JGSA 2026 โ District-Level Category Scorecard
Snapshot: 2026-05-07 ยท Scheme: โน Sanction Weighted
KHARGONE
7.17
๐ฅ
Completed1743
Started7188
Rank#1
KHANDWA
7.11
๐ฅ
Completed2930
Started9140
Rank#2
RAJGARH
6.78
๐ฅ
Completed4317
Started7564
Rank#3
๐ Category Scorecard โ District Level
52 units ยท Each cell shows: weight % (for that unit) + marks obtained / max marks
| # | District | Total | Farm Pond | Amrit Sarowar | Dug Well Recharge | Irrigation infrastructure | Water conservation & recharge | Watershed Related Works | Repair & Maintenance (Water Structures) | PMKSY: Watershed | JSJB 2.0 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| ๐ฅ | KHARGONE โ | 7.17 |
22.3%
5.89
CategoryFarm Pond
Started / Completed / Phys1,850 / 473 / 909
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate74.7%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked8.48Cr / 3.66Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.16 / 5.0
Final score5.89 / 10
|
4.7%
7.35
CategoryAmrit Sarowar
Started / Completed / Phys28 / 2 / 20
Completion rate78.6%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked1.56Cr / 1.06Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score7.35 / 10
|
6.5%
7.37
CategoryDug Well Recharge
Started / Completed / Phys3,865 / 990 / 2,605
⚠ Works needing verification (Completed/Physically Completed)62 works (exp <30%)
Completion rate93.0%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.53Cr / 0.29Cr
Expenditure rate (ongoing)54.5%
Part B score (max 5.0)2.72 / 5.0
Final score7.37 / 10
|
0.5%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 8 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
55.1%
7.33
CategoryWater conservation & recharge
Started / Completed / Phys1,307 / 231 / 722
Completion rate72.9%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked24.23Cr / 17.88Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score7.33 / 10
|
3.2%
6.84
CategoryWatershed Related Works
Started / Completed / Phys78 / 16 / 41
Completion rate73.1%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked1.47Cr / 0.94Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score6.84 / 10
|
2.1%
9.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 23 / 23
Completion rate95.8%
Part A score (max 5.0)4.79 / 5.0
Ongoing sanction / booked0.22Cr / 0.19Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score9.00 / 10
|
0.5%
5.48
CategoryPMKSY: Watershed
PMKSY Works0 total (30 done / -30 ongoing)
JGSA Target0.83 Cr
JGSA Valuation0.29 Cr
Expenditure0.44 Cr
% Valuation34.3%
Valuation Marks (40%)1.37
Exp Marks (40%)2.11
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score5.48 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works10,360
Target Works7,188
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| ๐ฅ | KHANDWA โ | 7.11 |
36.8%
5.75
CategoryFarm Pond
Started / Completed / Phys1,996 / 536 / 895
⚠ Works needing verification (Completed/Physically Completed)529 works (exp <30%)
Completion rate71.7%
Part A score (max 5.0)3.58 / 5.0
Ongoing sanction / booked0.95Cr / 0.41Cr
Expenditure rate (ongoing)43.4%
Part B score (max 5.0)2.17 / 5.0
Final score5.75 / 10
|
4.8%
6.59
CategoryAmrit Sarowar
Started / Completed / Phys25 / 3 / 10
Completion rate52.0%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked2.83Cr / 2.26Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score6.59 / 10
|
13.3%
8.72
CategoryDug Well Recharge
Started / Completed / Phys6,136 / 2,171 / 3,875
⚠ Works needing verification (Completed/Physically Completed)86 works (exp <30%)
Completion rate98.5%
Part A score (max 5.0)4.93 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score8.72 / 10
|
1.8%
7.27
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 12 / 16
Completion rate84.8%
Part A score (max 5.0)4.24 / 5.0
Ongoing sanction / booked0.43Cr / 0.26Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score7.27 / 10
|
25.6%
7.72
CategoryWater conservation & recharge
Started / Completed / Phys711 / 159 / 454
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked6.94Cr / 4.73Cr
Expenditure rate (ongoing)68.1%
Part B score (max 5.0)3.40 / 5.0
Final score7.72 / 10
|
8.9%
7.30
CategoryWatershed Related Works
Started / Completed / Phys173 / 36 / 95
Completion rate75.7%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked2.82Cr / 1.98Cr
Expenditure rate (ongoing)70.2%
Part B score (max 5.0)3.51 / 5.0
Final score7.30 / 10
|
3.5%
7.22
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 13 / 44
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.64Cr / 0.37Cr
Expenditure rate (ongoing)58.1%
Part B score (max 5.0)2.90 / 5.0
Final score7.22 / 10
|
0.4%
4.90
CategoryPMKSY: Watershed
PMKSY Works0 total (79 done / -79 ongoing)
JGSA Target0.50 Cr
JGSA Valuation0.22 Cr
Expenditure0.15 Cr
% Valuation43.3%
Valuation Marks (40%)1.73
Exp Marks (40%)1.17
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score4.90 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works100,853
Target Works9,140
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| ๐ฅ | RAJGARH โ | 6.78 |
22.4%
5.57
CategoryFarm Pond
Started / Completed / Phys2,284 / 1,380 / 425
⚠ Works needing verification (Completed/Physically Completed)44 works (exp <30%)
Completion rate79.0%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked9.99Cr / 3.23Cr
Expenditure rate (ongoing)32.3%
Part B score (max 5.0)1.61 / 5.0
Final score5.57 / 10
|
0.5%
7.79
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.39Cr / 0.35Cr
Expenditure rate (ongoing)89.0%
Part B score (max 5.0)4.45 / 5.0
Final score7.79 / 10
|
4.2%
7.53
CategoryDug Well Recharge
Started / Completed / Phys3,699 / 2,738 / 812
⚠ Works needing verification (Completed/Physically Completed)60 works (exp <30%)
Completion rate96.0%
Part A score (max 5.0)4.80 / 5.0
Ongoing sanction / booked0.23Cr / 0.12Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.74 / 5.0
Final score7.53 / 10
|
1.2%
5.48
CategoryIrrigation infrastructure
Started / Completed / Phys49 / 5 / 14
Completion rate38.8%
Part A score (max 5.0)1.94 / 5.0
Ongoing sanction / booked1.84Cr / 1.30Cr
Expenditure rate (ongoing)70.7%
Part B score (max 5.0)3.54 / 5.0
Final score5.48 / 10
|
53.6%
7.12
CategoryWater conservation & recharge
Started / Completed / Phys1,193 / 161 / 605
Completion rate64.2%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked51.24Cr / 40.06Cr
Expenditure rate (ongoing)78.2%
Part B score (max 5.0)3.91 / 5.0
Final score7.12 / 10
|
1.3%
6.90
CategoryWatershed Related Works
Started / Completed / Phys67 / 16 / 27
Completion rate64.2%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked1.21Cr / 0.89Cr
Expenditure rate (ongoing)73.8%
Part B score (max 5.0)3.69 / 5.0
Final score6.90 / 10
|
9.8%
6.66
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys269 / 17 / 147
Completion rate61.0%
Part A score (max 5.0)3.05 / 5.0
Ongoing sanction / booked9.04Cr / 6.53Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score6.66 / 10
|
2.0%
2.73
CategoryPMKSY: Watershed
PMKSY Works0 total (16 done / -16 ongoing)
JGSA Target4.36 Cr
JGSA Valuation1.41 Cr
Expenditure0.10 Cr
% Valuation32.4%
Valuation Marks (40%)1.30
Exp Marks (40%)0.09
Geotag Marks (10%)0.980
Physical Marks (10%)0.37
Final score2.73 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works59,686
Target Works7,564
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 4 | DINDORI โ | 6.74 |
34.9%
6.27
CategoryFarm Pond
Started / Completed / Phys2,317 / 829 / 1,186
⚠ Works needing verification (Completed/Physically Completed)26 works (exp <30%)
Completion rate87.0%
Part A score (max 5.0)4.35 / 5.0
Ongoing sanction / booked8.77Cr / 3.37Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score6.27 / 10
|
0.6%
3.53
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 2
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.75Cr / 0.15Cr
Expenditure rate (ongoing)20.6%
Part B score (max 5.0)1.03 / 5.0
Final score3.53 / 10
|
2.0%
5.76
CategoryDug Well Recharge
Started / Completed / Phys1,449 / 634 / 719
⚠ Works needing verification (Completed/Physically Completed)88 works (exp <30%)
Completion rate93.4%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.02Cr / 0.00Cr
Expenditure rate (ongoing)21.9%
Part B score (max 5.0)1.09 / 5.0
Final score5.76 / 10
|
0.6%
7.37
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 1 / 6
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.34Cr / 0.24Cr
Expenditure rate (ongoing)69.6%
Part B score (max 5.0)3.48 / 5.0
Final score7.37 / 10
|
29.1%
7.38
CategoryWater conservation & recharge
Started / Completed / Phys640 / 97 / 359
Completion rate71.3%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked26.23Cr / 20.05Cr
Expenditure rate (ongoing)76.4%
Part B score (max 5.0)3.82 / 5.0
Final score7.38 / 10
|
16.4%
7.70
CategoryWatershed Related Works
Started / Completed / Phys324 / 123 / 154
Completion rate85.5%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked5.59Cr / 3.83Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.43 / 5.0
Final score7.70 / 10
|
6.0%
4.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys85 / 23 / 31
Completion rate63.5%
Part A score (max 5.0)3.18 / 5.0
Ongoing sanction / booked6.97Cr / 2.46Cr
Expenditure rate (ongoing)35.3%
Part B score (max 5.0)1.77 / 5.0
Final score4.94 / 10
|
5.3%
2.99
CategoryPMKSY: Watershed
PMKSY Works0 total (44 done / -44 ongoing)
JGSA Target10.28 Cr
JGSA Valuation2.56 Cr
Expenditure2.12 Cr
% Valuation24.9%
Valuation Marks (40%)1.00
Exp Marks (40%)0.83
Geotag Marks (10%)0.930
Physical Marks (10%)0.24
Final score2.99 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works189,925
Target Works4,828
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 5 | BARWANI โ | 6.63 |
27.1%
6.05
CategoryFarm Pond
Started / Completed / Phys1,180 / 50 / 732
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate66.3%
Part A score (max 5.0)3.31 / 5.0
Ongoing sanction / booked6.21Cr / 3.39Cr
Expenditure rate (ongoing)54.7%
Part B score (max 5.0)2.73 / 5.0
Final score6.05 / 10
|
0.9%
3.65
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 1
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked0.37Cr / 0.15Cr
Expenditure rate (ongoing)39.7%
Part B score (max 5.0)1.99 / 5.0
Final score3.65 / 10
|
12.4%
7.22
CategoryDug Well Recharge
Started / Completed / Phys3,097 / 58 / 2,821
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate93.0%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.54Cr / 0.28Cr
Expenditure rate (ongoing)51.4%
Part B score (max 5.0)2.57 / 5.0
Final score7.22 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 4 / 6
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
34.3%
6.63
CategoryWater conservation & recharge
Started / Completed / Phys545 / 55 / 317
Completion rate68.3%
Part A score (max 5.0)3.41 / 5.0
Ongoing sanction / booked6.07Cr / 3.91Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score6.63 / 10
|
10.6%
6.98
CategoryWatershed Related Works
Started / Completed / Phys148 / 24 / 98
Completion rate82.4%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked1.45Cr / 0.83Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score6.98 / 10
|
1.3%
7.74
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys33 / 6 / 21
Completion rate81.8%
Part A score (max 5.0)4.09 / 5.0
Ongoing sanction / booked0.28Cr / 0.21Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.64 / 5.0
Final score7.74 / 10
|
8.2%
5.18
CategoryPMKSY: Watershed
PMKSY Works0 total (51 done / -51 ongoing)
JGSA Target5.32 Cr
JGSA Valuation3.18 Cr
Expenditure1.17 Cr
% Valuation59.8%
Valuation Marks (40%)2.39
Exp Marks (40%)0.88
Geotag Marks (10%)1.000
Physical Marks (10%)0.91
Final score5.18 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works18,964
Target Works5,016
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 6 | BALAGHAT โ | 6.57 |
56.4%
5.84
CategoryFarm Pond
Started / Completed / Phys4,980 / 1,811 / 1,674
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked35.97Cr / 16.85Cr
Expenditure rate (ongoing)46.8%
Part B score (max 5.0)2.34 / 5.0
Final score5.84 / 10
|
2.3%
2.06
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 1
Completion rate4.2%
Part A score (max 5.0)0.21 / 5.0
Ongoing sanction / booked5.58Cr / 2.07Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.85 / 5.0
Final score2.06 / 10
|
1.5%
7.25
CategoryDug Well Recharge
Started / Completed / Phys1,417 / 685 / 572
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate88.7%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.40Cr / 0.23Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score7.25 / 10
|
0.3%
8.00
CategoryIrrigation infrastructure
Started / Completed / Phys17 / 3 / 10
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.12Cr / 0.10Cr
Expenditure rate (ongoing)83.5%
Part B score (max 5.0)4.18 / 5.0
Final score8.00 / 10
|
32.2%
7.54
CategoryWater conservation & recharge
Started / Completed / Phys1,736 / 286 / 1,017
Completion rate75.1%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked27.16Cr / 20.55Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score7.54 / 10
|
1.3%
7.43
CategoryWatershed Related Works
Started / Completed / Phys68 / 26 / 27
Completion rate77.9%
Part A score (max 5.0)3.90 / 5.0
Ongoing sanction / booked0.80Cr / 0.57Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.43 / 10
|
1.0%
7.72
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 16 / 16
Completion rate80.0%
Part A score (max 5.0)4.00 / 5.0
Ongoing sanction / booked0.42Cr / 0.31Cr
Expenditure rate (ongoing)74.3%
Part B score (max 5.0)3.72 / 5.0
Final score7.72 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works12,146
Target Works8,282
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 7 | CHHINDWARA โ | 6.56 |
26.7%
6.43
CategoryFarm Pond
Started / Completed / Phys2,463 / 836 / 947
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate72.4%
Part A score (max 5.0)3.62 / 5.0
Ongoing sanction / booked17.94Cr / 10.09Cr
Expenditure rate (ongoing)56.3%
Part B score (max 5.0)2.81 / 5.0
Final score6.43 / 10
|
3.3%
0.94
CategoryAmrit Sarowar
Started / Completed / Phys19 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked7.27Cr / 1.37Cr
Expenditure rate (ongoing)18.9%
Part B score (max 5.0)0.94 / 5.0
Final score0.94 / 10
|
4.8%
6.88
CategoryDug Well Recharge
Started / Completed / Phys4,163 / 1,138 / 2,765
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked0.52Cr / 0.23Cr
Expenditure rate (ongoing)43.8%
Part B score (max 5.0)2.19 / 5.0
Final score6.88 / 10
|
1.0%
7.71
CategoryIrrigation infrastructure
Started / Completed / Phys23 / 8 / 13
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score7.71 / 10
|
43.0%
6.79
CategoryWater conservation & recharge
Started / Completed / Phys1,242 / 216 / 494
Completion rate57.2%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked54.97Cr / 43.27Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score6.79 / 10
|
9.9%
6.52
CategoryWatershed Related Works
Started / Completed / Phys314 / 75 / 107
Completion rate58.0%
Part A score (max 5.0)2.90 / 5.0
Ongoing sanction / booked9.66Cr / 6.99Cr
Expenditure rate (ongoing)72.4%
Part B score (max 5.0)3.62 / 5.0
Final score6.52 / 10
|
2.2%
7.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys61 / 15 / 26
Completion rate67.2%
Part A score (max 5.0)3.36 / 5.0
Ongoing sanction / booked2.11Cr / 1.60Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score7.14 / 10
|
4.0%
4.29
CategoryPMKSY: Watershed
PMKSY Works0 total (167 done / -167 ongoing)
JGSA Target9.01 Cr
JGSA Valuation3.62 Cr
Expenditure2.42 Cr
% Valuation40.2%
Valuation Marks (40%)1.61
Exp Marks (40%)1.07
Geotag Marks (10%)0.930
Physical Marks (10%)0.67
Final score4.29 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works12,329
Target Works8,285
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 8 | MORENA โ | 6.45 |
13.7%
5.65
CategoryFarm Pond
Started / Completed / Phys2,268 / 1,273 / 259
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate67.5%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked23.77Cr / 10.82Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.28 / 5.0
Final score5.65 / 10
|
0.3%
1.86
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.44Cr / 0.54Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score1.86 / 10
|
0.4%
4.68
CategoryDug Well Recharge
Started / Completed / Phys701 / 371 / 81
⚠ Works needing verification (Completed/Physically Completed)36 works (exp <30%)
Completion rate64.5%
Part A score (max 5.0)3.22 / 5.0
Ongoing sanction / booked0.55Cr / 0.16Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.45 / 5.0
Final score4.68 / 10
|
1.3%
6.30
CategoryIrrigation infrastructure
Started / Completed / Phys55 / 2 / 26
Completion rate50.9%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked3.33Cr / 2.50Cr
Expenditure rate (ongoing)75.0%
Part B score (max 5.0)3.75 / 5.0
Final score6.30 / 10
|
72.0%
6.40
CategoryWater conservation & recharge
Started / Completed / Phys2,436 / 41 / 1,224
Completion rate51.9%
Part A score (max 5.0)2.60 / 5.0
Ongoing sanction / booked164.43Cr / 124.97Cr
Expenditure rate (ongoing)76.0%
Part B score (max 5.0)3.80 / 5.0
Final score6.40 / 10
|
4.8%
6.71
CategoryWatershed Related Works
Started / Completed / Phys180 / 7 / 98
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked9.13Cr / 6.92Cr
Expenditure rate (ongoing)75.9%
Part B score (max 5.0)3.79 / 5.0
Final score6.71 / 10
|
2.0%
6.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys72 / 1 / 36
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked4.74Cr / 3.51Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score6.27 / 10
|
0.6%
4.07
CategoryPMKSY: Watershed
PMKSY Works0 total (6 done / -6 ongoing)
JGSA Target2.64 Cr
JGSA Valuation1.02 Cr
Expenditure0.49 Cr
% Valuation38.5%
Valuation Marks (40%)1.54
Exp Marks (40%)0.74
Geotag Marks (10%)0.950
Physical Marks (10%)0.84
Final score4.07 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,759
Target Works5,718
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 9 | RAISEN โ | 6.44 |
57.7%
6.47
CategoryFarm Pond
Started / Completed / Phys2,359 / 931 / 953
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate79.9%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked9.49Cr / 4.70Cr
Expenditure rate (ongoing)49.5%
Part B score (max 5.0)2.47 / 5.0
Final score6.47 / 10
|
2.3%
3.60
CategoryAmrit Sarowar
Started / Completed / Phys11 / 0 / 2
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked1.44Cr / 0.77Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score3.60 / 10
|
5.3%
7.98
CategoryDug Well Recharge
Started / Completed / Phys1,663 / 1,090 / 509
⚠ Works needing verification (Completed/Physically Completed)6 works (exp <30%)
Completion rate96.2%
Part A score (max 5.0)4.81 / 5.0
Ongoing sanction / booked0.15Cr / 0.09Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score7.98 / 10
|
1.0%
5.70
CategoryIrrigation infrastructure
Started / Completed / Phys10 / 4 / 0
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked0.51Cr / 0.38Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score5.70 / 10
|
25.5%
5.73
CategoryWater conservation & recharge
Started / Completed / Phys249 / 46 / 57
Completion rate41.4%
Part A score (max 5.0)2.07 / 5.0
Ongoing sanction / booked15.09Cr / 11.06Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score5.73 / 10
|
2.1%
5.80
CategoryWatershed Related Works
Started / Completed / Phys7 / 2 / 0
Completion rate28.6%
Part A score (max 5.0)1.43 / 5.0
Ongoing sanction / booked1.62Cr / 1.42Cr
Expenditure rate (ongoing)87.5%
Part B score (max 5.0)4.38 / 5.0
Final score5.80 / 10
|
1.1%
5.85
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys15 / 1 / 7
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked0.37Cr / 0.23Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.19 / 5.0
Final score5.85 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works21,370
Target Works4,314
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 10 | UJJAIN โ | 6.42 |
36.6%
6.28
CategoryFarm Pond
Started / Completed / Phys632 / 185 / 415
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate94.9%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.50Cr / 0.15Cr
Expenditure rate (ongoing)30.6%
Part B score (max 5.0)1.53 / 5.0
Final score6.28 / 10
|
15.7%
3.24
CategoryAmrit Sarowar
Started / Completed / Phys23 / 0 / 3
Completion rate13.0%
Part A score (max 5.0)0.65 / 5.0
Ongoing sanction / booked5.07Cr / 2.62Cr
Expenditure rate (ongoing)51.7%
Part B score (max 5.0)2.59 / 5.0
Final score3.24 / 10
|
19.7%
6.72
CategoryDug Well Recharge
Started / Completed / Phys2,819 / 1,331 / 1,459
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate99.0%
Part A score (max 5.0)4.95 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)35.4%
Part B score (max 5.0)1.77 / 5.0
Final score6.72 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 1 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
17.3%
7.67
CategoryWater conservation & recharge
Started / Completed / Phys180 / 70 / 98
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.46Cr / 0.28Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.67 / 10
|
4.3%
7.40
CategoryWatershed Related Works
Started / Completed / Phys57 / 44 / 9
Completion rate93.0%
Part A score (max 5.0)4.65 / 5.0
Ongoing sanction / booked0.15Cr / 0.08Cr
Expenditure rate (ongoing)55.1%
Part B score (max 5.0)2.75 / 5.0
Final score7.40 / 10
|
1.2%
10.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys11 / 4 / 7
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works7,092
Target Works3,725
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 11 | SHEOPUR โ | 6.35 |
17.2%
4.89
CategoryFarm Pond
Started / Completed / Phys705 / 340 / 155
⚠ Works needing verification (Completed/Physically Completed)20 works (exp <30%)
Completion rate70.2%
Part A score (max 5.0)3.51 / 5.0
Ongoing sanction / booked6.53Cr / 1.79Cr
Expenditure rate (ongoing)27.5%
Part B score (max 5.0)1.38 / 5.0
Final score4.89 / 10
|
2.6%
0.50
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.93Cr / 0.29Cr
Expenditure rate (ongoing)10.1%
Part B score (max 5.0)0.50 / 5.0
Final score0.50 / 10
|
0.2%
5.67
CategoryDug Well Recharge
Started / Completed / Phys110 / 70 / 11
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate73.6%
Part A score (max 5.0)3.68 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)39.8%
Part B score (max 5.0)1.99 / 5.0
Final score5.67 / 10
|
1.9%
8.81
CategoryIrrigation infrastructure
Started / Completed / Phys22 / 5 / 15
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.30Cr / 0.25Cr
Expenditure rate (ongoing)85.2%
Part B score (max 5.0)4.26 / 5.0
Final score8.81 / 10
|
60.0%
6.72
CategoryWater conservation & recharge
Started / Completed / Phys590 / 24 / 328
Completion rate59.7%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked28.49Cr / 21.29Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.74 / 5.0
Final score6.72 / 10
|
6.1%
6.66
CategoryWatershed Related Works
Started / Completed / Phys71 / 8 / 38
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked2.29Cr / 1.56Cr
Expenditure rate (ongoing)68.4%
Part B score (max 5.0)3.42 / 5.0
Final score6.66 / 10
|
3.1%
6.83
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 1 / 25
Completion rate74.3%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.69Cr / 0.43Cr
Expenditure rate (ongoing)62.3%
Part B score (max 5.0)3.12 / 5.0
Final score6.83 / 10
|
3.8%
4.15
CategoryPMKSY: Watershed
PMKSY Works0 total (98 done / -98 ongoing)
JGSA Target4.32 Cr
JGSA Valuation1.85 Cr
Expenditure0.77 Cr
% Valuation42.8%
Valuation Marks (40%)1.71
Exp Marks (40%)0.71
Geotag Marks (10%)0.720
Physical Marks (10%)1.00
Final score4.15 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,038
Target Works1,545
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 12 | BURHANPUR โ | 6.28 |
35.7%
5.86
CategoryFarm Pond
Started / Completed / Phys697 / 217 / 267
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate69.4%
Part A score (max 5.0)3.47 / 5.0
Ongoing sanction / booked4.32Cr / 2.06Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.39 / 5.0
Final score5.86 / 10
|
5.8%
4.78
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 2
Completion rate33.3%
Part A score (max 5.0)1.67 / 5.0
Ongoing sanction / booked1.37Cr / 0.85Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score4.78 / 10
|
8.4%
7.30
CategoryDug Well Recharge
Started / Completed / Phys1,186 / 453 / 546
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate84.2%
Part A score (max 5.0)4.21 / 5.0
Ongoing sanction / booked0.45Cr / 0.28Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score7.30 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys1 / 1 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.7%
6.15
CategoryWater conservation & recharge
Started / Completed / Phys287 / 33 / 139
Completion rate59.9%
Part A score (max 5.0)3.00 / 5.0
Ongoing sanction / booked5.21Cr / 3.29Cr
Expenditure rate (ongoing)63.1%
Part B score (max 5.0)3.16 / 5.0
Final score6.15 / 10
|
4.0%
6.61
CategoryWatershed Related Works
Started / Completed / Phys35 / 8 / 16
Completion rate68.6%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked0.35Cr / 0.23Cr
Expenditure rate (ongoing)63.7%
Part B score (max 5.0)3.18 / 5.0
Final score6.61 / 10
|
1.2%
6.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys13 / 0 / 9
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.09Cr / 0.05Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.67 / 5.0
Final score6.14 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works3,689
Target Works2,225
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 13 | KATNI โ | 6.25 |
30.4%
4.46
CategoryFarm Pond
Started / Completed / Phys1,680 / 425 / 545
⚠ Works needing verification (Completed/Physically Completed)47 works (exp <30%)
Completion rate57.7%
Part A score (max 5.0)2.89 / 5.0
Ongoing sanction / booked16.57Cr / 5.23Cr
Expenditure rate (ongoing)31.6%
Part B score (max 5.0)1.58 / 5.0
Final score4.46 / 10
|
2.1%
2.64
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 1
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked2.19Cr / 0.97Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score2.64 / 10
|
3.3%
4.99
CategoryDug Well Recharge
Started / Completed / Phys1,509 / 528 / 524
⚠ Works needing verification (Completed/Physically Completed)224 works (exp <30%)
Completion rate69.7%
Part A score (max 5.0)3.49 / 5.0
Ongoing sanction / booked0.60Cr / 0.18Cr
Expenditure rate (ongoing)30.1%
Part B score (max 5.0)1.51 / 5.0
Final score4.99 / 10
|
14.6%
7.37
CategoryIrrigation infrastructure
Started / Completed / Phys240 / 34 / 177
Completion rate87.9%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked1.86Cr / 1.11Cr
Expenditure rate (ongoing)59.5%
Part B score (max 5.0)2.97 / 5.0
Final score7.37 / 10
|
15.9%
7.03
CategoryWater conservation & recharge
Started / Completed / Phys328 / 73 / 166
Completion rate72.9%
Part A score (max 5.0)3.64 / 5.0
Ongoing sanction / booked6.66Cr / 4.51Cr
Expenditure rate (ongoing)67.7%
Part B score (max 5.0)3.39 / 5.0
Final score7.03 / 10
|
17.5%
7.52
CategoryWatershed Related Works
Started / Completed / Phys302 / 105 / 136
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked4.23Cr / 2.99Cr
Expenditure rate (ongoing)70.5%
Part B score (max 5.0)3.53 / 5.0
Final score7.52 / 10
|
5.8%
6.94
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys75 / 12 / 41
Completion rate70.7%
Part A score (max 5.0)3.53 / 5.0
Ongoing sanction / booked2.00Cr / 1.37Cr
Expenditure rate (ongoing)68.2%
Part B score (max 5.0)3.41 / 5.0
Final score6.94 / 10
|
5.4%
4.88
CategoryPMKSY: Watershed
PMKSY Works0 total (21 done / -21 ongoing)
JGSA Target6.30 Cr
JGSA Valuation4.66 Cr
Expenditure0.02 Cr
% Valuation74.0%
Valuation Marks (40%)2.96
Exp Marks (40%)0.02
Geotag Marks (10%)0.990
Physical Marks (10%)0.92
Final score4.88 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works10,220
Target Works4,146
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 14 | DHAR โ | 6.23 |
12.6%
4.33
CategoryFarm Pond
Started / Completed / Phys2,881 / 444 / 770
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate42.1%
Part A score (max 5.0)2.11 / 5.0
Ongoing sanction / booked30.40Cr / 13.54Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score4.33 / 10
|
0.1%
2.08
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.10Cr
Expenditure rate (ongoing)41.6%
Part B score (max 5.0)2.08 / 5.0
Final score2.08 / 10
|
2.9%
4.57
CategoryDug Well Recharge
Started / Completed / Phys4,481 / 1,074 / 882
⚠ Works needing verification (Completed/Physically Completed)310 works (exp <30%)
Completion rate43.7%
Part A score (max 5.0)2.18 / 5.0
Ongoing sanction / booked5.73Cr / 2.73Cr
Expenditure rate (ongoing)47.7%
Part B score (max 5.0)2.39 / 5.0
Final score4.57 / 10
|
0.4%
5.04
CategoryIrrigation infrastructure
Started / Completed / Phys24 / 3 / 4
Completion rate29.2%
Part A score (max 5.0)1.46 / 5.0
Ongoing sanction / booked1.46Cr / 1.04Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score5.04 / 10
|
69.1%
6.43
CategoryWater conservation & recharge
Started / Completed / Phys2,551 / 173 / 1,028
Completion rate47.1%
Part A score (max 5.0)2.35 / 5.0
Ongoing sanction / booked165.10Cr / 134.70Cr
Expenditure rate (ongoing)81.6%
Part B score (max 5.0)4.08 / 5.0
Final score6.43 / 10
|
7.3%
5.87
CategoryWatershed Related Works
Started / Completed / Phys664 / 40 / 251
Completion rate43.8%
Part A score (max 5.0)2.19 / 5.0
Ongoing sanction / booked16.71Cr / 12.31Cr
Expenditure rate (ongoing)73.7%
Part B score (max 5.0)3.68 / 5.0
Final score5.87 / 10
|
2.1%
6.19
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys147 / 6 / 69
Completion rate51.0%
Part A score (max 5.0)2.55 / 5.0
Ongoing sanction / booked4.34Cr / 3.16Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score6.19 / 10
|
0.5%
4.68
CategoryPMKSY: Watershed
PMKSY Works0 total (5 done / -5 ongoing)
JGSA Target1.78 Cr
JGSA Valuation0.72 Cr
Expenditure0.48 Cr
% Valuation40.6%
Valuation Marks (40%)1.63
Exp Marks (40%)1.09
Geotag Marks (10%)1.000
Physical Marks (10%)0.96
Final score4.68 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works24,597
Target Works10,749
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 15 | ASHOK NAGAR โ | 6.17 |
41.7%
5.21
CategoryFarm Pond
Started / Completed / Phys1,626 / 357 / 724
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate66.5%
Part A score (max 5.0)3.32 / 5.0
Ongoing sanction / booked16.18Cr / 6.11Cr
Expenditure rate (ongoing)37.8%
Part B score (max 5.0)1.89 / 5.0
Final score5.21 / 10
|
1.8%
2.80
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 1
Completion rate11.1%
Part A score (max 5.0)0.56 / 5.0
Ongoing sanction / booked1.85Cr / 0.83Cr
Expenditure rate (ongoing)44.9%
Part B score (max 5.0)2.25 / 5.0
Final score2.80 / 10
|
1.1%
6.10
CategoryDug Well Recharge
Started / Completed / Phys523 / 266 / 172
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate83.7%
Part A score (max 5.0)4.19 / 5.0
Ongoing sanction / booked0.16Cr / 0.06Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.92 / 5.0
Final score6.10 / 10
|
0.1%
5.25
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 0
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)38.3%
Part B score (max 5.0)1.91 / 5.0
Final score5.25 / 10
|
40.0%
7.12
CategoryWater conservation & recharge
Started / Completed / Phys938 / 219 / 433
Completion rate69.5%
Part A score (max 5.0)3.48 / 5.0
Ongoing sanction / booked14.15Cr / 10.31Cr
Expenditure rate (ongoing)72.9%
Part B score (max 5.0)3.65 / 5.0
Final score7.12 / 10
|
3.3%
8.46
CategoryWatershed Related Works
Started / Completed / Phys39 / 14 / 18
Completion rate82.1%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.56Cr / 0.49Cr
Expenditure rate (ongoing)87.2%
Part B score (max 5.0)4.36 / 5.0
Final score8.46 / 10
|
1.9%
6.01
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys32 / 4 / 11
Completion rate46.9%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked1.06Cr / 0.78Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.67 / 5.0
Final score6.01 / 10
|
5.0%
2.47
CategoryPMKSY: Watershed
PMKSY Works0 total (9 done / -9 ongoing)
JGSA Target5.91 Cr
JGSA Valuation0.61 Cr
Expenditure0.25 Cr
% Valuation10.3%
Valuation Marks (40%)0.41
Exp Marks (40%)0.17
Geotag Marks (10%)0.890
Physical Marks (10%)0.99
Final score2.47 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,536
Target Works3,170
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 16 | GUNA โ | 6.16 |
33.7%
4.65
CategoryFarm Pond
Started / Completed / Phys1,490 / 501 / 504
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked11.70Cr / 2.99Cr
Expenditure rate (ongoing)25.5%
Part B score (max 5.0)1.28 / 5.0
Final score4.65 / 10
|
โ |
4.5%
5.16
CategoryDug Well Recharge
Started / Completed / Phys2,187 / 946 / 1,108
⚠ Works needing verification (Completed/Physically Completed)89 works (exp <30%)
Completion rate93.9%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.11Cr / 0.01Cr
Expenditure rate (ongoing)9.2%
Part B score (max 5.0)0.46 / 5.0
Final score5.16 / 10
|
0.5%
6.12
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 1 / 4
Completion rate83.3%
Part A score (max 5.0)4.17 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)39.2%
Part B score (max 5.0)1.96 / 5.0
Final score6.12 / 10
|
45.8%
7.02
CategoryWater conservation & recharge
Started / Completed / Phys860 / 160 / 567
Completion rate84.5%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked10.29Cr / 5.75Cr
Expenditure rate (ongoing)55.9%
Part B score (max 5.0)2.79 / 5.0
Final score7.02 / 10
|
2.1%
6.95
CategoryWatershed Related Works
Started / Completed / Phys41 / 16 / 19
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.49Cr / 0.26Cr
Expenditure rate (ongoing)53.6%
Part B score (max 5.0)2.68 / 5.0
Final score6.95 / 10
|
4.4%
7.33
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys59 / 16 / 35
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.67Cr / 0.40Cr
Expenditure rate (ongoing)60.1%
Part B score (max 5.0)3.00 / 5.0
Final score7.33 / 10
|
4.0%
3.73
CategoryPMKSY: Watershed
PMKSY Works0 total (47 done / -47 ongoing)
JGSA Target4.98 Cr
JGSA Valuation1.57 Cr
Expenditure0.74 Cr
% Valuation31.6%
Valuation Marks (40%)1.26
Exp Marks (40%)0.59
Geotag Marks (10%)0.910
Physical Marks (10%)0.97
Final score3.73 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works28,009
Target Works4,643
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 17 | BETUL โ | 6.05 |
20.7%
5.28
CategoryFarm Pond
Started / Completed / Phys1,714 / 83 / 869
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate55.5%
Part A score (max 5.0)2.78 / 5.0
Ongoing sanction / booked23.13Cr / 11.59Cr
Expenditure rate (ongoing)50.1%
Part B score (max 5.0)2.50 / 5.0
Final score5.28 / 10
|
3.1%
2.04
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked6.97Cr / 2.85Cr
Expenditure rate (ongoing)40.8%
Part B score (max 5.0)2.04 / 5.0
Final score2.04 / 10
|
4.8%
7.38
CategoryDug Well Recharge
Started / Completed / Phys4,167 / 651 / 3,001
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate87.6%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked1.31Cr / 0.78Cr
Expenditure rate (ongoing)59.9%
Part B score (max 5.0)2.99 / 5.0
Final score7.38 / 10
|
0.0%
6.61
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 3 / 3
Completion rate85.7%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)46.5%
Part B score (max 5.0)2.32 / 5.0
Final score6.61 / 10
|
60.0%
6.07
CategoryWater conservation & recharge
Started / Completed / Phys1,918 / 123 / 904
Completion rate53.5%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked64.18Cr / 43.51Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score6.07 / 10
|
3.2%
6.39
CategoryWatershed Related Works
Started / Completed / Phys150 / 20 / 75
Completion rate63.3%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked2.87Cr / 1.85Cr
Expenditure rate (ongoing)64.4%
Part B score (max 5.0)3.22 / 5.0
Final score6.39 / 10
|
3.1%
6.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys169 / 17 / 75
Completion rate54.4%
Part A score (max 5.0)2.72 / 5.0
Ongoing sanction / booked2.96Cr / 2.02Cr
Expenditure rate (ongoing)68.3%
Part B score (max 5.0)3.41 / 5.0
Final score6.14 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works13,001
Target Works8,149
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 18 | NIWARI โ | 6.00 |
18.1%
3.39
CategoryFarm Pond
Started / Completed / Phys491 / 100 / 50
⚠ Works needing verification (Completed/Physically Completed)11 works (exp <30%)
Completion rate30.5%
Part A score (max 5.0)1.53 / 5.0
Ongoing sanction / booked5.02Cr / 1.87Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score3.39 / 10
|
2.5%
3.39
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 1
Completion rate20.0%
Part A score (max 5.0)1.00 / 5.0
Ongoing sanction / booked0.84Cr / 0.40Cr
Expenditure rate (ongoing)47.8%
Part B score (max 5.0)2.39 / 5.0
Final score3.39 / 10
|
5.8%
4.47
CategoryDug Well Recharge
Started / Completed / Phys964 / 224 / 252
⚠ Works needing verification (Completed/Physically Completed)85 works (exp <30%)
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked1.04Cr / 0.42Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.00 / 5.0
Final score4.47 / 10
|
โ |
34.2%
6.60
CategoryWater conservation & recharge
Started / Completed / Phys235 / 46 / 93
Completion rate59.1%
Part A score (max 5.0)2.96 / 5.0
Ongoing sanction / booked5.47Cr / 3.98Cr
Expenditure rate (ongoing)72.8%
Part B score (max 5.0)3.64 / 5.0
Final score6.60 / 10
|
14.6%
5.58
CategoryWatershed Related Works
Started / Completed / Phys111 / 15 / 30
Completion rate40.5%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked3.51Cr / 2.50Cr
Expenditure rate (ongoing)71.0%
Part B score (max 5.0)3.55 / 5.0
Final score5.58 / 10
|
19.9%
7.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys124 / 16 / 69
Completion rate68.5%
Part A score (max 5.0)3.43 / 5.0
Ongoing sanction / booked2.59Cr / 2.08Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.02 / 5.0
Final score7.44 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works1,936
Target Works1,930
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 19 | HARDA โ | 5.98 |
41.0%
3.82
CategoryFarm Pond
Started / Completed / Phys336 / 40 / 145
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate55.1%
Part A score (max 5.0)2.75 / 5.0
Ongoing sanction / booked3.89Cr / 0.83Cr
Expenditure rate (ongoing)21.3%
Part B score (max 5.0)1.07 / 5.0
Final score3.82 / 10
|
2.9%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.53Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
11.2%
5.96
CategoryDug Well Recharge
Started / Completed / Phys782 / 380 / 334
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate91.3%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.15Cr / 0.04Cr
Expenditure rate (ongoing)28.0%
Part B score (max 5.0)1.40 / 5.0
Final score5.96 / 10
|
8.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 2 / 17
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
18.9%
7.59
CategoryWater conservation & recharge
Started / Completed / Phys90 / 6 / 78
Completion rate93.3%
Part A score (max 5.0)4.67 / 5.0
Ongoing sanction / booked0.36Cr / 0.21Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.93 / 5.0
Final score7.59 / 10
|
4.1%
10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
9.1%
6.76
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 10 / 24
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.09Cr / 0.04Cr
Expenditure rate (ongoing)43.3%
Part B score (max 5.0)2.16 / 5.0
Final score6.76 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works2,681
Target Works1,281
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 20 | SEONI โ | 5.97 |
43.7%
4.59
CategoryFarm Pond
Started / Completed / Phys3,388 / 1,435 / 509
⚠ Works needing verification (Completed/Physically Completed)29 works (exp <30%)
Completion rate57.4%
Part A score (max 5.0)2.87 / 5.0
Ongoing sanction / booked33.75Cr / 11.65Cr
Expenditure rate (ongoing)34.5%
Part B score (max 5.0)1.73 / 5.0
Final score4.59 / 10
|
1.0%
1.08
CategoryAmrit Sarowar
Started / Completed / Phys5 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.91Cr / 0.41Cr
Expenditure rate (ongoing)21.6%
Part B score (max 5.0)1.08 / 5.0
Final score1.08 / 10
|
2.9%
6.23
CategoryDug Well Recharge
Started / Completed / Phys2,253 / 861 / 956
⚠ Works needing verification (Completed/Physically Completed)291 works (exp <30%)
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.37Cr / 0.16Cr
Expenditure rate (ongoing)43.9%
Part B score (max 5.0)2.20 / 5.0
Final score6.23 / 10
|
1.8%
8.01
CategoryIrrigation infrastructure
Started / Completed / Phys31 / 14 / 11
Completion rate80.6%
Part A score (max 5.0)4.03 / 5.0
Ongoing sanction / booked0.54Cr / 0.43Cr
Expenditure rate (ongoing)79.6%
Part B score (max 5.0)3.98 / 5.0
Final score8.01 / 10
|
33.4%
6.79
CategoryWater conservation & recharge
Started / Completed / Phys1,281 / 392 / 471
Completion rate67.4%
Part A score (max 5.0)3.37 / 5.0
Ongoing sanction / booked24.37Cr / 16.69Cr
Expenditure rate (ongoing)68.5%
Part B score (max 5.0)3.42 / 5.0
Final score6.79 / 10
|
8.7%
7.14
CategoryWatershed Related Works
Started / Completed / Phys318 / 151 / 98
Completion rate78.3%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked4.11Cr / 2.65Cr
Expenditure rate (ongoing)64.5%
Part B score (max 5.0)3.22 / 5.0
Final score7.14 / 10
|
3.6%
6.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys102 / 27 / 40
Completion rate65.7%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked2.56Cr / 1.73Cr
Expenditure rate (ongoing)67.8%
Part B score (max 5.0)3.39 / 5.0
Final score6.67 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works11,196
Target Works7,378
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 21 | BHIND โ | 5.95 |
16.9%
2.92
CategoryFarm Pond
Started / Completed / Phys1,067 / 272 / 148
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked11.43Cr / 2.17Cr
Expenditure rate (ongoing)19.0%
Part B score (max 5.0)0.95 / 5.0
Final score2.92 / 10
|
3.0%
0.61
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.62Cr / 0.44Cr
Expenditure rate (ongoing)12.2%
Part B score (max 5.0)0.61 / 5.0
Final score0.61 / 10
|
0.3%
5.79
CategoryDug Well Recharge
Started / Completed / Phys118 / 6 / 71
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate65.3%
Part A score (max 5.0)3.26 / 5.0
Ongoing sanction / booked0.11Cr / 0.06Cr
Expenditure rate (ongoing)50.6%
Part B score (max 5.0)2.53 / 5.0
Final score5.79 / 10
|
8.0%
6.06
CategoryIrrigation infrastructure
Started / Completed / Phys143 / 10 / 70
Completion rate55.9%
Part A score (max 5.0)2.80 / 5.0
Ongoing sanction / booked3.31Cr / 2.16Cr
Expenditure rate (ongoing)65.4%
Part B score (max 5.0)3.27 / 5.0
Final score6.06 / 10
|
54.5%
6.87
CategoryWater conservation & recharge
Started / Completed / Phys735 / 103 / 454
Completion rate75.8%
Part A score (max 5.0)3.79 / 5.0
Ongoing sanction / booked14.55Cr / 8.97Cr
Expenditure rate (ongoing)61.7%
Part B score (max 5.0)3.08 / 5.0
Final score6.87 / 10
|
8.5%
6.19
CategoryWatershed Related Works
Started / Completed / Phys78 / 12 / 42
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked2.97Cr / 1.62Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score6.19 / 10
|
3.8%
6.79
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys62 / 6 / 42
Completion rate77.4%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked0.80Cr / 0.47Cr
Expenditure rate (ongoing)58.3%
Part B score (max 5.0)2.92 / 5.0
Final score6.79 / 10
|
โ |
5.0%
8.19
CategoryJSJB 2.0
Total Works1,815
Target Works2,215
Achievement %81.9%
Weightage5% of composite score
Final score8.19 / 10
|
| 22 | NEEMUCH โ | 5.94 |
37.5%
4.29
CategoryFarm Pond
Started / Completed / Phys800 / 72 / 394
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.91 / 5.0
Ongoing sanction / booked9.28Cr / 2.57Cr
Expenditure rate (ongoing)27.6%
Part B score (max 5.0)1.38 / 5.0
Final score4.29 / 10
|
3.6%
5.05
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 4
Completion rate40.0%
Part A score (max 5.0)2.00 / 5.0
Ongoing sanction / booked1.13Cr / 0.69Cr
Expenditure rate (ongoing)61.0%
Part B score (max 5.0)3.05 / 5.0
Final score5.05 / 10
|
9.1%
6.12
CategoryDug Well Recharge
Started / Completed / Phys1,986 / 793 / 1,000
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate90.3%
Part A score (max 5.0)4.51 / 5.0
Ongoing sanction / booked0.46Cr / 0.15Cr
Expenditure rate (ongoing)32.2%
Part B score (max 5.0)1.61 / 5.0
Final score6.12 / 10
|
2.6%
7.72
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 4 / 26
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.06Cr / 0.04Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.72 / 10
|
27.1%
7.48
CategoryWater conservation & recharge
Started / Completed / Phys318 / 26 / 258
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked2.55Cr / 1.54Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score7.48 / 10
|
0.9%
10.00
CategoryWatershed Related Works
Started / Completed / Phys14 / 1 / 13
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
2.5%
7.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys37 / 3 / 31
Completion rate91.9%
Part A score (max 5.0)4.59 / 5.0
Ongoing sanction / booked0.11Cr / 0.07Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score7.77 / 10
|
11.7%
4.95
CategoryPMKSY: Watershed
PMKSY Works0 total (13 done / -13 ongoing)
JGSA Target6.58 Cr
JGSA Valuation3.45 Cr
Expenditure1.40 Cr
% Valuation52.5%
Valuation Marks (40%)2.10
Exp Marks (40%)0.85
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score4.95 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,589
Target Works3,198
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 23 | SHIVPURI โ | 5.93 |
33.2%
4.47
CategoryFarm Pond
Started / Completed / Phys2,015 / 733 / 546
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate63.5%
Part A score (max 5.0)3.17 / 5.0
Ongoing sanction / booked22.83Cr / 5.90Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score4.47 / 10
|
0.8%
1.48
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.56Cr / 0.46Cr
Expenditure rate (ongoing)29.6%
Part B score (max 5.0)1.48 / 5.0
Final score1.48 / 10
|
2.6%
4.95
CategoryDug Well Recharge
Started / Completed / Phys1,936 / 838 / 531
⚠ Works needing verification (Completed/Physically Completed)180 works (exp <30%)
Completion rate70.7%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked0.99Cr / 0.28Cr
Expenditure rate (ongoing)28.3%
Part B score (max 5.0)1.42 / 5.0
Final score4.95 / 10
|
1.1%
6.15
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 7 / 12
Completion rate59.4%
Part A score (max 5.0)2.97 / 5.0
Ongoing sanction / booked0.60Cr / 0.38Cr
Expenditure rate (ongoing)63.6%
Part B score (max 5.0)3.18 / 5.0
Final score6.15 / 10
|
44.7%
6.62
CategoryWater conservation & recharge
Started / Completed / Phys1,104 / 150 / 565
Completion rate64.8%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked35.75Cr / 24.16Cr
Expenditure rate (ongoing)67.6%
Part B score (max 5.0)3.38 / 5.0
Final score6.62 / 10
|
8.1%
6.76
CategoryWatershed Related Works
Started / Completed / Phys200 / 43 / 89
Completion rate66.0%
Part A score (max 5.0)3.30 / 5.0
Ongoing sanction / booked5.31Cr / 3.67Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score6.76 / 10
|
2.9%
6.97
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys79 / 21 / 38
Completion rate74.7%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked1.99Cr / 1.29Cr
Expenditure rate (ongoing)64.7%
Part B score (max 5.0)3.24 / 5.0
Final score6.97 / 10
|
1.6%
2.25
CategoryPMKSY: Watershed
PMKSY Works0 total (81 done / -81 ongoing)
JGSA Target3.04 Cr
JGSA Valuation0.05 Cr
Expenditure0.38 Cr
% Valuation1.5%
Valuation Marks (40%)0.06
Exp Marks (40%)0.51
Geotag Marks (10%)0.860
Physical Marks (10%)0.82
Final score2.25 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,659
Target Works5,374
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 24 | SAGAR โ | 5.91 |
30.3%
4.08
CategoryFarm Pond
Started / Completed / Phys2,171 / 789 / 384
⚠ Works needing verification (Completed/Physically Completed)67 works (exp <30%)
Completion rate54.0%
Part A score (max 5.0)2.70 / 5.0
Ongoing sanction / booked17.86Cr / 4.92Cr
Expenditure rate (ongoing)27.6%
Part B score (max 5.0)1.38 / 5.0
Final score4.08 / 10
|
0.7%
2.61
CategoryAmrit Sarowar
Started / Completed / Phys3 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.89Cr / 0.46Cr
Expenditure rate (ongoing)52.2%
Part B score (max 5.0)2.61 / 5.0
Final score2.61 / 10
|
8.3%
6.19
CategoryDug Well Recharge
Started / Completed / Phys4,633 / 1,849 / 1,742
⚠ Works needing verification (Completed/Physically Completed)810 works (exp <30%)
Completion rate77.5%
Part A score (max 5.0)3.88 / 5.0
Ongoing sanction / booked0.59Cr / 0.27Cr
Expenditure rate (ongoing)46.4%
Part B score (max 5.0)2.32 / 5.0
Final score6.19 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys25 / 14 / 11
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
38.4%
7.00
CategoryWater conservation & recharge
Started / Completed / Phys1,183 / 408 / 513
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate77.9%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked11.62Cr / 7.23Cr
Expenditure rate (ongoing)62.2%
Part B score (max 5.0)3.11 / 5.0
Final score7.00 / 10
|
5.1%
7.63
CategoryWatershed Related Works
Started / Completed / Phys120 / 56 / 48
Completion rate86.7%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked1.03Cr / 0.68Cr
Expenditure rate (ongoing)65.9%
Part B score (max 5.0)3.29 / 5.0
Final score7.63 / 10
|
3.8%
6.96
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys89 / 36 / 42
Completion rate87.6%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.71Cr / 0.37Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.58 / 5.0
Final score6.96 / 10
|
7.6%
2.93
CategoryPMKSY: Watershed
PMKSY Works0 total (227 done / -227 ongoing)
JGSA Target10.28 Cr
JGSA Valuation2.28 Cr
Expenditure1.35 Cr
% Valuation22.2%
Valuation Marks (40%)0.89
Exp Marks (40%)0.53
Geotag Marks (10%)0.910
Physical Marks (10%)0.61
Final score2.93 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works9,158
Target Works8,224
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 25 | MANDLA โ | 5.90 |
39.1%
6.08
CategoryFarm Pond
Started / Completed / Phys2,041 / 1,249 / 198
Completion rate70.9%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked23.80Cr / 12.09Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score6.08 / 10
|
5.1%
1.34
CategoryAmrit Sarowar
Started / Completed / Phys27 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked10.55Cr / 2.83Cr
Expenditure rate (ongoing)26.8%
Part B score (max 5.0)1.34 / 5.0
Final score1.34 / 10
|
2.2%
5.64
CategoryDug Well Recharge
Started / Completed / Phys1,720 / 642 / 595
⚠ Works needing verification (Completed/Physically Completed)45 works (exp <30%)
Completion rate71.9%
Part A score (max 5.0)3.60 / 5.0
Ongoing sanction / booked1.14Cr / 0.46Cr
Expenditure rate (ongoing)40.9%
Part B score (max 5.0)2.05 / 5.0
Final score5.64 / 10
|
6.3%
5.06
CategoryIrrigation infrastructure
Started / Completed / Phys40 / 13 / 4
Completion rate42.5%
Part A score (max 5.0)2.13 / 5.0
Ongoing sanction / booked8.77Cr / 5.14Cr
Expenditure rate (ongoing)58.6%
Part B score (max 5.0)2.93 / 5.0
Final score5.06 / 10
|
30.1%
6.29
CategoryWater conservation & recharge
Started / Completed / Phys971 / 343 / 134
Completion rate49.1%
Part A score (max 5.0)2.46 / 5.0
Ongoing sanction / booked39.45Cr / 30.27Cr
Expenditure rate (ongoing)76.7%
Part B score (max 5.0)3.84 / 5.0
Final score6.29 / 10
|
3.8%
6.43
CategoryWatershed Related Works
Started / Completed / Phys192 / 75 / 28
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked3.86Cr / 2.89Cr
Expenditure rate (ongoing)74.9%
Part B score (max 5.0)3.74 / 5.0
Final score6.43 / 10
|
2.8%
5.95
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys66 / 18 / 15
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked2.30Cr / 1.59Cr
Expenditure rate (ongoing)69.0%
Part B score (max 5.0)3.45 / 5.0
Final score5.95 / 10
|
5.7%
3.69
CategoryPMKSY: Watershed
PMKSY Works0 total (75 done / -75 ongoing)
JGSA Target11.77 Cr
JGSA Valuation4.51 Cr
Expenditure1.08 Cr
% Valuation38.3%
Valuation Marks (40%)1.53
Exp Marks (40%)0.37
Geotag Marks (10%)1.000
Physical Marks (10%)0.79
Final score3.69 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,580
Target Works5,057
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 26 | BHOPAL โ | 5.89 |
41.0%
4.47
CategoryFarm Pond
Started / Completed / Phys945 / 222 / 277
⚠ Works needing verification (Completed/Physically Completed)19 works (exp <30%)
Completion rate52.8%
Part A score (max 5.0)2.64 / 5.0
Ongoing sanction / booked9.42Cr / 3.44Cr
Expenditure rate (ongoing)36.5%
Part B score (max 5.0)1.83 / 5.0
Final score4.47 / 10
|
2.8%
4.79
CategoryAmrit Sarowar
Started / Completed / Phys7 / 0 / 3
Completion rate42.9%
Part A score (max 5.0)2.14 / 5.0
Ongoing sanction / booked0.82Cr / 0.43Cr
Expenditure rate (ongoing)53.0%
Part B score (max 5.0)2.65 / 5.0
Final score4.79 / 10
|
3.7%
5.86
CategoryDug Well Recharge
Started / Completed / Phys691 / 327 / 166
⚠ Works needing verification (Completed/Physically Completed)50 works (exp <30%)
Completion rate71.3%
Part A score (max 5.0)3.57 / 5.0
Ongoing sanction / booked0.38Cr / 0.17Cr
Expenditure rate (ongoing)45.9%
Part B score (max 5.0)2.30 / 5.0
Final score5.86 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 3 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
39.2%
6.81
CategoryWater conservation & recharge
Started / Completed / Phys451 / 118 / 203
Completion rate71.2%
Part A score (max 5.0)3.56 / 5.0
Ongoing sanction / booked5.19Cr / 3.37Cr
Expenditure rate (ongoing)65.0%
Part B score (max 5.0)3.25 / 5.0
Final score6.81 / 10
|
3.0%
6.12
CategoryWatershed Related Works
Started / Completed / Phys35 / 9 / 17
Completion rate74.3%
Part A score (max 5.0)3.71 / 5.0
Ongoing sanction / booked0.43Cr / 0.21Cr
Expenditure rate (ongoing)48.2%
Part B score (max 5.0)2.41 / 5.0
Final score6.12 / 10
|
5.1%
6.63
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys25 / 2 / 20
Completion rate88.0%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.19Cr / 0.08Cr
Expenditure rate (ongoing)44.6%
Part B score (max 5.0)2.23 / 5.0
Final score6.63 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works2,555
Target Works2,157
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 27 | SINGRAULI โ | 5.89 |
32.4%
5.01
CategoryFarm Pond
Started / Completed / Phys1,923 / 1,120 / 140
Completion rate65.5%
Part A score (max 5.0)3.28 / 5.0
Ongoing sanction / booked15.30Cr / 5.30Cr
Expenditure rate (ongoing)34.6%
Part B score (max 5.0)1.73 / 5.0
Final score5.01 / 10
|
3.1%
3.35
CategoryAmrit Sarowar
Started / Completed / Phys20 / 0 / 2
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked4.00Cr / 2.28Cr
Expenditure rate (ongoing)57.0%
Part B score (max 5.0)2.85 / 5.0
Final score3.35 / 10
|
2.1%
5.78
CategoryDug Well Recharge
Started / Completed / Phys1,156 / 525 / 374
⚠ Works needing verification (Completed/Physically Completed)63 works (exp <30%)
Completion rate77.8%
Part A score (max 5.0)3.89 / 5.0
Ongoing sanction / booked0.48Cr / 0.18Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.89 / 5.0
Final score5.78 / 10
|
0.1%
5.24
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 2
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.91 / 5.0
Final score5.24 / 10
|
49.0%
6.14
CategoryWater conservation & recharge
Started / Completed / Phys916 / 132 / 447
Completion rate63.2%
Part A score (max 5.0)3.16 / 5.0
Ongoing sanction / booked23.67Cr / 14.10Cr
Expenditure rate (ongoing)59.6%
Part B score (max 5.0)2.98 / 5.0
Final score6.14 / 10
|
5.2%
6.28
CategoryWatershed Related Works
Started / Completed / Phys131 / 27 / 58
Completion rate64.9%
Part A score (max 5.0)3.24 / 5.0
Ongoing sanction / booked2.53Cr / 1.54Cr
Expenditure rate (ongoing)60.7%
Part B score (max 5.0)3.04 / 5.0
Final score6.28 / 10
|
3.2%
6.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys56 / 9 / 27
Completion rate64.3%
Part A score (max 5.0)3.21 / 5.0
Ongoing sanction / booked1.53Cr / 0.96Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.15 / 5.0
Final score6.36 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works5,252
Target Works4,205
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 28 | SIDHI โ | 5.89 |
37.2%
4.31
CategoryFarm Pond
Started / Completed / Phys1,874 / 964 / 190
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate61.6%
Part A score (max 5.0)3.08 / 5.0
Ongoing sanction / booked15.90Cr / 3.93Cr
Expenditure rate (ongoing)24.7%
Part B score (max 5.0)1.23 / 5.0
Final score4.31 / 10
|
โ |
1.1%
4.44
CategoryDug Well Recharge
Started / Completed / Phys482 / 219 / 89
⚠ Works needing verification (Completed/Physically Completed)18 works (exp <30%)
Completion rate63.9%
Part A score (max 5.0)3.20 / 5.0
Ongoing sanction / booked0.41Cr / 0.10Cr
Expenditure rate (ongoing)24.9%
Part B score (max 5.0)1.24 / 5.0
Final score4.44 / 10
|
2.7%
6.42
CategoryIrrigation infrastructure
Started / Completed / Phys33 / 9 / 10
Completion rate57.6%
Part A score (max 5.0)2.88 / 5.0
Ongoing sanction / booked2.07Cr / 1.47Cr
Expenditure rate (ongoing)70.8%
Part B score (max 5.0)3.54 / 5.0
Final score6.42 / 10
|
41.5%
6.69
CategoryWater conservation & recharge
Started / Completed / Phys892 / 310 / 266
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked19.31Cr / 13.36Cr
Expenditure rate (ongoing)69.2%
Part B score (max 5.0)3.46 / 5.0
Final score6.69 / 10
|
4.5%
6.85
CategoryWatershed Related Works
Started / Completed / Phys98 / 44 / 28
Completion rate73.5%
Part A score (max 5.0)3.67 / 5.0
Ongoing sanction / booked1.59Cr / 1.01Cr
Expenditure rate (ongoing)63.5%
Part B score (max 5.0)3.17 / 5.0
Final score6.85 / 10
|
5.5%
6.58
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys106 / 46 / 23
Completion rate65.1%
Part A score (max 5.0)3.25 / 5.0
Ongoing sanction / booked2.91Cr / 1.94Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score6.58 / 10
|
2.4%
4.46
CategoryPMKSY: Watershed
PMKSY Works0 total (27 done / -27 ongoing)
JGSA Target2.89 Cr
JGSA Valuation1.64 Cr
Expenditure0.30 Cr
% Valuation56.7%
Valuation Marks (40%)2.27
Exp Marks (40%)0.41
Geotag Marks (10%)0.860
Physical Marks (10%)0.92
Final score4.46 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,110
Target Works3,485
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 29 | PANNA โ | 5.87 |
36.0%
4.65
CategoryFarm Pond
Started / Completed / Phys2,155 / 333 / 731
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate49.4%
Part A score (max 5.0)2.47 / 5.0
Ongoing sanction / booked23.33Cr / 10.18Cr
Expenditure rate (ongoing)43.6%
Part B score (max 5.0)2.18 / 5.0
Final score4.65 / 10
|
2.7%
2.12
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.52Cr / 1.49Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score2.12 / 10
|
4.0%
4.82
CategoryDug Well Recharge
Started / Completed / Phys1,820 / 363 / 586
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate52.1%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked2.44Cr / 1.08Cr
Expenditure rate (ongoing)44.3%
Part B score (max 5.0)2.22 / 5.0
Final score4.82 / 10
|
0.2%
5.44
CategoryIrrigation infrastructure
Started / Completed / Phys12 / 1 / 4
Completion rate41.7%
Part A score (max 5.0)2.08 / 5.0
Ongoing sanction / booked0.25Cr / 0.17Cr
Expenditure rate (ongoing)67.1%
Part B score (max 5.0)3.36 / 5.0
Final score5.44 / 10
|
35.8%
6.59
CategoryWater conservation & recharge
Started / Completed / Phys1,178 / 92 / 609
Completion rate59.5%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked19.74Cr / 14.26Cr
Expenditure rate (ongoing)72.2%
Part B score (max 5.0)3.61 / 5.0
Final score6.59 / 10
|
4.8%
6.78
CategoryWatershed Related Works
Started / Completed / Phys142 / 14 / 82
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked2.39Cr / 1.63Cr
Expenditure rate (ongoing)68.0%
Part B score (max 5.0)3.40 / 5.0
Final score6.78 / 10
|
11.5%
6.92
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys182 / 11 / 98
Completion rate59.9%
Part A score (max 5.0)2.99 / 5.0
Ongoing sanction / booked6.22Cr / 4.89Cr
Expenditure rate (ongoing)78.5%
Part B score (max 5.0)3.93 / 5.0
Final score6.92 / 10
|
โ |
5.0%
9.20
CategoryJSJB 2.0
Total Works5,065
Target Works5,503
Achievement %92.0%
Weightage5% of composite score
Final score9.20 / 10
|
| 30 | AGAR-MALWA โ | 5.86 |
26.1%
3.87
CategoryFarm Pond
Started / Completed / Phys718 / 88 / 195
Completion rate39.4%
Part A score (max 5.0)1.97 / 5.0
Ongoing sanction / booked9.81Cr / 3.72Cr
Expenditure rate (ongoing)37.9%
Part B score (max 5.0)1.89 / 5.0
Final score3.87 / 10
|
1.2%
4.24
CategoryAmrit Sarowar
Started / Completed / Phys4 / 0 / 1
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked0.49Cr / 0.29Cr
Expenditure rate (ongoing)59.8%
Part B score (max 5.0)2.99 / 5.0
Final score4.24 / 10
|
8.9%
5.57
CategoryDug Well Recharge
Started / Completed / Phys1,970 / 581 / 862
⚠ Works needing verification (Completed/Physically Completed)58 works (exp <30%)
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked1.22Cr / 0.47Cr
Expenditure rate (ongoing)38.2%
Part B score (max 5.0)1.91 / 5.0
Final score5.57 / 10
|
0.6%
6.14
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 1 / 3
Completion rate57.1%
Part A score (max 5.0)2.86 / 5.0
Ongoing sanction / booked0.17Cr / 0.11Cr
Expenditure rate (ongoing)65.7%
Part B score (max 5.0)3.28 / 5.0
Final score6.14 / 10
|
44.1%
6.36
CategoryWater conservation & recharge
Started / Completed / Phys454 / 54 / 211
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked12.57Cr / 8.64Cr
Expenditure rate (ongoing)68.8%
Part B score (max 5.0)3.44 / 5.0
Final score6.36 / 10
|
2.6%
6.91
CategoryWatershed Related Works
Started / Completed / Phys43 / 17 / 17
Completion rate79.1%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.29Cr / 0.17Cr
Expenditure rate (ongoing)59.1%
Part B score (max 5.0)2.96 / 5.0
Final score6.91 / 10
|
11.3%
7.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys170 / 10 / 114
Completion rate72.9%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked1.78Cr / 1.24Cr
Expenditure rate (ongoing)69.8%
Part B score (max 5.0)3.49 / 5.0
Final score7.14 / 10
|
โ |
5.0%
9.37
CategoryJSJB 2.0
Total Works3,155
Target Works3,366
Achievement %93.7%
Weightage5% of composite score
Final score9.37 / 10
|
| 31 | DATIA โ | 5.85 |
38.0%
3.76
CategoryFarm Pond
Started / Completed / Phys908 / 344 / 140
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate53.3%
Part A score (max 5.0)2.67 / 5.0
Ongoing sanction / booked8.65Cr / 1.90Cr
Expenditure rate (ongoing)22.0%
Part B score (max 5.0)1.10 / 5.0
Final score3.76 / 10
|
0.5%
2.67
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.25Cr / 0.13Cr
Expenditure rate (ongoing)53.4%
Part B score (max 5.0)2.67 / 5.0
Final score2.67 / 10
|
3.1%
5.96
CategoryDug Well Recharge
Started / Completed / Phys586 / 308 / 197
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate86.2%
Part A score (max 5.0)4.31 / 5.0
Ongoing sanction / booked0.21Cr / 0.07Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.65 / 5.0
Final score5.96 / 10
|
2.3%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys28 / 14 / 11
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)100.0%
Part B score (max 5.0)5.00 / 5.0
Final score9.00 / 10
|
40.1%
6.82
CategoryWater conservation & recharge
Started / Completed / Phys381 / 97 / 207
Completion rate79.8%
Part A score (max 5.0)3.99 / 5.0
Ongoing sanction / booked4.06Cr / 2.30Cr
Expenditure rate (ongoing)56.6%
Part B score (max 5.0)2.83 / 5.0
Final score6.82 / 10
|
5.1%
7.12
CategoryWatershed Related Works
Started / Completed / Phys61 / 17 / 35
Completion rate85.2%
Part A score (max 5.0)4.26 / 5.0
Ongoing sanction / booked0.52Cr / 0.30Cr
Expenditure rate (ongoing)57.1%
Part B score (max 5.0)2.85 / 5.0
Final score7.12 / 10
|
6.0%
7.05
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys48 / 11 / 31
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.30Cr / 0.16Cr
Expenditure rate (ongoing)53.5%
Part B score (max 5.0)2.68 / 5.0
Final score7.05 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works2,818
Target Works2,013
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 32 | INDORE โ | 5.85 |
49.1%
4.64
CategoryFarm Pond
Started / Completed / Phys569 / 173 / 132
⚠ Works needing verification (Completed/Physically Completed)16 works (exp <30%)
Completion rate53.6%
Part A score (max 5.0)2.68 / 5.0
Ongoing sanction / booked6.87Cr / 2.70Cr
Expenditure rate (ongoing)39.3%
Part B score (max 5.0)1.96 / 5.0
Final score4.64 / 10
|
6.8%
4.98
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 4
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked0.61Cr / 0.30Cr
Expenditure rate (ongoing)49.6%
Part B score (max 5.0)2.48 / 5.0
Final score4.98 / 10
|
6.3%
5.58
CategoryDug Well Recharge
Started / Completed / Phys870 / 487 / 149
⚠ Works needing verification (Completed/Physically Completed)99 works (exp <30%)
Completion rate73.1%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked0.36Cr / 0.14Cr
Expenditure rate (ongoing)38.5%
Part B score (max 5.0)1.93 / 5.0
Final score5.58 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 2 / 1
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.0%
7.93
CategoryWater conservation & recharge
Started / Completed / Phys130 / 63 / 48
Completion rate85.4%
Part A score (max 5.0)4.27 / 5.0
Ongoing sanction / booked0.62Cr / 0.45Cr
Expenditure rate (ongoing)73.2%
Part B score (max 5.0)3.66 / 5.0
Final score7.93 / 10
|
8.8%
7.37
CategoryWatershed Related Works
Started / Completed / Phys50 / 19 / 28
Completion rate94.0%
Part A score (max 5.0)4.70 / 5.0
Ongoing sanction / booked0.16Cr / 0.09Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score7.37 / 10
|
4.2%
8.31
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys21 / 9 / 10
Completion rate90.5%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked0.20Cr / 0.15Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score8.31 / 10
|
4.8%
3.84
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target1.35 Cr
JGSA Valuation0.64 Cr
Expenditure0.12 Cr
% Valuation47.5%
Valuation Marks (40%)1.90
Exp Marks (40%)0.36
Geotag Marks (10%)0.970
Physical Marks (10%)0.61
Final score3.84 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,962
Target Works1,651
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 33 | SATNA โ | 5.83 |
42.5%
4.23
CategoryFarm Pond
Started / Completed / Phys2,100 / 249 / 898
⚠ Works needing verification (Completed/Physically Completed)8 works (exp <30%)
Completion rate54.6%
Part A score (max 5.0)2.73 / 5.0
Ongoing sanction / booked21.43Cr / 6.43Cr
Expenditure rate (ongoing)30.0%
Part B score (max 5.0)1.50 / 5.0
Final score4.23 / 10
|
3.4%
1.01
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.66Cr / 0.74Cr
Expenditure rate (ongoing)20.2%
Part B score (max 5.0)1.01 / 5.0
Final score1.01 / 10
|
2.4%
6.71
CategoryDug Well Recharge
Started / Completed / Phys1,141 / 280 / 667
⚠ Works needing verification (Completed/Physically Completed)14 works (exp <30%)
Completion rate83.0%
Part A score (max 5.0)4.15 / 5.0
Ongoing sanction / booked0.38Cr / 0.19Cr
Expenditure rate (ongoing)51.1%
Part B score (max 5.0)2.56 / 5.0
Final score6.71 / 10
|
0.5%
6.61
CategoryIrrigation infrastructure
Started / Completed / Phys26 / 11 / 7
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked0.09Cr / 0.06Cr
Expenditure rate (ongoing)62.9%
Part B score (max 5.0)3.14 / 5.0
Final score6.61 / 10
|
34.1%
7.36
CategoryWater conservation & recharge
Started / Completed / Phys660 / 112 / 371
Completion rate73.2%
Part A score (max 5.0)3.66 / 5.0
Ongoing sanction / booked15.01Cr / 11.11Cr
Expenditure rate (ongoing)74.0%
Part B score (max 5.0)3.70 / 5.0
Final score7.36 / 10
|
4.5%
7.18
CategoryWatershed Related Works
Started / Completed / Phys143 / 28 / 79
Completion rate74.8%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked1.25Cr / 0.86Cr
Expenditure rate (ongoing)68.7%
Part B score (max 5.0)3.44 / 5.0
Final score7.18 / 10
|
7.6%
6.18
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys121 / 21 / 55
Completion rate62.8%
Part A score (max 5.0)3.14 / 5.0
Ongoing sanction / booked2.82Cr / 1.71Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.18 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works4,933
Target Works4,203
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 34 | ALIRAJPUR โ | 5.78 |
12.5%
3.85
CategoryFarm Pond
Started / Completed / Phys1,009 / 31 / 298
Completion rate32.6%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked14.66Cr / 6.52Cr
Expenditure rate (ongoing)44.5%
Part B score (max 5.0)2.22 / 5.0
Final score3.85 / 10
|
2.4%
5.38
CategoryAmrit Sarowar
Started / Completed / Phys16 / 0 / 7
Completion rate43.8%
Part A score (max 5.0)2.19 / 5.0
Ongoing sanction / booked2.49Cr / 1.59Cr
Expenditure rate (ongoing)63.8%
Part B score (max 5.0)3.19 / 5.0
Final score5.38 / 10
|
4.6%
5.14
CategoryDug Well Recharge
Started / Completed / Phys3,287 / 146 / 1,542
⚠ Works needing verification (Completed/Physically Completed)24 works (exp <30%)
Completion rate51.4%
Part A score (max 5.0)2.57 / 5.0
Ongoing sanction / booked4.07Cr / 2.10Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score5.14 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys2 / 0 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
70.6%
5.82
CategoryWater conservation & recharge
Started / Completed / Phys838 / 39 / 255
Completion rate35.1%
Part A score (max 5.0)1.75 / 5.0
Ongoing sanction / booked86.66Cr / 70.51Cr
Expenditure rate (ongoing)81.4%
Part B score (max 5.0)4.07 / 5.0
Final score5.82 / 10
|
1.8%
7.17
CategoryWatershed Related Works
Started / Completed / Phys74 / 4 / 46
Completion rate67.6%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked1.20Cr / 0.91Cr
Expenditure rate (ongoing)75.8%
Part B score (max 5.0)3.79 / 5.0
Final score7.17 / 10
|
1.1%
6.77
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys26 / 1 / 13
Completion rate53.8%
Part A score (max 5.0)2.69 / 5.0
Ongoing sanction / booked1.06Cr / 0.87Cr
Expenditure rate (ongoing)81.5%
Part B score (max 5.0)4.07 / 5.0
Final score6.77 / 10
|
1.9%
5.87
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target3.49 Cr
JGSA Valuation1.68 Cr
Expenditure1.86 Cr
% Valuation48.2%
Valuation Marks (40%)1.93
Exp Marks (40%)2.14
Geotag Marks (10%)0.980
Physical Marks (10%)0.83
Final score5.87 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,557
Target Works5,252
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 35 | VIDISHA โ | 5.74 |
51.3%
4.69
CategoryFarm Pond
Started / Completed / Phys2,031 / 1,068 / 245
⚠ Works needing verification (Completed/Physically Completed)15 works (exp <30%)
Completion rate64.6%
Part A score (max 5.0)3.23 / 5.0
Ongoing sanction / booked18.58Cr / 5.41Cr
Expenditure rate (ongoing)29.1%
Part B score (max 5.0)1.46 / 5.0
Final score4.69 / 10
|
2.0%
2.71
CategoryAmrit Sarowar
Started / Completed / Phys10 / 0 / 1
Completion rate10.0%
Part A score (max 5.0)0.50 / 5.0
Ongoing sanction / booked1.80Cr / 0.79Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score2.71 / 10
|
4.4%
6.36
CategoryDug Well Recharge
Started / Completed / Phys1,729 / 508 / 898
⚠ Works needing verification (Completed/Physically Completed)143 works (exp <30%)
Completion rate81.3%
Part A score (max 5.0)4.07 / 5.0
Ongoing sanction / booked0.46Cr / 0.21Cr
Expenditure rate (ongoing)45.8%
Part B score (max 5.0)2.29 / 5.0
Final score6.36 / 10
|
0.3%
7.86
CategoryIrrigation infrastructure
Started / Completed / Phys37 / 29 / 3
Completion rate86.5%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.08Cr / 0.05Cr
Expenditure rate (ongoing)70.6%
Part B score (max 5.0)3.53 / 5.0
Final score7.86 / 10
|
29.7%
6.95
CategoryWater conservation & recharge
Started / Completed / Phys848 / 376 / 258
Completion rate74.8%
Part A score (max 5.0)3.74 / 5.0
Ongoing sanction / booked9.51Cr / 6.11Cr
Expenditure rate (ongoing)64.3%
Part B score (max 5.0)3.21 / 5.0
Final score6.95 / 10
|
0.9%
8.74
CategoryWatershed Related Works
Started / Completed / Phys38 / 26 / 9
Completion rate92.1%
Part A score (max 5.0)4.61 / 5.0
Ongoing sanction / booked0.12Cr / 0.10Cr
Expenditure rate (ongoing)82.7%
Part B score (max 5.0)4.13 / 5.0
Final score8.74 / 10
|
1.4%
7.09
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys28 / 21 / 4
Completion rate89.3%
Part A score (max 5.0)4.46 / 5.0
Ongoing sanction / booked0.14Cr / 0.07Cr
Expenditure rate (ongoing)52.5%
Part B score (max 5.0)2.63 / 5.0
Final score7.09 / 10
|
5.1%
4.61
CategoryPMKSY: Watershed
PMKSY Works0 total (4 done / -4 ongoing)
JGSA Target5.13 Cr
JGSA Valuation3.40 Cr
Expenditure0.41 Cr
% Valuation66.2%
Valuation Marks (40%)2.65
Exp Marks (40%)0.32
Geotag Marks (10%)0.960
Physical Marks (10%)0.67
Final score4.61 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,265
Target Works4,721
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 36 | NARMADAPURAM โ | 5.58 |
40.3%
3.16
CategoryFarm Pond
Started / Completed / Phys777 / 244 / 147
⚠ Works needing verification (Completed/Physically Completed)81 works (exp <30%)
Completion rate50.3%
Part A score (max 5.0)2.52 / 5.0
Ongoing sanction / booked8.31Cr / 1.07Cr
Expenditure rate (ongoing)12.9%
Part B score (max 5.0)0.64 / 5.0
Final score3.16 / 10
|
2.7%
1.29
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.18Cr / 0.31Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score1.29 / 10
|
6.0%
5.40
CategoryDug Well Recharge
Started / Completed / Phys1,018 / 494 / 362
⚠ Works needing verification (Completed/Physically Completed)68 works (exp <30%)
Completion rate84.1%
Part A score (max 5.0)4.20 / 5.0
Ongoing sanction / booked0.25Cr / 0.06Cr
Expenditure rate (ongoing)23.8%
Part B score (max 5.0)1.19 / 5.0
Final score5.40 / 10
|
0.7%
7.87
CategoryIrrigation infrastructure
Started / Completed / Phys42 / 33 / 4
Completion rate88.1%
Part A score (max 5.0)4.40 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)69.4%
Part B score (max 5.0)3.47 / 5.0
Final score7.87 / 10
|
37.8%
7.83
CategoryWater conservation & recharge
Started / Completed / Phys346 / 176 / 133
Completion rate89.3%
Part A score (max 5.0)4.47 / 5.0
Ongoing sanction / booked3.47Cr / 2.34Cr
Expenditure rate (ongoing)67.3%
Part B score (max 5.0)3.37 / 5.0
Final score7.83 / 10
|
1.8%
7.08
CategoryWatershed Related Works
Started / Completed / Phys44 / 28 / 14
Completion rate95.5%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.02Cr / 0.01Cr
Expenditure rate (ongoing)46.2%
Part B score (max 5.0)2.31 / 5.0
Final score7.08 / 10
|
2.8%
6.78
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys35 / 27 / 5
Completion rate91.4%
Part A score (max 5.0)4.57 / 5.0
Ongoing sanction / booked0.40Cr / 0.18Cr
Expenditure rate (ongoing)44.2%
Part B score (max 5.0)2.21 / 5.0
Final score6.78 / 10
|
2.9%
4.18
CategoryPMKSY: Watershed
PMKSY Works0 total (1 done / -1 ongoing)
JGSA Target1.29 Cr
JGSA Valuation0.51 Cr
Expenditure0.22 Cr
% Valuation39.8%
Valuation Marks (40%)1.59
Exp Marks (40%)0.69
Geotag Marks (10%)0.900
Physical Marks (10%)1.00
Final score4.18 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works3,009
Target Works2,268
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 37 | UMARIA โ | 5.54 |
25.9%
4.15
CategoryFarm Pond
Started / Completed / Phys912 / 83 / 285
⚠ Works needing verification (Completed/Physically Completed)1 works (exp <30%)
Completion rate40.4%
Part A score (max 5.0)2.02 / 5.0
Ongoing sanction / booked13.95Cr / 5.96Cr
Expenditure rate (ongoing)42.7%
Part B score (max 5.0)2.14 / 5.0
Final score4.15 / 10
|
1.8%
3.97
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 2
Completion rate22.2%
Part A score (max 5.0)1.11 / 5.0
Ongoing sanction / booked1.35Cr / 0.77Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score3.97 / 10
|
3.0%
4.15
CategoryDug Well Recharge
Started / Completed / Phys1,111 / 107 / 404
⚠ Works needing verification (Completed/Physically Completed)21 works (exp <30%)
Completion rate46.0%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked1.52Cr / 0.56Cr
Expenditure rate (ongoing)37.1%
Part B score (max 5.0)1.85 / 5.0
Final score4.15 / 10
|
0.0%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys3 / 0 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
49.2%
5.87
CategoryWater conservation & recharge
Started / Completed / Phys708 / 68 / 290
Completion rate50.6%
Part A score (max 5.0)2.53 / 5.0
Ongoing sanction / booked21.58Cr / 14.42Cr
Expenditure rate (ongoing)66.8%
Part B score (max 5.0)3.34 / 5.0
Final score5.87 / 10
|
6.7%
6.50
CategoryWatershed Related Works
Started / Completed / Phys60 / 4 / 36
Completion rate66.7%
Part A score (max 5.0)3.33 / 5.0
Ongoing sanction / booked2.01Cr / 1.27Cr
Expenditure rate (ongoing)63.4%
Part B score (max 5.0)3.17 / 5.0
Final score6.50 / 10
|
6.5%
5.53
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys107 / 7 / 43
Completion rate46.7%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked3.49Cr / 2.23Cr
Expenditure rate (ongoing)64.0%
Part B score (max 5.0)3.20 / 5.0
Final score5.53 / 10
|
1.9%
4.51
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target1.80 Cr
JGSA Valuation0.89 Cr
Expenditure0.27 Cr
% Valuation49.3%
Valuation Marks (40%)1.97
Exp Marks (40%)0.61
Geotag Marks (10%)0.980
Physical Marks (10%)0.96
Final score4.51 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,935
Target Works2,910
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 38 | SHAHDOL โ | 5.53 |
40.6%
3.54
CategoryFarm Pond
Started / Completed / Phys3,127 / 722 / 525
⚠ Works needing verification (Completed/Physically Completed)3 works (exp <30%)
Completion rate39.9%
Part A score (max 5.0)1.99 / 5.0
Ongoing sanction / booked50.64Cr / 15.67Cr
Expenditure rate (ongoing)30.9%
Part B score (max 5.0)1.55 / 5.0
Final score3.54 / 10
|
1.3%
1.31
CategoryAmrit Sarowar
Started / Completed / Phys8 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.58Cr / 0.68Cr
Expenditure rate (ongoing)26.2%
Part B score (max 5.0)1.31 / 5.0
Final score1.31 / 10
|
0.8%
5.04
CategoryDug Well Recharge
Started / Completed / Phys620 / 122 / 240
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate58.4%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked0.65Cr / 0.28Cr
Expenditure rate (ongoing)42.4%
Part B score (max 5.0)2.12 / 5.0
Final score5.04 / 10
|
6.5%
9.00
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 8 / 22
Completion rate93.8%
Part A score (max 5.0)4.69 / 5.0
Ongoing sanction / booked1.10Cr / 1.07Cr
Expenditure rate (ongoing)96.7%
Part B score (max 5.0)4.83 / 5.0
Final score9.00 / 10
|
32.2%
6.08
CategoryWater conservation & recharge
Started / Completed / Phys1,042 / 112 / 376
Completion rate46.8%
Part A score (max 5.0)2.34 / 5.0
Ongoing sanction / booked39.25Cr / 29.31Cr
Expenditure rate (ongoing)74.7%
Part B score (max 5.0)3.73 / 5.0
Final score6.08 / 10
|
10.3%
7.70
CategoryWatershed Related Works
Started / Completed / Phys229 / 19 / 180
Completion rate86.9%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked1.98Cr / 1.33Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score7.70 / 10
|
3.2%
6.00
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys105 / 26 / 25
Completion rate48.6%
Part A score (max 5.0)2.43 / 5.0
Ongoing sanction / booked3.20Cr / 2.28Cr
Expenditure rate (ongoing)71.4%
Part B score (max 5.0)3.57 / 5.0
Final score6.00 / 10
|
โ |
5.0%
10.00
CategoryJSJB 2.0
Total Works67,475
Target Works5,163
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 39 | DAMOH โ | 5.53 |
16.0%
5.15
CategoryFarm Pond
Started / Completed / Phys1,584 / 476 / 392
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate54.8%
Part A score (max 5.0)2.74 / 5.0
Ongoing sanction / booked15.63Cr / 7.55Cr
Expenditure rate (ongoing)48.3%
Part B score (max 5.0)2.41 / 5.0
Final score5.15 / 10
|
0.2%
0.00
CategoryAmrit Sarowar
Started / Completed / Phys1 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.36Cr / 0.00Cr
Expenditure rate (ongoing)0.0%
Part B score (max 5.0)0.00 / 5.0
Final score0.00 / 10
|
2.8%
6.83
CategoryDug Well Recharge
Started / Completed / Phys2,247 / 862 / 750
⚠ Works needing verification (Completed/Physically Completed)38 works (exp <30%)
Completion rate71.7%
Part A score (max 5.0)3.59 / 5.0
Ongoing sanction / booked1.54Cr / 1.00Cr
Expenditure rate (ongoing)64.9%
Part B score (max 5.0)3.24 / 5.0
Final score6.83 / 10
|
0.6%
6.22
CategoryIrrigation infrastructure
Started / Completed / Phys16 / 0 / 5
Completion rate31.3%
Part A score (max 5.0)1.56 / 5.0
Ongoing sanction / booked0.72Cr / 0.67Cr
Expenditure rate (ongoing)93.1%
Part B score (max 5.0)4.65 / 5.0
Final score6.22 / 10
|
52.9%
5.36
CategoryWater conservation & recharge
Started / Completed / Phys1,017 / 94 / 250
Completion rate33.8%
Part A score (max 5.0)1.69 / 5.0
Ongoing sanction / booked82.16Cr / 60.34Cr
Expenditure rate (ongoing)73.4%
Part B score (max 5.0)3.67 / 5.0
Final score5.36 / 10
|
9.7%
6.04
CategoryWatershed Related Works
Started / Completed / Phys294 / 47 / 83
Completion rate44.2%
Part A score (max 5.0)2.21 / 5.0
Ongoing sanction / booked11.54Cr / 8.84Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score6.04 / 10
|
8.8%
5.47
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys207 / 9 / 61
Completion rate33.8%
Part A score (max 5.0)1.69 / 5.0
Ongoing sanction / booked12.04Cr / 9.11Cr
Expenditure rate (ongoing)75.7%
Part B score (max 5.0)3.78 / 5.0
Final score5.47 / 10
|
3.9%
1.67
CategoryPMKSY: Watershed
PMKSY Works0 total (4 done / -4 ongoing)
JGSA Target8.25 Cr
JGSA Valuation0.00 Cr
Expenditure0.09 Cr
% Valuation0.0%
Valuation Marks (40%)0.00
Exp Marks (40%)0.04
Geotag Marks (10%)1.000
Physical Marks (10%)0.62
Final score1.67 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works7,840
Target Works5,366
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 40 | CHHATARPUR โ | 5.52 |
46.5%
4.03
CategoryFarm Pond
Started / Completed / Phys1,863 / 691 / 396
⚠ Works needing verification (Completed/Physically Completed)66 works (exp <30%)
Completion rate58.3%
Part A score (max 5.0)2.92 / 5.0
Ongoing sanction / booked25.23Cr / 5.63Cr
Expenditure rate (ongoing)22.3%
Part B score (max 5.0)1.12 / 5.0
Final score4.03 / 10
|
3.7%
3.52
CategoryAmrit Sarowar
Started / Completed / Phys24 / 0 / 4
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked4.27Cr / 2.29Cr
Expenditure rate (ongoing)53.7%
Part B score (max 5.0)2.69 / 5.0
Final score3.52 / 10
|
5.1%
5.11
CategoryDug Well Recharge
Started / Completed / Phys3,918 / 2,792 / 564
⚠ Works needing verification (Completed/Physically Completed)204 works (exp <30%)
Completion rate85.7%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.69Cr / 0.11Cr
Expenditure rate (ongoing)16.5%
Part B score (max 5.0)0.82 / 5.0
Final score5.11 / 10
|
0.4%
8.24
CategoryIrrigation infrastructure
Started / Completed / Phys11 / 5 / 5
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.07Cr / 0.05Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.70 / 5.0
Final score8.24 / 10
|
30.2%
6.96
CategoryWater conservation & recharge
Started / Completed / Phys937 / 217 / 507
Completion rate77.3%
Part A score (max 5.0)3.86 / 5.0
Ongoing sanction / booked12.08Cr / 7.49Cr
Expenditure rate (ongoing)62.0%
Part B score (max 5.0)3.10 / 5.0
Final score6.96 / 10
|
3.5%
7.48
CategoryWatershed Related Works
Started / Completed / Phys125 / 32 / 82
Completion rate91.2%
Part A score (max 5.0)4.56 / 5.0
Ongoing sanction / booked0.49Cr / 0.29Cr
Expenditure rate (ongoing)58.5%
Part B score (max 5.0)2.92 / 5.0
Final score7.48 / 10
|
3.9%
6.34
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys80 / 6 / 48
Completion rate67.5%
Part A score (max 5.0)3.38 / 5.0
Ongoing sanction / booked2.06Cr / 1.22Cr
Expenditure rate (ongoing)59.4%
Part B score (max 5.0)2.97 / 5.0
Final score6.34 / 10
|
1.7%
6.38
CategoryPMKSY: Watershed
PMKSY Works0 total (1 done / -1 ongoing)
JGSA Target2.41 Cr
JGSA Valuation2.11 Cr
Expenditure0.82 Cr
% Valuation87.4%
Valuation Marks (40%)3.50
Exp Marks (40%)1.36
Geotag Marks (10%)0.680
Physical Marks (10%)0.84
Final score6.38 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works7,536
Target Works6,958
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 41 | JHABUA โ | 5.51 |
13.3%
3.49
CategoryFarm Pond
Started / Completed / Phys1,233 / 80 / 220
Completion rate24.3%
Part A score (max 5.0)1.22 / 5.0
Ongoing sanction / booked20.40Cr / 9.29Cr
Expenditure rate (ongoing)45.5%
Part B score (max 5.0)2.28 / 5.0
Final score3.49 / 10
|
1.7%
2.39
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 2
Completion rate14.3%
Part A score (max 5.0)0.71 / 5.0
Ongoing sanction / booked2.78Cr / 0.93Cr
Expenditure rate (ongoing)33.4%
Part B score (max 5.0)1.67 / 5.0
Final score2.39 / 10
|
5.3%
5.75
CategoryDug Well Recharge
Started / Completed / Phys4,071 / 1,165 / 1,294
⚠ Works needing verification (Completed/Physically Completed)30 works (exp <30%)
Completion rate60.4%
Part A score (max 5.0)3.02 / 5.0
Ongoing sanction / booked4.06Cr / 2.21Cr
Expenditure rate (ongoing)54.6%
Part B score (max 5.0)2.73 / 5.0
Final score5.75 / 10
|
0.1%
6.49
CategoryIrrigation infrastructure
Started / Completed / Phys9 / 5 / 3
Completion rate88.9%
Part A score (max 5.0)4.44 / 5.0
Ongoing sanction / booked0.01Cr / 0.00Cr
Expenditure rate (ongoing)41.0%
Part B score (max 5.0)2.05 / 5.0
Final score6.49 / 10
|
70.2%
5.66
CategoryWater conservation & recharge
Started / Completed / Phys1,368 / 79 / 464
Completion rate39.7%
Part A score (max 5.0)1.98 / 5.0
Ongoing sanction / booked76.88Cr / 56.57Cr
Expenditure rate (ongoing)73.6%
Part B score (max 5.0)3.68 / 5.0
Final score5.66 / 10
|
1.6%
5.17
CategoryWatershed Related Works
Started / Completed / Phys81 / 4 / 35
Completion rate48.1%
Part A score (max 5.0)2.41 / 5.0
Ongoing sanction / booked1.49Cr / 0.82Cr
Expenditure rate (ongoing)55.2%
Part B score (max 5.0)2.76 / 5.0
Final score5.17 / 10
|
1.4%
6.82
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 7 / 30
Completion rate74.0%
Part A score (max 5.0)3.70 / 5.0
Ongoing sanction / booked0.65Cr / 0.41Cr
Expenditure rate (ongoing)62.4%
Part B score (max 5.0)3.12 / 5.0
Final score6.82 / 10
|
1.3%
2.80
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target2.53 Cr
JGSA Valuation0.74 Cr
Expenditure0.14 Cr
% Valuation29.1%
Valuation Marks (40%)1.16
Exp Marks (40%)0.23
Geotag Marks (10%)0.950
Physical Marks (10%)0.46
Final score2.80 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,917
Target Works6,826
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 42 | MANDSAUR โ | 5.50 |
18.7%
2.86
CategoryFarm Pond
Started / Completed / Phys1,237 / 127 / 173
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate24.3%
Part A score (max 5.0)1.21 / 5.0
Ongoing sanction / booked16.46Cr / 5.44Cr
Expenditure rate (ongoing)33.0%
Part B score (max 5.0)1.65 / 5.0
Final score2.86 / 10
|
1.3%
3.54
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 1
Completion rate16.7%
Part A score (max 5.0)0.83 / 5.0
Ongoing sanction / booked1.21Cr / 0.65Cr
Expenditure rate (ongoing)54.1%
Part B score (max 5.0)2.70 / 5.0
Final score3.54 / 10
|
9.5%
5.62
CategoryDug Well Recharge
Started / Completed / Phys4,290 / 993 / 1,443
⚠ Works needing verification (Completed/Physically Completed)96 works (exp <30%)
Completion rate56.8%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked4.55Cr / 2.53Cr
Expenditure rate (ongoing)55.6%
Part B score (max 5.0)2.78 / 5.0
Final score5.62 / 10
|
0.5%
6.25
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 8 / 6
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.33Cr / 0.18Cr
Expenditure rate (ongoing)54.9%
Part B score (max 5.0)2.75 / 5.0
Final score6.25 / 10
|
58.1%
5.94
CategoryWater conservation & recharge
Started / Completed / Phys1,158 / 186 / 334
Completion rate44.9%
Part A score (max 5.0)2.25 / 5.0
Ongoing sanction / booked35.45Cr / 26.19Cr
Expenditure rate (ongoing)73.9%
Part B score (max 5.0)3.69 / 5.0
Final score5.94 / 10
|
2.2%
7.45
CategoryWatershed Related Works
Started / Completed / Phys53 / 16 / 20
Completion rate67.9%
Part A score (max 5.0)3.40 / 5.0
Ongoing sanction / booked0.84Cr / 0.68Cr
Expenditure rate (ongoing)81.0%
Part B score (max 5.0)4.05 / 5.0
Final score7.45 / 10
|
2.2%
6.42
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys40 / 9 / 11
Completion rate50.0%
Part A score (max 5.0)2.50 / 5.0
Ongoing sanction / booked1.29Cr / 1.02Cr
Expenditure rate (ongoing)78.4%
Part B score (max 5.0)3.92 / 5.0
Final score6.42 / 10
|
2.5%
3.98
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target2.95 Cr
JGSA Valuation1.94 Cr
Expenditure0.20 Cr
% Valuation65.8%
Valuation Marks (40%)2.64
Exp Marks (40%)0.27
Geotag Marks (10%)0.920
Physical Marks (10%)0.16
Final score3.98 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works7,066
Target Works6,804
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 43 | TIKAMGARH โ | 5.44 |
16.2%
3.00
CategoryFarm Pond
Started / Completed / Phys921 / 61 / 169
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate25.0%
Part A score (max 5.0)1.25 / 5.0
Ongoing sanction / booked11.89Cr / 4.17Cr
Expenditure rate (ongoing)35.1%
Part B score (max 5.0)1.76 / 5.0
Final score3.00 / 10
|
3.1%
0.70
CategoryAmrit Sarowar
Started / Completed / Phys14 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked3.04Cr / 0.43Cr
Expenditure rate (ongoing)14.0%
Part B score (max 5.0)0.70 / 5.0
Final score0.70 / 10
|
6.4%
5.66
CategoryDug Well Recharge
Started / Completed / Phys2,399 / 237 / 1,514
⚠ Works needing verification (Completed/Physically Completed)98 works (exp <30%)
Completion rate73.0%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked1.43Cr / 0.57Cr
Expenditure rate (ongoing)40.1%
Part B score (max 5.0)2.01 / 5.0
Final score5.66 / 10
|
0.1%
7.63
CategoryIrrigation infrastructure
Started / Completed / Phys20 / 10 / 4
Completion rate70.0%
Part A score (max 5.0)3.50 / 5.0
Ongoing sanction / booked0.05Cr / 0.04Cr
Expenditure rate (ongoing)82.7%
Part B score (max 5.0)4.13 / 5.0
Final score7.63 / 10
|
51.6%
5.99
CategoryWater conservation & recharge
Started / Completed / Phys1,050 / 98 / 355
Completion rate43.1%
Part A score (max 5.0)2.16 / 5.0
Ongoing sanction / booked31.95Cr / 24.48Cr
Expenditure rate (ongoing)76.6%
Part B score (max 5.0)3.83 / 5.0
Final score5.99 / 10
|
4.6%
6.49
CategoryWatershed Related Works
Started / Completed / Phys111 / 16 / 54
Completion rate63.1%
Part A score (max 5.0)3.15 / 5.0
Ongoing sanction / booked1.73Cr / 1.15Cr
Expenditure rate (ongoing)66.7%
Part B score (max 5.0)3.34 / 5.0
Final score6.49 / 10
|
9.0%
5.86
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys128 / 4 / 44
Completion rate37.5%
Part A score (max 5.0)1.88 / 5.0
Ongoing sanction / booked5.93Cr / 4.73Cr
Expenditure rate (ongoing)79.8%
Part B score (max 5.0)3.99 / 5.0
Final score5.86 / 10
|
3.9%
3.60
CategoryPMKSY: Watershed
PMKSY Works0 total (1 done / -1 ongoing)
JGSA Target3.79 Cr
JGSA Valuation1.58 Cr
Expenditure0.34 Cr
% Valuation41.7%
Valuation Marks (40%)1.67
Exp Marks (40%)0.36
Geotag Marks (10%)0.630
Physical Marks (10%)0.94
Final score3.60 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works4,893
Target Works4,643
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 44 | GWALIOR โ | 5.43 |
35.2%
4.14
CategoryFarm Pond
Started / Completed / Phys914 / 113 / 431
⚠ Works needing verification (Completed/Physically Completed)10 works (exp <30%)
Completion rate59.5%
Part A score (max 5.0)2.98 / 5.0
Ongoing sanction / booked10.64Cr / 2.48Cr
Expenditure rate (ongoing)23.3%
Part B score (max 5.0)1.17 / 5.0
Final score4.14 / 10
|
4.0%
1.67
CategoryAmrit Sarowar
Started / Completed / Phys12 / 0 / 1
Completion rate8.3%
Part A score (max 5.0)0.42 / 5.0
Ongoing sanction / booked2.69Cr / 0.68Cr
Expenditure rate (ongoing)25.1%
Part B score (max 5.0)1.26 / 5.0
Final score1.67 / 10
|
3.0%
5.22
CategoryDug Well Recharge
Started / Completed / Phys844 / 217 / 506
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate85.7%
Part A score (max 5.0)4.28 / 5.0
Ongoing sanction / booked0.29Cr / 0.05Cr
Expenditure rate (ongoing)18.8%
Part B score (max 5.0)0.94 / 5.0
Final score5.22 / 10
|
4.1%
8.05
CategoryIrrigation infrastructure
Started / Completed / Phys32 / 5 / 20
Completion rate78.1%
Part A score (max 5.0)3.91 / 5.0
Ongoing sanction / booked1.00Cr / 0.83Cr
Expenditure rate (ongoing)83.0%
Part B score (max 5.0)4.15 / 5.0
Final score8.05 / 10
|
30.2%
7.20
CategoryWater conservation & recharge
Started / Completed / Phys282 / 43 / 165
Completion rate73.8%
Part A score (max 5.0)3.69 / 5.0
Ongoing sanction / booked8.85Cr / 6.22Cr
Expenditure rate (ongoing)70.3%
Part B score (max 5.0)3.51 / 5.0
Final score7.20 / 10
|
4.9%
7.26
CategoryWatershed Related Works
Started / Completed / Phys61 / 13 / 35
Completion rate78.7%
Part A score (max 5.0)3.93 / 5.0
Ongoing sanction / booked0.99Cr / 0.66Cr
Expenditure rate (ongoing)66.5%
Part B score (max 5.0)3.33 / 5.0
Final score7.26 / 10
|
2.4%
7.14
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys29 / 10 / 14
Completion rate82.8%
Part A score (max 5.0)4.14 / 5.0
Ongoing sanction / booked0.27Cr / 0.16Cr
Expenditure rate (ongoing)60.0%
Part B score (max 5.0)3.00 / 5.0
Final score7.14 / 10
|
11.1%
1.88
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target8.02 Cr
JGSA Valuation0.55 Cr
Expenditure0.26 Cr
% Valuation6.9%
Valuation Marks (40%)0.28
Exp Marks (40%)0.13
Geotag Marks (10%)0.990
Physical Marks (10%)0.48
Final score1.88 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works2,438
Target Works2,174
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 45 | ANUPPUR โ | 5.42 |
68.8%
4.71
CategoryFarm Pond
Started / Completed / Phys3,699 / 2,249 / 369
⚠ Works needing verification (Completed/Physically Completed)97 works (exp <30%)
Completion rate70.8%
Part A score (max 5.0)3.54 / 5.0
Ongoing sanction / booked26.30Cr / 6.16Cr
Expenditure rate (ongoing)23.4%
Part B score (max 5.0)1.17 / 5.0
Final score4.71 / 10
|
โ |
0.8%
6.27
CategoryDug Well Recharge
Started / Completed / Phys455 / 82 / 260
⚠ Works needing verification (Completed/Physically Completed)67 works (exp <30%)
Completion rate75.2%
Part A score (max 5.0)3.76 / 5.0
Ongoing sanction / booked0.12Cr / 0.06Cr
Expenditure rate (ongoing)50.2%
Part B score (max 5.0)2.51 / 5.0
Final score6.27 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys4 / 2 / 2
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
14.3%
7.84
CategoryWater conservation & recharge
Started / Completed / Phys389 / 173 / 151
Completion rate83.3%
Part A score (max 5.0)4.16 / 5.0
Ongoing sanction / booked6.74Cr / 4.96Cr
Expenditure rate (ongoing)73.5%
Part B score (max 5.0)3.67 / 5.0
Final score7.84 / 10
|
1.1%
8.39
CategoryWatershed Related Works
Started / Completed / Phys24 / 8 / 13
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.90Cr / 0.73Cr
Expenditure rate (ongoing)80.3%
Part B score (max 5.0)4.01 / 5.0
Final score8.39 / 10
|
2.6%
7.65
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys44 / 27 / 11
Completion rate86.4%
Part A score (max 5.0)4.32 / 5.0
Ongoing sanction / booked0.60Cr / 0.40Cr
Expenditure rate (ongoing)66.6%
Part B score (max 5.0)3.33 / 5.0
Final score7.65 / 10
|
7.1%
2.62
CategoryPMKSY: Watershed
PMKSY Works0 total (43 done / -43 ongoing)
JGSA Target9.68 Cr
JGSA Valuation2.10 Cr
Expenditure0.21 Cr
% Valuation21.7%
Valuation Marks (40%)0.87
Exp Marks (40%)0.09
Geotag Marks (10%)1.000
Physical Marks (10%)0.67
Final score2.62 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,598
Target Works4,615
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 46 | RATLAM โ | 5.41 |
36.5%
3.59
CategoryFarm Pond
Started / Completed / Phys1,448 / 428 / 238
⚠ Works needing verification (Completed/Physically Completed)22 works (exp <30%)
Completion rate46.0%
Part A score (max 5.0)2.30 / 5.0
Ongoing sanction / booked20.24Cr / 5.23Cr
Expenditure rate (ongoing)25.9%
Part B score (max 5.0)1.29 / 5.0
Final score3.59 / 10
|
4.2%
3.17
CategoryAmrit Sarowar
Started / Completed / Phys16 / 1 / 1
Completion rate12.5%
Part A score (max 5.0)0.63 / 5.0
Ongoing sanction / booked3.40Cr / 1.73Cr
Expenditure rate (ongoing)51.0%
Part B score (max 5.0)2.55 / 5.0
Final score3.17 / 10
|
8.9%
5.94
CategoryDug Well Recharge
Started / Completed / Phys3,184 / 854 / 1,556
⚠ Works needing verification (Completed/Physically Completed)133 works (exp <30%)
Completion rate75.7%
Part A score (max 5.0)3.78 / 5.0
Ongoing sanction / booked1.65Cr / 0.71Cr
Expenditure rate (ongoing)43.1%
Part B score (max 5.0)2.16 / 5.0
Final score5.94 / 10
|
0.2%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys7 / 3 / 4
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
35.7%
6.96
CategoryWater conservation & recharge
Started / Completed / Phys528 / 198 / 216
Completion rate78.4%
Part A score (max 5.0)3.92 / 5.0
Ongoing sanction / booked7.69Cr / 4.68Cr
Expenditure rate (ongoing)60.8%
Part B score (max 5.0)3.04 / 5.0
Final score6.96 / 10
|
0.5%
6.78
CategoryWatershed Related Works
Started / Completed / Phys11 / 7 / 3
Completion rate90.9%
Part A score (max 5.0)4.55 / 5.0
Ongoing sanction / booked0.03Cr / 0.01Cr
Expenditure rate (ongoing)44.7%
Part B score (max 5.0)2.24 / 5.0
Final score6.78 / 10
|
1.3%
8.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys20 / 10 / 9
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.10Cr / 0.07Cr
Expenditure rate (ongoing)73.3%
Part B score (max 5.0)3.66 / 5.0
Final score8.41 / 10
|
7.9%
3.83
CategoryPMKSY: Watershed
PMKSY Works0 total (0 done / 0 ongoing)
JGSA Target7.33 Cr
JGSA Valuation2.63 Cr
Expenditure1.01 Cr
% Valuation35.8%
Valuation Marks (40%)1.43
Exp Marks (40%)0.55
Geotag Marks (10%)0.850
Physical Marks (10%)1.00
Final score3.83 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,737
Target Works5,214
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 47 | REWA โ | 5.37 |
43.7%
3.98
CategoryFarm Pond
Started / Completed / Phys2,318 / 1,022 / 294
⚠ Works needing verification (Completed/Physically Completed)107 works (exp <30%)
Completion rate56.8%
Part A score (max 5.0)2.84 / 5.0
Ongoing sanction / booked20.11Cr / 4.60Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score3.98 / 10
|
2.1%
0.13
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked2.30Cr / 0.06Cr
Expenditure rate (ongoing)2.6%
Part B score (max 5.0)0.13 / 5.0
Final score0.13 / 10
|
0.9%
5.73
CategoryDug Well Recharge
Started / Completed / Phys493 / 280 / 97
⚠ Works needing verification (Completed/Physically Completed)34 works (exp <30%)
Completion rate76.5%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.20Cr / 0.08Cr
Expenditure rate (ongoing)38.1%
Part B score (max 5.0)1.90 / 5.0
Final score5.73 / 10
|
2.4%
7.10
CategoryIrrigation infrastructure
Started / Completed / Phys72 / 41 / 14
Completion rate76.4%
Part A score (max 5.0)3.82 / 5.0
Ongoing sanction / booked0.60Cr / 0.39Cr
Expenditure rate (ongoing)65.5%
Part B score (max 5.0)3.28 / 5.0
Final score7.10 / 10
|
26.5%
6.90
CategoryWater conservation & recharge
Started / Completed / Phys631 / 335 / 154
Completion rate77.5%
Part A score (max 5.0)3.87 / 5.0
Ongoing sanction / booked7.41Cr / 4.49Cr
Expenditure rate (ongoing)60.6%
Part B score (max 5.0)3.03 / 5.0
Final score6.90 / 10
|
6.7%
6.60
CategoryWatershed Related Works
Started / Completed / Phys118 / 50 / 38
Completion rate74.6%
Part A score (max 5.0)3.73 / 5.0
Ongoing sanction / booked1.72Cr / 0.99Cr
Expenditure rate (ongoing)57.4%
Part B score (max 5.0)2.87 / 5.0
Final score6.60 / 10
|
7.0%
6.56
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys110 / 57 / 30
Completion rate79.1%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked1.52Cr / 0.79Cr
Expenditure rate (ongoing)52.1%
Part B score (max 5.0)2.60 / 5.0
Final score6.56 / 10
|
5.7%
3.07
CategoryPMKSY: Watershed
PMKSY Works0 total (2 done / -2 ongoing)
JGSA Target6.27 Cr
JGSA Valuation1.14 Cr
Expenditure0.87 Cr
% Valuation18.2%
Valuation Marks (40%)0.73
Exp Marks (40%)0.55
Geotag Marks (10%)0.990
Physical Marks (10%)0.79
Final score3.07 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,508
Target Works3,751
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 48 | SEHORE โ | 5.28 |
54.0%
3.77
CategoryFarm Pond
Started / Completed / Phys1,480 / 148 / 626
⚠ Works needing verification (Completed/Physically Completed)35 works (exp <30%)
Completion rate52.3%
Part A score (max 5.0)2.61 / 5.0
Ongoing sanction / booked18.71Cr / 4.33Cr
Expenditure rate (ongoing)23.2%
Part B score (max 5.0)1.16 / 5.0
Final score3.77 / 10
|
2.1%
1.92
CategoryAmrit Sarowar
Started / Completed / Phys6 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.43Cr / 0.55Cr
Expenditure rate (ongoing)38.4%
Part B score (max 5.0)1.92 / 5.0
Final score1.92 / 10
|
9.4%
6.10
CategoryDug Well Recharge
Started / Completed / Phys2,511 / 517 / 1,656
⚠ Works needing verification (Completed/Physically Completed)39 works (exp <30%)
Completion rate86.5%
Part A score (max 5.0)4.33 / 5.0
Ongoing sanction / booked0.77Cr / 0.28Cr
Expenditure rate (ongoing)35.5%
Part B score (max 5.0)1.78 / 5.0
Final score6.10 / 10
|
1.5%
6.73
CategoryIrrigation infrastructure
Started / Completed / Phys19 / 6 / 9
Completion rate78.9%
Part A score (max 5.0)3.95 / 5.0
Ongoing sanction / booked0.21Cr / 0.12Cr
Expenditure rate (ongoing)55.7%
Part B score (max 5.0)2.78 / 5.0
Final score6.73 / 10
|
20.3%
7.59
CategoryWater conservation & recharge
Started / Completed / Phys358 / 52 / 235
Completion rate80.2%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked4.50Cr / 3.22Cr
Expenditure rate (ongoing)71.6%
Part B score (max 5.0)3.58 / 5.0
Final score7.59 / 10
|
3.8%
7.03
CategoryWatershed Related Works
Started / Completed / Phys66 / 17 / 35
Completion rate78.8%
Part A score (max 5.0)3.94 / 5.0
Ongoing sanction / booked0.58Cr / 0.36Cr
Expenditure rate (ongoing)61.9%
Part B score (max 5.0)3.09 / 5.0
Final score7.03 / 10
|
2.7%
6.41
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys38 / 7 / 26
Completion rate86.8%
Part A score (max 5.0)4.34 / 5.0
Ongoing sanction / booked0.17Cr / 0.07Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.06 / 5.0
Final score6.41 / 10
|
1.1%
4.14
CategoryPMKSY: Watershed
PMKSY Works0 total (4 done / -4 ongoing)
JGSA Target0.79 Cr
JGSA Valuation0.22 Cr
Expenditure0.31 Cr
% Valuation27.4%
Valuation Marks (40%)1.10
Exp Marks (40%)1.59
Geotag Marks (10%)0.880
Physical Marks (10%)0.56
Final score4.14 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works5,313
Target Works4,478
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 49 | JABALPUR โ | 5.26 |
37.6%
2.78
CategoryFarm Pond
Started / Completed / Phys950 / 173 / 137
Completion rate32.6%
Part A score (max 5.0)1.63 / 5.0
Ongoing sanction / booked19.95Cr / 4.56Cr
Expenditure rate (ongoing)22.9%
Part B score (max 5.0)1.14 / 5.0
Final score2.78 / 10
|
6.0%
1.87
CategoryAmrit Sarowar
Started / Completed / Phys15 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked4.47Cr / 1.67Cr
Expenditure rate (ongoing)37.4%
Part B score (max 5.0)1.87 / 5.0
Final score1.87 / 10
|
2.0%
5.84
CategoryDug Well Recharge
Started / Completed / Phys579 / 242 / 242
⚠ Works needing verification (Completed/Physically Completed)4 works (exp <30%)
Completion rate83.6%
Part A score (max 5.0)4.18 / 5.0
Ongoing sanction / booked0.23Cr / 0.08Cr
Expenditure rate (ongoing)33.1%
Part B score (max 5.0)1.66 / 5.0
Final score5.84 / 10
|
0.2%
5.63
CategoryIrrigation infrastructure
Started / Completed / Phys8 / 6 / 0
Completion rate75.0%
Part A score (max 5.0)3.75 / 5.0
Ongoing sanction / booked0.07Cr / 0.03Cr
Expenditure rate (ongoing)37.6%
Part B score (max 5.0)1.88 / 5.0
Final score5.63 / 10
|
26.1%
7.95
CategoryWater conservation & recharge
Started / Completed / Phys363 / 191 / 100
Completion rate80.2%
Part A score (max 5.0)4.01 / 5.0
Ongoing sanction / booked5.45Cr / 4.29Cr
Expenditure rate (ongoing)78.7%
Part B score (max 5.0)3.94 / 5.0
Final score7.95 / 10
|
14.5%
6.47
CategoryWatershed Related Works
Started / Completed / Phys185 / 92 / 36
Completion rate69.2%
Part A score (max 5.0)3.46 / 5.0
Ongoing sanction / booked3.54Cr / 2.13Cr
Expenditure rate (ongoing)60.3%
Part B score (max 5.0)3.01 / 5.0
Final score6.47 / 10
|
2.8%
6.67
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys50 / 31 / 10
Completion rate82.0%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.31Cr / 0.16Cr
Expenditure rate (ongoing)51.5%
Part B score (max 5.0)2.57 / 5.0
Final score6.67 / 10
|
5.7%
4.74
CategoryPMKSY: Watershed
PMKSY Works0 total (5 done / -5 ongoing)
JGSA Target4.23 Cr
JGSA Valuation2.05 Cr
Expenditure1.37 Cr
% Valuation48.4%
Valuation Marks (40%)1.94
Exp Marks (40%)1.29
Geotag Marks (10%)0.760
Physical Marks (10%)0.76
Final score4.74 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works48,737
Target Works2,150
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 50 | DEWAS โ | 5.20 |
46.7%
3.39
CategoryFarm Pond
Started / Completed / Phys1,265 / 224 / 354
⚠ Works needing verification (Completed/Physically Completed)9 works (exp <30%)
Completion rate45.7%
Part A score (max 5.0)2.28 / 5.0
Ongoing sanction / booked24.58Cr / 5.42Cr
Expenditure rate (ongoing)22.1%
Part B score (max 5.0)1.10 / 5.0
Final score3.39 / 10
|
2.3%
2.77
CategoryAmrit Sarowar
Started / Completed / Phys11 / 1 / 1
Completion rate18.2%
Part A score (max 5.0)0.91 / 5.0
Ongoing sanction / booked2.01Cr / 0.75Cr
Expenditure rate (ongoing)37.2%
Part B score (max 5.0)1.86 / 5.0
Final score2.77 / 10
|
9.4%
5.61
CategoryDug Well Recharge
Started / Completed / Phys3,472 / 1,383 / 1,424
⚠ Works needing verification (Completed/Physically Completed)39 works (exp <30%)
Completion rate80.8%
Part A score (max 5.0)4.04 / 5.0
Ongoing sanction / booked1.62Cr / 0.51Cr
Expenditure rate (ongoing)31.4%
Part B score (max 5.0)1.57 / 5.0
Final score5.61 / 10
|
3.0%
6.66
CategoryIrrigation infrastructure
Started / Completed / Phys57 / 19 / 28
Completion rate82.5%
Part A score (max 5.0)4.12 / 5.0
Ongoing sanction / booked0.42Cr / 0.21Cr
Expenditure rate (ongoing)50.8%
Part B score (max 5.0)2.54 / 5.0
Final score6.66 / 10
|
28.3%
7.16
CategoryWater conservation & recharge
Started / Completed / Phys621 / 91 / 381
Completion rate76.0%
Part A score (max 5.0)3.80 / 5.0
Ongoing sanction / booked6.47Cr / 4.35Cr
Expenditure rate (ongoing)67.2%
Part B score (max 5.0)3.36 / 5.0
Final score7.16 / 10
|
2.9%
6.45
CategoryWatershed Related Works
Started / Completed / Phys94 / 24 / 53
Completion rate81.9%
Part A score (max 5.0)4.10 / 5.0
Ongoing sanction / booked0.52Cr / 0.24Cr
Expenditure rate (ongoing)47.1%
Part B score (max 5.0)2.36 / 5.0
Final score6.45 / 10
|
1.0%
6.36
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys16 / 4 / 10
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)39.6%
Part B score (max 5.0)1.98 / 5.0
Final score6.36 / 10
|
1.5%
3.72
CategoryPMKSY: Watershed
PMKSY Works0 total (22 done / -22 ongoing)
JGSA Target1.42 Cr
JGSA Valuation0.56 Cr
Expenditure0.06 Cr
% Valuation39.3%
Valuation Marks (40%)1.57
Exp Marks (40%)0.16
Geotag Marks (10%)1.000
Physical Marks (10%)1.00
Final score3.72 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works6,534
Target Works5,536
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 51 | SHAJAPUR โ | 5.09 |
42.3%
3.28
CategoryFarm Pond
Started / Completed / Phys680 / 230 / 46
⚠ Works needing verification (Completed/Physically Completed)5 works (exp <30%)
Completion rate40.6%
Part A score (max 5.0)2.03 / 5.0
Ongoing sanction / booked11.75Cr / 2.94Cr
Expenditure rate (ongoing)25.0%
Part B score (max 5.0)1.25 / 5.0
Final score3.28 / 10
|
3.4%
2.07
CategoryAmrit Sarowar
Started / Completed / Phys9 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked1.54Cr / 0.64Cr
Expenditure rate (ongoing)41.3%
Part B score (max 5.0)2.07 / 5.0
Final score2.07 / 10
|
8.8%
5.16
CategoryDug Well Recharge
Started / Completed / Phys1,636 / 664 / 740
⚠ Works needing verification (Completed/Physically Completed)44 works (exp <30%)
Completion rate85.8%
Part A score (max 5.0)4.29 / 5.0
Ongoing sanction / booked0.45Cr / 0.08Cr
Expenditure rate (ongoing)17.3%
Part B score (max 5.0)0.87 / 5.0
Final score5.16 / 10
|
0.7%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys5 / 2 / 3
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
28.4%
6.41
CategoryWater conservation & recharge
Started / Completed / Phys290 / 93 / 113
Completion rate71.0%
Part A score (max 5.0)3.55 / 5.0
Ongoing sanction / booked3.91Cr / 2.24Cr
Expenditure rate (ongoing)57.2%
Part B score (max 5.0)2.86 / 5.0
Final score6.41 / 10
|
3.5%
7.06
CategoryWatershed Related Works
Started / Completed / Phys40 / 17 / 21
Completion rate95.0%
Part A score (max 5.0)4.75 / 5.0
Ongoing sanction / booked0.05Cr / 0.02Cr
Expenditure rate (ongoing)46.1%
Part B score (max 5.0)2.31 / 5.0
Final score7.06 / 10
|
0.9%
8.27
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys8 / 4 / 3
Completion rate87.5%
Part A score (max 5.0)4.38 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)77.8%
Part B score (max 5.0)3.89 / 5.0
Final score8.27 / 10
|
7.0%
6.66
CategoryPMKSY: Watershed
PMKSY Works0 total (15 done / -15 ongoing)
JGSA Target3.16 Cr
JGSA Valuation2.20 Cr
Expenditure1.53 Cr
% Valuation69.6%
Valuation Marks (40%)2.78
Exp Marks (40%)1.93
Geotag Marks (10%)0.940
Physical Marks (10%)1.00
Final score6.66 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works3,567
Target Works2,668
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
| 52 | NARSINGHPUR โ | 5.01 |
66.5%
3.81
CategoryFarm Pond
Started / Completed / Phys1,346 / 756 / 87
⚠ Works needing verification (Completed/Physically Completed)2 works (exp <30%)
Completion rate62.6%
Part A score (max 5.0)3.13 / 5.0
Ongoing sanction / booked13.24Cr / 1.79Cr
Expenditure rate (ongoing)13.6%
Part B score (max 5.0)0.68 / 5.0
Final score3.81 / 10
|
1.1%
0.05
CategoryAmrit Sarowar
Started / Completed / Phys2 / 0 / 0
Completion rate0.0%
Part A score (max 5.0)0.00 / 5.0
Ongoing sanction / booked0.62Cr / 0.01Cr
Expenditure rate (ongoing)0.9%
Part B score (max 5.0)0.05 / 5.0
Final score0.05 / 10
|
1.4%
5.27
CategoryDug Well Recharge
Started / Completed / Phys308 / 120 / 105
⚠ Works needing verification (Completed/Physically Completed)13 works (exp <30%)
Completion rate73.1%
Part A score (max 5.0)3.65 / 5.0
Ongoing sanction / booked0.18Cr / 0.06Cr
Expenditure rate (ongoing)32.4%
Part B score (max 5.0)1.62 / 5.0
Final score5.27 / 10
|
0.1%
10.00
CategoryIrrigation infrastructure
Started / Completed / Phys6 / 6 / 0
Completion rate100.0%
Part A score (max 5.0)5.00 / 5.0
Ongoing worksNone โ all finished โ
Part B (expenditure)Full 5.0 marks awarded
Final score10.00 / 10
|
15.2%
7.86
CategoryWater conservation & recharge
Started / Completed / Phys145 / 86 / 45
Completion rate90.3%
Part A score (max 5.0)4.52 / 5.0
Ongoing sanction / booked3.08Cr / 2.06Cr
Expenditure rate (ongoing)66.9%
Part B score (max 5.0)3.35 / 5.0
Final score7.86 / 10
|
0.5%
6.70
CategoryWatershed Related Works
Started / Completed / Phys13 / 8 / 3
Completion rate84.6%
Part A score (max 5.0)4.23 / 5.0
Ongoing sanction / booked0.04Cr / 0.02Cr
Expenditure rate (ongoing)49.3%
Part B score (max 5.0)2.47 / 5.0
Final score6.70 / 10
|
1.4%
7.44
CategoryRepair & Maintenance (Water Structures)
Started / Completed / Phys22 / 15 / 6
Completion rate95.5%
Part A score (max 5.0)4.77 / 5.0
Ongoing sanction / booked0.01Cr / 0.01Cr
Expenditure rate (ongoing)53.3%
Part B score (max 5.0)2.67 / 5.0
Final score7.44 / 10
|
8.7%
6.33
CategoryPMKSY: Watershed
PMKSY Works0 total (87 done / -87 ongoing)
JGSA Target4.79 Cr
JGSA Valuation3.62 Cr
Expenditure1.87 Cr
% Valuation75.7%
Valuation Marks (40%)3.03
Exp Marks (40%)1.56
Geotag Marks (10%)0.900
Physical Marks (10%)0.84
Final score6.33 / 10
|
5.0%
10.00
CategoryJSJB 2.0
Total Works28,725
Target Works1,842
Achievement %100.0%
Weightage5% of composite score
Final score10.00 / 10
|
Scheme: โน Sanction Weighted
Level: District
Snapshot: 2026-05-07
Units shown: 52
โก Weight % shown is each unit's own auto-computed weight โ not the global admin-set value.
โ๏ธ Step 1 โ Category Weightage
Each work category is assigned a weight based on its share of the total sanctioned cost for that district/block/GP. Categories with a higher sanction value naturally carry more importance in the ranking.
Weightage = Sanctioned Cost of Category
รท Total Sanctioned Cost (all categories)
e.g. Farm Pond = โน200 Cr out of โน500 Cr total
Weightage = 200 รท 500 = 0.40 (40%)
Computed independently per unit โ two districts with different sanction distributions will have different weightages for the same category.
๐ ฐ Step 2a โ Part A Score (Completion)
Fixed 50% weight on completion of works.
Part A = (Completed + Phys) รท Started ร 5
๐ ฑ Step 2b โ Part B Score (Expenditure)
Fixed 50% weight on expenditure booking on ongoing works.
Part B = (Ongoing Booked รท Ongoing Sanction) ร 5
If all done โ full 5 marks automatically
๐ Step 3 โ Ceiling & Model
Category Score = Part A + Part B
๐ Step 4 โ Final Composite Score
Weighted sum of all category scores (weightages sum to 100%).
Final Score = ฮฃ (Weightage_i ร Score_i)
Example: Farm Pond 40% ร 7.2 + Dug Well 20% ร 6.5 + Amrit Sarovar 40% ร 8.1 โ 7.42
๐ก Tip: Click any district/block name to see its full score breakup table. Hover over any score cell for a step-by-step tooltip.