 10
โ€”
73.8% 6.21
CategoryWater conservation & recharge
Started / Completed / Phys225 / 11 / 116
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked7.46Cr / 5.05Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score6.21 / 10
4.3% 6.01
CategoryWatershed Related Works
Started / Completed / Phys15 / 6 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.20Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score6.01 / 10
1.0% 6.06
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 3 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.15Cr / 0.11Cr
Expenditure rate (ongoing)71.2%
Part B score (max 5.0)3.56 / 5.0
Final score6.06 / 10
84 RAGHOGARH โ†— GUNA 6.25 C
29.8% 4.44
CategoryFarm Pond
Started / Completed / Phys429 / 57 / 253
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate72.3%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked2.15Cr / 0.36Cr
Expenditure rate (ongoing)16.6%
Part B score (max 5.0)0.83 / 5.0
Final score4.44 / 10
โ€”
6.2% 4.78
CategoryDug Well Recharge
Started / Completed / Phys598 / 144 / 423
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate94.8%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)0.8%
Part B score (max 5.0)0.04 / 5.0
Final score4.78 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
60.1% 7.14
CategoryWater conservation & recharge
Started / Completed / Phys301 / 38 / 241
Completion rate92.7%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.93Cr / 0.47Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score7.14 / 10
2.1% 7.15
CategoryWatershed Related Works
Started / Completed / Phys10 / 5 / 4
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score7.15 / 10
1.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
85 BARGHAT โ†— SEONI 6.24 C
56.3% 5.79
CategoryFarm Pond
Started / Completed / Phys440 / 219 / 115
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate75.9%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked2.82Cr / 1.12Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)1.99 / 5.0
Final score5.79 / 10
โ€”
3.0% 5.79
CategoryDug Well Recharge
Started / Completed / Phys254 / 58 / 139
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate77.6%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score5.79 / 10
0.6% 4.79
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.12Cr / 0.12Cr
Expenditure rate (ongoing)95.8%
Part B score (max 5.0)4.79 / 5.0
Final score4.79 / 10
32.5% 6.97
CategoryWater conservation & recharge
Started / Completed / Phys139 / 43 / 56
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked1.99Cr / 1.36Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score6.97 / 10
5.6% 7.33
CategoryWatershed Related Works
Started / Completed / Phys24 / 12 / 9
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)59.0%
Part B score (max 5.0)2.95 / 5.0
Final score7.33 / 10
2.2% 5.24
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.11Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score5.24 / 10
86 PETLAWAD โ†— JHABUA 6.23 C
10.9% 4.38
CategoryFarm Pond
Started / Completed / Phys272 / 45 / 61
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked2.87Cr / 1.40Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.44 / 5.0
Final score4.38 / 10
1.4% 0.73
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.60Cr / 0.09Cr
Expenditure rate (ongoing)14.7%
Part B score (max 5.0)0.73 / 5.0
Final score0.73 / 10
5.0% 6.56
CategoryDug Well Recharge
Started / Completed / Phys832 / 357 / 300
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.42Cr / 0.22Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score6.56 / 10
0.1% 6.34
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 5 / 1
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.34 / 10
75.7% 6.67
CategoryWater conservation & recharge
Started / Completed / Phys372 / 22 / 190
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked13.10Cr / 10.00Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score6.67 / 10
4.1% 4.71
CategoryWatershed Related Works
Started / Completed / Phys50 / 0 / 19
Completion rate38.0%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked0.89Cr / 0.50Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score4.71 / 10
2.8% 6.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 13
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)40.5%
Part B score (max 5.0)2.03 / 5.0
Final score6.14 / 10
87 GOHAD โ†— BHIND 6.23 C
19.3% 3.44
CategoryFarm Pond
Started / Completed / Phys218 / 46 / 48
Completion rate43.1%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked3.13Cr / 0.80Cr
Expenditure rate (ongoing)25.7%
Part B score (max 5.0)1.28 / 5.0
Final score3.44 / 10
1.0% 0.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
0.3% 6.55
CategoryDug Well Recharge
Started / Completed / Phys31 / 0 / 20
Completion rate64.5%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score6.55 / 10
16.0% 7.16
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 4 / 37
Completion rate75.9%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.78Cr / 0.53Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score7.16 / 10
56.0% 7.01
CategoryWater conservation & recharge
Started / Completed / Phys152 / 10 / 110
Completion rate78.9%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked2.35Cr / 1.44Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.07 / 5.0
Final score7.01 / 10
6.4% 6.43
CategoryWatershed Related Works
Started / Completed / Phys19 / 5 / 9
Completion rate73.7%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.48Cr / 0.26Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score6.43 / 10
1.2% 6.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score6.33 / 10
88 GHUGHRI โ†— MANDLA 6.23 C
41.4% 7.29
CategoryFarm Pond
Started / Completed / Phys188 / 141 / 23
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked1.12Cr / 0.65Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score7.29 / 10
4.4% 1.49
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.80Cr / 0.24Cr
Expenditure rate (ongoing)29.8%
Part B score (max 5.0)1.49 / 5.0
Final score1.49 / 10
2.2% 6.26
CategoryDug Well Recharge
Started / Completed / Phys154 / 131 / 9
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score6.26 / 10
11.7% 3.56
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked1.86Cr / 0.95Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score3.56 / 10
37.7% 6.33
CategoryWater conservation & recharge
Started / Completed / Phys67 / 22 / 15
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked4.75Cr / 3.39Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score6.33 / 10
2.3% 7.33
CategoryWatershed Related Works
Started / Completed / Phys15 / 5 / 8
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.33 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
89 BARWAH โ†— KHARGONE 6.21 C
35.9% 4.66
CategoryFarm Pond
Started / Completed / Phys216 / 69 / 66
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.69Cr / 0.52Cr
Expenditure rate (ongoing)30.7%
Part B score (max 5.0)1.54 / 5.0
Final score4.66 / 10
1.8% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.5% 6.91
CategoryDug Well Recharge
Started / Completed / Phys720 / 104 / 583
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score6.91 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.4% 6.69
CategoryWater conservation & recharge
Started / Completed / Phys150 / 53 / 67
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.94Cr / 0.51Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.69 / 5.0
Final score6.69 / 10
7.9% 7.65
CategoryWatershed Related Works
Started / Completed / Phys26 / 9 / 14
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)64.6%
Part B score (max 5.0)3.23 / 5.0
Final score7.65 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
90 MAJHGAWAN โ†— SATNA 6.21 C
42.8% 5.38
CategoryFarm Pond
Started / Completed / Phys456 / 19 / 279
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked4.44Cr / 1.87Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score5.38 / 10
5.0% 1.66
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.51Cr / 0.50Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score1.66 / 10
1.6% 6.69
CategoryDug Well Recharge
Started / Completed / Phys200 / 38 / 117
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate77.5%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score6.69 / 10
0.3% 6.40
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.65 / 5.0
Final score6.40 / 10
42.5% 7.52
CategoryWater conservation & recharge
Started / Completed / Phys181 / 35 / 93
Completion rate70.7%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked6.37Cr / 5.08Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score7.52 / 10
5.7% 7.08
CategoryWatershed Related Works
Started / Completed / Phys39 / 6 / 22
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.54Cr / 0.37Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.08 / 10
2.1% 4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 4
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.37Cr / 0.20Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.66 / 5.0
Final score4.96 / 10
91 BADNAGAR โ†— UJJAIN 6.20 C
58.8% 6.74
CategoryFarm Pond
Started / Completed / Phys167 / 26 / 126
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.25Cr / 0.11Cr
Expenditure rate (ongoing)43.8%
Part B score (max 5.0)2.19 / 5.0
Final score6.74 / 10
17.0% 2.21
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.24Cr / 0.55Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score2.21 / 10
0.6% 10.00
CategoryDug Well Recharge
Started / Completed / Phys16 / 11 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.7% 7.19
CategoryWater conservation & recharge
Started / Completed / Phys19 / 6 / 11
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.14Cr / 0.08Cr
Expenditure rate (ongoing)54.3%
Part B score (max 5.0)2.71 / 5.0
Final score7.19 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
92 LALBARRA โ†— BALAGHAT 6.19 C
61.3% 5.48
CategoryFarm Pond
Started / Completed / Phys526 / 348 / 55
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked2.95Cr / 0.97Cr
Expenditure rate (ongoing)32.9%
Part B score (max 5.0)1.65 / 5.0
Final score5.48 / 10
1.9% 6.67
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.21Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score6.67 / 10
1.8% 7.37
CategoryDug Well Recharge
Started / Completed / Phys173 / 148 / 20
Completion rate97.1%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score7.37 / 10
1.6% 8.14
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)87.9%
Part B score (max 5.0)4.39 / 5.0
Final score8.14 / 10
30.3% 7.31
CategoryWater conservation & recharge
Started / Completed / Phys176 / 39 / 91
Completion rate73.9%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked2.15Cr / 1.55Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score7.31 / 10
1.6% 6.32
CategoryWatershed Related Works
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.13Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score6.32 / 10
1.5% 8.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.06Cr
Expenditure rate (ongoing)87.6%
Part B score (max 5.0)4.38 / 5.0
Final score8.13 / 10
93 KHARGONE โ†— KHARGONE 6.17 C
36.0% 4.65
CategoryFarm Pond
Started / Completed / Phys106 / 25 / 57
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.48Cr / 0.08Cr
Expenditure rate (ongoing)15.7%
Part B score (max 5.0)0.78 / 5.0
Final score4.65 / 10
8.5% 5.12
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.39Cr / 0.27Cr
Expenditure rate (ongoing)69.1%
Part B score (max 5.0)3.45 / 5.0
Final score5.12 / 10
7.9% 5.88
CategoryDug Well Recharge
Started / Completed / Phys245 / 18 / 218
Completion rate96.3%
Part A score (max 5.0)4.82 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score5.88 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
43.8% 7.38
CategoryWater conservation & recharge
Started / Completed / Phys47 / 7 / 38
Completion rate95.7%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)51.9%
Part B score (max 5.0)2.59 / 5.0
Final score7.38 / 10
1.8% 8.65
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)92.9%
Part B score (max 5.0)4.65 / 5.0
Final score8.65 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
94 NISARPUR โ†— DHAR 6.16 C
25.2% 4.09
CategoryFarm Pond
Started / Completed / Phys78 / 23 / 16
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.63Cr / 0.20Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.59 / 5.0
Final score4.09 / 10
โ€”
8.1% 4.63
CategoryDug Well Recharge
Started / Completed / Phys150 / 15 / 51
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.21Cr / 0.10Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score4.63 / 10
โ€”
63.3% 7.24
CategoryWater conservation & recharge
Started / Completed / Phys39 / 12 / 8
Completion rate51.3%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked2.77Cr / 2.59Cr
Expenditure rate (ongoing)93.4%
Part B score (max 5.0)4.67 / 5.0
Final score7.24 / 10
3.2% 5.45
CategoryWatershed Related Works
Started / Completed / Phys7 / 3 / 0
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)66.2%
Part B score (max 5.0)3.31 / 5.0
Final score5.45 / 10
0.2% 2.11
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)42.3%
Part B score (max 5.0)2.11 / 5.0
Final score2.11 / 10
95 MHOW โ†— INDORE 6.16 C
58.5% 4.82
CategoryFarm Pond
Started / Completed / Phys240 / 88 / 54
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate59.2%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked2.70Cr / 1.01Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score4.82 / 10
13.6% 5.84
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.08Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score5.84 / 10
7.2% 6.61
CategoryDug Well Recharge
Started / Completed / Phys300 / 199 / 25
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate74.7%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)57.5%
Part B score (max 5.0)2.88 / 5.0
Final score6.61 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys40 / 19 / 21
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
96 AMBAH โ†— MORENA 6.16 C
12.2% 4.58
CategoryFarm Pond
Started / Completed / Phys156 / 50 / 49
Completion rate63.5%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked0.84Cr / 0.24Cr
Expenditure rate (ongoing)28.1%
Part B score (max 5.0)1.41 / 5.0
Final score4.58 / 10
โ€”
0.9% 5.36
CategoryDug Well Recharge
Started / Completed / Phys64 / 11 / 44
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate85.9%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.07 / 5.0
Final score5.36 / 10
1.7% 7.12
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 4
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score7.12 / 10
73.6% 6.24
CategoryWater conservation & recharge
Started / Completed / Phys110 / 3 / 67
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked5.06Cr / 3.09Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score6.24 / 10
7.7% 7.72
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 8
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.38Cr / 0.30Cr
Expenditure rate (ongoing)79.4%
Part B score (max 5.0)3.97 / 5.0
Final score7.72 / 10
3.8% 6.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.52 / 5.0
Final score6.38 / 10
97 MAWAI โ†— MANDLA 6.15 C
47.7% 6.23
CategoryFarm Pond
Started / Completed / Phys247 / 198 / 17
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked1.38Cr / 0.52Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score6.23 / 10
5.4% 0.24
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.06Cr
Expenditure rate (ongoing)4.9%
Part B score (max 5.0)0.24 / 5.0
Final score0.24 / 10
1.8% 7.00
CategoryDug Well Recharge
Started / Completed / Phys153 / 44 / 75
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score7.00 / 10
2.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
36.3% 6.53
CategoryWater conservation & recharge
Started / Completed / Phys149 / 64 / 31
Completion rate63.8%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked2.57Cr / 1.71Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.53 / 10
1.8% 7.01
CategoryWatershed Related Works
Started / Completed / Phys7 / 5 / 0
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score7.01 / 10
4.9% 6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 3 / 7
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.47Cr / 0.35Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score6.56 / 10
98 KATNI โ†— KATNI 6.14 C
37.5% 3.85
CategoryFarm Pond
Started / Completed / Phys145 / 35 / 41
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked2.43Cr / 0.60Cr
Expenditure rate (ongoing)24.7%
Part B score (max 5.0)1.23 / 5.0
Final score3.85 / 10
5.0% 1.89
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.64Cr / 0.24Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score1.89 / 10
3.6% 3.48
CategoryDug Well Recharge
Started / Completed / Phys174 / 26 / 90
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.00Cr
Expenditure rate (ongoing)2.9%
Part B score (max 5.0)0.14 / 5.0
Final score3.48 / 10
13.8% 7.34
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 1 / 17
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score7.34 / 10
11.3% 6.92
CategoryWater conservation & recharge
Started / Completed / Phys34 / 7 / 22
Completion rate85.3%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.26Cr / 0.14Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score6.92 / 10
20.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys27 / 17 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.7% 7.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 5 / 7
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.21Cr / 0.16Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score7.75 / 10
99 NIWAS โ†— MANDLA 6.14 C
37.6% 6.62
CategoryFarm Pond
Started / Completed / Phys146 / 71 / 24
Completion rate65.1%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked1.41Cr / 0.95Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.36 / 5.0
Final score6.62 / 10
โ€”
3.2% 5.50
CategoryDug Well Recharge
Started / Completed / Phys118 / 38 / 38
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate64.4%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)45.6%
Part B score (max 5.0)2.28 / 5.0
Final score5.50 / 10
11.5% 5.57
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.66Cr / 0.41Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score5.57 / 10
31.9% 5.97
CategoryWater conservation & recharge
Started / Completed / Phys61 / 2 / 23
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.99Cr / 1.56Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score5.97 / 10
1.3% 4.29
CategoryWatershed Related Works
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.29 / 5.0
Final score4.29 / 10
14.5% 6.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.03 / 10
100 GAROTH โ†— MANDSAUR 6.14 C
11.1% 3.97
CategoryFarm Pond
Started / Completed / Phys281 / 19 / 88
Completion rate38.1%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked2.83Cr / 1.17Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score3.97 / 10
3.2% 3.54
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.21Cr / 0.65Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score3.54 / 10
5.6% 6.36
CategoryDug Well Recharge
Started / Completed / Phys964 / 71 / 480
Completion rate57.2%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked1.07Cr / 0.75Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score6.36 / 10
0.9% 5.52
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 2 / 4
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.29Cr / 0.16Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score5.52 / 10
74.4% 6.54
CategoryWater conservation & recharge
Started / Completed / Phys372 / 11 / 179
Completion rate51.1%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked14.26Cr / 11.39Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score6.54 / 10
1.7% 6.50
CategoryWatershed Related Works
Started / Completed / Phys12 / 0 / 9
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score6.50 / 10
3.1% 6.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 2 / 6
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.81Cr / 0.67Cr
Expenditure rate (ongoing)83.2%
Part B score (max 5.0)4.16 / 5.0
Final score6.38 / 10
101 KARKELI โ†— UMARIA 6.13 C
24.6% 5.00
CategoryFarm Pond
Started / Completed / Phys313 / 32 / 132
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked5.00Cr / 2.38Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score5.00 / 10
1.7% 6.26
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.38Cr / 0.28Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.76 / 5.0
Final score6.26 / 10
2.6% 5.68
CategoryDug Well Recharge
Started / Completed / Phys441 / 76 / 225
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate68.3%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.34Cr / 0.16Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score5.68 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
57.1% 6.60
CategoryWater conservation & recharge
Started / Completed / Phys267 / 12 / 171
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked8.05Cr / 5.11Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score6.60 / 10
5.6% 7.49
CategoryWatershed Related Works
Started / Completed / Phys30 / 2 / 23
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.21Cr / 0.14Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.32 / 5.0
Final score7.49 / 10
8.3% 5.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys58 / 3 / 23
Completion rate44.8%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked2.13Cr / 1.36Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score5.44 / 10
102 BATIYAGARH โ†— DAMOH 6.12 C
14.3% 6.33
CategoryFarm Pond
Started / Completed / Phys208 / 72 / 86
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked1.18Cr / 0.60Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score6.33 / 10
โ€”
2.5% 6.94
CategoryDug Well Recharge
Started / Completed / Phys336 / 186 / 84
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.93 / 5.0
Final score6.94 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
77.4% 5.93
CategoryWater conservation & recharge
Started / Completed / Phys125 / 18 / 55
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked17.12Cr / 10.31Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score5.93 / 10
3.3% 8.22
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.41Cr / 0.39Cr
Expenditure rate (ongoing)95.2%
Part B score (max 5.0)4.76 / 5.0
Final score8.22 / 10
2.3% 6.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 7
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score6.63 / 10
103 AJAIGARH โ†— PANNA 6.09 C
41.2% 5.18
CategoryFarm Pond
Started / Completed / Phys376 / 60 / 156
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked3.12Cr / 1.44Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.30 / 5.0
Final score5.18 / 10
2.5% 3.96
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.37Cr
Expenditure rate (ongoing)79.2%
Part B score (max 5.0)3.96 / 5.0
Final score3.96 / 10
5.4% 6.23
CategoryDug Well Recharge
Started / Completed / Phys396 / 89 / 178
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked0.33Cr / 0.19Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score6.23 / 10
โ€”
41.7% 6.98
CategoryWater conservation & recharge
Started / Completed / Phys216 / 24 / 126
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked2.49Cr / 1.74Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score6.98 / 10
3.7% 6.26
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 7
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.28Cr / 0.20Cr
Expenditure rate (ongoing)71.3%
Part B score (max 5.0)3.56 / 5.0
Final score6.26 / 10
5.5% 7.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 9
Completion rate68.8%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.34Cr / 0.25Cr
Expenditure rate (ongoing)71.5%
Part B score (max 5.0)3.57 / 5.0
Final score7.01 / 10
104 ATER โ†— BHIND 6.09 C
13.3% 3.57
CategoryFarm Pond
Started / Completed / Phys204 / 76 / 23
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked1.80Cr / 0.41Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.15 / 5.0
Final score3.57 / 10
2.7% 0.18
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.02Cr
Expenditure rate (ongoing)3.5%
Part B score (max 5.0)0.18 / 5.0
Final score0.18 / 10
0.2% 4.63
CategoryDug Well Recharge
Started / Completed / Phys24 / 4 / 12
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.30 / 5.0
Final score4.63 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
64.0% 6.86
CategoryWater conservation & recharge
Started / Completed / Phys226 / 48 / 124
Completion rate76.1%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked3.98Cr / 2.43Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score6.86 / 10
12.8% 5.29
CategoryWatershed Related Works
Started / Completed / Phys24 / 5 / 10
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.22Cr / 0.53Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.17 / 5.0
Final score5.29 / 10
6.5% 7.59
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 4 / 16
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score7.59 / 10
105 SIDHI โ†— SIDHI 6.09 C
43.2% 4.55
CategoryFarm Pond
Started / Completed / Phys485 / 247 / 92
Completion rate69.9%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked3.76Cr / 0.80Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score4.55 / 10
โ€”
1.1% 4.74
CategoryDug Well Recharge
Started / Completed / Phys130 / 62 / 32
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate72.3%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.12 / 5.0
Final score4.74 / 10
0.8% 7.32
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.11Cr / 0.10Cr
Expenditure rate (ongoing)96.3%
Part B score (max 5.0)4.82 / 5.0
Final score7.32 / 10
41.5% 7.47
CategoryWater conservation & recharge
Started / Completed / Phys279 / 78 / 119
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked4.94Cr / 3.89Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score7.47 / 10
9.1% 6.21
CategoryWatershed Related Works
Started / Completed / Phys57 / 25 / 11
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.23Cr / 0.75Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.06 / 5.0
Final score6.21 / 10
4.3% 8.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys24 / 13 / 5
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.42Cr / 0.37Cr
Expenditure rate (ongoing)88.0%
Part B score (max 5.0)4.40 / 5.0
Final score8.15 / 10
106 BUDNI โ†— SEHORE 6.09 C
59.8% 4.80
CategoryFarm Pond
Started / Completed / Phys78 / 22 / 33
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate70.5%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.42Cr / 0.11Cr
Expenditure rate (ongoing)25.5%
Part B score (max 5.0)1.28 / 5.0
Final score4.80 / 10
โ€”
16.4% 5.91
CategoryDug Well Recharge
Started / Completed / Phys151 / 45 / 82
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate84.1%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.70 / 5.0
Final score5.91 / 10
15.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.3% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.7% 5.32
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.57 / 5.0
Final score5.32 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
107 MANASA โ†— NEEMUCH 6.08 C
50.1% 4.61
CategoryFarm Pond
Started / Completed / Phys400 / 52 / 200
Completion rate63.0%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked5.96Cr / 1.75Cr
Expenditure rate (ongoing)29.3%
Part B score (max 5.0)1.46 / 5.0
Final score4.61 / 10
5.2% 6.33
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 4
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.66Cr / 0.46Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.33 / 10
6.8% 5.49
CategoryDug Well Recharge
Started / Completed / Phys759 / 473 / 251
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate95.4%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.07Cr / 0.01Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.72 / 5.0
Final score5.49 / 10
4.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 4 / 14
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.4% 7.77
CategoryWater conservation & recharge
Started / Completed / Phys179 / 23 / 140
Completion rate91.1%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked1.69Cr / 1.09Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score7.77 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
108 AMLA โ†— BETUL 6.08 C
28.6% 5.43
CategoryFarm Pond
Started / Completed / Phys215 / 15 / 99
Completion rate53.0%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked2.52Cr / 1.40Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score5.43 / 10
โ€”
6.5% 7.68
CategoryDug Well Recharge
Started / Completed / Phys437 / 56 / 288
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)74.8%
Part B score (max 5.0)3.74 / 5.0
Final score7.68 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
52.5% 5.97
CategoryWater conservation & recharge
Started / Completed / Phys128 / 5 / 50
Completion rate43.0%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked4.47Cr / 3.42Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score5.97 / 10
7.3% 7.12
CategoryWatershed Related Works
Started / Completed / Phys21 / 1 / 15
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.27Cr / 0.18Cr
Expenditure rate (ongoing)66.1%
Part B score (max 5.0)3.31 / 5.0
Final score7.12 / 10
5.0% 7.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 2 / 10
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked0.35Cr / 0.28Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)4.00 / 5.0
Final score7.15 / 10
109 PANAGAR โ†— JABALPUR 6.07 C
6.8% 0.85
CategoryFarm Pond
Started / Completed / Phys8 / 1 / 0
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked0.12Cr / 0.01Cr
Expenditure rate (ongoing)4.4%
Part B score (max 5.0)0.22 / 5.0
Final score0.85 / 10
โ€”
0.6% 1.13
CategoryDug Well Recharge
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.13 / 5.0
Final score1.13 / 10
โ€”
74.5% 6.93
CategoryWater conservation & recharge
Started / Completed / Phys12 / 10 / 0
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.73Cr / 0.40Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.93 / 10
2.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
15.8% 3.89
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score3.89 / 10
110 SARANGPUR โ†— RAJGARH 6.07 C
44.7% 5.15
CategoryFarm Pond
Started / Completed / Phys181 / 123 / 6
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate71.3%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked1.33Cr / 0.42Cr
Expenditure rate (ongoing)31.8%
Part B score (max 5.0)1.59 / 5.0
Final score5.15 / 10
โ€”
13.5% 7.97
CategoryDug Well Recharge
Started / Completed / Phys614 / 501 / 87
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score7.97 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
23.0% 6.17
CategoryWater conservation & recharge
Started / Completed / Phys39 / 23 / 10
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.20Cr / 0.08Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.17 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.9% 6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 3 / 20
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.59Cr / 0.35Cr
Expenditure rate (ongoing)59.7%
Part B score (max 5.0)2.99 / 5.0
Final score6.58 / 10
111 NARSINGHGARH โ†— RAJGARH 6.06 C
41.3% 4.87
CategoryFarm Pond
Started / Completed / Phys263 / 149 / 33
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked2.34Cr / 0.66Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.41 / 5.0
Final score4.87 / 10
โ€”
9.3% 5.92
CategoryDug Well Recharge
Started / Completed / Phys656 / 331 / 303
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate96.6%
Part A score (max 5.0)4.83 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.09 / 5.0
Final score5.92 / 10
1.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.8% 7.26
CategoryWater conservation & recharge
Started / Completed / Phys163 / 41 / 90
Completion rate80.4%
Part A score (max 5.0)4.02 / 5.0
Ongoing sanction / booked1.77Cr / 1.15Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score7.26 / 10
0.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 6 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.4% 6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys31 / 3 / 19
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.71Cr / 0.37Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.61 / 5.0
Final score6.16 / 10
112 MANAWAR โ†— DHAR 6.05 C
18.6% 4.21
CategoryFarm Pond
Started / Completed / Phys234 / 30 / 54
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate35.9%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked2.18Cr / 1.05Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score4.21 / 10
โ€”
5.4% 5.42
CategoryDug Well Recharge
Started / Completed / Phys386 / 107 / 112
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate56.7%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked0.40Cr / 0.21Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score5.42 / 10
1.4% 4.84
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.24Cr
Expenditure rate (ongoing)96.9%
Part B score (max 5.0)4.84 / 5.0
Final score4.84 / 10
56.9% 6.69
CategoryWater conservation & recharge
Started / Completed / Phys128 / 34 / 35
Completion rate53.9%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked6.96Cr / 5.57Cr
Expenditure rate (ongoing)80.0%
Part B score (max 5.0)4.00 / 5.0
Final score6.69 / 10
16.0% 6.31
CategoryWatershed Related Works
Started / Completed / Phys76 / 12 / 35
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked1.20Cr / 0.77Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score6.31 / 10
1.7% 5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 5
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score5.38 / 10
113 JOBAT โ†— ALIRAJPUR 6.05 C
11.3% 2.26
CategoryFarm Pond
Started / Completed / Phys141 / 0 / 2
Completion rate1.4%
Part A score (max 5.0)0.07 / 5.0
Ongoing sanction / booked1.82Cr / 0.80Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score2.26 / 10
3.0% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.0% 5.17
CategoryDug Well Recharge
Started / Completed / Phys442 / 2 / 235
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked0.52Cr / 0.26Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score5.17 / 10
โ€”
72.6% 6.48
CategoryWater conservation & recharge
Started / Completed / Phys87 / 6 / 31
Completion rate42.5%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked9.10Cr / 7.93Cr
Expenditure rate (ongoing)87.1%
Part B score (max 5.0)4.35 / 5.0
Final score6.48 / 10
5.0% 6.77
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 17
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.77 / 10
1.1% 7.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score7.78 / 10
114 GHORA DONGRI โ†— BETUL 6.05 C
20.8% 5.11
CategoryFarm Pond
Started / Completed / Phys221 / 29 / 97
Completion rate57.0%
Part A score (max 5.0)2.85 / 5.0
Ongoing sanction / booked4.04Cr / 1.83Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.11 / 10
2.6% 3.57
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.81Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score3.57 / 10
2.7% 8.01
CategoryDug Well Recharge
Started / Completed / Phys458 / 166 / 253
Completion rate91.5%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score8.01 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
72.6% 6.31
CategoryWater conservation & recharge
Started / Completed / Phys348 / 5 / 202
Completion rate59.5%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked13.02Cr / 8.70Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.31 / 10
0.1% 5.14
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.64 / 5.0
Final score5.14 / 10
1.1% 6.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 8
Completion rate61.5%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.86 / 10
115 DHANAURA โ†— SEONI 6.04 C
40.1% 4.00
CategoryFarm Pond
Started / Completed / Phys374 / 127 / 54
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate48.4%
Part A score (max 5.0)2.42 / 5.0
Ongoing sanction / booked4.42Cr / 1.40Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score4.00 / 10
1.8% 1.53
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score1.53 / 10
2.1% 9.48
CategoryDug Well Recharge
Started / Completed / Phys200 / 93 / 86
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate89.5%
Part A score (max 5.0)4.48 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.48 / 10
โ€”
31.6% 7.54
CategoryWater conservation & recharge
Started / Completed / Phys116 / 18 / 75
Completion rate80.2%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked1.92Cr / 1.36Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score7.54 / 10
16.3% 8.04
CategoryWatershed Related Works
Started / Completed / Phys37 / 12 / 18
Completion rate81.1%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.74Cr / 0.59Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score8.04 / 10
8.1% 6.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 7
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked1.00Cr / 0.81Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.02 / 5.0
Final score6.37 / 10
116 NEWALI โ†— BARWANI 6.04 C
24.4% 6.14
CategoryFarm Pond
Started / Completed / Phys83 / 8 / 37
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked0.55Cr / 0.37Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.43 / 5.0
Final score6.14 / 10
โ€”
13.6% 5.02
CategoryDug Well Recharge
Started / Completed / Phys265 / 1 / 262
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate99.2%
Part A score (max 5.0)4.96 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.1%
Part B score (max 5.0)0.05 / 5.0
Final score5.02 / 10
โ€”
53.6% 6.15
CategoryWater conservation & recharge
Started / Completed / Phys79 / 16 / 30
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked1.04Cr / 0.67Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.15 / 10
7.9% 6.49
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score6.49 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
117 GANDHWANI โ†— DHAR 6.03 C
5.6% 3.12
CategoryFarm Pond
Started / Completed / Phys237 / 10 / 22
Completion rate13.5%
Part A score (max 5.0)0.68 / 5.0
Ongoing sanction / booked1.97Cr / 0.96Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score3.12 / 10
โ€”
2.5% 2.51
CategoryDug Well Recharge
Started / Completed / Phys400 / 47 / 9
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked0.87Cr / 0.32Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score2.51 / 10
โ€”
76.0% 6.44
CategoryWater conservation & recharge
Started / Completed / Phys285 / 6 / 144
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked11.90Cr / 9.05Cr
Expenditure rate (ongoing)76.1%
Part B score (max 5.0)3.80 / 5.0
Final score6.44 / 10
12.1% 5.55
CategoryWatershed Related Works
Started / Completed / Phys164 / 4 / 50
Completion rate32.9%
Part A score (max 5.0)1.65 / 5.0
Ongoing sanction / booked3.26Cr / 2.55Cr
Expenditure rate (ongoing)78.1%
Part B score (max 5.0)3.91 / 5.0
Final score5.55 / 10
3.8% 6.10
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 0 / 14
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.58Cr / 0.26Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score6.10 / 10
118 WARASEONI โ†— BALAGHAT 6.02 C
57.3% 4.85
CategoryFarm Pond
Started / Completed / Phys390 / 132 / 177
Completion rate79.2%
Part A score (max 5.0)3.96 / 5.0
Ongoing sanction / booked1.52Cr / 0.27Cr
Expenditure rate (ongoing)17.8%
Part B score (max 5.0)0.89 / 5.0
Final score4.85 / 10
2.6% 3.69
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.37Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score3.69 / 10
1.5% 6.57
CategoryDug Well Recharge
Started / Completed / Phys114 / 56 / 53
Completion rate95.6%
Part A score (max 5.0)4.78 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.57 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
34.3% 7.94
CategoryWater conservation & recharge
Started / Completed / Phys157 / 49 / 92
Completion rate89.8%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.99Cr / 0.68Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.94 / 10
2.3% 6.99
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.99 / 10
1.8% 7.88
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 6 / 1
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score7.88 / 10
119 PORSA โ†— MORENA 6.02 C
15.6% 5.01
CategoryFarm Pond
Started / Completed / Phys171 / 75 / 41
Completion rate67.8%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked1.81Cr / 0.59Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.62 / 5.0
Final score5.01 / 10
โ€”
0.4% 3.85
CategoryDug Well Recharge
Started / Completed / Phys63 / 24 / 5
Completion rate46.0%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)31.0%
Part B score (max 5.0)1.55 / 5.0
Final score3.85 / 10
2.3% 4.29
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 0 / 3
Completion rate27.3%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked0.80Cr / 0.47Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score4.29 / 10
79.2% 6.28
CategoryWater conservation & recharge
Started / Completed / Phys267 / 6 / 128
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked16.50Cr / 12.43Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score6.28 / 10
2.1% 5.13
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 8
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked0.62Cr / 0.37Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.13 / 10
0.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
120 POHRI โ†— SHIVPURI 6.01 C
16.2% 4.74
CategoryFarm Pond
Started / Completed / Phys269 / 149 / 35
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked1.73Cr / 0.46Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score4.74 / 10
0.7% 0.13
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.01Cr
Expenditure rate (ongoing)2.5%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
2.0% 5.00
CategoryDug Well Recharge
Started / Completed / Phys262 / 156 / 42
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate75.6%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.12Cr / 0.03Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score5.00 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
66.7% 6.19
CategoryWater conservation & recharge
Started / Completed / Phys213 / 26 / 89
Completion rate54.0%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked12.29Cr / 8.59Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.50 / 5.0
Final score6.19 / 10
8.0% 6.52
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 12
Completion rate68.0%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.84Cr / 0.52Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score6.52 / 10
6.1% 7.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 3 / 13
Completion rate69.6%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked0.90Cr / 0.75Cr
Expenditure rate (ongoing)83.4%
Part B score (max 5.0)4.17 / 5.0
Final score7.65 / 10
121 SOHAGPUR โ†— NARMADAPURAM 6.00 C
59.5% 4.08
CategoryFarm Pond
Started / Completed / Phys118 / 29 / 43
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked0.26Cr / 0.05Cr
Expenditure rate (ongoing)20.5%
Part B score (max 5.0)1.03 / 5.0
Final score4.08 / 10
โ€”
10.9% 5.65
CategoryDug Well Recharge
Started / Completed / Phys133 / 56 / 64
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate90.2%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score5.65 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.1% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys13 / 4 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
122 LATERI โ†— VIDISHA 6.00 C
47.8% 4.64
CategoryFarm Pond
Started / Completed / Phys215 / 87 / 26
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate52.6%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked3.01Cr / 1.21Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score4.64 / 10
1.4% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.3% 6.43
CategoryDug Well Recharge
Started / Completed / Phys301 / 106 / 113
⚠ Works needing verification (Completed/Physically Completed)32 works (exp <30%)
Completion rate72.8%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score6.43 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
42.0% 7.03
CategoryWater conservation & recharge
Started / Completed / Phys168 / 78 / 51
Completion rate76.8%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked1.29Cr / 0.82Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score7.03 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 5 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
123 KHILCHIPUR โ†— RAJGARH 6.00 D
12.0% 4.99
CategoryFarm Pond
Started / Completed / Phys445 / 206 / 106
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked1.79Cr / 0.53Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.48 / 5.0
Final score4.99 / 10
โ€”
2.4% 7.82
CategoryDug Well Recharge
Started / Completed / Phys605 / 398 / 173
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score7.82 / 10
3.0% 4.14
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 0 / 4
Completion rate12.9%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked1.67Cr / 1.17Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.50 / 5.0
Final score4.14 / 10
66.7% 6.19
CategoryWater conservation & recharge
Started / Completed / Phys300 / 17 / 112
Completion rate43.0%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked28.85Cr / 23.32Cr
Expenditure rate (ongoing)80.8%
Part B score (max 5.0)4.04 / 5.0
Final score6.19 / 10
3.7% 6.58
CategoryWatershed Related Works
Started / Completed / Phys47 / 6 / 21
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked1.06Cr / 0.79Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score6.58 / 10
12.2% 5.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 1 / 32
Completion rate37.1%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked5.06Cr / 4.04Cr
Expenditure rate (ongoing)79.9%
Part B score (max 5.0)3.99 / 5.0
Final score5.85 / 10
124 SAMNAPUR โ†— DINDORI 5.99 D
26.3% 5.17
CategoryFarm Pond
Started / Completed / Phys277 / 157 / 83
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate86.6%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.49Cr / 0.08Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score5.17 / 10
โ€”
2.4% 9.63
CategoryDug Well Recharge
Started / Completed / Phys187 / 119 / 54
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate92.5%
Part A score (max 5.0)4.63 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.63 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.3% 7.69
CategoryWater conservation & recharge
Started / Completed / Phys69 / 16 / 43
Completion rate85.5%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.96Cr / 0.65Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score7.69 / 10
15.9% 6.85
CategoryWatershed Related Works
Started / Completed / Phys28 / 8 / 12
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked1.15Cr / 0.75Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score6.85 / 10
23.0% 3.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 4 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked4.08Cr / 0.17Cr
Expenditure rate (ongoing)4.2%
Part B score (max 5.0)0.21 / 5.0
Final score3.54 / 10
125 NIWARI โ†— NIWARI 5.99 D
19.4% 2.62
CategoryFarm Pond
Started / Completed / Phys204 / 18 / 19
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate18.1%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked2.32Cr / 0.80Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.71 / 5.0
Final score2.62 / 10
1.1% 0.19
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.01Cr
Expenditure rate (ongoing)3.7%
Part B score (max 5.0)0.19 / 5.0
Final score0.19 / 10
8.9% 4.36
CategoryDug Well Recharge
Started / Completed / Phys508 / 76 / 155
⚠ Works needing verification (Completed/Physically Completed)39 works (exp <30%)
Completion rate45.5%
Part A score (max 5.0)2.27 / 5.0
Ongoing sanction / booked0.62Cr / 0.26Cr
Expenditure rate (ongoing)41.8%
Part B score (max 5.0)2.09 / 5.0
Final score4.36 / 10
โ€”
44.8% 6.68
CategoryWater conservation & recharge
Started / Completed / Phys124 / 31 / 48
Completion rate63.7%
Part A score (max 5.0)3.19 / 5.0
Ongoing sanction / booked2.36Cr / 1.65Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score6.68 / 10
3.4% 5.75
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score5.75 / 10
22.4% 8.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 7 / 37
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.28Cr / 0.22Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score8.51 / 10
126 BAJNA โ†— RATLAM 5.97 D
15.6% 4.42
CategoryFarm Pond
Started / Completed / Phys297 / 119 / 36
Completion rate52.2%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked1.49Cr / 0.54Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score4.42 / 10
7.6% 3.67
CategoryAmrit Sarowar
Started / Completed / Phys6 / 1 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.99Cr / 0.40Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score3.67 / 10
10.4% 5.75
CategoryDug Well Recharge
Started / Completed / Phys795 / 282 / 331
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate77.1%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked0.38Cr / 0.15Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.90 / 5.0
Final score5.75 / 10
โ€”
65.1% 6.57
CategoryWater conservation & recharge
Started / Completed / Phys147 / 36 / 73
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked2.52Cr / 1.44Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.86 / 5.0
Final score6.57 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
127 BANDA โ†— SAGAR 5.97 D
35.8% 4.23
CategoryFarm Pond
Started / Completed / Phys140 / 70 / 10
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked1.05Cr / 0.29Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score4.23 / 10
โ€”
18.2% 6.40
CategoryDug Well Recharge
Started / Completed / Phys541 / 97 / 305
⚠ Works needing verification (Completed/Physically Completed)111 works (exp <30%)
Completion rate74.3%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score6.40 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.9% 6.76
CategoryWater conservation & recharge
Started / Completed / Phys66 / 13 / 44
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.29Cr / 0.14Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score6.76 / 10
4.1% 8.13
CategoryWatershed Related Works
Started / Completed / Phys8 / 5 / 2
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score8.13 / 10
2.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
128 BHIKANGAON โ†— KHARGONE 5.97 D
43.9% 4.55
CategoryFarm Pond
Started / Completed / Phys179 / 39 / 69
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate60.3%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.33Cr / 0.41Cr
Expenditure rate (ongoing)30.7%
Part B score (max 5.0)1.53 / 5.0
Final score4.55 / 10
7.5% 4.71
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.34Cr / 0.15Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.21 / 5.0
Final score4.71 / 10
13.6% 7.21
CategoryDug Well Recharge
Started / Completed / Phys415 / 133 / 246
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score7.21 / 10
โ€”
35.0% 7.53
CategoryWater conservation & recharge
Started / Completed / Phys42 / 16 / 18
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.63Cr / 0.44Cr
Expenditure rate (ongoing)69.7%
Part B score (max 5.0)3.49 / 5.0
Final score7.53 / 10
โ€” โ€”
129 SAUSAR โ†— CHHINDWARA 5.97 D
48.3% 6.30
CategoryFarm Pond
Started / Completed / Phys185 / 34 / 83
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.32Cr / 0.83Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score6.30 / 10
6.1% 0.58
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)11.6%
Part B score (max 5.0)0.58 / 5.0
Final score0.58 / 10
10.4% 7.69
CategoryDug Well Recharge
Started / Completed / Phys262 / 44 / 201
Completion rate93.5%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score7.69 / 10
โ€”
28.7% 5.85
CategoryWater conservation & recharge
Started / Completed / Phys52 / 1 / 22
Completion rate44.2%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked1.16Cr / 0.84Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score5.85 / 10
5.1% 6.51
CategoryWatershed Related Works
Started / Completed / Phys9 / 2 / 3
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.17Cr / 0.13Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score6.51 / 10
1.3% 5.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score5.69 / 10
130 DEWAS โ†— DEWAS 5.96 D
43.0% 4.97
CategoryFarm Pond
Started / Completed / Phys125 / 29 / 55
Completion rate67.2%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked1.21Cr / 0.39Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.61 / 5.0
Final score4.97 / 10
2.3% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.1% 6.06
CategoryDug Well Recharge
Started / Completed / Phys280 / 6 / 193
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate71.1%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score6.06 / 10
3.3% 7.36
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 3 / 5
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.36 / 5.0
Final score7.36 / 10
33.3% 6.61
CategoryWater conservation & recharge
Started / Completed / Phys104 / 8 / 67
Completion rate72.1%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked0.75Cr / 0.45Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score6.61 / 10
6.8% 6.74
CategoryWatershed Related Works
Started / Completed / Phys22 / 3 / 13
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.14Cr / 0.09Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score6.74 / 10
3.3% 6.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score6.22 / 10
131 BAGH โ†— DHAR 5.96 D
6.1% 4.00
CategoryFarm Pond
Started / Completed / Phys243 / 11 / 55
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate27.2%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked2.77Cr / 1.46Cr
Expenditure rate (ongoing)52.8%
Part B score (max 5.0)2.64 / 5.0
Final score4.00 / 10
โ€”
1.5% 3.72
CategoryDug Well Recharge
Started / Completed / Phys365 / 14 / 50
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate17.5%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked0.74Cr / 0.42Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.85 / 5.0
Final score3.72 / 10
โ€”
89.5% 6.17
CategoryWater conservation & recharge
Started / Completed / Phys232 / 9 / 71
Completion rate34.5%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked47.39Cr / 42.12Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score6.17 / 10
2.2% 4.92
CategoryWatershed Related Works
Started / Completed / Phys12 / 1 / 0
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked1.37Cr / 1.24Cr
Expenditure rate (ongoing)90.1%
Part B score (max 5.0)4.50 / 5.0
Final score4.92 / 10
0.6% 4.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.35Cr
Expenditure rate (ongoing)88.9%
Part B score (max 5.0)4.44 / 5.0
Final score4.44 / 10
132 BURHAR โ†— SHAHDOL 5.96 D
38.6% 3.99
CategoryFarm Pond
Started / Completed / Phys766 / 87 / 198
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate37.2%
Part A score (max 5.0)1.86 / 5.0
Ongoing sanction / booked16.46Cr / 7.02Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score3.99 / 10
0.7% 0.76
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.08Cr
Expenditure rate (ongoing)15.2%
Part B score (max 5.0)0.76 / 5.0
Final score0.76 / 10
0.7% 5.78
CategoryDug Well Recharge
Started / Completed / Phys181 / 22 / 73
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked0.22Cr / 0.14Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score5.78 / 10
5.0% 8.40
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 1
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked1.10Cr / 1.07Cr
Expenditure rate (ongoing)96.7%
Part B score (max 5.0)4.83 / 5.0
Final score8.40 / 10
27.6% 5.79
CategoryWater conservation & recharge
Started / Completed / Phys343 / 27 / 108
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked11.34Cr / 8.68Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score5.79 / 10
26.0% 8.72
CategoryWatershed Related Works
Started / Completed / Phys185 / 11 / 170
Completion rate97.8%
Part A score (max 5.0)4.89 / 5.0
Ongoing sanction / booked0.13Cr / 0.10Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.83 / 5.0
Final score8.72 / 10
1.4% 6.03
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 6 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.58Cr / 0.47Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.03 / 5.0
Final score6.03 / 10
133 AMARPATAN โ†— SATNA 5.95 D
48.1% 2.71
CategoryFarm Pond
Started / Completed / Phys74 / 0 / 26
Completion rate35.1%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked1.36Cr / 0.26Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score2.71 / 10
โ€”
5.9% 4.37
CategoryDug Well Recharge
Started / Completed / Phys99 / 12 / 69
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)5.6%
Part B score (max 5.0)0.28 / 5.0
Final score4.37 / 10
โ€”
41.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys31 / 1 / 30
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
4.9% 5.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.52 / 5.0
Final score5.85 / 10
134 KUKSHI โ†— DHAR 5.95 D
6.0% 3.06
CategoryFarm Pond
Started / Completed / Phys130 / 10 / 14
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate18.5%
Part A score (max 5.0)0.92 / 5.0
Ongoing sanction / booked1.55Cr / 0.66Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score3.06 / 10
โ€”
1.5% 4.11
CategoryDug Well Recharge
Started / Completed / Phys184 / 55 / 20
⚠ Works needing verification (Completed/Physically Completed)24 works (exp <30%)
Completion rate40.8%
Part A score (max 5.0)2.04 / 5.0
Ongoing sanction / booked0.22Cr / 0.09Cr
Expenditure rate (ongoing)41.4%
Part B score (max 5.0)2.07 / 5.0
Final score4.11 / 10
0.2% 1.75
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score1.75 / 10
87.1% 6.17
CategoryWater conservation & recharge
Started / Completed / Phys260 / 18 / 99
Completion rate45.0%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked16.33Cr / 12.80Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score6.17 / 10
3.0% 6.01
CategoryWatershed Related Works
Started / Completed / Phys36 / 3 / 15
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.40Cr / 0.28Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score6.01 / 10
2.2% 6.43
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.25Cr / 0.20Cr
Expenditure rate (ongoing)78.6%
Part B score (max 5.0)3.93 / 5.0
Final score6.43 / 10
135 SHAHPUR โ†— BETUL 5.94 D
10.8% 4.93
CategoryFarm Pond
Started / Completed / Phys120 / 0 / 83
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.77Cr / 0.23Cr
Expenditure rate (ongoing)29.5%
Part B score (max 5.0)1.47 / 5.0
Final score4.93 / 10
1.7% 2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.17Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
4.1% 6.21
CategoryDug Well Recharge
Started / Completed / Phys355 / 33 / 307
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)28.4%
Part B score (max 5.0)1.42 / 5.0
Final score6.21 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
76.1% 6.20
CategoryWater conservation & recharge
Started / Completed / Phys225 / 19 / 115
Completion rate59.6%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked8.24Cr / 5.31Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score6.20 / 10
0.7% 5.06
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score5.06 / 10
6.6% 5.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 2 / 15
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.81Cr / 0.50Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score5.51 / 10
136 CHITRANGI โ†— SINGRAULI 5.93 D
33.0% 4.97
CategoryFarm Pond
Started / Completed / Phys900 / 526 / 81
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked8.56Cr / 2.74Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score4.97 / 10
3.1% 2.91
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.52Cr / 1.47Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score2.91 / 10
1.3% 5.32
CategoryDug Well Recharge
Started / Completed / Phys406 / 182 / 132
⚠ Works needing verification (Completed/Physically Completed)38 works (exp <30%)
Completion rate77.3%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.14Cr / 0.04Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score5.32 / 10
โ€”
56.1% 6.57
CategoryWater conservation & recharge
Started / Completed / Phys563 / 60 / 349
Completion rate72.6%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked12.12Cr / 7.13Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score6.57 / 10
3.7% 6.81
CategoryWatershed Related Works
Started / Completed / Phys73 / 17 / 36
Completion rate72.6%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.78Cr / 0.50Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score6.81 / 10
2.7% 7.02
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 2 / 14
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.63Cr / 0.43Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score7.02 / 10
137 NAINPUR โ†— MANDLA 5.93 D
59.1% 5.43
CategoryFarm Pond
Started / Completed / Phys337 / 232 / 24
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked3.79Cr / 1.24Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score5.43 / 10
4.3% 0.09
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.14Cr / 0.02Cr
Expenditure rate (ongoing)1.8%
Part B score (max 5.0)0.09 / 5.0
Final score0.09 / 10
3.5% 4.91
CategoryDug Well Recharge
Started / Completed / Phys365 / 76 / 201
⚠ Works needing verification (Completed/Physically Completed)25 works (exp <30%)
Completion rate75.9%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked0.16Cr / 0.04Cr
Expenditure rate (ongoing)22.3%
Part B score (max 5.0)1.11 / 5.0
Final score4.91 / 10
3.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.8% 7.53
CategoryWater conservation & recharge
Started / Completed / Phys74 / 40 / 10
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked4.12Cr / 3.43Cr
Expenditure rate (ongoing)83.1%
Part B score (max 5.0)4.16 / 5.0
Final score7.53 / 10
1.2% 6.02
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 3
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)49.0%
Part B score (max 5.0)2.45 / 5.0
Final score6.02 / 10
2.2% 6.23
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 1
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)38.8%
Part B score (max 5.0)1.94 / 5.0
Final score6.23 / 10
138 RAHATGARH โ†— SAGAR 5.91 D
22.0% 4.01
CategoryFarm Pond
Started / Completed / Phys237 / 150 / 0
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate63.3%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.40Cr / 0.24Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score4.01 / 10
5.0% 2.61
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.46Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score2.61 / 10
7.6% 6.16
CategoryDug Well Recharge
Started / Completed / Phys531 / 272 / 201
⚠ Works needing verification (Completed/Physically Completed)54 works (exp <30%)
Completion rate89.1%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score6.16 / 10
1.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
48.6% 6.40
CategoryWater conservation & recharge
Started / Completed / Phys117 / 58 / 15
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked3.73Cr / 2.45Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score6.40 / 10
10.6% 6.61
CategoryWatershed Related Works
Started / Completed / Phys26 / 16 / 1
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked0.60Cr / 0.40Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.61 / 10
4.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 9 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
139 THANDLA โ†— JHABUA 5.91 D
13.2% 3.71
CategoryFarm Pond
Started / Completed / Phys243 / 13 / 49
Completion rate25.5%
Part A score (max 5.0)1.28 / 5.0
Ongoing sanction / booked3.25Cr / 1.58Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score3.71 / 10
1.5% 1.90
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.19Cr
Expenditure rate (ongoing)38.0%
Part B score (max 5.0)1.90 / 5.0
Final score1.90 / 10
5.9% 4.99
CategoryDug Well Recharge
Started / Completed / Phys737 / 274 / 131
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.84Cr / 0.38Cr
Expenditure rate (ongoing)44.9%
Part B score (max 5.0)2.25 / 5.0
Final score4.99 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
75.9% 6.39
CategoryWater conservation & recharge
Started / Completed / Phys212 / 11 / 101
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked12.18Cr / 9.12Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.75 / 5.0
Final score6.39 / 10
1.9% 6.08
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 8
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.11Cr / 0.03Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score6.08 / 10
1.5% 8.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 1 / 6
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.4%
Part B score (max 5.0)3.77 / 5.0
Final score8.14 / 10
140 KHANIYADHANA โ†— SHIVPURI 5.90 D
35.0% 5.25
CategoryFarm Pond
Started / Completed / Phys321 / 117 / 120
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked2.47Cr / 0.77Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score5.25 / 10
1.6% 0.03
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.00Cr
Expenditure rate (ongoing)0.6%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
3.2% 4.94
CategoryDug Well Recharge
Started / Completed / Phys335 / 144 / 80
⚠ Works needing verification (Completed/Physically Completed)74 works (exp <30%)
Completion rate66.9%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.9%
Part B score (max 5.0)1.59 / 5.0
Final score4.94 / 10
4.0% 5.79
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 5 / 6
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.89 / 5.0
Final score5.79 / 10
49.7% 6.53
CategoryWater conservation & recharge
Started / Completed / Phys163 / 33 / 73
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked6.85Cr / 4.49Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.28 / 5.0
Final score6.53 / 10
4.2% 6.67
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 9
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.67 / 10
2.3% 6.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 4 / 5
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.2%
Part B score (max 5.0)1.66 / 5.0
Final score6.16 / 10
141 PATAN โ†— JABALPUR 5.89 D
53.1% 2.54
CategoryFarm Pond
Started / Completed / Phys46 / 18 / 1
Completion rate41.3%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked0.48Cr / 0.05Cr
Expenditure rate (ongoing)9.5%
Part B score (max 5.0)0.48 / 5.0
Final score2.54 / 10
โ€”
0.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
38.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys16 / 15 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.5% 5.64
CategoryWatershed Related Works
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)46.0%
Part B score (max 5.0)2.30 / 5.0
Final score5.64 / 10
4.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
142 SHAHNAGAR โ†— PANNA 5.88 D
30.5% 4.71
CategoryFarm Pond
Started / Completed / Phys524 / 71 / 192
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked5.12Cr / 2.25Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score4.71 / 10
4.0% 0.73
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.36Cr / 0.20Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.73 / 5.0
Final score0.73 / 10
3.4% 4.51
CategoryDug Well Recharge
Started / Completed / Phys445 / 40 / 191
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate51.9%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.53Cr / 0.20Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score4.51 / 10
0.3% 3.80
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.08Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score3.80 / 10
38.6% 6.70
CategoryWater conservation & recharge
Started / Completed / Phys307 / 17 / 161
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked5.71Cr / 4.33Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.80 / 5.0
Final score6.70 / 10
7.1% 6.60
CategoryWatershed Related Works
Started / Completed / Phys48 / 7 / 23
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked1.17Cr / 0.81Cr
Expenditure rate (ongoing)69.5%
Part B score (max 5.0)3.48 / 5.0
Final score6.60 / 10
16.2% 7.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 3 / 40
Completion rate65.2%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked1.96Cr / 1.62Cr
Expenditure rate (ongoing)82.6%
Part B score (max 5.0)4.13 / 5.0
Final score7.39 / 10
143 SENDHAWA โ†— BARWANI 5.87 D
33.6% 4.56
CategoryFarm Pond
Started / Completed / Phys282 / 13 / 101
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate40.4%
Part A score (max 5.0)2.02 / 5.0
Ongoing sanction / booked3.10Cr / 1.57Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.53 / 5.0
Final score4.56 / 10
โ€”
19.4% 7.38
CategoryDug Well Recharge
Started / Completed / Phys1,168 / 9 / 1,052
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked0.27Cr / 0.15Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score7.38 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
43.8% 6.15
CategoryWater conservation & recharge
Started / Completed / Phys207 / 14 / 111
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked2.82Cr / 1.76Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.15 / 10
2.0% 6.14
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 6
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score6.14 / 10
0.9% 7.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 6 / 5
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score7.13 / 10
144 BIAORA โ†— RAJGARH 5.87 D
40.5% 5.36
CategoryFarm Pond
Started / Completed / Phys460 / 281 / 51
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked2.97Cr / 1.04Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.76 / 5.0
Final score5.36 / 10
1.5% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.9% 6.89
CategoryDug Well Recharge
Started / Completed / Phys613 / 474 / 105
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate94.5%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score6.89 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.4% 5.91
CategoryWater conservation & recharge
Started / Completed / Phys158 / 25 / 60
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked3.36Cr / 2.16Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score5.91 / 10
โ€”
16.1% 6.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 0 / 35
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked1.35Cr / 0.72Cr
Expenditure rate (ongoing)53.8%
Part B score (max 5.0)2.69 / 5.0
Final score6.19 / 10
145 SAILANA โ†— RATLAM 5.87 D
24.0% 4.09
CategoryFarm Pond
Started / Completed / Phys210 / 100 / 22
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked1.34Cr / 0.32Cr
Expenditure rate (ongoing)23.6%
Part B score (max 5.0)1.18 / 5.0
Final score4.09 / 10
10.1% 1.73
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.43Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score1.73 / 10
7.4% 5.88
CategoryDug Well Recharge
Started / Completed / Phys345 / 67 / 240
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate89.0%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)28.6%
Part B score (max 5.0)1.43 / 5.0
Final score5.88 / 10
โ€”
53.4% 7.09
CategoryWater conservation & recharge
Started / Completed / Phys73 / 26 / 25
Completion rate69.9%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked2.26Cr / 1.63Cr
Expenditure rate (ongoing)72.0%
Part B score (max 5.0)3.60 / 5.0
Final score7.09 / 10
0.2% 2.24
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score2.24 / 10
4.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 7 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
146 SAGAR โ†— SAGAR 5.87 D
22.3% 4.49
CategoryFarm Pond
Started / Completed / Phys205 / 51 / 58
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate53.2%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked1.84Cr / 0.67Cr
Expenditure rate (ongoing)36.6%
Part B score (max 5.0)1.83 / 5.0
Final score4.49 / 10
โ€”
7.8% 7.64
CategoryDug Well Recharge
Started / Completed / Phys542 / 155 / 339
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate91.1%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score7.64 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
61.3% 6.12
CategoryWater conservation & recharge
Started / Completed / Phys234 / 55 / 98
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked3.27Cr / 1.87Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.12 / 10
2.6% 5.93
CategoryWatershed Related Works
Started / Completed / Phys8 / 3 / 2
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.81 / 5.0
Final score5.93 / 10
5.6% 5.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 4 / 8
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.43Cr / 0.24Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score5.84 / 10
147 KESLA โ†— NARMADAPURAM 5.86 D
28.4% 2.71
CategoryFarm Pond
Started / Completed / Phys109 / 3 / 43
Completion rate42.2%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked2.46Cr / 0.30Cr
Expenditure rate (ongoing)12.1%
Part B score (max 5.0)0.60 / 5.0
Final score2.71 / 10
7.8% 1.29
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.31Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score1.29 / 10
2.5% 5.49
CategoryDug Well Recharge
Started / Completed / Phys145 / 19 / 116
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate93.1%
Part A score (max 5.0)4.66 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.83 / 5.0
Final score5.49 / 10
โ€”
59.7% 7.85
CategoryWater conservation & recharge
Started / Completed / Phys121 / 35 / 73
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked2.09Cr / 1.42Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score7.85 / 10
0.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 8 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
148 BADOD โ†— AGAR-MALWA 5.84 D
26.6% 3.44
CategoryFarm Pond
Started / Completed / Phys208 / 22 / 34
Completion rate26.9%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked3.48Cr / 1.46Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.10 / 5.0
Final score3.44 / 10
3.1% 4.41
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.31Cr / 0.17Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.74 / 5.0
Final score4.41 / 10
7.0% 5.15
CategoryDug Well Recharge
Started / Completed / Phys463 / 251 / 94
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate74.5%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked0.21Cr / 0.06Cr
Expenditure rate (ongoing)28.5%
Part B score (max 5.0)1.42 / 5.0
Final score5.15 / 10
1.1% 6.78
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score6.78 / 10
38.3% 6.93
CategoryWater conservation & recharge
Started / Completed / Phys156 / 9 / 103
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked2.07Cr / 1.39Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score6.93 / 10
3.0% 5.87
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 9
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.29 / 5.0
Final score5.87 / 10
20.9% 7.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 4 / 59
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked1.19Cr / 0.89Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score7.27 / 10
149 ISAGARH โ†— ASHOK NAGAR 5.83 D
37.8% 4.90
CategoryFarm Pond
Started / Completed / Phys282 / 42 / 109
Completion rate53.5%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked4.01Cr / 1.78Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.23 / 5.0
Final score4.90 / 10
3.7% 1.17
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.86Cr / 0.20Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score1.17 / 10
1.1% 5.12
CategoryDug Well Recharge
Started / Completed / Phys102 / 73 / 6
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.25 / 5.0
Final score5.12 / 10
โ€”
54.7% 6.84
CategoryWater conservation & recharge
Started / Completed / Phys205 / 69 / 59
Completion rate62.4%
Part A score (max 5.0)3.12 / 5.0
Ongoing sanction / booked4.32Cr / 3.21Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score6.84 / 10
1.3% 6.47
CategoryWatershed Related Works
Started / Completed / Phys9 / 7 / 0
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.58 / 5.0
Final score6.47 / 10
1.3% 4.15
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score4.15 / 10
150 MEHGAON โ†— BHIND 5.83 D
13.9% 2.32
CategoryFarm Pond
Started / Completed / Phys298 / 57 / 31
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.89Cr / 0.49Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.84 / 5.0
Final score2.32 / 10
3.2% 1.08
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.21Cr
Expenditure rate (ongoing)21.7%
Part B score (max 5.0)1.08 / 5.0
Final score1.08 / 10
0.3% 4.58
CategoryDug Well Recharge
Started / Completed / Phys28 / 1 / 11
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)48.8%
Part B score (max 5.0)2.44 / 5.0
Final score4.58 / 10
12.2% 5.30
CategoryIrrigation infrastructure
Started / Completed / Phys78 / 6 / 26
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.94Cr / 1.26Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.25 / 5.0
Final score5.30 / 10
56.9% 6.85
CategoryWater conservation & recharge
Started / Completed / Phys183 / 10 / 127
Completion rate74.9%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked4.56Cr / 2.84Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score6.85 / 10
9.7% 7.31
CategoryWatershed Related Works
Started / Completed / Phys24 / 1 / 16
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.80Cr / 0.60Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score7.31 / 10
3.8% 5.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 0 / 8
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.46Cr / 0.28Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score5.53 / 10
151 TIMARNI โ†— HARDA 5.83 D
42.1% 4.18
CategoryFarm Pond
Started / Completed / Phys139 / 15 / 81
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate69.1%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked0.69Cr / 0.10Cr
Expenditure rate (ongoing)14.6%
Part B score (max 5.0)0.73 / 5.0
Final score4.18 / 10
1.9% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
13.9% 5.96
CategoryDug Well Recharge
Started / Completed / Phys289 / 103 / 165
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate92.7%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.33 / 5.0
Final score5.96 / 10
1.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
26.3% 7.64
CategoryWater conservation & recharge
Started / Completed / Phys56 / 1 / 54
Completion rate98.2%
Part A score (max 5.0)4.91 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score7.64 / 10
4.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
10.3% 6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 7 / 11
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.06 / 5.0
Final score6.56 / 10
152 OBEDULLAHGANJ โ†— RAISEN 5.82 D
49.1% 5.88
CategoryFarm Pond
Started / Completed / Phys208 / 42 / 102
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked1.35Cr / 0.65Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score5.88 / 10
1.6% 2.87
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score2.87 / 10
4.1% 7.38
CategoryDug Well Recharge
Started / Completed / Phys149 / 73 / 63
Completion rate91.3%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.82 / 5.0
Final score7.38 / 10
1.0% 1.71
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score1.71 / 10
26.6% 5.58
CategoryWater conservation & recharge
Started / Completed / Phys23 / 1 / 8
Completion rate39.1%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked2.42Cr / 1.75Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score5.58 / 10
16.6% 6.22
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.50Cr / 1.37Cr
Expenditure rate (ongoing)91.0%
Part B score (max 5.0)4.55 / 5.0
Final score6.22 / 10
1.0% 5.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 0
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.25 / 10
153 DHAR โ†— DHAR 5.80 D
60.3% 4.74
CategoryFarm Pond
Started / Completed / Phys138 / 2 / 76
Completion rate56.5%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked2.03Cr / 0.78Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score4.74 / 10
โ€”
0.7% 5.73
CategoryDug Well Recharge
Started / Completed / Phys18 / 1 / 11
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)48.0%
Part B score (max 5.0)2.40 / 5.0
Final score5.73 / 10
2.6% 5.81
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)41.2%
Part B score (max 5.0)2.06 / 5.0
Final score5.81 / 10
23.8% 7.54
CategoryWater conservation & recharge
Started / Completed / Phys43 / 10 / 29
Completion rate90.7%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score7.54 / 10
12.0% 7.44
CategoryWatershed Related Works
Started / Completed / Phys25 / 4 / 17
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.23Cr / 0.15Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score7.44 / 10
0.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
154 KHAKNAR โ†— BURHANPUR 5.80 D
48.9% 5.40
CategoryFarm Pond
Started / Completed / Phys429 / 107 / 154
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked3.51Cr / 1.65Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.35 / 5.0
Final score5.40 / 10
3.6% 5.50
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)3.00 / 5.0
Final score5.50 / 10
10.9% 7.03
CategoryDug Well Recharge
Started / Completed / Phys739 / 233 / 343
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate77.9%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.40Cr / 0.25Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.13 / 5.0
Final score7.03 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.3% 5.97
CategoryWater conservation & recharge
Started / Completed / Phys154 / 23 / 74
Completion rate63.0%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked1.57Cr / 0.88Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.82 / 5.0
Final score5.97 / 10
5.0% 6.20
CategoryWatershed Related Works
Started / Completed / Phys25 / 6 / 10
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.25Cr / 0.15Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score6.20 / 10
1.4% 5.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score5.67 / 10
155 KHURAI โ†— SAGAR 5.80 D
44.5% 3.65
CategoryFarm Pond
Started / Completed / Phys253 / 99 / 23
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate48.2%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked2.32Cr / 0.57Cr
Expenditure rate (ongoing)24.7%
Part B score (max 5.0)1.24 / 5.0
Final score3.65 / 10
โ€”
8.9% 5.80
CategoryDug Well Recharge
Started / Completed / Phys339 / 129 / 103
⚠ Works needing verification (Completed/Physically Completed)88 works (exp <30%)
Completion rate68.4%
Part A score (max 5.0)3.42 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.38 / 5.0
Final score5.80 / 10
โ€”
44.5% 7.75
CategoryWater conservation & recharge
Started / Completed / Phys115 / 68 / 30
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.50Cr / 0.35Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.75 / 10
0.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
156 JAISINAGAR โ†— SAGAR 5.79 D
55.7% 3.86
CategoryFarm Pond
Started / Completed / Phys93 / 39 / 5
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate47.3%
Part A score (max 5.0)2.37 / 5.0
Ongoing sanction / booked0.90Cr / 0.27Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.50 / 5.0
Final score3.86 / 10
โ€”
18.6% 8.83
CategoryDug Well Recharge
Started / Completed / Phys383 / 261 / 32
⚠ Works needing verification (Completed/Physically Completed)90 works (exp <30%)
Completion rate76.5%
Part A score (max 5.0)3.83 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.83 / 10
โ€”
22.9% 7.49
CategoryWater conservation & recharge
Started / Completed / Phys19 / 12 / 4
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score7.49 / 10
2.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
157 JABERA โ†— DAMOH 5.78 D
16.6% 5.46
CategoryFarm Pond
Started / Completed / Phys234 / 43 / 70
Completion rate48.3%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked2.82Cr / 1.72Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.04 / 5.0
Final score5.46 / 10
โ€”
2.8% 7.23
CategoryDug Well Recharge
Started / Completed / Phys351 / 119 / 131
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked0.26Cr / 0.19Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score7.23 / 10
โ€”
51.2% 5.49
CategoryWater conservation & recharge
Started / Completed / Phys151 / 16 / 36
Completion rate34.4%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked10.48Cr / 7.89Cr
Expenditure rate (ongoing)75.3%
Part B score (max 5.0)3.77 / 5.0
Final score5.49 / 10
8.5% 5.54
CategoryWatershed Related Works
Started / Completed / Phys42 / 10 / 5
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked1.74Cr / 1.31Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.75 / 5.0
Final score5.54 / 10
20.9% 6.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 4 / 32
Completion rate48.0%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked3.50Cr / 2.98Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.26 / 5.0
Final score6.66 / 10
158 GHATIGAON โ†— GWALIOR 5.77 D
31.9% 4.51
CategoryFarm Pond
Started / Completed / Phys176 / 20 / 74
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.40Cr / 1.25Cr
Expenditure rate (ongoing)36.8%
Part B score (max 5.0)1.84 / 5.0
Final score4.51 / 10
5.3% 1.71
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.17Cr / 0.40Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.70 / 5.0
Final score1.71 / 10
1.8% 5.77
CategoryDug Well Recharge
Started / Completed / Phys149 / 84 / 46
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score5.77 / 10
6.1% 7.06
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 2 / 4
Completion rate54.5%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked0.76Cr / 0.66Cr
Expenditure rate (ongoing)86.7%
Part B score (max 5.0)4.34 / 5.0
Final score7.06 / 10
44.7% 6.89
CategoryWater conservation & recharge
Started / Completed / Phys101 / 7 / 53
Completion rate59.4%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked5.80Cr / 4.54Cr
Expenditure rate (ongoing)78.3%
Part B score (max 5.0)3.92 / 5.0
Final score6.89 / 10
8.3% 6.42
CategoryWatershed Related Works
Started / Completed / Phys31 / 5 / 14
Completion rate61.3%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.92Cr / 0.62Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score6.42 / 10
1.9% 4.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score4.77 / 10
159 KUSMI โ†— SIDHI 5.77 D
33.5% 5.07
CategoryFarm Pond
Started / Completed / Phys375 / 228 / 16
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate65.1%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked2.96Cr / 1.07Cr
Expenditure rate (ongoing)36.2%
Part B score (max 5.0)1.81 / 5.0
Final score5.07 / 10
โ€”
0.9% 4.96
CategoryDug Well Recharge
Started / Completed / Phys88 / 58 / 12
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate79.5%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)19.6%
Part B score (max 5.0)0.98 / 5.0
Final score4.96 / 10
6.7% 4.37
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 2 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked1.56Cr / 1.05Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score4.37 / 10
53.5% 6.21
CategoryWater conservation & recharge
Started / Completed / Phys186 / 100 / 18
Completion rate63.4%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked4.41Cr / 2.68Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.21 / 10
1.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.2% 6.91
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 12 / 1
Completion rate65.0%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked0.63Cr / 0.46Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score6.91 / 10
160 JAWAD โ†— NEEMUCH 5.75 D
33.0% 3.89
CategoryFarm Pond
Started / Completed / Phys198 / 3 / 92
Completion rate48.0%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked1.99Cr / 0.59Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score3.89 / 10
1.0% 1.58
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.03Cr
Expenditure rate (ongoing)31.5%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
15.9% 6.04
CategoryDug Well Recharge
Started / Completed / Phys609 / 82 / 449
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.20Cr / 0.07Cr
Expenditure rate (ongoing)33.5%
Part B score (max 5.0)1.68 / 5.0
Final score6.04 / 10
1.1% 6.50
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.50 / 10
39.8% 6.73
CategoryWater conservation & recharge
Started / Completed / Phys90 / 0 / 77
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.55Cr / 0.27Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.46 / 5.0
Final score6.73 / 10
2.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
7.3% 7.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 2 / 16
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.46 / 10
161 DEORI โ†— SAGAR 5.75 D
45.0% 3.85
CategoryFarm Pond
Started / Completed / Phys322 / 75 / 87
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate50.3%
Part A score (max 5.0)2.52 / 5.0
Ongoing sanction / booked3.54Cr / 0.94Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score3.85 / 10
โ€”
6.8% 6.59
CategoryDug Well Recharge
Started / Completed / Phys422 / 174 / 177
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate83.2%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score6.59 / 10
1.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
39.2% 7.31
CategoryWater conservation & recharge
Started / Completed / Phys181 / 90 / 70
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.74Cr / 0.43Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.31 / 10
6.6% 7.30
CategoryWatershed Related Works
Started / Completed / Phys15 / 9 / 4
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score7.30 / 10
1.1% 8.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)87.4%
Part B score (max 5.0)4.37 / 5.0
Final score8.12 / 10
162 UMARBAN โ†— DHAR 5.75 D
10.7% 5.78
CategoryFarm Pond
Started / Completed / Phys395 / 214 / 65
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.69Cr / 0.31Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score5.78 / 10
โ€”
5.6% 4.92
CategoryDug Well Recharge
Started / Completed / Phys474 / 289 / 33
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate67.9%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.31Cr / 0.10Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.53 / 5.0
Final score4.92 / 10
0.5% 2.48
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)49.7%
Part B score (max 5.0)2.48 / 5.0
Final score2.48 / 10
53.8% 6.28
CategoryWater conservation & recharge
Started / Completed / Phys124 / 22 / 34
Completion rate45.2%
Part A score (max 5.0)2.26 / 5.0
Ongoing sanction / booked6.16Cr / 4.96Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.02 / 5.0
Final score6.28 / 10
24.6% 4.86
CategoryWatershed Related Works
Started / Completed / Phys80 / 4 / 16
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked4.07Cr / 2.94Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score4.86 / 10
4.8% 5.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 0 / 5
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.70Cr / 0.52Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score5.46 / 10
163 BHANPURA โ†— MANDSAUR 5.74 D
23.2% 3.90
CategoryFarm Pond
Started / Completed / Phys156 / 13 / 43
Completion rate35.9%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked1.97Cr / 0.83Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score3.90 / 10
โ€”
8.2% 5.36
CategoryDug Well Recharge
Started / Completed / Phys458 / 311 / 112
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate92.4%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)14.9%
Part B score (max 5.0)0.75 / 5.0
Final score5.36 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
60.0% 6.16
CategoryWater conservation & recharge
Started / Completed / Phys131 / 7 / 48
Completion rate42.0%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked4.79Cr / 3.89Cr
Expenditure rate (ongoing)81.2%
Part B score (max 5.0)4.06 / 5.0
Final score6.16 / 10
7.4% 7.97
CategoryWatershed Related Works
Started / Completed / Phys22 / 7 / 9
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.30Cr / 0.26Cr
Expenditure rate (ongoing)86.6%
Part B score (max 5.0)4.33 / 5.0
Final score7.97 / 10
0.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
164 BIJADANDI โ†— MANDLA 5.74 D
35.1% 7.13
CategoryFarm Pond
Started / Completed / Phys151 / 102 / 21
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.85Cr / 0.52Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score7.13 / 10
18.5% 1.60
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.28Cr / 0.73Cr
Expenditure rate (ongoing)32.1%
Part B score (max 5.0)1.60 / 5.0
Final score1.60 / 10
2.7% 5.71
CategoryDug Well Recharge
Started / Completed / Phys131 / 37 / 80
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)25.0%
Part B score (max 5.0)1.25 / 5.0
Final score5.71 / 10
โ€”
39.9% 6.33
CategoryWater conservation & recharge
Started / Completed / Phys60 / 21 / 9
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked3.32Cr / 2.55Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.83 / 5.0
Final score6.33 / 10
3.7% 6.69
CategoryWatershed Related Works
Started / Completed / Phys15 / 10 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score6.69 / 10
0.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
165 PATERA โ†— DAMOH 5.73 D
17.5% 5.88
CategoryFarm Pond
Started / Completed / Phys291 / 59 / 102
Completion rate55.3%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked3.05Cr / 1.90Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score5.88 / 10
โ€”
1.7% 6.50
CategoryDug Well Recharge
Started / Completed / Phys247 / 79 / 94
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.11Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score6.50 / 10
0.6% 8.32
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)91.3%
Part B score (max 5.0)4.57 / 5.0
Final score8.32 / 10
54.3% 5.33
CategoryWater conservation & recharge
Started / Completed / Phys214 / 9 / 50
Completion rate27.6%
Part A score (max 5.0)1.38 / 5.0
Ongoing sanction / booked17.25Cr / 13.65Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.96 / 5.0
Final score5.33 / 10
19.0% 6.52
CategoryWatershed Related Works
Started / Completed / Phys102 / 19 / 36
Completion rate53.9%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked3.47Cr / 2.65Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score6.52 / 10
6.9% 5.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 4 / 7
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.84Cr / 1.53Cr
Expenditure rate (ongoing)83.5%
Part B score (max 5.0)4.17 / 5.0
Final score5.84 / 10
166 HOSHANGABAD โ†— NARMADAPURAM 5.73 D
36.5% 3.39
CategoryFarm Pond
Started / Completed / Phys49 / 24 / 1
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked0.27Cr / 0.05Cr
Expenditure rate (ongoing)16.8%
Part B score (max 5.0)0.84 / 5.0
Final score3.39 / 10
โ€”
12.7% 5.70
CategoryDug Well Recharge
Started / Completed / Phys119 / 86 / 2
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate73.9%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)40.0%
Part B score (max 5.0)2.00 / 5.0
Final score5.70 / 10
8.9% 7.13
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 21 / 1
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score7.13 / 10
28.8% 6.53
CategoryWater conservation & recharge
Started / Completed / Phys29 / 25 / 0
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score6.53 / 10
1.4% 5.76
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.01 / 5.0
Final score5.76 / 10
11.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
167 BERASIA โ†— BHOPAL 5.72 D
42.7% 4.50
CategoryFarm Pond
Started / Completed / Phys788 / 156 / 271
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked7.69Cr / 2.75Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.79 / 5.0
Final score4.50 / 10
3.0% 5.30
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 3
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.64Cr / 0.36Cr
Expenditure rate (ongoing)56.0%
Part B score (max 5.0)2.80 / 5.0
Final score5.30 / 10
3.6% 5.67
CategoryDug Well Recharge
Started / Completed / Phys564 / 275 / 131
⚠ Works needing verification (Completed/Physically Completed)49 works (exp <30%)
Completion rate72.0%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.28Cr / 0.12Cr
Expenditure rate (ongoing)41.5%
Part B score (max 5.0)2.07 / 5.0
Final score5.67 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
42.7% 6.78
CategoryWater conservation & recharge
Started / Completed / Phys402 / 90 / 191
Completion rate69.9%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked4.79Cr / 3.15Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score6.78 / 10
1.9% 5.80
CategoryWatershed Related Works
Started / Completed / Phys18 / 2 / 10
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.35Cr / 0.18Cr
Expenditure rate (ongoing)49.4%
Part B score (max 5.0)2.47 / 5.0
Final score5.80 / 10
5.9% 7.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 2 / 19
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.10Cr / 0.05Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score7.00 / 10
168 SIHAWAL โ†— SIDHI 5.72 D
34.1% 4.24
CategoryFarm Pond
Started / Completed / Phys352 / 162 / 50
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked2.96Cr / 0.73Cr
Expenditure rate (ongoing)24.6%
Part B score (max 5.0)1.23 / 5.0
Final score4.24 / 10
โ€”
1.1% 3.20
CategoryDug Well Recharge
Started / Completed / Phys95 / 18 / 16
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate35.8%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.15Cr / 0.04Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score3.20 / 10
2.5% 6.92
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 3 / 5
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.22Cr / 0.16Cr
Expenditure rate (ongoing)71.7%
Part B score (max 5.0)3.58 / 5.0
Final score6.92 / 10
51.1% 6.45
CategoryWater conservation & recharge
Started / Completed / Phys188 / 41 / 65
Completion rate56.4%
Part A score (max 5.0)2.82 / 5.0
Ongoing sanction / booked5.93Cr / 4.31Cr
Expenditure rate (ongoing)72.6%
Part B score (max 5.0)3.63 / 5.0
Final score6.45 / 10
3.0% 7.66
CategoryWatershed Related Works
Started / Completed / Phys22 / 13 / 6
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score7.66 / 10
8.2% 6.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 9 / 8
Completion rate65.4%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked1.01Cr / 0.65Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.25 / 5.0
Final score6.52 / 10
169 SHAHGARH โ†— SAGAR 5.71 D
53.8% 3.25
CategoryFarm Pond
Started / Completed / Phys162 / 71 / 14
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked0.92Cr / 0.11Cr
Expenditure rate (ongoing)12.5%
Part B score (max 5.0)0.63 / 5.0
Final score3.25 / 10
โ€”
11.7% 8.41
CategoryDug Well Recharge
Started / Completed / Phys208 / 79 / 63
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate68.3%
Part A score (max 5.0)3.41 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.41 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
21.9% 7.85
CategoryWater conservation & recharge
Started / Completed / Phys32 / 23 / 6
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score7.85 / 10
9.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 7 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
170 RON โ†— BHIND 5.71 D
13.9% 2.27
CategoryFarm Pond
Started / Completed / Phys86 / 23 / 4
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate31.4%
Part A score (max 5.0)1.57 / 5.0
Ongoing sanction / booked0.78Cr / 0.11Cr
Expenditure rate (ongoing)14.1%
Part B score (max 5.0)0.70 / 5.0
Final score2.27 / 10
5.7% 1.95
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.21Cr
Expenditure rate (ongoing)39.0%
Part B score (max 5.0)1.95 / 5.0
Final score1.95 / 10
0.2% 4.22
CategoryDug Well Recharge
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.22 / 10
4.9% 6.58
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.31Cr / 0.26Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score6.58 / 10
60.9% 6.68
CategoryWater conservation & recharge
Started / Completed / Phys58 / 21 / 19
Completion rate69.0%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked1.44Cr / 0.93Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.23 / 5.0
Final score6.68 / 10
7.8% 6.11
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.20Cr / 0.09Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score6.11 / 10
6.6% 6.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 4
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score6.13 / 10
171 GHATIYA โ†— UJJAIN 5.70 D
41.3% 5.95
CategoryFarm Pond
Started / Completed / Phys68 / 29 / 34
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score5.95 / 10
18.7% 1.75
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.48Cr / 0.01Cr
Expenditure rate (ongoing)1.7%
Part B score (max 5.0)0.08 / 5.0
Final score1.75 / 10
21.4% 4.92
CategoryDug Well Recharge
Started / Completed / Phys303 / 74 / 222
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate97.7%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)0.7%
Part B score (max 5.0)0.04 / 5.0
Final score4.92 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys19 / 4 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
172 NAGOD โ†— SATNA 5.68 D
43.1% 4.02
CategoryFarm Pond
Started / Completed / Phys363 / 81 / 133
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate59.0%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked2.83Cr / 0.61Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score4.02 / 10
2.5% 0.66
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.05Cr
Expenditure rate (ongoing)13.1%
Part B score (max 5.0)0.66 / 5.0
Final score0.66 / 10
3.0% 7.01
CategoryDug Well Recharge
Started / Completed / Phys190 / 18 / 153
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score7.01 / 10
1.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.5% 6.55
CategoryWater conservation & recharge
Started / Completed / Phys136 / 27 / 83
Completion rate80.9%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked1.37Cr / 0.69Cr
Expenditure rate (ongoing)50.0%
Part B score (max 5.0)2.50 / 5.0
Final score6.55 / 10
3.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys21 / 6 / 15
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
8.5% 8.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 3 / 13
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.09Cr / 0.07Cr
Expenditure rate (ongoing)82.5%
Part B score (max 5.0)4.12 / 5.0
Final score8.57 / 10
173 GOGANWA โ†— KHARGONE 5.68 D
47.9% 4.95
CategoryFarm Pond
Started / Completed / Phys110 / 13 / 35
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate43.6%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked1.09Cr / 0.60Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.76 / 5.0
Final score4.95 / 10
7.8% 4.77
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.31Cr
Expenditure rate (ongoing)95.4%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
16.3% 6.31
CategoryDug Well Recharge
Started / Completed / Phys260 / 58 / 195
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.3%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score6.31 / 10
โ€”
26.2% 6.60
CategoryWater conservation & recharge
Started / Completed / Phys21 / 5 / 5
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked0.64Cr / 0.54Cr
Expenditure rate (ongoing)84.4%
Part B score (max 5.0)4.22 / 5.0
Final score6.60 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
174 PRITHVIPUR โ†— NIWARI 5.68 D
18.8% 3.96
CategoryFarm Pond
Started / Completed / Phys287 / 82 / 31
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked2.70Cr / 1.08Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score3.96 / 10
3.5% 4.17
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.67Cr / 0.39Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score4.17 / 10
4.5% 4.56
CategoryDug Well Recharge
Started / Completed / Phys456 / 148 / 97
⚠ Works needing verification (Completed/Physically Completed)46 works (exp <30%)
Completion rate53.7%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.43Cr / 0.16Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score4.56 / 10
โ€”
31.0% 6.46
CategoryWater conservation & recharge
Started / Completed / Phys111 / 15 / 45
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked3.11Cr / 2.33Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score6.46 / 10
22.0% 5.56
CategoryWatershed Related Works
Started / Completed / Phys104 / 14 / 27
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked3.31Cr / 2.38Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score5.56 / 10
20.2% 6.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys76 / 9 / 32
Completion rate53.9%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked2.30Cr / 1.86Cr
Expenditure rate (ongoing)80.5%
Part B score (max 5.0)4.03 / 5.0
Final score6.72 / 10
175 MAUGANJ โ†— REWA 5.68 D
48.7% 4.88
CategoryFarm Pond
Started / Completed / Phys255 / 99 / 55
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked1.69Cr / 0.63Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.86 / 5.0
Final score4.88 / 10
โ€”
1.6% 5.63
CategoryDug Well Recharge
Started / Completed / Phys61 / 15 / 17
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked0.07Cr / 0.04Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.01 / 5.0
Final score5.63 / 10
4.4% 5.63
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.18Cr / 0.13Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score5.63 / 10
35.4% 6.64
CategoryWater conservation & recharge
Started / Completed / Phys70 / 24 / 24
Completion rate68.6%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.83Cr / 0.53Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.64 / 10
4.5% 5.76
CategoryWatershed Related Works
Started / Completed / Phys8 / 4 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.12Cr / 0.08Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score5.76 / 10
5.5% 6.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 7 / 5
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.96 / 5.0
Final score6.57 / 10
176 NEEMUCH โ†— NEEMUCH 5.66 D
41.7% 3.80
CategoryFarm Pond
Started / Completed / Phys202 / 17 / 102
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate58.9%
Part A score (max 5.0)2.95 / 5.0
Ongoing sanction / booked1.33Cr / 0.23Cr
Expenditure rate (ongoing)17.2%
Part B score (max 5.0)0.86 / 5.0
Final score3.80 / 10
4.9% 2.69
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.20Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score2.69 / 10
20.5% 6.24
CategoryDug Well Recharge
Started / Completed / Phys618 / 238 / 300
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate87.1%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.19Cr / 0.07Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score6.24 / 10
2.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
24.0% 7.38
CategoryWater conservation & recharge
Started / Completed / Phys49 / 3 / 41
Completion rate89.8%
Part A score (max 5.0)4.49 / 5.0
Ongoing sanction / booked0.32Cr / 0.18Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score7.38 / 10
2.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
177 BADA MALEHARA โ†— CHHATARPUR 5.64 D
46.2% 4.19
CategoryFarm Pond
Started / Completed / Phys284 / 154 / 36
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate66.9%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked2.50Cr / 0.42Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.85 / 5.0
Final score4.19 / 10
10.7% 4.50
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.36Cr / 0.77Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score4.50 / 10
5.3% 5.04
CategoryDug Well Recharge
Started / Completed / Phys698 / 623 / 23
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate92.6%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)8.3%
Part B score (max 5.0)0.42 / 5.0
Final score5.04 / 10
1.1% 7.03
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score7.03 / 10
27.5% 7.64
CategoryWater conservation & recharge
Started / Completed / Phys145 / 61 / 77
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.42Cr / 0.24Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.88 / 5.0
Final score7.64 / 10
4.7% 10.00
CategoryWatershed Related Works
Started / Completed / Phys29 / 17 / 12
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
4.5% 6.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 2 / 9
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score6.84 / 10
178 MORAR โ†— GWALIOR 5.64 D
44.5% 3.69
CategoryFarm Pond
Started / Completed / Phys236 / 32 / 117
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate63.1%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked1.50Cr / 0.16Cr
Expenditure rate (ongoing)10.6%
Part B score (max 5.0)0.53 / 5.0
Final score3.69 / 10
1.7% 10.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.5% 5.07
CategoryDug Well Recharge
Started / Completed / Phys238 / 35 / 165
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate84.0%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.09Cr / 0.01Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score5.07 / 10
1.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
40.2% 6.82
CategoryWater conservation & recharge
Started / Completed / Phys47 / 13 / 26
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked2.12Cr / 1.13Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score6.82 / 10
5.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys13 / 6 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
179 MORENA โ†— MORENA 5.64 D
5.3% 5.07
CategoryFarm Pond
Started / Completed / Phys198 / 87 / 15
Completion rate51.5%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked1.60Cr / 0.80Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score5.07 / 10
1.1% 2.89
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.40Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score2.89 / 10
0.6% 3.34
CategoryDug Well Recharge
Started / Completed / Phys146 / 52 / 1
Completion rate36.3%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked0.24Cr / 0.07Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score3.34 / 10
1.3% 4.89
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked0.74Cr / 0.60Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.06 / 5.0
Final score4.89 / 10
87.4% 5.74
CategoryWater conservation & recharge
Started / Completed / Phys405 / 7 / 133
Completion rate34.6%
Part A score (max 5.0)1.73 / 5.0
Ongoing sanction / booked37.53Cr / 30.13Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score5.74 / 10
4.2% 5.48
CategoryWatershed Related Works
Started / Completed / Phys22 / 1 / 7
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked1.80Cr / 1.32Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score5.48 / 10
0.2% 3.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
180 BETUL โ†— BETUL 5.63 D
29.8% 5.39
CategoryFarm Pond
Started / Completed / Phys145 / 0 / 80
Completion rate55.2%
Part A score (max 5.0)2.76 / 5.0
Ongoing sanction / booked1.76Cr / 0.93Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score5.39 / 10
6.5% 3.34
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.77Cr / 0.52Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score3.34 / 10
7.6% 7.19
CategoryDug Well Recharge
Started / Completed / Phys348 / 5 / 321
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate93.7%
Part A score (max 5.0)4.68 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score7.19 / 10
0.2% 4.82
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.32 / 5.0
Final score4.82 / 10
36.3% 5.85
CategoryWater conservation & recharge
Started / Completed / Phys87 / 2 / 43
Completion rate51.7%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked2.17Cr / 1.42Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.85 / 10
11.7% 5.24
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 6
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.91Cr / 0.55Cr
Expenditure rate (ongoing)60.9%
Part B score (max 5.0)3.04 / 5.0
Final score5.24 / 10
7.9% 6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score6.56 / 10
181 BADARWAS โ†— SHIVPURI 5.63 D
39.3% 4.68
CategoryFarm Pond
Started / Completed / Phys237 / 75 / 84
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate67.1%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked2.89Cr / 0.77Cr
Expenditure rate (ongoing)26.6%
Part B score (max 5.0)1.33 / 5.0
Final score4.68 / 10
โ€”
2.1% 5.12
CategoryDug Well Recharge
Started / Completed / Phys181 / 48 / 95
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.08Cr / 0.02Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score5.12 / 10
0.8% 3.36
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.12Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score3.36 / 10
44.3% 6.48
CategoryWater conservation & recharge
Started / Completed / Phys132 / 6 / 73
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked4.36Cr / 3.04Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score6.48 / 10
7.9% 6.10
CategoryWatershed Related Works
Started / Completed / Phys35 / 6 / 11
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.96Cr / 0.71Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score6.10 / 10
5.6% 5.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 5 / 7
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.73Cr / 0.35Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score5.41 / 10
182 JAWA โ†— REWA 5.63 D
42.3% 4.13
CategoryFarm Pond
Started / Completed / Phys227 / 91 / 61
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate67.0%
Part A score (max 5.0)3.35 / 5.0
Ongoing sanction / booked1.89Cr / 0.30Cr
Expenditure rate (ongoing)15.6%
Part B score (max 5.0)0.78 / 5.0
Final score4.13 / 10
โ€”
0.7% 5.72
CategoryDug Well Recharge
Started / Completed / Phys35 / 21 / 12
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate94.3%
Part A score (max 5.0)4.71 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score5.72 / 10
0.3% 6.80
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score6.80 / 10
41.5% 7.26
CategoryWater conservation & recharge
Started / Completed / Phys84 / 29 / 36
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked2.26Cr / 1.53Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score7.26 / 10
6.2% 6.05
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 12
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.16Cr / 0.08Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score6.05 / 10
9.1% 4.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 2 / 6
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked0.54Cr / 0.27Cr
Expenditure rate (ongoing)50.4%
Part B score (max 5.0)2.52 / 5.0
Final score4.87 / 10
183 CHANDERI โ†— ASHOK NAGAR 5.62 D
44.2% 4.79
CategoryFarm Pond
Started / Completed / Phys243 / 24 / 106
Completion rate53.5%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked2.84Cr / 1.20Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.79 / 10
โ€”
1.6% 7.11
CategoryDug Well Recharge
Started / Completed / Phys100 / 45 / 38
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score7.11 / 10
0.5% 4.41
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score4.41 / 10
35.1% 5.78
CategoryWater conservation & recharge
Started / Completed / Phys151 / 11 / 59
Completion rate46.4%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked2.58Cr / 1.79Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score5.78 / 10
12.2% 8.07
CategoryWatershed Related Works
Started / Completed / Phys13 / 3 / 6
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.47Cr / 0.44Cr
Expenditure rate (ongoing)92.2%
Part B score (max 5.0)4.61 / 5.0
Final score8.07 / 10
6.4% 5.60
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 1 / 4
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked0.62Cr / 0.47Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score5.60 / 10
184 BUXWAHA โ†— CHHATARPUR 5.62 D
40.2% 4.89
CategoryFarm Pond
Started / Completed / Phys153 / 48 / 47
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.1%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked2.32Cr / 0.83Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score4.89 / 10
4.5% 5.04
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.45Cr / 0.34Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score5.04 / 10
5.6% 5.60
CategoryDug Well Recharge
Started / Completed / Phys356 / 195 / 119
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate88.2%
Part A score (max 5.0)4.41 / 5.0
Ongoing sanction / booked0.07Cr / 0.02Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score5.60 / 10
โ€”
41.4% 6.29
CategoryWater conservation & recharge
Started / Completed / Phys96 / 14 / 44
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked3.54Cr / 2.31Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.27 / 5.0
Final score6.29 / 10
2.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.8% 4.48
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 4
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.65Cr / 0.32Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.48 / 5.0
Final score4.48 / 10
185 MANDLA โ†— MANDLA 5.62 D
54.8% 5.57
CategoryFarm Pond
Started / Completed / Phys288 / 149 / 14
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked5.48Cr / 3.00Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score5.57 / 10
โ€”
2.6% 4.66
CategoryDug Well Recharge
Started / Completed / Phys235 / 74 / 63
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)34.8%
Part B score (max 5.0)1.74 / 5.0
Final score4.66 / 10
11.9% 4.70
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 4 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.86Cr / 0.82Cr
Expenditure rate (ongoing)44.0%
Part B score (max 5.0)2.20 / 5.0
Final score4.70 / 10
23.8% 6.16
CategoryWater conservation & recharge
Started / Completed / Phys102 / 38 / 11
Completion rate48.0%
Part A score (max 5.0)2.40 / 5.0
Ongoing sanction / booked3.68Cr / 2.76Cr
Expenditure rate (ongoing)75.1%
Part B score (max 5.0)3.76 / 5.0
Final score6.16 / 10
5.0% 6.85
CategoryWatershed Related Works
Started / Completed / Phys31 / 11 / 8
Completion rate61.3%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.49Cr / 0.37Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score6.85 / 10
1.8% 4.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked0.37Cr / 0.21Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.80 / 5.0
Final score4.22 / 10
186 KURAI โ†— SEONI 5.59 D
42.0% 4.42
CategoryFarm Pond
Started / Completed / Phys260 / 33 / 135
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked3.41Cr / 0.81Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score4.42 / 10
4.9% 1.22
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.20Cr / 0.29Cr
Expenditure rate (ongoing)24.4%
Part B score (max 5.0)1.22 / 5.0
Final score1.22 / 10
2.5% 6.01
CategoryDug Well Recharge
Started / Completed / Phys240 / 23 / 181
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate85.0%
Part A score (max 5.0)4.25 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.76 / 5.0
Final score6.01 / 10
โ€”
37.9% 7.27
CategoryWater conservation & recharge
Started / Completed / Phys152 / 18 / 102
Completion rate78.9%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked2.40Cr / 1.60Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score7.27 / 10
9.8% 6.06
CategoryWatershed Related Works
Started / Completed / Phys47 / 5 / 27
Completion rate68.1%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.79Cr / 0.42Cr
Expenditure rate (ongoing)53.1%
Part B score (max 5.0)2.65 / 5.0
Final score6.06 / 10
2.9% 5.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 2 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.61 / 5.0
Final score5.94 / 10
187 RAJNAGAR โ†— CHHATARPUR 5.59 D
46.6% 4.57
CategoryFarm Pond
Started / Completed / Phys288 / 70 / 98
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked4.85Cr / 1.60Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score4.57 / 10
2.7% 3.54
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.50Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score3.54 / 10
2.9% 5.26
CategoryDug Well Recharge
Started / Completed / Phys574 / 460 / 41
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate87.3%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score5.26 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
33.1% 6.37
CategoryWater conservation & recharge
Started / Completed / Phys160 / 11 / 85
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked3.36Cr / 2.27Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score6.37 / 10
7.9% 7.46
CategoryWatershed Related Works
Started / Completed / Phys33 / 6 / 25
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)55.3%
Part B score (max 5.0)2.77 / 5.0
Final score7.46 / 10
6.1% 7.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 14
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.50Cr / 0.37Cr
Expenditure rate (ongoing)74.2%
Part B score (max 5.0)3.71 / 5.0
Final score7.28 / 10
188 MALTHONE โ†— SAGAR 5.58 D
39.2% 3.22
CategoryFarm Pond
Started / Completed / Phys179 / 34 / 34
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate38.0%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked2.11Cr / 0.56Cr
Expenditure rate (ongoing)26.3%
Part B score (max 5.0)1.32 / 5.0
Final score3.22 / 10
โ€”
8.2% 4.72
CategoryDug Well Recharge
Started / Completed / Phys288 / 145 / 74
⚠ Works needing verification (Completed/Physically Completed)48 works (exp <30%)
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)18.3%
Part B score (max 5.0)0.91 / 5.0
Final score4.72 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
48.1% 7.22
CategoryWater conservation & recharge
Started / Completed / Phys102 / 31 / 50
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.79Cr / 0.51Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score7.22 / 10
1.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 5 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
189 VIJAYRAGHAVGADH โ†— KATNI 5.57 D
44.3% 4.19
CategoryFarm Pond
Started / Completed / Phys243 / 50 / 85
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked2.01Cr / 0.57Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score4.19 / 10
โ€”
9.3% 5.44
CategoryDug Well Recharge
Started / Completed / Phys386 / 142 / 143
⚠ Works needing verification (Completed/Physically Completed)41 works (exp <30%)
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked0.16Cr / 0.05Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.75 / 5.0
Final score5.44 / 10
5.1% 6.71
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 7 / 1
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.08 / 5.0
Final score6.71 / 10
15.5% 7.02
CategoryWater conservation & recharge
Started / Completed / Phys36 / 13 / 19
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score7.02 / 10
15.1% 5.86
CategoryWatershed Related Works
Started / Completed / Phys40 / 22 / 7
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.45Cr / 0.20Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score5.86 / 10
10.8% 8.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 10
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.15Cr / 0.13Cr
Expenditure rate (ongoing)82.2%
Part B score (max 5.0)4.11 / 5.0
Final score8.34 / 10
190 NALKHEDA โ†— AGAR-MALWA 5.57 D
29.1% 4.31
CategoryFarm Pond
Started / Completed / Phys125 / 2 / 45
Completion rate37.6%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked2.08Cr / 1.01Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.43 / 5.0
Final score4.31 / 10
โ€”
10.9% 7.05
CategoryDug Well Recharge
Started / Completed / Phys464 / 100 / 233
Completion rate71.8%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.34Cr / 0.23Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score7.05 / 10
โ€”
52.3% 5.94
CategoryWater conservation & recharge
Started / Completed / Phys80 / 1 / 31
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked3.41Cr / 2.69Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score5.94 / 10
0.9% 3.51
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
6.8% 5.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys23 / 2 / 11
Completion rate56.5%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.27Cr / 0.17Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score5.94 / 10
191 LAHAR โ†— BHIND 5.57 D
22.9% 2.70
CategoryFarm Pond
Started / Completed / Phys134 / 32 / 23
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.24Cr / 0.16Cr
Expenditure rate (ongoing)13.0%
Part B score (max 5.0)0.65 / 5.0
Final score2.70 / 10
2.9% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.4% 7.46
CategoryDug Well Recharge
Started / Completed / Phys15 / 0 / 11
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score7.46 / 10
4.8% 5.17
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 3
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.10Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score5.17 / 10
59.5% 6.67
CategoryWater conservation & recharge
Started / Completed / Phys58 / 4 / 37
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked1.52Cr / 0.95Cr
Expenditure rate (ongoing)62.7%
Part B score (max 5.0)3.14 / 5.0
Final score6.67 / 10
4.2% 4.13
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.27Cr / 0.13Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.47 / 5.0
Final score4.13 / 10
5.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 0 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
192 SUSNER โ†— AGAR-MALWA 5.56 D
23.9% 5.02
CategoryFarm Pond
Started / Completed / Phys208 / 62 / 63
Completion rate60.1%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.28Cr / 0.52Cr
Expenditure rate (ongoing)40.4%
Part B score (max 5.0)2.02 / 5.0
Final score5.02 / 10
1.3% 3.42
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.12Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score3.42 / 10
9.9% 6.10
CategoryDug Well Recharge
Started / Completed / Phys508 / 186 / 252
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.14Cr / 0.05Cr
Expenditure rate (ongoing)35.8%
Part B score (max 5.0)1.79 / 5.0
Final score6.10 / 10
0.6% 2.73
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score2.73 / 10
59.0% 5.68
CategoryWater conservation & recharge
Started / Completed / Phys146 / 35 / 42
Completion rate52.7%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked4.76Cr / 2.90Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score5.68 / 10
0.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.0% 6.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 0 / 16
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)51.9%
Part B score (max 5.0)2.59 / 5.0
Final score6.40 / 10
193 BIJAWAR โ†— CHHATARPUR 5.56 D
40.5% 4.30
CategoryFarm Pond
Started / Completed / Phys209 / 64 / 59
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate58.9%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked2.23Cr / 0.61Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score4.30 / 10
3.5% 3.82
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.46Cr / 0.35Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score3.82 / 10
4.4% 4.76
CategoryDug Well Recharge
Started / Completed / Phys417 / 300 / 32
⚠ Works needing verification (Completed/Physically Completed)34 works (exp <30%)
Completion rate79.6%
Part A score (max 5.0)3.98 / 5.0
Ongoing sanction / booked0.07Cr / 0.01Cr
Expenditure rate (ongoing)15.6%
Part B score (max 5.0)0.78 / 5.0
Final score4.76 / 10
โ€”
48.7% 6.53
CategoryWater conservation & recharge
Started / Completed / Phys147 / 23 / 90
Completion rate76.9%
Part A score (max 5.0)3.84 / 5.0
Ongoing sanction / booked1.76Cr / 0.94Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score6.53 / 10
1.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 0 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
194 BALAGHAT โ†— BALAGHAT 5.56 D
58.9% 5.11
CategoryFarm Pond
Started / Completed / Phys357 / 151 / 67
Completion rate61.1%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked3.34Cr / 1.37Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.05 / 5.0
Final score5.11 / 10
3.0% 0.36
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.50Cr / 0.04Cr
Expenditure rate (ongoing)7.2%
Part B score (max 5.0)0.36 / 5.0
Final score0.36 / 10
2.0% 7.25
CategoryDug Well Recharge
Started / Completed / Phys137 / 71 / 53
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)54.4%
Part B score (max 5.0)2.72 / 5.0
Final score7.25 / 10
โ€”
32.5% 6.68
CategoryWater conservation & recharge
Started / Completed / Phys75 / 16 / 29
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked3.61Cr / 2.65Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.68 / 10
2.2% 5.67
CategoryWatershed Related Works
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.18Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.67 / 10
1.4% 6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.96 / 10
195 BADWARA โ†— KATNI 5.55 D
33.7% 4.16
CategoryFarm Pond
Started / Completed / Phys297 / 73 / 92
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked1.92Cr / 0.53Cr
Expenditure rate (ongoing)27.6%
Part B score (max 5.0)1.38 / 5.0
Final score4.16 / 10
7.5% 2.03
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.98Cr / 0.40Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score2.03 / 10
6.2% 4.68
CategoryDug Well Recharge
Started / Completed / Phys310 / 70 / 126
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked0.24Cr / 0.07Cr
Expenditure rate (ongoing)30.5%
Part B score (max 5.0)1.52 / 5.0
Final score4.68 / 10
โ€”
20.4% 7.69
CategoryWater conservation & recharge
Started / Completed / Phys52 / 3 / 36
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.74Cr / 0.58Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score7.69 / 10
24.4% 7.10
CategoryWatershed Related Works
Started / Completed / Phys41 / 16 / 19
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.45Cr / 0.25Cr
Expenditure rate (ongoing)56.7%
Part B score (max 5.0)2.84 / 5.0
Final score7.10 / 10
8.0% 5.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 6
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.47Cr / 0.23Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score5.17 / 10
196 GOTEGAON โ†— NARSINGHPUR 5.53 D
81.9% 4.88
CategoryFarm Pond
Started / Completed / Phys248 / 181 / 15
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked1.46Cr / 0.27Cr
Expenditure rate (ongoing)18.6%
Part B score (max 5.0)0.93 / 5.0
Final score4.88 / 10
โ€”
1.3% 4.64
CategoryDug Well Recharge
Started / Completed / Phys44 / 37 / 1
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)6.4%
Part B score (max 5.0)0.32 / 5.0
Final score4.64 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.9% 8.62
CategoryWater conservation & recharge
Started / Completed / Phys18 / 8 / 9
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score8.62 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 5 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
197 SABALGARH โ†— MORENA 5.53 D
28.6% 4.81
CategoryFarm Pond
Started / Completed / Phys545 / 188 / 55
Completion rate44.6%
Part A score (max 5.0)2.23 / 5.0
Ongoing sanction / booked13.14Cr / 6.78Cr
Expenditure rate (ongoing)51.6%
Part B score (max 5.0)2.58 / 5.0
Final score4.81 / 10
0.3% 1.86
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.09Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
0.3% 4.15
CategoryDug Well Recharge
Started / Completed / Phys108 / 58 / 12
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked0.08Cr / 0.01Cr
Expenditure rate (ongoing)18.2%
Part B score (max 5.0)0.91 / 5.0
Final score4.15 / 10
1.1% 5.31
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.62Cr
Expenditure rate (ongoing)86.3%
Part B score (max 5.0)4.31 / 5.0
Final score5.31 / 10
65.2% 5.87
CategoryWater conservation & recharge
Started / Completed / Phys380 / 4 / 166
Completion rate44.7%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked28.94Cr / 21.06Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score5.87 / 10
1.1% 6.84
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.44Cr / 0.31Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score6.84 / 10
3.5% 5.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 4
Completion rate21.1%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked2.19Cr / 1.80Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.10 / 5.0
Final score5.16 / 10
198 ALOT โ†— RATLAM 5.53 D
46.6% 4.29
CategoryFarm Pond
Started / Completed / Phys311 / 97 / 69
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked3.01Cr / 0.98Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score4.29 / 10
โ€”
21.9% 6.08
CategoryDug Well Recharge
Started / Completed / Phys1,067 / 359 / 406
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate71.7%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.61Cr / 0.31Cr
Expenditure rate (ongoing)49.9%
Part B score (max 5.0)2.50 / 5.0
Final score6.08 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.3% 6.85
CategoryWater conservation & recharge
Started / Completed / Phys105 / 60 / 28
Completion rate83.8%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.79Cr / 0.42Cr
Expenditure rate (ongoing)53.2%
Part B score (max 5.0)2.66 / 5.0
Final score6.85 / 10
0.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
199 BICHHUA โ†— CHHINDWARA 5.53 D
20.8% 6.55
CategoryFarm Pond
Started / Completed / Phys144 / 3 / 125
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.31Cr / 0.13Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.11 / 5.0
Final score6.55 / 10
12.4% 1.05
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.57Cr / 0.33Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score1.05 / 10
6.3% 4.88
CategoryDug Well Recharge
Started / Completed / Phys306 / 8 / 285
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)1.9%
Part B score (max 5.0)0.10 / 5.0
Final score4.88 / 10
1.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
42.5% 6.24
CategoryWater conservation & recharge
Started / Completed / Phys41 / 2 / 17
Completion rate46.3%
Part A score (max 5.0)2.32 / 5.0
Ongoing sanction / booked2.53Cr / 1.99Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.92 / 5.0
Final score6.24 / 10
16.0% 5.65
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 9
Completion rate36.0%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked1.32Cr / 1.02Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score5.65 / 10
0.7% 5.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)67.4%
Part B score (max 5.0)3.37 / 5.0
Final score5.87 / 10
200 ANUPPUR โ†— ANUPPUR 5.51 D
75.2% 4.86
CategoryFarm Pond
Started / Completed / Phys596 / 378 / 59
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked3.44Cr / 0.82Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.19 / 5.0
Final score4.86 / 10
โ€”
1.6% 6.06
CategoryDug Well Recharge
Started / Completed / Phys108 / 15 / 58
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.68 / 5.0
Final score6.06 / 10
โ€”
20.3% 7.42
CategoryWater conservation & recharge
Started / Completed / Phys78 / 30 / 39
Completion rate88.5%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.74Cr / 0.44Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score7.42 / 10
โ€”
2.8% 8.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.14Cr / 0.13Cr
Expenditure rate (ongoing)90.2%
Part B score (max 5.0)4.51 / 5.0
Final score8.68 / 10
201 NATERAN โ†— VIDISHA 5.50 D
54.3% 4.89
CategoryFarm Pond
Started / Completed / Phys320 / 132 / 73
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate64.1%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked3.36Cr / 1.13Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.68 / 5.0
Final score4.89 / 10
2.2% 1.58
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.12Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score1.58 / 10
7.1% 5.87
CategoryDug Well Recharge
Started / Completed / Phys484 / 67 / 347
⚠ Works needing verification (Completed/Physically Completed)47 works (exp <30%)
Completion rate85.5%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)32.0%
Part B score (max 5.0)1.60 / 5.0
Final score5.87 / 10
0.4% 5.89
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 2
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score5.89 / 10
35.3% 6.59
CategoryWater conservation & recharge
Started / Completed / Phys144 / 53 / 51
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked1.90Cr / 1.13Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score6.59 / 10
0.4% 4.77
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.07Cr
Expenditure rate (ongoing)95.4%
Part B score (max 5.0)4.77 / 5.0
Final score4.77 / 10
0.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
202 BADNAWAR โ†— DHAR 5.49 D
22.9% 4.99
CategoryFarm Pond
Started / Completed / Phys316 / 25 / 120
Completion rate45.9%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked4.50Cr / 2.43Cr
Expenditure rate (ongoing)53.9%
Part B score (max 5.0)2.70 / 5.0
Final score4.99 / 10
0.8% 2.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
5.2% 5.93
CategoryDug Well Recharge
Started / Completed / Phys602 / 192 / 84
Completion rate45.8%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked0.84Cr / 0.61Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.64 / 5.0
Final score5.93 / 10
2.3% 4.80
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 0 / 1
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked0.61Cr / 0.50Cr
Expenditure rate (ongoing)81.8%
Part B score (max 5.0)4.09 / 5.0
Final score4.80 / 10
57.8% 5.63
CategoryWater conservation & recharge
Started / Completed / Phys202 / 4 / 40
Completion rate21.8%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked15.04Cr / 13.66Cr
Expenditure rate (ongoing)90.8%
Part B score (max 5.0)4.54 / 5.0
Final score5.63 / 10
10.6% 5.95
CategoryWatershed Related Works
Started / Completed / Phys60 / 2 / 20
Completion rate36.7%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked2.32Cr / 1.91Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score5.95 / 10
0.3% 7.49
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.05Cr
Expenditure rate (ongoing)99.7%
Part B score (max 5.0)4.99 / 5.0
Final score7.49 / 10
203 BHITARWAR โ†— GWALIOR 5.49 D
40.9% 3.61
CategoryFarm Pond
Started / Completed / Phys257 / 28 / 99
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked3.83Cr / 0.87Cr
Expenditure rate (ongoing)22.7%
Part B score (max 5.0)1.14 / 5.0
Final score3.61 / 10
3.8% 0.81
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.68Cr / 0.11Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score0.81 / 10
3.8% 5.26
CategoryDug Well Recharge
Started / Completed / Phys265 / 57 / 162
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate82.6%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.11Cr / 0.02Cr
Expenditure rate (ongoing)22.5%
Part B score (max 5.0)1.13 / 5.0
Final score5.26 / 10
8.0% 7.92
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 2 / 12
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.24Cr / 0.17Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score7.92 / 10
32.5% 6.93
CategoryWater conservation & recharge
Started / Completed / Phys94 / 20 / 53
Completion rate77.7%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.85Cr / 0.52Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score6.93 / 10
5.6% 7.56
CategoryWatershed Related Works
Started / Completed / Phys13 / 2 / 10
Completion rate92.3%
Part A score (max 5.0)4.62 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score7.56 / 10
5.4% 8.75
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 3 / 8
Completion rate91.7%
Part A score (max 5.0)4.58 / 5.0
Ongoing sanction / booked0.11Cr / 0.09Cr
Expenditure rate (ongoing)83.3%
Part B score (max 5.0)4.16 / 5.0
Final score8.75 / 10
204 VIDISHA โ†— VIDISHA 5.48 D
58.4% 4.27
CategoryFarm Pond
Started / Completed / Phys271 / 172 / 12
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate67.9%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked1.89Cr / 0.33Cr
Expenditure rate (ongoing)17.5%
Part B score (max 5.0)0.87 / 5.0
Final score4.27 / 10
3.7% 1.09
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.09Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.09 / 5.0
Final score1.09 / 10
4.0% 4.50
CategoryDug Well Recharge
Started / Completed / Phys164 / 93 / 53
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate89.0%
Part A score (max 5.0)4.45 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.50 / 10
โ€”
29.9% 7.93
CategoryWater conservation & recharge
Started / Completed / Phys76 / 50 / 19
Completion rate90.8%
Part A score (max 5.0)4.54 / 5.0
Ongoing sanction / booked1.49Cr / 1.01Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score7.93 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
205 CHICHOLI โ†— BETUL 5.48 D
27.6% 3.71
CategoryFarm Pond
Started / Completed / Phys137 / 0 / 41
Completion rate29.9%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked2.53Cr / 1.12Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score3.71 / 10
9.3% 2.27
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.21Cr / 0.55Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.27 / 5.0
Final score2.27 / 10
8.2% 6.40
CategoryDug Well Recharge
Started / Completed / Phys411 / 57 / 237
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate71.5%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)56.5%
Part B score (max 5.0)2.82 / 5.0
Final score6.40 / 10
โ€”
37.5% 6.83
CategoryWater conservation & recharge
Started / Completed / Phys103 / 14 / 51
Completion rate63.1%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked2.03Cr / 1.49Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score6.83 / 10
12.5% 7.01
CategoryWatershed Related Works
Started / Completed / Phys37 / 1 / 25
Completion rate70.3%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked0.47Cr / 0.33Cr
Expenditure rate (ongoing)70.0%
Part B score (max 5.0)3.50 / 5.0
Final score7.01 / 10
4.8% 5.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 9
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked0.26Cr / 0.18Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.39 / 5.0
Final score5.77 / 10
206 TONK KHURD โ†— DEWAS 5.48 D
41.9% 4.59
CategoryFarm Pond
Started / Completed / Phys95 / 18 / 33
Completion rate53.7%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked1.44Cr / 0.55Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score4.59 / 10
3.3% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
13.7% 6.29
CategoryDug Well Recharge
Started / Completed / Phys395 / 75 / 207
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.29Cr / 0.16Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score6.29 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
32.5% 6.53
CategoryWater conservation & recharge
Started / Completed / Phys77 / 6 / 44
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked0.70Cr / 0.46Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score6.53 / 10
5.6% 4.86
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 2
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.19Cr / 0.08Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.01 / 5.0
Final score4.86 / 10
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
207 BICHHIYA โ†— MANDLA 5.46 D
36.7% 5.78
CategoryFarm Pond
Started / Completed / Phys346 / 207 / 4
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked5.70Cr / 3.11Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score5.78 / 10
4.1% 3.79
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 1.21Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score3.79 / 10
2.0% 5.14
CategoryDug Well Recharge
Started / Completed / Phys292 / 90 / 80
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked0.31Cr / 0.14Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.23 / 5.0
Final score5.14 / 10
11.0% 4.06
CategoryIrrigation infrastructure
Started / Completed / Phys15 / 1 / 1
Completion rate13.3%
Part A score (max 5.0)0.67 / 5.0
Ongoing sanction / booked4.25Cr / 2.89Cr
Expenditure rate (ongoing)67.9%
Part B score (max 5.0)3.40 / 5.0
Final score4.06 / 10
39.1% 5.74
CategoryWater conservation & recharge
Started / Completed / Phys269 / 97 / 12
Completion rate40.5%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked10.06Cr / 7.47Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.71 / 5.0
Final score5.74 / 10
2.9% 6.38
CategoryWatershed Related Works
Started / Completed / Phys24 / 12 / 1
Completion rate54.2%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked0.55Cr / 0.40Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score6.38 / 10
4.3% 4.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 5 / 0
Completion rate29.4%
Part A score (max 5.0)1.47 / 5.0
Ongoing sanction / booked1.02Cr / 0.69Cr
Expenditure rate (ongoing)67.5%
Part B score (max 5.0)3.37 / 5.0
Final score4.85 / 10
208 GUNOR โ†— PANNA 5.45 D
38.0% 4.12
CategoryFarm Pond
Started / Completed / Phys449 / 106 / 103
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate46.5%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked4.08Cr / 1.47Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.80 / 5.0
Final score4.12 / 10
โ€”
3.4% 4.14
CategoryDug Well Recharge
Started / Completed / Phys274 / 102 / 31
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate48.5%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked0.36Cr / 0.12Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score4.14 / 10
0.5% 3.32
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)66.4%
Part B score (max 5.0)3.32 / 5.0
Final score3.32 / 10
40.9% 6.32
CategoryWater conservation & recharge
Started / Completed / Phys200 / 20 / 102
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked3.12Cr / 2.04Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.32 / 10
5.0% 6.22
CategoryWatershed Related Works
Started / Completed / Phys21 / 4 / 9
Completion rate61.9%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked0.44Cr / 0.28Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.22 / 10
12.2% 6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys34 / 4 / 19
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked0.77Cr / 0.52Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score6.79 / 10
209 MEGHNAGAR โ†— JHABUA 5.45 D
11.1% 4.32
CategoryFarm Pond
Started / Completed / Phys192 / 11 / 60
Completion rate37.0%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked1.99Cr / 0.98Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score4.32 / 10
2.2% 3.82
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.48Cr / 0.21Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score3.82 / 10
5.1% 6.65
CategoryDug Well Recharge
Started / Completed / Phys653 / 34 / 447
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate73.7%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.44Cr / 0.26Cr
Expenditure rate (ongoing)59.3%
Part B score (max 5.0)2.97 / 5.0
Final score6.65 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
80.3% 5.49
CategoryWater conservation & recharge
Started / Completed / Phys233 / 10 / 75
Completion rate36.5%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked15.76Cr / 11.57Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.49 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.7% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
210 PRABHAT PATTAN โ†— BETUL 5.44 D
29.2% 4.73
CategoryFarm Pond
Started / Completed / Phys196 / 10 / 80
Completion rate45.9%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked3.02Cr / 1.47Cr
Expenditure rate (ongoing)48.7%
Part B score (max 5.0)2.44 / 5.0
Final score4.73 / 10
1.6% 0.38
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.29Cr / 0.02Cr
Expenditure rate (ongoing)7.6%
Part B score (max 5.0)0.38 / 5.0
Final score0.38 / 10
7.9% 6.18
CategoryDug Well Recharge
Started / Completed / Phys538 / 91 / 390
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate89.4%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.15Cr / 0.05Cr
Expenditure rate (ongoing)34.1%
Part B score (max 5.0)1.71 / 5.0
Final score6.18 / 10
โ€”
57.2% 5.83
CategoryWater conservation & recharge
Started / Completed / Phys144 / 8 / 64
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked5.12Cr / 3.41Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score5.83 / 10
1.8% 5.36
CategoryWatershed Related Works
Started / Completed / Phys8 / 2 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.19Cr / 0.11Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score5.36 / 10
2.2% 5.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 2 / 2
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score5.69 / 10
211 PALERA โ†— TIKAMGARH 5.44 D
16.3% 4.00
CategoryFarm Pond
Started / Completed / Phys232 / 30 / 53
Completion rate35.8%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked2.25Cr / 0.99Cr
Expenditure rate (ongoing)44.1%
Part B score (max 5.0)2.21 / 5.0
Final score4.00 / 10
2.1% 0.88
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.45Cr / 0.08Cr
Expenditure rate (ongoing)17.6%
Part B score (max 5.0)0.88 / 5.0
Final score0.88 / 10
7.0% 6.76
CategoryDug Well Recharge
Started / Completed / Phys585 / 179 / 319
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate85.1%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.20Cr / 0.10Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score6.76 / 10
0.2% 5.97
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score5.97 / 10
61.0% 5.72
CategoryWater conservation & recharge
Started / Completed / Phys279 / 32 / 61
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked8.98Cr / 7.28Cr
Expenditure rate (ongoing)81.1%
Part B score (max 5.0)4.05 / 5.0
Final score5.72 / 10
3.7% 7.28
CategoryWatershed Related Works
Started / Completed / Phys21 / 4 / 10
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.23Cr / 0.18Cr
Expenditure rate (ongoing)78.9%
Part B score (max 5.0)3.94 / 5.0
Final score7.28 / 10
9.7% 5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 1 / 9
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.53Cr / 1.21Cr
Expenditure rate (ongoing)79.1%
Part B score (max 5.0)3.95 / 5.0
Final score5.38 / 10
212 MAIHAR โ†— SATNA 5.43 D
48.1% 4.37
CategoryFarm Pond
Started / Completed / Phys328 / 35 / 148
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate55.8%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked3.91Cr / 1.24Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score4.37 / 10
3.7% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
1.5% 7.05
CategoryDug Well Recharge
Started / Completed / Phys155 / 73 / 50
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.09 / 5.0
Final score7.05 / 10
0.1% 8.33
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score8.33 / 10
30.6% 7.36
CategoryWater conservation & recharge
Started / Completed / Phys87 / 18 / 43
Completion rate70.1%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked2.36Cr / 1.82Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.86 / 5.0
Final score7.36 / 10
6.6% 6.73
CategoryWatershed Related Works
Started / Completed / Phys56 / 11 / 29
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.32Cr / 0.20Cr
Expenditure rate (ongoing)63.3%
Part B score (max 5.0)3.16 / 5.0
Final score6.73 / 10
9.4% 5.57
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 9 / 11
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.85Cr / 0.52Cr
Expenditure rate (ongoing)61.4%
Part B score (max 5.0)3.07 / 5.0
Final score5.57 / 10
213 KATANGI โ†— BALAGHAT 5.43 D
62.4% 4.86
CategoryFarm Pond
Started / Completed / Phys462 / 75 / 205
Completion rate60.6%
Part A score (max 5.0)3.03 / 5.0
Ongoing sanction / booked4.25Cr / 1.56Cr
Expenditure rate (ongoing)36.7%
Part B score (max 5.0)1.83 / 5.0
Final score4.86 / 10
2.3% 1.88
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.47Cr / 0.18Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.88 / 5.0
Final score1.88 / 10
1.9% 5.50
CategoryDug Well Recharge
Started / Completed / Phys148 / 41 / 88
Completion rate87.2%
Part A score (max 5.0)4.36 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score5.50 / 10
0.5% 6.90
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score6.90 / 10
32.3% 6.76
CategoryWater conservation & recharge
Started / Completed / Phys146 / 6 / 82
Completion rate60.3%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked3.19Cr / 2.39Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score6.76 / 10
0.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.09Cr
Expenditure rate (ongoing)83.6%
Part B score (max 5.0)4.18 / 5.0
Final score4.18 / 10
214 PANNA โ†— PANNA 5.43 D
42.9% 4.98
CategoryFarm Pond
Started / Completed / Phys327 / 55 / 146
Completion rate61.5%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked2.41Cr / 0.92Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score4.98 / 10
3.7% 1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.13Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
5.4% 4.11
CategoryDug Well Recharge
Started / Completed / Phys328 / 71 / 58
Completion rate39.3%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked0.52Cr / 0.22Cr
Expenditure rate (ongoing)42.8%
Part B score (max 5.0)2.14 / 5.0
Final score4.11 / 10
0.4% 5.98
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 4
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score5.98 / 10
26.6% 5.72
CategoryWater conservation & recharge
Started / Completed / Phys114 / 7 / 50
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked2.17Cr / 1.40Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score5.72 / 10
9.2% 7.56
CategoryWatershed Related Works
Started / Completed / Phys47 / 3 / 34
Completion rate78.7%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.32Cr / 0.24Cr
Expenditure rate (ongoing)72.5%
Part B score (max 5.0)3.63 / 5.0
Final score7.56 / 10
11.7% 6.69
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 0 / 12
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.66Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score6.69 / 10
215 PHANDA โ†— BHOPAL 5.43 D
45.5% 4.30
CategoryFarm Pond
Started / Completed / Phys157 / 66 / 6
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate45.9%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked1.73Cr / 0.69Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score4.30 / 10
2.9% 2.09
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.07Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score2.09 / 10
5.4% 6.34
CategoryDug Well Recharge
Started / Completed / Phys127 / 52 / 35
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.10Cr / 0.06Cr
Expenditure rate (ongoing)58.2%
Part B score (max 5.0)2.91 / 5.0
Final score6.34 / 10
โ€”
32.7% 6.92
CategoryWater conservation & recharge
Started / Completed / Phys49 / 28 / 12
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.40Cr / 0.22Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score6.92 / 10
11.2% 6.26
CategoryWatershed Related Works
Started / Completed / Phys17 / 7 / 7
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.14 / 5.0
Final score6.26 / 10
2.4% 4.51
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score4.51 / 10
216 MULTAI โ†— BETUL 5.42 D
41.0% 4.76
CategoryFarm Pond
Started / Completed / Phys153 / 4 / 72
Completion rate49.7%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked2.94Cr / 1.34Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.28 / 5.0
Final score4.76 / 10
5.3% 1.10
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.16Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score1.10 / 10
8.5% 5.69
CategoryDug Well Recharge
Started / Completed / Phys461 / 150 / 289
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate95.2%
Part A score (max 5.0)4.76 / 5.0
Ongoing sanction / booked0.05Cr / 0.01Cr
Expenditure rate (ongoing)18.6%
Part B score (max 5.0)0.93 / 5.0
Final score5.69 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
38.9% 6.37
CategoryWater conservation & recharge
Started / Completed / Phys142 / 16 / 77
Completion rate65.5%
Part A score (max 5.0)3.27 / 5.0
Ongoing sanction / booked2.43Cr / 1.50Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score6.37 / 10
3.4% 7.49
CategoryWatershed Related Works
Started / Completed / Phys18 / 2 / 15
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score7.49 / 10
2.9% 6.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 0 / 10
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score6.65 / 10
217 DATIA โ†— DATIA 5.42 D
35.8% 3.24
CategoryFarm Pond
Started / Completed / Phys406 / 78 / 80
Completion rate38.9%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked5.09Cr / 1.32Cr
Expenditure rate (ongoing)26.0%
Part B score (max 5.0)1.30 / 5.0
Final score3.24 / 10
โ€”
3.3% 5.44
CategoryDug Well Recharge
Started / Completed / Phys297 / 50 / 171
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.19Cr / 0.07Cr
Expenditure rate (ongoing)34.4%
Part B score (max 5.0)1.72 / 5.0
Final score5.44 / 10
1.9% 8.70
CategoryIrrigation infrastructure
Started / Completed / Phys18 / 9 / 8
Completion rate94.4%
Part A score (max 5.0)4.72 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.98 / 5.0
Final score8.70 / 10
47.7% 6.63
CategoryWater conservation & recharge
Started / Completed / Phys184 / 46 / 100
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked2.45Cr / 1.30Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score6.63 / 10
5.7% 6.46
CategoryWatershed Related Works
Started / Completed / Phys30 / 7 / 19
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.24Cr / 0.10Cr
Expenditure rate (ongoing)42.5%
Part B score (max 5.0)2.12 / 5.0
Final score6.46 / 10
5.7% 6.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 7 / 14
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked0.28Cr / 0.15Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.74 / 10
218 PAWAI โ†— PANNA 5.41 D
41.5% 4.21
CategoryFarm Pond
Started / Completed / Phys479 / 41 / 134
Completion rate36.5%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked8.60Cr / 4.11Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.39 / 5.0
Final score4.21 / 10
3.3% 3.62
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.10Cr / 0.79Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score3.62 / 10
4.3% 4.96
CategoryDug Well Recharge
Started / Completed / Phys377 / 61 / 128
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate50.1%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked0.71Cr / 0.35Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score4.96 / 10
0.1% 2.17
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score2.17 / 10
37.6% 6.63
CategoryWater conservation & recharge
Started / Completed / Phys341 / 24 / 170
Completion rate56.9%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked6.26Cr / 4.74Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score6.63 / 10
1.6% 6.41
CategoryWatershed Related Works
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.18Cr / 0.11Cr
Expenditure rate (ongoing)58.9%
Part B score (max 5.0)2.94 / 5.0
Final score6.41 / 10
11.7% 6.24
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys46 / 2 / 18
Completion rate43.5%
Part A score (max 5.0)2.17 / 5.0
Ongoing sanction / booked2.26Cr / 1.84Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score6.24 / 10
219 RAMPUR BAGHELAN โ†— SATNA 5.40 D
41.7% 4.06
CategoryFarm Pond
Started / Completed / Phys201 / 14 / 72
Completion rate42.8%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked2.52Cr / 0.96Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score4.06 / 10
7.0% 0.47
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.07Cr
Expenditure rate (ongoing)9.3%
Part B score (max 5.0)0.47 / 5.0
Final score0.47 / 10
2.9% 6.92
CategoryDug Well Recharge
Started / Completed / Phys126 / 22 / 89
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate88.1%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)50.3%
Part B score (max 5.0)2.51 / 5.0
Final score6.92 / 10
1.3% 6.03
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.18 / 5.0
Final score6.03 / 10
34.6% 7.47
CategoryWater conservation & recharge
Started / Completed / Phys72 / 9 / 46
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.62Cr / 0.46Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score7.47 / 10
7.0% 6.42
CategoryWatershed Related Works
Started / Completed / Phys15 / 0 / 10
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score6.42 / 10
5.5% 6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 3 / 9
Completion rate70.6%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score6.58 / 10
220 RAMA โ†— JHABUA 5.39 D
9.4% 2.86
CategoryFarm Pond
Started / Completed / Phys169 / 0 / 42
Completion rate24.9%
Part A score (max 5.0)1.24 / 5.0
Ongoing sanction / booked1.89Cr / 0.61Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.61 / 5.0
Final score2.86 / 10
3.0% 2.97
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.74Cr / 0.44Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score2.97 / 10
5.9% 6.18
CategoryDug Well Recharge
Started / Completed / Phys594 / 160 / 249
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate68.9%
Part A score (max 5.0)3.44 / 5.0
Ongoing sanction / booked0.45Cr / 0.25Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score6.18 / 10
โ€”
78.3% 5.67
CategoryWater conservation & recharge
Started / Completed / Phys98 / 2 / 33
Completion rate35.7%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked11.19Cr / 8.70Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.89 / 5.0
Final score5.67 / 10
0.6% 2.05
CategoryWatershed Related Works
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score2.05 / 10
2.8% 7.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 3 / 5
Completion rate72.7%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked0.15Cr / 0.12Cr
Expenditure rate (ongoing)80.7%
Part B score (max 5.0)4.04 / 5.0
Final score7.67 / 10
221 TEONTHAR โ†— REWA 5.39 D
43.8% 4.67
CategoryFarm Pond
Started / Completed / Phys282 / 148 / 34
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.5%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked2.06Cr / 0.60Cr
Expenditure rate (ongoing)29.0%
Part B score (max 5.0)1.45 / 5.0
Final score4.67 / 10
4.5% 0.30
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.57Cr / 0.03Cr
Expenditure rate (ongoing)5.9%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
1.2% 5.50
CategoryDug Well Recharge
Started / Completed / Phys59 / 24 / 16
Completion rate67.8%
Part A score (max 5.0)3.39 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)42.1%
Part B score (max 5.0)2.11 / 5.0
Final score5.50 / 10
6.8% 6.73
CategoryIrrigation infrastructure
Started / Completed / Phys21 / 10 / 2
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.24Cr / 0.19Cr
Expenditure rate (ongoing)77.5%
Part B score (max 5.0)3.87 / 5.0
Final score6.73 / 10
23.1% 6.51
CategoryWater conservation & recharge
Started / Completed / Phys80 / 53 / 5
Completion rate72.5%
Part A score (max 5.0)3.63 / 5.0
Ongoing sanction / booked0.69Cr / 0.40Cr
Expenditure rate (ongoing)57.7%
Part B score (max 5.0)2.89 / 5.0
Final score6.51 / 10
11.2% 6.14
CategoryWatershed Related Works
Started / Completed / Phys29 / 15 / 7
Completion rate75.9%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked0.36Cr / 0.17Cr
Expenditure rate (ongoing)46.9%
Part B score (max 5.0)2.34 / 5.0
Final score6.14 / 10
9.4% 6.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 6 / 5
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.31Cr / 0.18Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score6.54 / 10
222 KIRNAPUR โ†— BALAGHAT 5.39 D
65.7% 4.69
CategoryFarm Pond
Started / Completed / Phys457 / 159 / 134
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.1%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked3.82Cr / 1.13Cr
Expenditure rate (ongoing)29.7%
Part B score (max 5.0)1.49 / 5.0
Final score4.69 / 10
3.6% 0.81
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.72Cr / 0.12Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.81 / 5.0
Final score0.81 / 10
2.0% 6.71
CategoryDug Well Recharge
Started / Completed / Phys155 / 73 / 75
Completion rate95.5%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.7%
Part B score (max 5.0)1.94 / 5.0
Final score6.71 / 10
โ€”
26.2% 7.21
CategoryWater conservation & recharge
Started / Completed / Phys114 / 27 / 66
Completion rate81.6%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.83Cr / 0.52Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score7.21 / 10
1.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
223 AGAR โ†— AGAR-MALWA 5.38 D
31.1% 2.78
CategoryFarm Pond
Started / Completed / Phys177 / 2 / 53
Completion rate31.1%
Part A score (max 5.0)1.55 / 5.0
Ongoing sanction / booked2.97Cr / 0.73Cr
Expenditure rate (ongoing)24.5%
Part B score (max 5.0)1.23 / 5.0
Final score2.78 / 10
โ€”
11.0% 4.21
CategoryDug Well Recharge
Started / Completed / Phys535 / 44 / 283
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked0.53Cr / 0.12Cr
Expenditure rate (ongoing)23.1%
Part B score (max 5.0)1.15 / 5.0
Final score4.21 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
39.2% 6.65
CategoryWater conservation & recharge
Started / Completed / Phys72 / 9 / 35
Completion rate61.1%
Part A score (max 5.0)3.06 / 5.0
Ongoing sanction / booked2.32Cr / 1.67Cr
Expenditure rate (ongoing)71.9%
Part B score (max 5.0)3.59 / 5.0
Final score6.65 / 10
6.8% 7.84
CategoryWatershed Related Works
Started / Completed / Phys25 / 16 / 7
Completion rate92.0%
Part A score (max 5.0)4.60 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score7.84 / 10
11.4% 7.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 4 / 28
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.16Cr / 0.10Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score7.56 / 10
224 ICHHAWAR โ†— SEHORE 5.38 D
47.9% 3.82
CategoryFarm Pond
Started / Completed / Phys272 / 4 / 150
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked3.13Cr / 0.62Cr
Expenditure rate (ongoing)19.8%
Part B score (max 5.0)0.99 / 5.0
Final score3.82 / 10
1.3% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
7.2% 6.73
CategoryDug Well Recharge
Started / Completed / Phys418 / 78 / 298
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.23 / 5.0
Final score6.73 / 10
0.5% 5.24
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.74 / 5.0
Final score5.24 / 10
34.2% 7.04
CategoryWater conservation & recharge
Started / Completed / Phys83 / 9 / 51
Completion rate72.3%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked1.95Cr / 1.33Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.43 / 5.0
Final score7.04 / 10
5.9% 7.15
CategoryWatershed Related Works
Started / Completed / Phys18 / 4 / 12
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score7.15 / 10
3.0% 6.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 7
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)49.8%
Part B score (max 5.0)2.49 / 5.0
Final score6.86 / 10
225 DEOSAR โ†— SINGRAULI 5.38 D
39.8% 5.21
CategoryFarm Pond
Started / Completed / Phys691 / 431 / 28
Completion rate66.4%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked4.12Cr / 1.56Cr
Expenditure rate (ongoing)37.7%
Part B score (max 5.0)1.89 / 5.0
Final score5.21 / 10
3.5% 2.97
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.07Cr / 0.64Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score2.97 / 10
3.1% 6.00
CategoryDug Well Recharge
Started / Completed / Phys365 / 270 / 22
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.05Cr
Expenditure rate (ongoing)39.9%
Part B score (max 5.0)2.00 / 5.0
Final score6.00 / 10
0.2% 5.24
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
44.3% 5.50
CategoryWater conservation & recharge
Started / Completed / Phys224 / 57 / 54
Completion rate49.6%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked6.28Cr / 3.80Cr
Expenditure rate (ongoing)60.4%
Part B score (max 5.0)3.02 / 5.0
Final score5.50 / 10
5.4% 6.11
CategoryWatershed Related Works
Started / Completed / Phys25 / 5 / 10
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.75Cr / 0.47Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.11 / 5.0
Final score6.11 / 10
3.7% 6.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 4 / 5
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked0.51Cr / 0.32Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.41 / 10
226 UDAIGARH โ†— ALIRAJPUR 5.37 D
15.5% 3.80
CategoryFarm Pond
Started / Completed / Phys177 / 0 / 47
Completion rate26.6%
Part A score (max 5.0)1.33 / 5.0
Ongoing sanction / booked1.94Cr / 0.96Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score3.80 / 10
3.6% 3.22
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.63Cr / 0.41Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score3.22 / 10
6.4% 4.55
CategoryDug Well Recharge
Started / Completed / Phys432 / 10 / 148
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate36.6%
Part A score (max 5.0)1.83 / 5.0
Ongoing sanction / booked0.70Cr / 0.38Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score4.55 / 10
โ€”
69.7% 5.76
CategoryWater conservation & recharge
Started / Completed / Phys66 / 0 / 28
Completion rate42.4%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked9.28Cr / 6.75Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score5.76 / 10
4.8% 7.56
CategoryWatershed Related Works
Started / Completed / Phys22 / 0 / 18
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score7.56 / 10
โ€”
227 BHABRA โ†— ALIRAJPUR 5.37 D
15.2% 4.81
CategoryFarm Pond
Started / Completed / Phys120 / 0 / 53
Completion rate44.2%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked1.70Cr / 0.88Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score4.81 / 10
2.2% 3.51
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.34Cr
Expenditure rate (ongoing)70.1%
Part B score (max 5.0)3.51 / 5.0
Final score3.51 / 10
4.8% 6.30
CategoryDug Well Recharge
Started / Completed / Phys414 / 2 / 258
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked0.40Cr / 0.25Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score6.30 / 10
โ€”
76.4% 5.48
CategoryWater conservation & recharge
Started / Completed / Phys90 / 3 / 23
Completion rate28.9%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked13.66Cr / 11.01Cr
Expenditure rate (ongoing)80.6%
Part B score (max 5.0)4.03 / 5.0
Final score5.48 / 10
1.4% 5.58
CategoryWatershed Related Works
Started / Completed / Phys9 / 1 / 3
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.21Cr / 0.14Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.35 / 5.0
Final score5.58 / 10
0.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
228 KARAHAL โ†— SHEOPUR 5.37 D
33.7% 3.84
CategoryFarm Pond
Started / Completed / Phys229 / 40 / 81
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked3.65Cr / 0.87Cr
Expenditure rate (ongoing)24.0%
Part B score (max 5.0)1.20 / 5.0
Final score3.84 / 10
3.9% 0.54
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.96Cr / 0.10Cr
Expenditure rate (ongoing)10.7%
Part B score (max 5.0)0.54 / 5.0
Final score0.54 / 10
0.3% 4.04
CategoryDug Well Recharge
Started / Completed / Phys28 / 10 / 6
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.18 / 5.0
Final score4.04 / 10
3.6% 8.28
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 0 / 5
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.15Cr / 0.12Cr
Expenditure rate (ongoing)82.3%
Part B score (max 5.0)4.12 / 5.0
Final score8.28 / 10
52.5% 6.41
CategoryWater conservation & recharge
Started / Completed / Phys111 / 4 / 68
Completion rate64.9%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked4.74Cr / 3.00Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.41 / 10
1.8% 6.07
CategoryWatershed Related Works
Started / Completed / Phys10 / 1 / 5
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)61.3%
Part B score (max 5.0)3.07 / 5.0
Final score6.07 / 10
4.2% 6.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 0 / 6
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.20Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score6.26 / 10
229 KOLARAS โ†— SHIVPURI 5.36 D
44.2% 4.74
CategoryFarm Pond
Started / Completed / Phys238 / 91 / 68
Completion rate66.8%
Part A score (max 5.0)3.34 / 5.0
Ongoing sanction / booked3.09Cr / 0.86Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score4.74 / 10
1.8% 2.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.20Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score2.56 / 10
2.9% 4.59
CategoryDug Well Recharge
Started / Completed / Phys253 / 128 / 51
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)21.1%
Part B score (max 5.0)1.05 / 5.0
Final score4.59 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
49.6% 5.99
CategoryWater conservation & recharge
Started / Completed / Phys110 / 9 / 45
Completion rate49.1%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked5.50Cr / 3.89Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score5.99 / 10
0.6% 4.88
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score4.88 / 10
0.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
230 KAHNAPAS(GHANSAUR) โ†— SEONI 5.34 D
52.0% 3.89
CategoryFarm Pond
Started / Completed / Phys499 / 142 / 51
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate38.7%
Part A score (max 5.0)1.93 / 5.0
Ongoing sanction / booked7.17Cr / 2.81Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score3.89 / 10
โ€”
2.6% 4.28
CategoryDug Well Recharge
Started / Completed / Phys226 / 92 / 62
⚠ Works needing verification (Completed/Physically Completed)67 works (exp <30%)
Completion rate68.1%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)17.4%
Part B score (max 5.0)0.87 / 5.0
Final score4.28 / 10
โ€”
41.4% 6.93
CategoryWater conservation & recharge
Started / Completed / Phys185 / 46 / 76
Completion rate65.9%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked3.48Cr / 2.53Cr
Expenditure rate (ongoing)72.7%
Part B score (max 5.0)3.63 / 5.0
Final score6.93 / 10
2.2% 7.16
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 5
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.41 / 5.0
Final score7.16 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
231 SATNA โ†— SATNA 5.34 D
33.3% 4.59
CategoryFarm Pond
Started / Completed / Phys189 / 51 / 56
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked0.90Cr / 0.32Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.76 / 5.0
Final score4.59 / 10
6.2% 1.49
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.40Cr / 0.12Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score1.49 / 10
3.4% 6.95
CategoryDug Well Recharge
Started / Completed / Phys147 / 110 / 5
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate78.2%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.95 / 10
1.1% 5.31
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)66.3%
Part B score (max 5.0)3.31 / 5.0
Final score5.31 / 10
45.8% 6.22
CategoryWater conservation & recharge
Started / Completed / Phys48 / 12 / 12
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked2.22Cr / 1.65Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score6.22 / 10
2.0% 7.35
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.07Cr
Expenditure rate (ongoing)97.0%
Part B score (max 5.0)4.85 / 5.0
Final score7.35 / 10
8.1% 5.16
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.33Cr / 0.18Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.66 / 5.0
Final score5.16 / 10
232 ASHTA โ†— SEHORE 5.31 D
57.2% 4.36
CategoryFarm Pond
Started / Completed / Phys509 / 90 / 198
⚠ Works needing verification (Completed/Physically Completed)28 works (exp <30%)
Completion rate56.6%
Part A score (max 5.0)2.83 / 5.0
Ongoing sanction / booked6.15Cr / 1.88Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score4.36 / 10
5.5% 2.22
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.23Cr / 0.55Cr
Expenditure rate (ongoing)44.4%
Part B score (max 5.0)2.22 / 5.0
Final score2.22 / 10
8.3% 6.60
CategoryDug Well Recharge
Started / Completed / Phys725 / 273 / 356
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score6.60 / 10
1.5% 6.96
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 2 / 4
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score6.96 / 10
19.4% 7.71
CategoryWater conservation & recharge
Started / Completed / Phys101 / 19 / 58
Completion rate76.2%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked1.71Cr / 1.33Cr
Expenditure rate (ongoing)77.9%
Part B score (max 5.0)3.90 / 5.0
Final score7.71 / 10
5.6% 6.98
CategoryWatershed Related Works
Started / Completed / Phys32 / 11 / 12
Completion rate71.9%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked0.37Cr / 0.25Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score6.98 / 10
2.6% 6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys14 / 2 / 9
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score6.35 / 10
233 JATARA โ†— TIKAMGARH 5.31 D
10.0% 3.61
CategoryFarm Pond
Started / Completed / Phys261 / 19 / 58
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate29.5%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked2.64Cr / 1.13Cr
Expenditure rate (ongoing)42.6%
Part B score (max 5.0)2.13 / 5.0
Final score3.61 / 10
2.9% 1.19
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.27Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score1.19 / 10
4.6% 6.29
CategoryDug Well Recharge
Started / Completed / Phys661 / 33 / 434
⚠ Works needing verification (Completed/Physically Completed)31 works (exp <30%)
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.43Cr / 0.24Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.75 / 5.0
Final score6.29 / 10
โ€”
65.6% 5.60
CategoryWater conservation & recharge
Started / Completed / Phys342 / 17 / 92
Completion rate31.9%
Part A score (max 5.0)1.59 / 5.0
Ongoing sanction / booked16.84Cr / 13.50Cr
Expenditure rate (ongoing)80.2%
Part B score (max 5.0)4.01 / 5.0
Final score5.60 / 10
2.8% 6.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 6
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.53Cr / 0.41Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score6.00 / 10
14.0% 5.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys68 / 1 / 20
Completion rate30.9%
Part A score (max 5.0)1.54 / 5.0
Ongoing sanction / booked3.95Cr / 3.17Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score5.56 / 10
234 PICHHORE โ†— SHIVPURI 5.31 D
40.1% 4.09
CategoryFarm Pond
Started / Completed / Phys230 / 64 / 56
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate52.2%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked2.24Cr / 0.67Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score4.09 / 10
1.7% 3.10
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.12Cr
Expenditure rate (ongoing)62.1%
Part B score (max 5.0)3.10 / 5.0
Final score3.10 / 10
4.8% 4.58
CategoryDug Well Recharge
Started / Completed / Phys219 / 82 / 69
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate68.9%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked0.15Cr / 0.03Cr
Expenditure rate (ongoing)22.6%
Part B score (max 5.0)1.13 / 5.0
Final score4.58 / 10
2.2% 7.51
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 1 / 2
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)75.2%
Part B score (max 5.0)3.76 / 5.0
Final score7.51 / 10
37.3% 6.07
CategoryWater conservation & recharge
Started / Completed / Phys85 / 11 / 43
Completion rate63.5%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked1.88Cr / 1.09Cr
Expenditure rate (ongoing)57.9%
Part B score (max 5.0)2.90 / 5.0
Final score6.07 / 10
8.7% 7.57
CategoryWatershed Related Works
Started / Completed / Phys17 / 4 / 10
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.23Cr / 0.16Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score7.57 / 10
5.2% 5.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 6
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.29Cr / 0.15Cr
Expenditure rate (ongoing)50.5%
Part B score (max 5.0)2.53 / 5.0
Final score5.86 / 10
235 SHIVPURI โ†— SHIVPURI 5.27 D
50.1% 3.48
CategoryFarm Pond
Started / Completed / Phys254 / 59 / 82
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate55.5%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked4.92Cr / 0.70Cr
Expenditure rate (ongoing)14.1%
Part B score (max 5.0)0.71 / 5.0
Final score3.48 / 10
1.3% 2.12
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.30Cr / 0.13Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
3.1% 5.50
CategoryDug Well Recharge
Started / Completed / Phys269 / 125 / 70
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate72.5%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.16Cr / 0.06Cr
Expenditure rate (ongoing)37.4%
Part B score (max 5.0)1.87 / 5.0
Final score5.50 / 10
โ€”
41.2% 7.05
CategoryWater conservation & recharge
Started / Completed / Phys123 / 20 / 76
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked1.84Cr / 1.16Cr
Expenditure rate (ongoing)63.0%
Part B score (max 5.0)3.15 / 5.0
Final score7.05 / 10
2.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys8 / 2 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 5 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
236 SARDARPUR โ†— DHAR 5.27 D
16.7% 3.56
CategoryFarm Pond
Started / Completed / Phys353 / 21 / 116
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate38.8%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked5.28Cr / 1.71Cr
Expenditure rate (ongoing)32.5%
Part B score (max 5.0)1.62 / 5.0
Final score3.56 / 10
โ€”
2.4% 4.10
CategoryDug Well Recharge
Started / Completed / Phys489 / 87 / 123
⚠ Works needing verification (Completed/Physically Completed)119 works (exp <30%)
Completion rate42.9%
Part A score (max 5.0)2.15 / 5.0
Ongoing sanction / booked0.41Cr / 0.16Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.95 / 5.0
Final score4.10 / 10
0.6% 2.62
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.32Cr / 0.17Cr
Expenditure rate (ongoing)52.3%
Part B score (max 5.0)2.62 / 5.0
Final score2.62 / 10
74.0% 5.64
CategoryWater conservation & recharge
Started / Completed / Phys335 / 18 / 103
Completion rate36.1%
Part A score (max 5.0)1.81 / 5.0
Ongoing sanction / booked27.08Cr / 20.78Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score5.64 / 10
2.8% 5.35
CategoryWatershed Related Works
Started / Completed / Phys25 / 0 / 11
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked0.64Cr / 0.40Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.15 / 5.0
Final score5.35 / 10
3.5% 6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 1 / 10
Completion rate52.4%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.09Cr / 0.86Cr
Expenditure rate (ongoing)79.3%
Part B score (max 5.0)3.96 / 5.0
Final score6.58 / 10
237 DAHI โ†— DHAR 5.26 D
8.8% 4.07
CategoryFarm Pond
Started / Completed / Phys160 / 3 / 40
Completion rate26.9%
Part A score (max 5.0)1.34 / 5.0
Ongoing sanction / booked1.65Cr / 0.90Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.73 / 5.0
Final score4.07 / 10
โ€”
2.5% 2.66
CategoryDug Well Recharge
Started / Completed / Phys256 / 37 / 13
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate19.5%
Part A score (max 5.0)0.98 / 5.0
Ongoing sanction / booked0.52Cr / 0.18Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score2.66 / 10
โ€”
81.3% 5.51
CategoryWater conservation & recharge
Started / Completed / Phys279 / 2 / 115
Completion rate41.9%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked12.14Cr / 8.28Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score5.51 / 10
5.5% 4.11
CategoryWatershed Related Works
Started / Completed / Phys27 / 0 / 8
Completion rate29.6%
Part A score (max 5.0)1.48 / 5.0
Ongoing sanction / booked0.88Cr / 0.46Cr
Expenditure rate (ongoing)52.6%
Part B score (max 5.0)2.63 / 5.0
Final score4.11 / 10
1.8% 7.26
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys19 / 0 / 12
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked0.10Cr / 0.08Cr
Expenditure rate (ongoing)82.1%
Part B score (max 5.0)4.10 / 5.0
Final score7.26 / 10
238 BAGLI โ†— DEWAS 5.25 D
44.1% 3.57
CategoryFarm Pond
Started / Completed / Phys420 / 99 / 109
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate49.5%
Part A score (max 5.0)2.48 / 5.0
Ongoing sanction / booked6.41Cr / 1.41Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.10 / 5.0
Final score3.57 / 10
4.1% 1.54
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.36Cr
Expenditure rate (ongoing)30.8%
Part B score (max 5.0)1.54 / 5.0
Final score1.54 / 10
12.0% 6.33
CategoryDug Well Recharge
Started / Completed / Phys1,317 / 895 / 315
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.26Cr / 0.09Cr
Expenditure rate (ongoing)34.7%
Part B score (max 5.0)1.73 / 5.0
Final score6.33 / 10
0.5% 5.70
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)47.3%
Part B score (max 5.0)2.36 / 5.0
Final score5.70 / 10
33.9% 7.19
CategoryWater conservation & recharge
Started / Completed / Phys171 / 41 / 88
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked2.48Cr / 1.69Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score7.19 / 10
4.3% 6.34
CategoryWatershed Related Works
Started / Completed / Phys35 / 8 / 22
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)41.1%
Part B score (max 5.0)2.06 / 5.0
Final score6.34 / 10
1.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
239 HATTA โ†— DAMOH 5.24 D
20.8% 3.16
CategoryFarm Pond
Started / Completed / Phys175 / 19 / 29
Completion rate27.4%
Part A score (max 5.0)1.37 / 5.0
Ongoing sanction / booked2.59Cr / 0.93Cr
Expenditure rate (ongoing)35.9%
Part B score (max 5.0)1.79 / 5.0
Final score3.16 / 10
โ€”
2.1% 5.64
CategoryDug Well Recharge
Started / Completed / Phys141 / 48 / 60
Completion rate76.6%
Part A score (max 5.0)3.83 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)36.3%
Part B score (max 5.0)1.81 / 5.0
Final score5.64 / 10
โ€”
53.5% 5.81
CategoryWater conservation & recharge
Started / Completed / Phys96 / 21 / 20
Completion rate42.7%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked6.01Cr / 4.42Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score5.81 / 10
17.2% 6.07
CategoryWatershed Related Works
Started / Completed / Phys43 / 10 / 17
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked0.90Cr / 0.53Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score6.07 / 10
6.3% 4.87
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys17 / 1 / 5
Completion rate35.3%
Part A score (max 5.0)1.76 / 5.0
Ongoing sanction / booked0.70Cr / 0.44Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score4.87 / 10
240 PATHARIYA โ†— DAMOH 5.24 D
24.0% 3.79
CategoryFarm Pond
Started / Completed / Phys235 / 91 / 21
Completion rate47.7%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked2.80Cr / 0.79Cr
Expenditure rate (ongoing)28.2%
Part B score (max 5.0)1.41 / 5.0
Final score3.79 / 10
โ€”
5.0% 5.80
CategoryDug Well Recharge
Started / Completed / Phys385 / 182 / 52
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked0.37Cr / 0.20Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score5.80 / 10
4.6% 5.15
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked0.66Cr / 0.61Cr
Expenditure rate (ongoing)93.0%
Part B score (max 5.0)4.65 / 5.0
Final score5.15 / 10
54.7% 5.71
CategoryWater conservation & recharge
Started / Completed / Phys142 / 15 / 33
Completion rate33.8%
Part A score (max 5.0)1.69 / 5.0
Ongoing sanction / booked8.34Cr / 6.70Cr
Expenditure rate (ongoing)80.4%
Part B score (max 5.0)4.02 / 5.0
Final score5.71 / 10
8.3% 6.14
CategoryWatershed Related Works
Started / Completed / Phys14 / 0 / 4
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.31Cr / 1.24Cr
Expenditure rate (ongoing)94.2%
Part B score (max 5.0)4.71 / 5.0
Final score6.14 / 10
3.4% 4.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 3
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.49Cr / 0.33Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score4.96 / 10
241 PALI โ†— UMARIA 5.23 D
37.9% 4.97
CategoryFarm Pond
Started / Completed / Phys164 / 6 / 73
Completion rate48.2%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked3.37Cr / 1.72Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score4.97 / 10
1.1% 3.24
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.12Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score3.24 / 10
3.4% 4.39
CategoryDug Well Recharge
Started / Completed / Phys224 / 0 / 83
Completion rate37.1%
Part A score (max 5.0)1.85 / 5.0
Ongoing sanction / booked0.36Cr / 0.18Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score4.39 / 10
โ€”
45.0% 5.58
CategoryWater conservation & recharge
Started / Completed / Phys86 / 9 / 26
Completion rate40.7%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked4.98Cr / 3.53Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.54 / 5.0
Final score5.58 / 10
8.9% 4.91
CategoryWatershed Related Works
Started / Completed / Phys11 / 2 / 2
Completion rate36.4%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked1.26Cr / 0.78Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score4.91 / 10
3.7% 5.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 3
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked0.34Cr / 0.26Cr
Expenditure rate (ongoing)77.7%
Part B score (max 5.0)3.88 / 5.0
Final score5.76 / 10
242 UNCHAHARA โ†— SATNA 5.23 D
39.9% 2.82
CategoryFarm Pond
Started / Completed / Phys269 / 20 / 77
Completion rate36.1%
Part A score (max 5.0)1.80 / 5.0
Ongoing sanction / booked3.84Cr / 0.78Cr
Expenditure rate (ongoing)20.3%
Part B score (max 5.0)1.01 / 5.0
Final score2.82 / 10
โ€”
2.2% 6.17
CategoryDug Well Recharge
Started / Completed / Phys114 / 7 / 74
Completion rate71.1%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score6.17 / 10
โ€”
30.7% 6.74
CategoryWater conservation & recharge
Started / Completed / Phys91 / 3 / 57
Completion rate65.9%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked2.06Cr / 1.42Cr
Expenditure rate (ongoing)68.9%
Part B score (max 5.0)3.44 / 5.0
Final score6.74 / 10
3.0% 6.62
CategoryWatershed Related Works
Started / Completed / Phys8 / 3 / 2
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.18Cr / 0.13Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score6.62 / 10
24.2% 7.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 11
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.85Cr / 0.55Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score7.01 / 10
243 PIPARIYA โ†— NARMADAPURAM 5.22 D
54.2% 3.29
CategoryFarm Pond
Started / Completed / Phys97 / 51 / 1
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked0.69Cr / 0.08Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score3.29 / 10
โ€”
9.3% 5.72
CategoryDug Well Recharge
Started / Completed / Phys122 / 111 / 0
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)23.5%
Part B score (max 5.0)1.17 / 5.0
Final score5.72 / 10
โ€”
34.2% 7.94
CategoryWater conservation & recharge
Started / Completed / Phys34 / 25 / 2
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.70Cr / 0.55Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score7.94 / 10
1.1% 6.23
CategoryWatershed Related Works
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score6.23 / 10
1.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
244 DEPALPUR โ†— INDORE 5.22 D
51.4% 3.40
CategoryFarm Pond
Started / Completed / Phys169 / 14 / 34
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate28.4%
Part A score (max 5.0)1.42 / 5.0
Ongoing sanction / booked3.68Cr / 1.46Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score3.40 / 10
0.1% 0.03
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)0.5%
Part B score (max 5.0)0.03 / 5.0
Final score0.03 / 10
7.0% 4.71
CategoryDug Well Recharge
Started / Completed / Phys269 / 50 / 114
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked0.26Cr / 0.09Cr
Expenditure rate (ongoing)33.3%
Part B score (max 5.0)1.67 / 5.0
Final score4.71 / 10
โ€”
14.9% 6.80
CategoryWater conservation & recharge
Started / Completed / Phys43 / 12 / 20
Completion rate74.4%
Part A score (max 5.0)3.72 / 5.0
Ongoing sanction / booked0.38Cr / 0.23Cr
Expenditure rate (ongoing)61.5%
Part B score (max 5.0)3.07 / 5.0
Final score6.80 / 10
19.8% 7.30
CategoryWatershed Related Works
Started / Completed / Phys41 / 13 / 25
Completion rate92.7%
Part A score (max 5.0)4.63 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score7.30 / 10
6.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 3 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
245 SONDWA โ†— ALIRAJPUR 5.21 D
6.1% 4.16
CategoryFarm Pond
Started / Completed / Phys197 / 3 / 72
Completion rate38.1%
Part A score (max 5.0)1.90 / 5.0
Ongoing sanction / booked2.36Cr / 1.07Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score4.16 / 10
2.1% 7.40
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.40Cr / 0.29Cr
Expenditure rate (ongoing)73.1%
Part B score (max 5.0)3.65 / 5.0
Final score7.40 / 10
3.3% 4.42
CategoryDug Well Recharge
Started / Completed / Phys776 / 17 / 302
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate41.1%
Part A score (max 5.0)2.06 / 5.0
Ongoing sanction / booked1.17Cr / 0.56Cr
Expenditure rate (ongoing)47.4%
Part B score (max 5.0)2.37 / 5.0
Final score4.42 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
84.5% 5.20
CategoryWater conservation & recharge
Started / Completed / Phys275 / 17 / 41
Completion rate21.1%
Part A score (max 5.0)1.05 / 5.0
Ongoing sanction / booked36.58Cr / 30.34Cr
Expenditure rate (ongoing)82.9%
Part B score (max 5.0)4.15 / 5.0
Final score5.20 / 10
0.9% 7.34
CategoryWatershed Related Works
Started / Completed / Phys8 / 1 / 4
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked0.19Cr / 0.16Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score7.34 / 10
2.8% 6.17
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 1 / 6
Completion rate43.8%
Part A score (max 5.0)2.19 / 5.0
Ongoing sanction / booked0.94Cr / 0.75Cr
Expenditure rate (ongoing)79.7%
Part B score (max 5.0)3.98 / 5.0
Final score6.17 / 10
246 BHIND โ†— BHIND 5.20 D
35.2% 2.86
CategoryFarm Pond
Started / Completed / Phys127 / 38 / 19
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate44.9%
Part A score (max 5.0)2.24 / 5.0
Ongoing sanction / booked1.60Cr / 0.20Cr
Expenditure rate (ongoing)12.3%
Part B score (max 5.0)0.62 / 5.0
Final score2.86 / 10
9.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.88Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.4% 7.33
CategoryDug Well Recharge
Started / Completed / Phys14 / 0 / 13
Completion rate92.9%
Part A score (max 5.0)4.64 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score7.33 / 10
0.6% 4.95
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score4.95 / 10
40.8% 6.75
CategoryWater conservation & recharge
Started / Completed / Phys58 / 10 / 37
Completion rate81.0%
Part A score (max 5.0)4.05 / 5.0
Ongoing sanction / booked0.70Cr / 0.38Cr
Expenditure rate (ongoing)54.0%
Part B score (max 5.0)2.70 / 5.0
Final score6.75 / 10
10.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
247 SEONDHA โ†— DATIA 5.20 D
52.3% 4.33
CategoryFarm Pond
Started / Completed / Phys291 / 188 / 1
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate64.9%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked2.04Cr / 0.44Cr
Expenditure rate (ongoing)21.6%
Part B score (max 5.0)1.08 / 5.0
Final score4.33 / 10
2.2% 2.67
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score2.67 / 10
4.2% 5.50
CategoryDug Well Recharge
Started / Completed / Phys179 / 171 / 3
Completion rate97.2%
Part A score (max 5.0)4.86 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)12.7%
Part B score (max 5.0)0.63 / 5.0
Final score5.50 / 10
2.9% 8.57
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 4 / 1
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score8.57 / 10
30.1% 6.22
CategoryWater conservation & recharge
Started / Completed / Phys74 / 32 / 9
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked1.13Cr / 0.78Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score6.22 / 10
4.4% 6.40
CategoryWatershed Related Works
Started / Completed / Phys12 / 7 / 0
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.28Cr / 0.19Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score6.40 / 10
3.9% 6.20
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score6.20 / 10
248 WAIDHAN โ†— SINGRAULI 5.19 D
29.6% 4.83
CategoryFarm Pond
Started / Completed / Phys332 / 163 / 31
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked2.61Cr / 1.00Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score4.83 / 10
3.4% 4.66
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.40Cr / 0.17Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.16 / 5.0
Final score4.66 / 10
4.4% 5.94
CategoryDug Well Recharge
Started / Completed / Phys385 / 73 / 220
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate76.1%
Part A score (max 5.0)3.81 / 5.0
Ongoing sanction / booked0.20Cr / 0.08Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.13 / 5.0
Final score5.94 / 10
โ€”
44.9% 5.30
CategoryWater conservation & recharge
Started / Completed / Phys129 / 15 / 44
Completion rate45.7%
Part A score (max 5.0)2.29 / 5.0
Ongoing sanction / booked5.27Cr / 3.17Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score5.30 / 10
12.3% 5.45
CategoryWatershed Related Works
Started / Completed / Phys33 / 5 / 12
Completion rate51.5%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked1.00Cr / 0.58Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score5.45 / 10
5.3% 5.46
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 3 / 8
Completion rate55.0%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked0.39Cr / 0.21Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score5.46 / 10
249 MAJHOULI โ†— JABALPUR 5.19 D
19.2% 3.04
CategoryFarm Pond
Started / Completed / Phys110 / 15 / 17
Completion rate29.1%
Part A score (max 5.0)1.45 / 5.0
Ongoing sanction / booked2.30Cr / 0.73Cr
Expenditure rate (ongoing)31.7%
Part B score (max 5.0)1.58 / 5.0
Final score3.04 / 10
7.9% 2.71
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.61Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score2.71 / 10
0.2% 4.55
CategoryDug Well Recharge
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.00Cr / 0.00Cr
Expenditure rate (ongoing)1.0%
Part B score (max 5.0)0.05 / 5.0
Final score4.55 / 10
โ€”
15.2% 6.18
CategoryWater conservation & recharge
Started / Completed / Phys32 / 8 / 9
Completion rate53.1%
Part A score (max 5.0)2.66 / 5.0
Ongoing sanction / booked1.41Cr / 0.99Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score6.18 / 10
57.2% 6.01
CategoryWatershed Related Works
Started / Completed / Phys112 / 48 / 19
Completion rate59.8%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked3.24Cr / 1.95Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score6.01 / 10
0.3% 3.13
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score3.13 / 10
250 SHAJAPUR โ†— SHAJAPUR 5.19 D
44.9% 3.33
CategoryFarm Pond
Started / Completed / Phys232 / 71 / 24
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate40.9%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked4.49Cr / 1.15Cr
Expenditure rate (ongoing)25.6%
Part B score (max 5.0)1.28 / 5.0
Final score3.33 / 10
3.9% 1.92
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.69Cr / 0.26Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
5.9% 5.37
CategoryDug Well Recharge
Started / Completed / Phys432 / 300 / 82
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score5.37 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.4% 6.56
CategoryWater conservation & recharge
Started / Completed / Phys132 / 41 / 51
Completion rate69.7%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked2.11Cr / 1.30Cr
Expenditure rate (ongoing)61.6%
Part B score (max 5.0)3.08 / 5.0
Final score6.56 / 10
8.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys33 / 13 / 20
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
251 HARDA โ†— HARDA 5.18 D
54.1% 2.97
CategoryFarm Pond
Started / Completed / Phys98 / 5 / 36
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate41.8%
Part A score (max 5.0)2.09 / 5.0
Ongoing sanction / booked1.88Cr / 0.33Cr
Expenditure rate (ongoing)17.5%
Part B score (max 5.0)0.88 / 5.0
Final score2.97 / 10
4.6% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
11.6% 5.26
CategoryDug Well Recharge
Started / Completed / Phys231 / 151 / 54
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate88.7%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)16.5%
Part B score (max 5.0)0.82 / 5.0
Final score5.26 / 10
โ€”
20.2% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys11 / 1 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 0 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
252 BHIMPUR โ†— BETUL 5.18 D
20.9% 4.22
CategoryFarm Pond
Started / Completed / Phys196 / 3 / 54
Completion rate29.1%
Part A score (max 5.0)1.45 / 5.0
Ongoing sanction / booked4.78Cr / 2.65Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score4.22 / 10
2.9% 1.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.93Cr / 0.22Cr
Expenditure rate (ongoing)23.9%
Part B score (max 5.0)1.20 / 5.0
Final score1.20 / 10
3.6% 7.76
CategoryDug Well Recharge
Started / Completed / Phys433 / 19 / 325
Completion rate79.4%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.23Cr / 0.17Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score7.76 / 10
โ€”
68.1% 5.51
CategoryWater conservation & recharge
Started / Completed / Phys315 / 34 / 95
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked13.11Cr / 9.09Cr
Expenditure rate (ongoing)69.3%
Part B score (max 5.0)3.46 / 5.0
Final score5.51 / 10
2.0% 6.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 0 / 4
Completion rate44.4%
Part A score (max 5.0)2.22 / 5.0
Ongoing sanction / booked0.37Cr / 0.28Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score6.00 / 10
2.6% 4.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 1 / 3
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.70Cr / 0.49Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score4.47 / 10
253 JAORA โ†— RATLAM 5.16 D
52.2% 3.81
CategoryFarm Pond
Started / Completed / Phys160 / 30 / 44
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate46.3%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked2.99Cr / 0.89Cr
Expenditure rate (ongoing)29.9%
Part B score (max 5.0)1.49 / 5.0
Final score3.81 / 10
9.8% 3.85
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.91Cr
Expenditure rate (ongoing)77.0%
Part B score (max 5.0)3.85 / 5.0
Final score3.85 / 10
10.2% 5.81
CategoryDug Well Recharge
Started / Completed / Phys470 / 58 / 262
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate68.1%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.37Cr / 0.18Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.41 / 5.0
Final score5.81 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.2% 7.72
CategoryWater conservation & recharge
Started / Completed / Phys80 / 33 / 45
Completion rate97.5%
Part A score (max 5.0)4.88 / 5.0
Ongoing sanction / booked0.29Cr / 0.16Cr
Expenditure rate (ongoing)56.9%
Part B score (max 5.0)2.84 / 5.0
Final score7.72 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
254 RAMNAGAR โ†— SATNA 5.14 D
85.1% 4.29
CategoryFarm Pond
Started / Completed / Phys220 / 29 / 107
Completion rate61.8%
Part A score (max 5.0)3.09 / 5.0
Ongoing sanction / booked1.63Cr / 0.39Cr
Expenditure rate (ongoing)24.0%
Part B score (max 5.0)1.20 / 5.0
Final score4.29 / 10
โ€”
6.3% 10.00
CategoryDug Well Recharge
Started / Completed / Phys110 / 0 / 110
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
5.9% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys14 / 7 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
255 HANUMANA โ†— REWA 5.12 D
42.6% 3.43
CategoryFarm Pond
Started / Completed / Phys315 / 132 / 18
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate47.6%
Part A score (max 5.0)2.38 / 5.0
Ongoing sanction / booked5.12Cr / 1.07Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score3.43 / 10
0.8% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.7% 4.15
CategoryDug Well Recharge
Started / Completed / Phys62 / 20 / 19
⚠ Works needing verification (Completed/Physically Completed)12 works (exp <30%)
Completion rate62.9%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score4.15 / 10
3.8% 6.64
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 9 / 0
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.14Cr / 0.06Cr
Expenditure rate (ongoing)42.9%
Part B score (max 5.0)2.14 / 5.0
Final score6.64 / 10
28.7% 6.46
CategoryWater conservation & recharge
Started / Completed / Phys139 / 79 / 30
Completion rate78.4%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked1.32Cr / 0.67Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score6.46 / 10
11.9% 6.79
CategoryWatershed Related Works
Started / Completed / Phys16 / 6 / 6
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.46Cr / 0.28Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.79 / 10
11.5% 6.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 19 / 4
Completion rate79.3%
Part A score (max 5.0)3.97 / 5.0
Ongoing sanction / booked0.51Cr / 0.24Cr
Expenditure rate (ongoing)46.0%
Part B score (max 5.0)2.30 / 5.0
Final score6.27 / 10
256 SONKATCH โ†— DEWAS 5.10 D
50.3% 4.16
CategoryFarm Pond
Started / Completed / Phys103 / 26 / 34
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked1.54Cr / 0.38Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.25 / 5.0
Final score4.16 / 10
2.5% 4.21
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.20Cr / 0.17Cr
Expenditure rate (ongoing)84.3%
Part B score (max 5.0)4.21 / 5.0
Final score4.21 / 10
12.4% 5.17
CategoryDug Well Recharge
Started / Completed / Phys376 / 66 / 226
Completion rate77.7%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.22Cr / 0.06Cr
Expenditure rate (ongoing)25.8%
Part B score (max 5.0)1.29 / 5.0
Final score5.17 / 10
โ€”
32.7% 6.44
CategoryWater conservation & recharge
Started / Completed / Phys69 / 6 / 50
Completion rate81.2%
Part A score (max 5.0)4.06 / 5.0
Ongoing sanction / booked0.42Cr / 0.20Cr
Expenditure rate (ongoing)47.5%
Part B score (max 5.0)2.38 / 5.0
Final score6.44 / 10
1.1% 6.15
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 4
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)37.3%
Part B score (max 5.0)1.87 / 5.0
Final score6.15 / 10
0.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
257 LAUNDI โ†— CHHATARPUR 5.08 D
52.3% 3.74
CategoryFarm Pond
Started / Completed / Phys219 / 80 / 47
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked3.44Cr / 0.58Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.84 / 5.0
Final score3.74 / 10
1.1% 2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.09Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
7.5% 5.40
CategoryDug Well Recharge
Started / Completed / Phys474 / 243 / 169
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate86.9%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked0.13Cr / 0.03Cr
Expenditure rate (ongoing)21.0%
Part B score (max 5.0)1.05 / 5.0
Final score5.40 / 10
โ€”
31.0% 7.10
CategoryWater conservation & recharge
Started / Completed / Phys89 / 15 / 58
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked1.01Cr / 0.60Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score7.10 / 10
2.2% 7.34
CategoryWatershed Related Works
Started / Completed / Phys18 / 0 / 15
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.34 / 10
5.7% 5.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 1 / 6
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked0.45Cr / 0.27Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score5.74 / 10
258 UDAIPURA โ†— RAISEN 5.06 D
73.7% 4.87
CategoryFarm Pond
Started / Completed / Phys292 / 12 / 132
Completion rate49.3%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked3.24Cr / 1.56Cr
Expenditure rate (ongoing)48.1%
Part B score (max 5.0)2.40 / 5.0
Final score4.87 / 10
1.8% 3.27
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score3.27 / 10
5.4% 8.70
CategoryDug Well Recharge
Started / Completed / Phys194 / 122 / 67
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate97.4%
Part A score (max 5.0)4.87 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score8.70 / 10
โ€”
17.3% 4.64
CategoryWater conservation & recharge
Started / Completed / Phys20 / 2 / 4
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked1.11Cr / 0.70Cr
Expenditure rate (ongoing)62.8%
Part B score (max 5.0)3.14 / 5.0
Final score4.64 / 10
0.4% 2.54
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)50.7%
Part B score (max 5.0)2.54 / 5.0
Final score2.54 / 10
1.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
259 DAMOH โ†— DAMOH 5.06 D
17.3% 5.61
CategoryFarm Pond
Started / Completed / Phys230 / 103 / 22
Completion rate54.3%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked2.45Cr / 1.42Cr
Expenditure rate (ongoing)57.8%
Part B score (max 5.0)2.89 / 5.0
Final score5.61 / 10
1.1% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
3.5% 6.72
CategoryDug Well Recharge
Started / Completed / Phys433 / 144 / 111
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate58.9%
Part A score (max 5.0)2.94 / 5.0
Ongoing sanction / booked0.45Cr / 0.34Cr
Expenditure rate (ongoing)75.6%
Part B score (max 5.0)3.78 / 5.0
Final score6.72 / 10
0.1% 4.86
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)97.3%
Part B score (max 5.0)4.86 / 5.0
Final score4.86 / 10
56.9% 5.09
CategoryWater conservation & recharge
Started / Completed / Phys201 / 14 / 30
Completion rate21.9%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked15.57Cr / 12.43Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score5.09 / 10
11.2% 5.33
CategoryWatershed Related Works
Started / Completed / Phys70 / 8 / 11
Completion rate27.1%
Part A score (max 5.0)1.36 / 5.0
Ongoing sanction / booked2.65Cr / 2.10Cr
Expenditure rate (ongoing)79.5%
Part B score (max 5.0)3.97 / 5.0
Final score5.33 / 10
9.9% 3.68
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 0 / 2
Completion rate5.7%
Part A score (max 5.0)0.29 / 5.0
Ongoing sanction / booked3.02Cr / 2.05Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score3.68 / 10
260 RITHI โ†— KATNI 5.02 D
47.1% 3.39
CategoryFarm Pond
Started / Completed / Phys286 / 24 / 58
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate28.7%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked7.22Cr / 2.82Cr
Expenditure rate (ongoing)39.1%
Part B score (max 5.0)1.95 / 5.0
Final score3.39 / 10
2.0% 2.19
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.18Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.19 / 5.0
Final score2.19 / 10
3.0% 5.63
CategoryDug Well Recharge
Started / Completed / Phys259 / 127 / 56
⚠ Works needing verification (Completed/Physically Completed)70 works (exp <30%)
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)41.9%
Part B score (max 5.0)2.09 / 5.0
Final score5.63 / 10
6.4% 6.81
CategoryIrrigation infrastructure
Started / Completed / Phys54 / 10 / 34
Completion rate81.5%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.42Cr / 0.23Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score6.81 / 10
24.1% 6.37
CategoryWater conservation & recharge
Started / Completed / Phys112 / 32 / 38
Completion rate62.5%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked2.01Cr / 1.30Cr
Expenditure rate (ongoing)64.8%
Part B score (max 5.0)3.24 / 5.0
Final score6.37 / 10
10.9% 6.94
CategoryWatershed Related Works
Started / Completed / Phys51 / 24 / 16
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate78.4%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked0.13Cr / 0.08Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.02 / 5.0
Final score6.94 / 10
6.7% 7.40
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 5 / 6
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.36Cr / 0.27Cr
Expenditure rate (ongoing)74.6%
Part B score (max 5.0)3.73 / 5.0
Final score7.40 / 10
261 SHAHPURA โ†— JABALPUR 5.02 D
41.8% 2.90
CategoryFarm Pond
Started / Completed / Phys180 / 64 / 5
Completion rate38.3%
Part A score (max 5.0)1.92 / 5.0
Ongoing sanction / booked3.87Cr / 0.76Cr
Expenditure rate (ongoing)19.6%
Part B score (max 5.0)0.98 / 5.0
Final score2.90 / 10
3.4% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.48Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
1.0% 3.70
CategoryDug Well Recharge
Started / Completed / Phys52 / 25 / 2
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate51.9%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.10 / 5.0
Final score3.70 / 10
0.7% 5.02
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)33.7%
Part B score (max 5.0)1.69 / 5.0
Final score5.02 / 10
45.9% 7.09
CategoryWater conservation & recharge
Started / Completed / Phys122 / 89 / 16
Completion rate86.1%
Part A score (max 5.0)4.30 / 5.0
Ongoing sanction / booked1.07Cr / 0.59Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score7.09 / 10
2.4% 6.16
CategoryWatershed Related Works
Started / Completed / Phys9 / 8 / 0
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)34.3%
Part B score (max 5.0)1.72 / 5.0
Final score6.16 / 10
4.9% 6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 8 / 2
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score6.96 / 10
262 KARERA โ†— SHIVPURI 5.00 D
43.5% 3.63
CategoryFarm Pond
Started / Completed / Phys224 / 39 / 55
Completion rate42.0%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked4.08Cr / 1.25Cr
Expenditure rate (ongoing)30.7%
Part B score (max 5.0)1.53 / 5.0
Final score3.63 / 10
โ€”
3.3% 5.00
CategoryDug Well Recharge
Started / Completed / Phys210 / 42 / 97
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate66.2%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked0.14Cr / 0.05Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score5.00 / 10
1.3% 7.12
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score7.12 / 10
27.4% 5.90
CategoryWater conservation & recharge
Started / Completed / Phys98 / 15 / 40
Completion rate56.1%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked2.07Cr / 1.28Cr
Expenditure rate (ongoing)61.8%
Part B score (max 5.0)3.09 / 5.0
Final score5.90 / 10
23.3% 6.25
CategoryWatershed Related Works
Started / Completed / Phys37 / 5 / 15
Completion rate54.1%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked1.78Cr / 1.26Cr
Expenditure rate (ongoing)70.9%
Part B score (max 5.0)3.55 / 5.0
Final score6.25 / 10
1.2% 7.81
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 0 / 4
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)76.2%
Part B score (max 5.0)3.81 / 5.0
Final score7.81 / 10
263 JAISINGHNAGAR โ†— SHAHDOL 5.00 D
46.1% 3.50
CategoryFarm Pond
Started / Completed / Phys925 / 220 / 176
Completion rate42.8%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked13.71Cr / 3.73Cr
Expenditure rate (ongoing)27.2%
Part B score (max 5.0)1.36 / 5.0
Final score3.50 / 10
2.8% 1.01
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.29Cr
Expenditure rate (ongoing)20.1%
Part B score (max 5.0)1.01 / 5.0
Final score1.01 / 10
0.7% 5.84
CategoryDug Well Recharge
Started / Completed / Phys134 / 55 / 41
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)45.2%
Part B score (max 5.0)2.26 / 5.0
Final score5.84 / 10
5.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 1 / 8
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
37.9% 6.20
CategoryWater conservation & recharge
Started / Completed / Phys354 / 41 / 134
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked11.80Cr / 8.79Cr
Expenditure rate (ongoing)74.5%
Part B score (max 5.0)3.73 / 5.0
Final score6.20 / 10
1.4% 4.90
CategoryWatershed Related Works
Started / Completed / Phys15 / 3 / 3
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.51Cr / 0.29Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score4.90 / 10
5.9% 6.35
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 6 / 15
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked1.41Cr / 1.07Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score6.35 / 10
264 KURWAI โ†— VIDISHA 4.96 D
66.1% 4.37
CategoryFarm Pond
Started / Completed / Phys300 / 171 / 11
Completion rate60.7%
Part A score (max 5.0)3.03 / 5.0
Ongoing sanction / booked2.56Cr / 0.68Cr
Expenditure rate (ongoing)26.7%
Part B score (max 5.0)1.34 / 5.0
Final score4.37 / 10
1.9% 2.57
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.19Cr / 0.10Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score2.57 / 10
2.8% 5.06
CategoryDug Well Recharge
Started / Completed / Phys109 / 34 / 51
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate78.0%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.06Cr / 0.01Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.16 / 5.0
Final score5.06 / 10
1.1% 7.30
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 21 / 0
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)58.4%
Part B score (max 5.0)2.92 / 5.0
Final score7.30 / 10
24.5% 6.25
CategoryWater conservation & recharge
Started / Completed / Phys76 / 42 / 7
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.68Cr / 0.41Cr
Expenditure rate (ongoing)60.5%
Part B score (max 5.0)3.03 / 5.0
Final score6.25 / 10
2.0% 5.57
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score5.57 / 10
1.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
265 MAKHAN NAGAR โ†— NARMADAPURAM 4.96 D
49.0% 3.18
CategoryFarm Pond
Started / Completed / Phys122 / 45 / 19
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate52.5%
Part A score (max 5.0)2.62 / 5.0
Ongoing sanction / booked1.36Cr / 0.15Cr
Expenditure rate (ongoing)11.0%
Part B score (max 5.0)0.55 / 5.0
Final score3.18 / 10
โ€”
11.5% 4.84
CategoryDug Well Recharge
Started / Completed / Phys181 / 96 / 50
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate80.7%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)16.2%
Part B score (max 5.0)0.81 / 5.0
Final score4.84 / 10
1.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 4 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.0% 6.77
CategoryWater conservation & recharge
Started / Completed / Phys44 / 22 / 20
Completion rate95.5%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)40.0%
Part B score (max 5.0)2.00 / 5.0
Final score6.77 / 10
6.1% 10.00
CategoryWatershed Related Works
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
6.9% 5.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.32Cr / 0.15Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score5.66 / 10
266 NAIGARHI โ†— REWA 4.94 D
52.2% 3.31
CategoryFarm Pond
Started / Completed / Phys196 / 51 / 30
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate41.3%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked4.15Cr / 1.03Cr
Expenditure rate (ongoing)24.8%
Part B score (max 5.0)1.24 / 5.0
Final score3.31 / 10
โ€”
0.7% 3.98
CategoryDug Well Recharge
Started / Completed / Phys44 / 10 / 17
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate61.4%
Part A score (max 5.0)3.07 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)18.2%
Part B score (max 5.0)0.91 / 5.0
Final score3.98 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
31.3% 6.65
CategoryWater conservation & recharge
Started / Completed / Phys91 / 40 / 24
Completion rate70.3%
Part A score (max 5.0)3.52 / 5.0
Ongoing sanction / booked1.56Cr / 0.98Cr
Expenditure rate (ongoing)62.6%
Part B score (max 5.0)3.13 / 5.0
Final score6.65 / 10
7.2% 5.96
CategoryWatershed Related Works
Started / Completed / Phys18 / 5 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.54Cr / 0.35Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score5.96 / 10
8.1% 7.71
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 14 / 4
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.71 / 10
267 TENDUKHEDA โ†— DAMOH 4.89 D
16.5% 4.90
CategoryFarm Pond
Started / Completed / Phys211 / 89 / 62
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.74Cr / 0.20Cr
Expenditure rate (ongoing)26.4%
Part B score (max 5.0)1.32 / 5.0
Final score4.90 / 10
โ€”
5.2% 8.37
CategoryDug Well Recharge
Started / Completed / Phys354 / 104 / 218
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate91.0%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score8.37 / 10
โ€”
51.8% 4.87
CategoryWater conservation & recharge
Started / Completed / Phys88 / 1 / 26
Completion rate30.7%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked7.38Cr / 4.92Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.33 / 5.0
Final score4.87 / 10
6.8% 3.43
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.06Cr / 0.62Cr
Expenditure rate (ongoing)58.7%
Part B score (max 5.0)2.93 / 5.0
Final score3.43 / 10
19.6% 4.52
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 0 / 5
Completion rate18.5%
Part A score (max 5.0)0.93 / 5.0
Ongoing sanction / booked2.40Cr / 1.72Cr
Expenditure rate (ongoing)71.8%
Part B score (max 5.0)3.59 / 5.0
Final score4.52 / 10
268 LAKHNADON โ†— SEONI 4.89 D
48.7% 3.83
CategoryFarm Pond
Started / Completed / Phys979 / 378 / 8
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked11.64Cr / 4.32Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score3.83 / 10
โ€”
2.5% 5.48
CategoryDug Well Recharge
Started / Completed / Phys388 / 179 / 31
⚠ Works needing verification (Completed/Physically Completed)113 works (exp <30%)
Completion rate54.1%
Part A score (max 5.0)2.71 / 5.0
Ongoing sanction / booked0.17Cr / 0.09Cr
Expenditure rate (ongoing)55.5%
Part B score (max 5.0)2.77 / 5.0
Final score5.48 / 10
1.1% 4.68
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 1 / 0
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.25Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score4.68 / 10
38.8% 5.90
CategoryWater conservation & recharge
Started / Completed / Phys401 / 148 / 53
Completion rate50.1%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked8.88Cr / 6.02Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score5.90 / 10
4.0% 6.22
CategoryWatershed Related Works
Started / Completed / Phys34 / 11 / 7
Completion rate52.9%
Part A score (max 5.0)2.65 / 5.0
Ongoing sanction / booked0.86Cr / 0.61Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score6.22 / 10
4.9% 6.12
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys36 / 13 / 8
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.76Cr / 0.49Cr
Expenditure rate (ongoing)64.1%
Part B score (max 5.0)3.21 / 5.0
Final score6.12 / 10
269 SIRMOUR โ†— REWA 4.88 D
57.5% 3.52
CategoryFarm Pond
Started / Completed / Phys286 / 162 / 10
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate60.1%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked1.57Cr / 0.16Cr
Expenditure rate (ongoing)10.3%
Part B score (max 5.0)0.51 / 5.0
Final score3.52 / 10
3.2% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.4% 9.86
CategoryDug Well Recharge
Started / Completed / Phys73 / 70 / 1
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate97.3%
Part A score (max 5.0)4.86 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score9.86 / 10
1.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 13 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
30.8% 6.51
CategoryWater conservation & recharge
Started / Completed / Phys60 / 38 / 11
Completion rate81.7%
Part A score (max 5.0)4.08 / 5.0
Ongoing sanction / booked0.55Cr / 0.27Cr
Expenditure rate (ongoing)48.6%
Part B score (max 5.0)2.43 / 5.0
Final score6.51 / 10
5.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys12 / 8 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
270 SEHORE โ†— SEHORE 4.84 D
66.1% 3.61
CategoryFarm Pond
Started / Completed / Phys443 / 30 / 199
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate51.7%
Part A score (max 5.0)2.58 / 5.0
Ongoing sanction / booked5.64Cr / 1.16Cr
Expenditure rate (ongoing)20.5%
Part B score (max 5.0)1.03 / 5.0
Final score3.61 / 10
โ€”
11.4% 5.88
CategoryDug Well Recharge
Started / Completed / Phys729 / 80 / 571
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.20Cr / 0.06Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.42 / 5.0
Final score5.88 / 10
1.0% 5.71
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 3 / 1
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)34.2%
Part B score (max 5.0)1.71 / 5.0
Final score5.71 / 10
17.6% 7.95
CategoryWater conservation & recharge
Started / Completed / Phys121 / 11 / 96
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.58Cr / 0.41Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.53 / 5.0
Final score7.95 / 10
1.6% 6.51
CategoryWatershed Related Works
Started / Completed / Phys10 / 0 / 9
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)40.2%
Part B score (max 5.0)2.01 / 5.0
Final score6.51 / 10
2.2% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
271 CHANCHODA โ†— GUNA 4.83 D
34.3% 2.57
CategoryFarm Pond
Started / Completed / Phys396 / 88 / 54
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate35.9%
Part A score (max 5.0)1.79 / 5.0
Ongoing sanction / booked4.93Cr / 0.77Cr
Expenditure rate (ongoing)15.5%
Part B score (max 5.0)0.78 / 5.0
Final score2.57 / 10
โ€”
9.7% 4.79
CategoryDug Well Recharge
Started / Completed / Phys917 / 491 / 339
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate90.5%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.07Cr / 0.00Cr
Expenditure rate (ongoing)5.4%
Part B score (max 5.0)0.27 / 5.0
Final score4.79 / 10
0.6% 5.29
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score5.29 / 10
47.7% 6.25
CategoryWater conservation & recharge
Started / Completed / Phys204 / 51 / 107
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked2.39Cr / 1.14Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score6.25 / 10
0.6% 5.10
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)52.0%
Part B score (max 5.0)2.60 / 5.0
Final score5.10 / 10
7.0% 6.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 12 / 11
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score6.18 / 10
272 BASODA โ†— VIDISHA 4.80 D
75.8% 4.11
CategoryFarm Pond
Started / Completed / Phys303 / 167 / 21
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate62.0%
Part A score (max 5.0)3.10 / 5.0
Ongoing sanction / booked2.99Cr / 0.60Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score4.11 / 10
โ€”
2.3% 6.20
CategoryDug Well Recharge
Started / Completed / Phys90 / 43 / 23
⚠ Works needing verification (Completed/Physically Completed)7 works (exp <30%)
Completion rate73.3%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)50.6%
Part B score (max 5.0)2.53 / 5.0
Final score6.20 / 10
0.7% 6.22
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)74.4%
Part B score (max 5.0)3.72 / 5.0
Final score6.22 / 10
19.4% 7.15
CategoryWater conservation & recharge
Started / Completed / Phys95 / 57 / 25
Completion rate86.3%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.52Cr / 0.29Cr
Expenditure rate (ongoing)56.8%
Part B score (max 5.0)2.84 / 5.0
Final score7.15 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 5.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)32.6%
Part B score (max 5.0)1.63 / 5.0
Final score5.38 / 10
273 GYARASPUR โ†— VIDISHA 4.79 D
72.3% 4.23
CategoryFarm Pond
Started / Completed / Phys271 / 133 / 28
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate59.4%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked3.27Cr / 0.82Cr
Expenditure rate (ongoing)25.2%
Part B score (max 5.0)1.26 / 5.0
Final score4.23 / 10
โ€”
8.4% 6.42
CategoryDug Well Recharge
Started / Completed / Phys346 / 63 / 200
⚠ Works needing verification (Completed/Physically Completed)34 works (exp <30%)
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked0.13Cr / 0.07Cr
Expenditure rate (ongoing)52.4%
Part B score (max 5.0)2.62 / 5.0
Final score6.42 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
17.2% 6.20
CategoryWater conservation & recharge
Started / Completed / Phys75 / 24 / 29
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.62Cr / 0.33Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score6.20 / 10
โ€”
2.1% 5.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.08Cr / 0.06Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score5.78 / 10
274 KOTMA โ†— ANUPPUR 4.78 D
75.6% 4.11
CategoryFarm Pond
Started / Completed / Phys593 / 369 / 8
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate63.6%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked4.19Cr / 0.78Cr
Expenditure rate (ongoing)18.7%
Part B score (max 5.0)0.94 / 5.0
Final score4.11 / 10
โ€”
0.8% 5.88
CategoryDug Well Recharge
Started / Completed / Phys50 / 2 / 35
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)43.7%
Part B score (max 5.0)2.18 / 5.0
Final score5.88 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
19.6% 6.95
CategoryWater conservation & recharge
Started / Completed / Phys52 / 21 / 15
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked1.01Cr / 0.70Cr
Expenditure rate (ongoing)69.9%
Part B score (max 5.0)3.49 / 5.0
Final score6.95 / 10
0.9% 3.52
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.10Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score3.52 / 10
2.1% 6.45
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.03Cr
Expenditure rate (ongoing)49.1%
Part B score (max 5.0)2.45 / 5.0
Final score6.45 / 10
275 SITAMAU โ†— MANDSAUR 4.78 D
23.0% 2.92
CategoryFarm Pond
Started / Completed / Phys332 / 40 / 19
Completion rate17.8%
Part A score (max 5.0)0.89 / 5.0
Ongoing sanction / booked5.12Cr / 2.08Cr
Expenditure rate (ongoing)40.7%
Part B score (max 5.0)2.03 / 5.0
Final score2.92 / 10
โ€”
10.6% 5.36
CategoryDug Well Recharge
Started / Completed / Phys1,066 / 272 / 176
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate42.0%
Part A score (max 5.0)2.10 / 5.0
Ongoing sanction / booked1.55Cr / 1.01Cr
Expenditure rate (ongoing)65.2%
Part B score (max 5.0)3.26 / 5.0
Final score5.36 / 10
0.5% 5.76
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.43 / 5.0
Final score5.76 / 10
60.2% 5.24
CategoryWater conservation & recharge
Started / Completed / Phys360 / 71 / 46
Completion rate32.5%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked11.09Cr / 8.02Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score5.24 / 10
2.6% 6.60
CategoryWatershed Related Works
Started / Completed / Phys15 / 5 / 2
Completion rate46.7%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked0.41Cr / 0.35Cr
Expenditure rate (ongoing)85.3%
Part B score (max 5.0)4.27 / 5.0
Final score6.60 / 10
3.1% 5.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 3 / 3
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked0.32Cr / 0.23Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score5.78 / 10
276 INDORE โ†— INDORE 4.77 D
40.9% 4.50
CategoryFarm Pond
Started / Completed / Phys60 / 26 / 9
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.22Cr / 0.07Cr
Expenditure rate (ongoing)31.7%
Part B score (max 5.0)1.58 / 5.0
Final score4.50 / 10
26.1% 2.85
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score2.85 / 10
13.3% 5.01
CategoryDug Well Recharge
Started / Completed / Phys124 / 66 / 9
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate60.5%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score5.01 / 10
0.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
14.4% 7.80
CategoryWater conservation & recharge
Started / Completed / Phys20 / 16 / 2
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score7.80 / 10
1.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 6.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score6.09 / 10
277 SAIKHEDA (GADARWARA) โ†— NARSINGHPUR 4.76 D
79.1% 3.52
CategoryFarm Pond
Started / Completed / Phys207 / 96 / 28
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate59.9%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked1.91Cr / 0.20Cr
Expenditure rate (ongoing)10.6%
Part B score (max 5.0)0.53 / 5.0
Final score3.52 / 10
โ€”
2.7% 5.65
CategoryDug Well Recharge
Started / Completed / Phys64 / 29 / 8
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate57.8%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score5.65 / 10
โ€”
16.0% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys21 / 11 / 10
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
278 GAURIHAR โ†— CHHATARPUR 4.75 D
51.8% 3.58
CategoryFarm Pond
Started / Completed / Phys201 / 82 / 34
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate57.7%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked3.20Cr / 0.45Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score3.58 / 10
3.5% 0.86
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.52Cr / 0.09Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.86 / 5.0
Final score0.86 / 10
5.5% 4.47
CategoryDug Well Recharge
Started / Completed / Phys435 / 313 / 29
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.18Cr / 0.02Cr
Expenditure rate (ongoing)10.8%
Part B score (max 5.0)0.54 / 5.0
Final score4.47 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.4% 6.69
CategoryWater conservation & recharge
Started / Completed / Phys130 / 28 / 83
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.56Cr / 0.27Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.42 / 5.0
Final score6.69 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.9% 5.37
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 0 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score5.37 / 10
279 KUNDAM โ†— JABALPUR 4.66 D
56.5% 3.11
CategoryFarm Pond
Started / Completed / Phys268 / 14 / 79
Completion rate34.7%
Part A score (max 5.0)1.74 / 5.0
Ongoing sanction / booked6.62Cr / 1.82Cr
Expenditure rate (ongoing)27.4%
Part B score (max 5.0)1.37 / 5.0
Final score3.11 / 10
9.3% 1.92
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.60Cr / 0.61Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
4.0% 6.06
CategoryDug Well Recharge
Started / Completed / Phys266 / 103 / 149
Completion rate94.7%
Part A score (max 5.0)4.74 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)26.5%
Part B score (max 5.0)1.33 / 5.0
Final score6.06 / 10
โ€”
22.7% 8.30
CategoryWater conservation & recharge
Started / Completed / Phys95 / 35 / 50
Completion rate89.5%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked0.77Cr / 0.59Cr
Expenditure rate (ongoing)76.5%
Part B score (max 5.0)3.82 / 5.0
Final score8.30 / 10
7.5% 8.06
CategoryWatershed Related Works
Started / Completed / Phys42 / 22 / 14
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.14Cr / 0.10Cr
Expenditure rate (ongoing)75.5%
Part B score (max 5.0)3.77 / 5.0
Final score8.06 / 10
โ€”
280 MANPUR โ†— UMARIA 4.65 D
26.7% 3.10
CategoryFarm Pond
Started / Completed / Phys435 / 45 / 80
Completion rate28.7%
Part A score (max 5.0)1.44 / 5.0
Ongoing sanction / booked5.59Cr / 1.86Cr
Expenditure rate (ongoing)33.3%
Part B score (max 5.0)1.67 / 5.0
Final score3.10 / 10
2.7% 2.33
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.78Cr / 0.36Cr
Expenditure rate (ongoing)46.6%
Part B score (max 5.0)2.33 / 5.0
Final score2.33 / 10
4.1% 2.80
CategoryDug Well Recharge
Started / Completed / Phys446 / 31 / 96
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate28.5%
Part A score (max 5.0)1.42 / 5.0
Ongoing sanction / booked0.82Cr / 0.22Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.38 / 5.0
Final score2.80 / 10
0.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
51.3% 5.35
CategoryWater conservation & recharge
Started / Completed / Phys355 / 47 / 93
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked8.54Cr / 5.78Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.38 / 5.0
Final score5.35 / 10
8.4% 6.18
CategoryWatershed Related Works
Started / Completed / Phys19 / 0 / 11
Completion rate57.9%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked0.54Cr / 0.35Cr
Expenditure rate (ongoing)65.8%
Part B score (max 5.0)3.29 / 5.0
Final score6.18 / 10
6.9% 5.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys41 / 4 / 17
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked1.03Cr / 0.61Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score5.54 / 10
281 CHHATARPUR โ†— CHHATARPUR 4.65 D
52.1% 3.48
CategoryFarm Pond
Started / Completed / Phys242 / 88 / 46
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate55.4%
Part A score (max 5.0)2.77 / 5.0
Ongoing sanction / booked3.27Cr / 0.47Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.71 / 5.0
Final score3.48 / 10
4.0% 1.26
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.59Cr / 0.15Cr
Expenditure rate (ongoing)25.2%
Part B score (max 5.0)1.26 / 5.0
Final score1.26 / 10
7.7% 5.23
CategoryDug Well Recharge
Started / Completed / Phys508 / 292 / 143
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate85.6%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)19.1%
Part B score (max 5.0)0.95 / 5.0
Final score5.23 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 3 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
27.5% 6.51
CategoryWater conservation & recharge
Started / Completed / Phys115 / 43 / 40
Completion rate72.2%
Part A score (max 5.0)3.61 / 5.0
Ongoing sanction / booked1.37Cr / 0.80Cr
Expenditure rate (ongoing)58.0%
Part B score (max 5.0)2.90 / 5.0
Final score6.51 / 10
4.2% 6.42
CategoryWatershed Related Works
Started / Completed / Phys21 / 3 / 12
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.30Cr / 0.17Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score6.42 / 10
4.0% 6.82
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys10 / 2 / 6
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)56.4%
Part B score (max 5.0)2.82 / 5.0
Final score6.82 / 10
282 ALIRAJPUR โ†— ALIRAJPUR 4.63 D
23.6% 2.46
CategoryFarm Pond
Started / Completed / Phys186 / 1 / 25
Completion rate14.0%
Part A score (max 5.0)0.70 / 5.0
Ongoing sanction / booked4.51Cr / 1.59Cr
Expenditure rate (ongoing)35.2%
Part B score (max 5.0)1.76 / 5.0
Final score2.46 / 10
2.4% 3.21
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.49Cr / 0.32Cr
Expenditure rate (ongoing)64.2%
Part B score (max 5.0)3.21 / 5.0
Final score3.21 / 10
7.9% 4.85
CategoryDug Well Recharge
Started / Completed / Phys638 / 26 / 287
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate49.1%
Part A score (max 5.0)2.45 / 5.0
Ongoing sanction / booked0.83Cr / 0.40Cr
Expenditure rate (ongoing)47.9%
Part B score (max 5.0)2.40 / 5.0
Final score4.85 / 10
โ€”
65.3% 5.44
CategoryWater conservation & recharge
Started / Completed / Phys140 / 2 / 40
Completion rate30.0%
Part A score (max 5.0)1.50 / 5.0
Ongoing sanction / booked8.89Cr / 7.01Cr
Expenditure rate (ongoing)78.8%
Part B score (max 5.0)3.94 / 5.0
Final score5.44 / 10
0.7% 4.09
CategoryWatershed Related Works
Started / Completed / Phys6 / 0 / 2
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.03Cr
Expenditure rate (ongoing)48.4%
Part B score (max 5.0)2.42 / 5.0
Final score4.09 / 10
0.1% 8.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)93.3%
Part B score (max 5.0)4.66 / 5.0
Final score8.00 / 10
283 SIHORA โ†— JABALPUR 4.63 D
54.9% 1.84
CategoryFarm Pond
Started / Completed / Phys161 / 16 / 11
Completion rate16.8%
Part A score (max 5.0)0.84 / 5.0
Ongoing sanction / booked3.81Cr / 0.76Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.84 / 10
2.9% 3.93
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.23Cr / 0.18Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.93 / 5.0
Final score3.93 / 10
0.5% 2.78
CategoryDug Well Recharge
Started / Completed / Phys15 / 1 / 6
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate46.7%
Part A score (max 5.0)2.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)9.0%
Part B score (max 5.0)0.45 / 5.0
Final score2.78 / 10
โ€”
35.8% 8.33
CategoryWater conservation & recharge
Started / Completed / Phys39 / 21 / 5
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked1.02Cr / 1.47Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score8.33 / 10
1.4% 4.53
CategoryWatershed Related Works
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.08Cr / 0.04Cr
Expenditure rate (ongoing)57.3%
Part B score (max 5.0)2.87 / 5.0
Final score4.53 / 10
4.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 2 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
284 TIKAMGARH โ†— TIKAMGARH 4.61 D
29.3% 1.80
CategoryFarm Pond
Started / Completed / Phys190 / 2 / 22
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate12.6%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked3.37Cr / 0.79Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score1.80 / 10
1.3% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.17Cr / 0.00Cr
Expenditure rate (ongoing)0.1%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
10.7% 4.40
CategoryDug Well Recharge
Started / Completed / Phys548 / 8 / 322
⚠ Works needing verification (Completed/Physically Completed)33 works (exp <30%)
Completion rate60.2%
Part A score (max 5.0)3.01 / 5.0
Ongoing sanction / booked0.48Cr / 0.13Cr
Expenditure rate (ongoing)27.8%
Part B score (max 5.0)1.39 / 5.0
Final score4.40 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
41.9% 5.82
CategoryWater conservation & recharge
Started / Completed / Phys167 / 15 / 79
Completion rate56.3%
Part A score (max 5.0)2.81 / 5.0
Ongoing sanction / booked3.33Cr / 2.01Cr
Expenditure rate (ongoing)60.2%
Part B score (max 5.0)3.01 / 5.0
Final score5.82 / 10
13.1% 6.14
CategoryWatershed Related Works
Started / Completed / Phys45 / 5 / 25
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.63Cr / 0.35Cr
Expenditure rate (ongoing)56.1%
Part B score (max 5.0)2.80 / 5.0
Final score6.14 / 10
3.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 0 / 9
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
285 BEOHARI โ†— SHAHDOL 4.57 D
52.8% 2.32
CategoryFarm Pond
Started / Completed / Phys347 / 81 / 0
Completion rate23.3%
Part A score (max 5.0)1.17 / 5.0
Ongoing sanction / booked6.39Cr / 1.47Cr
Expenditure rate (ongoing)23.0%
Part B score (max 5.0)1.15 / 5.0
Final score2.32 / 10
โ€”
1.8% 2.71
CategoryDug Well Recharge
Started / Completed / Phys110 / 12 / 24
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate32.7%
Part A score (max 5.0)1.64 / 5.0
Ongoing sanction / booked0.19Cr / 0.04Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score2.71 / 10
18.6% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 5
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.8% 5.29
CategoryWater conservation & recharge
Started / Completed / Phys56 / 21 / 2
Completion rate41.1%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked1.34Cr / 0.87Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score5.29 / 10
7.4% 4.92
CategoryWatershed Related Works
Started / Completed / Phys12 / 3 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.67Cr / 0.43Cr
Expenditure rate (ongoing)65.1%
Part B score (max 5.0)3.26 / 5.0
Final score4.92 / 10
6.6% 6.04
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 10 / 0
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.45Cr / 0.29Cr
Expenditure rate (ongoing)65.3%
Part B score (max 5.0)3.26 / 5.0
Final score6.04 / 10
286 BALDEOGARH โ†— TIKAMGARH 4.56 D
29.3% 2.72
CategoryFarm Pond
Started / Completed / Phys238 / 10 / 36
Completion rate19.3%
Part A score (max 5.0)0.97 / 5.0
Ongoing sanction / booked3.63Cr / 1.27Cr
Expenditure rate (ongoing)35.0%
Part B score (max 5.0)1.75 / 5.0
Final score2.72 / 10
8.4% 0.30
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.28Cr / 0.08Cr
Expenditure rate (ongoing)6.1%
Part B score (max 5.0)0.30 / 5.0
Final score0.30 / 10
10.2% 5.38
CategoryDug Well Recharge
Started / Completed / Phys605 / 17 / 439
⚠ Works needing verification (Completed/Physically Completed)24 works (exp <30%)
Completion rate75.4%
Part A score (max 5.0)3.77 / 5.0
Ongoing sanction / booked0.32Cr / 0.10Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score5.38 / 10
0.6% 8.57
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 9 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.03Cr / 0.03Cr
Expenditure rate (ongoing)96.5%
Part B score (max 5.0)4.82 / 5.0
Final score8.57 / 10
40.8% 6.03
CategoryWater conservation & recharge
Started / Completed / Phys262 / 34 / 123
Completion rate59.9%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked2.79Cr / 1.69Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.03 / 10
5.6% 6.32
CategoryWatershed Related Works
Started / Completed / Phys31 / 7 / 13
Completion rate64.5%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked0.34Cr / 0.21Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score6.32 / 10
5.1% 6.38
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 2 / 6
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.45Cr / 0.35Cr
Expenditure rate (ongoing)77.6%
Part B score (max 5.0)3.88 / 5.0
Final score6.38 / 10
287 NARAYANGANJ โ†— MANDLA 4.50 D
36.2% 5.15
CategoryFarm Pond
Started / Completed / Phys187 / 39 / 61
Completion rate53.5%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked2.86Cr / 1.42Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score5.15 / 10
13.5% 0.42
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.39Cr / 0.20Cr
Expenditure rate (ongoing)8.3%
Part B score (max 5.0)0.42 / 5.0
Final score0.42 / 10
2.3% 6.36
CategoryDug Well Recharge
Started / Completed / Phys155 / 86 / 21
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate69.0%
Part A score (max 5.0)3.45 / 5.0
Ongoing sanction / booked0.12Cr / 0.07Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.91 / 5.0
Final score6.36 / 10
โ€”
29.0% 4.95
CategoryWater conservation & recharge
Started / Completed / Phys92 / 15 / 5
Completion rate21.7%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked4.20Cr / 3.25Cr
Expenditure rate (ongoing)77.2%
Part B score (max 5.0)3.86 / 5.0
Final score4.95 / 10
18.6% 5.31
CategoryWatershed Related Works
Started / Completed / Phys72 / 21 / 0
Completion rate29.2%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked2.34Cr / 1.81Cr
Expenditure rate (ongoing)77.1%
Part B score (max 5.0)3.85 / 5.0
Final score5.31 / 10
0.4% 3.84
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)76.8%
Part B score (max 5.0)3.84 / 5.0
Final score3.84 / 10
288 KALAPIPAL โ†— SHAJAPUR 4.50 D
52.6% 3.52
CategoryFarm Pond
Started / Completed / Phys150 / 68 / 11
Completion rate52.7%
Part A score (max 5.0)2.63 / 5.0
Ongoing sanction / booked1.61Cr / 0.28Cr
Expenditure rate (ongoing)17.7%
Part B score (max 5.0)0.88 / 5.0
Final score3.52 / 10
5.5% 1.25
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.34Cr / 0.09Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.25 / 5.0
Final score1.25 / 10
16.0% 4.84
CategoryDug Well Recharge
Started / Completed / Phys397 / 203 / 153
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate89.7%
Part A score (max 5.0)4.48 / 5.0
Ongoing sanction / booked0.04Cr / 0.00Cr
Expenditure rate (ongoing)7.0%
Part B score (max 5.0)0.35 / 5.0
Final score4.84 / 10
0.9% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
25.1% 6.88
CategoryWater conservation & recharge
Started / Completed / Phys40 / 20 / 13
Completion rate82.5%
Part A score (max 5.0)4.13 / 5.0
Ongoing sanction / booked0.22Cr / 0.12Cr
Expenditure rate (ongoing)55.0%
Part B score (max 5.0)2.75 / 5.0
Final score6.88 / 10
โ€” โ€”
289 NARSIMHAPUR โ†— NARSINGHPUR 4.49 D
64.1% 3.57
CategoryFarm Pond
Started / Completed / Phys245 / 112 / 28
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked3.18Cr / 0.45Cr
Expenditure rate (ongoing)14.2%
Part B score (max 5.0)0.71 / 5.0
Final score3.57 / 10
2.3% 0.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.27Cr / 0.00Cr
Expenditure rate (ongoing)1.6%
Part B score (max 5.0)0.08 / 5.0
Final score0.08 / 10
1.4% 5.00
CategoryDug Well Recharge
Started / Completed / Phys65 / 11 / 30
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate63.1%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)36.9%
Part B score (max 5.0)1.84 / 5.0
Final score5.00 / 10
โ€”
31.1% 6.65
CategoryWater conservation & recharge
Started / Completed / Phys32 / 11 / 10
Completion rate65.6%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked3.00Cr / 2.02Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score6.65 / 10
0.8% 6.10
CategoryWatershed Related Works
Started / Completed / Phys3 / 1 / 1
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)55.4%
Part B score (max 5.0)2.77 / 5.0
Final score6.10 / 10
0.3% 6.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score6.00 / 10
290 NALCHHA โ†— DHAR 4.47 D
36.9% 3.03
CategoryFarm Pond
Started / Completed / Phys165 / 1 / 28
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate17.6%
Part A score (max 5.0)0.88 / 5.0
Ongoing sanction / booked3.76Cr / 1.62Cr
Expenditure rate (ongoing)43.0%
Part B score (max 5.0)2.15 / 5.0
Final score3.03 / 10
โ€”
7.8% 4.43
CategoryDug Well Recharge
Started / Completed / Phys351 / 52 / 92
⚠ Works needing verification (Completed/Physically Completed)59 works (exp <30%)
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked0.39Cr / 0.19Cr
Expenditure rate (ongoing)47.6%
Part B score (max 5.0)2.38 / 5.0
Final score4.43 / 10
1.0% 7.02
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 1
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.02Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.27 / 5.0
Final score7.02 / 10
45.0% 5.47
CategoryWater conservation & recharge
Started / Completed / Phys100 / 14 / 27
Completion rate41.0%
Part A score (max 5.0)2.05 / 5.0
Ongoing sanction / booked3.82Cr / 2.61Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score5.47 / 10
5.6% 4.85
CategoryWatershed Related Works
Started / Completed / Phys26 / 5 / 6
Completion rate42.3%
Part A score (max 5.0)2.12 / 5.0
Ongoing sanction / booked0.40Cr / 0.22Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score4.85 / 10
3.7% 5.55
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys12 / 4 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.23Cr / 0.14Cr
Expenditure rate (ongoing)61.1%
Part B score (max 5.0)3.05 / 5.0
Final score5.55 / 10
291 KANNOD โ†— DEWAS 4.46 D
55.1% 2.68
CategoryFarm Pond
Started / Completed / Phys233 / 46 / 39
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate36.5%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked5.76Cr / 0.98Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score2.68 / 10
2.3% 2.79
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.39Cr / 0.22Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score2.79 / 10
10.3% 5.31
CategoryDug Well Recharge
Started / Completed / Phys676 / 286 / 300
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.18Cr / 0.03Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score5.31 / 10
10.9% 6.83
CategoryIrrigation infrastructure
Started / Completed / Phys34 / 13 / 18
Completion rate91.2%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.16Cr / 0.07Cr
Expenditure rate (ongoing)45.4%
Part B score (max 5.0)2.27 / 5.0
Final score6.83 / 10
19.1% 7.59
CategoryWater conservation & recharge
Started / Completed / Phys68 / 30 / 32
Completion rate91.2%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.61Cr / 0.37Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score7.59 / 10
1.9% 7.78
CategoryWatershed Related Works
Started / Completed / Phys16 / 8 / 6
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score7.78 / 10
0.3% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
292 RAIPUR KARCHULIYAN โ†— REWA 4.45 D
51.6% 3.52
CategoryFarm Pond
Started / Completed / Phys305 / 97 / 44
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate46.2%
Part A score (max 5.0)2.31 / 5.0
Ongoing sanction / booked1.65Cr / 0.40Cr
Expenditure rate (ongoing)24.1%
Part B score (max 5.0)1.20 / 5.0
Final score3.52 / 10
9.5% 0.20
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.67Cr / 0.03Cr
Expenditure rate (ongoing)4.0%
Part B score (max 5.0)0.20 / 5.0
Final score0.20 / 10
3.1% 4.52
CategoryDug Well Recharge
Started / Completed / Phys87 / 49 / 14
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate72.4%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked0.03Cr / 0.00Cr
Expenditure rate (ongoing)17.9%
Part B score (max 5.0)0.90 / 5.0
Final score4.52 / 10
2.5% 6.53
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 6 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)47.2%
Part B score (max 5.0)2.36 / 5.0
Final score6.53 / 10
25.9% 6.67
CategoryWater conservation & recharge
Started / Completed / Phys50 / 23 / 17
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.18Cr / 0.10Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.67 / 10
4.6% 6.41
CategoryWatershed Related Works
Started / Completed / Phys6 / 2 / 3
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)45.0%
Part B score (max 5.0)2.25 / 5.0
Final score6.41 / 10
2.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
293 MOMAN BADODIYA โ†— SHAJAPUR 4.43 D
51.2% 3.01
CategoryFarm Pond
Started / Completed / Phys192 / 59 / 11
Completion rate36.5%
Part A score (max 5.0)1.82 / 5.0
Ongoing sanction / booked3.20Cr / 0.76Cr
Expenditure rate (ongoing)23.7%
Part B score (max 5.0)1.19 / 5.0
Final score3.01 / 10
3.9% 2.97
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score2.97 / 10
11.9% 5.08
CategoryDug Well Recharge
Started / Completed / Phys443 / 50 / 325
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate84.7%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.16Cr / 0.03Cr
Expenditure rate (ongoing)17.0%
Part B score (max 5.0)0.85 / 5.0
Final score5.08 / 10
1.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
28.4% 6.31
CategoryWater conservation & recharge
Started / Completed / Phys68 / 21 / 28
Completion rate72.1%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked0.74Cr / 0.40Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score6.31 / 10
1.7% 5.31
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 0
Completion rate60.0%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.31 / 5.0
Final score5.31 / 10
1.9% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
294 DABRA โ†— GWALIOR 4.42 D
63.8% 4.08
CategoryFarm Pond
Started / Completed / Phys245 / 33 / 141
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked1.92Cr / 0.20Cr
Expenditure rate (ongoing)10.5%
Part B score (max 5.0)0.53 / 5.0
Final score4.08 / 10
8.8% 1.00
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.85Cr / 0.17Cr
Expenditure rate (ongoing)20.0%
Part B score (max 5.0)1.00 / 5.0
Final score1.00 / 10
5.1% 4.68
CategoryDug Well Recharge
Started / Completed / Phys192 / 41 / 133
Completion rate90.6%
Part A score (max 5.0)4.53 / 5.0
Ongoing sanction / booked0.05Cr / 0.00Cr
Expenditure rate (ongoing)3.0%
Part B score (max 5.0)0.15 / 5.0
Final score4.68 / 10
0.7% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.2% 6.35
CategoryWater conservation & recharge
Started / Completed / Phys40 / 3 / 33
Completion rate90.0%
Part A score (max 5.0)4.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.85 / 5.0
Final score6.35 / 10
1.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 0 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.6% 5.28
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 0 / 3
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score5.28 / 10
295 BABAI CHICHLI โ†— NARSINGHPUR 4.41 D
86.3% 3.62
CategoryFarm Pond
Started / Completed / Phys198 / 112 / 3
Completion rate58.1%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked2.33Cr / 0.33Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.71 / 5.0
Final score3.62 / 10
โ€”
1.8% 5.74
CategoryDug Well Recharge
Started / Completed / Phys45 / 26 / 16
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.07 / 5.0
Final score5.74 / 10
โ€”
9.4% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys16 / 10 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
2.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
296 KHATEGAON โ†— DEWAS 4.40 D
59.3% 2.60
CategoryFarm Pond
Started / Completed / Phys289 / 6 / 84
Completion rate31.1%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked8.22Cr / 1.71Cr
Expenditure rate (ongoing)20.9%
Part B score (max 5.0)1.04 / 5.0
Final score2.60 / 10
โ€”
5.4% 3.56
CategoryDug Well Recharge
Started / Completed / Phys428 / 55 / 183
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.49Cr / 0.08Cr
Expenditure rate (ongoing)15.6%
Part B score (max 5.0)0.78 / 5.0
Final score3.56 / 10
2.6% 5.28
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 0 / 5
Completion rate55.6%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked0.17Cr / 0.08Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.51 / 5.0
Final score5.28 / 10
31.4% 7.68
CategoryWater conservation & recharge
Started / Completed / Phys132 / 0 / 100
Completion rate75.8%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked1.52Cr / 1.18Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score7.68 / 10
1.0% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 1 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 4.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)33.6%
Part B score (max 5.0)1.68 / 5.0
Final score4.18 / 10
297 NOWGOAN โ†— CHHATARPUR 4.37 D
79.7% 3.50
CategoryFarm Pond
Started / Completed / Phys267 / 105 / 29
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate50.2%
Part A score (max 5.0)2.51 / 5.0
Ongoing sanction / booked3.43Cr / 0.68Cr
Expenditure rate (ongoing)19.9%
Part B score (max 5.0)0.99 / 5.0
Final score3.50 / 10
โ€”
6.2% 4.49
CategoryDug Well Recharge
Started / Completed / Phys456 / 366 / 8
⚠ Works needing verification (Completed/Physically Completed)75 works (exp <30%)
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)7.7%
Part B score (max 5.0)0.38 / 5.0
Final score4.49 / 10
โ€”
11.5% 9.00
CategoryWater conservation & recharge
Started / Completed / Phys55 / 22 / 30
Completion rate94.5%
Part A score (max 5.0)4.73 / 5.0
Ongoing sanction / booked0.06Cr / 0.05Cr
Expenditure rate (ongoing)94.2%
Part B score (max 5.0)4.71 / 5.0
Final score9.00 / 10
1.8% 10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 3 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.8% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
298 SHUJALPUR โ†— SHAJAPUR 4.34 D
47.6% 3.04
CategoryFarm Pond
Started / Completed / Phys106 / 32 / 0
Completion rate30.2%
Part A score (max 5.0)1.51 / 5.0
Ongoing sanction / booked2.46Cr / 0.75Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score3.04 / 10
2.1% 2.47
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.15Cr / 0.07Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score2.47 / 10
12.4% 4.96
CategoryDug Well Recharge
Started / Completed / Phys364 / 111 / 180
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate79.9%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.14Cr / 0.03Cr
Expenditure rate (ongoing)19.3%
Part B score (max 5.0)0.96 / 5.0
Final score4.96 / 10
1.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
35.6% 5.67
CategoryWater conservation & recharge
Started / Completed / Phys50 / 11 / 21
Completion rate64.0%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.84Cr / 0.42Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score5.67 / 10
0.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.6% 6.39
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score6.39 / 10
299 RANAPUR โ†— JHABUA 4.31 D
24.9% 1.97
CategoryFarm Pond
Started / Completed / Phys146 / 5 / 1
Completion rate4.1%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked5.13Cr / 1.81Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score1.97 / 10
2.1% 2.56
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 1
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.21Cr / 0.00Cr
Expenditure rate (ongoing)1.3%
Part B score (max 5.0)0.06 / 5.0
Final score2.56 / 10
6.1% 4.26
CategoryDug Well Recharge
Started / Completed / Phys524 / 89 / 74
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate31.1%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked0.91Cr / 0.49Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score4.26 / 10
โ€”
64.1% 5.23
CategoryWater conservation & recharge
Started / Completed / Phys145 / 11 / 30
Completion rate28.3%
Part A score (max 5.0)1.41 / 5.0
Ongoing sanction / booked9.02Cr / 6.88Cr
Expenditure rate (ongoing)76.3%
Part B score (max 5.0)3.82 / 5.0
Final score5.23 / 10
2.4% 5.85
CategoryWatershed Related Works
Started / Completed / Phys16 / 2 / 6
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.33Cr / 0.22Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score5.85 / 10
0.2% 4.25
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys7 / 1 / 2
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score4.25 / 10
300 JABALPUR โ†— JABALPUR 4.31 D
45.5% 2.76
CategoryFarm Pond
Started / Completed / Phys177 / 45 / 24
Completion rate39.0%
Part A score (max 5.0)1.95 / 5.0
Ongoing sanction / booked2.76Cr / 0.45Cr
Expenditure rate (ongoing)16.3%
Part B score (max 5.0)0.82 / 5.0
Final score2.76 / 10
11.1% 1.27
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.03Cr / 0.26Cr
Expenditure rate (ongoing)25.4%
Part B score (max 5.0)1.27 / 5.0
Final score1.27 / 10
6.4% 6.39
CategoryDug Well Recharge
Started / Completed / Phys230 / 111 / 76
Completion rate81.3%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.11Cr / 0.05Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.33 / 5.0
Final score6.39 / 10
0.2% 2.26
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)45.3%
Part B score (max 5.0)2.26 / 5.0
Final score2.26 / 10
22.3% 6.05
CategoryWater conservation & recharge
Started / Completed / Phys47 / 13 / 19
Completion rate68.1%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.46Cr / 0.24Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score6.05 / 10
7.3% 6.02
CategoryWatershed Related Works
Started / Completed / Phys13 / 9 / 2
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.06Cr / 0.02Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.79 / 5.0
Final score6.02 / 10
7.1% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 12 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
301 JAITHARI โ†— ANUPPUR 4.26 D
85.9% 3.64
CategoryFarm Pond
Started / Completed / Phys1,067 / 496 / 76
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked12.76Cr / 2.45Cr
Expenditure rate (ongoing)19.2%
Part B score (max 5.0)0.96 / 5.0
Final score3.64 / 10
โ€”
1.1% 6.23
CategoryDug Well Recharge
Started / Completed / Phys173 / 24 / 98
⚠ Works needing verification (Completed/Physically Completed)40 works (exp <30%)
Completion rate70.5%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.71 / 5.0
Final score6.23 / 10
0.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.0% 7.38
CategoryWater conservation & recharge
Started / Completed / Phys69 / 32 / 29
Completion rate88.4%
Part A score (max 5.0)4.42 / 5.0
Ongoing sanction / booked0.77Cr / 0.45Cr
Expenditure rate (ongoing)59.2%
Part B score (max 5.0)2.96 / 5.0
Final score7.38 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys5 / 3 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
3.6% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys18 / 16 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
302 SEONI MALWA โ†— NARMADAPURAM 4.25 D
65.4% 2.87
CategoryFarm Pond
Started / Completed / Phys182 / 65 / 15
⚠ Works needing verification (Completed/Physically Completed)17 works (exp <30%)
Completion rate44.0%
Part A score (max 5.0)2.20 / 5.0
Ongoing sanction / booked2.56Cr / 0.34Cr
Expenditure rate (ongoing)13.5%
Part B score (max 5.0)0.67 / 5.0
Final score2.87 / 10
โ€”
6.9% 6.27
CategoryDug Well Recharge
Started / Completed / Phys199 / 64 / 101
⚠ Works needing verification (Completed/Physically Completed)23 works (exp <30%)
Completion rate82.9%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)42.5%
Part B score (max 5.0)2.13 / 5.0
Final score6.27 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 4 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
23.9% 6.85
CategoryWater conservation & recharge
Started / Completed / Phys58 / 34 / 14
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.63Cr / 0.34Cr
Expenditure rate (ongoing)54.2%
Part B score (max 5.0)2.71 / 5.0
Final score6.85 / 10
1.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys9 / 6 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.7% 5.54
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 3 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)35.7%
Part B score (max 5.0)1.78 / 5.0
Final score5.54 / 10
303 KARELI โ†— NARSINGHPUR 4.24 D
81.6% 3.59
CategoryFarm Pond
Started / Completed / Phys211 / 117 / 13
Completion rate61.6%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked2.16Cr / 0.22Cr
Expenditure rate (ongoing)10.3%
Part B score (max 5.0)0.51 / 5.0
Final score3.59 / 10
โ€”
1.3% 4.85
CategoryDug Well Recharge
Started / Completed / Phys37 / 15 / 13
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate75.7%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)21.2%
Part B score (max 5.0)1.06 / 5.0
Final score4.85 / 10
0.5% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
13.8% 6.62
CategoryWater conservation & recharge
Started / Completed / Phys34 / 25 / 8
Completion rate97.1%
Part A score (max 5.0)4.85 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score6.62 / 10
0.5% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
2.4% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys6 / 4 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
304 RAMPUR NAIKIN โ†— SIDHI 4.23 D
42.7% 2.16
CategoryFarm Pond
Started / Completed / Phys306 / 65 / 9
Completion rate24.2%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked4.41Cr / 0.84Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score2.16 / 10
โ€”
1.4% 2.62
CategoryDug Well Recharge
Started / Completed / Phys73 / 8 / 17
Completion rate34.2%
Part A score (max 5.0)1.71 / 5.0
Ongoing sanction / booked0.12Cr / 0.02Cr
Expenditure rate (ongoing)18.1%
Part B score (max 5.0)0.90 / 5.0
Final score2.62 / 10
3.0% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 3 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
38.2% 5.49
CategoryWater conservation & recharge
Started / Completed / Phys123 / 40 / 23
Completion rate51.2%
Part A score (max 5.0)2.56 / 5.0
Ongoing sanction / booked2.84Cr / 1.66Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.93 / 5.0
Final score5.49 / 10
1.9% 10.00
CategoryWatershed Related Works
Started / Completed / Phys4 / 1 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
12.7% 5.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys27 / 6 / 8
Completion rate51.9%
Part A score (max 5.0)2.59 / 5.0
Ongoing sanction / booked0.72Cr / 0.39Cr
Expenditure rate (ongoing)54.8%
Part B score (max 5.0)2.74 / 5.0
Final score5.33 / 10
305 PIPLODA โ†— RATLAM 4.22 D
60.9% 2.79
CategoryFarm Pond
Started / Completed / Phys97 / 30 / 8
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate39.2%
Part A score (max 5.0)1.96 / 5.0
Ongoing sanction / booked1.48Cr / 0.25Cr
Expenditure rate (ongoing)16.7%
Part B score (max 5.0)0.84 / 5.0
Final score2.79 / 10
โ€”
14.3% 5.82
CategoryDug Well Recharge
Started / Completed / Phys197 / 44 / 102
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate74.1%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.10Cr / 0.04Cr
Expenditure rate (ongoing)42.2%
Part B score (max 5.0)2.11 / 5.0
Final score5.82 / 10
0.8% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 0 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
22.8% 6.51
CategoryWater conservation & recharge
Started / Completed / Phys21 / 11 / 4
Completion rate71.4%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)58.8%
Part B score (max 5.0)2.94 / 5.0
Final score6.51 / 10
1.2% 10.00
CategoryWatershed Related Works
Started / Completed / Phys2 / 2 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
โ€”
306 MALHARGARH โ†— MANDSAUR 4.20 D
38.4% 2.17
CategoryFarm Pond
Started / Completed / Phys238 / 29 / 23
Completion rate21.8%
Part A score (max 5.0)1.09 / 5.0
Ongoing sanction / booked3.99Cr / 0.86Cr
Expenditure rate (ongoing)21.5%
Part B score (max 5.0)1.08 / 5.0
Final score2.17 / 10
โ€”
16.4% 5.10
CategoryDug Well Recharge
Started / Completed / Phys811 / 140 / 293
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate53.4%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.95Cr / 0.46Cr
Expenditure rate (ongoing)48.5%
Part B score (max 5.0)2.43 / 5.0
Final score5.10 / 10
โ€”
42.8% 5.44
CategoryWater conservation & recharge
Started / Completed / Phys145 / 50 / 31
Completion rate55.9%
Part A score (max 5.0)2.79 / 5.0
Ongoing sanction / booked2.39Cr / 1.26Cr
Expenditure rate (ongoing)52.9%
Part B score (max 5.0)2.65 / 5.0
Final score5.44 / 10
1.4% 10.00
CategoryWatershed Related Works
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.9% 7.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.09Cr / 0.09Cr
Expenditure rate (ongoing)93.8%
Part B score (max 5.0)4.69 / 5.0
Final score7.19 / 10
307 MANDSAUR โ†— MANDSAUR 4.15 D
26.6% 1.54
CategoryFarm Pond
Started / Completed / Phys230 / 26 / 0
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate11.3%
Part A score (max 5.0)0.57 / 5.0
Ongoing sanction / booked2.55Cr / 0.49Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score1.54 / 10
โ€”
24.0% 4.55
CategoryDug Well Recharge
Started / Completed / Phys991 / 199 / 382
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate58.6%
Part A score (max 5.0)2.93 / 5.0
Ongoing sanction / booked0.91Cr / 0.30Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score4.55 / 10
โ€”
47.8% 5.36
CategoryWater conservation & recharge
Started / Completed / Phys150 / 47 / 30
Completion rate51.3%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked2.91Cr / 1.63Cr
Expenditure rate (ongoing)55.8%
Part B score (max 5.0)2.79 / 5.0
Final score5.36 / 10
0.3% 10.00
CategoryWatershed Related Works
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.3% 4.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys4 / 2 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.15 / 5.0
Final score4.65 / 10
308 CHAWARPATHA โ†— NARSINGHPUR 4.07 D
78.1% 3.63
CategoryFarm Pond
Started / Completed / Phys237 / 138 / 0
Completion rate58.2%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked2.21Cr / 0.32Cr
Expenditure rate (ongoing)14.3%
Part B score (max 5.0)0.71 / 5.0
Final score3.63 / 10
4.9% 0.02
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.35Cr / 0.00Cr
Expenditure rate (ongoing)0.4%
Part B score (max 5.0)0.02 / 5.0
Final score0.02 / 10
1.9% 4.40
CategoryDug Well Recharge
Started / Completed / Phys53 / 2 / 37
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.04Cr / 0.01Cr
Expenditure rate (ongoing)14.5%
Part B score (max 5.0)0.72 / 5.0
Final score4.40 / 10
0.4% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
11.1% 7.43
CategoryWater conservation & recharge
Started / Completed / Phys24 / 21 / 2
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.03Cr / 0.02Cr
Expenditure rate (ongoing)52.7%
Part B score (max 5.0)2.64 / 5.0
Final score7.43 / 10
1.5% 5.50
CategoryWatershed Related Works
Started / Completed / Phys5 / 4 / 0
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score5.50 / 10
2.0% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
309 JHABUA โ†— JHABUA 4.04 D
20.2% 3.06
CategoryFarm Pond
Started / Completed / Phys211 / 6 / 7
Completion rate6.2%
Part A score (max 5.0)0.31 / 5.0
Ongoing sanction / booked5.27Cr / 2.91Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.76 / 5.0
Final score3.06 / 10
0.9% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.24Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
6.7% 5.45
CategoryDug Well Recharge
Started / Completed / Phys731 / 251 / 93
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked0.99Cr / 0.61Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.10 / 5.0
Final score5.45 / 10
โ€”
71.9% 4.24
CategoryWater conservation & recharge
Started / Completed / Phys308 / 23 / 35
Completion rate18.8%
Part A score (max 5.0)0.94 / 5.0
Ongoing sanction / booked15.64Cr / 10.31Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.30 / 5.0
Final score4.24 / 10
โ€”
0.4% 3.64
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)39.5%
Part B score (max 5.0)1.98 / 5.0
Final score3.64 / 10
310 RATLAM โ†— RATLAM 3.92 D
64.8% 2.63
CategoryFarm Pond
Started / Completed / Phys373 / 52 / 59
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate29.8%
Part A score (max 5.0)1.49 / 5.0
Ongoing sanction / booked9.93Cr / 2.26Cr
Expenditure rate (ongoing)22.8%
Part B score (max 5.0)1.14 / 5.0
Final score2.63 / 10
โ€”
3.8% 5.15
CategoryDug Well Recharge
Started / Completed / Phys310 / 44 / 215
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate83.5%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.11Cr / 0.02Cr
Expenditure rate (ongoing)19.4%
Part B score (max 5.0)0.97 / 5.0
Final score5.15 / 10
0.2% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
29.7% 6.34
CategoryWater conservation & recharge
Started / Completed / Phys102 / 32 / 41
Completion rate71.6%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked1.54Cr / 0.85Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score6.34 / 10
โ€”
1.6% 7.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys5 / 1 / 3
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score7.66 / 10
311 REWA โ†— REWA 3.89 D
78.9% 3.39
CategoryFarm Pond
Started / Completed / Phys225 / 95 / 25
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked1.39Cr / 0.20Cr
Expenditure rate (ongoing)14.4%
Part B score (max 5.0)0.72 / 5.0
Final score3.39 / 10
8.9% 0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.38Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
0.2% 10.00
CategoryDug Well Recharge
Started / Completed / Phys14 / 14 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
9.5% 10.00
CategoryWater conservation & recharge
Started / Completed / Phys21 / 21 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
0.6% 10.00
CategoryWatershed Related Works
Started / Completed / Phys7 / 7 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
1.5% 10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
312 NASRULLAGANJ โ†— SEHORE 3.88 D
58.1% 2.19
CategoryFarm Pond
Started / Completed / Phys178 / 2 / 46
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate27.0%
Part A score (max 5.0)1.35 / 5.0
Ongoing sanction / booked3.38Cr / 0.57Cr
Expenditure rate (ongoing)16.9%
Part B score (max 5.0)0.84 / 5.0
Final score2.19 / 10
โ€”
15.5% 5.56
CategoryDug Well Recharge
Started / Completed / Phys488 / 41 / 349
Completion rate79.9%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.08Cr
Expenditure rate (ongoing)31.2%
Part B score (max 5.0)1.56 / 5.0
Final score5.56 / 10
1.1% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
18.2% 6.64
CategoryWater conservation & recharge
Started / Completed / Phys45 / 11 / 24
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.26Cr / 0.14Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score6.64 / 10
1.5% 5.69
CategoryWatershed Related Works
Started / Completed / Phys2 / 1 / 0
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.04Cr / 0.03Cr
Expenditure rate (ongoing)63.9%
Part B score (max 5.0)3.19 / 5.0
Final score5.69 / 10
5.6% 6.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys9 / 3 / 5
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.08Cr / 0.03Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score6.09 / 10
313 SOHAGPUR โ†— SHAHDOL 3.86 D
47.8% 2.29
CategoryFarm Pond
Started / Completed / Phys493 / 98 / 15
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate22.9%
Part A score (max 5.0)1.15 / 5.0
Ongoing sanction / booked8.83Cr / 2.02Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.15 / 5.0
Final score2.29 / 10
1.1% 2.78
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.14Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score2.78 / 10
1.1% 4.73
CategoryDug Well Recharge
Started / Completed / Phys97 / 18 / 41
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate60.8%
Part A score (max 5.0)3.04 / 5.0
Ongoing sanction / booked0.09Cr / 0.03Cr
Expenditure rate (ongoing)33.8%
Part B score (max 5.0)1.69 / 5.0
Final score4.73 / 10
1.3% 10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ€” all finished โœ“
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
41.8% 5.24
CategoryWater conservation & recharge
Started / Completed / Phys87 / 5 / 25
Completion rate34.5%
Part A score (max 5.0)1.72 / 5.0
Ongoing sanction / booked7.43Cr / 5.23Cr
Expenditure rate (ongoing)70.4%
Part B score (max 5.0)3.52 / 5.0
Final score5.24 / 10
0.9% 5.21
CategoryWatershed Related Works
Started / Completed / Phys6 / 1 / 3
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)37.5%
Part B score (max 5.0)1.88 / 5.0
Final score5.21 / 10
6.0% 5.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 3 / 9
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.73Cr / 0.44Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score5.14 / 10
Scheme: โ‚น Sanction Weighted Level: Block Snapshot: 2026-05-07 Units shown: 313 โšก Weight % shown is each unit's own auto-computed weight โ€” not the global admin-set value.
49
Day of campaign
103
Total days
54
Days remaining
Flat
Grading scheme
Campaign: 2026-03-19 โ†’ 2026-06-30  ยท  Grades based on raw combined achievement % โ€” no benchmark division.
Grade thresholds (raw combined %):
A โ€” On Track โ‰ฅ 80% B โ€” Progressing โ‰ฅ 70% C โ€” Lagging โ‰ฅ 60% D โ€” Critical โ‰ฅ 0% N/A No target
Grade distribution โ€” 313 blocks on this snapshot:
3
A โ€” On Track
25
B โ€” Progressing
94
C โ€” Lagging
191
D โ€” Critical
๐Ÿ’ก Flat scheme: Score % = (total score / 10) ร— 100. Grade assigned by comparing this % directly against fixed thresholds โ€” e.g., A+ โ‰ฅ 85%, A โ‰ฅ 80%.

โš–๏ธ Step 1 โ€” Category Weightage

Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.

Weightage = Sanctioned Cost of Category รท Total Sanctioned Cost (all categories) e.g. Farm Pond = โ‚น200 Cr out of โ‚น500 Cr total Weightage = 200 รท 500 = 0.40 (40%)

Computed independently per unit โ€” two districts with different sanction distributions will have different weightages for the same category.

๐Ÿ…ฐ Step 2a โ€” Part A Score (Completion)

Fixed 50% weight on completion of works.

Part A = (Completed + Phys) รท Started ร— 5

๐Ÿ…ฑ Step 2b โ€” Part B Score (Expenditure)

Fixed 50% weight on expenditure booking on ongoing works.

Part B = (Ongoing Booked รท Ongoing Sanction) ร— 5 If all done โ†’ full 5 marks automatically

๐Ÿ… Step 3 โ€” Ceiling & Model

Category Score = Part A + Part B

๐Ÿ“Š Step 4 โ€” Final Composite Score

Weighted sum of all category scores (weightages sum to 100%).

Final Score = ฮฃ (Weightage_i ร— Score_i)

Example: Farm Pond 40% ร— 7.2 + Dug Well 20% ร— 6.5 + Amrit Sarovar 40% ร— 8.1 โ†’ 7.42

๐Ÿ’ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.
Score Breakup
Sanction cost in โ‚น Crore  ยท  Marks on a scale of 0โ€“10
Sr. Category Sanction Cost
(โ‚น Crore)
Weightage
for Category
Marks Obtained (scale 0โ€“10) Marks as per
Weightage
For Completion
of Works
For Expenditure
Booking on
Running Works